Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
ASA-2001-08b4300 'Torre Avenue
Cupertino, CA 95014
(408}777-3348
FAX (448} 777-3333
Community Development Department
April 10, 2.001
Mr. Dick Lohmiller
1191 Stafford Drive
rupertina, C~A 95014
SUBJECT: PLANNING C~OM1VIlS510N ACTIGN LETTER ~ 08-ASA-O1
This letter conlflrms the decision of the Planning Commission, given at the rtteeting of
April 9, 2001, approving architectural and site review for design details of an approved
housing development, related to railings, eaves and entries, according to Planning
C;otnmission Resolution No, 6087.
Please be aware that if this permit is not used within two years, it shall expire an April 9,
2003.
Also, be aware that an appeal of this decision can be made within 14 calendar days. If this
happens, you will be notified of a public hearing which will. be scheduled before the City
Council
Sincerely,
rt
~.~'
V ra Gzl
Senior Planner
c: Cupertino Community Services
;:r"planning/post h~car~n~lactionletter4'S~zsa41
iJr;;,. ,w ~ , ~.-cyrr~a ?.,,.,e,..
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 6087
08-ASA-O1
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
APPROVING AN ARCHITECTURAL SITE APPROVAL FOR REFINEMENTS TO AN
APPROVED DEVELOPMENT PLAN.
SECTION I: PROJECT DESCRIPTION
Application No.: 08-ASA-O1
Applicant: Cupertino Community Services
Location: Vista Drive near Stevens Creek Boulevard
SECTION II: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received an application for an
Architectural and Site Approval, as described in this Resolution; and
WHEREAS, the Planning Commission finds that the changes are beneficial and compatible with the
surrounding area;
1. The proposal, at the proposed location, will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety, general
welfare, or convenience;
2. The proposal is consistent with the purposes of the zoning ordinance, and the General Plan.
3. The design will not result in abrupt changes in building scale between the subject site and
neighboring properties, as the proposal is single story and located at the rear of the structure.
4. The proposal will use materials that compliment neighboring structures.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this
matter, the application no. 08-ASA-O1, is here by approved; and
That the subconclusions upon which the findings and conditions specified in this Resolution are based
and contained in the public hearing record concerning Application 08-ASA-O1 as set forth in the
Minutes of the Planning Commission Meeting of April 9, 2001, and are incorporated by reference
herein.
Resolution No. 6087 08-ASA-01 Apri19, 2001
Page 2
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on submitted plan set entitled "Cupertino Community Services and Family
Housing" last updated February 21, 2001.
2. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government Code
Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of
such fees, and a description of the dedications, reservations, and other exactions. You are hereby
further notified that the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If
you fail to file a protest within this 90-day period complying with all of the requirements of Section
66020, you will be legally barred from later challenging such exactions.
PASSED AND ADOPTED this 9th day of April, 2001, at a Regular Meeting of the Planning
Commission of the City of Cupertino, State of California, by the following roll call vote:
AYES: COMMISSIONERS: Corr, Patnoe, Chen, Auerbach and Chairperson Kwok
NOES: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ATTEST: APPROVED:
/s/ Steve Piasecki /s/Patrick Kwok
Steve Piasecki Patrick Kwok, Chairperson
Director of Community Development Cupertino Planning Commission
g:/planning/Pdreports/pcASAreports/08-ASA-O1 res
10300 Torre Avenue
Cupertino, California X5014
Telephone: (408) 777-3308
FAX.• (408) 777-3333
C~11VfMUN1T~'' L E t'ELC7PMElV T
IVlarch 29, 20Q l
Mr. Dick Lohmiller
1191 Stafford Drive
Cupertino, CA 95014
SU$7ECT: DESIGN REVIEW COMMITTEE ACTION LETTER --Application 08-ASA-O1
This letter confirms the decision of the Design Review Committee, given at the meeting of
March ~$, 2001, approving design details of an approved housing development; related to
railings, eaves, and entries, according to Design Review Resolution No. 41.
Please be aware that if this permit is not used within one year, it shall expire on
March 28, 2002.
Also Hate that an appeal of this decision can be made within 14 calendar days of the decision. If
this occurs, you will be notified of a public hearing which will be scheduled before the City
Council.
Sincerely,
~ r!
~ ^-~V
~; ~'^ ~/"
1 ~
A~ ~.
Vera Gil ,,,!!}"`
Senior Planner
Enclosures:
Resolution No. 41
g:plann~ng/DRC Committee/action letter 08-ASA-Ol
r• _ ;,; ~, r.~~r ~_ ,
08-ASA-O1
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 41
OF THE DESIGN REVIEW COMMITTEE OF THE CITY OF CUPERTINO
APPROVING AN ARCHITECTURAL SITE APPROVAL FOR REFINEMENTS TO AN
APPROVED DEVELOPMENT PLAN.
SECTION I: PROJECT DESCRIPTION
Application No.: 08-ASA-O1
Applicant: Cupertino Community Services
Location: Vista Drive near Stevens Creek Boulevard
SECTION II: FINDINGS
WHEREAS, the Design Review Committee of the City of Cupertino received an application for an
Architectural and Site Approval, as described in this Resolution; and
WHEREAS, the Design Review Committee finds that the changes are beneficial and compatible with
the surrounding area;
1. The proposal, at the proposed location, will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety, general
welfare, or convenience;
2. The proposal is consistent with the purposes of the zoning ordinance, and the General Plan.
3. The design will not result in abrupt changes in building scale between the subject site and
neighboring properties, as the proposal is single story and located at the rear of the structure.
4. The proposal will use materials that compliment neighboring structures.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this
matter, the application no. 08-ASA-O1, is here by approved; and
That the subconclusions upon which the findings and conditions specified in this Resolution are based
and contained in the public hearing record concerning Application 08-ASA-O1 as set forth in the
Minutes of the Design Review Committee Meeting of March 28, 2001, and are incorporated by
reference herein.
Resolution No. 41 08-ASA-01 March 28, 2001
Page 2
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on submitted plan set entitled "Cupertino Community Services and Family
Housing" last updated February 21, 2001.
2. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government Code
Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of
such fees, and a description of the dedications, reservations, and other exactions. You are hereby
further notified that the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If
you fail to file a protest within this 90-day period complying with all of the requirements of Section
66020, you will be legally barred from later challenging such exactions.
PASSED AND ADOPTED this 28th day of March, 2001, at a Regular Meeting of the Design Review
Committee of the City of Cupertino, State of California, by the following roll call vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ATTEST:
/s/ Ciddy Wordell
Ciddy Wordell
City Planner
Chen, Chairperson Corr
APPROVED:
/s/ Chuck Corr
Chuck Corr
Design Review Committee
g:/planning/dre/08-ASA-01 reso.doc
2" TUBE STL
4-1/2" MAX., T
5/8" TUBE STI
2-1/2" (D M.B. V
WA5HER5, T1
WD. BEAM, P'i
- - AppYtatbn NumbM
~ _3 a~l~~
Dace
cam. t~s~«
Balcony Guardrail Detail
YAN METER Cupertino Community Services
~W~s Vista Drive
Cupertino, CA DATE: 02/21 /O1
N„,.,,~,;,,~„~,,o,,,,
t,, ~~,,,~ :~„•,•~
.„,~`~~5 ~.~
X15 7'J 5J `~': project # 0004 SCALE: 1"=1'-0"
!~
APPROVI i~ ~ ~Fl~(~"~~
Application Nurnbet
oath}
Signature ~,~1,i Il _ ~'-l- ~-
Casa Manager
SAINTED TUBE STEEL
('.AILING/GUARDRAIL
VOOD STRINGER
(RECAST CONC.
>TAIRS
:ONC. WALK
Stair Railing Detail
VAN METER Cupertino Community Services
Vista Drive
~~~~ Cupertino, CA DATE: 02/21 /O1
' ~~'r'~" protect # 0004 SCALE: 1 /2"=1'-0"
0.~ i]afTC'1:.E ~ Ij:tLV~O'~ 11
S:'0 fhir~ SI, c!~t
S~~la' .Ito
911(17 '115
!15 `11J i7i~
~PROVA~ = '~ ` -
Applicalion Number
DRC , ~ uate `~
Signature ~ ~''~ ~~
Ca::e Manayer
12
-~ 4
PTD. 2x6 TRIM
4x6 POST
LAG SCREWS, TYP.
4x4 BRACE MEMBER
CEMENT 60ARD PANEL
PLY SHEA"fHING
4x4 FRAMING
ELEVATION
Gable End Bracket Detail
Vim MAR Cupertino Community Services
W Vista Drive
~. ~ ~~ Cupertino, CA DATE: 02/21/01
ran project # 0004 SCALE: 3/4"=1'-0"
,,,.,.-,:,.~.~ . u,,.vi n ~. „
scn n~~,d tiv„c~i
n~, ,.:
said-.uu ~:.~
APPRO'
DRC
~3 - ('rSA -o ~
Application Numbor
3 ~;
are~~
l 7 ~i 1 ; .i s1
Casa Manager
4 x 8 BEAM
A35 CUPS
GUTTER
2 x 8 FASCIA, PTD.
1/2"ID x LAG SCREW, TYP.
4 x 6 BRACKET MEMBER,
CHAMFER EDGES AS
SHOWN
LAG SCREW, TYP. S.S.D.
5/16" CEMENT BOARD
PANEL
4x4 BRACE MEMBER
4x4 POST IN WALL
Large Eave Bracket Detail
VAH METER Cupertino Community Services
~W~S Vista Drive
A Cupertino, CA DATE: 02/21 /Ol
irVii.
Vf~
,,,~~,;,,f,~,,,,
~~:~~ s~,,,;,,
~,,~ ,
{'. , '~.~ project # 0004 SCALE: 1"=1'-0"
APPRO` ~' "~'` "~ ~
Ap lication Numbor
DRC _ 3 '~: ~ --
at~ -
Signature ~ ~ i ~~ r~ 1 ~
Case Manager
(2) 1/2"6
SCREE
2 x 8 PTD. WOOD TRIM,
PROVIDE 1 1/2" DIAM EAVE
VENTS AT EACH RAFTER BAY
~ x 8 BEAM
A35 GLIPS
GUTTER
2 x 8 FASCIA, PTD.
1/2"O LAG SCREW, TYP.
4 x 6 BRAGKET MEMBER,
CHAMFER EDGES AS
SHOWN
4x4 BRACKET MEMBER
.3x4 BRACKET MEMBER
Sn6" CEMENT 80ARD
PANEL
4x4 POST IN WALL
Small Eave Bracket Detail
YAN METER Cupertino Community Services
~W~$ Vista Drive
A Cupertino, CA DATE: 02/21/01
VA
rVY.
, project # 0004 SCALE: 1"=1'-0"
a,,,_~
„F,~~,,,o~„
s.n rn~~n ;veN~
~~~n„ ~ ian. i
m , c,~
r .,~~rSn
+~s ~~;a sas2
APPROVAL 0 ~ ~~ ~ `~ ~
gpplicalion Number
DRC ~ ~~ J~
~ Dat~•
Signature U Ca:.e Manager
ROOF TRU55, S.S.D., SEE
ROOF PLANS FOR SLOPE
COMP. SHINGLES OVER ss30
ROOF UNDERLAYMENT, LAP
ROOF FELT O/GUTTER
FLASHING
2x NAILER
ALUM FASCIA GUTTER WITH
2" MIN. FLASHING, NO
GUTTER AT PROPERTY LINE,
SEE SITE PLAN
FLEXIBLE MEMBRANE TO LAS
OVER BLDG. PAPER
2x6 WOOD FASCIA, RABBET
BACK TO RECEIVE SIDING
CAULK
Tight Eave Detail
YAH METER Cupertino Community Services
~W~$ Vista Drive
rVY.NVA Cupertino, CA DATE: 02/21 /Ol
,;k„~,;,,~.,~,xr, project # 0004 SCALE; 3°=1~-0"
- •, ~ „~
~,,..
n.` IS
~,'i'i ~ '..~sao .7
APPP,~ '1
QRC
Signature
~ Q~' ~'OI
Application Number-~
3I~J1O1
DatEr. ,
~C ~i~ ~~ ~ L ~~
Case Manager
BLOCKING
GUTTER WITH 2" MIN.
FLASHING OVER ROOF
SHEATHING
2X6 WOOD FASCIA
4X BF~M, S.S.D. SEE
SADDLE DETAIL C~ BLDG.
WALL
6X6 COLUMN BEYOND
WHERE OCCURS
Porch Shed Roof Detail
YAH ME'~ER Cupertino Community Services
Vista Drive
~~~~ Cupertino, CA DATE: 02/21 /Ol
~~~~ project # 0004 SCALE: 1"=1'-0"
p;oan'~~ ns • U~ow p"i r~
„o nu..f Sorret
m ~ mi~~-n~ ~~. C 6
a~iur r:n
J 15 '~~'~ .'iJ ~.!
~ Dart,
Signature ~~~-~--
Case Manager
{ f -
v ~.
• ~ r y"
r
/-
_ _ ~r<:
_ !~~ `
~~
{
` '
,
~~
r^ r ~
i ,
~
~ ;
3
•
-
e '
h
~ '
! !~
~ 1
:~
hr
~ - ~
.'.~w
.'a ..
Balcony Railing Photo
VAN METER
WILLIAMS
POLLACK
Cupertino Community Services
Vista Drive
Cupertino, CA
project # 0004 DATE: 02/21 /01
r, . ~~,
,,
'~'~~~:.
G
~~,~
~c,,, .-~.. -
Dates
Signature 1. •~ ~~j
- '_`;'
Case tvtanager
I ~ ~~
I -. ,.._f ~T-" f j
I ~:. ,~,I '~ r .. ,~
,. ,.
~ r
1 ~ ter' ~'~+~ ~ j
.~~~; .~.
~. ,
r./ sir (i;~t~
f ..~ z~~
i _ t `~~
:~
~ `~ ,.
i, ~ _f~._
,; : ~ ~ x
~,
_Q_ \~2
~----"* ~
~, ~~
'3 ~ I ~ ~ r r rl
t I i _ _ ~ rl ii`` -
t I j '; I ( _~ I I ~u
Stair Railing Photo
VAN METER Cupertino Community Services
WI LLI A MS Vista Drive
POLLACK propectl # 0 04 DATE: 02/21 /Ol
510 Thir:l SI
Il~~~ IS
St~~ 5~:~
S.In I-~,ii ~r;scu, C~
'~~IIO; U5~
,~
DN'~
Signature
..._.. ... .knit N. ,~-,r ~.
~o C~
Case~lanager
4
f.";
.~ ~ ~~ a ~~
~1~;
~t ~ ~~ ~3 r 4 ~ ii
-~~,,SS s4• F ~ 1 1~~
~.r.~.... „`Sf A'.X
Bracket Phofio
Cupertino Community Services
VAN AMS Vista Drive
W~~1 ~ Gupertino. CA pATE; 02!21 /Ol
P~LLACK project # 0004
5, ~ r~,,,~ s.
~~., s~ 5. ©„~ , ~,
g,., F i,tnasco, S;A
u.t' ' U +~
c.
.14 774 535:
APPROVAL _ p~~-,- Q6(~ -u ~
App ication Numh~r ~"
DRS 3 ~~ `~ ~._._.._.._._
Ua e
Signature ' ~~ `~" `
_ ~., ._
Case Man~:~~Er
\ _
~~i ~r~~
Gable Bracket Photo
VAN METER
WfLLIAMS
POLLACK
Cupertino Community Services
Vista Dr+ve
Cupertino, CA DATE. 02/21/01
project # 0004
5,o r~„~ s,
Ste 525. (3a+ 15
San Franuscu. CA
o,i ~ o ~ usn
J 15 97J 552
A~~'nlabon n,iur~b~;r
QRC 3 'J'C~1c! _r____
Signature L
Cate hl~nager
.:. t~
,f.i :1 r
.. ~ .:~~i''~s.
:.. ~.
::Y ... Wis.
Y ,.
~ ~ I I -
~ ~~ ,
L'tl?R+ ~ ~ a~
...- ~.
J!.~ ~-
_ rL ~~
,. ~ ;;~y~ ...
i_ .. _..~ ... ..
-G i~ .
.,~
y ~.
i
Tight Eave Photo
VAN METER Cupertino Community services
WILLIAMS Vista Drive
Cupertino, CA
POLLACK project # 0004 DATE: 02/21 /Ol
~~`.~~.
.,~r~~.~~~,.-.....~~ cn
n , _. . .
~.
~~;t~
"H,:o;:4uon I~h:~nn~~r -~
~~ ~~iC 3
J ~ .Da1
Signature % ~ 4'
~~
~pp Cace Managor
vI'
i
i
i ( j
t
.:'
i Y
-N'~
.,.+~ !.'. I _ - 111
M
z
~'. g. 1__
f 4 i.
~'
I~wr - 3 e
~' ~
•S~ r:~ .
~.
~ .~ ~a r ~ 1, i, i1
Porch Roof Photo
VAN METER Cupertino Community Services
WILLIAMS Vista Drive
POLLACK Cupertino, CA
•~t xi„~t~~~ • Y~~~~O~,~~• project # 0004 DATE: 02/21 /O1
5101hirn SI
SIn 525. Boy I S
San ~rarcc;cn. CA
Jd 107 USA
415 9 i ~l 5352
L
Building l:North Elevation
Building 1:South Elevation
_ ~~
1 ,~~~~ ~ ~.J L-J1!_J
I ~ ~ L
Ji
--
~ ~
~ ^ ^ ^ ^
- -
. I r
Building 1:East Elevation ~ 3
~i~f Cupertino Community Services and Family Housing Arcni+e~+
Cupertino Housing Services and Cupertino ca~ltomh Van Meter Williams Pollacl~
~ U~D~v~li~~.~ -~
Bridge Housing Corporation ^' "'"` `"
5~0 Th.~scyf5lreet. Sin 525
$~n FronciiCO. Cn 9.11 ~'
APPROVAL _ O~ - I~SI~~y ~
Building 1:West Elevation ~Wv t~rr~
oac ~~ ~a
$I~Gd2Uf8 1 i ~ '~ ~
Case anaper
APPROVAL _ f7`(3 - p~(~- O 1
Application Number
oRC ~ ~ a ~;
DatEL
Signature 'I (.~
Ca:.e Manager
Building 3:West Elevation
Building 3: Scuth Elevation
~~ nt Cupertino Community Services and Family Housing Arcn~tecr~
Cupertino Housing Services and cupert~no carromla Van Meter Williams Pollack
Bridge Housing Corporation """°'~'~'"-~"~n~°°'-~
s~o m~rd scoot, sre szs
Son Francisco. CA 94107
2/21/01
APPROVAL i~~ ' p~S a - u 1
Appliralion lumbar
DRC '-~ ~ o l
Dat
Signature ~ %'
Case anager
CCS Building; South Elevation
CCS Building: `Nest Elevation
i~ nr Cupertino Community Seniices and Family Housing Arct,itecr:
Cupertino Housing Services and a,~err~~a caurornia Van Meter Williams Pollack
Bridge Housing Corporation ""°°°"""~~""""`"'~"
520 Tlnrd StreM, Ste 5?5
San Rancsco, CA 94101
2/21 '01