Loading...
MMP-2024-004 - A1SL O P E P R O J E C T I O N L I N E 170 175 17 2 . 3 17 3 . 3 16 7 . 5 TO P O F B A N K ( C R E E K ) WA T E R L E V E L ( C R E E K ) CR E E K T O E 42 5 . 0 3 ' ONE CAR GARAGE NEW ONE STORY MAIN RESIDENCE SB9 HOME NEW PORCH 24"BOX FRONT YARD TREE VERIFY WATER METER OR UPGRADE AS NEEDED NEW SECOND STORY ADU ONE CAR CARPORT ADU ENTRANCE OPEN PATIO OPEN PATIO NEW PAVER DRIVEWAY PR O P O S E D F I R S T F L O O R RE A R S E T B A C K 20 ' - 0 " NEW DRIVEWAY CURB CUT PER DETAIL 1-20 PROPOSED FIRST FLOOR SIDE SETBACK 5'-0" NEW 6 FT TALL FENCE W/ GATE NEW 6 FT TALL FENCE W/ GATE NE W U G E L E C T . L I N E NE W 4 " D I A P V C S E W E R L I N E ENCROACHMENT PERMIT REQUIRED INSTALL NEW PLCO PER DISTRICT STANDARD SEE A/ T0 NE W 1 1 2" D I A W A T E R L I N E MAX. DRIVEWAY CUT PROPOSED FIRST FLOOR SIDE SETBACK 5'-0" REQD. FIRST FLOOR SIDE SETBACK 4'-0" REQD. FIRST FLOOR SIDE SETBACK 4'-0" RE Q D . RE A R SE T B A C K 4' - 0 " HEAT PUMP RECYCLING USABLE OPEN SPACE FOR BLDG B AREA = 51'-0" x 20'-0" =1020 SF FLOOR AREA = 2288 SF REQUIRED OPEN SPACE = 2288 x 15% = 343 SF PROVIDED = 1020 SF FF 183.1 INSTALL NEW PLCO PER DISTRICT STANDARD SEE A/ TS FOR BLDG. B SEE LOWER LATERAL PER DISTRICT STANDARD SEE D/ TS FOR BLDG. B BACKFLOW PREVENTOR DEVICE HEAT PUMP HEAT PUMP HPWH 7'-11" 8'-7" 58 ' - 0 " PR O P O S E D A D U RE A R S E T B A C K PR O P O S E D F I R S T F L O O R F R O N T S E T B A C K 20 ' - 0 " PR O P O S E D S E C O N D F L O O R F R O N T S E T B A C K 29 ' - 4 " HEAT PUMP x x xx SI T E P L A N AR E A S U M M A R Y VI C I N I T Y M A P revisions by drawn checked date scale job no. sheet of sheets 1/8" = 1'-0" A1SITE PLAN & HORIZONTAL CONTROL PLAN THE HORIZONTAL CONTROL PLAN IS PREPARED BASED ON THE BOUNDARY SURVEY PREPARED BY THE PROJECT'S LICENSED SURVEYOR. AM STATE OF CA L IFORNIA L I CENSE D A RCHITEC T AD I T I M U K H E R J E E 1/8" = 1'-0" VICINITY MAP FENCES SHALL NOT BE GREATER THAN 6’ IN HEIGHT IN ALL SIDE AND REAR YARD AREAS, AND A MAXIMUM OF 3’ IN HEIGHT IN THE FRONT YARD AREA. WHERE 6’ HIGH FENCES ARE ALLOWED, 8’ MAY BE PERMITTED WITH A BUILDING PERMIT AND NEIGHBOR APPROVAL. NORTH BUILDING OCCUPANCY GROUP R3 & U TYPE OF CONSTRUCTION V - B STORIES 2 W/O BASEMENT AUTOMATIC SPRINKLERS YES A R C H I T E C T L I C . C 3 1 6 1 1 1 4 4 8 S . S T E L L I N G R O A D CU P E R T I N O , C A L I F O R N I A AD I T I @ A M A R C H I T E C T S C A . C O M 40 8 4 5 5 3 7 9 3 CITY CODE SECTION 17.04.050, GROUND DISTURBING ACTIVITIES (I.E. DEMOLITION, GRADING, TREE REMOVAL, AND GENERAL CONSTRUCTION ACTIVITIES) WHICH OCCUR BETWEEN FEBRUARY 1 AND AUGUST 31 REQUIRE THE PERFORMANCE AND SUBMITTAL OF A PRECONSTRUCTION SURVEY BY A QUALIFIED ORNITHOLOGIST NO MORE THAN SEVEN DAYS PRIOR TO THE START OF GROUND DISTURBING ACTIVITIES. ADDITIONAL ACTIONS MAY BE REQUIRED BASED ON THE RESULTS OF THE PRECONSTRUCTION SURVEY, AS OUTLINED IN CITY CODE SECTION 17.04.050. GROUND DISTURBING ACTIVITIES WHICH OCCUR BETWEEN SEPTEMBER 1 AND JANUARY 31 DO NOT REQUIRE A PRECONSTRUCTION SURVEY UNDER THIS CITY CODE SECTION. SHOULD GROUND DISTURBING ACTIVITIES OCCUR BETWEEN FEBRUARY 1 AND AUGUST 31, A PRECONSTRUCTION SURVEY, COMPLETED NO MORE THAN SEVEN DAYS BEFORE THE START OF ACTIVITIES, WILL BE SUBMITTED TO THE CITY IN COMPLIANCE WITH CITY CODE SECTION 17.04.050. ADDITIONALLY, IF FEASIBLE, TREE REMOVAL AND/OR PRUNING WILL BE COMPLETED BEFORE THE START OF THE NESTING SEASON (FEBRUARY 1 TO AUGUST 31) TO HELP PRECLUDE NESTING. LEGEND PROJECT SUMMARY THE CONTOUR OF THE LAND PRIOR TO IMPROVEMENTS OR DEVELOPMENT, UNLESS OTHERWISE ESTABLISHED BY A CITY APPROVED GRADING PLAN THAT IS PART OF A SUBDIVISION MAP APPROVAL. ON GRADED SITES, THE TOP OF ANY EXTERIOR FOUNDATION SHALL EXTEND ABOVE THE ELEVATION OF THE STREET GUTTER AT A POINT OF DISCHARGE (OR THE INLET OF AN APPROVED DRAINAGE DEVICE), A MINIMUM OF 12 INCHES PLUS 2%. (CBC 1808.7.4) (CRC R403.1.7.3) 11.11.24 N E W O N E S T O R Y R E S I D E N C E W I T H S E C O N D S T O R Y A D U F O R G E E T H A K R I S H N A N A N D P A V I T H R A N A R A S I M H A N 10 4 3 0 S T E R L I N G B L V D . C U P E R T I N O , C A L I F O R N I A EXTERIOR FOUNDATIONS TO BE 6 INCHES MINIMUM WITHIN 10 FEET (5% MINIMUM). AT IMPERVIOUS SURFACES, A MINIMUM 2% SLOPE IS PERMITTED. PROVIDE DRAINAGE SWALES FOR SIDE YARDS CRC R401.3 THE HORIZONTAL CONTROL PLAN IS PREPARED BASED ON THE BOUNDARY SURVEY PREPARED BY THE PROJECT’S LICENSED SURVEYOR. WATER SUPPLY LINES SHALL NOT BE INSTALLED IN THE SAME TRENCH AS, AND SHALL BE AT LEAST 10 FEET HORIZONTALLY FROM AND ONE FOOT VERTICALLY ABOVE, ANY PARALLEL PIPELINE CONVEYING: (1) UNTREATED SEWAGE. (CAL. CODE REGS. TIT. 22, § 64572) PROJECT ADDRESS APN ZONING DISTRICT LAND USE FLOOD ZONE GROSS LOT AREA NET LOT AREA 10430 STERLING BLVD. 375 24 002 R1-7.5 LOW RES 1-6 DU/ AC NO 7927 S.F. 5100 SF. AREA CALCULATION ALLOWABLE FLOOR AREA 2295 S.F. (45%) ALLOWABLE AREA FOR SB 9 HOME 2000 S.F. ALLOWABLE LOT COVERAGE 2550 S.F. (45% +5%) ALLOWABLE BUILDING HT.16 FT. PROPOSED BUILDING HT.15'-11" FLOOR AREA SUMMARY NEW FIRST FLOOR 1999.5 S.F. NEW 1 CAR GARAGE 288.6 S.F. TOTAL PROPOSED FLOOR AREA 2288.1 S.F. ( 44.85%) ALLOWABLE FLOOR AREA 2295 S.F. LOT COVERAGE SUMMARY NEW FIRST FLOOR 1999.5 S.F. NEW FRONT PORCH 45 S.F. NEW 1 CAR GARAGE 288.6 S.F. TOTAL EAVE PROJECTION 214.9 S.F. PROPOSED COVERAGE 2548 S.F. ( 49.9 % ) ADU ( SECOND FLOOR) 799.49 S.F SB9 SECOND FLR ADU FRONT SETBACK 20'-0"29'-4" LEFT SIDE 5'-0"8'-7" REAR SETBACK 20'-0"58'-0" RIGHT SIDE 5'-0"7'-11" APPLICABLE CODES 2022 CALIFORNIA ADMINISTRATIVE CODE 2022 CALIFORNIA BUILDING CODE, VOLUMES 1 & 2 2022 CALIFORNIA RESIDENTIAL CODE 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA ENERGY CODE 2022 CALIFORNIA HISTORICAL BUILDING CODE 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE 2022 CALIFORNIA REFERENCED STANDARDS CODE CUPERTINO MUNICIPAL CODE. REMOVE AND REPLACE EXISTING DRIVEWAY AND CURB CUT WITH CURB, GUTTER, AND SIDEWALK PER CITY STANDARD DETAILS 1-16 AND 1-19, AS DIRECTED BY THE PUBLIC WORKS INSPECTOR. ENSURE GRADES MATCH AT THE BACK OF SIDEWALK TO ALLOW FOR POSITIVE DRAINAGE TOWARDS THE PUBLIC STREET, AND THE CURB AND GUTTER ALSO PROVIDES FOR POSITIVE DRAINAGE. SAW CUT 1’ MIN. OF EXISTING AC PAVEMENT ALONG THE DRIVEWAY TO BE REMOVED. REPLACE ASPHALT WITH A MINIMUM 12” AC DEEP LIFT PLUG.” CONTRACTOR SHALL CONTACT PROJECT’S CIVIL ENGINEER AND PUBLIC WORKS INSPECTOR FOR INSTALLATION AND INSPECTION OF ON-SITE GRADING & DRAINAGE FACILITIES. A LETTER FROM THE CIVIL ENGINEER WILL BE REQUIRED TO CERTIFY THAT GRADING AND DRAINAGE SYSTEMS ARE INSTALLED PER DESIGN PRIOR TO PROJECT ACCEPTANCE. IT IS THE OWNER’S AND CONTRACTOR’S RESPONSIBILITY TO ENSURE FENCE LOCATION AND HEIGHT ARE INSTALLED PER THE APPROVED PLAN. FENCES SHALL NOT ENCROACH INTO PUBLIC RIGHT OF WAY. THE SLOPE OF GRADE AWAY FROM EXTERIOR FOUNDATIONS TO BE 6 INCHES MINIMUM WITHIN 10 FEET (5% MINIMUM). AT IMPERVIOUS SURFACES, A MINIMUM 2% SLOPE IS PERMITTED SEE CIVIL DRAWINGS FOR THE GRADING AND DRAINAGE PLANS SEE LANDSCAPE PACKAGE FOR PRIVACY SCREENING CITY CODE SECTION 17.04.050, GROUND DISTURBING ACTIVITIES (I.E. DEMOLITION, GRADING, TREE REMOVAL, AND GENERAL CONSTRUCTION ACTIVITIES) WHICH OCCUR BETWEEN FEBRUARY 1 AND AUGUST 31 REQUIRE THE PERFORMANCE AND SUBMITTAL OF A PRECONSTRUCTION SURVEY BY A QUALIFIED ORNITHOLOGIST NO MORE THAN SEVEN DAYS PRIOR TO THE START OF GROUND DISTURBING ACTIVITIES. ADDITIONAL ACTIONS MAY BE REQUIRED BASED ON THE RESULTS OF THE PRECONSTRUCTION SURVEY, AS OUTLINED IN CITY CODE SECTION 17.04.050. GROUND DISTURBING ACTIVITIES WHICH OCCUR BETWEEN SEPTEMBER 1 AND JANUARY 31 DO NOT REQUIRE A PRECONSTRUCTION SURVEY UNDER THIS CITY CODE SECTION. SHOULD GROUND DISTURBING ACTIVITIES OCCUR BETWEEN FEBRUARY 1 AND AUGUST 31, A PRECONSTRUCTION SURVEY, COMPLETED NO MORE THAN SEVEN DAYS BEFORE THE START OF ACTIVITIES, WILL BE SUBMITTED TO THE CITY IN COMPLIANCE WITH CITY CODE SECTION 17.04.050. ADDITIONALLY, IF FEASIBLE, TREE REMOVAL AND/OR PRUNING WILL BE COMPLETED BEFORE THE START OF THE NESTING SEASON (FEBRUARY 1 TO AUGUST 31) TO HELP PRECLUDE NESTING. MECHANICAL EQUIPMENT SHALL BE LOCATED SUCH THAT SOUND PRESSURE LEVEL GENERATED BY THE USE OF THE UNIT DOES NOT EXCEED 55 DECIBELS AT ANY PROPERTY LINE. FIRE SPRINKLER SYSTEM SHALL BE DESIGNED PER NFPA 13D SHALL BE UNDER A SEPARATE PERMIT AND IS APPLIED FOR WITH THE SCCFD STANDARDS. PROJECT CONSTRUCTION ACTIVITIES WILL CONFORM TO THE APPLICABLE REQUIREMENTS OF THE CITY CODE CHAPTER 17.04. THE PROJECT IS SUBJECT TO THE STANDARDS AND REQUIREMENTS OF CITY CODE CHAPTER 17.04 INCLUDING FUGITIVE DUST CONTROL REQUIREMENTS DURING CONSTRUCTION. PROJECT CONSTRUCTION ACTIVITIES WILL COMPLY WITH THE BAY AREA AIR QUALITY MANAGEMENT DISTRICT BASIC CONTROL MEASURES INCLUDED IN THE LATEST VERSION OF BAAQMD’S CEQA AIR QUALITY GUIDELINES TO CONTROL FUGITIVE DUST DURING DEMOLITION, GROUND DISTURBING ACTIVITIES, AND/OR CONSTRUCTION. THE PROJECT IS SUBJECT TO THE STANDARDS AND REQUIREMENTS OF CITY CODE CHAPTER 17.04. THESE STANDARDS INCLUDE MEASURES TO PROTECT NESTING BIRDS SHOULD CONSTRUCTION TAKE PLACE BETWEEN FEBRUARY 1 AND AUGUST 31. R401.3 DRAINAGE SURFACE DRAINAGE SHALL BE DIVERTED TO A STORM SEWER CONVEYANCE OR OTHER APPROVED POINT OF COLLECTION THAT DOES NOT CREATE A HAZARD. LOTS SHALL BE GRADED TO DRAIN SURFACE WATER AWAY FROM FOUNDATION WALLS. THE GRADE SHALL FALL NOT FEWER THAN 6 INCHES (152 MM) WITHIN THE FIRST 10 FEET (3048 MM). EXCEPTION: WHERE LOT LINES, WALLS, SLOPES OR OTHER PHYSICAL BARRIERS PROHIBIT 6 INCHES (152 MM) OF FALL WITHIN 10 FEET (3048 MM), DRAINS OR SWALES SHALL BE CONSTRUCTED TO ENSURE DRAINAGE AWAY FROM THE STRUCTURE. IMPERVIOUS SURFACES WITHIN 10 FEET (3048 MM) OF THE BUILDING FOUNDATION SHALL BE SLOPED NOT LESS THAN 2 PERCENT AWAY FROM THE BUILDING. WATER SUPPLY REQUIREMENTS: POTABLE WATER SUPPLIES SHALL BE PROTECTED FROM CONTAMINATION CAUSED BY FIRE PROTECTION WATER SUPPLIES. IT IS THE RESPONSIBILITY OF THE APPLICANT AND ANY CONTRACTORS AND SUBCONTRACTORS TO CONTACT THE WATER PURVEYOR SUPPLYING THE SITE OF SUCH PROJECT, AND TO COMPLY WITH THE REQUIREMENTS OF THAT PURVEYOR. SUCH REQUIREMENTS SHALL BE INCORPORATED INTO THE DESIGN OF ANY WATER-BASED FIRE PROTECTION SYSTEMS, AND/OR FIRE SUPPRESSION WATER SUPPLY SYSTEMS OR STORAGE CONTAINERS THAT MAY BE PHYSICALLY CONNECTED IN ANY MANNER TO AN APPLIANCE CAPABLE OF CAUSING CONTAMINATION OF THE POTABLE WATER SUPPLY OF THE PURVEYOR OF RECORD. FINAL APPROVAL OF THE SYSTEM(S) UNDER CONSIDERATION WILL NOT BE GRANTED BY THIS OFFICE UNTIL COMPLIANCE WITH THE REQUIREMENTS OF THE WATER PURVEYOR OF RECORD ARE DOCUMENTED BY THAT PURVEYOR AS HAVING BEEN MET BY THE APPLICANT(S). 2019 CFC SEC. 903.3.5 AND HEALTH AND SAFETY CODE 13114.7.