Loading...
ASA-2005-05b City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: (408) 777-3223 FAX: (408) 777-3366 CITY OF CUPEI\IINO OFFICE OF THE CITY CLERK November 23,2005 Eric Morley Morley Bros. LLC 99 Almaden Blvd. #720 San Jose, CA 95113 RE: Application Nos. V-2005-03, ASA-2005-05, OPA-2005-0I, 2-2005-02, TM-2005-07, TR-2005-06 (EA-2005-03), Eric Morley (Morley Bros. LLC), 19310- 19320 Pruneridge Avenue, APN 316-06-050 and -051 Dear Mr. Morley: At its November 15 meeting, the Cupertino City Council approved Application Nos. U- 2005-03, ASA-2005-05, OP A-2005-0l, Z-2005-02, TM-2005-07, TR-2005-06 (EA-2005-03) with the following conditions: GP A-2005-01 The City Council approved a change of the General Plan land use designation from "INDUSTRIAL/RESIDENTIAL" to "PARKS" for Lot K of the approved tentative map (file No. TM-2005-07). Z-2005-02 The Rezoning conditions are as follows: The applicant shall provide a zoning plat map (Exhibit A), and legal descriptions for the portions of the gross acreage rezoned peRES) - Plarmed Residential and PR - Public Park (Exhibit B). U -2005-03 The Use Permit conditions are as foHows: 1. APPROVED EXHIBITS The recommendation of approval is based on Exhibits titled: "Pruneridge Residential, Cupertino, California" consisting of forty sheets labeled T1, C1 - C7, L1.1 ~ L1.8, B1, A-1- A-23, except as may be amended by the Conditions contained in this Resolution. Printed on Recycled Paper 2 2. RELINQUISHMENT OF POTENTIAL INGRESS/EGRESS EASEMENT Prior to final building occupancy, the applicant shall relinquish to the adjacent apartment property owner to the west any potential ingress/egress easement over the apartment property that is not needed for circulation or ingress/egress to the project property. If the adjacent property ov.ner declines to accept the easement, the applicant shall incorporate the area into the project and improve it with landscaping to be maintained by the Homeowners' Association. 3. TANDEM PARKING GARAGES Forty two-car tandem parking garages associated with condominium flat--floor plan 1 and plan 1 A are approved. 4. NOISE MITIGATION To mitigate significant vehicular noise generated by traffic on Highway 280, the noise mitigations recommended by Illingworth & Rodkin, Inc. in a noise assessment and subsequent response to the City dated August 8, 2005 and September 21, 2005 shall be incorporated in the building plans. This includes a noise attenuation wall along the southern property line and solid materials to buffer exterior noise for upper level balconies adjacent to Highway 280. The City Arborist shall review the location and construction details of the sound wall to ensure the preservation of the row of Coast Redwoods along the southerly property line. To mitigate interior noise levels generated by highway traffic, the Applicant shall incorporate in his building plans higher STC-rated construction materials and provide mechanical ventilation of the residential units. 5. PARKING GARAGES TO BE USED FOR PARKING Applicant shall write into the homeO\vners association's CC&R's that all garages shall be kept sufficiently free and clear to house two parked automobiles. 6. SITE PLAN REVISION To screen the onsite north/south driveway that abuts Pruneridge A venue, the Applicant shall move one of the park-facing residential units onto the driveway terminus. The site plan revisions shall be reviewed and approved by the Director of Community Development at the building permit stage. 7. BUILDING FINISHES, MA TERIALS, PAVEMENT TREATMENTS, ARCHITECTURAL DETAILS, FURNITURE, FENCING, LIGHTING AND LANDSCAPING REVIEW At the building pemlit stage, all building finishes, materials, pavement treatments, architectural details, furniture, fencing, lighting and landscaping shall be reviewed for substantial consistency with the approved plans and exhibits and approved by the Director of Community Development. 3 8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020( d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications', reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. 9. BELOW MARKET RATE HOUSING (BMR) Prior to building permit approval, the Applicant shall enter into BMR housing agreement with the City of Cupertino. 20% of the housing units shall be offered as below market rate units. The 5% of the housing units above 15% shall consist of the smaller, 2 bedroom/2 bath units and be offered at the moderate income price. 10. PUBLIC ART CONTRIBUTION The applicant shall contribute $100,000 toward public art in the community. 11. TREE PRESERVATION ALONG RIDGEVIE\V COURT The applicant shall retain and transplant trees number 791-802, to the extent feasible, and applicant shall work with the City to revise the plans to reconfigure the proposed sidewalk and parallel parking with a reduction of up to 8 parking spaces, along a portion of Ridgeview Court to retain up to 6 trees along Ridgeview Court (779,780,781, 782, 784, 786), if feasible, to the satisfaction of the Community Development Director. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT. 12. STREET WIDENING Street widening, improvements and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. 13. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 14. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 4 15. FIRE HYDRANT Fire hydrants shall be located as required by the City, Santa Clara County Fire and San Jose Water Company. 16. TRAFFIC SIGNS, DETAILS, AND LEGENDS Traffic control signs, details and legends shall be placed at locations specified by the City. All improvement plans shall include all necessary signage, details and legends. 17. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 18. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Development in all other zoning districts shall be served by on site storm drainage facilities connected to the City storm drainage system. If City storm drains are not available, drainage facilities shall be installed to the satisfaction of the City Engineer. * Pre and Post Development Calculations are required 19. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City and Santa Clara County Fire, as needed 20. UNDERGROUND UTILITIES The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino,. and shall coordinate with affected utility providers for installation of underground utility devices. The developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 21. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits. Fees: a. Checking & Inspection Fees: $ 5% of Off-Site Improvement Cost or $2,785.00 mm. b. Grading Permit: $ 5% of Site Improvement Cost c. Development Maintenance Deposit: $ 1,000.00 5 d. Storm Drainage Fee: e. Power Cost: f. Map Checking Fees: g. Park Fees: h. Street Tree TBD ** $ 6,750.00 $601,850.00 By Developer ** Based on the latest effective PG&E rate schedule approved by the Public Utility Commission (P.U.C.) Bonds: a. Faithful Performance Bond: 100% of Off-site and On-site Improvements b. Labor & Material Bond: 100% of Off-site and On-site Improvement c. On-site Grading Bond: 100% of site improvements. - The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 22. TRANSFORMERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. 23. DEDICATION OF WATERLINES The developer shall dedicate to the City all waterlines and appurtenances installed to City Standards and shall reach an agreement with San Jose Water for water service to the subject development. 24. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in your grading and street improvement plans. Erosion and or sediment control plan shall be provided. 25. AMENDED DEVELOPMENT BEST MANAGEMENT PRACTICES (BMP) REQUIREMENTS In addition, the applicant must include the use and maintenance of site design, source control and stormwater treatment BMP's, which must be designed per approved numeric sizing criteria. The City encourages the use of HMP (Hydro modification plan) BMP's in the design of the project. The property o\vners with treatment BMP's will be required to certify on-going operation and maintenance. 6 26. NPDES CONSTRUCTION GENERAL PERMIT The applicant must obtain a notice of intent (NOI) from the State Water Resources Control Board, which encompasses a preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction BMP's to control stoml water runoff quality and BMP inspection and maintenance 27. DEDICATION, IMPROVEMENT & MAINTENANCE OF LAND FOR PUBLIC PARK PURPOSES The applicant shall dedicate Lot K, as shown in the tentative map file no. TM-2005-07, in fee title to the City for park purposes. The park shall be increased to one acre in size. As additional community benefit, the applicant shall undertake the improvements to public park in accordance with the approved preliminary landscape plan dated 9/2/05 and in accordance with City public park standards and the recommendations of the City Parks & Recreation Commission. The valuation of the park improvements provided by the applicant shall be capped at a maximum amount of $700,600. The park and associated improvements shall be inspected by the City prior to final park acceptance. Should portions of the park be completed prior to City acceptance, the applicant shall bear the cost of park maintenance until City acceptance of the park. Concurrent with the City's acceptance of the park, the City shall accept full maintenance responsibility for the park with the cost of the maintenance being funded by the Homeowners' Association through a city-formed Landscaping & Lighting Assessment District. 28. SIDEWALK EASEMENT The Applicant shall grant to the City an easement for the sidewalk portion along Pruneridge Avenue within private property. 29. TRAFFIC Public Works accepts the overall conclusion that the Transportation Impact Analysis (TIA)that a net decrease in estimated vehicle trips generated by the proposed development from those generated by the previous office building use of the site will result in less than significant impacts on the intersections studied and the sUlTounding neighborhood streets. As stated previously, the project wiH be required to make improvements to correct equipment or operational deficienc1es at the signalized intersections along Pruneridge Avenue at Tantau Avenue, the HP Driveway, and Wolfe Road. The improvements shall include upgrading of the existing Emergency Vebicle Preempt (EVP) system facilities and installation of pedestrian countdo\vn traffic signal heads. The project shall amend the TlA or provide a separate analysis to determine whether the traffic signal at the HP Driveway is currently warranted and vihether its operation meets current MUTeD standards. 7 Although Public Works accepts the conclusion of tbe TIA as stated above, the intersection Levels of Service conclusions are somewhat inconsistent \lv.ith the City's General Plan and CMP traffic studies. The project's consultant shall discuss the potential sources of the inconsistencies \vith Public Works and follow up with amendments to the TIA, if necessary. ASA-2005-05 The Architectural & Site Approval conditions are as follows: 1. APPROVED EXHIBITS The recommendation of approval is based on Exhibits titled: "Pruneridge Residential, Cupertino, California" consisting of forty sheets labeled Tl, Cl - C7, Ll.l - Ll.8, B 1, A-I - A-23, and submitted material boards, except as may be amended by the Conditions contained in this Resolution. 2. RELINQUISHMENT OF POTENTIAL INGRESS/EGRESS EASEMENT Prior to final building occupancy, the applicant shall relinquish to the adjacent apartment property owner to the west any potential ingress/egress easement over the apartment property that is not needed for circulation or ingress/egress to the project property. If the adjacent property owner declines to accept the easement, the applicant shall incorporate the area into the project and improve it with landscaping to be maintained by the Homeowners' Association. 3. TANDEM PARKING GARAGES Forty two-car tandem parking garages associated with condominium flatu floor plan 1 and plan IA are approved. 4. NOISE MITIGATION To mitigate significant vehicular noise generated by traffic on Highway 280, the noise mitigations recommended by Illingworth & Rodkin, Inc. in a noise assessment and subsequent response to the City dated August 8, 2005 and September 21, 2005 shall be incorporated in the building plans. This includes a noise attenuation wall along the southern property line and solid materials to buffer exterior noise for upper level balconies adjacent to Highway 280. The City Arborist shall review the location and_construction details of the sound wall to ensure the preservation of the row of Coast Redwoods along the southerly property line. To mitigate interior noise levels generated by highway traffic, the Applicant shall incorporate in his building plans higher STC-rated construction materials and provide mechanical ventilation of the residential units. 5. PARKING GARAGES TO BE USED FOR PARKING Applicant shaU write into the homeowners association's CC&R's that all garages shan be kept sufficiently free and clear to house two parked automobiles. 8 6. SITE PLAN REVISION To screen the onsite north/south driveway that abuts Pruneridge Avenue, the Applicant shall move one of the park-facing residential units onto the driveway terminus. The site plan revisions shall be reviewed and approved by the Director of Community Development at the building penn it stage. 7. BUILDING FINISHES, MATERIALS, PAVEMENT TREATMENTS, ARCHITECTURAL DETAILS, FURNITURE, FENCING, LIGHTING AND LANDSCAPING REVIEW At the building permit stage, all building finishes, materials, pavement treatments, architectural details, furniture, fencing, lighting and landscaping shall be reviewed for substantial consistency with the approved plans and exhibits and approved by the Director of Community Development. 8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement ofthe amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legaHy barred from later challenging such exactions. 9. BELOW MARKET RATE HOUSING (BMR) Prior to building permit approval, the Applicant shall enter into BMR housing agreement with the City of Cupertino. 20% of the housing units shall be offered as below market rate units. The 5% of the housing units above 15% shall consist of the smaller, 2 bedroom/2 bath units and be offered at the moderate income price. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT. 10. STREET WIDENING Street widening, improvements and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. 11. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 12. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shaH be positioned so as to preclude glare and other foms of visual interference to 9 adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 13. FIRE HYDRANT Fire hydrants shall be located as required by the City, Santa Clara County Fire and San Jose Water Company. 14. TRAFFIC SIGNS, DETAILS. AND LEGENDS Traffic control signs, details and legends shall be placed at locations specified by the City. All improvement plans shall include all necessary signage, details and legends. 15. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 40 I Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 16. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Development in all other zoning districts shall be served by on site storm drainage facilities connected to the City storm drainage system. If City storm drains are not available, drainage facilities shall be installed to the satisfaction of the City Engineer. * Pre and Post Development Calculations are required 17. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City and Santa Clara County Fire, as needed 18. UNDERGROUND UTILITIES The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. The developer shall submit detailed, plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 19. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits. 10 Fees: a. Checking & Inspection Fees: $ 5% of Off-Site Improvement Cost or $2,785.00 mm. b. Grading Permit: $ 5% of Site Improvement Cost c. Development Maintenance Deposit: $ 1,000.00 d. Storm Drainage Fee: TBD e. Power Cost: * * f. Map Checking Fees: g. Park Fees:. h. Street Tree $ 6,750.00 $601,850.00 By Developer ** Based on the latest effective PG&E rate schedule approved by the Public Utility Commission (P.D.C.) Bonds: d. e. f. Faithful Performance Bond: 100% of Off-site and On-site Improvements Labor & Material Bond: 100% of Off-site and On-site Improvement On-site Grading Bond: 100% of site improvements. _ The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 20. TRANSFORMERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. 21. DEDICATION OF WATERLINES The developer shaH dedicate to the City all waterlines and appurtenances installed to City Standards and shall reach an agreement with San Jose Water for water service to the subject development. 22. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in your grading and street improvement plans. Erosion and or sediment control plan shall be provided. 23. AMENDED DEVELOPMENT BEST MANAGEMENT PRACTICES (BMP) REQUIREMENTS In addition, the applicant must include the use and maintenance of site design, source control and stormwater treatment BMP's, which must be designed per approved numeric sizing criteria. The City encourages the use of HMP (Hydromodification plan) BMP's in 11 the design of the project. The property owners with treatment BMP's will be required to certify on-going operation and maintenance. 24. NPDES CONSTRUCTION GENERAL PERMIT The applicant must obtain a notice of intent (NOI) from the State Water Resources Control Board, which encompasses a prepar~tion of a Storm Water Pollution Prevention Plan (SWPPP), use of construction BMP's to control storm water runoff quality and BMP inspection and maintenance 25. DEDICATION, IMPROVEMENT & MAINTENANCE OF LAND FOR PUBLIC PARK PURPOSES The applicant shall dedicate Lot K, as shown in the tentative map file no. TM-2005-07, in fee tide to the City for park purposes. The park shall be increased to one acre in size. As additional community benefit, the applicant shall undertake the improvements to the public park in accordance with the approved preliminary landscape plan dated 9/2/05 and in accordance with City public park standards and the recommendations of the City Parks & Recreation Commission. The valuation of the park improvements provided by the applicant shall be capped at a maximum amount of $700,600. The park and associated improvements shall be inspected by the City prior to final park acceptance. Should portions of the park be completed prior to City acceptance, the applicant shall bear the cost of park maintenance until City acceptance of the park. Concurrent with the City's acceptance of the park, the City shall accept full maintenance responsibility for the park with the cost of the maintenance being funded by the Homeowners' Association through a city-formed Landscaping & Lighting Assessment District. 26. SIDE'" ALK EASEMENT The Applicant shall grant to the City an easement for the sidewalk portion along Pruneridge Avenue within private property. 27. TRAFFIC Public Works accepts the overall conclusion that the Transportation Impact Analysis (IIA) that a net decrease in estimated vehicle trips generated by the proposed development from those generated by the previous office building use of the site \vill result in less than significant impacts on the intersections studied and t11e sunounding neighborhood streets. As stated previously, the project will be required to make improvements to correct equipment or operational deficiencies at the signalized intersections along Pruneridge /\venue at Tantau ,Avenue, the HP Dri'\'eway, and Wolfe Road. The improvements shall include upgrading of the existing Emergency Vehicle Preempt (EVP) sj'stem facilities and installation of pedestrian countdown tratTIe signal heads. 12 The project shall amend the TIA or provide a separate analysis to determine whether the traffic signal at the HP Driveway is currently warranted and whether its operation meets cunent MUTCD standards. Although Public Works accepts the conclusion of the TIA as stated above, the intersection Levels of Service conclusi.ons are somewhat inconsistent with the City's General Plan and CMP traffic studies. The project's consultant shall discuss the potential sources of the inconsistencies with Public Works and follow up \-vith amendments to the TlA, if necessary. TM-200S-07 The Tentative Map conditions are as follows: 1. APPROVED EXHIBITS The recommendation of approval is based on Exhibits titled: "Tentative Map Cupertino, California 130 Residential Condominium Units 19310 Pruneridge Avenue & 19320 Pruneridge Avenue" consisting of seven sheets labeled C 1 - C7, and Circulation Diagram, consisting of one sheet, and labeled L 1.2, except as may be amended by the Conditions contained in this Resolution. 2. TENTATIVE MAP REVISIONS Revise tentative map as needed to reflect site design changes in the location of the residential units. Increase the size of the public park (Lot K) to one acre minimum. 3. CONDOMINIUM PLAN Prior to occupancy of the units, the Applicant shall provide the condominium unit boundary planes) to the City. 4. MAINTENANCE RESPONSIBILITY OF COMMON AREAS The Applicant shall designate through the CC&Rs the homeowners' assoc1at1On as the responsible party for all maintenance of private common areas in this development 5. PEDESTRIAN EASEMENTS The Applicant shall submit a final map for City approval that describes and records public pedestrian easements from the abutting apartment property through the development to the public park that is in conformance with Sheet L 1.2 of the project plan set. 6. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020( d) (1), these Conditions constitute 'WTitten notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. Y Oil are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all 13 of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT. 7. STREET WIDENING Street widening, improvements and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. 8. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 9. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shaH be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 10. FIRE HYDRANT Fire hydrants shall be located as required by the City, Santa Clara County Fire and San Jose Water Company. 11. TRAFFIC SIGNS,. DETAILS, AND LEGENDS Traffic control signs, details and legends shall be placed at locations specified by the City. All improvement plans shall include all necessary signage, details and legends. 12. GRADING Grading shall be as approved and required by the City Engineer in accordance \vith Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 13. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Development in all other zoning districts shall be served by on site storm drainage facilities connected to the City storm drainage system. If City storm drains are not available, drainage facilities shall be installed to the satisfaction of the City Engineer. * Pre and Post Development Calculations are required 14. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City and Santa Clara County Fire, as needed 14 15. UNDERGROUND UTILITIES The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices, The developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer: 16. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits. Fees: a. Checking & Inspection Fees: $ 5% of Off-Site Improvement Cost or $2,785.00 mm. b. Grading Permit: $ 5% of Site Improvement Cost c. Development Maintenance Deposit: $ 1,000.00 d. Storm Drainage Fee: TBD e. Power Cost: * * f. Map Checking Fees: g. Park Fees: h. Street Tree $ 6,750,00 $601,850.00 By Developer ** Based on the latest effective PG&E rate schedule approved by the Public Utility Commission (P.U.C.) Bonds: g. h. 1. Faithful Performance Bond: 100% of Off-site and On~site Improvements Labor & Material Bond: 100% of Off-site and On-site Improvement On-site Grading Bond: 100% of site improvements, _ The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 17. TRANSFORMERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. 15 18. DEDICATION OF WATERLINES The developer shall dedicate to the City all waterlines and appurtenances installed to City Standards and shall reach an agreement with San Jose Water for water service to the subject development. 19. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in your grading and street improvement plans. Erosion and or sediment control plan shall be provided. 20. AMENDED DEVELOPMENT BEST MANAGEMENT PRACTICES (BMP) REQUIREMENTS In addition, the applicant must include the use and maintenance of site design, source control and stormwater treatment BMP's, which must be designed per approved numeric sizing criteria. The City encourages the use of HMP (Hydromodification plan) BMP's in the design of the project. The property owners with treatment BMP's will be required to certify on-going operation and maintenance. 21. NPDES CONSTRUCTION GENERAL PERMIT The applicant must obtain a noti.ce of intent (NOr) from the State Water Resources Control Board, which encompasses a preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction BMP's to control storm water runoff quality and BMP inspection and maintenance 22. DEDICATION. IMPROVEMENT & MAINTENANCE OF LAND FOR PUBLIC PARK PURPOSES The applicant shall dedicate Lot K, as shown in the tentative map file no. TM-2005-07, in fee title to the City for park purposes. The park shall be increased to one acre in size. As additional community benefit, the applicant shall undertake the improvements to the one acre public park in accordance with the approved preliminary landscape plan dated 9/2/05 and in accordance with City public park standards and the recommendations of the City Parks & Recreation Commission. The valuation of the park improvements provided by the applicant shall be capped at a maximum amount of $700,600. The park and associated improvements shall be inspected by the City prior to final park acceptance. Should portions of the park be completed prior to City acceptance, the applicant shall bear the cost of park maintenance until City acceptance of the park. Concurrent with the City's acceptance of the park, the City shall accept full maintenance responsibility for the park with the cost of the maintenance being funded by the I1omeowners' Association through a city-formed Landscaping & Lighting Assessment District. 23. SIDEWALK EASEMENT The Applicant shall grant to the City an easement for the sidewalk portion along 16 Pruneridge Avenue within private property. 24. TRAFFIC Public Works accepts the overall conclusion that the Transportation Impact Analysis (TIA) that a net decrease in estimated vehicle trips generated by the proposed development from those generated by the previous office building use of the site will result in less than significant impacts on the intersections studied and the surrounding neighborhood streets. As stated previously, the project will be required to make improvements to con'ecl equipment or operational deficiencies at the signalized intersections along Pruneridge Avenue at Tantau Avenue, the HP Driveway, and Wolfe Road. The improvements shall include upgrading of the existing Emergency Vehicle Preempt (EVP) system facilities and installation of pedestrian countdown traffic signal heads. The project shall amend the TIA or provide a separate analysis to detennine whether the traffic signal at the HP Driveway is currently warranted and whether its operation meets current MUTCD standards. Although Public Works accepts the conclusion of the TIA as stated above, the intersection Levels of Service conclusions are somewhat inconsistent with the City's General Plan and CMP traffic studies. The project's consultant shall discuss the potential sources of the inconsistencies with Public Works and follow up with amendments to the TIA, if necessary. TR-2005-06 The Tree Removal Permit conditions are as follows: 1. APPROVAL ACTION The recommendation of approval is based on Exhibit titled: "Tentative Map Tree Plan Pruneridge Avenue & Ridgeview Court, Cupertino, California" consisting of one sheet labeled C7 and tree protection recommendations outlined in a tree survey prepared by McClenahan Consulting LLC and dated June 17, 2005, except as may be amended by the Conditions contained in this Resolution. 2. TREE REPLACEMENT Removed trees shall be replaced in conformance with landscape plans sheets L 1.1, L 1.3, L1.4, L1.5, and L1.6. Final selection of species and tree sizes shall be approved by the Community Development Director. 3. NOTICE OF FEES. DEDICATIONS. RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020( d) (1), these Conditions constitute v.rritten notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are 17 hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. 4. TREE PRESERVATION BOND FOR THREE OAK TREES Prior to building permit approval, the applicant shall provide a tree bond or equivalent financial instrument in the amount of $30,000 for the protection of three coast live oak trees designated tree nos. 640 through 642 in a tree survey prepared by McClenahan Consulting LLC and dated June 17,2005. 5. TREE PRESERVATION ALONG RIDGEVIEW COURT The applicant shall retain and transplant trees number 791-802, to the extent feasible, and developer shall work with the City to revise the plans to reconfigure the proposed sidewalk and parallel parking with a reduction of up to 8 parking spaces, along a portion of Ridgeview Court to retain up to 6 trees along Ridgeview Court (779,780,781, 782, 784, 786), if feasible, to the satisfaction of the Community Development Director. Please review conditions carefully. If you have any questions regarding the conditions of approval, please contact the Department of Community Development at 408-777~3308 for clarification. Failure to incorporate conditions into your plan set will result in delays at the plan checking stage. If development conditions require tree preservations, do not clear the site until required tree protection devices are installed. The conditions of project approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d)(1), these conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Any interested person, including the applicant, prior to seeking judicial review of the city council's decision in this matter, must first file a petition for reconsideration with the city clerk within ten days after the council's decision. Any petition so filed must comply with municipal ordinance code ~2. 08. 096. Sincerely: ' ck01-f~ JJ,vViPU1 Karen B. Guerin Administrative Clerk cc: Community Development ASA-2005-05 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION No. 6329 (Denial) OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDED DENIAL OF AN ARCHITECTURAL AND SITE APPROVAL FOR A 130-UNIT TOWNHOME AND STACKED FLAT CONDOMINIUM DEVELOPMENT AND AN APPROXIMATELY 0.937-ACRE PUBLIC PARK LOCATED AT 19310 -19320 PRUNERIDGE AVENUE SECTION I: PROTECT DESCRIPTION Application No.: Applicant: Location: ASA-2005-05 (EA-2005-03) Eric Morley (Morley Bros. LLC)/Sobrato Development Companies 19310 -19320 Pruneridge Avenue SECTION II: FINDINGS WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held one or more public hearings on this matter; and WHEREAS, the architectural and site approval application is part of a larger project that includes an amendment to the General Plan that would allow residential development in an area where it is currently prohibited for lack of a development allocation; and WHEREAS, the City Council is currently reviewing the whole general plan and the Commission does not wish to presume the intent of the City Council during its general plan deliberations by taking action on the project-related general plan amendment and all other project-related applications; NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matterl the application for Architectural and Site Approval is hereby recommended for denial, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof; and That the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the public hearing record concerning Application No. ASA-2005- 05 as set forth in the Minutes of the Planning Commission Meeting of October 11, 2005, and are incorporated by reference herein. Resolution No. Page 2 ASA-2005-05 October 11, 2005 PASSED AND ADOPTED this 11th day of October 2005, at a Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: Chairperson Wong, Vice-Chair Miller Commissioners Saadati, Geifer, Chen COMMISSIONERS: none COMMISSIONERS: none COMMISSIONERS: none NOES: ABSTAIN: ABSENT: ATTEST: APPROVED: I sl Steve Piasecki Steve Piasecki Director of Community Development Is / Gilbert Wong Gilbert Wong, Chairperson Planning Commission G: IPlanning\PDREPORTlRES\2005IASA-2005-05 denial res. doc PRUNERIDGE RESIDENTIAL ~hcct Indc~ Tit:eShcct C, C.4 :>-Pk~ Buildi,'!,: r",ncisca;,,'lJ';tr.' Ll.1 LL2 ---'!\RCHITEr~''j' A..P' Townl-.OLnC' ).-' Li\NlJSCAl'I Van DornAbed Landscape Architects 1U,",tL"~U"C D",,,il Ph" Bi"l'wak DCla; --------oV] L Charles W Davidson .l~ Augu,( 30, 2005 Pruneridge Residential F"~ ,~ T -1 Cupertino, California #20050166 rtMffJf/,g @!F 1[;@[IIg'if'g[llg'if'fffi [!"""'-'f'l-''''' ~llm""""JS:teP'aI'1 1..o~''''9 Map Pr"IIm"'<<'y~Ir'Ig<:Ylo:lDr"H'a9<"PI,,", EX15'lr"9TOl''' Tr"",~",,~ ~j """;"",",,,,,,...,,,,~,.,,,,,,,,,,,,,.,,,,,,,,,,,,!lY""""''' co """M "-"" ~"",,=~.w;""'''.S"'''''''''''~T .0._ _" r<"'''~'_"""""",,", """~S'.wrt .~"''' '" Wi "/l'im"1J>o,7;~aYct/.._"-""""",, !lP r.f rE !il!fJ /^,j fj5J ~~p ~n1 J~~~ ~';\1Jjl ~n~L\ 130 Rf:5IDE"TIAL CO~,DCMINllJf'/ L'JITS 1130 P,uneridge ,Ave"lVe 4 10320 "'ru~e('idge t\Venue 1wnl~ 1 tW~. ~ 11ll .. ~~ ~ ~l~P ~n LEGEND f/,@I[;#J 'if'1@[IIg fi'IiJ#JIP J. t r ~ . a- UID <:> L._____..l -07 1J.o\ TM+!D6M C0fllll'U1'Vl5 we 'FReE 1AAM..-""""''''''_r...''''liD_""'''''''''.OO...... f<M>.ril.<KT. """"""'W""'-'lErnT.-DA/lJEfUlOU .~ /'~tf\ /./. .. / ,.---..-~"P<J:_ =, -~ '\ \ , ,/ r~ ;y~ GJ/O$VJ;N"R INrBfN:::(tlL CUPI!"fUYO LTD. TANDnI COlfllVTERiJ INC OFF"" .-/ ~~.. (?r->f .//.... r~ d ~Ylff:.l!'..t;I;, --EB1!.~ll. STP'~~:"-Si:[IN.~' 1) ...ERW4U ST9':!/.c-SEC7'ION.L '(' ,. "jptc::;ilh' :"<>i:}_. ... -<0-'''' ~,ST.RE,,:[-S~cnw F L,~~tL~----~ /~~.- ..BliPRJ::SKN1'A1:JVII ,:~rF CFlOSS Mr;T/ON -E1W'A.IF. "TR~,~1'_<,g':7'm~' Q... f-:-1'::- if,,' -j:h -~t;:- .,.,..,:.~~v ;; r~ ",f" ~.(':;:' .,.--:.. .. , ,------:>;-' ., TANDEM COIlPUYVltI Jlt/C OFFICE /-/ ~j ~- f!f1 /3/ /~ ~WWM~ mEr PI../I,N PRI.IW:1/!(!(;tflt<IlIJE.tP'DGE:W:rrW.'.If<' ~'~@;~~ .......'.'..'....'......'..'..-.....'...'.'........-...'."'....."."'.."... '''''''"''''''''',",..<>Lr_,."."" f2::-' -- ._-= "-"-"';:o~: ;:~~"' -~~ ----i:.~, "--=-"'--_....1.. rr:N(i omn WitH II ;JffJESTRIAI'i CONNECTION TO HAMPTON APARTMENTS JOOT-US[ DRIVE PROPOSED /'.M:KHlORr~OD PM" C1RCULA TION DIAGRAM VEI-ICUlAR - lZ1C1Qls9} PEDESTRIAN ~-r::-~~,o II 1'lt2i..:.....".' !. ~ POlE WIT fiXTURES SEE DHALA,LV [TYP.) CRGJLAR PASEO NQDE WITH !:NH"'Ncm PAVING CRCULAR TRELLIS CENTRAl. PLANTER AND Fl.OWERNG ACCENT lRfrS SfE OHAIl.S F, Ll7 "'NO f,L1.ll f'lCNC ARE... V'I)ER EXlSWG TREES WITH D.G. PAVNL, IlBQ'~ PICNIC TAfIIES."'~DRP/lJKNG FOUNT AN AND TRASH RECEPT AlliS SEE DETAL C, Lt7 MEA~RING WALK TO RESlJENGS AND CIRCLlATlON CON~CTlO"l TO PARK PASEO OPEN SPACE AND 11AMPT0N APARTMENTS ENHANCED PASED EtHRY PAVING AN) OVERHEAf) nRJIS fF..,TlJRF 'iff DETAl F, Ll7 AN:) E. Ll.6 III I I I I - MEAN:lERING WALK AT PARK EDCI WITH tliNAMENfAL TRee;, SHl.U8S AM) GROUNDCOVERS Al.OI'iG RESI)ENTlAL UNITS. -tIGSTI) ACCENT TREESlN lJKlVfWAY PlKKtTSITYPj EXlSTt-.lC TREES TO REMAIN WIlH NEW Lil'VERSTORY PLANrnC (TYP.! GATEWAY ENTRY Willi TRHlIS Ar-D W1ANCED PAVING --~ _'Z~ ~)>~-'~~O~.A ~ e~I2,;~1) rf<:h-~~-'-o~ C,,?f\- 3.u.?',-" 11ii " LAO seRa... TREES AT ROAD TERMIi'LIS VERTICAL ACCENT TRffS AS VISU,\L BACKDROP TO SnJIf'TUK~ AtV CRUCLAR TRELllS ~W"f/ BOARD ON BOARD GOOUNEI<.HlOR FENCE ME ,DETAH C,1.11:1 TRB.LIS STRUCTURES AT ENTRY WALK SEE DETAL E. L1.6 ~NHAN(W VEf-ICULAR PAYNe; AT PEDESTRIAN CROSSWALKS [TYP) :-:~ ~ 0" ':~ .~ ~~ ~~Z ~~ ~~ ~" - ENHANnO VFHIClI-AR rAVNG AT PEDESTRIAN CON/I.ECTlONS TO P^SW5 SeE DHAL E. Lt7 r-- ME^~G CONCRETE I WALKS(TYF'J OPEN -11JKF ARE.~S IrYP.) F'OlELlG-fTrlXTURES SR DETAIL A. 11.7 (TVP.I ~~ II j ~. &If) ,IIRUlS ~ @POLE LIGHT FIXTURE @BENCH @BIKE RACK (g) VEHICULARPA VING @PARK AMENITIES (EYEDESTRIAN PAVING I~ SCULPTURAL ELEMENT? 11't2t ~i @ PLA Y STRUCTURES <\)~ @4' TOT LOT FENCE (9) 6' GOOD NEIGHBOR FENCE @ PICKET FENCE ~ ~ 2t::o;~J-OCP Cg:2-:f9E;T,}.RELLIS CE) CURVEClT~~_~LIS ~ 01:'1 ~~h In: Zv__ ~~~t ~liij: ~~..h:~ -.-'" ~;Lll:Ji~~! ~ ill ~ , I I". g~ a~~ "' .- SIDE SLOPE AREA /- BIOSWAl[ PLANTE!) WITH DROUGHT TOLI:RANT /- EROSION RESLq ANT GRASSES. SI1 PLANT PALETTE - - - CHECK DAM r REQUIRED LONGITIJ!)INAL SLOPE SIT SPECIFICATION THIS SHEE'l FOR A!)OO1l)NAL NFORMATIUN TYPICAL BlOSWAlE CROSS SECTION BIQSWALE PLANT PALETTE ^groslisexerOla COMMON Nl\ME ~.".'.'.'.b..~'wm.""'. B~ffala grass Cll:ep,ngw,ldrye .-- - Tall ~",c~e "'"-----I B~chlae dactyloides E;I""'UIUltlcaldes Malale!Redfelcue :":,"~'~~'"~.::'.;~ IZOYs'~~~9 , BIOSWALE SPECIFICATIONS '-",,'hanar'o,.I'o '~"""". an'-<>lkra,"n iJIau'dbt'n",,'I>d" 1""",,"nO"'II'''''';O 4~ '0 0\<"0"'''0.... d.m, ''''uld "",".,,, ""'""',,,,,,, "'C)I 10" 1~~ f~tlO roouco 'IdOClti Sw.l.,'","",h""'a_beg,,;u..ro"""~~h"",'h...kd'''''.o'''''~"h'''''',,;.00.. ".prlr.-n........_lobe""'moo,h..,,,,,,,r:hon,",m,,,n'u"'''''9nflawd'r'' Wur..-v"'o';'Y;5'OJdb,I..,"'.no"Qu,'ro'-"""',,",,.,o",""m<>>,mn,,,,["o.;""..HI", "",',m lId"."".!""",..,, ~"1"O""V"coe"l.,"""r...,,",,(1 MIo;mum,L"","""",",..",,,,,.1 c"...n..""I",willos""o" ","d,"" "m.;, """'"". "d.,.,,'"',oro."'....n1andSm'nLIIO d,al,A",klf"" 'm. ",,>0'. "';"U'" "'hl.,"aT~""Su",.",J'"'S"lids """",,,, '("Oul B~"';'h."'......t."dmO""'H'lI.p..-ro.m."..,"a"ce""'"di ::-7040 ,~o~ . August 30, 2005 Front Loft Righi Rea' o 8 -- 4 11 8 " Plex Building Elevation Style A Pruneridge Residential Cupertino, California ~~ ~:Tj1r\~!";,~Y0::'Y: V ~;,::,:":,,,., ";.0:i;;':J:.'~ #20050166 ~~Clf:l Plall .. P2~" )U I ~rc~ll :: I,x,,,,; Ic::- _~.,... . P1 P5 P4 P3 P5 . Pruneridge Residential Cupertino, California August 30, 2005 Second FloOi FirslFloor GarilgeLevel 8.Plex Building Composite Style A o E: --- 4 16 ~-~ ~# A-2 #20050166 i.",;.I:"\ ~ , Fmrt Right {Left Reverse) Rear o 9 -- 4 12 8 . Plex Building Elevation Style B . Pruneridge Residential ~" ~,mJ,9ROll~"",; v ~!.~i;\,,1i.,; :,t \~:~@ #20050] 66 August 30, 2005 Cllpertino, California . August 30, 2005 Pruneridge Residential Cupertino, California 112-3~)::'--CU> I Secord Floor First Floor Garage Level 8.Plex Building Composite Style B o 8 --- 4 16 #200S0] 66 . August 30, 2005 ~.'c""'" .. ,. {;j1 Front Left Right e Rear o 8 -.--. 4 12 7. Plex Building ElevaliDn Style B Pruneridge Residential ,.~ ~;r~{>~~~Y~:.i:~:~ "'., ,-~,~"'''' '.:.',~:;",,:':;:: #20050 t 66 Cupertino, California . Allgllst 30, 2005 P1 Plait P3 Pruneridge Residential Cupertino, California Second Floor FirslFloor 's::i,;~c.)a. GaraaeLevei 7.Plex Building Composite Style B J 8 -- 4 16 A - (, #20050166 . August 30, 2005 Front Right I~~t ~ ..... ~ ':....,;- 7 . Plex Building Elevation "12 Style C Pruneridge Residential Cupcl1ino, California 1/20050166 . August 30, 2005 P5 P4 Plait -E~':'~ Pruneridge Residential Cupertino, California Second Floor First Floor GeJrageLflvel 7.Plex Building Composite Style C o 8 --- 4 16 ,-~ ~:T~Or\~R,~~ffi V ~~~!~:..;..:"" :.~',::~:~;;: t\ "8 #200,0166 . August 30, 2005 o Right (Lefl Reverse) Rear '~ 6 . Plex Building Elevallon 4 12 Style A Pruneridge Residential Cupertino, Califomia ~~~ V #20050166 . August 30, 2005 P1alt Pruneridge Residential Cupertino, California SaGOna Floor First Floor f'I";j".3::.","', Garage Level 6.Plex Building Composite Style A o 8 -- 4 16 ,v~ ~J:~:'!',9ROYF;',-""", V ~:~~S;,,;,,;"c" ~,~ \i::'::~U:~ i12(1)50] 66 j\-IO . August JO, 2005 l.J~~\ ~ Front left Right Rear ~ .. ~ c~-+'---_"~ ~--=--==_~_ ii Pmneridge Residential I ~ 6 . Plex Building Elevation 4 12 StyleS ----.1- Cupertino, California !tTg:r~ROY!:"..,.c, ~~i,;:',~"r:"; :,~S,:;~(;~ i i A" 11 #20050166 ~--"-- --,_.- ----~_..~----_._------ . AllgUst 30, 2005 Pruneridge Residential Cupertino, California Second Fiest Floor Garag~Level 6.Plex Building Composite Style B o 8 --- 4 16 ,~ ~~T~,I,H,~2l,1~;~:c: V ;:0.:~,,;,,;H ';.~:;;~i:~ #20050166 I oct A -]2 Lefl Rig'l! Rear . Pruneridge Residential August 30, 2005 Cupertino, California oJ- o 8 ----- 4 12 1120050166 . Augu.st 30,2005 P1 P1alt P2alt -~,------ Pruneridge Residential Cupertino, California Second Fioo' i:irstFloor Garage Level Ti:2- r 5.Plex Building Composite Style A o 8 --- 4 1E #20050166 . August 30, 2005 Front Left Rg'1' J:\ ~ I~ear {~ 5 . Plex Building Elevation 4 12 Style C Residential Cupertino, California (~ ~T~f:~?~R~;2 //20050166 A-IS . August 30, 2U05 PlaIt P1Blt P4 Pruneridge Residential Cupertino, California Second Floor First Floor Garage Le'llOj --~.."_._~--_.__..~ -'~~'-"--j" S.Plex Building CompDsite Style C o 9 --- 4 16 _'~ t<.'o!~:r:9ROYF,\","c, II!; ,.., ~" ~" ., L .........,j.-:;,..-;:: !2Io.,.,otoi :,:.~'.;,.;,;"";:.',:.;,:.~.:,,: ~~ ^'".., ."-~"...,...., A-16 #200S0] 00 G"rageLe,'el . August 30, 2005 'J Pruneridge Residential Cupertino, California o 4 --- 2 B End Units (Plans 1 & 2) ''"'~ ~~I~X;,~,~~Y;'~:;(o; ~_W',,.",,....,, '"''''"'''''''' c,.,_ .LL....,.....""'" #20050166 Garage Levei . August 30, 2005 '~ End Units (Plans 1 alt & 2alt) 2 8 Pruneridge Residential Cupertino, Califomia ~.,..~ ~-r:~,rH~Sl}0::~;: ~_6.:,;',:"",;"":,~,,;,:,:,,:,,,: r "',."" u"""""""-......."" #20050166 Go."'''.''-.6E: 2::;-"'-" ~ ::;::;-Q . August 30, 2005 -----+ Fi's! Floor 685 sf Pruneridge Residential Cupertino, CaJifomia Q 4 -- 2 8 Second riUIJI 757 sf T ownhome - 21' 1486 sq. ft. 3 Bed, 2.5 Bath ,,-t ~;I~~:~?~~~}~l ~.'"..,"'.,," "^,,,,,,..,,,, _ l':""" ACL....."''''....,."n> #200511166 . August 30, 2005 Fir:;:i='cor 737 sf Pruneridge Residential Cupertino, California liZ' Secol1dFloor i52sf o 4 --- 1 8 T ownhome . 22' 1532 sq. ft. 3 Bed, 2.5 Bath ,..~ ~i A- 20 !120050166 1- - . August 30, 200j FirslFloor 76BsI Pruneridge Residential Cupertino, California Second Floor 742 sf o 1 -- 1 8 TDwnhome - 24' 1680 sq. ft. 3 Bed. 3 Bath ,~~ V #20050166 /\ " 211 q . August 30, 2005 o 4 --- 2 8 Cupertino, California Pruneridge Residential ~..'~r.. 9'-1" .-' . . I , !_r~>',<..:,'. ..:........ ..<......J"~ I ., L + .... i"-,l L:.."~~._ Typical Section ~oI~'(9ROYF,"',oo ~:~Ji~',:~,"~ "~;:~-~1]:h"~~ :2~~ #20050166 I....,.. 'r-'m'.... ~'.', D ~ ;~......,=ff.f~,.~........ ~..,.. ,ib'. " "::.. :",1 \ . L- .. .:" ;~'::: "__.'~=~L;J-_~_~..__i.'~ o .:: --- 2 9 Typical Section . Pruneridge Residential Cupertino, California ~-~ ,~ August 30, 2005