Loading...
HomeMy WebLinkAboutApple Park Prelim Site Logistics Plan 2025 JanBBBBBBBB As As As EV1s EV1s EV1sEV1sEV1sEV1sEV1sEV1sEV1sEV1s EV1sEV1sEV1sEV1sEV1sEV1sEV1sEV1s EV1s EV1s FEV2s FEV2s FEV2sFEV2sFEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2sFEV2s FEV2s FEV2s FEV2s FEV2sFEV2s FEV2sFEV2s FEV2sFEV2s FEV2sFEV2s FEV2sFEV2s FEV2s FEV2sFEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2sFEV2sFEV2s FEV2s As As As As As AsEV1s EV1sEV1sFEV2s FEV2s EV1s FEV2s FEV2sFEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2s FEV2sFEV2sFEV2sFEV2sFEV2sFEV2s EV1s EV1s FEV2s FEV2s FEV2sFEV2s FEV2s FEV2s FEV2sFEV2s EV1sEV1s FEV2s FEV2s EV1s FEV2sFEV2sFEV2s FEV2s FEV2s FEV2sFEV2s FEV2s FEV2s FEV2sFEV2s FEV2sFEV2s FEV2s PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO AsPARKING NO FEV2s As As EV1s EV1s FEV2sFEV2s PARKING NO EV1s As PARKING NO FEV2s PARKING NO As PARKING NO As PARKING NO PARKING NO PARKING NO FHV AEDAEDAEDAEDAEDAED 120 121122 123 124 125 126 127 128 129 130 131 132 133 134 135 137136 UP UPUPUP RA M P U P RA M P U P 3 A-CP-1271 (N)(N) (N)(N)(N) (N) (N) (E) (E) (E) (E) (E) (E) (E) (E)(E) (E)(E)(E) (E) (E) (E) (E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E) (E)(E)(E)(E)(E)(E) (E)(E) (E) (N) (N)(N)(N)(N)(N) (E) CE N T R A L U T I L I T Y P L A N T ( C U P ) APPLE SOUTH PARKING STRUCTURE SCOPE OF INTERIOR WORK AT LEVEL 1,2,3 AND ROOF PLAN SEE SHEET (NOT INCLUDED IN PLANNING SUBMISSION) SCOPE OF UTILITY YARD EXTERIOR SITE WORK APPLE NORTH PARKING STRUCTURE STEVE JOBS THEATER APPLE MAIN BUILDING NORTH TANTAU AVENUE (N)(N) /1 A-CP-1650 INTERSTATE -280 (E) FIRE HYDRANT (E) FIRE HYDRANT (E) FIRE HYDRANT 94'-2 3/8" 52'-11 1/2" 105'-5" (E) FIRE HYDRANT 20'-0" SCVWD SETBACK LINE PROPERTY SETBACK 17'-0 1/8" 2 A-CP-1271 1 A-CP-1271 1A-0003 2 A-0003 3 A-0003 CALABAZAS CREEK SITE PLAN LEGEND SEE A-0002 FOR ALL GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS (N) CONSTRUCTION (E) CONSTRUCTION TO REMAIN (N) CONCRETE (E) LIGHTING (N) PROPOSED LIGHTING (E) (N)SEE SHEET A-CP-6501 FOR REFERENCE A. SHEET NOTES AND KEYNOTES ARE APPLICABLE TO THIS SHEET ONLY. B. ALL WALKWAYS AND SIDEWALKS ALONG ACCESSIBLE ROUTES OF TRAVEL SHALL BE CONTINUOUSLY ACCESSIBLE, HAVE MAXIMUM 1/2" CHANGES IN ELEVATION, BE MINIMUM 48" IN WIDTH AND WHERE NECESSARY TO CHANGE ELEVATION AT SLOPE EXCEEDING 5% (1:20) SHALL HAVE RAMPS COMPLYING WITH CBC 11B-405 (CONTRACTOR TO VERIFY EXISTING CONDITIONS) C. MAXIMUM CROSS SLOPES ON ANY SIDEWALK OR RAMP SHALL NOT EXCEED 2%. ALL REQUIRED EGRESS SHALL BE PROVIDED PER CALIFORNIA TITLE 24 HANDICAP REQUIREMENTS. (CONTRACTOR TO VERIFY EXISTING CONDITIONS) GENERAL NOTES - SITE PLAN N Title Number Revision Project No.Scale @ Arch E1Date Project Client Key Plan General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. Architect shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 6. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Work. Not For Construction 84 W. Santa Clara St., #200, San Jose, CA 95113, T 408.288.7833 A9A8 A7 A6 A5 A4 A2 A3 6 Apple Park Way Cupertino, CA 95014 APN: 316-06-061 A1 01/17/25 As indicated 04A-CP-1270 Overall Site Plan 3649-272-00 Apple Park Main Campus Upgrades APPLE INC. 1" = 60'-0"1 PROPOSED OVERALL SITE PLAN SITE PLAN KEY PROPERTY LINE BUILDABLE ZONE PER CIVIL DRAWING VEHICULAR PATHWAY AREA OF WORK VALLEY WATER SETBACK LINE Rev. Date MM/DD/YY Reason For Issue Issued By 00 04/17/24 DD Set Issue HGA 01 06/05/24 50% CD Progress Set HGA 02 11/12/24 MEP Upgrades - Planning Permit Set HGA 03 11/15/24 PRICING SET HGA 04 01/17/25 MEP Upgrades - 90% CD Hit Print HGA