Loading...
HomeMy WebLinkAbout25-078 Cline Glass_Service Order #1 dated 11-3-25 for Senior Center Mirror Replacement - 2026-324Contract/Purchasing Action Personnel Information Name Robert Griffiths Department Public Works  Division Facilities Date 10.31.2025 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation City of Cupertino Senior Center Bid Proposal.pdf Service Order Amount $960.00 Master Agreement Number 2025-030 Contract Start Date 06/02/2025 Contract End Date 06/30/2028 Firm Name Cline Glass Address 3517 Yale Way, Fremont, CA 94538, USA Phone (510) 490-4400 Consultant/Contractor Name Cline Glass Consultant/Contractor Email tomcline@garlic.com Project Name SO 1 Senior Center Mirror Replacement Project Location Senior Center Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.gov Master Agreement Maximum Compensation $60,000.00 Total Previously Encumbered to Date $0.00 Encumbrance this Service Order $960.00 Master Agreement Unencumbered Balance $59,040.00 SO GL #100-87-831 700-702 NWS Project Code Signature       11/03/2025 PST  Consultant/Contractor Signature Date       11/03/2025 PST  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       11/03/2025 PST  Management Analyst Signature Date Email: tomcline@garlic.com Date: 11/03/2025 PST Email: nathanv@cupertino.org Date: 11/03/2025 PST Email: PWMA@cupertino.gov Date: 11/03/2025 PST CA License #472048 DIR #1000014057 BID PROPOSAL Phone: (510) 490-4400 Fax: (510) 490-4410 3517 Yale Way Fremont | CA | 94538 ob Name Cupertino Senior Center Job Location:21251 Stevens Creek Blvd., Cupertino, CA Bid Date:10/30/2025 Attn:Contractor:City of Cupertino Architect:N/A Date Of Plans: Spec Sections:08810: Mirrors; Scope Of Work: Replace Existing 1/4" Mirror W/New 1/4" Mirror With Safety Backing: Material Cost - $ 472.00 Labor Cost - $ 488.00 Total Cost - $ 960.00 Estimate No.:24-6071 Addenda's Noted: Furnished & Installed:YES Tax Included:YES Union Shop:YES Base Bid: Alternates: Exclusions: Cleaning, Breakage And Protection. Also: This Quote Good For 90 Days Signed By: Fax No.: Robert Griffiths Tom Cline SO 1 Senior Center Mirror Replacement - Service Request Created:10/31/2025 Status:Signed Transaction ID:87980106-9d8c-4217-8815-a58dbf2ad0c5 "SO 1 Senior Center Mirror Replacement - Service Request" history Sundari Pilaka created the document 10/31/2025 5:32:06 PM PDT - IP address 99.72.152.114 Document was emailed to Cline Glass 10/31/2025 5:32:07 PM PDT Cline Glass opened the document 11/03/2025 12:00:59 PM PST - IP address 72.105.142.9:50060 Cline Glass signed the document 11/03/2025 12:01:13 PM PST - IP address 72.105.142.9:50060 Document was emailed to Nathan Vasquez 11/03/2025 12:01:14 PM PST Nathan Vasquez opened the document 11/03/2025 1:12:27 PM PST - IP address 64.165.34.3:7858 Nathan Vasquez signed the document 11/03/2025 1:12:41 PM PST - IP address 64.165.34.3:7858 Document was emailed to Public Works Management Analyst 11/03/2025 1:12:42 PM PST Public Works Management Analyst opened the document 11/03/2025 1:15:16 PM PST - IP address 64.165.34.3:16115 Public Works Management Analyst signed the document 11/03/2025 1:15:35 PM PST - IP address 64.165.34.3:16115 Document was successfully signed and filed 11/03/2025 1:15:35 PM PST