HomeMy WebLinkAboutReso 0450}iC-51,075.41
R ,t r.....IG:, :;o. +50
OF 'iii eu<.CitIT ; ;!'t'i 1i. AR) SITE APPROVAL CO ;iiITTEE
OF Ti GI I':. OF C',,: T I. O. P. C;O s'•t iNG approval.
o".-
__Ja ds(api g and_Li,-e_asaund �ual-1—_fn.r tcio._light
industrial buildings as indicated on Exhibit
C 1st P..evision.
PROPERTY ON,NER: Chris Marchese
APPLICANT: The Westfield Company
ADDRESS: 990 E. Argues Avenue, Sunnyvale, California 94086.
LOCATION OF PROPERTY: Southeast corner of the inteksection of Pruneridge Avenue
and Tantau Avenue
ZONE: P (a)
Conditions:
1-7. Architectural.and Site Approval Standard Conditions.
8. That the wall be 4. ft. in height starting at the north end of the property
line, to the garage of Mr. Mau where the wall height shall step up
tc, 6 ft. This height shall continue to the south boundary of the third
lot in from Pruneridge Avenue at which point the wall shall step up to
an 8 ft. height and continue at that height to the southern boundary of the
Westfield Company property.
9. That additional shrubs be planted in the three large planter islands
in the parking lot.
10. That the light poles in the parking lot be separated from the planter islands
so that the light can prcvide the desired coverage. The height of the pole
is to remain as shown.
11. That the Coast Redwoods opposite the third lot in from the street (Mr. Tyler's
property) be cringed to a lower growing tree that shall be subject to approval
of the City staff.
12. The wall is to be the same color as the painted portions of the building.
PASSED SAND ADOPTED this 19th day of September, 1974, at. a regular meeting of the
Architectural and Site Approval Committee of the City of Cupertino, State of
California, by the following roll call vote:
AYES; Commiittee Members: Dressler, Koenitzer, Rogers, Sallan
NAYS: " " None
ABSTAINING; " " None
ABSENT: " " Weinstein
ATTEST: APPROVED;
__"`j4� ,�1,,'�ti✓'-�'/s/ C. Nancy Sallan
To y I ame.r C. Nancy Sallan, Chairwoman
Assistant Planner Architectural :and Site Approval Committee