Loading...
HomeMy WebLinkAboutReso 230325-Z-80 RESOLUTION NO. 2303 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL TO PREZONE APPROXIMATELY 148 ACRES FROM SANTA CLARA COUNTY EXCLUSIVE AGRICULTURE TO CITY OF CUPERTINO P (PLANNED DEVELOPMENT WITH RESIDENTIAL INTENT). APPLICANT: Interland Development Company ADDRESS: 411 Borel Avenue, Suite 600, San Mateo, California 94402 SUBMITTED: May 13, 1980 LOCATION: Generally bounded by Rainbow Drive to the north, Stelling Road to the east, Prospect Road to the south and by Fremont Older Open Space Preserve and Upland Way to the west. ----------------------------------------------------------------------------- FINDINGS AND SUBCONCLUSIONS: Approval is recommended subject to the findings as set forth on Page 1 and subconclusions as set forth in the minutes of the Planning Commission meeting of April 26, 1982. CONDITIONS: 1-14. Standard Conditions to the extent that they do not conflict with the special conditions enumerated herein. In the event a conflict does exist, the special conditions enumerated herein shall apply. 15. The approval is based upon Exhibits A, A 1st Revision and Alternates 1-3 as may be modified by additional conditions contained herein. 16. The approval permits construction of a maximum of 419 dwellings consisting of six (6) to nine (9) (including existing dwellings) dwellings located on the 40+ acre site designated "retained property" and 413-410 dwellings located on the balance of the property. The final dwelling unit yield and mix of dwelling unit types shall be determined by the City in conjunction with a subsequent use permit review. The determination will be based upon a finding that the total all -day traffic generated by the development will not exceed 3,860 all -day trips. The following trip generation factors for each dwelling unit type shall be used in the computation to attain the maximum 3,860 ADT figure. Dwelling Unit Type ADT Factor Detached 12.0 Semi-detached (zero lot line) 9.5 Attached townhouses (family) 7.2 Attached townhouses (elderly) 3.3 17. The applicant/property owner agrees to participate in his proportionate share of major off -site street improvements of a local or communitywide nature. Said agreement shall include, but not be limited to, agreement to participate in a local improvement district, or directly contribute to street improvement. If an assessment district is formed, the applicant/ property owner's share would be determined by a cost benefit ratio as established by assessment district law. Boundaries for any district would be determined at a later date per assessment district law. The agreements -2- 25-Z-80 Planning Commission Resolution No. 2303 (continued) 17. (continued) to install the above improvements shall be submitted and recorded prior to or in conjunction with the issuance of building permits. At the use permit stage, building permits shall be phased in conjunction with mitigation of traffic consistent with an adopted General Plan. 18. The on -site circulation plan shall contain the following elements: (a) The driveway serving hillside homes and the collector road serving the main project area from Upland Way shall be consolidated. (b) The applicant shall construct a direct vehicular access to Stelling Road as described on Exhibit A 1st Revision, Alternative 3. Unless the roadway requirement is waived at the use permit stage of development review, the construction of said roadway may require condemnation of a separate parcel. The City and developer shall cooperate in acquiring approval of a railroad grade crossing from the State Public Utilities Commission. (c) The use permit plan shall incorporate a detailed traffic control plan for the reach of Rainbow Drive between the intersection of Bubb Road to the Southern Pacific railroad crossing. The traffic control plan shall include an element to reduce vehicular speeds and volumes of traffic and discourage penetration into adjacent neighborhoods. The traffic control plan may eliminate left turn movements from the Seven Springs Ranch project site onto Rainbow Drive. The homes adjacent to Upland Way and Rainbow Drive shall be oriented to those streets. (d) The use permit site plan shall describe a circulation plan to eliminate or reduce the potential for vehicles traversing the site from Prospect Road to the Stelling Road or Upland Way project entrances. The plan shall orient traffic to Stelling Road and Prospect Road access points to the greatest extent possible. 19. The number of hillside dwellings located west of the 200 ft. wide riparian easement shall be determined by application of the "Foothill Modified, Half -Acre" slope density formula. The general and specific development standards contained in the Residential Hillside Development Ordinance shall be used as a general guide to review a subsequently submitted use permit site plan for the subject area of the project site. A riparian zone delineated on Exhibits A and A 1st Revision shall be 100 ft. from either side of the creek as measured from the center line of said creek. Grading for development in the riparian zone is prohibited except for narrow paths for passive recreational activities such as walking and jogging. 20. The development shall incorporate passive and active water and space heating design principles and equipment to provide approximately 75% of the heating requirements. A precise energy plan shall be submitted and approved by the City in conjunction with the use permit plan. -3- 25-Z-dU Resolution No. 2303 (continued) 21. The applicant shall provide an irrevocable offer of dedication, dedicate, or otherwise acquire a fire station site for the City in one of three alternative locations listed below: 1st Priority - A site located adjacent to the required access road and Stelling Road referenced in Condition 18(b). 2nd Priority - A site located in the northwest quadrant of the intersection of Prospect Road and Stelling Road. 3rd Priority - A site located on the south side of Rainbow Drive immediately west of the Southern Pacific Railroad right of way. The City will select the site and means of acquisition in conjunction with the use permit and tentative subdivision phase of the Planned Development application process. The applicant shall participate in the funding for the construction of the fire station building based upon a subsequently developed and approved financing mechanism. The fire station building shall be owned by the City of Cupertino. 22. The applicant/owner shall convey a public equestrian and hiking trail easement (or a fee interest), linking Upland Way with the Fremont Older Open Space District as shown on Exhibit A 1st Revision. Said trail shall be designed to provide neighborhood access. Accordingly, the trail shall not include a parking facility. The MidPeninsula Regional Open Space District shall provide fencing adjacent to the easement and shall indemnify and defend owners of subject properties from any liability as a result of operation and maintenance of fencing and public equestrian and hiking trail easement. 23. The public park depicted on the approved site plan exhibit is not approved. The three acre space may be infilled by dwelling units shifted from other areas in the site plan. The final design will be approved in conjunction with a subsequently filed use permit application. 24. The development rights to the common area shall be dedicated to the City of Cupertino in advance of the recordation of a final subdivision map, to assure that the open space shall be. available for the entire development. PASSED AND ADOPTED this 26th day of April, 1982, at a regular meeting of the Planning Commisson of the City of Cupertino, State of California, by the following roll call vote: AYES: Commissioners Adams, Binneweg, Blaine, Koenitzer, Chairman Claudy NAYS: None ABSTAIN: None ABSENT: None ATTEST: APPROVED: /s/ John Claudy James H. Sisk -4- John Claudy, Chairman Planning Dir?rtgr Planning Commission