Loading...
HomeMy WebLinkAbout25-058 Innovation Controls_Service Order #3 dated 1-13-26 Lighting Controls Switch Station UpgradeContract/Purchasing Action Personnel Information Name Travis Warner Department Public Works  Division Facilities Date 01.09.2026 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Light switch upgrade.pdf Service Order Amount $16,492.00 Master Agreement Number 2025-025 Contract Start Date 04/09/2025 Contract End Date 06/30/2028 Firm Name Innovation Controls Address 1434 Lincoln Ave, San Rafael, CA 94901 Phone (415) 699-7712 Consultant/Contractor Name Innovation Controls Consultant/Contractor Email trey@innovation- controls.com Project Name SO 3 Lighting Controls Switch Station Upgrade Project Location Sports Center Cupertino Project Manager Name Cupertino Project Manager Email Master Agreement Maximum Compensation $30,000.00 Total Previously Encumbered to Date $6,756.68 Encumbrance this Service Order $16,492.00 Master Agreement Unencumbered Balance $6,751.32 SO GL #570-87-836 700-702 NWS Project Code Signature       01/12/2026 PST  Consultant/Contractor Signature Date       01/13/2026 PST  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       01/13/2026 PST  Management Analyst Signature Date Email: trey@innovation-controls.com Date: 01/12/2026 PST Email: nathanv@cupertino.org Date: 01/13/2026 PST Email: PWMA@cupertino.gov Date: 01/13/2026 PST Innovation Controls 1434 Lincoln Ave, San Rafael, CA 94901 415-699-7712 Trey@Innovation-Controls.com November 28, 2025 Travis Warner City of Cupertino, Public Works 21111 Stevens Creek Blvd Cupertino, CA 95014 RE: Cupertino Sports Complex Lighting Controls Switch Station Upgrade Below is pricing to supply, install, and program new digital switches for the Sports Complex PRICING:  First/Lower Floor Switch Upgrade: $10,532.00  Second/Upper Floor Switch Upgrade: $ 5,960.00 Total: $16,492.00  Option 1: Add dimming to private offices: $ 1,996.00  Option 2: Add dimming to 1st Floor Hall: $ 2,702.00 INCLUSIONS:  First/Lower Floor: Supply, install, and program Intelligent Lighting Controls digital switches as follows: o (6) LSWS digital wall occupancy sensor stations o (6) LSG3 2-zone digital wall switches o (7) LSG3 1-zone digital wall switches o (4) LSKS digital key switches o (1) LSPSR4 4-port power supply/repeater in LCP-1  Second/Upper Floor: Supply, install, and program Intelligent Lighting Controls digital switches as follows: o (2) LSWS digital wall occupancy sensor stations o (6) LSG3 2-zone digital wall switches o (2) LSG3 1-zone digital wall switches o (1) LSPSR4 4-port power supply/repeater in LCP-2  Supply & install new Cat6 cabling to supply 24v power and communication for new switch stations.  Remove old low voltage cabling where conditions allow.  Dimming Option 1 adds the following: o (3) LSDM 4-output 0-10v dimmer cards with connections to newer LED lighting in the private offices on both floors. o Updated button kits with dimmer control.  Dimming Option 2 adds the following: o (1) LSDM 4-output card with connections to the hallway LED lighting on the first floor o (8) LSCS digital ceiling sensors to provide on/off/dimming control based on occupancy. Innovation Controls 1434 Lincoln Ave, San Rafael, CA 94901 415-699-7712 Trey@Innovation-Controls.com EXCLUSIONS:  Cutting, patching, or painting of drywall AUTHORIZATION: Thank you for the opportunity to work with you on this project. Upon acceptance of this proposal, please sign below as an authorized representative of the City of Cupertino and return to Trey@Innovation-Controls.com for commencement. Please allow 4-6 weeks for product delivery. Signed: Date: Print Name: SO 3 Lighting Controls Switch Station Upgrade - Service Request Created:01/12/2026 Status:Signed Transaction ID:cfd7de28-e819-4308-b4a2-6b2785ee98ef "SO 3 Lighting Controls Switch Station Upgrade - Service Request" history Jindy Gonzalez created the document 01/12/2026 5:28:22 PM PST - IP address 64.165.34.3 Document was emailed to Innovation Controls 01/12/2026 5:28:23 PM PST Innovation Controls opened the document 01/12/2026 6:22:52 PM PST - IP address 23.93.48.177:53288 Innovation Controls signed the document 01/12/2026 6:47:03 PM PST - IP address 23.93.48.177:54385 Document was emailed to Nathan Vasquez 01/12/2026 6:47:04 PM PST Nathan Vasquez opened the document 01/13/2026 6:03:50 AM PST - IP address 64.165.34.3:31193 Nathan Vasquez signed the document 01/13/2026 6:04:18 AM PST - IP address 64.165.34.3:31193 Document was emailed to Public Works Management Analyst 01/13/2026 6:04:19 AM PST Public Works Management Analyst opened the document 01/13/2026 7:42:53 AM PST - IP address 73.241.25.149:51317 Public Works Management Analyst opened the document 01/13/2026 7:42:53 AM PST - IP address 73.241.25.149:51317 Public Works Management Analyst signed the document 01/13/2026 7:43:32 AM PST - IP address 73.241.25.149:60343 Document was successfully signed and filed 01/13/2026 7:43:32 AM PST