Loading...
HomeMy WebLinkAboutDraft Environmental Impact Report - Enviros - 1974 Erixriros 1 j2 �. � �® i n � s • AGREEMENT FOR PREPARATION OF DRAFT EIMWJNHMAL II FACT REPORT AGREEMENT made by the CY Y OF CUPERTINO, a municipal corporation of the State of California, hereinafter referred to as "City", and Enviros, hereinafter refc:rred to as "Enviros". R E C I T A L S A. In connection with the proposed Rancho Deep Cliff (W. J. Herman) Project in City, City has determined that the project may have a substantial effect upon the environment; and B. Accordingly, the Environmental Review Committee of City has deter- ca ned that an Environmental Impact Report will be required in connection with said project; and C. The Environmental Review Committee of City has selected Enviros to prepare a draft Environmental Impact Report with respect to said project. NOW, THEREFORE, City and Enviros hereby agree as follows: 1. Enviros shall prepare a draft Environmental Impact Report with respect to the proposed Rancho. Deep Cliff (W. J. Herman) Project in City, based upon existing data, and any additional data which may have to be developed properly to assess the effect of the project upon the environment, in accordance with Citv's Environmental Assessment Procedure, dated Marci 27, 1973, as amended, emphasizing therein the questions of natural/bielogical, aesthetics, geologic/ soil and land use/socio-economic impacts. 2. Enviros shall supply City with four preliminary copies and twenty-eight finished copies of the draft Environmental Impact Report. 3. Sandra M. Rennie shall act as Froject Manager for the report, and Sandra M. Rennie shall be required to attend up to four meetings of the City i Co!mcil or Planning Commission of City, in connection with the review and presentation of the draft Environmental Impact Report. 4. City shall pay Enviros, upon completion of the "Rough' Draft Environmental Impact Report, a fee based upon a time and material basis, with the total amount not to exceed three thousand five hundred dollars .f ($3,500.00). Upon certification of the Environmental Impact Report by the City Council, the City shall pay Enviros a fee based upon a time and material basis, with the total amount not to exceed seven hundred dollars ($700.00) . In any event, the total price of the service t_erein described shall not exceed four thousand two hundred dollars ($4,200.00) . Direct labor shall be billed in accordance with the Schedule of Billing Rates for Individuals which is marked "A" and is attached hereto and made a part hereof by reference. Other direct charges shall be billed at Enviros' cost. Any additional services provided by Enviros beyond those services described above shall be billed separately, on a time and naterial basis, but such additional services shall not be performed, and Enviros shall not be entitl-d to receive any compensation therefor, unless prior, Written approval of such additional services has been given by City. 5. Enviros represents to City that it is skilled in the professional calling necessary to perform the services nereinabove described, and that it has not heretofore been employed by or associated with Rancho Deep Cliff (W. J. Herman) or Stella Kester, and it has no financial interest in the project. 6. City shall make available to Enviros all information and data which it has in its possession, or under its control, which may be helpful to Enviros in performing the services hereinabove described. 7. All data developed, t ,r-•-'zer with the draft Environmental Impact Report, shall become the property of City. -2- 8. The status of Enviros shall be that of an independent contractor, and Enviros shall indemnify and save harmless City from any and all claims, demands or liability by or to any person for injuries to person or damage to property arising out of its performance of the services provided for by this Agreement. 9. This is the whole agreement of the parties, and may not be modified except by an instrument in writing executed by the party against whom the enforcement of any modification, waiver or discharge is sought. IN WITNESS WHEREOF, the parties have executed this Agreement, in T!J C���-0�,�/Z duplicate, this � day of 1974. CITY OF CUPERTINO, a municipal corporation of the State of California /00� i'M? 0 By M yor ATT::ST: 1 Enviros Cit Clerk Bv_ / s Sandra M. Rennie Approved as to form: OOP 0010Z�- 494000-V DA` D H. ADAMS City Attorney -3- s�� j.� F � � �y'Jt•• A EXHIBIT A FEES T Pry 1 l > i nr? i ices Fri!lci !l $37. 50 p`r hour Sf-+n i Cti 's�iOV per F+our S t a;f Co.t,_;I L r t S2'.00 p-,r hour .:Cr.l i C 'I.v.1. h-ir r _ :. At Cost :i I 15: p=r mile 1'()X i O ' ' RESOLUTION NO. 3758 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AUTHORIZING EXECUTION OF AGREE- MENT FOR AN ENVIROr.IENTAL DIPACT REPORT FOR CONSTRUCTION OF SIXTY-EIGHT CLUSTER MATS ON 17.5 ACRES KNOWN AS RANCHO DEEP CLIFF Wf1EREAS, the City of Cupertino desires consulting services for preparation of a draft Environmental Impact Report for the construction of sixty--eight cluster units on 17.5 acres known as Rancho Deep Cliff; and WHZREAS, an agreement has been presented to the City Council for such services to be rendered by the consulting firm of ENTIROS: NOW, THEREFORE, BE IT RESOLVED that the Mayor and the Cit; Clerk are hereby authorized to execute the agreement herein referred to in behalf of the City of Cupertino. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this & day of Octobee , 1974, by the folio«iug vote: Vote Members of the City Council AYES: Frolich, Jackson, Meyers, Nellis, Sparks NOES: None ABSENT: None ABSTAIN: None APPROVED: /s/ Reed Sparks Mayor, City of Cupertino ATTEST: /s/ Wn. E. Ryder City Clerk o� r AGREEMENT FOR PREPARATION OF DRAFT ENVIRONKENrAL UVACT REPORT AGREEKENT made by the CITY OF CUPERTINO, a municipal corporation of the State of California, hereinafter referred to as "City," and Enviros, hereinafter referred to as "Enviros". R E C I T A L S A. In connection with the proposed San Carlos Homes Project in City, City has determined that the project may have a substantial effect upon the environment; and B. Accordingly, the Environmental Review Committee of City has deter- mined that an Environmental Impact Report will be required in connection with said project; and C. The Environmental Review Committee of City has selected Enviros to prepare a draft Environmental Impact Report with respect to said project. NOW, THEREFORE, City and Enviros hereby agree as follows: 1. Enviros shall prepare a draft Environmental Impact Report with respect to the proposed San Carlos Homes Project in City, based upon existing data, and any additional data which may have to be developed properly to assess the effecL of the project upon the environment, in accordance with City's Environmental Assessment Procedure, dated March 27, 1973 as amended, emphasizing therein the questions of natural/biological, aesthetf'.cs, geologic/soil and land use/socio- economic impacts. 2. Enviros shall supply City with four preliminary copies and twenty-eight finished copies of the draft Environmental Impact 'Report. 3. Sandra M. Rennie shall act as Project Man.Esher for the report, and Sandra M. Rennie shall be required to attend up to four meetings of the City k 0 Council or Planning Commission of City, in coanpction with the review and r • presentation of the draft Environmental Impact Report. 4. City shall pay Enviros, upon completion of the services hereinabove described, a fee based upon a time and material basis, with the total price not to exceed three thousand five hundred dollars ($3,500.00). Direct labor shall be billed in accordance with the Schedule of Billing Rates for Individuals which is marked Exhibit "A" and is attached hereto and made a part hereof by reference. Other direct charges shall be billed at Enviros' cost. Any additional services provided by Enviros boyond those services described above shall be billed separately, on a time and material basis, but such additional services shall not be performed, and Enviros shall not be entitled to receive any compensation therefor, unless prior written approval of such additional services has been given by City. 5. Enviros represents to City that it is skilled in the professional calling necessary to perform the services hereinabove described, and that it has not been employed by San Carlos Homes, 6. City shall nake available to Enviros all information and data which it has in its possession, or under its control, w�ich may be helpful to Enviros in per"orming the services hereinabove described. 7. All data developed, together with the draft Environmental Impact Report, shall become the property of City. 8. The status of Enviros shall be that of an independent contractor, and Enviros shall indemnifv and save harmless City from any and all claims, demands or liability by or to any person for injuries to person or damage to property arising out of its performance of the services provided for by this Agreement. 9. This is the whole agreement of the parties, and nay not be modified -2- except by an instrument in writing executed by the party against whom the enforcement of any modification, waiver or discharge is sought. IN WITNESS WHEREOF, the parties ha.,e executed this Agreement, in duplicate, this 16th day of July , 1974. CITY OF CUPERTINO, a municipal corporation of the State of California By . yor ATTEST: Enviros t7 City erk By Sandra M. Rennie Approved as to form: o- J' By CHARLES KILIAN Assistant City Attorney -3- SWIM enviro5 a July 18, 1974 Mr. Robert Cowan. Associate Planner Planning) Department City of Cupertino 10300 Torre Avenue Cupertino, California 95014 Dear Bob: Please find enclosed our Schedule of Fees and our conflict of interest statement. Thank you for your assistance this morning. Sincerely, eoffrey . Swett Enclosure: as stated GHS:rr P_O. BOY 11.16. LOS .-ALTOS. CALIFORNIA 9-1022 (-1 i 5) 948-03 9 enviro!i July 18, 1974 Robert Cowan, Associate Planner Planning Department City of Cupertino 10300 Torre Ave. Cupertino, California 95014 Re: San Carlos Homes- Voss Ave. EIR Dear Mr. Cowan: Enviros has no prior, existing or contemplated professional relationships with. San Carlos Homes and Development - Developer L.C. Majors and Associates - Site P1--:ner George S. Nolte - Civil Engineer Sincerely, Geoffrey H. Swett GHS:rr P.O. B!').A 1146, 1,0'-; ALTO , CALIFO RN'IA Oa")22 (416) 9-1,S-O3T9 ��a®® envira5 SCHEDi1LE OF FEES Professional Services: Principal $300 per day Senior Consultant $200 per day Staff Consultant $160 per day Technical Writer, Draftsman and + Secretarial S80 pep-- day Transportation, Per Diem, Reproduction and Miscellaneous Expenses At Cost Mileage 15� per mile Exhibit A P.O. BOX 1146, LOS ALTOS. CALIFORNIA 94022 (415) 9.1,E-++3 7 9 envi ro!i SCHEDULE OF FEES Professional Services: Principal $37.50 per hour Senior Consultant $25.00 per hour Staff Consultant $20.00 per h0U, Technical Writer, Draftsman and Secretarial $10.00 per hour Transportation, Per Diem, Reproduction and Miscellaneous Expenses At Cost Mileage 15t per mile P 0. BOX 1146, LO S .1L" OSt C'ALI E'(M IA 9-lc)22 0 RESOLUTION NO. 3702 A RRSOLUTIO.. OF THE CITY COUNCIL OF TILE CITY OF C:IPEI:T IN'0 AM47RIZINC E'r.ECUTION OF AGRELkI :T FOR AN EN%'IROl;X ?,TAL IMPACT REPORT FOR S.AN CARLOS 110!T. S AXD DEVELOPMENT PROJECT WHEREAS, the City of Cupertino desires consulting services for preparation of a draft Environmental Impact Report for the proposed San Carlos Homes and Development Project; and �.4-i-REAS, an agreement has been presented to the City Council for such services to be rendered by the consdlting firm of E:�VIROS; THEREFORE, BE IT RESOL".-ED that the `savor and the City Clerk are hereby authorized to execute the agrecr..;ertt herein referred to in behalf of the City of Cupt-rti :o. PASSED A.1—) J,1)CT 1ED at � r(:Uular mect!ng c_` tf:C City COurc 11 0 the Cit, of Cupert .no t Diu I rh_d-'Y of�uy� l ' y Vote ?`.cr bs rs � t: r ��.L l AY;,S: ar•kwr , revers, Nellie , clpar- - N0L11*. gone Frolich AL�1:':Z:'• :acne /s/ Reed Spark____ ol ijiC.l tiv:.L� - �'�T'1`F:ST. /s/ Wm. E. Ryder City; Clerk t AML CITY OF CUPERTINO {s 10300 TORRE AVENUE • CUPERT140, CALtFORN0 95014 '.r,o ace°cY TELEMHONE 252-45CS OFFICE OF THE CITY ATTORNEY 900 Community Bank Building 111 West St. John Street San Jose, California 95113 July 23, 1974 9 `` ,, 1Z Ellen Pagnini , Deputy City Clerk City of Cupertino `IJL ?-> 1`'+r-i 10 300 Torre Avenue- ,— Cupertino, California 90014 ! CIO Re: Document for Approval Dear Ellen: Enclosed is Agreement for Preparation of Draft Environmental Impact Report which has been signed by me in my capacity as Assistant City Attorney. Very truly- yo s, CHARLES T. KILIAN Assistant City Attorney CTK/nt Enclosure is Il 1252-4505 R ; OEPARTMW OF A01OIMSTRATIVE SERVICES 4 July 19, 1974 Mr. Charles Kilian A-.sistant City Attorney 90 Commercial Bank Building 111 West St. John Street San Jose, California 95113 DOCUMENT FOR APPROVAL We are enclosing a copy of the following document for your approval: One (1) copy - Agreement for Preparation, of Draft Environmental Impact Report (ENVIROS) San Carlos Homes Project After execution of this document, please return to this office. ELLEN PAGNINI DEPUTY CITY CLERK ep encls. n Ciq of Curertwo 10300 Torre Avenue Cupertino, California 95014 Telephone (408) 252-4?O5 DEPART%%ENT OF PLANNING AND DEVELOPMENT September 12, 1974 Application No. 4-EIR-74 Applicant: San Carlos Homes and Development Request: Public Hearing to Consider Draft Environmental Impact Report regarding the proposed residential cluster project consisting of seventy—four (74) single— family cluster residential units on 20.7 acres. Location: South side of Voss Avenue opposite Lockwood Drive. Gentlemen.: The City of Cupertino has prepared the attached Draft Environmental Impact Report concerning t'.e above request and will consider said report at a public hearing before tae F.,4ry Council on `ovetber i, 1974. If you have any co,-,ments concerning the attached report, please forward =hem in written form to this department .rithin thirty days of September 13, 1974.. If you have any questions, do not hesitate to contact this office. Sincerely yours, CITY OF Ci?PERT_I`iO J�esH. sk Planning Director JHS:pc Enclosure S i!nviro!5 August 12, 1974 Mr. James Sisk Planning Director City of Cupertino Cupertino, U lifornia Dear Mr. Sisk: Enviros is pleased to submit the attached Draft Environmental Impact Report on a 20.7 acre Planned Development proposed by San Carlos Homes. From a long-term environmental viewpoint, the project as proposed is not a wise commitment of the land resource. It can be redesigned to be environrentally acceptable and still provide an acceptable return on investment. The requirements of the California Environmental Quality Act and the City of Cupertino are met by this report. We have enjoyed the opportunity to work on this project. P Y P J Sincerely, ' Sandra M. Renn/ ieieg Executive Director SMR:RT Enc. P.O. .BOX 11.46, LOS ALTOS, CALIFORNIA 94022 (415) 948-0379 4 r r r i DRAFT EIR SAN C,ARLOS HOMES VOSS AVENUE CUPERTINO, CALIFORNIA i i i 1 1 1 i FINDINGS AND SUMMARY Draft EIR provides an independent analysis of the environmental The p p Y consequences of building 74 single-family detached units proposed by San Carlos domes on a 20.7 acre site on Voss Road near Lockwood Drive in Cupertino, California. The site, which is located at the toe of ti:e foothills, contains flat land, gentle and steep slopes. It provides nabitat for a number of small wildlife and horses graze the property. The only structure on the site is a stable. Adjacent developed areas are in duplexes; however much vacant land is also nearby. Soils on the site are generally sable for building except for areas of soil creep and potential landslide; these affect l is 1-4, 10-11 , and 24-28. The site is aesthetically appealing and can be seen from some distance. The project would impinge on others' view of this section of foothills; internal view is mainly of other houses and their roofs. The Plan generally places houses on the lower and mid levels of the property. Density is excessive and creates a crowded and potentially noisy living environment. A large portion of the site is left as open space, but its use is limited. The Plan proposes private streets, which are narrower than city streets. Their width should preclude on-street parking. Off- street parking is confined to driveways (except 10 spaces in parking bays). Public facilities and services are adequate to serve the project. Approximately 814 auto trips per day would be generated; streets are adequate to handle this load. A negligible increase in air pollution w"ll occur. A minor increase in perimeter ambient noise will occur; superior standards i for residential areas are unaffected, except at Voss at Foothill , which is already exceeding the standard. The project responds to a favorable housing market. No historical or archaeological sites were noted on or near the property. Energy resources are adequate; the project places no unusual energy demands. A fire hazard exists now which could be aggravated with develop- ment. The project is not judged to be growth inducing; however, decisions on how much and where to allow development on foothill terrain can be considered precedent setting. Alternatives considered included previous proposals for the site, strict application of the present zoning, a variety of options in type and density of residential units and No Project. The pro- ject as proposed is one of the least envir^-mentally compatible options. It is the judgment of the Study Team that numerous mitigation measures are required to satisfactorily ameliorate adverse imps^ts, including a change in site plan design. Env i ros August, 1974 �i a TABLE OF CONTENTS 1 - P age FINDINGS AND SUMMARY. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . i I. INTRODUCTION. . . . .. . . . . . .. . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . 1 Objective. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 The Environmental Consultant. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Depth of the Report.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Impact Assessment. . 3 Other Considerations. . . . . . . . . . . . . . . . . . . . . .. . . . . . . . 4 Environmental Impact Boundary. . . . . . . . . . . . . . . . . . . . . . . . 4 II . DESCRIPTIVE INFORMATION. . . . . . . . . . . . . . . . . . . . . . . . . 7 e The Present Environment. . . . . . . e . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Climate. . . . . . . . . . . . . . . 7 The Project: San Carlos Homes P.O. . . . . . . . . . . . . . . . . . . . . . . . 10 III . ENVIRONMENTAL. IMPACT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 OnSite. . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Plant and Fauna Associations. . . . . . . . . . . . . . . . . . . . . . . . . 13 Geology and Soils. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Hydrology and Flooding • • • . . • • • . • , . • . • . • • . . • . . • . . • • • • • 32 Health and Safety. . 33 Noise. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Within the Impact Boundary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 LandUse. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 38 Aesthetics and View. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 Traffic and Circulation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 Air Quality. . . . . . . . 54 Public Facilities and Services. . . . . . . . . . . . . . . . . . . . . . . 55 Housing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . � . , . . 61 Historical/Archaeological . 63 Energy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 GrowthInducement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 Unavoidable Adverse Impacts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70 IV. SHORT TERM - LONG TERM RELATIONSHIPS. . . . . . . . . . . . . . . . . . . . . . 71 iii TABLE OF CONTENTS (Continued) Page V. ALTERNATIVES TO THE PROJECT.. ... .............. . . .. . .. . . . . . 72 Alternative 1 - No Project. . . . . . . . . .. . .. . . . . . . . . . . . . . . . .. . 72 Alternative 2 - Existing Zoning. . . . . . . . . . .. .. . . . . . . . . . . . .. 73 Alternative 3 - One-Acre Lots. . . . . . . . .. . . . . . . . . . . . . . . . . . . . 74 Alternative 4 - Developer's Plan Less Units on Mid and Upper Elevations. . . . . . . . . . . . . 74 Alternative 5 90 Townhouses. . . . . . . . . . . . . . . . . . . . . . . . . . . . 75 Alternative 6 - 83 Townhouses. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76 VI. THE NEW ENVIRONMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 APPENDIX A - CONTACTS AND BIBLIOGRAPHY. . . . . . . . . . . . . . . . . . . . . . . . A-1 TABLES 1 . Maximum-Minimum Monthly Temperatures. . . . . . . . . . . . . . . . . . . . . . 8 2. Number of Days Over 90° F and Under 32° F. . . . . . . . . . . . . . . . . 8 3. Mean Precipitation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 4. Number of Days Over 0.10 Inches.. . . . . . . . . . . . . . . . . .. . . . . . . e 8 5. Mean Monthly Relative Humidity. . 9 6. Mean Days of Wind Over 20 MPH. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 7. Frequency of Wind Over 35 MPH. . . . . . . . . . . . . . . . . . . . . . . . . . . . . it 8. The Grass Vegetation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 9. Closed Oak Woodland Vegetation. . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 10. Fauna Which Could Be Found on Site. . . . . . . . . . . . . . . . . . . . . . . . 21 11 . Predicted Noise Impact. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 12. Trip Generation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. . . . . . 51 13. StrPet Distribution of Traffic. . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 14. Effect on Peak Hour Traffic. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53 15. Projected Property Tax Revenue. . . . . . . . . .. . . . . . . . . . . 59 16. Cost Efficiency of Gas vs. Electricity. . . . . 1 . . . . . . . 67 iv TABLE OF CONTENTS (Continued) Pale FIGURES 1 . Project Location. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 2 2. Impact Boundary. . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . .. . . . . 5 Fr. .� 2A. Project Site Plan. . .•. . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12A 3. Site Ecosystems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 4. Distribution of Venetation Elements on Site. . . . . . . . . . . . . . . 16 5. Closed Oak Woodland. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 6. Soil Creep. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 7. Earthquakes and Surface Faults. . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 8. Hallcraft Site Plan. . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77 v INTR0DUCTION This study provides an irdepe-ndent analysis of the environmental consequences of constructing 74 single family detached homes on 20.7 acres located on Voss Avenue, opposite Lockwood Drive in Cupertino, California (see Fig. 1). The report defines the areas affected and describes all impacts— beneficial and detrimental—and recommends mitigation measures (steps taken to compensate for adverse environmental impacts) where appro- priate, as well as discussing five alternatives to the project. The developer is San Carlos Homes & Development Co. OBJECTIVE The objective of the project, as stated by the developer, is to provide well designed homes in a plarned development which will retain a significant amount of open space. THE ENVIRONMENTAL CONSULTANT: E IR NV OS Enviros, a multi-disciplinary environmental consulting firm, has performed the environmental assessment on the project and this Draft Environmental Impact Report. The Impact assessment was prepared by an eight-member Enviros Study Team representing physical , natural , and social sciences. It included: Sandra M. Rennie, Project Manager Victorine M. Rudin, Sociologist Frederick W. Haltenhoff, Geologist John P. Monteverdi , Meteorologist Carmen Swartz, Noise and Traffic Byron L. Wood, Biologist -1- r' wlrA �•_•� _• es�•s.l.w.�e. •..r•r+.`" ��4n..v.! 4"._..—_—_:..� .__ .� � i .• .r I • ••e.:...1a .. •. .= , ^'•I.��• I w•,uw ltQ d .. �'Iw :.. t.V.i •�. ON 'flit TI • �' 51 .II • � •+ � •� f � h' 0. 'f��• rro\'\�,• ''�IV fI "_f.."!'~ •I •�.{`)i I', I�V I' I I•` I .: .'I 1 ` ,'ram+ t •�� � •• 'I•_�.. ,�• (� .,;.." ��:L 7 �ts —' _ •�• 1_�"^ I`� I v I'� �' I I. � I`.J;r'�' ;A .lrl.11llll`.••'�•i i � F •�^s� a..sa I .l �'�� I i1 i�I I 1 � / '� r•~'`~ '�• 'l.�j 11.•� \ `"t I/ J .r4 ••O /•� 1n IN0 Ivs i �i�� :�•_ '� YA Nns / \� "'N ,l' W y�l jl �I (I •ae�`s ,- - � �_� � � �Gf� 1 '� c ld ONi i�f1J �� 9 J� m �)I t ' .'1•�i1 ..'i :,,'V f l.= U '1 I� .C�.•,��q••�:; t 't I,'I� +--��tt �,ti� \\.+n<r.r�1 � �� �,t-.�+ ';� I i�rl .�` � .� a t ,•••I t fr! n ...'® Q •a ;�`.�s r a'f�a• l r f • is 4•.� "�t .js c /�Oti� ; `�,1, I ��\ :II •,� T i,� t� ,.• l s .y , }� t), �1� 40 �'" 1� •we, jTa"ae • • S /,t, v.• .Y `A ' V M'1 C� .-.} /\ \ _.6<.•C 1 Y t '�a-:� ' y -"+. �' Ada .re • • 4, 1 i 1 Jr .�a•`/•a ,re.+`�5 �'•� r� i,�__.. e< '—� • t i o ( � { `� i .��•A� Ri •�.•. o •r� +;% i /e icy �,� � ('i'�+�•._,,,., � \ , . � , , •o \ • , •A• '� �� •,7p�s .r.i.�.a�.,y�( �:l �t�t1�p/•e •.t�. � ��- r-,«�.._! -��,i�yv1 r � 7-7 �/ .>����..-'_��/•` �.( •� ••' •f� ••\• 1 V ,C'J�` u,~'.•t,`\ I,• ..... .... ' .•l.t.�l 1 N 1 •� ,h 1• f �✓.' ••'•t �6 __I• 1'. �I�.......::::.. ;I• .,a •, i c l ` ': �� r;,�', .. ®�- + a n• � � r 1 / •'i � ��j � Y✓ �...i 10 I ••,. � ei ee •) `, \ },\ 1 ..t"( � i / , .�..LL "" �ii••:,•j 1 6•.�,.� ;%•� / le<_' •P I _ / {....ram �j � / .,.: -� :. ••0•. L••�••. .VS• .• •'� a gyp' it, \ N� �:�C\ 5 1>-��'l __=r-• .e� use• •d •• • �' i• 1 . `•• + �•* Ja�� I /o•s �_�s� t�` v N hhhhhh t / i I;: ' J;� \r,.\• r. `\1 w• I !; �} / O �a '�. t •�••• .�'�'�p� a �i s�t�•-- f.�l b V�`�'�'' _-N Ml� if 1 r �,1 r:.+.c r• ♦ •�N •: `.•4• •• : �• i,/ .•f \ 1 II r (' ` \.. t{,�I/( 'C \ ` a\i_ ".� ai c CL 000 lyA to dp L11PS •►� 06 • o•• • w:to spp t .� 0 r\ JO`n 2f; ;r-i \ `i ) r, al `r1`�{ °• P�y�`y/tA."' I �) (..p4��'`� ,�� ` V(� - v, ''-► ' /•4(�,,, �J 4P. ��� �i V� �-�.�t�l;\°'�I. 1`.`�. .. , ,� �lJ a,{��,��y �`.�..y;l V � �. •` -/ fig !i �e � '� t ^ L �` `/ ` cue` , ...A w3 I� �.n+qt r/♦.d�e. .> ( !t \ 1 I � I(r r 1r�l��G..�� i♦�_ v/ -V �� /; 1 .�• �� w����"f�.� \�- C��'l. �1 A� 1��\�•�� )I t _'�♦Al�>'/�-��'.l .�i�� r' 1'C' /.�y �� r 4J oo � ,♦`, `,��.ttl� II \ �� c.U��J/f:i... � � � (rf, r �I �' �: r`:. � 4 Cb � f ��� �• y i L,��y„�•tT.. lr{�.,\�ji.�-. _.� ..r %�i t/�,� J 1 1+ _�-O'•-` j�. „� - � e• ..• � e � y/� J �\ lI �11 �—•t .�,.. Cli. ,;_-, •/��;_ 7'ti� \ Wf ,- r/,� ,! `' � • ./� \ �t�/ 9• ���•,r�.t:b I'\(,�.;1 .•��� .=\\/�� •.�„ 'L,:i;;J�/.et� J ,>•,`t1 J/�'.�t✓�','. /" �!�� ( , ,� . ,� 40. ` C �n ���1\e.. ��1• �/`sni0 l f_!_'Jr i� 'I ��` /ram .\i � � �J ��\\CaO. {e•�r ti•�,91 �I' '-"- RR, �•`e��1`f�._JY_./s. � ♦�.._J'� 1 � �� - �M ®l61 � �a •\ �-. � •��� `�`d_. 'jet-u " ' � � �lt,i "��,j._cr*-t 1��, \'� \t ,:' C / i on •C� .. 1 � � '�! 1 .� .O ��r ��i � 1� � (\ :°.�\V7tC t i:' �I '•'I��:,q `/-� // �J,p J�1�.�1�/"'- .r /1 r171/"/ • • o /���\��.� \�'( r. 11r���1b(• J�p.+,� �C:��L{l��j�lV" Vt�'���,�i, 1 �, 1� '��:��✓-! ,i ''' 71/j•�j �� \ r-- � 0�' r •+�✓�• '� ��'L' V .-.-R••�.✓ .♦�t s�'lt ?';�\l� \,�' � Ilj( li r t �_�- \. `` .Ir .'l. ,- •.��A � • •' ` •r /7 r, I W •.; a `�./ • _�{ j /�•� r/ ✓j� / r��;l�'� \ 1Li 1 15�1`. f L ��r •1 1~ '/ m. ir.r---�'r�• "�f 1 {III// �/r \..!!� f ,<<1/'\,� !i �� r�/ ; r �I.f�! ` .� _ 1 1 �I; t r• •- +ta• OL �� � 0 j t, '11 �� I' .\ r i�.� �- /.'t ! �i�-! t 7;hl r:i rp0�i,'.�1 i \1`' 'I�.1 r '�/ ,i� '111 r•1 � p / v I ` \, �.��r�♦/ ?Y ✓„ e'.t�/,/�!''��{^ ��li' l��l_!'`V/�rl ��/'��(�,•�c ��� C�•/,r, l/�11 f��/�w''�\�(/f ` )�Ur,►r� ,I'��(N���/,_'� \i"�1'.\p.l,.�.J/t) �Oi f%'�i t�(l;'.���%/..'j '��l�'i�� `•;:�1�t fk Robert L. Rennie, Forester Melvin Rudin, Environmental Design Each member of the team spent time on the site, with agency representatives in the city, county, special districts, and with private persons as appropriate. Appendix 1 provides the list of contacts and references. Depth of the Report After a preliminary investigation was conducted to identify the potential significant impacts on the project, the Study Team Shen applied judgment to establish the depth of study on each impact. ,,11 types of impact identified by the Califcrnia Environmental Quality Act (CEQA), Resources Agency Guidelines for Impact Reports, and the City of Cupertino were addressed by the Stray Team. Impact factors not present on the subject site or with the subject project are identified as such within the section on Environmental Impact. This assessment and report were prepared during July 1974. Since long-term site investigation was not possible, judgment has been used to determine conditions on the site as they would occur over the passage of all seasons. While validity remains high with this type of study, it is nevertheless imperfect. One deficiency is in the identification of flora, some of which are annual ind only obvious during a short time period, and fauna, which may be present at some times but not others. Impact Assessment Impacts are of two types—those which affect Man and those which affect resources other than Man. Magnitude of Impact on Man is best measured by the number of people affected and the extent to which they have been affected. Magnitude of impact on other resources is best measured by the extent of qualitative change in the resource. -3- In this study, impacts are classified in five ways: Neutral , Major Beneficial , Minor Beneficial , Major Adverse and Minor Adverse. Impacts may also be described as primary or secondary. A primary impact is one in which effects of a project on an ecosystem are immediately noticeable and measurable upon commencement of the project. A secondary impact is one in which effects have a direct and/or cumulative impact but are not immediately noticeable or measurable. Other Considerations The judgment by a developer that a specific available site is marketable is usually the prime reason for a residential development proposal . Thus, in considering alternatives, alternate sites for the project are not usually considered; however, in this case, con- siderable vacant residential land does exist on the valley floor which could accommodate these units. Therefore, both alternate uses for- this site and alternate sites (in general ) for the project are considered. Mitigation measures have been built into the project by the developer. Additional suggestions generated by this study are discussed, as appropriate, within each subsection under Environmental Impact. Environmental Impact Boundary Proper environmental planning requires that a project and its site, not be viewed in isolation but in relation to adjacent con- ditions and its sub-regional (or larger, as appropriate) setting. See Fig. 2 for impact boundary map. The area of overall impact of this project is roughly described as Homestead Road northerly, Prospect Road (Saratoga;) southerly, Permanente plant westerly, and Lawrence Expressway easterly. drW Xiepunog laedwi LeluawuoJ}nu3 Z ?jnB�j .. ,..• X. • IL•;.. -•l f' 'Y�••>,elaan I\t ,...L'� ,\t ,, 1.b,.� •t..;.o..\ filAb I~ j 1 '�.. -... ! e'' s r�`'^ ° it + ,>> 1 ,`\ s i c' j..�• /h` i-;.^�, \ !r��'b� ( tr •r L P'i r , . T.r!.r: � ••lee r S + }� N 1\\ t Pf s,; t :•N••e 4I ..: .2,I� ff �• arc ae..J �f) t ''• t S ',\ ( I w 1• j° Vr� d�S; •''o•. \•; �f'•`+•..' I .c., . Y c .'.;. . t p a` I t �.a r\ j-- `V•`\ 1 -�,�i91:nh � n„ ^ lY �. /••• .•...emu -o ^ •eaautt ., tr`uc a w 1 I .,•.e •` d�e� 4�. •' ': '��� i s l I 4 '.e i1.N 1 1� � . ,S �, f ct .t• ➢ I „"".o °a� r, �' �' _ r i- r•1 Tiet 1 � N 1. I ".,,r,re, •O/r•tl a �" -�/ r ry�h4TN,E• yg ti . AJt� i •�• ".:_.. tia.• I,w• • y,.l nl \\ el•',. �.. rt \t' `�, ,N a �i.`�,• — -�..1--. da x zaiac�3' ^�wi-r. _,���5'/ . >o �v„ _o_ a • 1 .1 BE a i,.•el, \ } r i •t a�,. . . f�--.—. l > � yn�a gJ n �.li C� � rl.. �•t •ww�ta �... t :^ W 0,.•J o> 4 -, , q ..aL i 1 Z �� � C �� r_—.—;_ s,r.: �S� a+,..T.�a -�. oo-Ja CNL. ' •r+. a . �t 1 t' '�� r �1 .�•:�`�,1 -.Y�14 Vr-.7'..i' (1�•):,t ',� i A.•., 1 �y .a1= {NR r S �5 � 'AV SI L I ( 1•y'ft .IqD {�-`t •ai�� ,� ! f-. °:6 i 4 . ' I e t � F]. \ !\\``� `\P.. � e•�!�•! .au..••• a-•pj A o• a.u"•.F ! "1 o. va,� i o.•> tt s �`��_ ! -. \ , 1!' ��Opt;•, xIy�>� ��1_ ^v e...1�1 •..u8.1: a � \),.tJ9 a , .:`� I >,. ��,�.1/ .CC.,� 1 1 �`�•��� �•�•?f.l�i i.1te•/:_� �t i"!r 1�' � \` 1 f`,t � ). � �.�,t ,�` Il � '�` 11,�; r •, . .� 1 tHii1•'I;ti t 2: ;;G�.1j h,n• C e , c. , '— \- j�r'; �, } r,t.^,.,, e,xn�•.—•-------•--- -- '�rS-.. ^!e O.Oq i a y �'..•. f i\-. � '1 tw r - > : i ro •Oc 1.,.u� \`` 1\ m„ t v I •> r�o♦ ��..1+.•,�• .—.� y�•":♦{� r'•'4py !tl)•lalt\, O Otl o• q l ..S•.. I 'a) t) jv. , •I rT ( 1 OI Mit• `.—.. Qa t } \' Ir 1 .^•] r 6J tlC\l • 1 �)0:t \ 1, r f. ••IJ i.' • a`{ A:C. /� -.•V + ••1.:••i ra::C•1'1•.•j,,. `' r ) 3 ,• 1[MOl/10w t11: l �• ^ Z � \•..•w.. C • •i� �' -t)C N �t o\`. 0 ) IrttJ t)0 ,xi.t .•IJ f to .,.:1•:_ ♦P : $ •{,•.•r.l•o•'•n ee• .. t .a a s;•'toll S ' ,\ - _ V .S\. •1,:♦ Oro fJ�l 3� ':�.f..u.c. 1'..r ••;. a^va)1�° ,i ,�l? �u;',�`•:>•s��,.,.. _ -rx .'f „ - .e. ..> � \�.�'xr1��'• .tlt`.D �'• 1'-.M.. Y�i�'••{ ���ccc 1 S • [• •/ ' C .. } �. �r t.. . , •�•• 1, J '•!t i'L is i �,.)tJ-:•,�.`e lcloe \.l loc.>S.' (.. a•e'11!Onl'T �.. 1— i `\. ;I \ "�....t4 t.. !J 1 ?• os - a.i�:w.•tn i 1 I �. °,a• ; a r ( r -• ' C ( � �, >. J wa.c... 4-- tta r•Iw 1 -/Yl ! Ie7e�atre.tE.)l�" ^....r -t`J 1 FI a o s, I �.o S c o I � I,4 I1 � a... iil , � E � �'L.�•:•�'�—. 7•'La• i`.-. �� T Aa:tr1.1- .7 A• o- t`t' 1, t: ! Lx1 .•P 9�_•••. Ll nr 4 1., rct,tt .,�117 , t •t'. S'T•I t ' .\,\�\ 1 t1 it o r t . tf 1 •�6...n,Y1:�..�a f•1>.rJ��•'1 7 a M� � '.I � Y o7i.� :I I \ I Y' � ♦ i \t, 1\ \i .. > ` � ^i I l_;' 7 :�\ ^Y1� � •n:,rr. r <. .r� lti:I * i �t r I'•. s I V • .o� \\ ��• 1 '• ,. a,, f � h-•� - ■ � aa*** t(-a ro ° x'i•ri r yq, )- .��..f.,G 1 \• \\ \'t e.t n 1.• fw.v ¢ ` iV6•ii.v]..ft :;•t:.s S ;•r._ „I; �.„ e:ut•u� \\ l`\ \�`\.� o , I ♦' u l t t ',y�``" ` . 1•j,.6• �lv is- 7i • '^• j y • ` "' A. u.ro,.tl \.. e 1. 1 VS•T�� 11 \_, I .11. ,o �" —.� _._._. ftii�i::S ^ '�4r• vY:�v�� a��C.e .�.,;:i.oct � '$ J • �' r,ra; ^� t0-)zl �a .. r, ; \ 11 a. -.} j � r�. �. ,i faYf•f '`l° I_�'=''i �• ; lg lr•�e I et.al ye lN: \�,..- t i 111 1 \t,- CIVi "r )p L./13a�_0.�(�/! �.� o.t,u,� 1 .... i o I 9Ty I r -•I .R r,Lg -•n)a la»u0 sYanyts t o ( C On,e a)alfo cH�ny— a� s ;j 1 >.a .vr Lrlr= A YYr.J r' f� l �, i,l•w i 1 }A A Fr 'v ! � 1 . ` `, ►� o P+lr c• � I �• •I ^•.• In F•�.7 • I. .a I� �1�. a';�� Nr 1 U wa 1 :'\{l,� f $;�i.c' i % I � 4 °!a. .' 'i � is ! .4 � I �i�t•,tv� 4♦� p{1 � ,.: i\,t 3 31 M p\•IAA. i, Z 21 i,�,� 1 ••L �r0 JI\� 9 Y. v 1 I C �A I. ,. .i,.01t �•T... i. ., �. 21, , \ J•rN11� .mip��sl...w.,, j ,i 0 ., , Q ''. { a J •, \ :� '_• ,. •r�Ik1L .ee �pf � j •� � � ��• r � r � , .�t i; Q •, -' \ E'.i•�'� ��itei, 'eteru� A u d P•�, it � , �-E, tl � ` a •J•"• xoel a, w.:nrrtlr t, •n I ti - t ,r / \ ),}� 1� ,laa•• K�xttl' ]1 — ^11,• ,nir,n I a. r „` C ,, i ( \ (�/a�`,f.i, � }4``''aPM \r• 1 t' P( 1 Y{ ��I:� ti5lrr+a^ Ilt .n � 1 .i f' 1 �V \ `` ' '•.�, r ili.li "Iri �•e4� •N^^� t� l • �. �: 1 t i ., , :a ,r-ew� •a� j �f•0 1 e�,•i•a ��- ye� �Oif.� �=� 41.,xA� i t S h \. _ i `-, C ''I>-l.. l i;� ; � � �\'-�\1 la:,,�• r .� q.�• 'a\,^4tl �aS w11.•iliv. at(Y.l•�/�'r\,oe' -i I ~ v•�,ir. � '.t ..i I' f..irt `.t.,. Ydrl.l v\•. i J ; .I t •� ' �11�'4°Wt 1 i4j�73 L —" I f tit j I�fv�r.'.-e:,ifrr.�•rrl e:s�-rn-t nc.�,�own ►�.� � � ', t '.'.,�, t, ,�/. AMUJ •l1UlS ti OUJ.II V(t. I •i f ' ;.1\ ;�• ' \ an ate,.P• pin ! .ow .rit"`' , i { 'S •e ..< � i•! ,i I ..� ��.,.. ar °`'. t'�i a• •i'.1,..`n,r • r'"" I .. 1., .� ,laa. r r.a t taaot. y PP r r-/• ,j.•..' I �.3 Or011 - I �11 I;le, I�. .�t '.+ ..,..I .rLSDt 11 r• JI:a•'� • t �I.••_. .lie " � il•'1 .� .., .• c t' � t, .. .,^\ i �•r,r. .•••� � Ilrola, •a;' r '-y:4 e E . rio't.,l...•o, nt � 'c• l � n, . .�.,, s —�i -•-;t �,. . :n. 1 \•• t• r�i,, �.!\ 1+ •."1i 1 .\,r.�`��J w.wLr.1tt q• ,'•,a n••iti All .1...., t• .' 1 t - �` ;•{,��. w •-..•• rw.o,I "tn ^ ��1 • �J S ' • .. This area was selected to reflect major short-range traffic impact routes, micro airshed, commercial areas, public facility and school locations. �v I ' . DESCRIPTIVE INFORMATION THE PRESENT ENVIRONMENT The project site is located on Voss Avenue off Lockwood. It lies in an intermediate area at the toe of the Cupertino foothills, and contains both flat level land and sloping foothill terrain. The western foothill portion is about 140 vertical feet higher than the flatland and affords an extensive view. It is bounded on the north and east by duplexes; other sides of the property are bounded by vacant land. The site is a beautiful one, containing a richness in variety of its topography and vegetation. The only structure currently on the site is an old stable, ramshakle, mostly unroofed, but probably still used. It is presently zoned Al-10, Agricultural-Residential , 10,000 sq.ft. lots (single family) . Further descriptive detail is included under subtopics of the Environmental Impact section. Climate The climate of the Cupertino area is extremely favorable for year round outdoor recreation and generally pleasant conditions. Data recorded at Moffett Field Naval Air Station is used in analysis of the area's climate; these data are representative except for amount of rainfall . e Tables 1 and 2 give absolute and average temperates as frequency of highs and lows. On only 4 days during the summer extremely hot weather can be expected; hard freezes occur about 5 times per year. Being fart:._ from the Bay, the site's temperatures should be more extreme—warmer summers, cooler winters. tTables 3 and 4 give frequency and amount of precipitation. Approximately 10 inches additional rainfall can be expected at the -7- Table 1 Absolute and Mean Maximum and Minimum Temperatures J F M A M J J A S 0 N D Annual Abs. Max. 70 75 82 86 98 104 95 91 96 92 83 75 104 Mean Max. 56 59 62 65 68 72 73 73 74 71 64 58 66 Abs. Min. 22 26 30 35 38 43 45 47 42 39 30 28 22 Mean Min. 41 43 44 47 50 54 57 56 55 51 45 42 49 Table 2 Mean Number of Days with Temperatures > 90° or < 32° J F M A M J J A S 0 N D Annual > 90° 0.0 0.0 0.0 0.0 0.4 1 .1 0.6 0.1 1 .5 0.2 0.0 0.0 3.9 < 32" 3.3 0.6 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.8 5.2 Table 3 Mean Precipitation at Moffett Field J F M A M J J A S 0 N D Annual 3.13 2.02 1 .75 0.98 0.52 0.06 0.00 0.01 0.26 0.38 1 .37 2.76 13.2 -8- Table 4 Mean Number of Days on Which Precipitation Equalled or Exceeded 0.10 Inches J F M A M J J A S 0 N D Annual 7.8 5.2 4.6 2.9 1 .8 0.2 0.0 0.0 0.4 1 .1 3.2 5.1 32.3 Table 5 Mean Relative Humidity (In Percent) J F M A M J J A S 0 N D Annual 81 77 72 72 71 70 74 76 73 72 75 79 74 -9- >t, site. Nevertheless, the distribution and the number of days on which it falls should be similar for both locations. Table 5 shows mean monthly relative humidity. There is a tendency for relative humidity to be higher during the winter than the summer. This is probably related to the development of low ground inversion and radiation fog. Humidity at the site should show the same seasonal trend, but be 5-10% lower. Wind direction is directly related to the orientation of the pressure gradient. During summer, the pressure gradient and funnelling result in wind direction at the site's being perceived as WNW. The winter flows vary with WNW being dominant and SE being second-most frequent. Wind speeds are directly related to the strength of the pressure gradient. Tables o and 7 show days winds exceeded 20 and 35 MPH. iFrom April through August, peak wind speeds occurred at 4 P.M. ; from September through March they tended to occur more frequently during the day than night. Peak gusts usually occur in association with winter storms. The characteristics of the wind at the site will be the same as at Moffett Field, but velocity will be less. As a general rule, subtracting 5 MPH from the average hourly wind speed when speeds are greater than 10 MPH, and 2 to 3 MPH when less than 10 MPH, will give a fair representation of the character- istic wind velocities at the site. THE PROJECT - SAN CARLOS HOMES P.D. The project proposes 74 single family detached homes clustered on the lower and mid levels of a 20.7± acre site. Dwelling units would be detached with 2- and 3-car garages. Design varies to allow accommodation to the present slope conditions with a minimum amount of grading. Plans call for 15 one-story, 17 two-story and 42 split- level units. i Table 6 Mean Plumber of Days Surface Wind Equalled or Was Greater Than 20 MPH J F M A M J J A S 0 N D Annual 16 LST 1 .3 1 .6 2.1 4.4 5.9 9.1 6.1 4.7 2.7 1 .2 0.9 1 .2 41 .2 22 LST 0.5 0.8 0.4 0.2 0.0 0.1 0.0 0.0 0.1 0.5 0.5 0.8 3.9 04 LST 0.8 0.9 0.7 0.2 0.0 0.0 0.0 0.0 0.0 0. 1 0.3 0.7 3.7 10 LST 1 .9 1 .2 1 .1 1 .0 0.3 0.2 0.1 0.0 0.2 0.8 0.4 1 .6 8.8 Table 7 Percentage Frequency Wind Speed Equal To or Greater Than 35 MPH J F -M - A M J J A S 0 tl D Annual 0.1 0.3 0.0 0. 1 0.0 0.0 0.0 0.0 0.0 0. 1 0.0 0.1 0.1 a -11- Thirty-five to farty percent of the site would be classified as recreational open space; this would include all of the upper, highest elevation portion of the site, including the pond which is now present.The 3- and 4-bedroom units are proposed to sell for $55,000 Three hundred fifty (350) off-street parking spaces are proposed. -12- , _ .. ..°ewe•, �.rr�.r.ie•i ti, :mu vuvoosBi T A{YTA'3 1•30 ., - r^: �.I► it�+J T Y ea.sm.en a asee es ds.s w® Il wren y«t.r 4,"-m '3 Ito snn ea -� o..Wrs 01 o •i w"am s1w P- w 's'lvovsw T dorm y v 1• 1 ;� ofnr w e�.o to i 4..wro+m 4 an;mwwTs n P+ir••Yo os•ont+•0`r.�•.gs••r ••.•v[ +aqR ^mar .•w,w oww .we.•+a ••m..Q •..wy.s.w.•s PoC• '.••••x1's . s ,�,::.•=vr•�m nw:v iM'••a+aa vtib•J PA cw.•r•c» ' 9wwrno rti: .», xr-' -au / _ 41 -a,s,1c1/9 a. :!LL�a .•xc:.g ar.. �� 91�11..k:-S _Q e 9i. y►�4 A iA/'to C C A�K1 ill ifi7v17.� >� _____ c l f 1� �iYJr %� `•fir i•ta`�01312G .Ulf Cs:a+�"'4cd o<, 03 > > ,( , J g `' ,y,,.,, or .,70�... v i yam.. '. o iG..l�r -era�1.•; i ( i lOF .fir.' r t rl ''• w •✓ /I Jd' , 1'i `� ,(./`,. '\~�,• _ J k •t s J( tlLl jL tt `' ' -L' .�'• • � Y •. �i 1; � �J-+, ` y' el� �•( v a r «Z r.-� tit �. .- __ •- . -�% r !F � - + "ram t. �-• ±�:�r �_sytC�= �=•- - `' A�••t �� ��/ - .--- ,�. ,t ,w AP JI or CV) Me 11L�\fJ -� -'• y } it e _ POW * ! y P. ` • �' � �.,r. e ♦ e•,/ � s ya0 _ _ _---ti, t•.�Jim_r _.. y Y� 1• 1 ` _ : r ,• s ,... ;. _• fir. ,, -•� ---^>;"�'a ,� "x,i • . r r _ r "� 'M f'Si -` ��+.��. i•r• I y}R+$_�.�.s.��, • - ...�. - ,� 1t ,e• +•. s� •3�•��� • .. r • *`,1 �� i. Yw • KL e 1 „ " •„ „•.-.. , •nax ,.':. �.. ,...,. ,r _ y.. . x .-,.,.. ..-°. ,. .. �.r• s .- .. .. ., :c =f ,r-.. 1 z.Y.•'. :..-31�4° r•4 .;i'«.",• .._ :rd.' `Y K• tt �c--t" .._ .r .,, qy • .�«N .,y..r... .. ''�,,,.g.;,,,._ .. Y�. .� ".«V,`'S5 wIN H,- 't.�!« ,t� h'd %:�f ,,, �.. �•� �. s•"�-"' K , a _a [y 3:«...iAs .. .:..,.., .. '... ,c. .-. -• ..�.. � 1•i ,. x '•F ya`i a..,.I, ; N1x,•'a ate,' �s,.}�,. .l.,. ... - +.. •. w'a ,,Y;,,..`t[@ - -:., '4...,. .«.•... .. .is ..rr k, r.. ..s _.,a. „r.. .. � ... r►L. a'• ♦t «. .. %.•! c�-,.®.11.{i, a•w..++P,. 'r!'•'°�?• s�.��' n"� tat x ` .,,•, a 'rt � ....:.. ,: :.> .. .••. ...,. r.. ,' �ti x- 'a., ems' �i .�,'A ENVIRONMENTAL IMPACT ON SITE Plant and Fauna Associations The site is an intermediate area between the flat valley floor and the peninsula hills. Not only is the site intermediate in terms of topography but also in terms of vegetation cover. The area in broad terms may be referred to as the ecotone between urban eco- system of the Santa Clara Valley and the "natural" foothill woodland plant community of the peninsula hills. Another way of looking at the area is as a kind of buffer Zone between the two different if not conflicting ecosystems. The ground surfaces within the project area may be divided into five major divisions on the basis of vegetation. On the lower, eastern portion of the site, grasses and introduced as well as native trees are the characteristic plants. The upper portion, the western or hillside, is covered by woody plants brush and two distinct woodland associations. In the northwest corner is a small pond. As is the case in almost all natural systems, zones of inter- action and mixing are common. These ecotones are important in con- sidering the long range changes taking place in the different associations as well as the entire system. Figure 3 shows the approximate distribution of the major elements of each ecosystem. Foothill l:oodlands This plant community is characterized by scattered trees with an undergrowth consisting in some areas of almost exclusively herbaceous plants, grasses and low shrubs; while in other areas trees may be dense, with scattered shrubs underneath. A number of herbaceous plants are common. t -13- Figure 3 S i to Ecesys terms Ave. � ! 10 Project site ®oak Woodland [M8rush ® Grassland 0 Orchard M-Woodland-gross ®Water Source: Enviros In direct contrast to the foothill woodland is the urban area of the Santa Clara Valley. This area is characterized by a large variety of introduced species, including the remains of once pro- ductive orchards. Few of the orchards remain in coninercial produc- tion. Since no part of the project site is occupi d by this urban area it will not be considered as one of the major elements of the project site. It should be remembered that although no part of the project site is included in this urban area, that it is an extension of this which is proposed and as such the present urban area will act as a reservoir for many of the plants and animals which will enter the project area upon development. -14- Figure 4 gives the general distribution of each of the five elements found on the site. Each has distinguishing characteristics and is sensitive to environmental caanges in different ways. Grass The vegetation element distinguished as grass is by far the most common on the project site. It has an area of about 13.4 acres on the eastern sector of the site and is characterized by several species. The dominant species are Yellow star thistle (Centaurea solstitialis), Yellow Mustard (Brassica campestris), Filaree (Erodium spp. ) , Wily; oat (Avena fatua) and Ryegrass (toiium spp. ) . It is these species along with several others, represented in lesser numbers. A list of species found in lesser quantities is given in Table 8. Table 8 The Grass Vegetation Ccrr^on game Scientific 'dame Curly dock -ze, z crispus Bur clover i--d-';crago r. Ewa Bull mallow '•.'aZvta nicaeensis Foxtail ;tordewa spp. Fescue restuca spp. Plantain PZantago Zrv-.r_-eolata Amaranth /--naranthuo sp, . Wild radish Rapranu s cativus Morning glory Convolvulus spp. Artichoke thistle cyraza cara'ur.culus Common groundsel Senecio truZ7ax-is -15- •,r%'••�,- 'Brush•. .. / `• ONO �, ;�• Gross �'�, '•. . _ - _ - _ _ - • s • -,,a `.,. •'` Cayote • . ---.. Live Oak •% �•�, ���•. Close® .... .. _. - •' ��� Oak Open Wooalantt , -Oak Gross •% WoOdlond `•" : Ceder/ `• ..�• Fi Salk C.Walnut •� ' •ti . Live oak Vesper E1410 yptus F gut-,02 4. j+ajor vecetcztion elements of the r dosed 0a% 'Woodland is sin iliar `oro�ect site. Open Oal: lloodland is siiliar the foothill woodland to the savanna association,association, The area of the grass element was previously used as a paste-e, several horses are still kept on the site. At an earlier time cattle were also kept in this area. Two consequences of this earlier use are of importance in the present vegetation element (1) the grass species are largely introduced. Such species are well adapted to the environmental conditions of the area and as such have became well established. (2) These introduced species are well adapted to a disturbed environment. Disturbance, common at the urban fringe, has long been an important environmental factor in this area and is the result of use for grazing as well as develop- ment of adjacent areas for orchards. Two small reservoirs are located on the site suggesting use for a variety of purposes for considerable time. Closed Oak woodland This vegetation :.0 enent is the second most common on the site (about 5. 1 acres) . it is the closed oak woodland which is seen from the valley floor. Dominant species are Coast live oak ( uercus agrii'olia) , Valley oak (Quercus lobat-a) , California laurel (Umbelu- laria californica) and Slack walnut (Ju lans californica) . The Coast live oak is however the most common and forms the major element in the upper canopy or overstory, The term closed oak woodland is used to distinguish this element from the oak woodland which usually has trees widely spaced with ma►;y open areas of grass covering the intermediate areas. In this closed woodland the trees are found growin close enough together as to form an almost comr ,etely closed canopy. Under this canopy a second story or layer of shrubs is coffron. Figure 5 gives a schonatic representation of this closed oak woodland. The understory is characterized by several shrubs most common, of which are Toyon (Heteromeles arbutifolia) , Poison oak (Rhus diversiloba), Scrub oak ( uercus dumosa) and Coyote bush (Bacchar•is ilularis). The ground layer is composed of many of the same species found in the grassland element. -17- Figure 5 Schematic Representation of the Closed Oak Woodland Upper story of lame trees - Intermediate story of smaYL trees, shrubs and brush - Ground story of grasses ajid. herbs This woodland element forms a complex mosaic. Alone its eastern margin it grades into the oak woodland which is character- ized by scattered oaks and grassland. Table 9 Plants of the Closed Oak Woodland Element Common Name Scientific Name Bickeye Aecculus californica Buckbrush Cearwoc hus cuneatus Red bud Cercis occidentalis Yerba Santa Eriodictyon californicrm Gooseberry Ribes spp. Wild rose Rosa californica The major element of disturbance 'n this element has in the past been, and will continue to be, fire. Like much of the foothill woodland vegetation this portion has become adapted to periodic fires, keeping the second story to a minimum. Open Oak Woodland. The open woodland, often when found covering large areas known as savanna, is a sort of half-way country between the foothill woodland and the grassland. On the project site the area of this element is about 1 .5 acres. The dominant species in this element are Coast live oak ( uercus agrifoiia) and Valley oak ( uercus lobata). Trees are generally widely spaced with open grass areas between individual trees. Trees are found individually or in small clumps. No intermediate or second story is found in this element. The overstory of oaks and ground layer of grasses constitute the vertical composition of this element. Under natural conditions this element was influenced by periodic fires. Such fires, like those in the foothill woodland, kept an understory of brush from developing. With the reduction in fires this element has undergone notable change. Perhaps the most impor- tant change has been the replacement of native grasses by intro- duced species. Cattle which were allowed to roam the hills at will are in large part responsible for the shift from the native grasses to introduced species. The native species, though adapted to fire, were not able to withstand repeated grazing. Brush. The brush element covers only about 0.5 acres on the project site. It is large confined to the area around the small pond in the northwest corner of the property and on an alandoned dam in the southern part of the site. The dominant species which compose this element are Coyote bush (Baccharis pilularis) , Poison oak (Rhus diversiloba) , Ceanothus (Ceanothus spp. ) and Scrub oak ( uercus dumosa) . Several thickets composed of Poison Oak (Rhiis diversiloba), Coyote bush (Baccharis pilularis) and Wild rose (Rosa californica) are present. The brush element is a good example of a successional stage between the grassland and the foothill woodland. Several small -19- f -11 OWN Coyote bush (Baccharis iiularis plants have become established in the lower part of the property suggesting that the successional process has started. The development of brush can be seen as a result of decreased fire and grazing on the project site and sur- rounding area. The brush element is well developed to the west and along with the foothill woodland element comprise the dominant hillside vegetation cover. Ponds. The small pond fed by an intermittent stream and located in the northwestern portion of the site is only about 0.2 acres in area. It was probably used for irrigation water and as a water supply for the cattle and horses which were allowed to graze the hillsides. The pond is not maintained and as such supports a dense growth of cattail (Typha spp.) , Tule (Scirpus spp.) , Spike rush (Heieochairs spp. ) and Sedges (Carex spp. ). The pond itself is 1 chocked with a heavy growth of algae. Because of the intermittent nature of the stream the level of the water is subject to considerable change. On the basis of past water lines it would appear that the water level may change more than six feet between high and low level . At this time the water level is down about four feet from earlier this year. At one time another man-made pond existed on the property. This pond was located south of the ridge in the center of the project site, between the open oak woodland and the closed oak woodland. At this time the pond has no water in it and is under- going succession from grass to brush. Several large Coyote bush (Baccharis pilularis) plants are established in the old pond. The dam has already been colonized by several brush species. It is unlikely that water remains in this pond for any length of time, since the watershed area is small and the dam is in disrepair. Introduced Species. Located in the southern portion are several introduced trees probably planted around a house. Those identified -20- were Er;glish walnut (Juglans re is Fig (Fiscus spp ), Silk tree (Albiz is spp.), Pepper tree (Schinus spp. ) and Deodar cedar (Cedrus deodarj. These trees are in a state of decline. %lso located along the southern part of the project site are several Eucalyptus (Eucalyptus globulus). This introduced tree appears to be well adapted to the area. All are in good condition despite adverse conditions during the past two winters. Wildlife Only a few of the total possible variety of animals to inhabit ® the area were observed on the two visits. Shy animals, or animals �I with highly specialized habitat requirements have probably already disappeared. Grazing has caused further disruption. Yet a third disruptive element is the Permanente cement plant. These three factors have resulted in considerable disturbance both on the pro- ject site and in the adjacent area. Table 10 gives a list of animals one might find on the project site. Table 10 IFauna Which Could Be Found On Site Open Oak Closed Oak Grassland Woodland Woodland Brush Pond �+hibians Slender salamander X X X X Western spadefoot toad X X Pacific treefrog X X X Bullfrog X Western toad X X X X X Reptiles Fence lizard X X X X Alligator lizard X X X X Gopher snake X X X X Garter snake X X Pond turtle X Ringneck snake X X X X (Continued) -zl- a Table 10 (Continued) Open Oak Closed Oak Grassland Woodland Woodland Brush Pond Reptiles (Continued) Kingsnake X X X X Coast garter snake X X X X 1 Rattlesnake X x X x Mammals Opossum X X X Raccoon X X X Skunk k X X x Ground squirrel X X X X Gopher X X X X California mole X X X X Bats X X X X Weasel X X X X Coyote X X X X Bobcat X X k Rats X X X X Mice X X x X Jackrabbit X X X Black-tailed deer X X X X Birds Mallard duck X Coots X Quail X X Pigeons X X X X Doves X X X X Owls X X X Swifts X X X X Hummingbirds X X X X Flycatchers X X X X X Swallows X X X X Jays X X X Magpies X X X Red tail hawk X X X X Crows X X X X Wrens X K Mockingbirds X X X X Finches X X X Blackbirds X X X X Sparrows X X X X Robin X X X Meadowlark X X -22- On the basis of two visits to the project site and a review of available literature no evidence exists to suggest the presence of rare or endanrtred plants or animals. Food Chains The transfer of food energy from plants through a series of organisms with repeated eating and being eaten may be referred to as the food chain. At each level a large amount of the potential energy is lost as heat, perhaps as much as 90%. Because of this the number of links in a chain is limited usually to four or five. The shorter the food chain the greater the available energy. Food chains are of two kinds: (1 ) the grazing food chain which begins with green plants, goes to herbivores and finally to the carnivores.l (2) The stritus food chain which begins with dead organic matter and continues through detritus feeding organisms. Food chains are Snot isolated sequences but occur iro complex interlocking patterns. In natural systems all those organisms r,ihich occupy the same step in the sequence belong to the same trophc level . All green plants occupy the first trophic level , herbivores the second, carnivores which eat herbivores the third a::d secondary carnivores the fourth level . On the basis of the possible species list one might envisage a food chain of the following kind. The number of possible diverse and interlocking Oak acorn --► Ground squirrel -,. Gopher snake Red tail hawk food chains is considerable. It should be emphasized that with Man food chains are subject to considerable disruption and dislocation. In this area alone man has caused the disappearance of the Grizzly bear and probably the Mountain lion. T'lis has resulted in the removal Herbivores are plant eating animals; carnivores are meat eating. -23- of the top level of the chain. What this means is that herbivores, such as deer, now have no natural enewy and their populations are allowed to increase beyond naturai limits. Man has to a very ® limited degree replaced the :appt - level carnivores, but all too ® often his predation is misdirected. The possible food chain noted above could at any point include man, unfortunately it has often included man at the top since it is not uncommon, though illegal , that people will shoot Red tail hawks. Impacts and Mitigation In all probability the major damage has already been done. The proposed development will only increase the degree of that imrdct. Since the property has been used for grazing, has been surrounded by orchards which have now been replaced with houses and has a cement plant just to the west the most significant damage has been done. What remains is also subject to adverse impact. Vegetation destruction would be greatest and most permanent if development is allowed on the hills. Open Oak Woodland will be the most 'impacted. The Closed Oak Woodland, because of its location on the steeper hillsides, would be less impacted. Generally, most of the oaks near the pond are in fair to good health, particularly the live oaks. Several of the deciduous oaks are in poor health with insect damage noted in the crowns. On the southwest portion, the oaks are in fair health; a number of trees had thinning crowns and numerous dead small branches and twigs. It is this habitat which probably supports the largest wildlife populations and it is therefore fortunate that it is found in areas unsuited for development. In landscaping, the developer should emphasize the use of native species. These require less care and in the long run will be More suited to the .climatic changes which have recently caused so much concern in the Bay Area. Further, the use of native species -24- would provide food and other habitat wou p requirements for native animal ® species displaced in the process of development. ® The destruction of vegetation is the greatest potential threat to wildlife. This is because all u0mels are dependent. on ;j1a%;ts -'the-- dir�Ttly cy. indirect? ; fcr food ane cover, an,' because 4ay envirormental change Is reflected in the vegetation it is useful to thin'-. of a►oimals es associated with the major vegetation elements. Each animal will respond to change in its own way; few generaliza- tions concerning impac` car; be made. Also it should be remembered that unlike plants, animals are not restricted to a given site, Aand can move in response to change. Such movement is however restricted to suitable habitats if such exist in the surrounding area. The animal , faced with adverse environmental change, must move or die. If an adjacent habitat is occupied by another indi- vidual one must give way to the other. In the natural environment only so many individuals of a given species are able to feed and reproduce in a limited area. Further development will probably result in reductions in the number of reptiles, they will be forced further up the hill . If Coyote and Bobcat are in the area they will also be forced further away from the valley. Birds which will suffer from development will include the Red tail hawk. Most of the species now in the area are already fairly well adapted to the urban fringe and will continue to be found in the area though probably in reduced numbers. The reduction in numbers will be a result of two factors: (1 ) the destruction of habitat, which pro- vides food and shelter for breeding and protection from predation. (2) As a result of habitat destruction the lower level of the food chain will be Jisrupted. This would mean that the carnivores will have a reduced food source and will therefore be reduced in numbers. Some species will probably increase as a result of development. Many rodents are well adapted to man and will increase in numbers -25- 0 with levelopment. Rats and mice are the two best examples. Other mammals which are able to live in close proximity to man and not suffer adverse impact are Raccoon and Deer. Both will probably maintain populations similar to those which they now have. Birds which are able to adapt include Jays, Doves, Pigeons, Crows, Black- birds, Sparrows and Robins. One species which might enter the area is the Starling which now can be found in the urban area. The best way to mitigate impact on the wildlife is to confine development to the flat, eastern portion of the site. Generally it is felt that the adverse impact on wildlife, provided that development is limited to the flat eastern portion of the property, will be minimal . If development is allowed in the oak areas the impact will be greater as a result of habitat destruc- tion. As previously mentioned the most significnt damage has been done; the large carnivores are already gone and those species which remain will suffer less since they are already adapL,�d to man's tpresence. The small pond located in the northwestern corner of the pro- ject site can only be improved as a result of development. At this time it is in a state of decline due to lack of upkeep. Aquatic and semi-aquatic vegetation are causing the pond to become chocked with vegetation and this in turn is causing r=ductions in aquatic animals. Cleaning up the pond, removing much of the aquatic and semi-aquatic vegetation will render it more productive in terms of a greater variety of wildlife. Cleaning it will not affect its use as a wildlife water hole. Neighbors of the property report the pond contains fish. If true, the populations will not survive for long in the existing pond. If cleaned and maintained, fish could be planted, thereby creating a valuable recreation facility for the proposed housing development. If the pond were to become a recreational facility, the large oaks and part of the aquatic Y -26- vegetation should be left so as to increase the haritat diversity in and adjacent to the pond. The project as proposed is not the best alternative in terms of flora and fauna impact. See also section on Alternatives. Impact, which is secondary, is considered Minor Adverse. GEOLOGY AND SOILS The proposed project consists of approximately 20.7 acres of undeveloped nearly flat, gently rolling, and steep hillside terrain in the City of Cupertino, California. The eastern portion of the project land is characterized by 10% slopes dipping eastward, and the western portion has slopes as high as 50%. Total relief in the area is about 140 feet. Two reports already exist which deal with specific on-site conditions. These were done by Burkland and Associates (1972) , and by Berlogar, Long and Associates (1974). Both concluded that the site is generally suitable for building, with some special considerations in terms of the placement of pads and building design. These recommendations are partly on the basis of test pit investigations of subsurface conditions, as well as other surface investigations. Nowhere on the project site is bedrock exposed. Inspection of float, and debris in and around the numerous (filled-in) test pits in the area, shows .red-brown, fine- to coarse-grained sand, cobbles, and boulders, and light-brown, sandy claystones. This is typical of the Santa Clara Formation, and agrees well with work done by Cummings (1968 and 1972) and Rogers (1973) . Cummings reports: "The formation consists chiefly of pebble and cobble gravels interbedded with sand, silt and clay. Most of the strata are weakly consolidated -27- . ew with a friable matrix of silty sand and iron oxides. Locally, however, there are beds and concretions that are tightly cemented with calcium carbonate. At most localities the formation is on the order of several hundred meters thick. .. "Study of the compositions of the clasts in the gravels of the Santa Clara Formation has ® revealed the existence of a number of mappable lithostratigraphic units within the formation. . ." The site lies within the Stevens Creek unit. The Stevens Creek unit has a bad reputation for instability in some areas. Surficial material on the site consists of a layer of topsoil blanketing the entire site, and colluvium where the streams Pnter the flatter eastern portion. The topsoil is made up of weathered fragments of the local bedrock. Cobble float is not uncommon. Test pits dug by Berlogar, Long and Associates (1974) have shown this topsoil to vary in thickness from 1 to 4 feet on the low areas, to about 2 feet on the hilly areas. The colluvium is slopewash-- unsorted pebbles, cobbles and boulders in a sand and clay matrix— from the two streams. A gently rolling anticline (geologic hill folded upward) oriented northwest-southeast and reported by Burkland and Associates Q (1972) to exist across the center of the project area. Its existence was suggested by information from one of their test pits. Berlogar, Long and Associates (1974) did not report finding it. There is evidence of a fault oriented northwest-southeast along the western boundary of the project site. The existence of this fault ;s based upon the tilting of Miocene rocks to the north of the project area, known faulting in a cut near the Permanente Cement plant, the presence of possible fault gouge in the debris of one of the test pits, and observation of shearing in the Berlogar, Lung and Associates test pit 18. See Figure 7. -28- ac, t .;M• — a s t �it0 Not to Beale Oil tre vrotec oI or tee'IS l,oa .� ?%.Ore 6 � I SAN ANDREAS N 3T®E o0 • a FAULT ZONE ^� SMAHNON pp 'i! ®I i 1 to I W FAULT EONE •"� z ' ,*I ''d ►n 1 i 1 L+ = g m ! MONTE BELLO RIDGE I YoUAA N I o 1 1 GacuAtcC a I i 1 6 n I c • t ��Aqp=8000rtt2 e►RANCISCANI TZATWRT, o'0 8000 P c l000 / TERTIARY •��1 °i� Roe Roe e000 `.M 0 .v . y ad In .�� F RANCISCAN �„ (..� ti 0 �� , TERTIARY' ROCKS n S ,�,,,� 1 /1 �DUATERNARY • . • . o R®ia., •:' ROCKS , . � AFTER CALIF.OEPT. • 4 • • , .• ' , Z FRANCISCAN ' . WATER DES,t19611 OOP0 yl a �i AND TERTIARY? /�,` ,OLATESQo91tt.105.14Q • ® g tke�— ROCKS Z • 1 � •'�dsr FRANCISCAN °l !//♦oe/�eii � �•• �'1 ROCKS *'e ERROR ENVELOPE 1'OR � HYPOCENTERS OF EARTHQUAKES`� SEISMIC DATA ON TWO LARGEST EVENTS ( v INOtCATE DISOLACEMENT arDST PRODAOU► ON A MUST FAULT AT A OEPT%OVER 549% a a DIPPING zoo DOWNWARD TOTIIE S W POSSIBLE LINC'.'jr CONNECTION (SEE BtWCR•IN PRESS) EygTWEEta EAnt►►rn,AaB TNRUST FAULT AMC SURFACE FAULTS O1 o •v SNANNON? FAULT ZONE � � e 0 KILOMETER• $OLO FEET NO VERTICAL EXAGGERATION e w e Gko MOST PROBABLE LOCATION OF Tmh%;ST FAULT DISPLACEMENT(RE SAUER) Figure 7 . Possible relationship between earthquakes and surface faults (Cupertino urea), This cross section was bone about 1j mi. to the northwest of the project. site. (Modified from Rogers, 1973.) A careful field examination was made to locate any signs of current slope instability. Aerial photos 'nd pertinent literature were also studied. Impact and Mitigation Down slope movement due to soil creep and landsliding is considered a possible hazard on part of the site. Soil creep was observed near the northerr central portion of the site, and linear cracks (oriented approximately northwest-southeast), suggestive of severe creep or landsliding, were found along Oe old road in the west central part of the project site. See Figure 6. If an anti- cline does exist—which can be determined during grading operations— this slope could be a dip slope, and creep or landsliding could then be expected to continue to be a prob emm. Air photo interpre- tation and field observations suggest ar.other possible larger land- slide above the gond on the northwestern part of the property. Evilding below these possible landslides, and fill on the areas of creep, Should be restricted, or special considerations such as the use or retaining walls and drainage systems, be employed. If building is restricted, lots 1-4, 10-11 , and 24-28 would not be developed. No evidence of recent movement along the fault on the western heundary was noted in the field or in the aerial photos. Since it is probably presently an in-ctive fault, and since the planned development will not be near this fault, fault rupture is not considered a hazard on the project site. It is possible this fault could once more be reactivated as part of the San Andreas Fault System, but the likelihood of a major earthquake along it is negligible. The Shuinon fault, buried beneath alluvium, is thought to pass close by the northeastern corner of the project site. The existence of this fault is questionable in this area (as -indicated by Rogers, 1973)� It is possible that some recent seismic activity of small -31- magnitude in this area is related to this fault (see Bauer, in press, in Rogers, 1973). There is a history of seismic activity in this region—and there will probably be a large earthquake related to the San Andreas Fault sometime in the next several decades—but seismic hazard related to the Shannon fault is considered to be minimal on the basis of the lack of good information about its location and activity. Seismic hazard, even from a large earthquake, is much less on this site—with its relatively shallow alluvial cover=- compared with other existing buildings on thicker alluvium in the adjacent Santa Clara Valley. The earth fill dam dt the northwestern corner of the project site appears stable, but a stability analysis should be done on it before houses are constructed below it. Even if it is determined to be stable, landsliding—possibly seismically induced—from either the north or south of the reservoir could cause its water to overtop the dam and cause minor flooding of the houses immediately below it. Impact, which is primary, is considered Major Adverse. HYDROLOGY AND FLOODING The area drains into Stevens Creek about 3/4 mi . to the east. ® These streams are dry most of the year; and are required to carry only small amounts of water during the rainy season. No defined stream course exists on the property and no groundwater was observed by Berlogar. ® Local areas in the Santa Clara Fonnation are permeable enough ® for the placement of percolation ponds, but the pond on the property as a whole i5 not considered an important aquifer in the foothills area. It is not necessary for groundwater recharge. Impact Increased run-off caused by this development will be insignifi- cant in terms of downstream (Stevens Creek) flooding and damage, but -32- it could cause significant erosion if not properly directed. Cuts in the Santa Clara Formation have been known to erode badly. Hydro- mulching immediately after establishing a cut, and on fill slopes. will probably be sufficient to prevent severe erosion. Y HEALTH AND SAFETY Soils. There is nothing inherent in the design of the homes which in and of itself creates a hazard to health and safety. How- ever, there is evidence of soil creep which could result in sliding and potential damage for some eleven lots: 1-4. 10-11 , and 24-28. Figure 6 shows these soil creep areas, which are located on the beginning of the rise of the `oothills. This can be best mitigated a by simply not building on or below these possible landslides. If building is allowed, fill should be restricted on the areas of creep and special considerations such as the use of retaining walls and drainage systems be employed. The Pond. It is confirmed that the pond is a breeding place for vectors, particularly mosquitos and other insects. The pond also presents a possible drowning hazard. The first problem will be mitigated by the Santa Clara County Health #Department's adding the pond to its inventory after which a vector control program will be instituted, if neces,ary. About the only way to eliminate the drowning hazard is to drain the ,pond or to fence it, thus taking away a very positive feature of the site's permanent open space. A Homeowners' Association should assume liability for the pond. ® Fire. The area is subject to periodic burning and fire danger ® must be kept in mind both as a permanent hazard and during construc- tion. The area behind the project site covered as it is with brush and woodland could carry a fire down into the urban area. California is noted for its destructive fires on the edges of urban areas. Only recently (1970) a fire in the Berkeley Hills, carried by z 5 ti.. �J brush and woodland vegetation, destroyed several homes. On this site, trespassers have been responsible for small fires (one within the past month) and a serious grass fire occurred above the property a few years ago. To reduce the fire danger, the following mitigation measures are s-jynested: a Remove the understory in the Closed Oak Woodland _,i` h would fuel a fire's spread. Limit development to the flat eastern portion, thus reducing the chance for involvement- of houses. ® Construct a fire break (cleared area) behind lots 12-23. This would mitigate the restricted access of fire equip- ment to this fire prone area, and the uccc � could also double as an element of a trail system. ® A trail system in other parts of the si `.e could serve a si�Jlar function. i A Homeov)ners' Association should assume responsibility for maintenance necessary to insure the lowest possible ® hazard potential over the long term. ® No steps short of removing all vegetation can eliminate the fire danger, even that drastic step is only a preventive measure and does not insure that fire will not happen. Other Hazards. A neighbor has confirmed that rattlesnakes are a problem on the property, having killed three himself in the past year. With development they will retreat into the foothills, but can still be expected in the upper portion of this site. The s'te contains a significant amount of poison oak, which causes severe skin eruptions in most people. Mitigation world be 2Mr. Falk, northwest corner of Voss and El Prado. -34- to remove the plants. Modified site design can successfully mitiga-,e the impact. I mpact, which is secondary, is considered Major Adverse, due pri- marily to the placement of houses in areas subject to soil creep. NOISE Noise produced on the site itself is presently not detectable. Sources of noise which originate off the site but potentially affect the noise level on the site are several : A Land uses adjacent ® Two airports ® A railroad i Interstate 280 ® General traffic flow Land ruses adjacent include residential , a School and a con- valescent hospital . 'Moffett naval Airfield is approximately 7 straight line -:files, San Jo-Je Municipal Airport is 9 straight line miles away fre!n the site. Neither airport's flight patterns traverse the site. The railroad track is located one mile westerly and carries on_ `rairl in and out daily. Traffic noise is on local streets, Foothill ''. c,ulevard (an arterial carrying truck traffic) and Interstate CuC detectable at the west end of Alcalde) Measurements taken on-site show the present ambient level— , despite off site sources—to be very quiet. At the site and Voss the level is 45 dB(A) L50; at the site and Alcade it is 48 dB(A) L50' Impact and Mj t 2_ation. A permanent source of noise resulting from the project will be from increased traffic. Present levels and predicted new levels are summarized in Table 11 . -35- Table 11 Predicted Noise Impact Present Predicted Design Criterial Location Time Level , L50 Level , L50 Outisde, Daytime Voss at site 4 p.m. 45 dB(A) 47 dB(A) (Residential ) 50 dB(A) Monte Vista School Noon 53 53 (School ) 55 Pleasant View (Con- Noon 51 51 (Conn. H. ) 50 valescent Hospital ) Voss at Foothill Noon 67 auto 67 (Residential ) 50-55 82 truck Notes: 1 . Per Highway Resea-ch Council , National Academy of Engineering, 1971 Source: Enviros These project increases will not yield degradation of the ambient noise level except at Foothill-Voss where the recor=mended level is now far exceeded. There is at present no alternate route for the large volume of trucks on Foothill , but the signalized intersection ® minimizes braking noise on Foothill by opera;.ing on demand from Voss. i Although no predictions on the amount of intra-development noise are possible, it is the opinion of the Study Team that the site design places houses so close together as to create sound tunnels between some units which will carry and magnify noise. The effective density is so great--with relatively large houses on small lots with narrow streets—that the occupied areas of the site are likely to be impacted with the kinds of noises which affect privacy as well as raise the ambient noise level . This effect can best be mitigated ty a reduction in density. They can also be mitigated somewhat by 9:�sul, ting the units well and restricting placement of windows onto narrow sideyards, particularly directly across from neighboring windows. 3The density of the developed portion of the site only. -36- With mitigation the impact, which is primary, is considered Neutral. -37- WITHIN THE IMPACT BOUNDARY LAND USE The site is presently zoned Al-10, Agricultural-Residential , 10,000 sq.ft. lot, single-family. In essence, the intent of such a zone is to avoid urban sprawl , to establish distinctive neighbor- hoods, allow semi-rural residential development, preserve the natural beauty of the hills, allow public accessibility to view- points, and impose height restrictions in order to protect the silhouette of hilltops and ridges. (See Section 77 of Ordinance 220(i ) , P. 162-163. ) This zone (.pith this density) appears to be peculiar to this site. From the upper elevation, the view is extensive, especially on a clear day. The San Jose metropolitan area , the lc..er peninsula, and the East Bay hills can be seen, and, of course, the roofs of all the d:relIin s on the lower elevations in the vicinity. In addition to the horses, unleashed dogs were observed running in the property. The rustlings of small wildlife could be heard in the underbrush on the upper elevation. There are paths running through the property, enabling r;alkers to reach the varying elevations and avoid the thistles, snakes, etc. , but not the horse manure. Trespassers are obviously attracted to the property. During site investigation many footprints could be seen in the dried mud near the pond. Two abandoned vehicles were in the draw beyond the end of Voss Avenue (must have been there a long while, as access is difficult due to fences and there has been much target practice done on them by other trespassers). -38- Adjacent Land Uses and Zoning The only properties immediately adjacent to the site that have similar zoning are those south of Alcalde, a pocket of unincorporated land. This area is zoned single-family, 10,000 sq.ft. lots and is characterized by scattered single-family development. The hones existing here are of various type and size and generally old. Puny appear poorly maintained and of substandard construction. Due north of Voss Avenue (served by E1 Prado Way, Medina Lane, and Lockwood Drive) are duplexes, R2-4.25, 4,250 sq.ft./dwelling unit. Zoning restricts to one-story north of N.E:dina Lane. The duplexes located along Voss are three years old, attractively designed and landscaped. Those along E1 Prado are equally attrac- tive, but have problem backyards as they were allowed to back up right onto the foothills. East of the site, on both sides of Lock`rlood Jrive, the zcninq is also R2-4.25. These duplexes are all two-story structures; at first glance they appear to be large single-family hoses . The backyards and rear windows of the :`:rst westerly of' these units will overlook the most densely developed part of the site if built as proposed. tThe other areas adjacent to the property are undeveloped. They are zoned as follows: A triangle of land southwest of the site is zoned Al-43, agricultural-residential , one acre lots, single-family. Thirteen acres of lard lying northwest of the site is presently zoned R3-2.2 which is multiple-high density, 2,200 sq.ft./dwelling unit. This zoning was set about; 12 years ago; the city is now suggesting re-zoning to one-acre lots. the property is a hilly knoll with orchard trees. -39- Across Voss Avenue from the northeast corner of the ® subject site, between Lockwood Drive and Monta Vista Elemen- tary School is 4.9 acres of undeveloped park site belonging to the City of Cupertino. Compliance with Plans and Policies The city is still in the process of developing a complete new General Plan. The land Use Element is being created in four geo- graphical segments: Core, Valley Floor Infilling, Lower Foothills, and Upper Foothills. The subject Fite is immediately west of the boundary of the Halley Floor Infilling plan, and almost extends to the Upper Foothill area. The plans for the first two geographic sub-areas named above have been prepared; only the first has been approved by the City Council . The latter two were partially dependent on completion and adoption of the Santa Clara County Monte Bello Ridge Mountain Area Plan, which has just occurred. Due to an incomplete land use element, other elements of the General Plan have been considered "interim;" e.g. , the Open Space and Conserva- tion Element, and the Housing Element. In terms of the Land Use Element then, the subject site is currently in a "limbo" position. It is classified as within the Lower Foothills geographic sub-area and no recent (post 1964) city plan for this sub-area yet exists. Another approach by the city to designating this property appears on a map labeled General Plan Study Exhibit "A" , dated 12/30/73. The intent of this map is to illustrate the City of Cupertino's urban service area, existing city boundary, and sphere of influence. The map further delineates within the urban service area the boundary between the "lower area" and the "hill area." The subject property is designated as an undeveloped property within the lower area. -40- The basic premise of the Valley Floor Infilling plan is in accord with the LAFCO and UD/OS4 policies--that any further outward expansion of the urban area should occur only after some of the substantial amount of vacant land already adjacent to services within the urban area is developed. The Valley Floor Infilling plan speaks to an area of semi- developed land immediately south of Alcalde Road and less than two blocks east of the subject site's southeast corner. The policy the plan suggests for what it designates as "Area C" (p. 19 of the plan) reflects the three distinct land types contained in the area: alone its eastern portion near Foothill Boulevard and McClellan Road the use shall be commercial ; the lots beginning northerly of the coiruner- cial designation, and continuir;g north to Alcalde Road and thence west to Merriman Road shall be designated as a residential use with 4.4-7.6 dwelling units per gross acre; the balance of the study area west from Merriman to Santa Lucia shall be designated as a residential land use type with a dwelling unit ir.tensity range of 0 to 4.4 units per gross acre. The residential density range suc�y ested in the above-described area is typical of the plan's suc;yestions for other undeveloped and serni-developed properties lying within the Valley Floor Infilling boundary west of Foothill Boulevard. These densities can serve as guidelines for acceptable densities for the subject property as well , although perhaps only for the level portion of the property. Plans for park lands are discussed in the Open Space and Con- servat4on Element in terms of four density alternatives (p. 16 of the element). The resultant population from the four alternatives ranges from 35,000 to 50,000. The population of Cupertino was 4Local Agency Fo=-..-.=..tion Commission and Urban Development/Open Space subcommittee of County Planning and Policy Coirmittee. -41- estimated by the State Department of Finance to be 22,300 as of April 1973. Using the city's average r4' 3.2 persons per dwelling unit and 7,860 dwelling units existing dnd under construction on Jar.!eary 1 , 1973, the population last January was approximately 25,152. A number of policy statements occur in the Open Space and Conservation Element which are pertinent to this proposed develop- ment. The policies are within a section labeled "hillsides" but should be justified as applicable to this Fite (see pp. 4-6 of element) . Selected policy statements are: Goal I. To foster sustained recognition that the hills are a natural resource of local and area- •ride importance. Policy 1 . The desirable natural environment of the area should be protected. Policy 2. Both developers and governmental jurisdictions should be encouraged to provide for permanent open space within or adjacent to hillside developments by: . . . b. Clustering residential developt;ents with com- pensatory open space. d. Acquiring private and excess public lands for open space needs. (dote: suggested ways include scenic easements, development rights, mutual covenant, planned unit development. ) Po1i y 4. Conservation should be promoted, insofar as is possible, of . ridgecrests . and other special natural features. Policy 5. The vast recreational and educational potential of the hill areas should be promoted and implemented by . . . a coordinated regional trail system. Parks and Recreation goals and policies have promoted adoption of Ordinance No. 602 which provides for a dedication on in-lieu payment for park acquisition and development. This project would require 0.79 acres for dedication. In order for private open space to be offered in iieu of this acreage, a number of specific facilities must be provided. The developer's plan does not show inclusion of the required amenities in the private open space. -42- 1 • ®ems f The Monte Bello Ridge Mountain Area Plan prepared under the ® direction of the Planning Policy Committee for Santa Clara County ■ is concerned with an area of about 40 square miles of foothills and mountains and reflects on several jurisdictions. It encourages the cities to adopt its recommended policies when making decisions affecting lands within the Plonte Bello region. The Plan does not speak to specific properties such as the subject site. Its applica- bility to the site is termed "broad brush" by P.P.C. staff. That broad brush paints the area of this proposed development as "resi- dential land use: low to very low density depending on availability of utilities and steepness of slope, from 1-5 acres/dwelling unit with sewers and water." It would seem reasonable that such a density could be a guide- line for the upper elevations of the site and densities in line with the valley floor be used on the flatter portions. Recon,nendations within the Monte Bello Plan should be heeded. For example; "Development within the mountain environment should be dispersed a!aong large areas of open space by utilizing the gentler slopes while generally preserving the steeper slopes in open space. All development should be planned and designed to be in harmony with the natural environment. Engineering and design solutions which make major changes in the natural terrain should be prohibited." "Residential : A maximum limit on residential population should be established for all hill- side plans. Population densities should be related to physiographic and environmental factors; for instance, steepness of slope, drainage, slope stability. . . . By providing compensating areas of suitable, functional open space, it may be possible to permit localized areas of higher density." -43- "Methods should be explored which should provide for the housing of people of all income levels within the mountain enviroruent." The developer has asked for a zoning change on the subject property to Planned Development. According to the city zoning ordinance (Ordinance 618, section 3): "The Planned Development zone is intended to provide a ,mans of guiding land development or redevelopment in areas of the City that are uniquely suite] for a planned coordinati%_0 of land uses and to provide for a Ereaier flexibility of land -,se intensity and design because of accessibility, ownership pattern, topographical considerations, and conrunity design objectives. "The Planned Development zore is specifically in'endkA to encourage variety in the develop- ment pattern—of the community; to promote a more desirable itvi environr,ent; to encourage developers to use a more cre.itive auuroach in lard development; to pro--vide a means of reduc- ing the amount of improvements required in development through better design and land planning; to conserve natural features; to facilitate a more aesthetic and efficient use of open spaces and to ercourage the creation Of public or private conmon open spaces.'r— (Consultant's en,phasis) The density within the Planned Development zone can vary with what is c+�7:patible with neighboring uses; the PD zone serves as an overlay ,one. The developer is seeking an allowable density of 3.4 &,elling units/gross acre. The City of Cupertino planning department_ is recorm,ending development of a slope density formula. A mechanical means of zoning hillside properties will remove much of the subjectivity from zoning decisions about foothill properties. -44- 5 An area with similar topography has been developed recently. According to Robert: Cowan, Assistant Planning Director, DeAnza Oaks has a density of 4.9 dwelling units per gross acre; using the entire terrain for this averaging has resulted in a feeling of crowding among the dwelling units. A proposal for development of the 13-acre parcel located northwest of the subject site is also currently before the city. Voss Avenue Properties is proposing to construct a "hillside resi- dential complex" of 1.84 units. The plan specifies 21 .13 building coverage, covered parking for 350 cars, and ureovered parking for an additional 28 cars. The access to the development is totally from Voss Avenue. The plans for the development show it stair- stepping up the slope giving the sarne appearance as hillside struc- tures in the Belmont and upper peninsula areas. The city planning and public works departments anticipate disapproval of the project, citing plans to rezone the property to one-acre residential lots. A 1970 development application on the project site elicited a ne,lative response from neighbors surrounding the site. A petition with the ® signatures of 103 neighborhood residents opposed to the plan was ® :.resented to the city. These residents viere concerned about the den- sity of the project. Although residing generally i:r R? -one cf a comparable density, they were apparently concerned about additional traffic, a sense of congestion, a!,d 1hp lass of the neighborhood open space. If the plan now being proposed for the site does not guarantee preservation of an open feeling in relation to the hills now viewable by the surrounding residents, it is likely that neighborhood pro.. �sts will again be heard. However, one neighbor living just across Voss from the mid- portion of the property expressed 'hope that the property would be built upon. He is harrassed by trespassers going onto the property -45- and creating a noise and litter nuisance; he' cs further concerned about the fire hazard. Planning and Using the Open Space The plan contains considerable open space but the question is how much of it is usable. There are guidelines for this analysis. The City`s cluster ordinance (220 (e) , Section 25) says: "Common Area included in the calcination of allowed number of dwelling units shall be usable for recreational purposes. Landscaped areas, tennis courts, swimming pools, ornamental lakes, narrow natural streams, and similar areas , and buildings accessory to recreational uses, may be includes: in this area . Land too steep for recreational purposes , defuse brush, or concrete-lined drainage ditches, and similar areas, may be deeded as Common area , subject to acceptance by the City Council , but shall not be included in the area on which the nuirber of dwelling units is caicula';ed. Land steeper than 7", after grading , shall not be deemed to be a Usable Cowi,,on Area , unl e:s_ "he Deve l o,rl.m ant Plan Shows that it can and :,ill be used for active recreational purposes, or landscaped in such a way that it, in the judgement of the Planning orumission, entrances the overall quality of the development." Santa Clara County his similar criteria for accessing %,,-hat is useful open space for recreational development. in its opinion, slopes exceeding 10'� are very difficult to develop. Ho:•.'ever, steep land may have great scenic value, it may be a rich wildlife habitat, and it way accommodate trails that follow `he =-ontours of the land. The county has suggested a differential st-andard fer measuring the recreational usability of parks in hilly te, rair vs. those on flat land; park land with slopes exceeding 10% have been given 251/* of full value. Perhaps a comparable devaluing should be used in counting the conrion open area in this project when figuring allowable dwelling units. i -46- Once the g!@ntiq of open space is determined, the management of it must be considered. A master plan should be devised at this point to consider linking open space on this proipct with open spaces on adjoining parcels. Create linkages while the lands in the area are still undeveloped. UD/OS recommends multiple use of the utility corridors which crisscross the County, including recreational use as part of a countywide trails system. Power lines extend from the Cupertino PG & E substation cn the westerly side of the site; a possible link to the nearby pond on the north- western portion of the property could be feasible. A precedent for this already exists. The city acquired development rights to open sp,aca in the JeAilza Oaks development. A description appears in the Open Space and Conservation Element on P. 13: "17 Ac. Oak Meadows Park - a hilly cwiTion area set aside in a cluster development south of Stevens Crtii:;; Boulevard. This area should be made accessible to the public as a part of a trail system from the northwestern part of the City to Stevens Creek Reservoir."' The Open Space and Conservation Element further recoounends ® that "unique ov particularly interesting wildlif-. and vegetative habitats sh:;ald be preserved by including them in the park system. " This could be applied to the pond. If the city does seek development rights to such open spaces,- it should assume maintenance and liability costs for such trai 's. The land seems suitable for both pedestrian and equestrian trails. Impacts and Mitigation Although the question of whether the land use proposed is compatible with the city's goals and policies i not easy to answer, general guidelines are available which give direction to the decision. Interpretation by the Study Team suggests the project as purposed is -41- . a Invviros 2/2 overly dense, has not incorporate plans to provide recreational use in the open space or a trail system, and does not meet goals of either the Planned Development Ordinance or those pertaining to scenic quality and preservation of view. See also sections on Soils and Geology, Health and Safety and Aesthetics and View. The impact, which is primary, is considered Major Adverse. i a AESTHETICS AND VIEW With t;ris project, aesthetics and view is closely related to ,lensity ar;d placement of the units. It is also closely related to the topograph.-/ of ti,,e site making its analysis somewhat complicated s because of the numerous points of view which must be considered_ The aesthetics of a project have become an important considera- tion for Cupertino. The Land Use Element for the Core Area expresses concerns for the aesthetic appearance of the major thoroughfare.; and adjacent areas. Performance standards have been established to accomplish community objectives in this regard. T;ie aesthetics concern is further apparent when sne notices the emphazis that is being placed on coordinating an early California or Spanish style in public buildings and commercial developments. In addition to the immediate short-range view, the city is also concerned about the visual backdrop to the community. s Views of tarp Site The upper elevations of the site are visible as you approach the intersection of Voss and foothill Boulevard from the north. From the east the upper elevations can be seen from the open areas around DeAnza College and the higher elevations of the valley floor moving south along Stelling. If the project is built as proposed, the view of the homes from north and east would be similar to that of the hillside step developments of Daly City and South San Francisco. Unless a landscaping -48- AM 19 provision is required to screen the back fence lines (especially on Voss), the above analogy is all too easily realized. If built upon, how the property will appear from the surrounding properties is a paramount concern. Regarding trees, the city will require that the removal of any but orchard trees be reviewed by the architectural and site control committee. Preservation of a considerable portion of the "viewable" hill- side can be accomplished in a combination of ways. A slope density formula provides justifiable basis for less than maximum development. The argument that a reduction in density reduces the value of the property 's not viable in that the land is in a semi-agricultural zone now. (Although market value is now based on residential use. ) Views Fran Within the Site The views that the residents of the homes to be built upon the site have is also important. Placement of horses to take best advan- tage of views toward the Bay or the valley floor or of the permanent open spaces in he foothills and mountains should take precedent over attempting to achieve the maximum number of housing sites. The pond on the property will probably not be viewable from the home sites. A good view of it is obtainable from the property contained in the Voss Avenue Properties proposed development. The Permanente cement plant cannot be seen from the property. However, the high tension lines and towers linking to the PG & E substation are clearly visible. Lower elevation views of the hills would be blocked by the I upper elevation structures except for those homesites along Voss. Due to the density and distribution of the lower elevation sites, little or no view of the hills would be possible. The immediate downhill views will be a curvilinear pattern of lower elevation roof tops. Only those hones on the north and east -49- e side of the interior road joining Voss to Alcalde will have a view of the valley. But, the way these homes are positioned, views will be accessible only from rear or side elevations of the upper sites. Half of the upper level sites view the house immediately opposite them. Considering the terrain upon which the homes may be built, it is likely that decks will be a feasible addition to the homes. How they will be viewed from below should be considered. The wooded part of the site which is designated as park open ' space ;s a steep area of natural culverts covered by dense brush and trees. Visually this terrain is attractive but physically E provides only difficult access for use as a "park." If the wooded areas are to be used as a park open space, then ® some provisions for access should be .made. Without planned access, the area could be destroyed Ly indiscrininate foot or motorcycle traffic. Fard use of this area could result in soil erosion and a breach of the private yards of the upper level sites as well as ® degradation of its visual appeal . Mitigation The visual iM pact has been described above as being adverse for both those viewing the site from outside and those viewing it from within the development. Clustering the units (the Study Team does not consider the proposed site plan as clustering) or duplexing on the lower flat portion of the site would: ® Provide more physical and visual open space. • Be visually compatible with existing adjacent land uses. • (Could) provide view corridors to the hills. This should be combined with an altered placement of homes on the intermediate level which should include: -50- i Q� a a Fewer and larger homes to provide a contrast and allow the open space to move into the upper level, thus providing visual and physical linkage of open space. s Placement of the homes to appear less uniform or regimented. The impact, which is primary, is considered Major Adverse. TRAFFIC AND CIRCULATION Traffic Generation The proposed site is located between Voss and Alcalde Avenues west of Lockwood. Voss and Alcalde are two-way, two-lane residential streets providing access out from the site via Foothill Boulevard, a two-way two-lane north-south arterial . Access to Foothill from Voss is controlled by a semi-actuated signal . Table 12 shows an estimated 814 trips per day would be generated by the project. ® Table 12 ® Daily Trip Generation family le sin De,elling Units 74 single Y Trips per unit 11 .0/dayl Total trips per day 834 Peak hour trips 91 vehicles/hr. NOtes: 1 . City of Cupertino estimate e2. Assumes 11 .2% of daily trips Source: Cal Trans and Enviros -51- Table 13 Street Distribution of Traffic ® Percent of Vehicles/ ® Total Trips Peak Hour Alcalde (to Foothill) 25 23 Voss (to Foothill) 15 68 Foothill North of Vass 100 91 Foothill North of Stevens Creek 80 13 Stevens Creek East of Foothill 20 18 Source: Enviros The limiting factor to traffic movement from this development is the signal at Voss and Frothiil . According to city estimates, present peak hour (8:30-9:30, a .m. ) traffic on Voss east to Foothill is 89 vehicles/hour. The project's additional 63 vehicles/hour increases traffic on Voss to 157 vehicles/hour which can be accommo- dated within the "C" service level .5 See Table 14. Once traffic moves into the flow on Foothill Boulevard, the increase (10%) will not cause a significant impact. Present streets are satisfactory to accommodate the traffic from this development. Internal Circulation The project proposes private streets which are not wide enough to be eligible for public dedication. If streets do not become congested with on-street parking, are wide enough and are properly designed (grade and curves) to accommodate emergency vehicles and `'A "C" level of service is interpreted to mean light congestion and occasional backups can be expected. -52- m ll Ell Table 14 Effect on Peak Hour Traffic Peak Vehicles Per Hour Present New Total Percent Increase Foothill at Voss 816 91 907 10% Foothill North of Stevens Creek 1 ,512 73 1 ,585 5% Stevens Creek East of Foothill 844 18 862 2% Voss West of Foothill 89(E) 68(E) 157 76% garbage/service trucks, no problem is created. These precautions are not apparent in the plan, however. Parking. According to the plan, there will be 46 homes with 2-car garages and 28 homes with 3-car garages, hence conceivably 176 resident vehicles. Ten parking spaces are provided in on- street parking bays. All off-street parking mentioned in the plan utilizes driveways. There have been numerous concerns expressed about allowing curbside parking on the private streets. Other developments in Cupertino with private streets have had problems, according to the Public Works Department and have consequently asked that the streets be placed under the vehicle code so that parking violators can be penalized. Public Works recommends against allowing streetside parking unless the streets are widened to 32 feet. It is the opinion of the Study Team that guests/service vehicles ® will be reticent to park in driveways. Likewise, they are unlikely ® to use one of the few parking bays if it is not adjacent to their destination. Voss Avenue may be wide enough for curbside parking for the homes that front on it; no houses front on Alcalde so it is unlikely to serve a similar function. -53- 4. Streets and Sidewalks. As to street design, it is possible that the road which connects Voss with Alcalde could become a neighborhood short cut. The Open Space Element favors loop roads rather than cul-de-sac's for fire control purposes. Some type of meandering sidewalk may be necessary for pedestrian safety. The hillside ordinance requires pedestrian walkways if development is on a through street and within one-half mile of a school , and if shoulder areas are not improved to permit safe pedestrian traffic. Bicyclists can link up with two bike routes: a Cupertino city bike route traverses (or plans to) Stevens Creek Boulevard from DeAnza Oaks to the eastern city limits; a County bicycle route is designated along Foothill Boulevard-Stevens Canyon Road. Impact and Mitigation Impact is not considered significant on external city streets. However, if private streets are allowed, they should be built to the same construction standards as city streets even though they are narrower. It is the judgment of the Study Team that the parking plan is impractical and that the design should be altered to either allow off-site parking in other than driveways (this problem is directly related to density, see also Land Use subsection) or streets should be gidened to accommodate street parking. Impact, which is primary, is considered Minor Adverse. 1 AIR QUALITY Cupertino is located in the San Francisco Bay Area Air Basin, which has been classified as a basin with critical air pollution problems. At the San Jose Air Monitoring Station (the only local station with multi-pollutant measuring capability) minimum air standards were exceeded in 1973 on 11% of the days for oxidants, 10.6% for particulates, and 9% for carbon monoxide. At Muuntain 'View, -54- whose station rea;ls oxidants only, the standard was exceeded 3% of the days. Proximity of the site to the Kaiser Permanente plant warrants evaluation of potential particulate fallout onto the site. During 1968 studies by the Bay Area Pollution Control Uistrict and Kaiser Permanente detem. fined ;.hat about 4% of the particulate matter in the area surrounding the Cement Plant we,-,.- attributable to the Kaiser Company operations. since that time two modifications have been made by the Kaiser company to their control systems. The initial control improvement costing $1 million reduced the particu- late matter to an undectable level . An additional improvement was made in 1972 to reduce particulates even more. No detect'>on of Kaiser's particulate matter has been found at ground level in the area surrounding the plant since the first of these improvements have been made. The plant produces 30 tons of NO and 0.6 ton particulates per day. The 6 discharge points are located: 2 at 1000 feet elevation, 2 at 900 and 2 at 850. Impact The development is expected to add about 4,556 Vehicle Miles Traveled (VMT P to the present 70,000,000 VMT in the Bay Area. This project will cause an increase of 0.006% in the VMT and a proportional increase in emissions from mobile sources. The impact, which is primary, is considered Minor Adverse. PUBLIC FACILITIES AND SERVICES Water. The property is served by the City of Cupertino Municipal system, and is in a good location for adequate water service. It is close to the main distribution line from the Mercedes Road Tank. 6Cal Trans data, adopted. _ :� -55- i The develont will connect to a 20 inch main line which is planned to extend from the Mercedes tank to Permante Road. Storm Drains. The City Public Works Department would require that the pond be connected to a storm drain that would feed into the regular stenr drainage system essential for the property. Sewers. According to the Cupertino Sanitary District, the only sewer policy which the district practices in reality i:; "first come, first served." Mr. McBee of the Cupertino Sanitary District has stated that the development as proposed can be accommodated; so too can the proposed 184-unit multiple family project proposed nearby. How- ever, he cautioned that if this density is typical of future develop- " , ment in the area, another collector will have to be laid parallel b to the existing one. Sewage is transported via the Santa Clam Interr..eptor to the San Jose-Santa Clara Treatment Plant. The Interceptor has a current peak capacity of 6.8 million gal/day which will be reached by 1977. A new Interceptor is being planned along Lawrence Station Road which will increase peak capacity to 13-14 million gal/day. It is expected to be built by 1977, and will provide capacity to serve the ultimate maximum needs of Cupertino. Cupertino has purchased capacity in the plant now of 3.4 million gal/day average flo:y; use is 3.3 million gal/day. Negotiations are underway to purchase an additional 8 million gal/day, which will meet the city's ultimate maximum need.;. Solid Waste Disposal . Los Altos Garbage Company serves this vicinity, and can handle the increase. The private streets will i present no problem, if curbside parking is not allowed. The garbage trucks require a 10 ft wide clearance. The spokesman did not antici- pate problems with the grade of the streets, as they arp able to cope with Los Altos Hills and Portola Halley. The primary concern was with the street surface; they have had experiences in Cupertino where the base material under the asphal* was not strcng enough to support garbage trucks in hot weather. The company has no require- ments about placement of cans for pickup. Fire Protection. The site is served by a fire station located at Stevens Creek Boulevard and Foothill Boulevard. A three-man crew there could respond the approximate one-mile distance in a very few minutes; an eight-man backup crew could follow quickly. Fireflow requirements are met, due to the watertank atop the nearby hill (see Water). The 30 ft wide private st'reets are adequate as long as there is no curbside parking. The cul-de-sac's are accep- table; their length is within the allowable city ordinance maximum, and the city has no limit on the number of homes allowable on a cul-de-sac.7 The maximum street grade which the fire trucks can handle is 15%. The property is within a hazardous fire area, thus certain 1 requirements must be met in building construction. The roof of each structure must have a special purpose or fire retardant surface (shake roofs are stiJ allowed but they must have an asbestos under- layer); spark arresters must be placed on each chimney; natural brush must be cleared away from structures. As to whether the proposed use presents a greater fire hazard than the existing land use, the fire deparL.,lent's response is "the more people, the more hazards." 7Although the hillside ordinance recommends not exceeding 10 DU's, one cul-de-sac in the plan has 13. -57- The pond on the property served a positive function on one past occasion: water was pumped from it a few years ago to help control a hillside fire. Police Protection. Cupertino has a col+tractual arrangement with the County of Santa Clara Sheriff's Department for 24-hour service. The recent study done by S.R- I. on average response time by police in the various jurisdictions found that in Cupertino by the sheriff's department to be nine minutes. According to the department's spokesman, a sheriff's car could reach the proposed development within a few minutes as it is not far removed from their regular activity areas. As to whether they have the manpower to adequately handle this increased development, the answer depends on what the City of Cupertino is willing to contract for. The city must consider the i ,cumulative effect of expanded residential development and the con- struction of Vallco Park and other coranercial projects. If the city pays for more, the Sheriff's Department will provide it. Parks. Neighborhood park requiremer.ts appear sufficiently iplanned for within this site's general neighborhood, if certain conditions are met. These are: if the population projection based upon 4.5 dwelling units/A. (assuming 3.2 persons/D.U. overall , 4.0 persons/D.U. in R1 zones) is not exceeded; and if the city can include joint use of surplus school properties. The city already owns 4.9 acre Monta Vista Park northeast across Voss from the site and is planning to jointly develop an additional 4 acres of Monta Vista School surplus property. Libraa. Residents would utilize the library at Civic Center and the yet-to-be-constructed South Los Altos Branch Library. Public Transportation. The closest service at present by the Santa Clara County Transit District is bus route No. 43 which travels south on Foothill Boulevard from Los Altos and then turns east at Stevens Creek Boulevard. _58- i Commercial Sho pP in9. The City of Cupertino Planning Commission has recommended that no new neighborhood centers are to be constructed west of the Route 85 freeway right-of-way. The existing commercial center in Old Monta Vista should be strengthener; to provide a neigh- borhood and coununity range of services for residents within the western portion of the comnunity. As things now exist, residents of the site would be as apt to do their routine shopping in south Los Altos or Sunnyvale as Cupertino. Choosing to shop in other than Cupertino would of course mean a loss of sales tax revenue for the city. Tax Revenues. The site consists of two parcels, assessed for FY 1974-75 as follows: #342.-15-32 (7.7 . A. ) - $34,900 total assessed value -342-15-33 (12.94 A. ) - $64,700 total assessed value $99,600 (25% of full cash value) ® The parcels are within Tax Rate Area 13-026. . The latest tax. rate �I available is for the fiscal year 1973-74; the total tax rate was $11 .668 per $100 assessed valuation. The tax rate for the City of Cupertino for FY 1973-74 was S0.310 per $100 assessed valuation. Table 15 shows projected property tax revenue. Table 15 Projected Property Tax Revenue Revenue to All Revenue to Agencies Cupertino New Revenue from Project $125,197.64 $3,326.30 Less Present Revenue 11 ,621 .33 308.76 Net New Revenue $113,576.31 $3,017.54 Note: 1 . Based on average full cash value of $65 000 g ) -59- — =m- Whether revenues from thi project meet or exceed costs associated with the project is not known. Isolation of cost factors requires exhaustive study and the cit: has not undertaken this task. It is not expected that any unusual burden would be placed on the relative ability to provide services, however. Schools Children in grades K-8 attend schools in the Cupertino Union Elementary School Dsstrict. The site is within the attendance areas of Monta Vista Elementary School at Voss and Foothill Boulevard and Kennedy Junior High School at Voss and Hyannisport. As is true of most elementary scf;ool districts in the North County, Cupertino is experiencing declining enrollment. The largest single class is now at the eighth grade level . Monta Vista School has a capacity of 390 students. Its projected enrollment for 1974-75 is 272 and for 1975-76 is 246. Ar alternative education program will be located there this fall to utilize some of the unused space. Kennedy Junior High has a capacity of 1 ,084, but can actually handle an additional 10% or a. maximum el approximately 1 ,200 students. Its enrollment projections are 1974-75, 1 ,050; 1975-76, 995; 1976-77, 1 ,007. Cupertino bases its projections on a yield factor per dwelling unit of 0.6 children for grades K-6 and 0.19 for grades 7-8. Using the figure of 74 homes that the developer suggests, this means about 44 children for Monta Vista School and 15 children for the junior high school , or virtually no impact on school capacities. Even if these estimates are low, there is still a considerable margin. Students for Kennedy Junior High would require bus service from the site: the pedestrian routes along either Stevens Creek or VcClallan are hazardous for school children. The number of children requiring bussing would not create an overload on existing bus service. -60- The situation is different at the high school level. Enrollment is not expected to peak until two years from now. Monta Vista High School within the Fremont union High School District would serve this site; the school is located at 21840 McClellan Road. The school 's capacity (based upon locker, lunchroom, and physical educa- tion facilities) is 2,100; the projected enrollment for 1974-75 is 2,150. Plans are to add to school plant space by use of a portable building. District residents discourage the practice of shifting high school attendance area boundaries, although Monta Vista has one of the fastest growing student populations—30-35 unanticipated new students enroll each September. The Fremont Union High School District bases its projections on 0.9 students per single-family home being of high school age. Applying this to 74 homes would produce 67 more students for Monta Vista High School . Bus service would have to be provided also. By the time the homes were built and occupied, if the development is approved, the declining ,enrollment trend may begin to be felt, how- ever. Impact, which is secondary, is Neutral . HOUSING Santa Clara County needs more new houses than any other county in the Bay Area, according to ABAG, in a report based on the 1970 federal census. Sixteen thousand nine hundred (16,900) single-family homes and 53,800 new apartments are needed. The Santa Clara County Planning Department reports that the county-wide occupancy rate in October 1973 was 97.4% for all types of residences. Living space is increasingly difficult to find and construction of new housing is declining due to a number of factors: a tighte -ing money supply, rapidly rising interest rates, rising costs of land, materials and labor and builders' carrying charges. -61- y` In 1971 the Joint Cities-County Housing Element Program attempted to identify housing patterns and cope with housing needs. In doi- so, it projected household income patterns for 1975. Cupertino c one of three planning areas (the other two were Saratoga and Los Altos Hills) projected to have both the highest percentage of high income households and the lowest percent of lower income households. The project, as proposed, would add to ttie moderately high priced housing stock. Cu ertino';, Housing Element attempts to address this problem p 9 P of a disparity in housing values. The Element incorporates the goals of the PPC do,:ument and also states an intent_ to support the concept of, and participate in, the "fair share" regional alloca- tion of lcw-moderate incof-e housing units. Policy #2 of Go,l II says that: The City of Cupertino should require a mix in the type and cost of housing units in new subdivisions and apart.ent complexes as a prerequisite to the granting of planned unit developments." Morecver, this statement appears in the Valley floor Infilling Plan trar,s--li tted from the Planning Commission to the City Ccunci 1 in July 174: (p.5) "The (planning) Commission finds that there are no properties within the residential infil- 1ing segmtent of the Gereral Plan which are large enough to >upport a private subsidy program; however, the Ccrrission finds that in certain areas a housing range can be estab- lished which will allow greater density than that within the surrounding neighborhood if the developer can shop: that he can implement a community-wide social goal ." The question of how large a property must be in order to provide .a Tix in housing prices and still allow the developer to survive should be closely examined. The City of Palo Alto adopted -62- a resolution (#4725) which encourages the inclusion of 20-40% low/moderate income housing in developments of 20 or more units. Without federal or state subsidies, it is extremely difficult for a developer to provide even moderate income units. However, the intent of the resolution has resulted in the production of about 10% of new units at below market cost. Impact and Mitigation The project does fill an existing market need. However, it contributes nothing toward realization of the above-mentioned housing goals. Utilization of the Palo Alto Plan is worth consider- ing. An example of the plan is the Foothill Green development on Arastradero Road, Palo Alto. The development consists of 26 single- family detached homes and 2 duplexes (4 units) The land costs for the entire development were absorbed in the price of the single- family detached homes; the duplex prices were based on construction costs only. Deed restrictions on the duplexes :sill limit the profit that can be realized on subsequent sales. The sales price will be based upon the original sales price plus cost-of-lining increases. The City Housing Corporation has right of first refusal on subse- quent sales. On the present site, more-modest priced duplex units would be compatible with neighboring land uses if placed on the fiat easterly portions of the property. Fe�•rer and more expensive homes on the upper elevations might offset the costs. Impact, which is primary, is considered Neutral . HISTORICAL/ARCHAEOLOGICAL Much of Cupertino's heritage stems from DeAnza's expedition from Monterey to San Francisco in 1776. It is believed that DeAnza's route lay just northerly of the property. Prior to passing that -63- way, he encamped 3/25/1776 on the Arroyo de San Joseph Cupertino (now Stevens Creek). In the era of the land grants, the property was part of the San Antonio Rancho (documented by the U.S. Surveyor General , June 1867). The Historical Atlas Map of Santa Clara County, Calif. 1876, shows the San Antonio Rancho subdivided into several large parcels. The subject property was part of a 320-acre section owned by Mrs. S. A. Anthony. The property was inherited by her daughter, Miss Florence Anthony, who later sold to the Voss family. The Anthony property was planted in prune and walnut orchards. A come constructed on the property by Miss Anthony was razed several years ago. The pond was created during the Voss ownership by damming up an "arr-oycito" (little stream) in order to provide irrigation for some of the Voss land. The area was within the territory of the Costanoan Indians. In all probability, the property was not suited to their use: There is no evidence of a local water source and no ecotonal assoc- iations that would afford the Indians their dietary staples. The nearest trade or rAgration route appears to have been between the villages of Matala-n and Sokel , running north-south some five miles ® to the west (Kroeber, 1925) . Accordingly, no archaeological sites 1� have been recorded in this vicinity at either the A. E. Traganza Museum of Anthropology, California State University, San Francisco, or the University of California Archaeological Research Facility at Berkeley. A surface reconnaissance of the property, with focused attention on a possible catchment basin on the highland, alsc proved negative. Fact Ethnographies of the Costanoan 'Indians have depicted them as generally cremating their dead (Chords, 1913) and subsequently burning their homes and possessions (Heizer, 1974) . Therefore, it is very unlikely that this property could contain a burial site. Neither -64- does it appear to have particular historical significance. Impact, which is primary, is considered Neutral . ENERGY The project would obtain its energy from Pacific Gas and Electric Company (P.G.& E. ) . Gross area-wide future supply is adequate. Supply Inforiiation provided by P.G.& E. to the California Public Utility Comxriission (General Order 131 dated July 25, 1972) projected the electric lead and resource forecast through 1991 : 1972 1976 1981 1991 Loads (megawatts) 11 ,343 14,635 20,003 37,827 Resources (after scheduled maintenance)$ 13,538 17,714 23,907 44,014 Percent Net Margin 19.4 21 .0 19.5 16.4 While resources (generative capacity)appear adequate, the shortage of fuel (fuel oil and natural gas) could have caused shortage problems this year. For the rest of 1974, it appears that the crisis situation has eased due to a higher than nor,;ial hydro-electric supply. The Diablo Canyon Unit is on schedule and will increase the supply of electricity during 1975. 8Resources are based on completed construction as scheduled of nuclear units, Diablo Canyon Units #1 and 2, for in service 1975 and 1976, respectively. Delay in scheduled service of Diablo Canyon Unit #2 would reduce the net margin to 14.1`6. Reduction in capacity below the approximate 200 design level in-r;:ases the probability of insufficient service. -65- Pacific Gas and Electric, which ,O so supplies natural gas to the area, obtains its supplies from California, the southwestern states (El Paso Gas) and Canadian (Pacific Transmission) sources. There is apparently a scarcity of information on supply commitments beyond 1974 and the PUC has recommended that the utilities prepare estimates of gas and oil requirements beyond 1975 and investigate the ability of suppliers to meet such requirements. The emphasis on air quality will serve to increase the demand for natural gas because of its clean-burning quaiitirs and as a result, there is a rising demand for a supply that may remain static through 1985. The present rate of consumption for the state is approximately 5.7 million Mcf9 per day (1 .1 million equivalent barrels of oil ). California's total domestic proven reserve of natural gas was approximately 7.5 billion Mcf and it is estimated that by 1985 production will decline to about 1 .0 million Mcf per day. The state presently imports 61% of its gas supply from the southwestern states and 17% from Canada. The future supply from these sources and other possible sources (Alaska, oversea and undiscovered sources) are indefinite as to timing and volume at this time. The only direct substitutes for natural ;us that can be utilized in the short term are oil and to a lesser extent, coal .10 1 Mitigation to Reduce Energy Consumption Table 16, showing the ratio of gas to electricity as end uses (first column) and in the second column the ratio of gas to electri- city viewed cs a total energy process. 9Mcf equals one thousand cubic feet. 10The Resources Agency, State of California, En_jgLin Califoriiia, January, 1973. -66- Table 16 Cost-Efficiency of Gas vs. Electricity End Use 1 Net System 2 Energy Ratio Energy-Use Ratio End Use Appliance Gas to Electric Gas to Electric Space heat 1.31 0.39 Dater heater 1 .45 0.44 Central Air Conditioning 4.30 1 .29 Range 2.00 0.60 Notes: 1 . The energy ratio expresses the efficiency of electricity use divided by the efficiency of gas use to accomplish a particular task; i .e. , the energy ratio of the range im- plies that it takes twice as much gas energy as electricity to do the same job. 2. Based on 30% net efficiency for electricity generation, transmission and distribution, the energy of the range requires 600 of the gas required to generate the elec tricity (for an electric range) compared with using gas directly. Source: The Rand Corporatlon Other measures which will reduce consumption of energy in building design and construction include: a Building design. Other things being equal , the building unit with the smallest ratio of exposed surface to heated usable volume will lose the least heat in cold weather and require the least cooling in hot weather. It is estimated that the theoretical requirements for energy would be 20 to 25% less for multi-story buildings. a Minimize amount of heat load in sunaner months by orienting the structures relative to the path of the sun to minimize amount of sunlight through south and west facing walls and -67- windows. Using wider eaves on those walls and the use of deciduous tree canopies will also help regulate heat load for maximum advantage in winter and summer. • Improve thermal insulation in wall acid roof of structures; minimize paved areas. a Provide air ducts and venting to draw heat away from heat generating equipment and lighting. a Improve efficiency of lighting systems and use of light fixtures that minimize light loss.11 If these methods of energy conservation are followed, the buildings will have a lower overall cost because operating expenses will be less. With mitigation, the impact, which is secondary, is considered Neutral . GROWTH INDUCEMENT Seventy-four new units would be aided to the housing stock. The density in the zone which wouid allow up to 65 units is less dense than the project as planned. It is anticipated the units would be occupied by families already living in the South Bay Area „ who are moving up. No significant impact is placed by this development on services or facilities which would require increased gross plant capacity. Since no basic employment is offered by the project, it would not contribute to a positive area population growth. A new area is not opened for development by the provision of water and sewer and roads. These facilities are on or adjacent to _ l Such as a polarized process which reduces energy consumption by one-third while improving visibility. t -68- the property. However, it must be recognized that allowing development on the hilly portions of this site may be precedent-setting as regards future development. Impact, which is secondary, is considered Neutral. -69- UNAVOIDABLE ADVERSE IMPACTS Many of the adverse impacts described in the previous sections can be successfully mitigated by a major change in site plan design coupled with a reduction in density. (See discussion of Alternatives.) However, some impacts are unavoidable: • Loss of open space • Loss of wildlife habitat s Loss of some trees and plants • Alteration of scenic quality of this foothills site • Increased fire hazard • Minor increase in noise, traffic and air pollution 1 1 1 i SHORT TERM - L04G TERM RELATIONSHIPS This has been addressed in several sections of the report in more detail . An economic use of the land would be accomplished with the project. Although the plan calls for minor alteration to the land to accommodate the building pads, sufficient change will be made to warrant saying the land will not be the same in the future. Thus, tthe use does represent a long term comeiitment of a valuable resource— land. iThe land, while lovely, is not unique and should not be preserved from development on that account. The city's decision on wha= to allow on this valley floor-foothills transitional site will seek to give direction to future decisions on foothills' sites and as such may affect the snort-term, long-term use relationships on iruch other land. In the judgment of the Study Tear, the project as proposed should not be considered a wise long-tern corrmltment of resources because it: (1 ) Violates the visual quality of an area which is widely viewable. (2) Is not in accord with the City of Cupertino's goals and policies. (3) Will create a living en ironr,ent which is lower in quality than is acceptable. (4) Does not maximize the open space potential of the land to be left undeveloped. -71- 4.^ ALTERNATIVES TO THE PPJJECT AN Enviros has evaluated alternatives to the project by considering viable previous proposals for the site, strict application of the present zoning, a variety of options in type and density of residential units and No Project. Alternatives contemplating development other than residential were rejected as inappropriate to the site. ALTERNATIVE 1 - NO PROJECT The no-project alternative is, on the short term at least, to leave the site as it is. To insure this as a long term use, the property would likely have to be purchased publically. The desir- ability of that should be measured against the significance of the parcel . The site is a beautiful one. It is not, however, needed for relief from crowding of development around it; much open space (vacant land) exists in the area. A 5-acre city park site is nearby and presumably its development iwould have priority over purchase of another undeveloped site. In any event, only part of the site is suitable for active recreational activity. The site does not have significant size and is within the city's jurisdiction; it is doubtful the Regional Park District would be interested in its purchase. This alternative is not considered viable. There are two overriding but somewhat subtle values which should be considered in evaluating the development alternatives. They are to seek usable open space and to ensure its enhancement. The question is how the open space "works." Linkage, not gross acreage, is the key. Visual as well as physical use will be enhanced by extending fingers of green area into the developed portion of the -72- site. Thought to the recreation activity checklist in Ordinance no. 602 will be helpful in considering how this open space might be used. Above all , the open space should not be fenced; that limits even its visual "use." Enhancement of the open space requires a plan for its use, e.g. , trails, picnic areas, etc. , and a plan for its maintenance. Key to this maintenance is creation of a strong Homeowners' Association. The city should satisfy itself that the legal and financial capability to maintain the open space has been planned for. ALTERNATIVE 2 - APPLICATION OF EXISTING ZONING Application of the existing zoning with a more or less uniform coverage, would yield 65 units.12 This would mean a far greater destruction of wildlife habitat and ecosystem disruption as well as removal of mature trees. Homes would be placed on steep hillsides and on areas exhibiting soil creep. Scarring of the land to accom- modate building pads and roads would be extensive. Density would be reduced and potentially an improved individual living environment (� could be created. The aesthetic appeal and open space quality of the ® site would be effectively lost. Schools could expect to add 110 children. Based on a computation considering statewide housing cost averages,13 houses would market for approximately $63,000 average. No significantly different impact would be expected in air quality, traffic related noise, and traffic. twine fewer housing units would be added to the existing stock. 12 Based on 75% of gross acreage. 13As rreated to cost of land, A & E, and city fees , per formulas used by the Society of Real Estate Appraisers, (updated at Annual Monterey Bay Appraisal Seminar Program, May 1974) . -73- sk is fy ALTERNATIVE 3 - APPLICATION OF MONTEBELLO RIDGE STUDY SUGGESTION FOR FOOTHILLS—i)NE-ACRE LOTS Application of one-acre zoning would yield 20 units. This alternative would mean virtually the same disruption to wildlife and plants as Alternative 2. Some homes would potentially be placed on steep hillsides and/or areas of potential soil creep. An undetermined number of mature trees would be lost, although not as many would likely be lost as with Alternative 2. Scarring of the land would be extensive, although somewhat less than with Alternative 2. Reduced density would provide a more exclusive feeling and insure privacy and less noise intrusion. Aesthetically, the site would be similar to the one-acre grid found in developed portions of Los Altos Hills. The open space quality of the land as perceived by others would be significantly degraded. Schools could expect no more than 34 children.14 Housing cost would average $132,500, which would be grossly incompatible with the duplex developments nearby. Impacts of other types would not be significantly changed. ALTERNATIVE 4 - DEVELOPER'S PLAN LESS ALL UNITS ON MID AND UPPER ELEVATIONS Removal of all units which are clearly viewable from well off the site plus removal of those subject to landsliding or soil creep will yield 50 units. This plan would satisfactorily mitigate the loss of habitat and tree removal by avoiding the most heavily vegetated areas. It would also remove the necessity of scarring the mid and upper elevations for either roads or building pads. This alternative would not improve the problem of crowding in the developed area, but the open space and visual quality of the open space land would be preserved. School enrollment would be 85; home value is estimated at $72,500.15 4 Considered the maximum possible, giver the high cost of the units. ti 15See footnote 13, Supra. -74- d � _�J The merits of the internal aspects of the site plan, e.g. , inadequate parking, excessive density and noise, etc: , are not changed. Changes in other impact factors are not perceptible. The following two alternatives contemplate multi-family housing— townhouses--for the site. Considering the large amount of the site which should be left in its natural state for numerous environmental reasons made clear throughout this report, it is the judgment of the x Study Team that townhouses offer the best opportunity for clustering, the key compon=nt in providing maximum environmental protection/ enhancement and a reasonable return on investment for the developer. A proposal submitted by Hallcraft Homes in 1972 is considered by Enviros to be thoughtfully designed and is used as a reference to the following two alternatives. See Figure 8 for site plan. ALTERNATIVE 5 - 90 TOWNHOUSES The 90 townhouses allow for clustering. The site plan in Figure 6 illustrates the concept of linkage of open space. Units as placed in this plan would necessitate removal of about the same number of trees as in the developer's plan but considerable "opening up" of the developed area has occurred and green belts are created which would allow pathways up into the mid and upper elevations of the open space. Soil creep and high visibility areas are not avoided and it is do!btful that units could be replaced away from these areas without crowding the remaining developed area. Townhouses produce fewer children per unit; 52 children could be expected to anroll in K-12. Home cost would average $44,700. One ?rade-off that might be considered is rcarrangement of the 90 units to avoid the soil creep areas but leave the units which are visible on the first lower knoll facing Voss in return for inclusion of 4-6 units of privately subsidized below-market value units (see subsection on !lousing). This would directly address one of the city's goals- -75- ., meeting its fair share of lower income housing 16- for which solutions have not been forthcoming. ALTERNATIVE 6 - 83 TOWNHOUSES 'm' Alternative 5 except that it This alternative is similar to p would rE-nove units in both the unstable and viewable areas. Forty- two children would be generated; housing rest wruld average $46,50017 16This would not produce low income housing but would take a step toward lowering its cost for qualified families/persons. 17See foteno to 13, Supra. -76- f 2 1 •� t �1• �\ 't\ � �•aac�"'e°'�r•' • ' ..q 11 � i .+ '••'_ ,. J ���� � r � ,,,r�'1 � .. Cr `• � ...Via\ 1 '.1• .1' . �:� -\e�emb `� `r'�"'� r 11,i jl', � V 1 r .r `.� \C . .� l •�. i r � 1 t� 4' if�� :•� 'per ('' ' '_ ^' `1 r�..,s�.y 7t :, � .+ �� ! � 1 /y�'_ •`".� :'e'r •. /�r 71 J. � '�\� `, ... �•.d+.t'�t ! i •} i A�� 'j'' i 11 �,,.�;`1,..�.«•.la.....J •\r�1'. ,�\ ' ', `\I 1. '+ '/~l/ " L C� 15 y � i^.a' `P1• i t i'f :'',.,'.'�" T 'r 1�,,/��r.Yr t r � ! ,�C �^i/���l�� '. .. ��w i\.i� ��.,� �• � �.•,Z>y �`�� �v�., .� \�� Y.ii'//{� 1 ,lam �1,, �]� , i i `�,�- �' .' �• ,yam'd-..�r ��, , `i _• L \w.` •t. ` . .{• / \ti / r \ � � tiI�•.s ���ij r......ter.,. .'\ 1 1 �t \ `` `'� •�\\ � �i �/I-• \` .� � 5�.� ,: �j �\` ,���'•�� I �` "' jr r ' /' �...« .._,.. __ ( .\ � ,�. .6� •��1 � ,/����_r�g�t ' I 1, / ! i or be NI 04 �ras■......*..p..r�!., �yf{. 1 +1 c. \\ 'r ��J r l._.�_-� '�GB� -'" t, � �' / 1� l + �;5� y r r��'I I I' � '� �^\ /,�y +� '. �_ l 11 // �/ ' • T --_- - ` \� r iV t ilk Id Now O i O ®• pM • �` \I n8 •• •« • Un Its ud w s •5 MQ N G w W • [I XT JWU EI� 60 ` •fiJi , uj t � ��,,J• � S� jg$pm A $kb I+ THE NEW ENVIRONMENT The following table ranks impacts of proposed alternatives. By applying values to these impacts based on personal perception, the reader can evaluate overall impact by his own standards. IMPACT SUMMARY TABLE Alternatives Proposed #one #two #three #four #five* #six* Project Number of units 74 0 65 20 50 90 83 Impact factor Flora and Fauna B A C C A B A o Health and Safety C A C C A B A Ambient noise C A B A C B B Soils and Geology C A C C A B A Land use C A C C B A A Aesthetics/°View C A C C B B A Housing B C B C B A B Impact of all development alternatives about the same on public facilities, air quality, energy, historical/archeological , and traffic and circulation. Key: no significant adverse impact = A moderate adverse impact = B significant adverse impact = C * Alternatives five and six obtain better scores on some Impact factors due to better site design. No implication that more units provid a better project is intended. APPENDIX A PERSONS CONTACTED City of Cupertino Glen Greg, Public Forks Robert Cogan, Planning Adde Laurin, Planring Travice Whitten, 1'ubl is Works Bert Viskovich, Public Works Louis Stocklmeier, Historian County of Santa Clara Gil Fayette, Planning Health Department !` C. D. Marron, Sheriff's Office Santa Clara Malley Water District Bill Carlson Tom lwamura Others Bill McBee, Cupertino Sanitary District Frank Brunetti , Cupertino Union Elementary District Donald Richley, Fremont Union High School District Joe Renati , Los Altos Garbage Company Katherine Berson, Midpeninsula Citizens for Fair Housing Cherie Charles, City of Palo Alto Mr. Falk, Neighbor Murray Levish, Burkland & Associates Tom Rogers, California Division of (Mines b Geology _ , A. E. Traganza museum, San Francisco State , Archaeological Research Facility, University of California Richard Burpee, Kaiser Permanente Company A-1 Others (Continued) Jim Talbot, Bay Area Air Pollution Control District Tom Story, BAAPCD PUBLICATI0N5 1 . Berlogar, Long and Associates, 1974, Report - soils engineering and geologic investigation, proposed "Oak Meadows" develop- ment, tract 3142, Cupertir.a, California: An unpublished report done for San Carlos Homes and Development Co. 2. Brown, Vinson, The California Wildlife Region, Naturegraph Publishers, Healdsburg, CA, 1965. 3. Brown, Vinson, Henry Weston and Jerry Buzzell , Handbook of California Birds, Naturegraph Publishers, Healdsburg, CA. 1973. 4. Burkland and Associates, 1972, Preliminary geologic investigation, Walnut Creek Villas, Cupertino, California: An unpublished report done for the City of Cupertino. 5. Choris, Louis, San Francisco 100 Years Ago. San Francisco: A. N. Robinson, 1913. 6. City of Cupertino: Cupertino General Plan: Open Space and Conservation Element, 1972. Cupertino General Plan: Housing Element, 1972. Cupertino General Plan: Land Use Element: Core Area, 1973. Zoning Ordinances. Zoning Maps. Planning Commission, Valley Floor Infiliing, July 1974. 7. County of Santa 0 ara: The Joint Cities-County Housing Element, 1971 . Monte Bello Ridge Mountain Area Plan, 1974. A Plan for the Conservation of Resource:., 1973. Planning Department, Santa Clara Valley Plans #72, 1974. Planning Department, Santa Clara Valley Plans #74, 1974. A-2 ter_ 8. Cummings, J. C. , 1968, The Santa Clam Formation and post- Pliocene slip on the San Andreas Faun in Central California, in Proc. of conference on geologic prob►,� 5 of the San Andreas fault system: Stanford Univ. Puts. - Geel . cci . , v. XI, p. 191-207. 9. Cummings, J. C. , 1972, The Santa Clara Formation on the southern San Francisco Peninsula, in Unofficial progress report on USGS Quaternary studies in the San Francisco Bay area: Guidebook tGr Friends of the Pleistocene, Oct. 6-8, p. 3-10. 10. Cupertino Chamber of Commerce, Community Economic Profile, April 1973. 11 . Heizer, Robert (ed.). The Costanoan Indians. Mountain View: W. B. Associates, 1974. 12. Kroeber, A. L. Handbook of the Indians of California. Washington: Government Printing Office, 1925. 13. Historical Atlas Map of Santa Clara County, California, 1876. 14. Munz, Philip and David Keck, A California Flora and Supplement, University of California Press, Berkeley, CA, 1968. 15. Odum, Eugene, Fundamentals of Ecolo W. B. Saunders Co. , Philadelphia, 1971 . 16. Ornduff, Robert, Introduction to California Plant Life, University of California Press, Berkeley, CA, 1974. 17. Rohbins, W. W. , Margaret Bellue, and Walter Ball , Weeds of California, California Department of Agriculture, State of California. 18. Rogers, T. H. , and Armstrong, C. F. , 1973, Environmental geologic analysis of the Monte Bello Ridge Mountain study area, Santa Clara County, California: Calif. Div. Mines Geol . open file report. 19. Stocklmeir, Louis, Heritage of the City of Cupertino, 1963. 20. Sunset, Sunset Western Garden Book, Lane Magazine 8 Book Company, Menlo Park, CA, 1971 . A-3