ASA-2005-04b
CITY OF
PE IN
10300 Torre Avenue
Cupertino, CA 95014
(408) 777-3308
FAX 777-3333
May 251 2005
John Tang
San Jose Water Company
1265 S. Bascom Avenue
San Jose, CA 95128
SUBJECT: PLANNING COMMISSION ACTION LETTER - ASA-2005-04
This letter confirms the decision of the Planning Commission, given at the
meeting of May 24, 20051 approving an architectural and site approval for a
security fence for an existing water tank, located on Regnart Road, according to
Planning Commission Resolution No. 6301.
Please be aware that if this permit is not used within a two-year period, it shall
expire on May 24, 2007.
Also, please note that an appeal of this decision can be made within 14 calendar
days from the date of this letter. If this happens, you will be notified of a public
hearing, which will be scheduled before the City CounciL
Sincerel y I
,~
/
Ciddy Wordell
City Planner
Cc : San Jose Water Company, 374 W. Santa Clara Street, CA 95196
glplilrlll1r1g/post heamtg/acliorlletter asa-2005-04
ASA - 2005-04
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 6301
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
RECOMMENDING ARCHITECTURAL AND SITE APPROVAL FOR A SECURITY FENCE
FOR AN EXISTING WATER TANK LOCATED ON REGNART ROAD
SECTION 1: PROJECT DESCRIPTION
Application No(s):
Applicant:
Location:
ASA-2005-04
John Tang (San Jose Water Co.)
Regnart Road
SECTION II: FINDINGS
WHEREAS, the necessary public notices have been given in accordance with the Procedural
Ordinance of the City of Cupertino, and the Planning Commission has held one or more
public hearings on this matter; and
WHEREAS, the applicant has met the burden of proof required to support said application;
and has satisfied the following requirements:
1. The proposal, at the proposed location, will not be detrimental or injurious to
property or improvements in the vicinity, and will not be detrimental to the public
health, safety, general welfare, or convenience;
2. The proposal is consistent with the purposes of this chapter, the General Plan, and
zoning ordinance;
3. The proposal will use materials and design elements that compliment neighboring
structures;
4. The proposal conforms with the design guidelines and standards of the Heart of
the City Specific Plan;
NOW, THEREFOREI BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, the design review application is hereby approved subject to the
conditions which are enumerated in this Resolution beginning on page 2 thereof; and
That the subconclusions upon which the findings and conditions specified in this resolution
are based and contained in the public hearing record concerning Application ASA-200S-04
Resolution No. 6301
Page 2
ASA-200S-04
May 24, 2005
set forth in the Minutes of the Planning Commission meeting of May 241 2005, and are
incorporated by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPT.
1. APPROVED EXHIBITS
Approval is based on the plan set entitled: Regnart Station Security Fencing/' dated
5/19/05 and consisting of 1 sheet except as may be amended by the conditions
contained in this approval.
2. FENCE MATERIAL
Replacement fencing for the south boundary shall be a dark vinyL chain-link material.
3. FENCE INSTALLATION
The fence shall be installed within 30 days of approval.
PASSED AND ADOPTED this 24th day of May 2005, at a Regular Meeting of the Planning
Commission of the City of Cupertino, State of California, by the following roll call vote:
AYES:
NOES:
ABST AIN:
ABSENT:
COMMISSIONERS: Chen, Vice-Chair Miller, Saadati and Chairperson Wong
COMMISSIONERS:
COMMISSIONERS: Giefer
COMMISSIONERS:
ATTEST:
APPROVED:
/ sf Ciddy Wordell
City Planner
Planning Department
Is/ Gilbert Wong
Gilbert Wong, Chairperson
Cupertino Planning Commission
G: \ Planning\PDREPORT\ RES\ ASA-2005-04 res. doc