HomeMy WebLinkAboutRM-2025-014 - C1.1 SITE PLANGSPublisherVersion 1183.0.54.25
N
SITE PLAN
2PAGE:
9/17/2025
22
THIS DRAWING AS AN INSTRUMENTOF
SERVICE, IS AND SHALL REMAIN THE
PROPERTY OF THE DESIGNER AND
SHALL NOT BE REPRODUCED,
PUBLISHED, OR USED IN ANY WAY
WITHOUT THE PERMISSION OF THE
DESIGNER.
BID DATE
PLAN CHECK
FINAL PERMIT
REVISIONS
DATE
C1.1
CHIEN CHIH HUANG
&
SZU HUA LI
10329 COLBY AVE
CUPERTINO, CA 95014
Wednesday, September 17, 2025
NOTE: DIMENSIONS SHOWN ARE MINIMUM AND ARE INTENDED TO BE APPROXIMATE TO ALLOW FOR REASONABLE TOLERANCES DUE TO FIELD CONDITIONS.
APN NUMBER
PLAN PREPARED BY:
CHIA CHI CHANG
1422 S 4TH ST ALHAMBRA, CA 91803
(949) 423-4651
CHIADESIGN.US@GMAIL.COM
316-290-25
7'-3 1/4"
7'-0"
15
'
-
0
"
28
'
-
2
"
5'
MA
X
18'-0"
20'-5 1/2"
11'-6 1/2"
10
'
-
0
"
8'-1"
19
'
-
4
"
27
'
-
3
/
4
"
3'-0"
4'
-
0
"
200 AMP
ELECTRICAL PANEL
(N) PLCO 4" DIM MIN
SEE DETAIL ATTACHED
ON SHEET A-2/
(E) LOCATION
OF GAS METER
TEMP STRAW WATTLES
DURING CONSTRUCTION
THE GROUND IS REQUIRED TO
SLOPE AWAY FROM THE
BUILDING'S FOUNDATIONS A
MIN OF 5% FOR A DISTANCE
OF 10-FT.
TEMP STRAW
WATTLES DURING
CONSTRUCTION
(E)
OUTDOOR
LIGHTING
(E)
OUTDOOR
LIGHTING
BUILDING SEWER CLEANOUT
WITHIN 2-FEET OF THE
FOUNDATION. REQUIRED
PER SECTION 202 AND 707
OF THE CPC.
(N) REPRESENTS
WALLS BELOW
THE GROUND IS REQUIRED TO
SLOPE AWAY FROM THE
BUILDING'S FOUNDATIONS A
MIN OF 5% FOR A DISTANCE
OF 10-FT.
NEW LOCATION FOR
(E)OUTDOOR CONDENSER
CONDENSERS MUST HAVE A
MINIMUM 5 FT CLEARANCE
FROM DRYER VENT OUTLETS
PER CENC §150.0(H)3.
CONCRETE
DRIVEWAY
PR
O
P
E
R
T
Y
LI
N
E
:
91
.88
'
N89
°17
'00
"E
PR
O
P
E
R
T
Y
LI
N
E
:
91
.94
'
N88
°41
'00
"E
PROPERTY LINE: 80'
N0°43'00"W
112 MAPS 40
LOT 84
7,500 SQ.FT
MAIN
ENTRANCE
PROPERTY LINE: 83.26'
N0°43'00"W
SIDE WALK
PLANTER
CURB
BURLINGAME AVE
WM
N
GRASS
GRASS (P) ADDITION
COVER AREA
690 SQ.FT
TO
TH
E
PU
B
L
I
C
MA
I
N
SE
W
E
R
W
W
W
OHE
OHE
OHE
OHE
10
'
RE
A
R
SE
T
B
A
C
K
SITE SETBACK
10' REAR SETBACK
L L
L
L
L L
(E) SHED
8'x14'
REMAIN
RELOCATE
PODOCARPUS
MACROPHYLLUS
4"DIAMETER
8'HEIGHT
TO BE REMOVED
CAMPHOR TREE
10.5"DIAMETER
12'HEIGHT
713 SQ.FT
HVAC
(P) ADDITION
FLOOR AREA
786 SQ.FT
10
'
-
0
"
10
'
-
0
"
18.8'
8'-0"
7'-0"
15
'
-
0
"
28
'
-
2
"
200 AMP
ELECTRICAL PANEL
CONCRETE
DRIVEWAY
PR
O
P
E
R
T
Y
LI
N
E
:
91
.88
'
N89
°17
'00
"E
PR
O
P
E
R
T
Y
LI
N
E
:
91
.94
'
N88
°41
'00
"E
PROPERTY LINE: 80'
N0°43'00"W
112 MAPS 40
LOT 84
7,500 SQ.FT
MAIN
ENTRANCE
PROPERTY LINE: 83.26'
N0°43'00"W
GM
SIDE WALK
PLANTER
BURLINGAME AVE
WM
(E)HVAC
GRASS
GRASS
CURB
N
(E) SHED
8'x14'
REMAIN
TO BE REMOVED
CAMPHOR TREE
10.5"DIAMETER
12'HEIGHTPODOCARPUS
MACROPHYLLUS
4"DIAMETER
8'HEIGHT
TO BE REMOVED
CAMPHOR TREE
10.5"DIAMETER
12'HEIGHT
(E) MAIN HOUSE COVERAGE
2,256 SQ.FT
SITE LEGEND
NEW ADDITION
EXISTING
WALL LEGEND
GRASS
PROPERTY LINE
FENCE
CONCRETE
PROPERTY LINE
Cupertino Sanitary Permit # : 24-168 Page 2
Cupertino Building Department # : BLD-2024-1630
PERMITS HAVE EXPIRATION DATE OF 1 YEAR FROM DATE OF APPROVAL. IF REFILING FOR PERMIT APPLICATION AFTER YEAR IS UP, NEW PERMIT FEES MUST
BE PAID BY APPLICANT.
SUPPLYING SANITARY SEWERAGE SERVICES FOR:
CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, LOS ALTOS AND SURROUNDING UNINCORPORATED AREAS
Conditions/Requirements to be met during construction:
Install new property line cleanout to District’s standards. See attached detail. Property line
cleanout must be within 5 feet of the property line. Cleanout shall be the same diameter as the
street portion of the service lateral. Gravity lateral is 4” diameter. (O.C. 4101)
- Current PLCO has offset.
Cupertino Sanitary District Initial (Visual) Inspection required. Contractor shall leave new pipe
installation exposed. Do not backfill. Owner to contact District 48 hours prior to scheduling a
District Inspector for a visual inspection. (O.C. 5203)
Cupertino Sanitary District Final (CCTV) Inspection and Approval of the new property line
cleanout, point of connection, and District lateral is required prior to clearance for City of
Cupertino Final Inspection. Owner must allow District at least 48 hours’ notice to schedule a
District Inspector for a video inspection. District to provide Building Department with written
notification upon completion of inspection. (O.C. 7102)
Additional Comments:
• Storm water surface or roof drains and other general surface water runoff, shall not be
discharged to the sanitary sewer.
• The Cupertino Sanitary District recommends installing the required improvements near
the beginning of the project in case any unforeseen issues arise with the installations.
• The applicant may potentially be required to upgrade their sanitary sewer lower lateral if
the District finds the structural conditions of the pipe to be unsatisfactory.
The District permit counter is open from 10AM to 3PM. Fees can be paid at the District
office located at 20863 Stevens Creek Boulevard, Suite 100 in Cupertino, CA by cash, check
(payable to “Cupertino Sanitary District”), or credit card. Payment via credit card can be
made over the phone. Please contact Frankie Martinez at (408) 477-7300 to process your
credit card payment. Please call (408) 253-7071 to schedule an inspection.
All conditions, requirements and recommendations are to be completed at the
(owner/developer)’s expense. Approval of Cupertino Sanitary District permit form does not grant
permission to start construction on a project. Construction may be started once Building
Department clears all permits from all required departments. If you have any questions or need
additional information, please contact Jennifer Quach via email at jquach@markthomas.com
Regards,
For: Benjamin T. Porter, P.E.
District Manager-Engineer
N:\CUSD\Permits & Fees\Permits - Developments\2024\24-168_BLD-2024-1630_10329 Colby Ave\24-168_S1_BLD-2024-
1630_10329 Colby Ave.docx
GSPublisherVersion 895.0.57.25
N
SITE PLAN
2PAGE:
12/3/2024
22
THIS DRAWING AS AN INSTRUMENTOF
SERVICE, IS AND SHALL REMAIN THE
PROPERTY OF THE DESIGNER AND
SHALL NOT BE REPRODUCED,
PUBLISHED, OR USED IN ANY WAY
WITHOUT THE PERMISSION OF THE
DESIGNER.
BID DATE
PLAN CHECK
FINAL PERMIT
REVISIONS
DATE
C1.1
CHIEN CHIH HUANG
&
SZU HUA LI
10329 COLBY AVE
CUPERTINO, CA 95014
Tuesday, December 3, 2024
NOTE: DIMENSIONS SHOWN ARE MINIMUM AND ARE INTENDED TO BE APPROXIMATE TO ALLOW FOR REASONABLE TOLERANCES DUE TO FIELD CONDITIONS.
APN NUMBER
PLAN PREPARED BY:
CHIA CHI CHANG
1422 S 4TH ST ALHAMBRA, CA 91803
(949) 423-4651
CHIADESIGN.US@GMAIL.COM
316-290-25
18.8'
7'-0"
15
'
-
0
"
28
'
-
2
"
5'-8 1/4"
5'
MA
X
18'-0"
5'-0"
4'-8 3/4"
4'-0"
200 AMP
ELECTRICAL PANEL
(N) REPRESENTS
WALLS BELOW
(N) ROOF EAVE
(N) PLCO 4" DIM MIN
SEE DETAIL ATTACHED
ON SHEET A-2/
(N) LOCATION
OF GAS METER
THE GROUND IS
REQUIRED TO SLOPE
AWAY FROM THE
BUILDING'S
FOUNDATIONS A MIN
OF 5% FOR A
DISTANCE OF 10-FT.
THE GROUND
IS REQUIRED
TO SLOPE
AWAY FROM
THE
BUILDING'S
FOUNDATION
S A MIN OF
5% FOR A
DISTANCE OF
10-FT.
TEMP STRAW
WATTLES DURING
CONSTRUCTION
TEMP STRAW
WATTLES DURING
CONSTRUCTION
THE GROUND IS
REQUIRED TO SLOPE
AWAY FROM THE
BUILDING'S
FOUNDATIONS A MIN
OF 5% FOR A
DISTANCE OF 10-FT.
TEMP STRAW
WATTLES DURING
CONSTRUCTION
(P) OUTDOOR LIGHTING
(P) OUTDOOR LIGHTING(P) OUTDOOR LIGHTING
(E)
OUTDOOR
LIGHTING
(E)
OUTDOOR
LIGHTING
BUILDING SEWER CLEANOUT
WITHIN 2-FEET OF THE
FOUNDATION. REQUIRED
PER SECTION 202 AND 707
OF THE CPC.CONCRETE
DRIVEWAY
PR
O
P
E
R
T
Y
LI
N
E
:
91
.88
'
N89
°17
'00
"E
PR
O
P
E
R
T
Y
LI
N
E
:
91
.94
'
N88
°41
'00
"E
PROPERTY LINE: 80'
N0°43'00"W
112 MAPS 40
LOT 84
7,500 SQ.FT
MAIN
ENTRANCE
PROPERTY LINE: 83.26'
N0°43'00"W
SIDE WALK
PLANTER
CURB
BURLINGAME AVE
WM
N
HVAC
GRASS
GRASS
(P) ADDITION
46 SQ.FT
(P) ADDITION
141 SQ.FT
TO
TH
E
PU
B
L
I
C
MA
I
N
SE
W
E
R
W
W
W
OHE
OHE
OHE
OHE
(P) ADDITION
141 SQ.FT
18.8'
8'-0"
7'-0"
15
'
-
0
"
28
'
-
2
"
200 AMP
ELECTRICAL PANEL
CONCRETE
DRIVEWAY
PR
O
P
E
R
T
Y
LI
N
E
:
91
.88
'
N89
°17
'00
"E
PR
O
P
E
R
T
Y
LI
N
E
:
91
.94
'
N88
°41
'00
"E
PROPERTY LINE: 80'
N0°43'00"W
112 MAPS 40
LOT 84
7,500 SQ.FT
MAIN
ENTRANCE
PROPERTY LINE: 83.26'
N0°43'00"W
GM
SIDE WALK
PLANTER
BURLINGAME AVE
WM
HVAC
GRASS
GRASS
CURB
N
SITE LEGEND
NEW ADDITION
EXISTING
WALL LEGEND
GRASS
PROPERTY LINE
FENCE
CONCRETE
PROPERTY LINE
Cupertino Sanitary Permit # : 24-168 Page 2
Cupertino Building Department # : BLD-2024-1630
PERMITS HAVE EXPIRATION DATE OF 1 YEAR FROM DATE OF APPROVAL. IF REFILING FOR PERMIT APPLICATION AFTER YEAR IS UP, NEW PERMIT FEES MUST
BE PAID BY APPLICANT.
SUPPLYING SANITARY SEWERAGE SERVICES FOR:
CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, LOS ALTOS AND SURROUNDING UNINCORPORATED AREAS
Conditions/Requirements to be met during construction:
Install new property line cleanout to District’s standards. See attached detail. Property line
cleanout must be within 5 feet of the property line. Cleanout shall be the same diameter as the
street portion of the service lateral. Gravity lateral is 4” diameter. (O.C. 4101)
- Current PLCO has offset.
Cupertino Sanitary District Initial (Visual) Inspection required. Contractor shall leave new pipe
installation exposed. Do not backfill. Owner to contact District 48 hours prior to scheduling a
District Inspector for a visual inspection. (O.C. 5203)
Cupertino Sanitary District Final (CCTV) Inspection and Approval of the new property line
cleanout, point of connection, and District lateral is required prior to clearance for City of
Cupertino Final Inspection. Owner must allow District at least 48 hours’ notice to schedule a
District Inspector for a video inspection. District to provide Building Department with written
notification upon completion of inspection. (O.C. 7102)
Additional Comments:
• Storm water surface or roof drains and other general surface water runoff, shall not be
discharged to the sanitary sewer.
• The Cupertino Sanitary District recommends installing the required improvements near
the beginning of the project in case any unforeseen issues arise with the installations.
• The applicant may potentially be required to upgrade their sanitary sewer lower lateral if
the District finds the structural conditions of the pipe to be unsatisfactory.
The District permit counter is open from 10AM to 3PM. Fees can be paid at the District
office located at 20863 Stevens Creek Boulevard, Suite 100 in Cupertino, CA by cash, check
(payable to “Cupertino Sanitary District”), or credit card. Payment via credit card can be
made over the phone. Please contact Frankie Martinez at (408) 477-7300 to process your
credit card payment. Please call (408) 253-7071 to schedule an inspection.
All conditions, requirements and recommendations are to be completed at the
(owner/developer)’s expense. Approval of Cupertino Sanitary District permit form does not grant
permission to start construction on a project. Construction may be started once Building
Department clears all permits from all required departments. If you have any questions or need
additional information, please contact Jennifer Quach via email at jquach@markthomas.com
Regards,
For: Benjamin T. Porter, P.E.
District Manager-Engineer
N:\CUSD\Permits & Fees\Permits - Developments\2024\24-168_BLD-2024-1630_10329 Colby Ave\24-168_S1_BLD-2024-
1630_10329 Colby Ave.docx
R2
SCALE: 1/8" = 1'-0"2PROPOSED SITE PLAN
SCALE: 1/8" = 1'-0"1EXISTING SITE PLAN
NOT TO SCALE 3PLCO INSTALL DETAILS
" THIS SITE PLAN IS PREPARED BASED ON THE BOUNDARY
SURVEY PREPARED BY THE PROJECT'S LICENSED SURVEYOR"
DATE: 07/22/2024
SURVEYOR: ZHEN WANG
2 Light Wall Cylinder Black
9244BK (Black)
Project Name:
Location:
Type:
Qty:
Comments:
Certifications/Qualifications
Location Ra ting Damp
Warranty www.kichler.com/warra nty
Dimensions
Base Ba ckplate 5.00 X 4 .75
Extension 7.00"
Weight 1.65 LBS
Height from center of Wa ll
opening (Spec Sheet)
6.00"
Height 12.00"
Width 4.75"
Mounting/Installation
Interior/Exterior Exterior
Mounting Style Wall Mount
Mounting Weight 1.65 LBS
Primary Lamping
Lam p Included Not Included
Lam p Type BR30
Light Source Incadescent
Max or Nominal Watt 65W
# of Bulbs/LED Modules 2
Socket Type Medium
Socket Wire 105
Product/Ordering Information
SKU 9244BK
Finish Black
Style Contemporary
UPC 783927536790
Specifications
Material ALUMINUM
Kichler
7711 East Pleasant Valley Road Cleveland, Ohio 44131-8010
Toll free: 866.558.5706 or kichler.com
Notes:
1) Information provided is subject to change without notice.
All values are design or typical values when measured under
laboratory conditions.
2) Incandescent Equivalent: The incandescent equivalent as
presented is an approximate number and is for reference
only.
R2
R2
SCALE: 1/8" = 1'-0"2PROPOSED SITE PLAN
SCALE: 1/8" = 1'-0"1EXISTING SITE PLAN
NOT TO SCALE 3PLCO INSTALL DETAILS
SCALE: 1:1.43 4EXTERIOR FRONT LIGHTING
" THIS SITE PLAN IS PREPARED BASED ON THE BOUNDARY
SURVEY PREPARED BY THE PROJECT'S LICENSED SURVEYOR"
DATE: 07/22/2024
SURVEYOR: ZHEN WANG
(E) FRONT DOOR OUTDOOR
LIGHTING
(E) GARAGE
SIDE DOOR LIGHTING
COLBY AVE COLBY AVE
(P) OUTDOOR LIGHTINGL
NO EXISTING LANDSCAPING WILL BE REMOVED
OR REPLACED AS PART OF THIS PROJECT
(P) FLOOR AREA ADDITION
IMPERVIOUS CALCULATION:
REAR YARD SETBACK AREA:
20'x83.26'= 1,665.2 SQ.FT
ADDITION IN SETBACK:
18'-7"x10' IRREGULAR
183'+112(E) SHED 112'/1,665.2'=17.71%