Loading...
HomeMy WebLinkAboutASAC Reso 1374(ASAC) 9-U-83 (Amended) RESOLUTION NO. 1374 OF THE ARCHITECIURAL AND SITE APPROVAL CrX4MTTT'EE OF THE CITY OF CUPERTINO RECONII ENDING APPROVAL OF CONCEPTUAL LANDSCAPING PLAN AND ARCHITECIURAL PLANS FOR A RESIDENTIAL PLANNED DEVELOPMENT PROJECT APPLICANT/DEVELOPER: Gregory Group, Inc. PROPERTY OWNER: Gregory Group, Inc. APPLICANT'S ADDRESS: 220 Twin Dolphin Drive, Suite C Redwood City, California 94065 PROJECT LOCATION: South side of Rainbow Drive between Upland Way and Stelling Road The Architectural and Site Approval Committee finds as follows with regard to the subject application: 1. The plans as conditioned are consistent with the previously approved use permit plans. CONDITIONS: 1-8) Standard Architectural and Site Approval Connnittee Conditions to the extent that they do not conflict with the special conditions listed herein. In the event of conflict, the specific conditions listed herein shall prevail. 9) This reconmiendation of approval is based upon Exhibits L-2, B-9 1st Revision, and B-10 of Application 9-U-83 (amended) unless modified by conditions contained herein. 10) The applicant shall install ten additional 24 inch box specimen deciduous trees as required by Condition 2 of Planning Connnission Resolution No. 2995. The type and location of the additional trees shall be approved by staff at the building permit level. 11) The shrub and ground covers utilize in the Stelling Road right-of-way shall be approved by the Department of Public Works prior to installation. Landscape and irrigation plans shall be approved by the Department of Public Works. 12) The landscaping and fencing along the eastern property line is not approved under this application. The applicant shall submit revised plans to staff for review and approval. Staff shall have the right to forward the plans to the Architectural and Site Approval Committee for informal review and approval. 13) The riparian corridor shall be preserved in its natural state. The applicant shall clear the corridor of debris and construction materials and shall remove dead limbs and branches from plant material within the corridor. ASAC RESOLUTION NO. 1374 APPLICATION 9-U-83 (AMENDED) PAGE -2- 14) The house locations shown on Exhibit L-2 of Application 9-U-83 (amended) are not approved under this application. PASSED AND ADOPTED this 25th day of April, 1988 at a regular meeting of the Architectural and Site Approval Committee of the City of Cupertino, State of California, by the following roll call vote: AYES: MEMBERS: Baca, Gong, Mann NAYS: MEMBERS: ABSTAIN: MEMBERS: Chairwoman Jackson ABSENT: N EMBHERS : Miller ATTEST: APPROVED: /s/ Randal R. Tsuda /s/ Betty Mann Randal R. Tsuda Betty Mann, Acting Chairwoman Planner II Architectural & Site Apprvl. Comm. RSO9U83(2)