Loading...
HomeMy WebLinkAboutRM-2025-014 - C1.1 SITE PLANGSPublisherVersion 1183.0.54.25 N SITE PLAN 2PAGE: 9/17/2025 22 THIS DRAWING AS AN INSTRUMENTOF SERVICE, IS AND SHALL REMAIN THE PROPERTY OF THE DESIGNER AND SHALL NOT BE REPRODUCED, PUBLISHED, OR USED IN ANY WAY WITHOUT THE PERMISSION OF THE DESIGNER. BID DATE PLAN CHECK FINAL PERMIT REVISIONS DATE C1.1 CHIEN CHIH HUANG & SZU HUA LI 10329 COLBY AVE CUPERTINO, CA 95014 Wednesday, September 17, 2025 NOTE: DIMENSIONS SHOWN ARE MINIMUM AND ARE INTENDED TO BE APPROXIMATE TO ALLOW FOR REASONABLE TOLERANCES DUE TO FIELD CONDITIONS. APN NUMBER PLAN PREPARED BY: CHIA CHI CHANG 1422 S 4TH ST ALHAMBRA, CA 91803 (949) 423-4651 CHIADESIGN.US@GMAIL.COM 316-290-25 7'-3 1/4" 7'-0" 15 ' - 0 " 28 ' - 2 " 5' MA X 18'-0" 20'-5 1/2" 11'-6 1/2" 10 ' - 0 " 8'-1" 19 ' - 4 " 27 ' - 3 / 4 " 3'-0" 4' - 0 " 200 AMP ELECTRICAL PANEL (N) PLCO 4" DIM MIN SEE DETAIL ATTACHED ON SHEET A-2/ (E) LOCATION OF GAS METER TEMP STRAW WATTLES DURING CONSTRUCTION THE GROUND IS REQUIRED TO SLOPE AWAY FROM THE BUILDING'S FOUNDATIONS A MIN OF 5% FOR A DISTANCE OF 10-FT. TEMP STRAW WATTLES DURING CONSTRUCTION (E) OUTDOOR LIGHTING (E) OUTDOOR LIGHTING BUILDING SEWER CLEANOUT WITHIN 2-FEET OF THE FOUNDATION. REQUIRED PER SECTION 202 AND 707 OF THE CPC. (N) REPRESENTS WALLS BELOW THE GROUND IS REQUIRED TO SLOPE AWAY FROM THE BUILDING'S FOUNDATIONS A MIN OF 5% FOR A DISTANCE OF 10-FT. NEW LOCATION FOR (E)OUTDOOR CONDENSER CONDENSERS MUST HAVE A MINIMUM 5 FT CLEARANCE FROM DRYER VENT OUTLETS PER CENC §150.0(H)3. CONCRETE DRIVEWAY PR O P E R T Y LI N E : 91 .88 ' N89 °17 '00 "E PR O P E R T Y LI N E : 91 .94 ' N88 °41 '00 "E PROPERTY LINE: 80' N0°43'00"W 112 MAPS 40 LOT 84 7,500 SQ.FT MAIN ENTRANCE PROPERTY LINE: 83.26' N0°43'00"W SIDE WALK PLANTER CURB BURLINGAME AVE WM N GRASS GRASS (P) ADDITION COVER AREA 690 SQ.FT TO TH E PU B L I C MA I N SE W E R W W W OHE OHE OHE OHE 10 ' RE A R SE T B A C K SITE SETBACK 10' REAR SETBACK L L L L L L (E) SHED 8'x14' REMAIN RELOCATE PODOCARPUS MACROPHYLLUS 4"DIAMETER 8'HEIGHT TO BE REMOVED CAMPHOR TREE 10.5"DIAMETER 12'HEIGHT 713 SQ.FT HVAC (P) ADDITION FLOOR AREA 786 SQ.FT 10 ' - 0 " 10 ' - 0 " 18.8' 8'-0" 7'-0" 15 ' - 0 " 28 ' - 2 " 200 AMP ELECTRICAL PANEL CONCRETE DRIVEWAY PR O P E R T Y LI N E : 91 .88 ' N89 °17 '00 "E PR O P E R T Y LI N E : 91 .94 ' N88 °41 '00 "E PROPERTY LINE: 80' N0°43'00"W 112 MAPS 40 LOT 84 7,500 SQ.FT MAIN ENTRANCE PROPERTY LINE: 83.26' N0°43'00"W GM SIDE WALK PLANTER BURLINGAME AVE WM (E)HVAC GRASS GRASS CURB N (E) SHED 8'x14' REMAIN TO BE REMOVED CAMPHOR TREE 10.5"DIAMETER 12'HEIGHTPODOCARPUS MACROPHYLLUS 4"DIAMETER 8'HEIGHT TO BE REMOVED CAMPHOR TREE 10.5"DIAMETER 12'HEIGHT (E) MAIN HOUSE COVERAGE 2,256 SQ.FT SITE LEGEND NEW ADDITION EXISTING WALL LEGEND GRASS PROPERTY LINE FENCE CONCRETE PROPERTY LINE Cupertino Sanitary Permit # : 24-168 Page 2 Cupertino Building Department # : BLD-2024-1630 PERMITS HAVE EXPIRATION DATE OF 1 YEAR FROM DATE OF APPROVAL. IF REFILING FOR PERMIT APPLICATION AFTER YEAR IS UP, NEW PERMIT FEES MUST BE PAID BY APPLICANT. SUPPLYING SANITARY SEWERAGE SERVICES FOR: CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, LOS ALTOS AND SURROUNDING UNINCORPORATED AREAS Conditions/Requirements to be met during construction: Install new property line cleanout to District’s standards. See attached detail. Property line cleanout must be within 5 feet of the property line. Cleanout shall be the same diameter as the street portion of the service lateral. Gravity lateral is 4” diameter. (O.C. 4101) - Current PLCO has offset. Cupertino Sanitary District Initial (Visual) Inspection required. Contractor shall leave new pipe installation exposed. Do not backfill. Owner to contact District 48 hours prior to scheduling a District Inspector for a visual inspection. (O.C. 5203) Cupertino Sanitary District Final (CCTV) Inspection and Approval of the new property line cleanout, point of connection, and District lateral is required prior to clearance for City of Cupertino Final Inspection. Owner must allow District at least 48 hours’ notice to schedule a District Inspector for a video inspection. District to provide Building Department with written notification upon completion of inspection. (O.C. 7102) Additional Comments: • Storm water surface or roof drains and other general surface water runoff, shall not be discharged to the sanitary sewer. • The Cupertino Sanitary District recommends installing the required improvements near the beginning of the project in case any unforeseen issues arise with the installations. • The applicant may potentially be required to upgrade their sanitary sewer lower lateral if the District finds the structural conditions of the pipe to be unsatisfactory. The District permit counter is open from 10AM to 3PM. Fees can be paid at the District office located at 20863 Stevens Creek Boulevard, Suite 100 in Cupertino, CA by cash, check (payable to “Cupertino Sanitary District”), or credit card. Payment via credit card can be made over the phone. Please contact Frankie Martinez at (408) 477-7300 to process your credit card payment. Please call (408) 253-7071 to schedule an inspection. All conditions, requirements and recommendations are to be completed at the (owner/developer)’s expense. Approval of Cupertino Sanitary District permit form does not grant permission to start construction on a project. Construction may be started once Building Department clears all permits from all required departments. If you have any questions or need additional information, please contact Jennifer Quach via email at jquach@markthomas.com Regards, For: Benjamin T. Porter, P.E. District Manager-Engineer N:\CUSD\Permits & Fees\Permits - Developments\2024\24-168_BLD-2024-1630_10329 Colby Ave\24-168_S1_BLD-2024- 1630_10329 Colby Ave.docx GSPublisherVersion 895.0.57.25 N SITE PLAN 2PAGE: 12/3/2024 22 THIS DRAWING AS AN INSTRUMENTOF SERVICE, IS AND SHALL REMAIN THE PROPERTY OF THE DESIGNER AND SHALL NOT BE REPRODUCED, PUBLISHED, OR USED IN ANY WAY WITHOUT THE PERMISSION OF THE DESIGNER. BID DATE PLAN CHECK FINAL PERMIT REVISIONS DATE C1.1 CHIEN CHIH HUANG & SZU HUA LI 10329 COLBY AVE CUPERTINO, CA 95014 Tuesday, December 3, 2024 NOTE: DIMENSIONS SHOWN ARE MINIMUM AND ARE INTENDED TO BE APPROXIMATE TO ALLOW FOR REASONABLE TOLERANCES DUE TO FIELD CONDITIONS. APN NUMBER PLAN PREPARED BY: CHIA CHI CHANG 1422 S 4TH ST ALHAMBRA, CA 91803 (949) 423-4651 CHIADESIGN.US@GMAIL.COM 316-290-25 18.8' 7'-0" 15 ' - 0 " 28 ' - 2 " 5'-8 1/4" 5' MA X 18'-0" 5'-0" 4'-8 3/4" 4'-0" 200 AMP ELECTRICAL PANEL (N) REPRESENTS WALLS BELOW (N) ROOF EAVE (N) PLCO 4" DIM MIN SEE DETAIL ATTACHED ON SHEET A-2/ (N) LOCATION OF GAS METER THE GROUND IS REQUIRED TO SLOPE AWAY FROM THE BUILDING'S FOUNDATIONS A MIN OF 5% FOR A DISTANCE OF 10-FT. THE GROUND IS REQUIRED TO SLOPE AWAY FROM THE BUILDING'S FOUNDATION S A MIN OF 5% FOR A DISTANCE OF 10-FT. TEMP STRAW WATTLES DURING CONSTRUCTION TEMP STRAW WATTLES DURING CONSTRUCTION THE GROUND IS REQUIRED TO SLOPE AWAY FROM THE BUILDING'S FOUNDATIONS A MIN OF 5% FOR A DISTANCE OF 10-FT. TEMP STRAW WATTLES DURING CONSTRUCTION (P) OUTDOOR LIGHTING (P) OUTDOOR LIGHTING(P) OUTDOOR LIGHTING (E) OUTDOOR LIGHTING (E) OUTDOOR LIGHTING BUILDING SEWER CLEANOUT WITHIN 2-FEET OF THE FOUNDATION. REQUIRED PER SECTION 202 AND 707 OF THE CPC.CONCRETE DRIVEWAY PR O P E R T Y LI N E : 91 .88 ' N89 °17 '00 "E PR O P E R T Y LI N E : 91 .94 ' N88 °41 '00 "E PROPERTY LINE: 80' N0°43'00"W 112 MAPS 40 LOT 84 7,500 SQ.FT MAIN ENTRANCE PROPERTY LINE: 83.26' N0°43'00"W SIDE WALK PLANTER CURB BURLINGAME AVE WM N HVAC GRASS GRASS (P) ADDITION 46 SQ.FT (P) ADDITION 141 SQ.FT TO TH E PU B L I C MA I N SE W E R W W W OHE OHE OHE OHE (P) ADDITION 141 SQ.FT 18.8' 8'-0" 7'-0" 15 ' - 0 " 28 ' - 2 " 200 AMP ELECTRICAL PANEL CONCRETE DRIVEWAY PR O P E R T Y LI N E : 91 .88 ' N89 °17 '00 "E PR O P E R T Y LI N E : 91 .94 ' N88 °41 '00 "E PROPERTY LINE: 80' N0°43'00"W 112 MAPS 40 LOT 84 7,500 SQ.FT MAIN ENTRANCE PROPERTY LINE: 83.26' N0°43'00"W GM SIDE WALK PLANTER BURLINGAME AVE WM HVAC GRASS GRASS CURB N SITE LEGEND NEW ADDITION EXISTING WALL LEGEND GRASS PROPERTY LINE FENCE CONCRETE PROPERTY LINE Cupertino Sanitary Permit # : 24-168 Page 2 Cupertino Building Department # : BLD-2024-1630 PERMITS HAVE EXPIRATION DATE OF 1 YEAR FROM DATE OF APPROVAL. IF REFILING FOR PERMIT APPLICATION AFTER YEAR IS UP, NEW PERMIT FEES MUST BE PAID BY APPLICANT. SUPPLYING SANITARY SEWERAGE SERVICES FOR: CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, LOS ALTOS AND SURROUNDING UNINCORPORATED AREAS Conditions/Requirements to be met during construction: Install new property line cleanout to District’s standards. See attached detail. Property line cleanout must be within 5 feet of the property line. Cleanout shall be the same diameter as the street portion of the service lateral. Gravity lateral is 4” diameter. (O.C. 4101) - Current PLCO has offset. Cupertino Sanitary District Initial (Visual) Inspection required. Contractor shall leave new pipe installation exposed. Do not backfill. Owner to contact District 48 hours prior to scheduling a District Inspector for a visual inspection. (O.C. 5203) Cupertino Sanitary District Final (CCTV) Inspection and Approval of the new property line cleanout, point of connection, and District lateral is required prior to clearance for City of Cupertino Final Inspection. Owner must allow District at least 48 hours’ notice to schedule a District Inspector for a video inspection. District to provide Building Department with written notification upon completion of inspection. (O.C. 7102) Additional Comments: • Storm water surface or roof drains and other general surface water runoff, shall not be discharged to the sanitary sewer. • The Cupertino Sanitary District recommends installing the required improvements near the beginning of the project in case any unforeseen issues arise with the installations. • The applicant may potentially be required to upgrade their sanitary sewer lower lateral if the District finds the structural conditions of the pipe to be unsatisfactory. The District permit counter is open from 10AM to 3PM. Fees can be paid at the District office located at 20863 Stevens Creek Boulevard, Suite 100 in Cupertino, CA by cash, check (payable to “Cupertino Sanitary District”), or credit card. Payment via credit card can be made over the phone. Please contact Frankie Martinez at (408) 477-7300 to process your credit card payment. Please call (408) 253-7071 to schedule an inspection. All conditions, requirements and recommendations are to be completed at the (owner/developer)’s expense. Approval of Cupertino Sanitary District permit form does not grant permission to start construction on a project. Construction may be started once Building Department clears all permits from all required departments. If you have any questions or need additional information, please contact Jennifer Quach via email at jquach@markthomas.com Regards, For: Benjamin T. Porter, P.E. District Manager-Engineer N:\CUSD\Permits & Fees\Permits - Developments\2024\24-168_BLD-2024-1630_10329 Colby Ave\24-168_S1_BLD-2024- 1630_10329 Colby Ave.docx R2 SCALE: 1/8" = 1'-0"2PROPOSED SITE PLAN SCALE: 1/8" = 1'-0"1EXISTING SITE PLAN NOT TO SCALE 3PLCO INSTALL DETAILS " THIS SITE PLAN IS PREPARED BASED ON THE BOUNDARY SURVEY PREPARED BY THE PROJECT'S LICENSED SURVEYOR" DATE: 07/22/2024 SURVEYOR: ZHEN WANG 2 Light Wall Cylinder Black 9244BK (Black) Project Name: Location: Type: Qty: Comments: Certifications/Qualifications Location Ra ting Damp Warranty www.kichler.com/warra nty Dimensions Base Ba ckplate 5.00 X 4 .75 Extension 7.00" Weight 1.65 LBS Height from center of Wa ll opening (Spec Sheet) 6.00" Height 12.00" Width 4.75" Mounting/Installation Interior/Exterior Exterior Mounting Style Wall Mount Mounting Weight 1.65 LBS Primary Lamping Lam p Included Not Included Lam p Type BR30 Light Source Incadescent Max or Nominal Watt 65W # of Bulbs/LED Modules 2 Socket Type Medium Socket Wire 105 Product/Ordering Information SKU 9244BK Finish Black Style Contemporary UPC 783927536790 Specifications Material ALUMINUM Kichler 7711 East Pleasant Valley Road Cleveland, Ohio 44131-8010 Toll free: 866.558.5706 or kichler.com Notes: 1) Information provided is subject to change without notice. All values are design or typical values when measured under laboratory conditions. 2) Incandescent Equivalent: The incandescent equivalent as presented is an approximate number and is for reference only. R2 R2 SCALE: 1/8" = 1'-0"2PROPOSED SITE PLAN SCALE: 1/8" = 1'-0"1EXISTING SITE PLAN NOT TO SCALE 3PLCO INSTALL DETAILS SCALE: 1:1.43 4EXTERIOR FRONT LIGHTING " THIS SITE PLAN IS PREPARED BASED ON THE BOUNDARY SURVEY PREPARED BY THE PROJECT'S LICENSED SURVEYOR" DATE: 07/22/2024 SURVEYOR: ZHEN WANG (E) FRONT DOOR OUTDOOR LIGHTING (E) GARAGE SIDE DOOR LIGHTING COLBY AVE COLBY AVE (P) OUTDOOR LIGHTINGL NO EXISTING LANDSCAPING WILL BE REMOVED OR REPLACED AS PART OF THIS PROJECT (P) FLOOR AREA ADDITION IMPERVIOUS CALCULATION: REAR YARD SETBACK AREA: 20'x83.26'= 1,665.2 SQ.FT ADDITION IN SETBACK: 18'-7"x10' IRREGULAR 183'+112(E) SHED 112'/1,665.2'=17.71%