HomeMy WebLinkAboutASAC Minutes 08-24-81ASAC-286
SUMMARY MINUTES OF REGULAR MEETING OF THE A.S.A.C. August 24, 1981, AND REFERRAL OF
RECOMMENDED DECISIONS OF VARIOUS PUBLIC HEARINGS TO THE CITY COUNCIL. MEETING HELD
IN ROOM 106 OF CITY HALL, CUPERTINO, CALIFORNIA.
Meeting called to order at 7:00 p.m. by Chairman Rooker with a salute to the flag.
ROLL CALL:
Present: Higdon, Miller, Morrison, Nobel and Chairman Rooker
Absent: None
Staff Present: Steve Piasecki, Associate Planner and Sonia Binnendyk, Planner I
CONTINUED ITEM:
1. Application HC -51,222.1 - Cupertino Hills Swim and Racquet Club - discussion of
solution to smoke problems resulting from installation of a barbecue pit. Said
property is located on the west side of Linda Vista Drive southerly of the inter-
section of Rae Lane and Linda Vista Drive.
Presentation: Roger Costa representing Cupertino Hills Swim and Racquet Club.
The Racquet Club Proposed adding back, sides, and partial front to existing barbecue
structure, raising the structure's height, and constructing a hood with a stack
extending two feet over existing lattice overhang.
The Committee expressed concern regarding whether the flue would draw smoke, but
concurred that the above solution was in the right direction.
INFORMAL REVIEW OF USE PERMIT APPLICATIONS:
2. Application 17-U-31 - Shell Oil Company - Use Permit to rebuild the service station
located at the northeast corner of Stevens Creek Boulevard and Stelling Road. The
reconstruction would require removal of all existing facilities and the construction
of a self -serve station.
Presentation: John Williams representing Shell Oil Company.
The Committee expressed concern regarding the amount of asphalt and the visibility
of the soffit underneath the canopy.
Recommended that sign is lowered and embelished with wood. The possibility of a
four-sided sign should be explored. Sign is subject to staff approval.
Recommended that landscaping include berming and ground cover match the ground cover
of the Racquet Club across Stelling. Landscaping area should be widened, sidewalk
should remain at 10 ft. Requested informal review of final landscaping plan.
Recommended that block wall wrap around trash enclosure.
- 1 -
,Minutes of August 24, 1981 A.S.A.C (continued) ASAC-286
3. Application 18-U-81 - De Anza Forge (Cupertino Village) - Rezone and Use Permit
to construct 152 dwelling units on 7.3 acres. Said property is located in the
southwesterly quadrant of Homestead Road and De Anza Boulevard just north of
Highway 280.
Presentation: John Vidovich and Ron Enz
Concerns regarding the visual impacts of individual antennas and location of
solar panels were discussed. Garage door openers were recommended. Two members
of the Committee recommended one covered parking space per bedroom be required.
Three members were not particularly concerned about additional covered parking
spaces.
The mini -storage General Plan amendment was favored by all Committee members.
Approval was recommended per exhibits presented. Committee was concerned that
final building plans reflect proposed materials (i.e. tile roofs, heavy timber trim).
Committee Member Miller excused himself from meeting.
4. Application 19-U-81 - Sobrato Development Company - Use Permit to construct a
three-story office building equaling approximately 105,000 sq. ft. Said property
is located on the southwest corner of De Anza Boulevard and Lazaneo Drive in a
P (Planned Development) zoning district.
Presentation: John Sobrato.
Three Committee members recommended approval. One member was concerned that the
proposed high technology building would be inappropriate in the proposed location.
ADJOURNMENT:
Chairman Rooker adjourned the meeting to the next regular meeting of September 14, 1981.
APPROVED:
/s/ Raymond Rooker
Raymond Rooker, Chairman
ATTEST:
/s/ Dorothy Cornelius
City Clerk
- 2 -