DIR-2001-19b
CITY OF CUPERTINO
10300 Torre A venue, Cupertino, CA
Date:
December 12,2001
To:
Mayor and City Council Members
Chair and Planning Commissioners
Steve Piasecki, Director of Community Development~
From:
Subject:
Application 19-DIR-Ol, a minor modification of application 14-U-01, to allow the
modification of certain architectural elements of the development.
~"~.,..".....'m..'_....n.~m.~....._..."....n__._n.__.n_~.__.____.__~.....n.'.....___w.w~.w_~~"...."W_~"">'_+_.uww.w~...~.w....w........'._.n_"u._...".....~.w.u..._.~.u."........n.......n_"u_.._.~"w....w~...+..'-'-'.,.H'h''".',.~ri-..'"_"_n~mm._.''n"...n~..n~""..,nn'_.._'..'~...n._m~_~"m.~nn"'"_"""'..'."';+_"_~~_rih-<,.,,...+...+..w".w_........"~...,..~w.._.U"...w>'-.......w
! Chapter 19.132 of the Cupertino Municipal Code allows for administrative approval of minor changes to a i
! project. The Director reports his decision to the City Council and Planning Commission in time to allow I
L"~n:y~ Council member or Planning Commissioner to appeal the decision within fourteen calendar days. !
<'-", + ~~-_,.~, "",'n,_n. h_~+.n"~m'"n.n.n.....'....w....._._._w.._...._.w.._~._n._....___._..w._...,,~.~.~.n.......nM...'.n._._.._w..w_.n.nn._w_...ww..w.__....w......_.w.w.w.w_....ww.w_w..___..,_...w_.~_~_~_.._._~.........__.._........,........ ..............,.................._......"........,.."........._.._......_....m.....'........_~......m...'..................n ,..m... '...m......'...........,..'.....m.
Application:
Cupertino Community Services and its architect, Van Meter, Williams and Pollack, have applied for a
Director's Minor Modification to approve several architectural changes to the 24-unit affordable housing
development located on Vista Drive near Stevens Creek Boulevard. Most of the changes are considered
minor with little impact on the overall architecture of the building. Two changes are of a more significant
nature. These two changes are the addition of porch elements on Building 3, south elevation and the
removal of windows on the CCS Building's north elevation. The addition of the porches adds substantially
to the architecture and staff approves of the modification.
However, the removal of the windows posed some concern to staff. Staff requested that a trellis treatment
be added to the wall to add some interest. The applicant complied and those changes may be seen on sheet
entitled, "CCS Building: North Elevation." The windows were removed to comply with building code
requirements. If the windows remained, they would need to be I-hour fire rated windows adding to the
construction cost. Since the development is an affordable housing development operating on a tight
budget, staff does not have any concerns with the modification.
The city's architectural consultant, Larry Cannon, reviewed the proposed changes and assisted in
recommending the trellis on the CCS building. Overall, Mr. Cannon is not concerned with the
recommended modifications.
A letter from the applicant, Van Meter, Williams and Pollack, is attached for review. Also enclosed are
sheets detailing the approved elevations ("City Council Set") and the proposed changes ("Permit Review
SeC).
Action:
The Director of Community Development deems the modification minor and approves the architectural
modifications as shown in the attached elevation sheets.
Enclosures:
Elevation sheets showing approved and proposed architectural modifications.
Letter from applicant dated August 10, 2001
VAN, METER
WILLIAMS
POLLACK
August 10, 2001
Vera Gil
Community Development Department
Planning Division
City of Cupertino
10300 Torre Ave..
Cupertino, CA 95014-3255
Dear Vera,
We request that a Directors Minor Modification be used to approve the changes to the Cupertino
Community Services project that have occurred between the Planning Commission drawings dated
December 12, 2000 and the permit/construction set. The following descriptions refer to the enclosed
sketches,
1. Building 1 North Elevation Two windows were eliminated from the center of this elevation, one from
the ground floor and one from the second floor. The remaining second floor window was also
reduced in size. This was done because the windows did not relate well to the interior spaces,
Having the two center windows made it difficult to layout furniture. The other change in this elevation
involves the patio/balcony to the left-hand size of the elevation. Posts were added to support the
corners of the balcony. This simplifies construction of the decks. The addition of posts also led us to
change the shape of the ground floor patio to match the balcony above (from a semi-circle to a
rectangl,e), The shed roof supported by brackets above the balcony has been changed to an awning
to match the awning at the south elevation of these buildings.
2. Building 1 West Elevation- The gabled portion at the right side of this elevation was narrowed and
two windows were eliminated from the second and ground floors. The proportion of this element in
the planning commission drawings made it look rather squat. The windows also did not relate well to
the interior spaces. We narrowed this bay and centered the window in it similar to the bay on the left.
The kitchen of this unit was also reconfigured so the window is now centered over the sink,
3. Building 1 South Elevation - An electrical closet was added to the center of the ground floor to hide
the electric meter and panel boards.
4. Building 3 South Elevation - The second floor windows in the living room of the D unit were enlarged
to match those on the second floor,
520 Third 5treet
5u ite 525, Box 15
San Francisco" CA
94107 USA
415.974.5352
FAX .974.5238
www.vm:wp.com
5. Building 3 South Elevation at Porches - These porches were combined as shown because of a
comment made during a planning commission meeting to make them more like the other porches,
6. Building 3: North Elevation 2nd Floor Windows and Trellises - The window size was reduced so that it
fits above the shower/tub surround. The trellises have been added as an add alternate and would be
constructed if the client has money to build them. The water heater closet was eliminated because
the units no longer have individual, water heaters.
7. Building 3: North Elevation D unit Patio and Deck - The kitchen layout for unit D was revised which
allowed us to install sliding gl,ass doors similar to the other units. The water heater closets were
eliminated as the units no longer have individual water heaters,
8, CCS Building: East Elevation - The window and door layout was revised to reflect changes in the
clients programmatic requirements and to make the fa9ade more organized.
9. CCS Building: North Elevation - A window was added to the second floor to balance this elevation,
Windows were eliminated from the ground floor community room. Upon discussion with the building
department,. it was determined these window would be required to be 1-hour rated. The significant
additional cost of rating these windows was the prime determinant to their removal. We have
presented two ophons for this wall. One shows the windows removed. The second shows a lattice
structure for the support of vines to be planted in the landscape strip next to the building.
10. CCS Building: West Elevation - Two windows were eliminated from this elevation because they
conflict with an internal staircase,
11. An additional element that was mentioned in the plan check comments but has not been addressed in
a before/after sketch is the trees and landscape island that were eliminated from the parking lot. This
happened because the building department required us to add an additional accessible parking
space. After discussions with Greg Casteel it was decided that the best location was at this main
entry to the residential portion of the project. When we located the accessible space here we had to
eliminate the landscape island as the accessible space needs an adjacent loading zone. We actually
tried to keep two of the trees in a smaller landscape island but were not allowed. Please refer to the
enclosed sketch.
I apologize that the sketches are not formatted similarly. The sketches issued March 28\h show the
before/after views on separate sheets, The sketches issued July 16th show the before/after images on
the same page, I hope this does not become confusing.
Again, as we discussed on the phone, we feel that the changes we have made enhance the project and
respond to either aesthetic, technical or programmatic considerations which have been further refined in
the time since the planning commission drawings were completed. The changes do not alter the general
character of the project and most are only visible on internal facades and not from the street frontage.
Please feel free to call me if you need any additional information.
~IY' -
Paul F,tf
Architect
cc:
Dick Lohmiller, CCS
Tom Earley, Bridge Housing
PE RM IT REVI EW SET
CITY COUNCIL SET
CCS Building: North Elevation
NTS
July 15 ,2001
ARCHfECTURE OlJiBAN [)::SGN
520 Third Streel
Suite 525, Box 15
San Francisco, CA
94107 USA
415.974.5352
Cupertino Community Services
and Family Housing
Vista Street
Cupertino, CA
VAN METER
WlWAMS
POU.ACK
w__.. .:.':::..::-----t~;:.';;,~".-""-
c~
.~~
"--._==-~-'-
OOR
.,,.~
... ,m_r__ ___..H-'__.
. ...::~ .....=:1 II 11"1111 II IIII ~.
....E5 ..
--..
.,-'- .-
........~_..~......-p~..
PE RM IT REVI EW SET
CITY COUNCIL SET
CCS Building: East Elevation
NTS
July 15 ,2001
ARCHfTEC1URE- \J'1BAN[ESlSN
520 Third Street
SUlle 525, Box 15
San Francisco, CA
94107 USA
415.974.5352
Cupertino Comimunity Services
and Family Housing
Vista Street
Cupertino, CA
VAN, METER
WlWAII
POLLACK
l
~-
tj .....
~k
~..... .-
~I
-. L
PERMIT REVIEW SET
CITY COUNCil SET
Bldg. 3: North Elevation D Unit Patio and Deck
NTS
July 15,2001
ARCHI lEcn.IRE . l}1BAN [J'SKiN
520 Third SlrBel
Suite 525. Box 15
San Frandsco, CA
94107 USA
415.9745:352
Cupertino Community Services
and Family Housing
Vista Street
Cupertino, CA
VAN MEtER
WlWAII
POU.ACK
--~- --- ..-'- -
-9 ~ --=--- - -------- -
.,. ,-,_....
.- ---.........''''''...-
PE RM IT REVI EW SET
,II SK
CITY COUNCil SET
CCS Building: West Elevation
NTS
July 15,2001
VAN MEIER
WlWAII
POllACK
ARCHITECTIJRE -\.J1BAN [)O.S/GN
520 Third Street
SUite 525, Box 15
San Francisco, CA
94107 USA
415.974.5352
Cupertino Community Services
and Family Housing
Vista Street
Cupertino, CA
4-9"
UNIT ~:2/~5 UNIT ~.9/~6
46'-9" 3'-
UNIT ~7/~'O UNIT **8/**"
6/6
A/A
A/A
6/6
PERMIT REVIEW SET
6/6
4 '-9"
1
1
1
I
I
I
1
1
I
46'-9'1
3'-
AlA
A/A
6/6
L.S.
L.S.
51' 0"
: 6 UN STALL,.@8'-a."E,A.,1
'1' I I
I I
I 'I
I ____l____j__________~
CITY COUNCIL SET
Landscape Islandl Accessible Parking
NTS
August 9 ,2001
ARCHITECTURE. lJ'IBAN [ESGN
520 TI1 "d Street
Suite 525, Box 15
San Francisco.. CA
94107 USA
415.9745352
Cupertino Community Services
and Family Housing
Vista Street 0
Cupertino, CA
YAN MEtER
WlWAMS
POLlACK
~...lWl.
In-Tn
lJjl-~
PERMIT REVIEW SET
~D ...-id!=-D
llfll ...
~.......
~
! 1
CITY COUNCIL SET
Bldg. 3: North Elevation 2nd Floor Windows and Trellises
NTS
July 15,2001
VAN METER
WlWAII
POU.ACK
ARCHrTECTURE . LABAN DCSGN
520 Timd Street
SUite 525. 'Box. 15
San Francisco., CA
94107 USA
415.974.5352
Cupertino Community Services
and Family Housing
Vista Street
Cupertino, CA
_ m ----I
1==-..
PERMIT REVIEW SET
~._-
D
D
o
---;
I
D
CITY COUNCil SET
Bldg. 3: Porch at South Elevation
NTS
July 15,2001
ARCHITECTURE. lJ1BAN lXSIGN
520 Third Street
Suite 525, Box 15
San Francisco, CA
94107 USA
4159745352
Cupertino Community Services
and Family Housing
Vista Street
Cupertino, CA
YAN METER
WlWAIS
POU.ACK
PERMIT REVIEW SET
CITY COUNCIL SET
Bldg. 1: North Elevation (Bldg. 2 opp hand)
j [
VAN M,mR
WlWAMS
up rtino (~OrnrTILHlity rvl es
and FarTJily Housir""ig
r ?~~ ;::..'
. '-...." -.-
! t i
,tI
9
D)
'.
~)
i
<0
PERMIT REVIEW SET
CITY COUNCIL SET
Bldg. 1: South elevation (Bldg. 2 opp. hand)
fJl
VAN METER
WlWAMS
POU.ACK
Cupertino Comm nity Services
and Farnily Hou g
'" ~"I"\'M'" ,tl.,....~.
b.
PERMIT REVIEW SET
CITY COUNCIL SET
Bldg. 1: West elevation (Bldg. 2 opp. hand)
VAN METER
WlWAMS
POU.ACK
, "':. . i,Pri'< rl'~"'w'
C:: pertirlo Community Services
and Family Housing
I
I Jp':"'1 If'lO, (- ,t:"
PERMIT REVIEW SET
CITY COUNCIL SET
Bldg. 3: Partial South Elevation
11 ,
VAN METER
WlWAMS
POU.ACK
,', "', ~'<" . . 'rl . [l.>..., .~.
Cupe ino Cornrllunity Servi es
a d Farllily Housing
I 10 feet
10. ,1.\
" .1
r_
,
\
c;;,
""
~
i ~
1.1.. ~~
~i
<:
9
E:
"-
-t
I
!
!
, f-
a 1'1
,. "I I'll
I ~~; ;1'1 j
! "'1,. U J~il
, "-,~l; !! JflJl
~ Hhl! .lld LJ
I. C .of 1.lli~. ~ ~ 1.1_ 1
I w, ~ lll~l i ~ .
; IHllh I ~
~ '1Ii~l.
I . . .:
~ ..
,,' ~
1 · -:---~ .::
r3 ~ e
~ S .i
'~G 0.
'::;.~ Cii
:: r:
.
! III
i "1'1
~ !~I'H
, 1 I Ill>!
I! .! lli41j
Jo ! U!J~!
l 1 0
c H!; J
lU:.tJI~
)1 H l~. d
. I! I 11
Ii
"
!J
I
1
y. 1
.~
't
L { ,
~i I II
1 if II B
1 ':i': ~ ~ p
~ U lii 1;
· t\ i, I j
j ~; ~ l II
? 2~ "ill ....
~
~
:1.
l'l
Z
'1.
l>'
&
l-'
...Ii,
<(
II
! ILl inl
PO""'~
8'-:
t= r !i
, .~ ,-
l~l ----J
:Ii' _I
Iii
lir--l
. .!HJi-~
!
II
?1
I' 11111. 1+ '
_III 'iI":;'. II .
lllnlhn I I
'II
! i !
I
:
1111'Jr
ti
"
'i5
!l-
~ ~ti
~ l~~
;;::. a-,eJ.
~ la g
i~ j~j
~ t~u~
:~
'"
<ll
y
.~ Cl
Jl.5
>>lll
~g~
.:;JJ: ~ g
E >>". ~
E:H
8~!
O"C
Cc
:':m
8-
:l
()
z
1
II.
w
I--
iJi
~
o/l
We:
.~~
i': ~
" 0
we-
",0
e:O
tilt>>
~-~
oil
e:J::
j'j ~1J,
a8~