Loading...
HomeMy WebLinkAboutReso 24122-GPA-83 RESOLUTION NO. 2412 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO APPROVING AN AMENDMENT TO THE COMPREHENSIVE GENERAL PLAN WHEREAS, the Planning Commission has held public hearings involving written reports and testimony from Planning staff and citizens in general, and WHEREAS, the Planning Commission has concluded its deliberations relative to the General Plan Amendment. NOW, THEREFORE, BE IT RESOLVED: 1. That the Planning Commission approves the Amendment to the City of Cupertino General Plan as set forth in Exhibit A attached hereto and made a part thereof. 2. The Planning Commission hereby authorizes the Chairman of the Planning Commission to endorse said amendment. PASSED AND ADOPTED at a regular meeting of the Planning Commission of the City of Cupertino this 27th day of June, 1983, by the following vote: AYES: Commissioners Blaine, Claudy, Koenitzer, Chairman Adams NAYS: None ABSTAIN: None ABSENT: None APPROVED: /s/Victor J. Adams Victor J. Adams, Chairman Planning Commission ATTEST: /s/ James H. Sisk James H. Sisk Planning Director "EXHIBIT A" AREA 5 Vallco Park The Vallco Park Planning Area is a mixed use planned unit development comprised of constructed and planned commercial, office, and light industrial facilities. The Vallco Park Planning Area is bordered by Stevens Creek Boulevard on the south, by Homestead Road on the north, by the eastern City limit line on the east, and by a residential subdivision and Portal Plaza Shopping Center on the west. Figure 2-H is the land use diagram for Vallco Park. The figure identifies the permitted land use for specific sub -areas of the park. Figure 2-I describes the permitted intensity of development expressed in the form of a Floor Area Ratio (FAR). A FAR is a mathematical expression of the amount of building area permitted per unit of land. In the context of the Cupertino General Plan, permitted building area is determined by multiplying the square footage of a parcel by the FAR. The FARs differ based upon land use type, the degree to which building area intensity has been transferred to other sites, and the applicability of the Vallco Construction Phasing Memorandum. The Memorandum applies to all properties within Vallco Park with the exception of the Vallco Fashion Park site and the block bounded by Vallco Parkway, Finch Avenue (extended), Stevens Creek Boulevard and Wolfe Road. Figure 2-I describes areas within Vallco Park which are subject to development controls imposed by the Vallco Park Construction Phasing Memo. Future development proposals located within areas not regulated by the Vallco Park Construction Phasing Memo will be reviewed to ensure that key intersections serving the City's arterial street system maintain a minimum level ❑f service D. Figure 2-J describes required street improvements to maintain the required level of service on the City's primary street system. The street improvements are intended to serve 1990 development intensities based upon full build -out of the City's entire planning area (Urban Service Area). Future developers of property in Vallco Park will be obligated via a construction tax or other means to participate in the funding of the street improvements listed on Figure 2-J. The development monitoring system will ensure that designated level of service levels will not be exceeded after construction of a specific development. -1- Land Use and Design Policies for Vallco Park n - i - _ i r : n i i - .J .t- - t - - i. J. .-1 l A i- . ,., , .-t 0l1;_ f 1. (-1 gLs re �.-17 aUCIi L1Tle per 1111 LLe i iaiiu LiSe L'y -iC� aiiv Figure 2—I identifies permitted land use intensities for the Vallco Park Planning Area. Approximately '00,000 sq. ft. of additional commercial space and a hotel complex with the maximum room size of 720 rooms can be constructed in addition to the buiding space allowed by relevant FARTS. The hotel and commercial expansion may be located in the Vallco Park Planning Area located south of 280 Freeway, north of Stevens Creek Boulevard, and east of Finch Avenue extension. The hotel will include banquet space, conference rooms, and ancillary commercial activities common to a hotel complex. Ancillary commercial activities include restaurants, gift shops, personal services, flower shops, book stores and similar uses commonly located in and supporting a hotel facility. The Planning Commission shall approve the maximum floor area of ancillary commercial space in conjunction with a future development application. The Planning Commissions decision on the amount of ancillary commercial space will be based upon the degree to which the space supports the hotel function. Policy 2. The policies listed below shall guide development in Vallco Park. a. Building heights shall not exceed eight stories with the exception of the hotel which is unspecified. The final height ❑f the hotel will be determined in conjunction with a future development application. b. Project designs should avoid a wall-like appearance on street techniques may include varying altering building orientation, the building facade into sever vertical planes. monotonous frontages. Design building setbacks, and segmenting of 31 horixontal and Buildings in Vallco Park should be particularly sensitive to creating a continuous building wall along Stevens Creek Boulevard. Creating street level vistas into the project and varying the building facade through offset building setbacks and stepping back of the upper floors will help to achieve a spacious, open and inviting site plan. c. To the greatest extent possible off-street parking shall be hidden from public view. The required number of off-street parking space for multi -story commercial, office and industrial projects in Vallco Park will be determined in conjunction with specific development proposals. S . . • • . . . . . . . . ■ . ■ ■ ■ ■ ■ ■ • I . ■ . !� V I'V"i�♦�O%♦�►'V ♦- i♦i♦i♦i I♦V♦�♦ IV 1*1 AS f"1:: •7:1173:' •7I !��' ♦ ��► +♦+�♦ ♦ ♦ ♦ �-• IK� -- ♦�iiiiiivv�i''V' �i��i�i' �♦+�+i ♦iii ��► .+ ♦� ♦�++++♦i+i►i♦ii♦♦i+♦♦. a. i♦i+♦+i+i+i is = ♦♦++♦♦+v1►♦+++++♦♦+♦�+a.�► �ti_•♦_♦♦♦♦+++♦� L� �'./li a 1, - ■ . * . . . - - - - 'a - - L LJ —L4 I �,• rte: Ps It I i _ •WMOiff.10-•I � `i i•?1'i I V e v ' �J .33 .4 a a I I ( .33 .33 .34 SkNI -j ��� `�'` i s� / T . D L ��`�� ice• L- , � L7 1 L ,r y, r+,-`'•�i � tom_* . 3 6 I { 1 I i y's ` l� 9L[MtYT1AT' fCY00L I • , , '� OiTt LO tY t11T � i I Kr � taw. LEGEND Fs AREA NOT REGULATED BY VALLCO CONST- PHASING MEMORR QAREA REGULATED BY DALLCO CONST. PHASING MEMO FIGURE L -I VALLCO PARK LAND USE PLAN:LEVEL LEVEL OF SERVICE & IMPROVEMENT COSTS s 'a uoMeettAv 1COAD 4 9 20 24 32 JU NI P1.Ro R/tA IOWY _ gG 25 27 I2 U . , 4 40eveNe I 3 cleetlt d,�o 5 14 ZI 29 33 IS M�ct,Gl.wl ROAD .• �) t 2 Co w . • 17 22 30 PauNd6C rD W a l0 3 RAINAOM/ O .4 _ = 3 19 23 1 PICai7E'LT FD. PRELIMINARY PLAN INTERSECTIONS 1979/8 LEVEL 1990 LEVEL. LITROVEMENT COST 1. STEVENS CREEK/BUBB 2. NCC EL S/BUBB 3. STEVENS CREEK/85 B- 0+ 4. STELLING/HOMESTEAD E- 0 2 LTO N/B to W/B 96,000 5. STE.LLNG/STEVENS CREEZ 0- C- 2 LTO W/B to 5/3 RTO E/B to 5/3 325,000 6. STE.LLNC/9CCLELLy5 C ITO S/B to W/B 72,000 7. STELLING/85 8. STE.LING/RAINBOW C C+ 9. DEANZA/HOMESTEAD E- 0- 2 LTO W/B to 5/3 4 Cans 9/B 370,000 10. OEANZA/280 (NORTH) C+ C- 11. DEANZA/280 (SOUTH) D- C 3 Lanes Thru N/B LTO Lao. 74/6 400,000 12. OEANZA/MARIANI 13. DEANZA/*AZANEO 14. OEANZA/STEVE7S CREEK E+ 0- 2 LSO W/B to S/B 4 Lanes Thou S/B 1,300,000 15. DEANZA/RODRIGOES 16. DEANZA/)1CC vtL N 17. DEANZA/BOLL34CER D- 0- 3 Lanes Thru S/B 2 LTO S/B to 0/B 100,000 18. SAGA/SVALE/RAINBOW 19. SARA/SVALE/PROSPECT C C- 2 LTO S/B to E/B 3 Lanes Thru S/B 185,000 20. BLANEY/HOMESTEAD 21. BLANET/STEVENS CREEK 22. BLANEY/BOLLINCEK 23. SLANEY/PROSPECT 24. WOLF'S/RONESTFAD C C- 3 Lanes Thru S/B 50,000 25. WOT.FE/PRUNEEIDCE 26. 00020/280 (NORTH) A- S+ 27. 40120/280 (SOUTH) A- 8+ 28. WOLFE/VALLCO PARKWAY 29. WOLF4/STEVENS CREEK 0+ D+ 2 LTO W/B co S/B RTO E/B Co 5/3 325,000 30, XILLER/BOLLI.NCER C+ C- 2 LTO S/B to E/B 55,000 31. NILL.ER/PROSPECT C 0+ 32. HOMESTEAD/TANTAU 33. STEVENS CREEK/TANTAU SUB -TOTAL 3.270,000 STEVENS CREEK/85 B- B 3 Cans Thru 0/5, 1 120 E/B to N/B 25,000 SUB -TOTAL 25,000 EPCLNEEALNG AVND CONTLNOENCIES - 225 SUS -TOTAL 772,000 o Haintaia Current Laval TOTAL 4.000,000 -5- FIGURE i-J Policy 3 Housing may be considered in conjunction with non-residential developments Such housing may be permitted in addition to the Floor Area Ratio established for non-residential uses. Policy 4. With the exception described below, the timing of development for Vallco Park properties shall be regulated by the Vallco Park Construction Phasing Memo. The timing of development for properties not regulated by the Vallco Park Construction Phasing Memo, as identified on Figure 2-I, shall be evaluated on a case -by -case basis in conjunction with a use permit review. The City shall evaluate a use permit proposal based upon a traffic assessment which describes the impact of a development on the ability to maintain a level of service D or better at arterial intersections. Policy S. The below -listed traffic management measures shall be incorporated into and made requirement of future development approvals for Vallco Park area projects. a. Vallco Park developers will contribute funds via a Construction Tax or other funding mechanisms to complete needed road improvements to satisfy the City's established level of service indicators. b. Neighborhood traffic management will be designed and installed to prevent traffic intrusion into neighborhood streets, particularly Finch and Tantau Avenues. c. A regional bus transfer station shall be built in the vicinity of Finch Avenue (extension) and Vallco Parkway. d. Development in Vallco Park will be designed t❑ facilitate pedestrian movements. Policy 6. The following community service mitigation measures shall be incorporated into future projects. a. Police security stations will be built into projects. Police communication repeater stations will be built into major buildings. b. Fire Protection measures will be built into major buildings, particularly multi -story buildings. Additonally, if deemed necessary by a panel of City and Central Fire District officials, a funding mechanism will be established to ensure that developers of multi -story buildings will pay for adequate manning levels and equipment to fight fire in multi -story buildings. -6-