Loading...
DIR-2006-29b CITY OF CUPERTINO --------------------------------------------------------------- --------------------------------------------------------------- 10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308 To: Mayor and City Councilmembers Chair and Planning Commission From: Steve Piasecki, Director of Community Development Prepared by: Ciddy Wordell, City Planner " ~ ~. &<t ~.e ':::?:~~(> /2c /:;. .'. / '-C/L Date: September 22, 2006 Subj: File No. DIR-2006-29: Director's Minor Modification to a use permit (9-U-66) to locate a demonstration building in a parking lot for a three-year period --------------------------------------------------------------- --------------------------------------------------------------- Chapter 19.128 of the Cupertino Municipal Code allows for the Director of Community Development to grant a temporary use permit for a time period not exceeding administrative approval of minor changes to a project. The Director reports his decision to the City Council and Planning Commission in time to allow any Councilmember or Planning Commissioner to appeal the decision within fourteen calendar days. Application: File No. DIR-2006-29: Director's Minor Modification to a use permit (9-U-66) to locate a demonstration building in a parking lot for a three-year period, 19111 Pruneridge Avenue. Hewlett Packard proposes to locate a temporary building on the HP campus to serve as a demonstration building. Although the building appearance is like a home, the demonstrated products are not home-related. The size of the building is 1,859 square feet. It will have minimum visibility from Pruneridge Avenue. The building will be located in a parking lot that is remote from the office buildings. This area has been used for a contractor's trailer for several years, and the applicant reports no adverse parking impacts from this use. The building and landscaping would utilize approximately 20 - 22 parking spaces. The applicant subsequently submitted a modification to the application, which would rotate the building 180 degrees and provide access from the perimeter road (see Exhibit A). Approval is based on this modification. DIR-2006-29 Page 2 Action: The Director of Community Development approves the modification with the following conditions: 1. The modification shall expire on October 6, 2009. 2. The building may be rotated as shown in Exhibit A, as long as the adjacent trees and tree roots are not adversely impacted. 3. The area shall be restored as a parking lot upon expiration of the modification. This approval of the modification is effective September 22, 2006. The fourteen-day appeal period will expire on October 6,2006. Enclosures: Applicant's letter dated September 4, 2006 Exhibit A - Rotated building site plan Plan Set G:Planningj PDREPORT jDIRreports j 2006 j DIR-2006-29 2 ~ DOrnL(R-GRUmnn ~ 11111 ~NI~ ~F D~SIG~ lTtH~o~OG~ RECEIVEI) SEP 0 7 2.006 September 4, 2006 BY: City of Cupertino Planning Department 10300 Torre Avenue Cupertino CA 95014 Attention: Ms. Ciddy Wordell, AICP City Planner Regarding: Hewlett Packard Company Demonstration Home Project near Pruneridge Avenue, Cupertino Site DGA Project No. 06080 Dear Ciddy: Last April I came to City Hall to discuss relocation of a modular 'home' to Hewlett Packard's Cupertino Site. This is to be an adjunct to the Site's marketing efforts, providing a home-like setting for the demonstration of various high-tech devices. At that time you reviewed my binder of the site and existing home photos with Steve Piasecki, from which it was agreed that the project would qualify for a Director's Minor Modification. This was on the basis of the following: 1. The home appears as shown in the attached photo, taken when it was used as a display at a trade show. It will be in place temporarily at the HP site, to be removed after a period of about three years. 2. It will be located in a former parking lot about 120 feet from Pruneridge Avenue, which is substantially screened per the attached site photos. The surface and grades of the parking lot will be modified to suit the proposed landscape shown. Per the attached sketches the plantings and hardscape will be residential in scale, in keeping with the scale and style of the house itself. 3. After removal of the demonstration home, the parking lot will be restored to its former condition, or (if HP desires) submittal made to the Planning Department for an alternate treatment. 4. The Home will be accessible per ADA, including a handicap parking stall and accessible access to the building entries by means of ADA-compliant sidewalks. 5. After granting of the Minor Modification permit, we will submit to the Building Department for building permit in compliance with applicable codes, prior to preparation and placement of the Home at this location. DtREC~gi~Obp~dvA DATE: -- 'a-If) SIGNATl}{!lk C 550 Ellis Street, Mountain View, CA 94043 phone I 650-943-1660 fax I 650-943-1670 www.dowlergruman.com Hewlett Packard Company Demonstration Home Project near Pruneridge Avenue DGA Project No. 06080 September 4, 2006 I trust that this application is consistent with our previous understandings. While the project has been delayed in the interim since we spoke, the client wishes to move ahead and greatly appreciates your assistance in this matter. Please contact me if you have any comments or questions, or require additional documentation. Best Regards ~ Rick Callison AlA Senior Associate Cc: Bruce Benton, Hewlett-Packard Company Ameer Karim, Hewlett-Packard Company David Nelson, MPA Design OOlUlfn-GRUmRn R R CHIT f & I S umon design C"" DIR.PdtOilA'P~6VAl DATE: -~-O SIGNATURE: / -f1 OMMUNITY OEV. 01". '" ::I. o ~ A A .Ii, :~"'..'.,j' '" ." '>~;;~~~" i~~tt: \; ~:,\(,~~ " :~.CJ A~;:m 'f,-3: ~ ,(Q~,. CD i'"~"~i> 'I "'~.,.. ~y ~""':r::' ~:~'O ~~~~~?:~ I" ',;;,;:lI;,"" am :~.~..~~:~~. ~ ~ ~~ 11 () ;''=! ~~ . ~ .' ~ ~ I fil!" ~.~ " \1 uII J' f I ~ o )> ,... - ~ (J) o o ~ Ig I ! ~ ~ -~~~~ ~ je ~ 1 i Exhibit A - ~ 11- C Gl ~ " l6'a " _. ... tD ~ n 3 ~ C"z ~ 9 ::-0 1'-'0- og ~o ~ -7 i.:, .,~ i . '~'l,< )'( " ... ... ".. - ~ " ,...4U~ p.. ~~, I;lJ." ,. DGA Project No. 06080 September 1.2006 R~rFT'lED SEP 0 7 2006 BY: ---- -- 1 ~ y ) -- HEWLETT-PACKARD DEMONSTRATION HOME II -- - -- - ---- -- - _ -- --------- - --- - ---1 ~ ~1II11 DGA planning I architecture !Intenors ~Pl@ invent DGA Project No. 06080 September 1,2006 Homestead Road 'Y.~ ~'l ( - - - - -- -- .. I.nll II I I . I I 1111 I J I I I I I II II II I I . I I J I I .... · [IIII11D ~ ~n I 111"1~n'\...\ ~ ~ '1;1""- o;lQ~ F--,~(,)';:J~ II _ Lotbl 408447-4103 --'-rr---;T ... "'0 42 41 Lolbt L t'O 406447-3504 -0 0 co 0 0::: 43 0 a:: ~ ::J C 0 co S ....... A c: co l- T I 47 IJ IlUJr~pov-n-, ""'1~ I ~ 0 N ~ ~ 11111 DGA planning I ar"chltecturc Ilntcnors '\J . · ... Site l' ----1 ((/7 ~~ ..+\. "f . ,."- r' ,. ti.HP [)EMO~f:lO.f1E;~ I ~ ~~ f~. y,..~ ~ j' '"\". '~..l"" ~_ _ to. '~ _ -~a~ "~,:".J'.f" ,- ) '>)) L.../ _ / C>/R-d.C€Jb -~Ci g~~~~TO~~ APPAOVAL - SIGNATU~ Q?~~ . COMMUN!TY Dt:V. DIn. lhJl@ invent ~~ - - c ~ l> ~ "0 W ::I ::I 5 ()(l I: ~ ri :r l\ ~ n n r' C f3 5 r' n :J 0 ;:;i /. ~^ rl" ~j .... '/,' I. I ':It 't~"I "'- l~f-o ~.o 1$ m jr. :I I r-:;... I'. ~.. 'I ~'~ -:.. ...~t' '~'I' t{O" rJ .~.:": 4....... l~;, hi ..~,--t 1 . ~J ~1 :'=! :~ @l Vi -to CD __ _J . ... .~ ,. \ ./.. " .., ~. \:.. 'I' '. .... ..... ,...., , I . 1, ~ ... ~~ t ~-. .' \1 .~ ~ ,J ~" ~'i.' . .... ~.-.;,~.. ..... :" ,. J~ . ~~,' -, t . 1 .!f -1 n , '. .y ~. , . ~8' " .' .. s;. 0 m ~ ~ t- ... ~ l' ." 0- ~~~t~) .~ T tJ~\ ~ T 'r- q.' '. 0- Il : CU, oO i .; . ~~, . ~ "l ~ . " '" \ J, \' .. ~ t:~.,~ ... ".~ tt.?~ ,: .Ji. ~~ ~ :.!:~7~" . ;\:'. L:!"'f.' i'~ . I }~l' ~~I ti.\. f\' .~~ '4rf ~r" ...".:: ~{. ~-~ ~~,.. ~ '::-="~'~1.. ~i"i.' ~n . . I- i'4 .j ~ J ... \0 ,~ - . J ~ (f)O-lOILJ c a J> " Vl-, I'D 0 "'C _. .... tD I'D n 3 rt g-z ., ? ~ 0 t...J 0'0 00 o (X) 0'0 0 LEGEND G RHAPHIOlEPtS @ ROSA @ ZANTEDESCHlA r.0 AGAPANlHUS ~~. . I . J ~ HEMEROCAWS ~ ORNAMENTAl GRASSES ~ SEASONAL COLOR ~ ~":':':I LAWN '. - 0 LAGERSTROEMlA @ CAMElUA (MULTI) 0 CANNA () UGUSlRUIol 0~~ ~ NANDlNA (MULTI) 0 PHORIolIUIol " pi ~ ~IIIII DGA planning I archrtccturc I,ntenors DGA Project No. 06080 September 1,2006 1-J l' SCALE: 1/20"= 1 '-0" .. . Site ~ / ' ./ < '\~ ~ ..-;-~~ ;~ ~~. ~.l-j~ ~C?EM01.1J9J~~~ ... :.t.-...lL '''' . '{; & ;: .....,.. ,.... _.... ~",_~ :=::::'" ~l:If~....... . - ~ '" :, '> ) > ~~ ...:./ - I L A N o S C A P I N G - ---:-:- --, [hP)@ invent I _ u ~ ~ 11I11 DGA planning I architecture I'ntenors DGA Project No. 06080 September 1,2006 S \ ~ " ") <...., c1 /--- \ r.I --J. "" ~l 0' <V~ Existing --./j Privel Eucalyplus Hedge Vine Screen Calla Lilies Beyond Flowering I F10\,;ering Crape Myrtle Crape Myrtle I Tall Flowers Flax al Window Privet I ledge between existing Ash Trees Magnolia Camellias at Entry I Daylily Enlry Walk Lawn ./' '- -- Nandina Rhaphiolepis or Gardenias Crape Myrtle al Lawn Mixed Grasses (lull at window) ADA Accessible Path 10 new Enlry Doors Camellia set in Annuals Camellia set in Annuals Crape Myrtle at Lawn Calla Lilies Daylilics Elevations DI R ~<9.ooP - XI DIRECTOR'S APPROVAL DATE: C(-~-Ofo SIGNATURE: ~~//V:~{?c? JI>>- OMMUNITY DEV. DIR. ~ ~(7 ~- ~'~ ~~~~ ~~,!~. 1,HP [)EMO~HOJ~1~~ ~ "'~. f. f' "'f' ,.. t .r _ ~ ....,.l ~ %.. _ ~~:.e:.~ ~_ .. .. .. ~~~.. ~,2/ E L E V A T I o N S (hl]@ n v e n t