HomeMy WebLinkAboutCC 12-16-2025 Item No. 10 Development Project United Furniture Site_Staff PresentationCC 12-16-2025
#10
Development Project
United Furniture Site
Presentation
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
10075 E. Estates & 19610 Stevens Creek Blvd.
United Furniture Site
DP-2024-004, TM -2024-005
ASA-2024-008 & U -2025-004
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Subject
●Consideration of a new residential
development project consisting of 55-
townhomecondominium units and 10 ADUs,
housed within ten three-story buildings, on
three contiguous parcels, totaling 2.72-
acres, located on the south side of Stevens
Creek Boulevard at the present location of
the United Furniture.
●Applicant: Nick Kosla (Toll Brothers)
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TVBackground – United Furniture
Site
●2.68-acre site built
out in 1960.
●United Furniture
anchor tenant.
●Within the Heart of
the City Specific
Plan
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Background - Applications
●Site Zoned for in July 2024 as a HE Site
(65 – 80 DU/acre).
●SB330 application in February 2024,
locking in lower density (25 DU/acre)
and other objective standards.
●July 31, 2024, Development
Application was submitted.
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Application Request – Building 1
Modification
●55-unit townhome project
●10 ADUs
●11 BMR
●6 Median Income (100-
120% AMI)
●5 Moderate Income
(80-100% AMI)
●Resulting density is 20.52
DU/acre
●10 three-story buildings ranging
from 2,020 – 2,567 square feet
●Qualify for Density Bonus
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TVAnalysis – Density Bonus -
Waivers
●Side Setbacks – Western Side
●Required – 20’-8”
●Proposed – 10’ (Building Face)
●Rear Setback – Richwood Drive
●Required – 62’-2”
●Proposed – 9’ (Building Face)
●Building Form – Terracing adjacent to Single Family
●Not terracing to the required 1.5:1 setback to height ratio.
●Lot Coverage
●Required – 40%
●Proposed – 43%
●Elimination of Retail Requirement
●Design Standards for Common Landscape and Open Space
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Analysis – Density Bonus
Parking Reduction
●Density Bonus Law allows qualifying projects to provide parking
at a ratio of 1 parking space per studio to one-bedroom unit; 1.5
parking spaces per two- or three-bedroom unit; and 2.5 parking
spaces per four- or more-bedroom unit.
●Required is 118 spaces.
●Providing 2 enclosed per unit, and 9 additional spaces
unenclosed, or 119 spaces.
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Design
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Environmental Review
●A Categorical Exemption memorandum and a Notice of
Exemption has been prepared to demonstrate compliance with
the California Environmental Quality Act (CEQA)
●The project scope falls within the Class 32 CEQA Exemption
pursuant to CEQA Guideline Sections 15332 (Infill Development
Projects) and it has been determined that the project will not
result in any significant effects on the environment.
●The project will be conditioned to comply with the Environmental
Standards adopted by the City pursuant to Chapter 17.04 of the
Municipal Code.
●Condition 7 of Draft DP Resolution requires that soil
concentrations are acceptable to residential development, as
well as to the satisfaction of SCCDEH prior to the issuance of any
grading, foundation, or building permits.
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Planning Commission
●On November 12, 2025, the Planning
Commission, by a 5-0 vote, adopted
Resolution Nos. 2025-16 through 2025-
1918 recommending approval of the
development.
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Recommended Action
●Find the project exempt from the California Environmental
Quality Act (CEQA)
●Approve the following permits:
●Adopt Resolution No. 25-___ approving
Development Permit (DP-2024-004)
●Adopt Resolution No. 25-___ approving Use Permit (U-
2025-004);
●Adopt Resolution No. 25-___ approving Architectural
& Site Approval Permit (ASA -2024-008);
●Adopt Resolution No. 25-___ approving Tentative
Final Map (TM-2024-005)
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Next Steps
The City Council’s decision will be final unless a request for
reconsideration petition is filed in compliance with CMC
2.08.096 (within 10 days of the notice by the Council within 10
days of their decision). If the project is approved, the
applicant may apply for building permits at that time, subject
to Condition 7 of the draft Development Permit Resolution.
This section may
be cropped for TV
This section may
be cropped for TV
This section may be cropped for TV This section may be cropped for TV
Questions?