CITY COUNCIL INFORMATIONAL MEMORANDUM
Date: January 30, 2026
To: Cupertino City Council
From: Chad Mosley, Director of Public Works
Re: Photovoltaic Systems Design and Installation (PV) Project, Design Update
Background
The Capital Improvement Program (CIP) Photovoltaic Systems Design and Installation (PV)
Project was approved by the City Council as part of the Fiscal Year (FY) 24-25 annual budget. On
December 3, 2024, the conceptual design for three sites - Community Hall, Cupertino Sports
Center, and Quinlan Community Center – was approved. At the February 4, 2025, Council
meeting, the Design Build Entity (DBE) contract for the PV project was awarded to Syserco
Energy Solutions, Inc. (SES). The staff reports and minutes from those meetings are available
online via the City’s website. https://cupertino.legistar.com/Calendar.aspx
The conceptual design approved by Council in December 2024 included a conceptual layout at
all three sites. The layouts at Community Hall and Cupertino Sports Center remain unchanged
as the project enters construction.
The conceptual design approved at Quinlan Community Center included PV panels on the roof
of QCC, a carport in the Alves parking lot and shade structures above the Memorial Park central
picnic area. When the DBE contract was awarded, the conceptual design in that area had been
revised to include only a carport in the Alves parking lot and shade structures above the
Memorial Park central picnic area, accepting a suggestion from SES to reduce costs.
The schematic design of the project was initiated after execution of the DBE contract. Syserco
submitted options for the shade structures above the Memorial Park central picnic area. The
aesthetic designs and the costs for the system over the picnic area were not acceptable. Two of
the options received are pictured below (see Figure 1 and 2).
Figure 1: April 2025 option, Plan and 3D illustration
Figure 2: June 2025 option, Plan view
The City worked with SES to consider many options for the Memorial Park central picnic area
(Attachment B). After an extensive process, it was determined the most economical and
reasonable option was an extended carport in the Alves parking lot. This solution stays within
budget, meets NEM2.0 requirements, and consolidates the panels into a single installation (see
Figure 3). While the carport’s footprint will increase, and additional optimization equipment will
be needed to address shading from nearby trees, this approach results in a $70,000 cost savings
and minimizes disruption to Memorial Park, as construction will be confined to one area. The
proposed design is currently under review and may undergo minor adjustments, but the project
will move forward with this single-site installation.
Figure 3: October 2025 construction plan
The second phase of work for this site begins in late January and will continue until mid-April
2026. Attachment A illustrates the plans for the three sites.
If there is a desire for the design to be more aesthetically appealing and blend in better with the
surroundings, after project completion, staff will be able to look at opportunities to enhance the
architectural appeal of the array.
Sustainability Impact
No sustainability impact. The schematic design update does not impact the previously stated
climate action plan benefits.
Fiscal Impact
The project funding is not impacted. The schematic design is projected to save costs from the
conceptual design.
City Work Program (CWP) Item/Description:
N/A
Council Goal:
Environmental Sustainability and Fiscal Strategy.
California Environmental Quality Act
No California Environmental Quality Act impact.
_____________________________________
Prepared by: Susan Michael, CIP Manager
Reviewed by: Chad Mosley, Director of Public Works
Approved for Submission by: Tina Kapoor, City Manager
Attachments:
A – PV project Site plans
B – PV project Memorial Park options
QUINLAN COMMUNITY CENTER: ALVES PARKING LOT
415 MODULE STRUCTURE
12650 SQ. FT.
40
'
-
7
"
5
M
O
D
U
L
E
S
311'-4 5/8"
83 MODULES
9'-0"5'-0"
EV
CHARGING
ONLY
E
V
E
V
IR
R
IR
R
IR
R
IR
R
(E)(E)
(E
)
(E)(E)(E)
(E)
(E)(E)
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR
IRRIGATION
BOXES
IRRIGATION
BOXES
IRRIGATION
BOXES
UTILITIRRIGATION BOX
1.5' DIA. DROP
INLET
BURIED S/L LINE
-2'3" PER USA
BURIED UNK LINE
-1'2" PER USA
BURIED UNK LINE
-2'3" PER USA
BURIED S/L LINE
-1'2" PER USA
BURIED UNK LINE
-1'2" PER USA
BURIED SD LINE
-2'3" PER USA
BU
-1'
B
P
BURIED S/L LINE
PER USA
BURIED S/L LINE
PER USA
BURIED S/L LINE
PER USA
24" TREE 18" TREE 15" TREE 18" TREE 18" TREE 18" TREE 20" TREE 16" TREE 18" TREE 20" TREE 18" TREE 18" TREE 14" TREE 18" TREE 18" TREE
ALVES DRIVE
GRAS
S
A
R
E
A
GRAS
S
A
R
E
A
PAV
E
D
W
A
L
K
W
A
Y
BENCHMARK
VAN ACCESSIBLE EV1 ADA VAN
ACCESSIBLE
STALL
1 ADA
ACCESSIBLE
STALL
EV CHARGING STALLS
1 ADA
ACCESSIBLE
STALL
DETECTABLE
WARNINGS.
DETECTABLE
WARNINGS.
LENGTH OF PREVIOUS LAYOUT
LENGTH OF CURRENT LAYOUT
ATTACHMENT A
COMMUNITY HALL: ROOF PLAN
CATV
CATV
CATVCATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
CATV
(E)
(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
IRR
IRR
IRR
IRR
IRR
SD
SD
SD
SDSDSDSD
SDSD
SD
SD
SD
SDSDSDSD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
IRR
IRR
IRRIRR
IRRIRR
IRR
IRR
IRR
IRRIRR
IRR
IRR
IRR
IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR IRR IRR IRR
IRR
IRR
IRR
IRR
IRRIRR
IRR
IRR
IRR
IRRIRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR
IRR
IRR
IRRIRR
IRR
IRR
(E)
(E)
36'-0"36'-0"36'-0"36'-0"14'-2 3/4"14'-2 3/4"
36'-0"36'-0"7'-1 1/4"7'-1 1/4"
6'
-
1
"
18
'
-
3
"
6'
-
1
"
18
'
-
3
"
37
'
-
6
"
37
'
-
6
"
13
'
-
1
3
/
8
"
13
'
-
1
3
/
8
"
24'-4 1/4"24'-4 1/4"
1
2 3
CUPERTINO SPORTS CENTER: PARKING LOT
PHOTOVOLTAICS SYSTEMS DESIGN AND INSTALLATION PROJECT - SITE PLANS
1. Memorial Park picnic area, full circle options
Total Change order: $557,000 to $650,000
ATTACHMENT B
Notes:
1. Pricing indicated on each option is an additional charge to the contract
2. Pricng is ROM (rough order of magnitude)
PAGE 1 OF 7
PHOTOVOLTAICS SYSTEMS DESIGN AND INSTALLATION PROJECT - MEMORIAL PARK OPTIONS
2. Memorial Park pickle ball courts. (Option was eliminated because while it will provide shade, the light
quality coming through the PV modules and the gaps between them creates unplayable visibility for
players; and added costs.)
Total Change order: $380,000
3. Quinlan front parking lot. (Option was eliminated due to negative impact to cultural events at QCC
and added cost.)
Total Change order: $114,000
Notes:
1. Pricing indicated on each option is an additional charge to the contract
2. Pricng is ROM (rough order of magnitude)
PAGE 2 OF 7
4. Six Curved Tee structures at picnic area, no wood finish. Approximately 36 PV modules each
structure.
Total Change order:
5. Six straight Tee structures at picnic area, no wood finish. Approximately 36 PV modules each
structure.
Total Change order:
6. Eight straight Tee structures at picnic area, no wood finish. Approximately 26 PV modules each
structure.
Total Change order:
$490,00
$570,000
$530,000
Notes:
1. Pricing indicated on each option is an additional charge to the contract
2. Pricng is ROM (rough order of magnitude)
PAGE 3 OF 7
$570,000
7. Sixteen straight Tee structures at picnic area, no wood finish. Approximately 12 PV modules each
structure.
Total Change order:
9
8. Sixteen straight Tee structures at picnic area with wood finish (applied veneer or wood material
structure?). Approximately 12 PV modules each structure.
Total Change order:
$630,000
$510,000
Notes:
1. Pricing indicated on each option is
an additional charge to the contract
2. Pricng is ROM (rough order of
magnitude)PAGE 4 OF 7
9. Eight wood glulam structures at picnic area with wood finish (applied veneer or wood material
structure?). Approximately 24-26 PV modules each structure.
Total Change order:
10. Alves Carport: in the current configuration (415 modules): add wood veneer finish to columns and
frame.
Total Change order:
Image for Option 6: similar look and feel for "wood veneer"
$590,000
$170,000
*This would require checking for:Code ComplianceCapacity of current structure
Notes:
1. Pricing indicated on
each option is an
additional charge to the
contract
2. Pricng is ROM (rough
order of magnitude)PAGE 5 OF 7
wood frame inspiration
11. Alves Carport: in the current configuration (415 modules): add wood veneer finish to columns and
frame, and add two wood screens.
Total Change order:
415 MODULE STRUCTURE
12650 SQ. FT.
40
'
-
7
"
5
M
O
D
U
L
E
S
311'-4 5/8"
83 MODULES
9'-0"5'-0"
EV
CHARGING
ONLY
E
V
E
V
IR
R
IR
R
IR
R
IR
R
(E)(E)
(E
)
(E)(E)(E)
(E)
(E)(E)
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR
IRRIGATION
BOXES
IRRIGATION
BOXES
IRRIGATION
BOXES
UTILITIRRIGATION BOX
1.5' DIA. DROP
INLET
BURIED S/L LINE
-2'3" PER USA
BURIED UNK LINE
-1'2" PER USA
BURIED UNK LINE
-2'3" PER USA
BURIED S/L LINE
-1'2" PER USA
BURIED UNK LINE
-1'2" PER USA
BURIED SD LINE
-2'3" PER USA
BU
-1'
B
P
BURIED S/L LINE
PER USA
BURIED S/L LINE
PER USA
BURIED S/L LINE
PER USA
24" TREE 18" TREE 15" TREE 18" TREE 18" TREE 18" TREE 20" TREE 16" TREE 18" TREE 20" TREE 18" TREE 18" TREE 14" TREE 18" TREE 18" TREE
ALVES DRIVE
GRAS
S
A
R
E
A
GRAS
S
A
R
E
A
PAV
E
D
W
A
L
K
W
A
Y
BENCHMARK
VAN ACCESSIBLE EV1 ADA VAN
ACCESSIBLE
STALL
1 ADA
ACCESSIBLE
STALL
EV CHARGING STALLS
1 ADA
ACCESSIBLE
STALL
DETECTABLE
WARNINGS.
DETECTABLE
WARNINGS.
LENGTH OF PREVIOUS LAYOUT
LENGTH OF CURRENT LAYOUT
wood frame location
wood frame inspirationwood screen inspirations
$285,000 - Requires verification for code compliance and structural analysis
Notes:
1. Pricing indicated on each option is an additional charge to the contract
2. Pricng is ROM (rough order of magnitude)
PAGE 6 OF 7
12. Alves Carport: in the current configuration (415 modules): add two steel decorative screens.
Total Change order:
415 MODULE STRUCTURE
12650 SQ. FT.
40
'
-
7
"
5
M
O
D
U
L
E
S
311'-4 5/8"
83 MODULES
9'-0"5'-0"
EV
CHARGING
ONLY
E
V
E
V
IR
R
IR
R
IR
R
IR
R
(E)(E)
(E
)
(E)(E)(E)
(E)
(E)(E)
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR
IRRIGATION
BOXES
IRRIGATION
BOXES
IRRIGATION
BOXES
UTILITIRRIGATION BOX
1.5' DIA. DROP
INLET
BURIED S/L LINE
-2'3" PER USA
BURIED UNK LINE
-1'2" PER USA
BURIED UNK LINE
-2'3" PER USA
BURIED S/L LINE
-1'2" PER USA
BURIED UNK LINE
-1'2" PER USA
BURIED SD LINE
-2'3" PER USA
BU
-1'
B
P
BURIED S/L LINE
PER USA
BURIED S/L LINE
PER USA
BURIED S/L LINE
PER USA
24" TREE 18" TREE 15" TREE 18" TREE 18" TREE 18" TREE 20" TREE 16" TREE 18" TREE 20" TREE 18" TREE 18" TREE 14" TREE 18" TREE 18" TREE
ALVES DRIVE
GRAS
S
A
R
E
A
GRAS
S
A
R
E
A
PAV
E
D
W
A
L
K
W
A
Y
BENCHMARK
VAN ACCESSIBLE EV1 ADA VAN
ACCESSIBLE
STALL
1 ADA
ACCESSIBLE
STALL
EV CHARGING STALLS
1 ADA
ACCESSIBLE
STALL
DETECTABLE
WARNINGS.
DETECTABLE
WARNINGS.
LENGTH OF PREVIOUS LAYOUT
LENGTH OF CURRENT LAYOUT
steel frame location
steel screen inspirations
$250,000 - Requires verification for code compliance and structural analysis
Notes:
1. Pricing indicated on each option is an additional charge to the contract
2. Pricng is ROM (rough order of magnitude)
PAGE 7 OF 7