Loading...
HomeMy WebLinkAboutPC Reso 20653-U-80 RESOLUTION NO. 2065. OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF A USE PERMIT TO CONVERT A RESIDENTIAL STRUCTURE CONSISTING OF APPROXIMATELY 1,300 SQ. FT. INTO AN OFFICE BUILDING. APPLICANT: George H. Buck ADDRESS: 1112 Curtner Avenue, San Jose, California 95125 SUBMITTED: March 14, 1980 LOCATION: Northeast corner of Foothill Boulevard and Stevens Creek Boulevard FINDINGS AND SUBCONCLUSIONS: Approval is recommended subject to the findings as set forth on Page 1 and subconclusions as set forth in the Minutes of the Planning Commission meeting of April 16, 1980. CONDITIONS: 1-14. Standard Conditions to the extent that they do not conflict with the special conditions enumerated herein. In the event a conflict does exist, the special conditions as enumerated herein shall apply. 15. The approval is based upon Exhibits A, B, and B-1 of Application 3-U-80 as may be amended by additional conditions contained herein. 16. The applicant shall eliminate the concrete slab and parking space shown on the westerly side of the existing building and replace said area with landscaping to be reviewed and approved by the Architectural and Site approval Committee. 17. The applicant shall be required to install a 6 ft. high sound attenuation wall along the easterly property line to be set back at the building setback line and then stepped down as it approaches Stevens Creek Boulevard. The wall shall be reviewed and approved by the Architectural and Site Approval Committee. 18. The applicant shall record a covenant obligating existing and future property owners to agree to provide reciprocal ingress/egress easements with the adjoining property to the north at such time in the future as the City can require the same of the adjoining property owner. 19. The existing garage structure shall be removed and all existing specimen trees preserved subject to the review and approval of the Architectural and Site Approval Committee. 20. The applicant shall present elevation exhibits to the Architectural and Site Approval Committee which demonstrates the rehabilitation of the building to appear more like an office structure. -2- 3-U-80 Planning Commission Resolution No. 2065 (continued) PASSED AND ADOPTED this 16th day of April, 1980, at a regular meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: Commissioners Blaine, Claudy, Vice -Chairman Koenitzer NAYS: None ABSTAIN: None ABSENT: Commissioner Adams APPROVED: Is/ R. D. Koenitzer R. D. Koenitzer, Vice -Chairman Planning Commission ATTEST: Robert Cowan Assistant Planning Director -3-