HomeMy WebLinkAboutCC 11-18-2025 Item No. 19 FY 25-27 City Work Program and TBD List_Supplemental ReportCC 11-18-2025 Item No. 19 FY 25-27 City Work Program and TBD List Supplemental Report CITY MANAGER’S OFFICE CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3212 CUPERTINO.GOV CITY COUNCIL STAFF REPORT SUPPLEMENTAL 1 Meeting: November 18, 2025 Agenda Item #19 Subject Review first quarterly update for the FY 25-27 City Work Program and make modifications with items from the TBD list Recommended Action 1)Receive first quarterly update for the FY 2025-27 City Work Program; 2)Review the TBD list and the FY 25-27 City Work Program, make any desired modifications to finalize the council priority projects Background: Council has requested modification to the TBD list (Attachment C). The updated TBD list is provided with this supplemental report as Attachment D. Staff have also updated the Q1 Dashboard Printout (Attachment B) after a resident brought to our attention that it had incorrect page numbers. This is included as Attachment E. Attachments Provided with Original Staff Report: A.FY 2025-2027 City Work Program B.Q1 Dashboard Printout C.TBD List as of November 2025 Attachments Provided with Supplemental 1: D.TBD List as of November 2025 – Updated E.Q1 Dashboard Printout – Updated D - TBD List as of November 2025 # Requested Item Requestor/ Seconder Date Requested Recommendation/ Council Motion Date Council Approved 1 Consider a policy to provide access to documents made available for closed sessions ahead of time with proper security measures. Accordingly, Councilmembers can read the materials before and after a closed session. Requestor: Chao Seconder: Moore At 7/16/24 Council meeting On 2/4 Council voted to keep this item on the TBD list until it is added to the Council Procedures Manual. Staff recommends removing this item from this list once it has been heard by the City Council. 2/4/25 2 Review the Cupertino City Council Procedures Manual Requestor: Chao Seconder: Moore At 12/3/24 Council meeting Revisions to the manual were done at the March 18 City Council Meeting. Staff recommends removing this item from this list once it has been heard by the City Council. 7/1/25 approved by council to agendize 3 Restore the previous responsibilities of the Audit Committee (Motion: An action item to restore the Audit Committee’s previous responsibilities. The motion passed with the following vote: Ayes: Chao, Moore, and Wang. Noes: Fruen and Mohan. Abstain: None. Absent: None). Requestor: Chao At 12/17/24 Council Meeting On 2/4 Council voted to agendize this discussion. On 5/20 Council directed the Audit Committee to discuss their scope and bring recommendations to Council. The Audit Committee discussed this at the July 28 meeting and recommendations were brought to Council at the October 7 CC meeting. Council directed this item to return to the Audit Committee for further discussion. Staff recommends removing this item from this list once it has been heard by the City Council. 2/4/25 approved by council to agendize 4 A study session to consider regulations on sound amplification devices in parks (Motion: A friendly amendment was approved to hold a study session on this item. Add this item to an agenda: Amend CMC Section 13.04.120 Use of Requestor: Moore Seconder: Chao At 9/17/24 Council meeting Staff recommends removing this item. Sound amplification is currently allowed in parks with a valid City permit as specified in CMC 13.04.120 Use of Park Property Section I. 2/4/25 approved by council to agendize D - TBD List as of November 2025 # Requested Item Requestor/ Seconder Date Requested Recommendation/ Council Motion Date Council Approved Park Property “No person in the park shall do any of the following: … 1. Use any system for amplifying sounds, whether for speech or music or otherwise, unless an exclusive use permit is first secured,” as… “No person in a park shall do any of the following: … 1. Use any system for amplifying sounds, whether for speech or music or otherwise, in an unreasonable loud manner, unless an exclusive use permit is for secured,” where the definition of “unreasonably loud manner” means “the volume of sound in the use or operation of any sound application equipment if such sound can be heard by a person from fifty (50) or more feet from the source of the amplification” (as defined in Oakland Muni Code) 5 Guidelines and Procedures regarding Proclamations and Certificates (Motion: A friendly amendment was approved to agendize this item as appropriate.) Requestor: Chao 1/15/25 added by email. Email attached below. Staff recommends removing this item because each Mayor establishes their own ceremonial calendar at the beginning of each year. 2/4/25 approved by council to agendize 6 Grant Policy Update Requestor: Chao 6/13/25 Verbal Request This item is tentatively scheduled for January 2026. Staff recommends removing 7/1/25 approved by D - TBD List as of November 2025 # Requested Item Requestor/ Seconder Date Requested Recommendation/ Council Motion Date Council Approved Seconder: Moore this item from this list once it has been heard by the City Council. council to agendize 7 Revisions to Commissioners Handbook pursuant to updates in the City Council Procedures Manual (accompanies amendments from March 2025 to Procedures Manual) Requestor: Chao Seconder: Moore 12/3/24 Staff recommends removing this item from this list once it has been heard by the City Council. N/A 8 A study session on Memorial Park and the proposed design. Most people I've spoken to love Memorial Park the way it is now where it is mostly naturally space, rather than one jam packed with stuff in the proposed plan. I hope to consider a minimalist option with upgrade of existing features and only include some low impact features. And reduce the cost. Maybe we might refer it to Parks and Rec Commission to consider options. Requestor: Chao 9/23/25 added by email Staff recommends considering this item for the FY 25-27 CWP to discuss status of current projects and staff capacity to take on new ones. N/A 9 Study Session on updates to the Policies and Guidelines on Sister Cities, Friendship Cities, and International Delegations pertaining to international travel (Postponed on April 2, 2025) Requestor: Chao Seconder: Wang At 3/4/25 Council meeting The policy will be coming to Council in February 2026. Staff recommends removing this item from this list once it has been heard by the City Council. N/A 10 Study session regarding potential ballot measure to protect frontage retail; rezoning of mixed-use sites to preserve retail Requestor: Chao Seconder: 9/15/25 Verbal Request and 11/4/25 Staff recommends considering this item for the FY 25-27 CWP to discuss status of current projects and staff capacity to take on new ones. N/A D - TBD List as of November 2025 # Requested Item Requestor/ Seconder Date Requested Recommendation/ Council Motion Date Council Approved Moore/ Wang added by email 11 Consider establishing protections for parkland, similar to those adopted by the cities of Sunnyvale and Milpitas Requestor: Moore Seconder: Chao 9/30/25 Verbal Request Staff recommends considering this item for the FY 25-27 CWP to discuss status of current projects and staff capacity to take on new ones. N/A 12 Formation of a City Council Subcommittee on Festival/Facilities Fee Waiver Policy Requestor: Chao Seconder: Moore 9/29/25 Verbal Request This item will be drafted as a Council consent item. N/A 13 Review of contractual duties and scope of work for Cupertino Chamber of Commerce agreement. Requestor: Chao Seconder: Moore 10/1/25 and 11/10/25 added by email Staff recommends removing this item from this list once it has been heard by the City Council. N/A 14 Study Session on various fees; in lieu, enterprise at BBF and McClellan Ranch, AB 1600 SB 1 Requestor: Moore Seconder: Chao Added in agenda review Staff recommends removing this item from this list once it has been heard by the City Council. N/A 15 Study Session to review the Arts & Culture Commission’s recommendation to the Municipal Code standards for art in public and private development, including the standards in the Municipal Code and developing an Art-in-lieu fee policy. (Application No. MCA-2025-003) Added by City Council Added at 10/21/25 CC Meeting Staff recommends removing this item from this list once it has been heard by the City Council. N/A D - TBD List as of November 2025 # Requested Item Requestor/ Seconder Date Requested Recommendation/ Council Motion Date Council Approved 16 Review placement, design, and approval process for bike rack installations in City parks; Requestor: Moore Seconder: Chao 11/10/25 added by email Staff recommends removing this item from this list once it has been heard by the City Council. N/A 17 Discuss the future of Blackberry Farm Golf Course - From CIP Budget Book FY 2024-25: "The current facility that was constructed in the 1960’s is functionally outdated and lacks many of the amenities that are found at successful golf course operations. The 1960’s irrigation system is failing due to age, which results in an excessive use of water and labor to maintain the system. The increasing retail cost of water exacerbates the operational inefficiency. The facilities lack a driving range, and instructional areas limit their potential to attract new users. The existing restaurant needs full renovation in order to attract banquets, weddings and other non-golf-related events. This study would build on the December 2015 report and recommendations made by the National Golf Foundation, Inc. The outcome of the study will help determine the level of investment Requestor: Mohan Seconder: Fruen 11/11/25 added by email Staff recommends removing this item from this list once it has been heard by the City Council. N/A D - TBD List as of November 2025 # Requested Item Requestor/ Seconder Date Requested Recommendation/ Council Motion Date Council Approved required in the facility. Study and public outreach are complete. Staff will present to City Council for direction." When will this matter come before Council? 18 Discuss the future of Blackberry Farm Swimming Pool - Improvements to the two pools at BB Farm needed. Bid and permit processes were underway. Has construction been completed? Requestor: Mohan Seconder: Fruen 11/11/25 added by email Staff recommends removing this item from this list once it has been heard by the City Council. N/A 19 Explore Red Light Cameras in Cupertino Requestor: Moore Seconder: Chao 10/9/25 verbal request Staff recommends considering this item for the FY 25-27 CWP to discuss status of current projects and staff capacity to take on new ones. N/A 20 Options for Expanding Housing Element Site Inventory to Address Potential Shortfall in Zoned Capacity Requestor: Fruen Seconder: Mohan 11/12/25 added by email Staff recommends considering this item for the FY 25-27 CWP to discuss status of current projects and staff capacity to take on new ones. N/A 21 Public outreach and engagement strategy – establishing citywide standards to embed meaningful engagement into every city project Staff recommends considering this item for the FY 25-27 CWP to discuss status of current projects and staff capacity to take on new ones. N/A D - TBD List as of November 2025 # Requested Item Requestor/ Seconder Date Requested Recommendation/ Council Motion Date Council Approved 22 Approval process for any entity to place their logo, name, brand, on any City property Requestor: Chao Seconder: Moore 11/13/25 in agenda review Staff recommends removing this item from this list once it has been heard by the City Council. N/A 23 Veterans Day Event Support Requestor: Moore Seconder: Chao 11/13/25 in agenda review Staff recommends removing this item from this list once it has been heard by the City Council. N/A 24 Veterans Day Memorial Maintenance Requestor: Moore Seconder: Chao 11/13/25 in agenda review Staff recommends removing this item from this list once it has been heard by the City Council. N/A Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $200,000.00 $200,000.00 $1,440.31 $198,559.69 11/10/2025 City Manager's Office Updates #  Task Status Task Start Task End Update % Completed 1.1 Research In Progress 7/1/2025 3/31/2026 1.1 Staff held individual meetings with County Fire and the Cupertino Sanitary District, external agencies involved in the permitting approval process, to discuss permitting for small businesses. Staff also engaged with businesses across different stages of the permitting process to better understand their overall experiences with internal and external permitting process. 1.2 Staff reviewed and analyzed data sources that can be utilized in the development of the Economic Development Data Dashboard. 5.00 1.2 Execution Phase In Progress 7/1/2025 7/1/2026 1.2 As part of the City’s ongoing Shop Local program, staff implemented two new initiatives: Dine Out for the 4th in July and Restaurant Week in October. As part of Restaurant Week’s business support efforts, staff, in partnership with the Cupertino Chamber of Commerce, hosted a technical assistance workshop in October to help businesses learn strategies for attracting and retaining customers, further strengthening community engagement and program visibility. More information can be found on the Economic Development webpage. 1.2 Staff completed a full upload of active business license data to the Business Directory database and added new resource providers to the Business Resource Directory. Currently, the Business Directory features more than 1,300 businesses, and the Resource Directory includes over 40 resource providers. 30.00 1.1 Streamline permitting process for small businesses 1.2 Retention and recruitment of retail and small businesses: Explore options to support small businesses/startups, fill empty storefronts, and encourage entry of new forms of retail to promote revitalization • Explore more themed events like restaurant week, and other festivals to bring vitality to Cupertino businesses • Improve placemaking in the city and the city's revenue stream Fiscal Strategy Economic Development for Retail and Small Businesses (Page 1 of 2) 1 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $200,000.00 $200,000.00 $1,440.31 $198,559.69 11/10/2025 City Manager's Office Updates #  Task Status Task Start Task End Update % Completed 1.3 Outreach In Progress 7/1/2025 7/1/2026 1.2 For the Dine Out and Restaurant Week initiatives, staff conducted targeted business outreach through door-to-door visits, phone calls and emails. Staff developed promotional videos and promoted the programs across the City’s social media channels. The Chamber also helped with outreach efforts by encouraging participation. For increased visibility, a “Dine Local. Dine in Cupertino.” banner was installed on Stevens Creek Boulevard and participating businesses received branded posters and window clings to display at their storefronts. Yard signs promoting the campaign were placed in the public right-of-way throughout the city. Additionally, staff distributed postcards at community events to encourage community participation. Local media coverage also helped raise awareness and promote community participation. 30.00 1.4 Closing Processes Future 7/1/2026 7/1/2026 Project will be complete upon the conclusion of the execution phase. 0.00 1.1 Streamline permitting process for small businesses 1.2 Retention and recruitment of retail and small businesses: Explore options to support small businesses/startups, fill empty storefronts, and encourage entry of new forms of retail to promote revitalization • Explore more themed events like restaurant week, and other festivals to bring vitality to Cupertino businesses • Improve placemaking in the city and the city's revenue stream Fiscal Strategy Economic Development for Retail and Small Businesses (Page 2 of 2) 2 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 11/10/2025 City Manager's Office Updates #  Task Status Task Start Task End Update % Completed 1.1 Planning Phase Complete 7/1/2025 8/31/2025 The City Council reinstated the EDC through Ordinance 25-2273, which was approved following a first reading on July 1, 2025, and a second reading on July 15, 2025. The ordinance took effect 30 days later, on August 14, 2025. 100.00 1.2 Outreach Complete 7/1/2025 10/7/2025 The application period for the EDC closed on September 2, 2025. The City Council conducted interviews on September 15, 2025, and appointed five members representing the following industries: Hospitality/Tourism, Technology, Commercial Real Estate, Education, and Retail/Small Business. On October 7, 2025, the City Council designated a primary and alternate representative from the City Council to the EDC. Information on the EDC and the new appointees can be found on the EDC webpage. 100.00 1.3 Design Phase In Progress 9/15/2025 11/30/2025 A press release announcing the reinstatement of the EDC was issued on September 19, 2025. During the week of September 22, staff facilitated onboarding and orientation activities, which included administration of the oath of office, orientation, establishment of City email accounts, creation of the Committee’s webpage, and completion of other administrative setup tasks. 95.00 1.3 Create a small business council, provide regulatory support. 1.4 Restore the Economic Development Committee Fiscal Strategy Small Business Council / Economic Development (Page 1 of 2) 3 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 11/10/2025 City Manager's Office Updates #  Task Status Task Start Task End Update % Completed 1.4 Execution Phase Future 11/15/2025 12/31/202 5 The EDC will host its first quarterly meeting before the end of calendar year 2025, with regular quarterly meetings to continue thereafter. 0.00 1.5 Closing Processes Future 1/1/2026 6/30/2026 This project will close out once a subcommittee within the EDC is established. This subcommittee will focus on providing regulatory support through the formation of a Small Business Council. 0.00 1.3 Create a small business council, provide regulatory support. 1.4 Restore the Economic Development Committee Fiscal Strategy Small Business Council / Economic Development (Page 2 of 2) 4 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 11/10/2025 Administrative Services Updates #  Task Status Task Start Task End Update % Completed 1.1 Planning Phase Complete 7/1/2025 7/31/2025 Contacted current list of qualified candidates on the MA list to determine interest. Held selection interviews with qualified candidates and performed reference checks of top candidate. 100.00 1.2 Execution Phase Complete 8/1/2025 10/31/2025 Did not pursue offer to candidate. Staff pivoted to open recruitment approach for broader candidate outreach; finalized preparation for position posting. Position was posted 9/3 with interviews concluded by the middle of October. 100.00 1.3 Closing Processes In Progress 10/20/2025 12/31/2025 Reference checks and final offer presented to candidate. Start date anticipated in December. 50.00 Explore a Grants Analyst Position Fiscal Strategy Grants Analyst 5 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $250,000.00 $250,000.00 $0.00 $250,000.00 11/10/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.1 Research In Progress 7/1/2025 12/31/2025 Exploration of industry standards and regional practice 50.00 1.2 Planning Phase In Progress 1/3/2025 2/20/2026 Compare with existing process and methods/paths to update; identify potential cost of software update and/or materials 50.00 1.3 Procurement Phase Future 2/20/2026 3/31/2026 If software update and/or new materials are necessary, begin purchasing process. 0.00 1.4 Execution Phase Future 4/1/2026 5/29/2026 Update procedures and process and any public handouts, update city website. 0.00 1.5 Closing Processes Future 6/1/2026 6/30/2026 Project will be completed once updates have been made. 0.00 Develop a suite of improvements to (1) improve access to, and (2) speed the processing of permits for small home upgrades so as to enhance compliance and improve overall efficiency. Improve turnaround times. Set SLA's for staff and outsourced reviewers, customer service KPI's, templates to reduce back and forth, internal staff expertise to reduce consulting expenses. Quality of Life Permit Streamlining and Simplification for Small Home Upgrades 6 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $25,000.00 $25,000.00 $0.00 $25,000.00 11/10/2025 Administrative Services Updates #  Task Status Task Start Task End Update % Completed 1.1 Research Complete 7/1/2025 9/30/2025 1. Investment Policy (IP): Researched other agencies. Additional research still needed for refinement of policy and quarterly report 2. Cash Flow Policy (CFP): Researched other agencies and have begun developing a policy and cash flow model. 100.00 1.2 Planning Phase Complete 7/1/2025 9/30/2025 1. IP: Start drafting policy 2. CFP: Draft policy has been created but still being refined before ASD and CM review. Cash flow model is complete and in test. 100.00 1.3 Execution Phase In Progress 10/1/2025 6/30/2026 1. IP: complete policy 2. CFP: complete policy 50.00 Review and assess the City’s investment policy and best practices with an analysis of quarterly treasurers report. Establish a cashflow management policy with the goal to reduce the total percentage in cash from 20% to 2% and to reduce the total percentage in cash and cash-equivalent to at most 10%, on par with other cities. Fiscal Strategy Financial, Investment, and Cashflow Policy Review 7 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $1,000,000.00 $1,000,000.00 $0.00 $1,000,000.00 11/10/2025 City Attorney's Office Updates #  Task Status Task Start Task End Update % Completed 1.1 Research In Progress 10/1/2025 11/30/2026 Research impact fees in other cities and legal parameters for each fee. This item was intended to start in year 2 but staff have already begun preliminary discussions. 20.00 1.2 Planning Phase Future 11/30/2026 1/31/2027 Present options and findings to Council and determine next steps. 0.00 1.3 Execution Phase Future 1/31/2027 5/31/2027 Implement fees as applicable pending Council direction. 0.00 1.4 Closing Processes Future 5/31/2027 6/30/2027 Project will be completed once updates are made. 0.00 Conduct nexus studies to review a range of impact fees, such as Traffic Impact Fee, Retail Impact Fee, BMR Impact Fee, and Parkland Impact Fee, and other means of offsetting conversion of commercial land uses to residential to ensure the impact fees are defensible against legal challenges. Fiscal Strategy Defensible Impact Fee Nexus Study for Traffic Impact Fee, Retail Impact Fee, BMR Impact Fee, and Parkland Impact Fee 8 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $250,000.00 $250,000.00 $0.00 $250,000.00 11/10/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.1 Research In Progress 7/1/2025 11/12/2025 1) Locate areas of unprogrammed turf that would facilitate pollinator vegetation. 2) Prepare for pilot study to verify appropriate water usage. 70.00 1.2 Procurement Phase Future 11/12/2025 12/31/2025 1) Procure consultant to prepare drawings for turf conversion. 0.00 1.3 Planning Phase In Progress 10/1/2025 7/31/2026 2) Initiate irrigation pilot study to verify appropriate water usage. 25.00 1.4 Design Phase Future 1/1/2026 5/31/2026 1) Prepare plans for turf conversion. Coordinate effort with Sustainability Commission. 0.00 1.5 Execution Phase Future 5/31/2026 7/31/2026 1) Convert turf to pollinator vegetation.0.00 1.6 Closing Processes Future 7/31/2026 9/30/2026 2) Evaluate pilot irrigation program and establish next steps as necessary. 0.00 1) Reduce irrigation while increasing pollinator supporting vegetation (turf conversion). 2) Optimize irrigation systems including CUSD use agreement sites. Environmental Sustainability Water Conservation Policies 9 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $65,000.00 $65,000.00 $951.18 $64,048.82 11/10/2025 Parks & Recreation Updates #  Task Status Task Start Task End Update % Completed 1.1 Research In Progress 7/1/2025 12/31/2025 Work with SASCC to provide the gap and feasibility analysis and bring together a working group 10.00 1.2 Outreach In Progress 7/1/2025 12/31/2025 Enhance marketing efforts for Senior Center and programs 50.00 1.3 Planning Phase In Progress 7/1/2025 12/31/2025 Explore potential external agencies to provide services to enhance Senior Services 50.00 1.4 Execution Phase Future 1/1/2026 2/28/2026 Analyze SASCC gap and feasibility analysis results 0.00 1.5 Closing Processes Future 3/1/2026 6/30/2026 Share results with the appropriate departments and implement what is feasible 0.00 6.1 Due to the high cost of senior centers, many seniors have to "age in place", but do still need services typically provided in senior centers, in addition to common home maintenance. 6.2 Utilizing the survey results conducted in 2022 and 2023 to meet the needs of Cupertino seniors 6.3 Consider consultant services similar to Palo Alto or Saratoga Senior Center to enhance services, while reducing cost to the city. NOTE: Cupertino Age-Friendly could make a presentation on the result of 2023 survey, in collaboration with the city staff. NOTE: Successful Aging Solutions & Community Consulting (SASCC), who runs the Saratoga Senior Center could provide a free gap analysis and feasibility analysis Quality of Life Enhance Senior Services 10 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $200,000.00 $200,000.00 $0.00 $200,000.00 11/10/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.1 Research In Progress 7/1/2025 12/31/2025 Staff to look into various concepts for city properties. Discussions on CUSD/Finch have occurred during closed sessions since September 2025. 25.00 1.2 Design Phase Future 1/1/2026 4/30/2026 Produce memo with options and develop scope for report. 0.00 1.3 Execution Phase Future 5/1/2026 5/31/2026 Present study to Council.0.00 1.4 Closing Processes Future 6/1/2026 6/30/2026 Project complete once Council receives study. 0.00 Future planning strategies for Stocklmeir house/garages, Blech House, Blue Pheasant. Goal of judicial use of city-owned properties. Investigate potential purchase of CUSD Finch/Phil property. Include the McClellan Barn and the house at the entrance of Blackberry Farm. Quality of Life City Properties: Planning for Optimal Use 11 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 11/10/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 7/1/2022 9/30/2022 Researched 5G ordinance regulations in other cities. 100.00 1.3 Execution Phase Complete 4/1/2023 10/21/2025 Staff is finalizing a muni code update based on input from City Council. This update will govern the installation of wireless small cell facilities within the Public Right of Way. This was adopted at the October 21, 2025 City Council meeting. 100.00 1.4 Closing Processes Complete 9/30/2025 11/30/2025 This ordinance will go into effect on November 20. 100.00 Update 5G Ordinance Quality of Life 5G Ordinance 12 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $40,000.00 $40,000.00 $0.00 $40,000.00 11/10/2025 City Manager's Office Updates #  Task Status Task Start Task End Update % Completed 1.1 Research In Progress 7/1/2025 3/31/2026 Emergency policies are currently being reviewed in order to assess need for updates. 50.00 1.2 Planning Phase In Progress 7/1/2025 2/28/2026 Staff is developing a plan for the EOC activation and the recruitment for a new Emergency Manager. 60.00 1.3 Execution Phase In Progress 9/1/2025 3/1/2026 Updates will be made as necessary to the Emergency policies. EOC activation will commence in December. 60.00 1.4 Closing Processes Future 3/1/2026 6/30/2026 Project will be completed upon completion of EOC activation, Emergency Manager recruitment, and potential policy updates. 0.00 Review fire, earthquake, tornado, active shooter, tsunami, hazardous transport accident policies; and ensure EOC is active and functioning with a permanent position not consultant running the program. Quality of Life Emergency Operations Readiness 13 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $250,000.00 $250,000.00 $0.00 $250,000.00 11/10/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.1 Research In Progress 7/1/2025 11/30/2025 Prepare RFP Documents for Advertising 60.00 1.2 Procurement Phase Future 11/30/2025 1/31/2026 Advertise project, select consultant, execute contract. 0.00 1.3 Outreach Future 2/1/2026 9/30/2026 Prepare document and solicit public input. 0.00 1.4 Closing Processes Future 10/1/2026 11/30/2026 Accept final plan.0.00 Create an Urban Forest Master Plan that includes an updated and expanded tree list which will increase the number of trees, enhance the City's tree canopy, and promote landscaping throughout the City. Environmental Sustainability Urban Forest Program 14 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $10,000.00 $10,000.00 $0.00 $10,000.00 11/10/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.1 Research In Progress 7/1/2025 11/28/2025 Explore industry standards, regional practices, and legal parameters. 50.00 1.2 Design Phase In Progress 12/1/2025 3/27/2026 Consider updates and potential PC/CC review. 25.00 1.3 Execution Phase Future 3/30/2026 4/30/2026 Finalize updates to documents, website, CMC. 0.00 1.4 Closing Processes Future 5/1/2026 5/30/2026 Project will be completed once updates are finalized. 0.00 1. Consider a community meeting requirement for any major project application, especially those requiring a general plan amendment, as some other cities have adopted. 2. Consider increasing notification radius from 300 feet to 500 feet (or even 1000 feet for major projects) for any project application, especially those requiring a general plan amendment. 3. Improve notification methods for SB 330 preliminary applications, streamlined projects, not requiring planning/council approval and other projects Public Engagement & Transparency Add Notifications for SB 330 & Other Projects During the Application & Approval Process 15 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $100,000.00 $100,000.00 $0.00 $100,000.00 11/10/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.2 Research In Progress 10/1/2024 11/30/2025 The City of Cupertino has joined with other West Valley Cities to jointly study opportunities to address issues faced by the unhoused and will execute a group contract with GoodCity to conduct the study. The Needs Analysis portion of the study is complete and the feasibility portion is nearing completion. 75.00 1.3 Procurement Phase Complete 10/1/2024 4/2/2025 The City Manager was authorized to sign a Memorandum of Understanding to execute the agreement to join the West Valley Cities joint feasibility study during the April 2, 2025 City Council meeting. 100.00 1.4 Execution Phase Complete 6/30/2025 11/30/2025 On July 15, 2025, policies on oversized parking and RVs were considered by the City Council. An ordinance was presented for first reading on Sep 3, 2025 and adopted on Sep 16, 2025. Outreach to RV residents will be coordinated with WVCS and Sheriff's Office prior to enaction on Oct 16, 2025. 100.00 1.5 Closing Processes In Progress 11/30/2025 6/30/2026 Upon completion, the results of the feasibility study will be presented to the City Council for a study session. The City Council will also consider other policies related to RVs and encampment policies will be considered by Council on November 4, 2025 25.00 Determine best practices for limited budget smaller cities to manage the unhoused. Review RV practices in surrounding cities for impacts and potential adoption. Review transitional housing outcomes in surrounding cities. Policies to include nimble contingency plans. Quality of Life Unhoused Policies 16 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 11/10/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.1 Design Phase In Progress 7/1/2025 6/30/2026 Dialog Consulting to complete design drawings for City Hall Annex and future EOC. 50.00 1.2 Planning Phase In Progress 7/1/2025 11/18/2025 Hold City Hall Study Session for City Hall Retrofit discussion 20.00 1.3 Procurement Phase Future 7/1/2026 11/30/2026 1) Procure contractor for City Hall Annex Renovation. 2) Prepare RFP documents for design of City Hall Retrofit, procure consultant, execute contract. 0.00 1.4 Design Phase Future 2/16/2026 2/15/2027 Prepare Design Drawing for City Hall Retrofit Project 0.00 1.5 Execution Phase Future 10/1/2026 7/1/2027 Renovation for City Hall Annex will begin in fall 2026. Construction of retrofit improvements will begin in early 2027. 0.00 1.6 Closing Processes Future 7/1/2027 5/1/2029 The completion of the City Hall annex is scheduled for mid-2027. Retrofit improvements are tentatively scheduled for completion summer 2029. 0.00 Implement the previously approved 2022 Council plan with EOC migration 1) City Hall Annex Renovation (including the EOC) 2) City Hall Retrofit Quality of Life City Hall Retrofit and City Hall Annex Renovation including the EOC 17 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $238,000.00 $238,000.00 $12,208.62 $225,791.38 11/10/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 7/1/2019 10/30/2019 Researched need for ELI developmentally disabled housing and moderate income housing and determined possible City locations. 100.00 1.3 Planning Phase Complete 7/1/2021 8/16/2022 Scoped affordable housing project with non-profits/developers and worked with Public Works to determine feasibility of project on City sites. Had Council study session March 15. RFP was released in August . 100.00 1.4 Procurement Phase Complete 2/9/2021 4/15/2025 Two responses to the NOFA were received in Feb 2025 for the Mary Ave and Wolf Rd projects. On Mar 27, 2025 the Housing Commission recommended providing funding assistance to both projects. On April 15, Council approved funding for both projects. 100.00 1.5 Design Phase Complete 12/19/202 4 9/30/2025 Staff studied opportunities for preserving expiring BMR housing and presented options. Preserving BMRs through acquisition was found to be infeasible with current BMR funds. BMR Anti-Displacement policy: priority replacement on the waitlist passed on June 15, 2025. Mary Ave Villas submitted development application and study session was held in July. 100.00 Explore opportunities to preserve existing expiring BMR housing. Develop ELI (Extremely Low Income) and BMR housing units for Developmentally Disabled individuals (IDD) on City-owned property as well as the County-owned sites. Housing Preserve existing and develop new BMR/ELI Housing (Page 1 of 2) 18 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $238,000.00 $238,000.00 $12,208.62 $225,791.38 11/10/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.6 Execution Phase In Progress 1/31/2023 12/30/2025 Council selected developer through approval of an ENA for the Mary Avenue Site in February. Developer to continue community outreach efforts and submit application. City Council has authorized $4 million in funding for the development. Loan documents, BMR agreements, and land lease are currently being drafted. Application has been deemed complete and is currently under review for compliance. 75.00 1.7 Closing Processes In Progress 9/30/2025 2/20/2026 Execution of loan, BMR agreement, and land lease expected to be complete in October 2025. Final step includes entering into Disposition and Development Agreement by 2025. Will present final DDA to Council in early 2026. Construction will commence. 25.00 Explore opportunities to preserve existing expiring BMR housing. Develop ELI (Extremely Low Income) and BMR housing units for Developmentally Disabled individuals (IDD) on City-owned property as well as the County-owned sites. Housing Preserve existing and develop new BMR/ELI Housing (Page 2 of 2) 19 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $240,000.00 $240,000.00 $55,917.75 $184,082.25 11/10/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.2 Procurement Phase Complete 10/9/2020 4/30/2024 RFP sent out in Oct 2020. Proposals evaluated and RRM Design Group was selected for this project, but was put on hold in October 2023. RRM Design Group contract terminated in late 2023. Council approved a new agreement with Placeworks in April 2024. 100.00 1.3 Outreach In Progress 12/1/2024 12/31/2025 A community meeting was held on 2/10/2025 in hybrid format to discuss why we need objective standards, how they are different from subjective standards and how the community can continue to engage on this subject. Over 20 participants were in attendance. 80.00 1.4 Design Phase In Progress 7/31/2025 12/30/2025 Prepare and review draft documents internally. 50.00 1.5 Execution Phase In Progress 10/1/2025 2/28/2026 Project review and approval by Planning Commission and City Council. 25.00 1.6 Closing Processes Future 3/31/2026 3/31/2026 Complete project, publish final documents on website etc. 0.00 Create objective design standards for residential projects, including ensuring adequate buffers from neighborhood low‐density residential development Quality of Life Residential and Mixed Use Residential Design Standards FY 23 20 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 11/10/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.1 Planning Phase Complete 7/1/2024 7/1/2024 Staff completed studies on designated corridors with potentially high concentration of bikes and peds due to recent bike or ped related improvements (Blaney, Bubb, Mary, Prospect, McClellan). 100.00 1.2 Execution Phase Complete 7/1/2024 12/31/2024 Staff made adjustment of posted speed limits in the field for initial streets listed above. 100.00 1.3 Closing Processes In Progress 1/1/2025 6/30/2026 Municipal Code Amendments to be adopted upon completion of a proposed City-wide study, which is included as a Q1 budget proposal to collect additional data. 30.00 Lower speed limits where feasible pursuant to state adopted Assembly Bill 43. Transportation Speed Limit Lowering (AB 43) 21 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $25,000.00 $25,000.00 $0.00 $25,000.00 11/10/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.1 Research Future 1/1/2026 2/28/2026 In collaboration with CAO, staff will do research to determine what needs to be changed 0.00 1.2 Procurement Phase Future 3/1/2026 4/15/2026 Staff will prepare an RFP for services and based on responses may need to request budget amendment from Council to complete scope of work. 0.00 1.3 Design Phase Future 5/15/2026 6/15/2026 Staff will refine contract and scope of work with selected consultant. 0.00 1.4 Outreach Future 7/1/2026 7/31/2026 Outreach to the public, including the business community. 0.00 1.5 Design Phase Future 8/1/2026 8/31/2026 Staff will work with consultant to determine what changes may be proposed. 0.00 1.6 Execution Phase Future 9/1/2026 11/30/2026 Staff will work with consultant to draft Ordinances and bring for Council consideration at a public hearing. 0.00 1.7 Closing Processes Future 12/1/2026 1/31/2027 Ordinance may be updated upon Council direction. 0.00 Update Sign Ordinance. Quality of Life Sign Ordinance 22 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $330,000.00 $330,000.00 $307,960.76 $22,039.24 11/10/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.1 Procurement Phase Complete 7/1/2024 12/31/2024 Agreement executed December 2024.100.00 1.2 Execution Phase In Progress 1/1/2025 5/31/2026 Phase 1 is complete. Project recommendations are being developed and Phase 2 outreach is underway. An update has been presented to the Bike Ped and Planning Commissions. An update was also provided at the 11/4/25 City Council meeting. 70.00 1.3 Closing Processes Future 6/1/2026 6/30/2026 City Council adoption of plan expected June 2026. 0.00 This item is a consolidation of existing and new transportation efforts aiming to further goals outlined in the City's Vision Zero Initiative, including: 1) Review and update the bike plan 2) Review and update the pedestrian plan 3) Review current Complete Streets Policy and propose adjustments to create a better interface between all modes of transportation Transportation Active Transportation Plan 23 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $50,000.00 $50,000.00 $0.00 $50,000.00 11/10/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 10/5/2022 2/15/2023 Staff completed research on bike rack and installation requirements 100.00 1.3 Outreach Complete 10/19/2022 4/16/2025 Staff gathered feedback and recommendations from commissions 100.00 1.4 Planning Phase Complete 9/4/2023 4/30/2025 BPC Subcommittee and Rotary finalized locations for bike racks at parks. 100.00 1.5 Execution Phase In Progress 5/1/2025 6/30/2026 Decorative bike racks purchased by Rotary have been installed. U-shape racks to be purchased and installed imminently. Locations for U-shape rack installations being investigated. 50.00 1.6 Closing Processes Future 6/30/2026 6/30/2026 Project will be complete once bike racks are installed. 0.00 Increase the inventory of bicycle facilities and amenities, such as bike racks, citywide. Transportation Bicycle Facilities FY 23 24 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 11/10/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.1 Research Complete 1/30/2024 8/30/2024 CIP and CDD staff completed the research phase by examining multiple Bay Area jurisdictions. 100.00 1.2 Outreach Complete 9/1/2024 5/31/2025 Study session held at the 9/23/24 Arts and Culture Commission. Staff will return in early 2025 with modifications to the existing policy and Municipal Code for the Commission's review. Staff will engage with SVCREATES to review Commission recommendation. 100.00 1.3 Execution Phase In Progress 5/19/2025 2/28/2026 Arts and Culture Commission finalizing recommendations in Spring 2025. Afterwards, this will be brought to the City Council for a First and Second Reading. Last revision approved by ACC on July 28, 2025. Planning Commission reviewed on September 23, 2025. CC conducted a study session on October 21, 2025. 75.00 1.4 Closing Processes Future 2/28/2026 3/30/2026 Muni Code will be updated based on Council direction. 0.00 Revisit Municipal Code standards for art in public and private development, including the standards in the Municipal Code and developing an Art‐in‐lieu fee policy. Quality of Life Art in Public and Private Areas 25 Power BI Desktop Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $50,000.00 $50,000.00 $38,699.70 $11,300.30 11/10/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 1/31/2024 6/1/2025 Staff has completed research and coordination with neighboring jurisdictions about policy options for new buildings. Policy options for existing buildings are currently being assessed in partnership with regional jurisdictions and contractors. 100.00 1.3 Outreach Complete 8/1/2024 7/31/2025 Workshops and stakeholder calls with local businesses on existing building policies have been completed. Residential outreach campaign and survey in progress with support from a contractor. 100.00 1.4 Execution Phase Complete 5/1/2024 4/30/2025 Due to recent legal rulings, a Reach Code replacement for new building electrification was approved by Council in September 2024. The code became effective in April 2025, following CEC an CBSC approval. 100.00 1.5 Planning Phase In Progress 3/1/2025 11/30/2025 Draft policy options for existing buildings electrification will be developed based on feedback from community and regional approach. 97.00 Conduct public outreach, policy research, and coordinate with regional efforts to develop policy options for electrification of Cupertino's buildings in light of recent legal rulings inhibiting certain electrification efforts. Environmental Sustainability Electrification Study 26