Loading...
HomeMy WebLinkAboutASAC Minutes 08-24-81ASAC-286 SUMMARY MINUTES OF REGULAR MEETING OF THE A.S.A.C. August 24, 1981, AND REFERRAL OF RECOMMENDED DECISIONS OF VARIOUS PUBLIC HEARINGS TO THE CITY COUNCIL. MEETING HELD IN ROOM 106 OF CITY HALL, CUPERTINO, CALIFORNIA. Meeting called to order at 7:00 p.m. by Chairman Rooker with a salute to the flag. ROLL CALL: Present: Higdon, Miller, Morrison, Nobel and Chairman Rooker Absent: None Staff Present: Steve Piasecki, Associate Planner and Sonia Binnendyk, Planner I CONTINUED ITEM: 1. Application HC -51,222.1 - Cupertino Hills Swim and Racquet Club - discussion of solution to smoke problems resulting from installation of a barbecue pit. Said property is located on the west side of Linda Vista Drive southerly of the inter- section of Rae Lane and Linda Vista Drive. Presentation: Roger Costa representing Cupertino Hills Swim and Racquet Club. The Racquet Club Proposed adding back, sides, and partial front to existing barbecue structure, raising the structure's height, and constructing a hood with a stack extending two feet over existing lattice overhang. The Committee expressed concern regarding whether the flue would draw smoke, but concurred that the above solution was in the right direction. INFORMAL REVIEW OF USE PERMIT APPLICATIONS: 2. Application 17-U-31 - Shell Oil Company - Use Permit to rebuild the service station located at the northeast corner of Stevens Creek Boulevard and Stelling Road. The reconstruction would require removal of all existing facilities and the construction of a self -serve station. Presentation: John Williams representing Shell Oil Company. The Committee expressed concern regarding the amount of asphalt and the visibility of the soffit underneath the canopy. Recommended that sign is lowered and embelished with wood. The possibility of a four-sided sign should be explored. Sign is subject to staff approval. Recommended that landscaping include berming and ground cover match the ground cover of the Racquet Club across Stelling. Landscaping area should be widened, sidewalk should remain at 10 ft. Requested informal review of final landscaping plan. Recommended that block wall wrap around trash enclosure. - 1 - ,Minutes of August 24, 1981 A.S.A.C (continued) ASAC-286 3. Application 18-U-81 - De Anza Forge (Cupertino Village) - Rezone and Use Permit to construct 152 dwelling units on 7.3 acres. Said property is located in the southwesterly quadrant of Homestead Road and De Anza Boulevard just north of Highway 280. Presentation: John Vidovich and Ron Enz Concerns regarding the visual impacts of individual antennas and location of solar panels were discussed. Garage door openers were recommended. Two members of the Committee recommended one covered parking space per bedroom be required. Three members were not particularly concerned about additional covered parking spaces. The mini -storage General Plan amendment was favored by all Committee members. Approval was recommended per exhibits presented. Committee was concerned that final building plans reflect proposed materials (i.e. tile roofs, heavy timber trim). Committee Member Miller excused himself from meeting. 4. Application 19-U-81 - Sobrato Development Company - Use Permit to construct a three-story office building equaling approximately 105,000 sq. ft. Said property is located on the southwest corner of De Anza Boulevard and Lazaneo Drive in a P (Planned Development) zoning district. Presentation: John Sobrato. Three Committee members recommended approval. One member was concerned that the proposed high technology building would be inappropriate in the proposed location. ADJOURNMENT: Chairman Rooker adjourned the meeting to the next regular meeting of September 14, 1981. APPROVED: /s/ Raymond Rooker Raymond Rooker, Chairman ATTEST: /s/ Dorothy Cornelius City Clerk - 2 -