Loading...
HomeMy WebLinkAboutReso 0430HC -51 M1 075. 38 RESOLUTION NO. 430 OF THE ARCHITECTURAL AND SITE APPROVAL CON111T'TEE OF TrlE CITY Or CUPERTI v0, reco am=ending approval of site, architecture 1cr..dscep.h:f„ grading, lighting and signing for an industrial building and parking structure as indicated on Exhibits A, A-1, B, B-1, B-2, C and D. PROPERTY OWNER: Vallco Park, Ltd. APPLICANT: Vallco Park, Ltd. ADDRESS: P.O. Drawer V, Cupertino, Calif. 95014 LOCATION OF PROPERTY: West of Swallow Drive between Forge Drive and Homestead Road. ZONE: P (Planned Development with industrial/office land uses intended) FIRE ZONE: 3 Conditions: 1--7. Architectural and Site Approval. Standard Conditions. 8. That a walkway be constructed on the eastern side of the building that will relate to the adjoining 4=MI office entrances. The location of the walk shall offer minimum exposure to roadway and parking traffic. 9. That bike racks be included on the site in a location determined by the applicant. 10. That the staff review the intensity of the parking lot lighting upon installation to insure that they do riot produce an objectional glare. 11. That additional shrubbery be placed along Homestead Road frontage adjacent to the building. The choice and number of plants shall he reviewed by staff. l2. That the total signing for the ANT buildings on Homestead Road shall consist of one sign that will be 10 ft. in height as shown on Exhibit A and one that will be 7 ft. as previously approved for the AMI building on Swallow Drive and Forge Drive. The location of these signs shall be determined by the applicant and the staff. PASSED AND ADOPTED this 17th day of July, 1974, at a regular meeting of the Architectural and Site Approval Committee of the City of Cupertino, State of California, by the following roll call vote: AYES: Committee Members: Dressler, Koenitzer, Rogers, Sallan NAYS: it tt None ABSTAINING: tt tt None ABSENT: " tt Weinstein ATTEST: Toby K Ln er Senior Planning Technician APPROVED: /s/ C. Nancy Sailan C. Nancy Salian, Chairwoman Architectural and Site Approval Committee