1.Subject: Approval of the June 26, 2025 Administrative Hearing Minutes
Recommended Action: Approve the June 26, 2025 Administrative Hearing Minutes
1. Draft Minutes
POSTPONEMENTS
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the Committee on any matter
within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3)
minutes. In most cases, State law will prohibit the Commission from making any decisions with respect
to a matter not on the agenda.
PUBLIC HEARINGS
Effective January 1, 2023, Government Code Section 65103.5 (SB 1214) limits the distribution of
copyrighted material associated with the review of development projects. Members of the public wishing
to view plans that cannot otherwise be distributed under SB 1214 may make an appointment with the
Planning Division to view them at City Hall by sending an email to planning@cupertino.org. Plans
will also be made available digitally during the hearing to consider the proposal.
OLD BUSINESS
NEW BUSINESS
2.Subject: Architectural and Site Approval for an expansion of an existing utility space at
Apple Park to provide MEP redundancy upgrades, including switchgears,
transformers, generators, and renewable energy charged batteries. (Application No(s).:
ASA-2024-014; Applicant: Apple, Inc.; Location: 4 Apple Parkway; APN(s): 316-06-061)
Recommended Action: Staff recommends that the Hearing Officer approve the:
1. Architectural and Site Approval, ASA-2024-014 in accordance with the Draft
Resolution
Page 1
1
AH 8-28-251 of 59
Administrative Hearing Agenda August 28, 2025
Staff Report
1. Draft Resolution ASA-2024-014
2. Project Plans (abridged due to limitations of state law pursuant to SB1214)
3. Tenth Addendum to the Apple Campus 2 Project Final Environmental Impact Report (EIR), State
Clearinghouse #2011082055 dated August 5, 2025.
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this
meeting who is visually or hearing impaired or has any disability that needs special assistance should
call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for
assistance. In addition, upon request in advance by a person with a disability, meeting agendas and
writings distributed for the meeting that are public records will be made available in the appropriate
alternative format.
Any writings or documents provided to a majority of the members after publication of the agenda will
be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at
10300 Torre Avenue, Cupertino, California 95014, during normal business hours.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section
2.08.100 written communications sent to the City Council, Commissioners or staff concerning a matter
on the agenda are included as supplemental material to the agendized item. These written
communications are accessible to the public through the City website and kept in packet archives. Do
not include any personal or private information in written communications to the City that you do not
wish to make public, as written communications are considered public records and will be made
publicly available on the City website.
Page 2
2
AH 8-28-252 of 59
CITY OF CUPERTINO
Agenda Item
Subject: Approval of the June 26, 2025 Administrative Hearing Minutes
Approve the June 26, 2025 Administrative Hearing Minutes
CITY OF CUPERTINO Printed on 8/22/2025Page 1 of 1
3
AH 8-28-253 of 59
DRAFT MINUTES
CUPERTINO ADMINISTRATIVE HEARING
COMMITTEE
Thursday, June 26, 2025
At 5:02 p.m. Hearing Officer Luke Connolly called the Regular Administrative Hearing
Committee meeting to order at Conference Room C, 10300 Torre Avenue.
ROLL CALL
Present: Hearing Officer Luke Connolly. Absent: None.
APPROVAL OF MINUTES
1. Subject: Approval of the February 20, 2025 Administrative Hearing
Minutes
Recommended Action: Approve the February 20, 2025 Administrative
Hearing Minutes.
The meeting minutes were adopted.
POSTPONEMENTS – None
ORAL COMMUNICATIONS –
A member of the public spoke about their confusion about the progression of events in an
administrative hearing, commented on the plans of the applicant, and it was determined that
they were speaking on an agenda item.
PUBLIC HEARING
2. Subject: Consider the subdivision of an existing 28,235-square-foot lot into two residential
lots in the single-family residential (R1-10) zoning district. (Application No.(s): TM-2024-
008; Applicant: Mohammad Kamrul Islam; Location: 10033 Hillcrest Road; APN: 326 16
014).
Recommended Action: That the Hearing Officer adopt the draft resolution
(Attachment 1) to:
1. Find the actions exempt from the California Environmental Quality Act (“CEQA”);
and
Approve the Tentative Parcel Map (TM-2024-008).
Hearing Officer Luke Connolly introduced Senior Planner Emi Sugiyama who gave a 4
AH 8-28-254 of 59
Administrative Hearing Minutes June 26, 2025
brief overview of the project.
A member of the group representing the applicant made a comment on the presentation,
stating that it was done very well.
Hearing Officer Luke Connolly opened the public comment period and the following
people spoke:
• (Name not provided) asked what the purpose was of dividing the property into
two properties.
Hearing Officer Luke Connolly explained that the proposal was not to build anything, but
to divide the property into two lots, and that there was no construction proposed at this
time, but should construction be proposed, it would be reviewed at a later date,
emphasizing that it was just the creation of an additional lot.
(Name not provided) stated that there could be another building someday.
A member of the public arrived.
Hearing Officer Luke Connolly stated that if you could build one home on a lot, you could
build another one on another lot in the future. He stated that since this was a larger parcel,
and lots for construction need to be at least 10,000 square feet, on this property there were
two lots that were at least that size.
The member of the public who arrived announced himself as a neighbor, coming to
support.
Hearing Officer Luke Connolly closed the public comment period.
Decision: Hearing Officer Luke Connolly moved the staff recommendation and approved
the project by adopting the draft resolutions with no modifications.
A member of the public asked why in the lot there was 1500 square feet dedicated to the
driveway.
Senior Planner Emi Sugiyama explained that this was for a curb and a gutter. The speaker
asked for clarification that it was in the front, Hearing Officer Connolly and Senior Planner
Emi Sugiyama agreed that he understood correctly.
OLD BUSINESS – None
NEW BUSINESS - None
5
AH 8-28-255 of 59
Administrative Hearing Minutes June 26, 2025
STAFF AND COMMITTEE REPORTS – None
FUTURE AGENDA SETTING – None
ADJOURNMENT
At 5:09 p.m. Hearing Officer Connolly adjourned the Regular Administrative Hearing Committee
meeting.
Minutes prepared by:
Lindsay Nelson, Administrative Assistant
6
AH 8-28-256 of 59
CITY OF CUPERTINO
Agenda Item
Subject: Architectural and Site Approval for an expansion of an existing utility space at Apple Park
to provide MEP redundancy upgrades, including switchgears, transformers, generators, and
renewable energy charged batteries. (Application No(s).: ASA-2024-014; Applicant: Apple, Inc.;
Location: 4 Apple Parkway; APN(s): 316-06-061)
Staff recommends that the Hearing Officer approve the:
1. Architectural and Site Approval, ASA-2024-014 in accordance with the Draft Resolution
CITY OF CUPERTINO Printed on 8/22/2025Page 1 of 1
7
AH 8-28-257 of 59
ADMINISTRATIVE HEARING STAFF REPORT
Meeting Date: August 28, 2025
Subject
Architectural and Site Approval for an expansion of an existing utility space at Apple
Park to provide MEP redundancy upgrades, including switchgears, transformers,
generators, and renewable energy charged batteries. (Application No(s).: ASA-2024-014;
Applicant: Apple, Inc.; Location: 4 Apple Parkway; APN(s): 316-06-061)
Recommended Action
Staff recommends that the Hearing Officer approve the:
1. Architectural and Site Approval, ASA-2024-014 in accordance with the Draft
Resolution (Attachment 1)
Discussion
Project Data:
General Plan Designation Industrial/Residential
Zoning Designation P(MP)
Consistency with General Plan Yes
Consistency with Zoning Yes
Environmental Assessment Addendum Apple Campus 2 Final EIR certified on
Oct. 15, 2013 (Attachment 3)
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org
8
AH 8-28-258 of 59
Background
The applicant, Apple Inc., received approval from the City Council on October 15, 2013
to demolish the existing Hewlett Packard campus, and neighboring facilities and replace
them with approximately 3.42 million square feet of office, research, and development
buildings, as well as a 1,000-seat corporate auditorium, a fitness center, and associated
site improvements including access tunnels, a surface parking lot, outdoor dining and
recreational facilities and landscaping.
As part of the approval, the Development Permit (CC Resolution No. 13-084) and
Development Agreement (Ordinance No. 13-2114) outline the process by which
subsequent approvals for Phases I and II of the project should be processed. The process
requires the City to approve these with Architectural and Site Approval permits
approved at an administrative level if the overall development limits are not exceeded.
Phase I, which comprises the main 150-acre Apple Park Campus, bounded by North
Wolfe Road to the west, East Homestead Road to the north, North Tantau Avenue and
the Calabazas Creek to the east, and Interstate 280 to the south, includes 746,500 allocated
square feet for future amenity space.
Apple is seeking permits for an expansion of an existing utility space at Apple Park to
provide MEP redundancy upgrades, including switchgears, transformers, generators,
and renewable energy charged batteries.
Analysis:
Architectural and Site Approval
The expansion of the existing
utility space at Apple Park to
provide MEP redundancy
upgrades are located at the
southern end of the campus.
The utility space is located south
of the Apple South Parking
Structure, as shown in Figure 1.
The proposed project area is
39,552 square feet and can be
divided into a “Battery Yard”
section and a “Generator Yard”
section, shown in Figure 2
below.
Figure 1 Proposed area of work (red outline)
9
AH 8-28-259 of 59
ASA-2024-014 Apple Park – Utility Space Expansion August 28, 2025
Page 3
The Generator Yard is bound by I-280 to the south and the existing parking structure to
the north, directly adjacent to previously approved, existing utility space to the west. The
Battery Yard is located southeast of the Apple South Parking Structure, directly east of
the new Generator Yard, and west of Calaveras Creek. Currently, the Battery yard is
landscaped.
The existing utility space
consists of mechanical and
electrical infrastructure,
including two existing
generators located in the
eastern portion of the space,
which would be retained. The
project would include the
extension of existing fencing
and expansion of the existing
utility space (immediately to
the west of the proposed
project area) to the east to
allow the installation of three
new electric generators
(Generator Yard), and six
battery storage units (Battery
Yard). Figures 3 and 4,
Conceptual Renderings,
shows the modified project,
including the proposed
fencing and location.
Figure 2: Partial Site Plan. "Generator Yard" is the bubble to the left, "Battery Yard" is in the bubble to the right.
Figure 3 Rendering of the proposed Battery Yard.
Figure 4 Rendering of the proposed Generator Yard
10
AH 8-28-2510 of 59
ASA-2024-014 Apple Park – Utility Space Expansion August 28, 2025
Page 4
The generators and associated equipment within the Generator Yard range from
approximately 13 feet to 35 feet in height. The battery storage units are proposed to be
less than 15 feet tall. The battery storage units are proposed to be less than 15 feet tall. A
new six-foot retaining wall would be constructed to accommodate site grading
requirements at the proposed Battery Yard, with a seven-foot noise attenuating fence on
top of it.
All trees located along the southern boundary of the project site, adjacent to the Generator
and Battery Yards, would be protected in place, therefore providing a visual buffer
between Highway motorists and the proposed project. A condition of approval has been
added that would require an arborist report to ensure the trees are protected during and
after construction. New landscape plantings are also proposed within the Battery Yard
portion of the proposed project to replace existing landscaping being removed. These
include low WUCOL, native shrubs which include Deer Grass, Valley Violet, as well as
Mexican Blue Oak trees.
Modified project implementation would also require the removal of nine parking spaces
within the existing Apple South Parking Structure to allow for new co nduit routing.
However, to avoid a reduction in the overall parking supply, the project would include
the construction of nine replacement parking stalls northwest of the existing Central
Utility Plant, as shown in the Parking Exhibit in the Plan Set.
The proposed systems would be used for emergency use only, such as, in the event of a
power outage at Apple Park. During operation, the battery units would be used first,
followed by the generators. This internal redundancy system is designed to operate
parallel to the existing PG&E grid to enhance system resilience. The modified project
would provide maximum extent practicable redundancy upgrades aimed at improving
the reliability of the mechanical and electrical infrastructure serving Apple Park.
The existing and proposed generators are tested monthly for maintenance pur poses, and
yearly total runtimes are consistent with the allowed limits of the Bay Area Air District
(Air District) air permit. The modified project would not expand the size of the campus
and would not include any ground disturbance outside of the construction area approved
in the Final EIR. In addition, the modified project would not result in an increase in the
number of employees or parking spaces on campus.
Environmental Review
An EIR was prepared and approved in accordance with the requirements of CEQA. The
proposed plans have been evaluated by LSA Associates, Inc. in their memo dated August
5, 2025, and the analysis indicates that the architectural refinements that the applicant is
11
AH 8-28-2511 of 59
ASA-2024-014 Apple Park – Utility Space Expansion August 28, 2025
Page 5
seeking would not require major revisions to the Final EIR certified on October 15, 2013,
due to new or substantially increased significant environmental effects. Furthermore,
there have been no substantial changes with respect to the circumstances under which
these refinements would be undertaken that would require major revisions of the Final
EIR due to new or substantially increased significant environmental effects, and there has
been no discovery of new information of substantial importance that would trigger or
require major revisions to the Final EIR due to new or substantially increased significant
environmental effects.
The certified Final EIR adequately identifies all environmental effects and adequate
mitigation measures for the proposed modifications to the previously approved project.
Therefore, no subsequent or supplemental EIR is required prior to approval of the
Architectural and Site Approval as described above. Refer to Attachment 3, Tenth
Addendum to the Apple Campus 2 Project Final Environmental Impact Report (EIR), State
Clearinghouse #2011082055 dated August 5, 2025.
Other Department/Agency Review
The City’s Building Division, Environmental Programs Division, Public Works
Department, Cupertino Sanitary District, and the Santa Clara County Fire Department
have no objections to the project.
Public Noticing
A summary of noticing on the project is presented in the table below:
Notice of Public Hearing, Site Notice
& Legal Ad
Agenda
Site Signage (14 days prior to
hearing)
Adjacent noticing to neighbors
(10 days prior to the hearing)
Posted on the City's official notice bulletin
board (one week prior to the hearing)
Posted on the City of Cupertino’s Website
Public Comments
As of the publishing of this report, no comments have been received.
Conclusion
Staff recommends approval of the Architectural and Site Approval permit, since the plans
and conditions of approval address all concerns related to the proposed project.
Additionally, all applicable findings for approval of the proposed project, consistent with
chapters 19.168 of the Cupertino Municipal Code as detailed in the Draft Resolution,
Attachment 1.
12
AH 8-28-2512 of 59
ASA-2024-014 Apple Park – Utility Space Expansion August 28, 2025
Page 6
Next Steps
The permit will be effective 14 calendar days from the date of the hearing. The decision
of the Administrative Hearing Officer is final, unless appealed within 14 calendar days
from the date of the hearing. The applicant team may apply for building and/or other
permits with the City at the end of the appeal period.
This approval is valid until August 28, 2027. The applicant may apply for a one-time two-
year extension before the approval expires.
Prepared by: Gian Paolo Martire, Senior Planner
Reviewed and Approved for submission by: Piu Ghosh, Planning Manager
ATTACHMENTS
1.Draft Resolution ASA-2024-014
2.Project Plans (abridged due to limitations of state law pursuant to SB1214)
3.Tenth Addendum to the Apple Campus 2 Project Final Environmental Impact Report
(EIR), State Clearinghouse #2011082055 dated August 5, 2025.
13
AH 8-28-2513 of 59
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO.
OF THE ADMINISTRATIVE HEARING OFFICER
OF THE CITY OF CUPERTINO APPROVING
AN ARCHITECTURAL AND SITE APPROVAL PERMIT
FOR AN EXPANSION OF AN EXISTING UTILITY SPACE
TO PROVIDE MEP REDUNDANCY UPGRADES, INCLUDING
SWITCHGEARS, TRANSFORMERS, GENERATORS, AND
RENEWABLE ENERGY CHARGED BATTERIES
LOCATED AT 4 APPLE PARK WAY
SECTION I: PROJECT DESCRIPTION
Application No.: ASA-2024-014
Applicant: Apple, Inc.
Location: 4 Apple Park Way; APN: 316-06-061
SECTION II: FINDINGS
WHEREAS, the City of Cupertino received an application for an Architectural and Site
Approval to consider an expansion of an existing utility space to provide MEP
redundancy upgrades, including switchgears, transformers, generators, and renewable
energy charged batteries at Apple Park, as described in Section I. of this Resolution; and
WHEREAS, after consideration of evidence contained in the entire administrative record,
at the public hearing on October 15, 2013, the City Council adopted Resolution No. 13-
084, adopting an Environmental Impact Report (EIR)for the Apple Park Project; and
WHEREAS, environmental analysis was conducted by LSA, Inc. pursuant to the
requirements of CEQA, and an addendum to the EIR was prepared which found that no
new or substantially increased significant environmental effects; and
WHEREAS, the necessary public notices have been given as required by the Cupertino
Municipal Code, and the Administrative Hearing Officer has held at least one public
meeting with regard to the application; and
14
AH 8-28-2514 of 59
Resolution No. ASA-2024-014 August 18, 2025
Page 2
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
1. The proposal, at the proposed location, will not be detrimental or injurious to property
or improvements in the vicinity, and will not be detrimental to the public h ealth,
safety, general welfare, or convenience;
The applicant proposes extending the exiting utility space which encompasses 39,552
square feet within the 170-acre Apple Park Campus. The structures proposed are three new
electric generators, and six battery storage units and not likely to be visible from
neighboring properties. All the proposed changes are minor improvements to the existing
site and will not be detrimental or injurious to property or improvements in the vicinity.
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any
specific plan, zoning ordinances, applicable planned development permit, conditional
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following specific
criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
There are no changes in building scale as the structures are below the height of the adjacent
parking garage. Existing landscaping, including mature redwoods, will be maintained
along Highway 280, and a new 6 foot retaining wall with a 7 foot sound attenuation fence
on top will be constructed along Calabazas Creek, therefore only minimal portions of the
structures will be visible to motorists. No other height or scale modifications are proposed
to the existing buildings that will impact the existing massing.
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
15
AH 8-28-2515 of 59
Resolution No. ASA-2024-014 August 18, 2025
Page 3
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments and
provide shielding to prevent spill-over light to adjoining property owners.
The proposed structure will be subterranean and unlikely visible from neighboring
properties. Existing mature trees are proposed to be retained, and the landscaping planted
by the structures, as well as sound walls, will visually buffer the generators and batteries
from the public. Outdoor lighting incorporates appropriate shielding and is designed to
meet the dark-sky requirements of the Municipal Code.
c)The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
At this point, no signs are approved as part of this project.
d)With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
This application is not a new project and will maintain the existing buffering and setbacks
established adjacent to the existing residential neighborhoods.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 3 thereof,
The application for an Architectural and Site Approval, Application no. ASA-2024-014 is
hereby approved and that the subconclusions upon which the findings and conditions
specified in this resolution are based and contained in the Public Meeting record
concerning Application no. ASA-2024-014 as set forth in the Minutes of the
Administrative Hearing Meeting of August 28, 2025 and are incorporated by reference as
though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1.APPROVED EXHIBITS
Approval is based on the plan set drawn by HGA titled “Apple Park Main Campus
Upgrades” consisting of sixty-two (62) sheets labeled A-0001 - A-CP-6502, C1.0 - C9.0,
16
AH 8-28-2516 of 59
Resolution No. ASA-2024-014 August 18, 2025
Page 4
L-1 – L-20, and EL-SW-1609A - EL-SW-1609F, except as may be amended by
conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible for verifying all pertinent property
data including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or
construction records. Any misrepresentation of any property data may invalidate
this approval and may require additional review.
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. EA-2011-12 (CC Res No. 13-082)
shall be applicable to this approval.
4. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on
the first page of the building plans.
5. EXTERIOR BUILDING MATERIALS/TREATMENTS
a. The final building exterior plan shall closely resemble the details shown on the
original approved plans.
b. No fencing is approved within the front setback area.
c. All final building exterior treatment plan (including but not limited to details
on exterior color, materials, architectural treatments, doors, windows, lighting
fixtures, and/or embellishments) shall be reviewed and approved by the
Director of Community Development prior to issuance of building permits to
ensure quality and consistency.
d. Any exterior changes determined to be substantial by the Director of
Community Development shall either require a modification to this permit or
a new permit based on the extent of the change.
6. SIGNAGE
Signage is not approved with this application. Signage shall conform to the City
Sign Code.
7. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum
extent feasible subject to the Building Official. The applicant shall provide
evidence that materials were recycled prior to occupancy.
17
AH 8-28-2517 of 59
Resolution No. ASA-2024-014 August 18, 2025
Page 5
8. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible for consulting with other departments and/or
agencies with regard to the proposed project for additional conditions and
requirements. Any misrepresentation of any submitted data may invalidate an
approval by the Community Development Department.
9. INDEMNIFICATION AND LIMITATION OF LIABILITY
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold
harmless the City, its City Council, and its officers, employees, and agents
(collectively, the “indemnified parties”) from and against any liability, claim,
action, cause of action, suit, damages, judgment, lien, levy, or proceeding
(collectively referred to as “proceeding”) brought by a third party against one or
more of the indemnified parties or one or more of the indemnified parties and the
applicant related to any Ordinance, Resolution, or action approving the project,
the related entitlements, environmental review documents, finding or
determinations, or any other permit or approval authorized for the project. The
indemnification shall include but not be limited to damages, fees, and costs
awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs,
liabilities, and expenses incurred in connection with such proceeding whether
incurred by the Applicant, the City, or the parties initiating or bringing such
proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such att orneys’ fees
and costs shall include amounts paid to the City’s outside counsel and shall
include City Attorney time and overhead costs and other City staff overhead costs
and any costs directly related to the litigation reasonably incurred by City. The
applicant shall likewise agree to indemnify, defend, and hold harmless the
indemnified parties from and against any damages, attorneys’ fees, or costs
awards, including attorneys’ fees awarded under Code of Civil Procedure section
1021.5, assessed or awarded against the indemnified parties. The Applicant shall
cooperate with the City to enter a Reimbursement Agreement to govern any such
reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary
18
AH 8-28-2518 of 59
Resolution No. ASA-2024-014 August 18, 2025
Page 6
by proceedings challenging the project approvals and related environmental
review, if the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS
DEPARTMENT
1. GRADING
Grading shall be as approved and required by the Director of Public Works in
accordance with Chapter 16.08 of the Cupertino Municipal Code. 401
Certifications and 404 permits maybe required. Please contact Army Corp of
Engineers and/or Regional Water Quality Control Board as appropriate.
2. DRAINAGE
Drainage shall be provided to the satisfaction of the Director of Public Works.
Hydrology and pre- and post-development hydraulic calculations must be
provided to indicate whether additional storm water control measures are to be
constructed or renovated. The storm drain system may include, but is not limited
to, subsurface storage of peak stormwater flows (as needed), bioretention basins,
vegetated swales, and hydrodynamic separators to reduce the amount of runoff
from the site and improve water quality.
Additional comments will be provided and shall be incorporated prior to Building
Permit approval.
3. C.3 REQUIREMENTS
C.3 regulated improvements are required for all projects creating and/or replacing
5,000 S.F. or more of impervious surface, collectively over the entire project site.
The developer shall reserve a minimum of 4% of developable surface area for the
placement of low impact development measures, for storm water treatment,
unless an alternative storm water treatment plan, that satisfies C.3 requirements,
is approved by the Director of Public Works.
19
AH 8-28-2519 of 59
Resolution No. ASA-2024-014 August 18, 2025
Page 7
The developer must include the use and maintenance of site design, source control
and storm water treatment Best Management Practices (BMPs), which must be
designed per approved numeric sizing criteria. A Storm Water Management Plan
and a Storm Water Facilities Operation, Maintenance and Easement Agreement,
and certification of ongoing operation and maintenance of treatment BMPs are
each required. All storm water management plans are required to obtain
certification from a City approved third party reviewer.
4. IMPROVEMENT AGREEMENT
The project developer shall enter into a Improvement agreement with the City of
Cupertino providing for payment of fees, including but not limited to checking
and inspection fees, storm drain fees, transportation impact fees, park dedication
fees and fees for under grounding of utilities. Said agreement and fees shall be
executed and paid prior to issuance of the Building permit.
Fees:
a. Checking & Inspection Fees: Per current fee schedule ($10,729 or 6% of
improvement costs)
b. Grading Permit: Per current fee schedule ($4,891 or 6% of
improvement costs)
c. Storm Drainage Fee: Per current fee schedule ($12,344 per AC based
On limits of work area)
d. Storm Management Plan Fee: Per current fee schedule ($2,217)
Bonds:
a. Faithful Performance Bond: 100% of Off-site and On-site Improvements
b. Labor & Material Bond: 100% of Off-site and On-site Improvement
c. On-site Grading Bond: 100% of site improvements.
The fees described above are imposed based upon the current fee schedule
adopted by the City Council. However, the fees imposed herein may be modified
at the issuance of a building permit in the event of said change or changes, the fees
changed at that time will reflect the then current fee schedule.
5. SURVEYS
A Boundary Survey and a horizontal control plan will be required for all new
construction to ensure the proposed MEP will be set based on the boundary survey
and setback requirements.
20
AH 8-28-2520 of 59
Resolution No. ASA-2024-014 August 18, 2025
Page 8
6. UNDERGROUND UTILITIES
Developer shall comply with the requirements of the Underground Utilities
Ordinance No. 331 and other related Ordinances and regulations of the City of
Cupertino, and shall coordinate with affected utility providers for installation of
underground utility devices.
Developer shall submit detailed plans showing utility underground provisions.
Said plans shall be subject to prior approval of the affected Utility provider and
the Director of Public Works.
7. BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water
Resources
Control Board, for construction activity, which disturbs soil. BMP plans shall be
included in grading and street improvement plans.
8. EROSION CONTROL PLAN
Developer must provide an approved erosion control plan by a Registered Civil
Engineer. This plan should include all erosion control measures used to retain
materials on site. Erosion control notes shall be stated on the plans.
9. WORK SCHEDULE
Every 6 months, the developer shall submit a work schedule to the City to show
the
timetable for all grading/erosion control work in conjunction with this project.
SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE
DEPARTMENT
1. KNOX KEY BOXES/LOCKS WHERE REQUIRED FOR ACCESS
Where access to or within a structure or an area is restricted because of secured
openings or where immediate access is necessary for lifesaving or firefighting
purposes, the fire code official is authorized to require a key box to be installed in
an approved location. The Knox Key Box shall be a of an approved type and shall
contain keys to gain necessary access as required by the fire code official. Locks.
An approved Knox Lock shall be installed on gates or similar b arriers when
required by the fire code official. Key box maintenance. The operator of the
building shall immediately notify the fire code official and provide the new key
21
AH 8-28-2521 of 59
Resolution No. ASA-2024-014 August 18, 2025
Page 9
when a lock is changed or re-keyed. The key to such lock shall be secured in the
key box. [CFC Sec. 506].
PASSED AND ADOPTED this 28th day of August 2025 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, p ursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST: APPROVED:
Gian Martire Luke Connolly
Senior Planner Administrative Hearing Officer
22
AH 8-28-2522 of 59
REN.9-30-25
No. C-20117
A IFEO
NTRA
OLF
IT
C
S A
T
CEH
I CC
RAD
ENEI
L T
S
SCOTT R.COLS
NO
N
Title
Number Revision
Project No.Scale @ Arch E1Date
Project
Client
Key Plan
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in feet and inches unless noted
otherwise.
3. All dimensions shall be verified on site before proceeding
with the work.
4. Architect shall be notified in writing of any discrepancies.
5. Any areas indicated on this sheet are approximate and
indicative only.
6. Drawings and general provisions of the Contract,
including General and Supplementary Conditions and
Specification Sections, apply to this Work.
84 W. Santa Clara St., #200, San Jose, CA 95113, T 408.288.7833
A9A8
A7
A6
A5 A4
A2
A3
6 Apple Park Way Cupertino, CA 95014
APN: 316-06-061
A1
11/12/24
00A-0001
CoverSheet
3649-272-00
Apple Park Main
Campus Upgrades
APPLE INC.
APPLE PARK MAIN CAMPUS
CENTRAL UTILITY PLANT INFRASTRUCTURE UPGRADE
PLANNING SUBMISSION
11.12.2024
AREA OF WORK
Rev. Date
DD/MM/YY
Reason For Issue Issued
By
00 11/12/24 MEP Upgrades - Planning Permit Set HGA
23
AH 8-28-2523 of 59
REN.9-30-25
No. C-20117
A IFEO
NTRA
OLF
IT
C
S A
T
CEH
I CC
RAD
ENEI
L T
S
SCOTT R.COLS
NO
N
Title
Number Revision
Project No.Scale @ Arch E1Date
Project
Client
Key Plan
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in feet and inches unless noted
otherwise.
3. All dimensions shall be verified on site before proceeding
with the work.
4. Architect shall be notified in writing of any discrepancies.
5. Any areas indicated on this sheet are approximate and
indicative only.
6. Drawings and general provisions of the Contract,
including General and Supplementary Conditions and
Specification Sections, apply to this Work.
84 W. Santa Clara St., #200, San Jose, CA 95113, T 408.288.7833
A9A8
A7
A6
A5 A4
A2
A3
6 Apple Park Way Cupertino, CA 95014
APN: 316-06-061
A1
02/28/25
01A-0003
Axonometric
Renderings
3649-272-00
Apple Park Main
Campus Upgrades
APPLE INC.
RENDERINGS NOT FOR CONSTRUCTION USE. FOR REFERENCE ONLY.
AREA OF WORK
BATTERY YARD - REMOVABLE FENCE PANELS INSTALLED1 BATTERY YARD - REMOVABLE FENCE PANELS REMOVED2
GENERATOR YARD - BIRDEYE VIEW3
Rev. Date
MM/DD/YY
Reason For Issue Issued
By
00 11/12/24 MEP Upgrades - Planning Permit Set HGA
01 02/28/25 Planning Permit Rev HGA
01
24
AH 8-28-2524 of 59
BBBBBBBB
DN
DN
DN
As
As
As
EV1s EV1s EV1sEV1sEV1sEV1sEV1sEV1sEV1sEV1s EV1sEV1sEV1sEV1sEV1sEV1sEV1sEV1s EV1s
EV1s FEV2s FEV2s FEV2sFEV2sFEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2sFEV2s FEV2s
FEV2s
FEV2s FEV2sFEV2s FEV2sFEV2s FEV2sFEV2s FEV2sFEV2s FEV2sFEV2s FEV2s FEV2sFEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s FEV2s
FEV2s
FEV2s
FEV2s FEV2s FEV2sFEV2sFEV2s FEV2s
As
As
As
As
As
AsEV1s
EV1sEV1sFEV2s
FEV2s
EV1s
FEV2s
FEV2sFEV2s
FEV2s
FEV2s
FEV2s
FEV2s
FEV2s FEV2s FEV2sFEV2sFEV2sFEV2sFEV2sFEV2s
EV1s EV1s FEV2s
FEV2s FEV2sFEV2s
FEV2s
FEV2s FEV2sFEV2s
EV1sEV1s
FEV2s FEV2s
EV1s
FEV2sFEV2sFEV2s
FEV2s FEV2s
FEV2sFEV2s
FEV2s
FEV2s FEV2sFEV2s FEV2sFEV2s FEV2s
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
NO
AsPARKING
NO
FEV2s
As
As
EV1s
EV1s
FEV2sFEV2s
PARKING
NO
EV1s
As PARKING
NO
FEV2s
PARKING
NO As PARKING
NO As
PARKING
NO
PARKING
NO
PARKING
NO
FHV
AEDAEDAEDAEDAEDAED
120
121122
123
124
125
126
127
128
129
130
131
132
133
134
135
137136
UP
UPUPUP
RA
M
P
U
P
RA
M
P
U
P
3
A-CP-1271
(N)(N) (N)(N)(N) (N)(N)
(E) (E)(E)(E)(E)(E)(E)
(E)(E)(E)(E)(E)(E)
(E)
(E) (E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)
(E)(E)(E)(E)(E)(E)
(E)(E)
(E)
(N)
(N)(N)(N)(N)
(N)
(E)
CE
N
T
R
A
L
U
T
I
L
I
T
Y
P
L
A
N
T
(
C
U
P
)
APPLE SOUTH PARKING STRUCTURE (P.S)
SCOPE OF INTERIOR WORK AT LEVEL 1,2,3 AND ROOF PLAN
SEE SHEET (NOT INCLUDED IN PLANNING SUBMISSION)
SCOPE OF UTILITY YARD EXTERIOR SITE WORK
APPLE NORTH PARKING STRUCTURE
STEVE JOBS THEATER
APPLE MAIN BUILDING
NORTH TANTAU AVENUE
(N)(N)
/1 A-CP-1650
INTERSTATE -280
(E) FIRE HYDRANT
(E) FIRE HYDRANT
(E) FIRE HYDRANT
94'-2 3/8"
52'-11 1/2"
105'-5"
(E) FIRE HYDRANT
20'-0" SCVWD SETBACK LINE
PROPERTY SETBACK
17'-0 1/8"
2
A-CP-1271
1
A-CP-1271
1A-0003
2
A-0003
3
A-0003
CALABAZAS CREEK
NINE PARKING STALLS ON PROJECT SITE TO COMPENSATE
FOR THE NINE STALLS REMOVED WITHIN THE PARKING
STRUCTURE TO ACCOMMODATE NEW CONDUIT ROUTING,
SEE SHEET A-CP-1272 FOR MORE INFORMATION
(N)
SITE PLAN LEGEND
SEE A-0002 FOR ALL GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
(N) CONSTRUCTION
(E) CONSTRUCTION
TO REMAIN
(N) CONCRETE
(E) LIGHTING
(N) PROPOSED
LIGHTING
(E)
(N)SEE SHEET A-CP-6501 FOR REFERENCE
A. SHEET NOTES AND KEYNOTES ARE APPLICABLE TO THIS SHEET ONLY.
B. ALL WALKWAYS AND SIDEWALKS ALONG ACCESSIBLE ROUTES OF TRAVEL
SHALL BE CONTINUOUSLY ACCESSIBLE, HAVE MAXIMUM 1/2" CHANGES IN
ELEVATION, BE MINIMUM 48" IN WIDTH AND WHERE NECESSARY TO CHANGE
ELEVATION AT SLOPE EXCEEDING 5% (1:20) SHALL HAVE RAMPS COMPLYING
WITH CBC 11B-405 (CONTRACTOR TO VERIFY EXISTING CONDITIONS)
C. MAXIMUM CROSS SLOPES ON ANY SIDEWALK OR RAMP SHALL NOT EXCEED
2%. ALL REQUIRED EGRESS SHALL BE PROVIDED PER CALIFORNIA TITLE 24
HANDICAP REQUIREMENTS. (CONTRACTOR TO VERIFY EXISTING CONDITIONS)
GENERAL NOTES - SITE PLAN
REN.9-30-25
No. C-20117
A IFEO
NTRA
OLF
IT
C
S A
T
CEH
I CC
RAD
ENEI
L T
S
SCOTT R.COLS
NO
N
Title
Number Revision
Project No.Scale @ Arch E1Date
Project
Client
Key Plan
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in feet and inches unless noted
otherwise.
3. All dimensions shall be verified on site before proceeding
with the work.
4. Architect shall be notified in writing of any discrepancies.
5. Any areas indicated on this sheet are approximate and
indicative only.
6. Drawings and general provisions of the Contract,
including General and Supplementary Conditions and
Specification Sections, apply to this Work.
84 W. Santa Clara St., #200, San Jose, CA 95113, T 408.288.7833
A9A8
A7
A6
A5 A4
A2
A3
6 Apple Park Way Cupertino, CA 95014
APN: 316-06-061
A1
02/28/25 As indicated
01A-CP-1270
Overall Site Plan
3649-272-00
Apple Park Main
Campus Upgrades
APPLE INC.
1" = 60'-0"1 PROPOSED OVERALL SITE PLAN
SITE PLAN KEY
PROPERTY LINE
BUILDABLE ZONE PER CIVIL DRAWING
VEHICULAR PATHWAY
AREA OF WORK
VALLEY WATER SETBACK LINE
01
Rev. Date
MM/DD/YY
Reason For Issue Issued
By
00 11/12/24 MEP Upgrades - Planning Permit Set HGA
01 02/28/25 Planning Permit Rev HGA
01
01
25
AH 8-28-2525 of 59
DN
DN
DN
RAMP RAMPRAMPRAMP
EXISTING METAL FENCE TO REMAIN
1
A-CP-2611
1
A-CP-2613
RAMP
(D)(D)(D)(D)(D)(D)(D)
(D)
(E) LIGHT POST TO BE REMOVED
AND STORED FOR FUTURE REUSE,
TYP.
(E) ROAD CURB TO BE
DEMOLISHED
(E) LANDSCAPE TO BE REMOVED
FOR NEW CONSTRUCTION
(D)
EXISTING ROAD CURB AND FENCE TO
BE REMOVED TO ACCOMMODATE NEW
FENCE INSTALLATION
(E) (E)(E)(E)(E)(E)(E)
(E)(E)(E)(E)(E)(E)
(E)
(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)
(E)(E)(E)(E)(E)(E)
(E)(E)
(E)
(E) CONCRETE SLAB AND
RETAINING WALL TO BE REMOVED
TO ACCOMMODATE
UNDERGROUND CONDUIT ROUTING
EXISTING UTILITY YARD TO REMAIN
EXISTING UTILITY YARD PROPOSED UTILITY YARD UPGRADES
CE
N
T
R
A
L
U
T
I
L
I
T
Y
P
L
A
N
T
(
C
U
P
)
APPLE SOUTH PARKING STRUCTURE
EXISTING RETAINIING WALL
RAMP RAMPRAMPRAMPRAMP
EXISTING LANDSCAPEEXISTING ROAD CURB
CE
N
T
R
A
L
U
T
I
L
I
T
Y
P
L
A
N
T
(
C
U
P
)
APPLE SOUTH PARKING STRUCTURE
(E)(E)(E)(E)(E)(E)(E)
(E) (E)(E)(E)(E)(E)(E)
(E)(E)(E)(E)(E)(E)
(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)
(E)(E)(E)(E)(E)(E)
(E)(E)
(E)
(E)
(E)
(E)
1
A-CP-2614
RAMPRAMP
2
A-CP-2611
RAMP
RAMP RAMPRAMP
(N)(N) (N)(N) (N)(N)(N)(E) (E)(E)(E)(E)(E)(E)
(E)(E)(E)(E)(E)(E)
(E)
(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)(E)
(E)(E)(E)(E)(E)(E)
(E)(E)
(E)
(N)
(N)
PROPOSED RETAINING WALL
AROUND NEW UTILITY YARD
CONSTRUCT (N) ROAD CURB AND
INSTALL (N) NEW FENCE
(E) MANHOLE TO REMAIN,
SEE CIVIL FOR MORE INFORMATION
(E)
CE
N
T
R
A
L
U
T
I
L
I
T
Y
P
L
A
N
T
(
C
U
P
)
APPLE SOUTH PARKING STRUCTURE
EXISTING UTILITY YARD PROPOSED UTILITY YARD UPGRADES
PROPOSED UNDERGROUND CONDUIT PATHWAY
SEE ELECTRICAL, CIVIL, STRUCTURAL FOR ADDITIONAL INFORMATION.
PROVIDED UNDER SEPARATE PERMIT BLD-2024-2493
(N)(N)(N)
(N)
(N)(N)
PROVIDE PLANTING TO SCREEN FENCE
PLANT TYPES TO MATCH EXISTING ADJACENT
PLANTING
SEE CIVIL DRAWING C2.1 & C2.2 FOR EXISTING TREE LOCATIONS
MAINTAIN 6'-0" CLEAR PATHWAY IN EXISTING
LANDSCAPE FOR FIRE DEPARTMENT ACCESS
GENERATOR YARD
BATTERY YARD
20'-0" SCVWD SETBACK LINE
PROPERTY SETBACK
16'-4 1/16"
PROPERTY SETBACK
24'-11 7/8"
PR
O
P
E
R
T
Y
S
E
T
B
A
C
K
21
'
-
1
1
7
/
8
"
PR
O
P
E
R
T
Y
S
E
T
B
A
C
K
19
'
-
4
5
/
1
6
"
PR
O
P
E
R
T
Y
S
E
T
B
A
C
K
20
'
-
3
9
/
1
6
"
PR
O
P
E
R
T
Y
S
E
T
B
A
C
K
24
'
-
0
9
/
1
6
"
PROPERTY SETBACK
25'-9 1/4"
PROPERTY SETBACK
17'-0 1/8"
PROVIDE (N) SOUND ABSORBING
PANELS ON TOP OF RETAINING
WALL TO MITIGATE SOUND
TRANSMISSION OF EQUIPMENT
474'-0"
(N)
PLAN LEGEND
SEE A-0002 FOR ALL GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
(N) CONSTRUCTION
(E) CONSTRUCTION
TO REMAIN
(E) CONSTRUCTION
TO BE REMOVED
(N) CONCRETE
(E) LIGHT POST TO
REMAIN
(N) LIGHT POST TO
MATCH EXISTING
(E)
(N)
(D) EXISTING LIGHTING
POST TO BE REMOVED
AND STORED FOR
REUSE
(D)
SEE SHEET A-CP-6501 FOR REFERENCE
A. PLAN DIMENSIONS ARE FROM FACE OF WALL, UNLESS NOTED OTHERWISE. PLAN DIMENSIONS INDICATED AS
"HOLD" OR "CLEAR" DIMENSIONS ARE FROM FACE.
B. INSTALL WORK STRAIGHT, PLUMB, LEVEL, SQUARE, AND TRUE, IN PROPER ALIGNMENT.
C. WHERE NEW WORK ABUTS, ALIGNS OR ADJOINS EXISITING MATERIALS, MAKE SMOOTH AND EVEN
TRANSITION AND ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. FINISH NEW WORK TO MATCH
ADJACENT UNDISTURBED SURFACES, UNLESS NOTED OTHERWISE.
D. CLOSE AND PATCH HOLES AND OPENINGS IN EXISTING SLAB AND WALL, WHICH EXIST OR RESULT FROM
DEMOLITION OR ALTERATION WORK TO MATCH ADJACENT UNDISTURBED SURFACES.
E. SHEET NOTES AND KEYNOTES ARE APPLICABLE TO THIS SHEET ONLY.
F. MAXIMUM CROSS SLOPES ON ANY SIDEWALK OR RAMP SHALL NOT EXCEED 2%. ALL REQUIRED EGRESS
SHALL BE PROVIDED PER CALIFORNIA TITLE 24 ACCESSIBILITY REQUIREMENTS.
G. THE FINISH ON NEW CONCRETE SHALL MATCH EXISTING. GENERAL CONTRACTOR TO PROVIDE TEST PANELS
FOR VERIFICATION PRIOR TO CONCRETE POUR.
H. GRIND AND FINISH EXISTING SLAB SMOOTH WHERE BUTRESS WALLS HAVE BEEN REMOVED TO MATCH
EXISTING SURFACES TO REMAIN.
I. ADA SIGNAGE TO BE INSTALLED AT EXITS ONLY.
GENERAL NOTES - FLOOR PLAN
REN.9-30-25
No. C-20117
A IFEO
NTRA
OLF
IT
C
S A
T
CEH
I CC
RAD
ENEI
L T
S
SCOTT R.COLS
NO
N
Title
Number Revision
Project No.Scale @ Arch E1Date
Project
Client
Key Plan
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in feet and inches unless noted
otherwise.
3. All dimensions shall be verified on site before proceeding
with the work.
4. Architect shall be notified in writing of any discrepancies.
5. Any areas indicated on this sheet are approximate and
indicative only.
6. Drawings and general provisions of the Contract,
including General and Supplementary Conditions and
Specification Sections, apply to this Work.
84 W. Santa Clara St., #200, San Jose, CA 95113, T 408.288.7833
A9A8
A7
A6
A5 A4
A2
A3
6 Apple Park Way Cupertino, CA 95014
APN: 316-06-061
A1
02/28/25 As indicated
01A-CP-1271
Existing, Demo &
Proposed Site Plan
3649-272-00
Apple Park Main
Campus Upgrades
APPLE INC.
1" = 50'-0"2 DEMOLITION - UTILITY YARD
1" = 50'-0"1 EXISTING - UTILITY YARD
1" = 50'-0"3 PROPOSED - UTILITY YARD
BUILDABLE ZONE PER CIVIL DRAWING
ENLARGED PLAN KEY
PROPERTY LINE
AREA OF WORK
VALLEY WATER SETBACK LINE
01
01
Rev. Date
MM/DD/YY
Reason For Issue Issued
By
00 11/12/24 MEP Upgrades - Planning Permit Set HGA
01 02/28/25 Planning Permit Rev HGA
01
01
26
AH 8-28-2526 of 59
1
MEMORANDUM
DATE August 5, 2025
O Gian Martire, Senior Planner, City of Cupertino
ROM Florentina Craciun, Associate/Senior Environmental Planner
Theresa Wallace, AICP, Principal
SUBJECT Tenth Addendum to the Apple Campus 2 Project Final Environmental Impact Report
(EIR), State Clearinghouse No. 2011082055
This memorandum, prepared pursuant to the California Environmental Quality Act (CEQA), is the
Tenth Addendum to the certified Apple Campus 2 Project Final EIR (Final EIR, SCH # 2011082055).1
The project evaluated in this Addendum (modified project) would involve installation of three new
electric generators and six new batter storage units and associated infrastructure within the existing
utility yard at Apple Park.
This Tenth Addendum was prepared pursuant to CEQA Guidelines Section 15164 which states: “The
lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some
changes or additions are necessary, but none of the conditions described in Section 15162 calling for
preparation of a subsequent EIR have occurred.” Section 15162 specifies that “no subsequent EIR
shall be prepared for that project unless the lead agency determines … one or more of the
following”:
1. Substantial changes are proposed in the project which would require major revisions of the
previous EIR due to the involvement of new significant environmental effects or a substantial
increase in the severity of previously identified significant effects;
2. Substantial changes occur with respect to the circumstances under which the project is under-
taken which would require major revisions of the previous EIR due to the involvement of new
significant environmental effects or a substantial increase in the severity of previously identified
significant effects; or
3. New information of substantial importance, which was not known and could not have been
known with the exercise of reasonable diligence at the time the previous EIR was certified as
complete was adopted, shows any of the following:
(A) The project would have one or more significant effects not discussed in the previous EIR;
1 LSA Associates, Inc., 2013. Apple Campus 2 Project Final Environmental Impact Report. September.
27
AH 8-28-2527 of 59
2
(B) Significant effects previously examined would be substantially more severe than shown in
the previous EIR;
(C) Mitigation measures or alternatives previously found not to be feasible would in fact be
feasible and would substantially reduce one or more significant effects of the project, but
the project proponents decline to adopt the mitigation measure or alternative; or
(D) Mitigation measures or alternatives which are considerably different from those analyzed in
the previous EIR would substantially reduce one or more significant effects on the environ-
ment, but the project proponents decline to adopt the mitigation measure or alternative.
Pursuant to CEQA Guidelines Section 15164(e), the following describes the modified project and
briefly explains that no impacts would be associated with the proposed changes, and the reasons for
the City’s conclusion that changes to the modified project (and associated environmental effects) do
not meet the conditions described in Sections 15162 and 15163 calling for preparation of a
Subsequent EIR or a Supplement to an EIR.
APPROVED PROJECT
The Final EIR, which was certified on October 15, 2013, analyzed the environmental impacts
associated with the development of a new campus for Apple on a 176-acre site bordered generally
by East Homestead Road on the north; North Tantau Avenue on the east; Interstate 280 (I-280) and
The Hamptons apartments on the south; and North Wolfe Road on the west. The approved Apple
Campus 2 (now called Apple Park) project included demolition of all existing structures within the
project site and the construction of 3,420,000 square feet of office, research, and development uses;
245,000 square feet of auditorium, fitness center, and valet parking reception uses; 92,000 square
feet of utility plants; and parking and ancillary buildings.
Significant environmental impacts, and mitigation measures, were identified in the following topical
areas: Planning Policy; Land Use; Biological Resources; Cultural Resources; Geology, Soils, and
Seismicity; Hydrology and Water Quality; Hazards and Hazardous Materials; Transportation and
Circulation; Noise; Air Quality; and Public Services and Utilities.
PREVIOUS ADDENDUMS
Since certification of the EIR and approval of the project the following modifications were approved:
• The First Addendum to the EIR was adopted by the City on April 9, 2014, in connection with
the City’s approval of minor modifications to the dimensions, geometry and footprint of
several site buildings, a reduction of parking spaces, and the addition of a Security
Operations Center.2
2 LSA Associates, Inc., 2014. Addendum to the Apple Campus 2 Project Final Environmental Impact Report.
April 4.
28
AH 8-28-2528 of 59
3
• The Second Addendum to the EIR was adopted by the City in September 2014 in connection
with the City’s approval of minor modifications to the Corporate Auditorium, Corporate
Fitness Center, and Central Plant Equipment Yard.3
• The Third Addendum to the EIR was adopted by the City in November 2014 in connection
with the City’s approval of minor modifications to the Phase 2 North Tantau Avenue Sites C
and D portion of the project and included revisions to the configuration of buildings, the
placement of parking, and tree removal and landscaping.4
• The Fourth Addendum to the EIR was adopted by the City in July 2015 in connection with
the City’s approval of minor modifications to North Tantau Avenue Phase 1 Site A, including
the replacement of valet reception and parking uses with a visitor center/store and parking,
and increasing the number of parking spaces and moving most of the parking from a
structured building to a garage below the visitor center.5
• The Fifth Addendum to the EIR was adopted by the City in August 2015 and addressed
modifications to Phase 2 office buildings, a parking structure and a satellite plant.6
• The Sixth Addendum to the EIR was adopted by the City in April 2016 in connection with the
City’s approval of additional proposed modifications to the Apple Campus 2 Phase 2 North
Tantau Avenue Sites C and D portion of the project.7
• The Seventh Addendum to the EIR was adopted by the City in April 2016 and evaluated final
designs for ancillary buildings including a small maintenance shed, two security/reception
buildings, and two outdoor food stations associated with the Apple Campus 2 project. 8
• The Eighth Addendum to the EIR was adopted by the City in July 2018 and evaluated minor
changes to the approved development program for Phase 2 Site B.9
3 LSA Associates, Inc., 2014. Second Addendum to the Apple Campus 2 Project Final Environmental Impact
Report. September 15.
4 LSA Associates, Inc., 2014. Third Addendum to the Apple Campus 2 Project Final Environmental Impact
Report. November 4.
5 LSA Associates, Inc., 2015. Fourth Addendum to the Apple Campus 2 Project Final Environmental Impact
Report. July 2.
6 Chao, Gary, Assistant Director of Community Development and Ghosh, Piu, Senior Planner, City of
Cupertino. 2015. Staff Report: Director’s Minor Modification (DIR-2015-15) to allow modifications to a
previously approved office building, parking structure and satellite plant as part of Phase 2 of an office,
Research and Development Campus located at 10300 and 10435 N. Tantau Avenue. August 4.
7 LSA Associates, Inc., 2016. Sixth Addendum to the Apple Campus 2 Project Final Environmental Impact
Report. March 16. As revised per Community Development Department Edits on April 7, 2016.
8 LSA Associates, 2016. Seventh Addendum to the Apple Campus 2 Project Final Environmental Impact
Report. April 7.
9 LSA Associates, Inc. 2018. Eighth Addendum to the Apple Campus 2 Project Final Environmental Impact
Report. July 20.
29
AH 8-28-2529 of 59
4
• The Ninth Addendum to the EIR was adopted by the City in January 2023 and evaluated
minor modifications in the overall building square footage and excavation and grading totals
within the approved project.10
PROJECT DESCRIPTION AND EXISTING SETTING
The following describes the proposed minor changes to the approved development program for the
utility yard that was analyzed in the Final EIR, and as amended by the First through Ninth Addenda
and approved by the City.
Modified Project and Minor Modifications to The Approved Project
The modified project would reconfigure and upgrade the existing utility yard at Apple Park by
installing three new electric generators and six new battery storage units and associated
infrastructure, as shown in Figure 1, Site Plan. The existing utility yard consists of mechanical and
electrical infrastructure, including two generators located in the eastern portion of the yard. The
utility yard is situated southeast of the main parking structure, where it would remain. The modified
project would not expand the size of the campus and would not include any ground disturbance
outside of the construction area approved in the Final EIR. In addition, the modified project would
not result in an increase in the number of employees or parking spaces on campus.
The modified project would include the extension of existing fencing and expansion of the utility
yard to the east to allow for the installation of three new electric generators (Generator Yard), and
six battery storage units (Battery Yard). The Generator Yard would be located south of the Apple
South Parking Structure, as shown in Figure 2, Generator Yard Plans; while the Battery Yard would
be located southeast of the Apple South Parking Structure, directly east of the new Generator Yard,
as shown in Figure 3, Battery Plan. The new equipment would be located near the existing utility
yard in the southeastern corner of the Apple Park campus, bounded by I-280 to the south, the
existing parking structure to the north, and adjacent to the current utility yard infrastructure.
Existing generators would be retained.
Modified project implementation would also require the removal of nine parking spaces within the
existing Apple South Parking Structure to allow for new conduit routing. However, to avoid a
reduction in the overall parking supply, the project would include the construction of nine
replacement parking stalls northwest of the existing Central Utility Plant, as shown in Figure 4,
Parking Plan. All trees located along the southern boundary of the project site, adjacent to the
Generator and Battery Yards, would be protected in place. A new 13-foot retaining wall would be
constructed around the proposed Battery Yard to accommodate site grading requirements and
provide noise attenuation. Figure 5, Conceptual Renderings, shows the modified project, including
the proposed fencing and location.
The proposed systems would be used for emergency use only, such as in the event of a power
outage at Apple Park. During operation, the battery units would be used first, followed by the
10 LSA Associates, Inc. 2023. Ninth Addendum to the Apple Campus 2 Project Final Environmental Impact
Report. January 6.
30
AH 8-28-2530 of 59
5
generators. This internal redundancy system is designed to operate parallel to the existing PG&E
grid to enhance system resilience. The modified project would provide maximum extent practicable
redundancy upgrades aimed at improving the reliability of the mechanical and electrical
infrastructure serving Apple Park.
The existing and proposed generators are tested monthly for maintenance purposes, and yearly
total runtimes are consistent with the allowed limits of the Bay Area Air District (Air District) air
permit.
Project Construction
Modified project construction would occur over approximately 12 months. Project construction
would include site preparation and grading, followed by utility yard construction, equipment
installation, and startup and commissioning. Part of project implementation testing of the installed
equipment would occur as part of the last stage of construction. Construction activities would result
in approximately 3,000 cubic yards of cut material that would be hauled off site. All construction
staging would take place on the Apple Park campus and there would be no anticipated street
closures.
Construction is anticipated to begin in approximately August 2025 with the first phase consisting of
site preparation and grading. This work would utilize hydraulic hammers, excavators, skid steer
loaders, backhoes, etc., to cut soil down to street level (average 5 feet depth). Once rough grading is
complete, site conduit would be installed and backfilled. Phase two would begin with construction
of the utility yard which includes equipment pads, site concrete, and fencing. The final phase would
consist of equipment installation and the associated startup, testing, and commissioning with
completion targeted for the end of 2026.
31
AH 8-28-2531 of 59
2400120
FEET
SOURCE: HGA
I:\2025\20252355\G\Site_Plan.ai (6/2/2025)
FIGURE 1
Tenth Addendum to the Apple Campus 2 Project
Site Plan
32
AH 8-28-2532 of 59
16
’
-
4
7
/
8
”
34
’
-
6
1
/
2
”
61’-1”
9’
-
6
”
22
’
-
1
1
1
/
2
”
PROPOSED - WEST GENERATOR YARD
SOURCE: HGA
I:\2025\20252355\G\Generator_Plan.ai (6/2/2025)
FIGURE 2
Tenth Addendum to the Apple Campus 2 Project
Generator Yard Plan
33
AH 8-28-2533 of 59
48024
FEET
SOURCE: HGA
I:\2025\20252355\G\Battery_Plan.ai (6/2/2025)
FIGURE 3
Tenth Addendum to the Apple Campus 2 Project
Battery Plan
34
AH 8-28-2534 of 59
LEVEL 02 - EXISTING PARKING PLAN LEVEL 03 - EXISTING PARKING PLAN ROOF LEVEL - EXISTING PARKING PLAN
LEVEL 01 - EXISTING PARKING PLAN
LEVEL 01 - PROPOSED PARKING PLAN
2000100
FEET
SOURCE: HGA
I:\2025\20252355\G\Parking_Plan.ai (6/2/2025)
FIGURE 4
Tenth Addendum to the Apple Campus 2 Project
Parking Plan
35
AH 8-28-2535 of 59
BATTERY YARD - REMOVABLE FENCE PANELS INSTALLED
GENERATOR YARD - BIRDEYE VIEW
BATTERY YARD - REMOVABLE FENCE PANELS REMOVED
SOURCE: HGA
I:\2025\20252355\G\Concepts.ai (6/2/2025)
FIGURE 5
Tenth Addendum to the Apple Campus 2 Project
Conceptual Rendering
36
AH 8-28-2536 of 59
11
COMPARISON TO THE CONDITIONS LISTED IN CEQA GUIDELINES SECTIONS 15162 AND
15163
The following discussion summarizes the reasons that a Subsequent EIR or Supplement to the EIR,
pursuant to CEQA Guidelines Sections 15162 and 15163, is not required to evaluate the
environmental effects of the minor design and construction modifications to the project evaluated
in the Final EIR.
Substantial Changes to the Project
As discussed above, the proposed modifications to the utility yard would include the installation of a
new generator and battery yard, that would occur over approximately 12 months and would require
the off hauling of 3,000 cubic yards of soil. The modified project would reconfigure the existing
utility yard by installing three new electric generators, six new battery storage units, and associated
infrastructure, including extension of existing fencing and construction of a retaining wall to
accommodate site grading. While the project would require removal of nine parking spaces within
the Apple South Parking Structure to allow for new conduit routing, these spaces would be replaced
elsewhere on campus and the project would not result in a net loss in parking. Additionally, the
proposed modifications would not expand the campus footprint or increase the number of
employees or parking spaces.
Because the modified project would result in additional excavation, additional construction activity,
and increased noise beyond what was originally analyzed in the Final EIR as amended and approved
by the City, the only environmental issues related to these changes would be potential impacts to air
quality, greenhouse gas emissions, energy, and noise associated with the additional excavation,
construction, and operation. Based on the scope of the modified project changes, the modified
project would not result to any changes to the other environmental resources covered in the Final
EIR, as it would not change these topics are evaluated below. Although the modified project involves
additional excavation, all work would occur within previously disturbed and studied areas. As such,
no new impacts to archaeological, tribal cultural, or geological resources would occur, and no other
environmental categories would be affected beyond those identified.
Air Quality
The Final EIR found that construction emissions would not exceed the Air District’s thresholds with
incorporation of Mitigation Measure AIR-1, which requires implementation of the Air District’s Basic
Best Management Practices for Construction-Related Fugitive Dust Emissions (Basic BMPs) (e.g.,
watering exposed surfaces, covering haul trucks, limiting idling) and use of low-emission construction
equipment. Additionally, the Final EIR determined that operational nitrogen oxide (NOₓ), a group of
reactive gases including nitric oxide (NO) and nitrogen dioxide (NO₂) that are primarily produced
during fuel combustion, would exceed the Air District’s thresholds of significance, primarily due to
vehicle trips and energy use, and determined that even with implementation of Mitigation Measure
AIR-2, which requires expanding the Transportation Demand Management (TDM) program to reduce
vehicle trips, operational air quality impacts would be significant and unavoidable. The Final EIR also
concluded that with implementation of Mitigation Measure AIR-4, the approved project would not
37
AH 8-28-2537 of 59
12
expose sensitive receptors to substantial pollutant concentrations or result in significant odor
impacts. Although Mitigation Measures AIR-1 and AIR-2 remain applicable to control construction
emissions and operational vehicle trips, Mitigation Measure AIR-3, which requires implementation of
AIR-1 and AIR-2 to address cumulative impacts, is not applicable to the modified project as it would
not result in new or more severe cumulative air quality impacts.
Additionally, the Final EIR evaluated the project’s consistency with the 2010 Clean Air Plan. Since
certification of the Final EIR, the Air District adopted the 2017 Clean Air Plan and updated its CEQA
Air Quality Guidelines. The 2017 Clean Air Plan outlines regional strategies to reduce emissions of
criteria air pollutants and greenhouse gases and to support the Bay Area’s transition to a post-carbon
economy.
Similar to the approved project, the modified project is located within the San Francisco Bay Area Air
Basin and is regulated by the Air District. At the time the Final EIR was certified, the region was
designated as non-attainment for ozone and particulate matter. Ambient air quality conditions in the
vicinity of the project site have remained generally unchanged since that time, and no new sensitive
receptors would be introduced by the modified project. Additionally, the modified project would
involve short-term construction activities within the previously developed utility yard, including site
preparation and grading, followed by utility yard construction, equipment installation, and startup
and commissioning. Construction activities would occur over approximately 12 months and result in
approximately 3,000 cubic yards of cut material that would be hauled off site. All construction staging
would take place on the Apple Park campus and there would be no anticipated street closures.
Given the small scale and duration of proposed activity compared to the approved project, and that
construction emissions would be temporary and localized the modified project would not result in
construction emissions above those previously analyzed. However, to reduce potential construction
emissions of the modified project, Mitigation Measure AIR-1 would remain applicable.
Once operational, the new backup systems would not introduce any combustion-based emissions as
the battery units would be charged using existing on-site renewable energy, and the electric
generators would be used only during power outages or for limited maintenance testing. Moreover,
the modified project would not increase the number of employees, vehicle trips, or operational
activities. As such the modified project would not result in operational emissions above those
analyzed in the Final EIR and the modified project would not conflict with the goals of the 2017 Clean
Air Plan.
The proposed modifications would not result in new or more severe air quality impacts than
previously identified in the Final EIR.
Energy
The Final EIR did not include a separate, detailed analysis of energy impacts, as this topic was
addressed in the Greenhouse Gas Emissions and Sustainability section of the Final EIR. The Final EIR
found that the approved project’s energy demand would be met through a combination of on-site
renewable energy generation, including photovoltaic systems and fuel cells and grid-supplied
renewable energy obtained through California’s Direct Access Program and the purchase of
38
AH 8-28-2538 of 59
13
renewable energy credits. Additionally, the Final EIR determined that the approved project would be
required to comply with the California Energy Code (Title 24, Part 6) and the California Green
Building Standards Code (CALGreen, Title 24, Part 11).
According to the Final EIR, energy would be supplied to the approved project via the approximately
50,000-square-foot Central Plant, located adjacent to the Main Parking Structure, along with
Satellite Plant North and Satellite Plant South, which would house similar mechanical and electrical
systems. At full buildout, the approved project was anticipated to consume up to 142,000,000
kilowatt-hours (kWh) annually. Of this energy demand, approximately 15,000,000 kWh (11 percent)
would be generated by on-site photovoltaic systems; 71,000,000 kWh (50 percent) would be
generated by on-site fuel cells; and 56,000,000 kWh (39 percent) would be obtained through Direct
Access sources, i.e., renewable energy from third-party providers. 11 The Final EIR concluded that the
approved project would meet remaining energy needs through a combination of on-site
photovoltaics, fuel cells using natural gas, and participation in California’s Direct Access Program.
The modified project would not alter the approved project’s overall energy demand or require
changes to its primary energy infrastructure. Instead, the proposed improvements would
reconfigure and upgrade the existing utility yard at Apple Park through the installation of three new
electric generators and six battery storage units, along with associated infrastructure. These systems
would operate in parallel with the PG&E grid and be used only during emergency power outages or
for routine maintenance testing. Battery units would be charged using the project’s existing on-site
renewable energy sources, while the generators would serve solely as secondary backup systems.
Additionally, the modified project would not include any increase in building square footage,
employees, or vehicle trips.
Because the modified project would not expand energy demand and would enhance system
reliability and emergency preparedness, the modified project would remain consistent with the
energy efficiency and sustainability commitments of the approved project. The modified project
would continue to comply with all applicable regulatory requirements, including the current
California Energy Code and CALGreen standards. Therefore, the modified project would not result in
wasteful, inefficient, or unnecessary energy use and would not result in new or more severe energy
impacts than those identified in the Final EIR. No new mitigation measures are required.
Greenhouse Gas Emissions
The Final EIR included a quantitative analysis of greenhouse gas (GHG) emissions associated with the
approved project and found that with the implementation of the required conditions of approval,
the approved project’s GHG emissions would not have a significant impact on the environment.
At the time the Final EIR was certified in 2013, the evaluation of GHG emissions was guided by CEQA
Guidelines Section 15064.4 and the Air District 2011 CEQA Air Quality Guidelines. Since certification
11 The Direct Access Program in California allows commercial and industrial customers to purchase
electricity from a competitive Energy Service Provider, rather than from their local utility (in Apple’s case,
Pacific Gas and Electric Company (PG&E).
39
AH 8-28-2539 of 59
14
of the Final EIR, the Air District adopted the 2022 CEQA Guidelines 12 which identify updated GHG
significance thresholds that evaluate a project based on its effect on California’s efforts to meet the
State’s long-term climate goals. According to the Air District’s 2022 CEQA Guidelines, new land use
development projects need to incorporate project design elements related to natural gas, energy,
vehicle miles traveled, and electric vehicle infrastructure to contribute their “fair share” toward
implementation of the goal of carbon neutrality by 2045. If a project is designed and built to
incorporate the identified project design elements, then it would contribute its portion of what is
necessary to achieve California’s long-term climate goals—its “fair share”—and an agency reviewing
the project under CEQA can conclude that the project will not make a cumulatively considerable
contribution to global climate change. The document concludes that if a project does not
incorporate these design elements, it should be found to result in a significant climate impact
because it would hinder California’s efforts to address climate change.
The modified project would involve minor modifications to the previously approved utility yard
within the Apple Park campus, including the installation of three new electric generators and six
new battery storage units, along with associated infrastructure improvements. Given the small scale
and duration of activity compared to the approved project, construction-related GHG emissions
would remain less than significant. In addition, once operational, the new backup systems would not
introduce any combustion-based emissions as the battery units would be charged using existing on-
site renewable energy, and the electric generators would be used only during power outages or for
limited maintenance testing. The proposed improvements would reconfigure and upgrade the
existing utility yard as well as enhancing on-site energy resilience and ensuring uninterrupted
operations in the event of power outages. Furthermore, the modified project would not increase
the number of employees, vehicle trips, or operational activities.
Additionally, the Final EIR noted that the approved project was certified under Assembly Bill 900 (AB
900), which allows qualifying projects that demonstrate environmental leadership, such as net zero
GHG emissions, to benefit from streamlined judicial review under CEQA. To pursue this designation,
the approved project submitted an AB 900 application to the Governor’s Office on April 19, 2012.
CARB conducted an independent analysis of the approved project’s GHG emissions and, on June 14,
2012, issued Executive Order LP-12-002. This Order confirmed that the project would not result in
any additional net GHG emissions, satisfying AB 900 requirements. As part of the AB 900 process,
Apple and the City entered into a letter agreement through which Apple agreed that all measures
required for AB 900 certification “shall be conditions of approval, and those conditions will be fully
enforceable by the City of Cupertino.” Implementation of conditions of approval would ensure that
all energy used on the site would be derived from renewable sources, whether generated on-site,
purchased via Direct Access transactions with an Energy Service Provider, or purchased renewable
energy credits from new sources that are certified Green-e Energy providers. Conditions of approval
would also require Apple to annually submit documentation to the City verifying that all energy
provided to the site is derived from renewable sources of electricity such as wind, solar, and landfill
gas-to-power projects. In addition, this documentation would include annual verification that all fuel
cell and boiler gas is derived from directed biogas. The modified project would operate in
12 Bay Area Air Quality Management District (BAAQMD). 2023. California Environmental Quality Act Air
Quality Guidelines. April.
40
AH 8-28-2540 of 59
15
compliance with the renewable energy sourcing requirements, and would not increase operational
emissions, energy use, or GHG output, as the proposed generators and batteries achieve higher
energy efficiency standards than the one originally installed. Therefore, the modified project would
remain fully consistent with the project’s AB 900 certification with the conditions of approval as
outlined above.
Because the modified project is limited in scale, involves no increase in operational intensity,
supports the continued use and reliability of on-site renewable energy systems, and would operate
in compliance with the renewable energy sourcing requirements, it would not result in any new or
more severe impacts related to GHG emissions compared to what was disclosed in the Final EIR.
Accordingly, the modified project would not result in new or substantially more severe GHG
impacts, and no new mitigation measures are required.
Noise
To address potential noise impacts associated with the modified project, two technical evaluations
were prepared by Salter Inc. as a consultant to Apple: (1) the Megapack (Battery) Unit Noise
Memorandum 13 and (2) the Backup Electrical Generators Memorandum.14 Additionally, LSA
completed a peer-review of the two draft technical memoranda to determine conformance with
standard noise and vibration methodologies.15 The memoranda were revised per the peer review
comments and in a manner consistent with CEQA requirements. The final reports are included in
Appendix A and the conclusions of each evaluation are summarized below:
Battery Unit Noise Memorandum
• The proposed 12 new Tesla Megapack battery units would be located at the southeast
corner of the Apple Park campus with I-280 to the south, a parking structure in the north,
existing equipment to the west, and a culvert/canal to the east. Across I-280, natural
shielding and terrain reduce noise to 55 dBA, meeting the City nighttime noise limit; while
freeway traffic noise is louder than the battery noise in this area.
• The proposed 13-foot retaining wall/noise barrier, approximately 3 feet taller than the
Megapack units and solid from top to bottom, would be designed to reduce equipment
noise to 55 dBA at the property line, meeting both daytime and nighttime City noise limits.
• Residences located 850 to 1,900 feet away would experience noise levels between 35 dBA
and 40 dBA, which is below the 50 dBA nighttime limit.
13 Salter, Inc., 2024. Apple Park (AC2) Utility Yard – Megapack Units – Noise Study and City Noise Limits. July
21.
14 Salter Inc., 2024. Apple Park (AC2) Utility Yard – Backup Electrical Generators – Noise Study and City Noise
Limits. July 21.
15 LSA Associates, Inc. 2025. Peer review of the technical noise memoranda for the Apple Park (AC2) Utility
Yard Project. August 5.
41
AH 8-28-2541 of 59
16
• Sound reflections and shielding from nearby buildings, terrain, and the proposed noise
barrier are expected to provide 5 to 15 dBA of additional noise reduction, based on standard
calculation methods and site conditions.
Backup Electrical Generators Noise Memorandum
• The proposed new generators would be provided with factory sound attenuating enclosures
to reduce radiated noise. In addition, the new generators would be 500 feet southeast of
the existing generators, which is farther away from residences as compared to the existing
generators. These new generators would also be located farther away from other
commercial and residential properties and would be generally shielded by terrain and
buildings.
• Noise from all five generators (two existing and three new), if operated simultaneously,
would not exceed the City’s daytime noise limit of 65 dBA at all nearby property lines. In
addition, the new generators would be quieter than the existing two generators and located
farther away from existing residences.
Because the modified project is limited in scale, involves no increase in operational intensity, and it
would include the installation of equipment rated to be quieter than existing generators and
batteries, it would not result in any new or more severe impacts related to noise impacts compared
to what was disclosed in the Final EIR. However, as identified in the Final EIR, Mitigation Measure
NOI-1, which requires the installation of temporary sound walls, adherence to restricted
construction hours, use of properly muffled equipment, strategic placement of noisy machinery, and
designation of a noise liaison, would reduce any potential construction-related noise impacts near
sensitive receptors to less-than-significant levels. In addition, compliance with the City’s noise
ordinance, which limits noise levels to 65 dBA during daytime and 55 dBA at night for nonresidential
properties, and 60 dBA during daytime and 50 dBA at night for residential properties, would further
ensure that noise impacts remain within acceptable thresholds. Accordingly, the modified project
would not result in new or substantially more severe noise impacts, and no new mitigation
measures are required.
Summary
As discussed above, the minor modifications to the project would not result in new significant
environmental impacts beyond those identified in the certified Final EIR. These changes would not
substantially increase the severity of any previously identified impacts and would not require major
revisions to the Final EIR. The proposed modifications are consistent with the type and scale of
infrastructure improvements evaluated in the Final EIR, including utility yard development,
emergency power systems, and site grading. As such, the proposed changes represent minor
refinements to the approved Final EIR and do not constitute substantial changes to the project. An
Addendum is therefore the appropriate document to address these modifications, and preparation
of a Subsequent or Supplemental EIR is not required under CEQA Guidelines Sections 15162 and
15163.
42
AH 8-28-2542 of 59
17
Substantial Changes in Circumstances
Construction of the Apple Campus 2 Project has been substantially completed, with the majority of
the site already in operation. The proposed modifications to the utility yard and the installation of
new equipment would not alter the overall development footprint, land use, or intensity of use
analyzed in the Final EIR. Environmental conditions in and around the project site have not changed
such that implementation of the proposed minor modifications to the project would result in new
significant environmental effects or a substantial increase in the severity of environmental effects
identified in the Final EIR, and thus major revisions to the Final EIR are not required due to
substantial changes in circumstances.
New Information
No new information of substantial importance, which was not known and could not have been
known when the Final EIR was certified, has been identified to show that the proposed minor design
modifications to the project would be expected to result in: 1) new significant environmental effects
not identified in the Final EIR; 2) substantially more severe environmental effects than shown in the
Final EIR; 3) mitigation measures or alternatives previously determined to be infeasible would in fact
be feasible and would substantially reduce one or more significant effects of the project, but the
project sponsor declines to adopt the mitigation measure or alternative; or 4) mitigation measures
or alternatives that are considerably different from those identified in the Final EIR would substan-
tially reduce one or more significant effects of the project, but the project sponsor declines to adopt
the mitigation measure or alternative. In addition, the proposed minor design modifications to the
project would require no new mitigation measures because no new or substantially more severe
impacts are expected beyond those identified in the Final EIR.
Existing regulations (including City of Cupertino General Plan policies and Zoning Ordinance
regulations) and mitigation measures adopted and made conditions of project approval would
continue to apply.
CONCLUSION
The proposed minor modifications to the Apple Campus 2 Project described in this Tenth Addendum
would not require major revisions to the Final EIR, as amended by the First through Ninth Addenda,
due to new or substantially increased significant environmental effects. There have been no
substantial changes with respect to the circumstances under which these minor modifications would
be undertaken that would require major revisions of the Final EIR due to new or substantially
increased significant environmental effects, and there has been no discovery of new information of
substantial importance that would trigger or require major revisions to the Final EIR due to new or
substantially increased significant environmental effects. Therefore, no subsequent or supplemental
EIR is required prior to approval of the modified project, as described in this Tenth Addendum.
43
AH 8-28-2543 of 59
18
44
AH 8-28-2544 of 59
19
REFERENCES
Bay Area Air District, 2017. Bay Area 2017 Clean Air Plan. April 19.
Bay Area Air District. 2023. California Environmental Quality Act Air Quality Guidelines. April.
Decker, J. 2024. EEG Noise Study: City 23-0491 Apple Park 1. December.
Salter Inc. 2024. Apple Park (AC2) Utility Yard Megapack Units – Noise Study and City Noise Limits
(Project No. 23-0491). November 6.
Salter Inc. 2024. Apple Park (AC2) Utility Yard Backup Electrical Generators – Noise Study and City
Noise Limits (Project No. 23-0491). December 10.
City of Cupertino. 2024. Cupertino General Plan: Community Vision 2015–2040. May 14.
LSA Associates, Inc. 2013. Apple Campus 2 Project EIR. State Clearing House No. 2011082055. June.
LSA Associates, Inc. 2025. Peer review of the technical noise memoranda for the Apple Park (AC2)
Utility Yard Project. June 25.
45
AH 8-28-2545 of 59
20
This page intentionally left blank
46
AH 8-28-2546 of 59
21
APPENDIX A- NOISE MEMORANDUM AND NOISE PEER REVIEW
47
AH 8-28-2547 of 59
MEMORANDUM
DATE: 21 July 2025
NAME: COMPANY: EMAIL:
Thorsten Ludewig Apple Inc. tludewig@apple.com
FROM: Jeremy Decker, PE
SUBJECT: Apple Park (AC2) Utility Yard
Backup Electrical Generators – Noise Study and City Noise Limits
PROJECT: 23-0491
This memo summarizes our noise study of the proposal to add three new generators to the utility yard
near where two existing generators are now located. The new equipment will be located at the southeast
corner of the Apple Park campus with I-280 to the south, a parking structure the north, and alongside
existing equipment in the utility yard. These units would be located quite distant from other commercial
and residential properties and generally shielded by terrain and buildings.
SUMMARY
1. We understand that routine daytime testing of backup generators is subject to the noise limits of the
Cupertino Municipal Code. The Noise Ordinance lists a daytime property line noise limit of 65 dBA at
neighboring non-residential property.1 See additional detail in the Appendix.
2. We understand that the generators are generally tested in succession. Nonetheless, we find that
noise from all five generators (two existing and three new generators), if ever operated
simultaneously, would be expected to meet the City noise limits at all nearby properties (see Table 1
below). We also note that the new generators are quieter than the existing two generators and
located even farther from residences.
1 “Daytime” means the period from 7:00 a.m. to 8:00 p.m. on weekdays, and the period from 9:00 a.m. to 6:00 p.m. on
weekends. “Nighttime” means periods of weekdays from 8:00 p.m. to 7:00 a.m., and periods on weekends from 6:00 p.m.
to 9:00 a.m. For more detail, see Cupertino Municipal Code Chapter 10.48 Community Noise Control.
48
AH 8-28-2548 of 59
Apple Park Generators
21 July 2025
Noise Study
Page 2
NEW GENERATORS
The proposed project includes three new generators to be located approximately 500 feet southeast of
the existing generators (as shown in Figures 1 and 2 below). The new generators will be provided with
factory sound attenuating enclosures to reduce radiated noise.
Figure 1: Area of Utility Yard with Generators, Southwest of Parking Garage.
Figure 2: Location of Generators in Utility Yard.
49
AH 8-28-2549 of 59
Apple Park Generators
21 July 2025
Noise Study
Page 3
ANALYSIS RESULTS
The summary of our analysis is provided in Table 1 below. All calculated levels would meet the applicable
City daytime noise limit (referenced in the Appendix). The calculations are based on noise measurements
of the two existing generators and sound data provided by the new generator manufacturer. Our analysis
also accounts for acoustical shielding provided by buildings and terrain. We noted that the proposed new
generators are rated to be quieter than the existing units. In addition, the new generators will be even
farther away from residences as compared to the existing generators.
Table 1: Generator Noise Analysis Summary
Location One Generator All Five
Generators
Nearest corner of Residential Property to Northwest 45 to 54 dBA 60 dBA
Nearest edge of Tantau 09 (TA09) office property to the southeast 40 to 50 dBA 56 dBA
Commercial property line to the southwest (across Interstate 280) 51 to 61 dBA 65 dBA
Distant Santa Clara residences beyond Tantau Ave to the east 30 to 40 dBA 45 dBA
Our calculations are based on the following:
● Source sound data based on our on-site measurements of existing generators and sound data
provided by the generator manufacturer. Each new unit is to be rated to generate up to 75 dBA at a
distance of 7 meters.
● Sound propagation based on the industry standard that sound attenuates at 6 dB per doubling of
distance from the source.
● We accounted for sound reflections from large nearby surfaces (such as building faces) and acoustical
shielding (attenuation) from terrain and intervening buildings, which are expected to provide
between 5 and 10 decibels of noise reduction (based on industry standard calculation methods and
our experience).
* * *
Please let us know if you have any questions.
50
AH 8-28-2550 of 59
Apple Park Generators
21 July 2025
Noise Study
Page 4
APPENDIX A: CITY NOISE LIMITS
Cupertino
The Cupertino Municipal Code states the following:
10.48.040 Daytime and Nighttime Maximum Noise Levels. Individual noise sources, or the combination of
a group of noise sources located on the same property, shall not produce a noise level exceeding those
specified on property zoned as follows, unless specifically provided in another section of this chapter:
Land Use at
Point of Origin
Maximum Noise Level at Complaint Site of Receiving Property
Nighttime Daytime
Residential 50 dBA 60 dBA
Nonresidential 55 dBA 65 dBA
Santa Clara
For reference, we are also listing the Santa Clara noise limits as distant single-family residences to the far
east are located in Santa Clara. The Santa Clara Municipal Code states the following:
9.10.040 Noise or Sound Regulation: It shall be unlawful for any person to operate or cause to allow to be
operated, any fixed source of disturbing, excessive or offensive sound or noise on property owned, leased,
occupied or otherwise controlled by such person, such that the sound or noise originating from that source
causes the sound or noise level on any other property to exceed the maximum noise or sound levels which
are set forth in Schedule A, as follows:
Schedule A - Exterior Sound or Noise Limits [excerpt]
Receiving Zone
(Zoning Category) Time Period Noise Level
(dBA)
Category 1 - Single-
family and duplex
residential (R1, R2)
Commencing at 7:00am and ending
at 10:00pm that evening 55
Commencing at 10:00pm and ending
at 7:00am the following morning 50
51
AH 8-28-2551 of 59
MEMORANDUM
DATE: 21 July 2025
NAME: COMPANY: EMAIL:
Thorsten Ludewig Apple Inc. tludewig@apple.com
FROM: Jeremy Decker, PE
SUBJECT: Apple Park (AC2) Utility Yard
Megapack Units – Noise Study and City Noise Limits
PROJECT: 23-0491
This memo summarizes our noise study for the proposed Tesla Megapack battery units and associated
noise reductions measures, as needed. The new equipment will be located at the southeast corner of the
Apple Park campus with I-280 to the south, a parking structure the north, existing equipment to the west,
and a culvert/canal to the east. These units would be located near another Apple property, but they will
be quite distant from other commercial and residential properties and shielded by terrain and buildings.
SUMMARY
1. The Cupertino City Municipal Code noise limits are 65 dBA during daytime hours and 55 dBA during
nighttime hours at neighboring nonresidential property.1 See additional detail in Appendix A.
2. Conservatively assuming the scenario of all 12 battery units operating at full duty-cycle continuously
through the day and night, we calculated that the equipment noise would be expected to meet the
City noise limits at all nearby properties (see Table 1 below). A noise barrier wall at the east side of
the equipment is to be used to reduce noise transmitted in that direction.
BACKGROUND
The project will include a section of the utility yard just southeast of the parking garage that will house
twelve (12) Tesla Megapack battery units (see rendering below, Figure 1). The primary noise generators
are cooling fans located at the top of the housing. The data received from the vendor indicates that each
Megapack battery unit could generate noise between 63 and 71 dBA at a distance of 10 meters. They also
1 “Daytime” means the period from 7:00 a.m. to 8:00 p.m. on weekdays, and the period from 9:00 a.m. to 6:00 p.m. on
weekends. “Nighttime” means periods of weekdays from 8:00 p.m. to 7:00 a.m., and periods on weekends from 6:00 p.m.
to 9:00 a.m. For more detail, see Cupertino Municipal Code Chapter 10.48 Community Noise Control.
52
AH 8-28-2552 of 59
Apple Park Battery Units
21 July 2025
Noise Study
Page 2
indicated that noise could be 15 dB quieter at minimum duty cycle operation. However, based on
coordination with you and the Tesla representative, we understand that the cooling fans could operate at
100% duty cycle at daytime and nighttime hours under certain conditions. Thus, our analysis
conservatively focuses on accommodating the maximum operating condition with all twelve Megapack
units operating simultaneously, all with fans running at full speed.
Figure 1: Rendering of battery equipment area
The project equipment area and nearest property boundary (to the east) is shown in Figure 2 below.
Figure 2. Nearest property boundary to the east.
53
AH 8-28-2553 of 59
Apple Park Battery Units
21 July 2025
Noise Study
Page 3
ANALYSIS RESULTS
The summary of our analysis is provided in Table 1 below. All calculated levels would meet the applicable
City noise limits.
1. Near the site, to the east, is the Apple TA09 property line, approximately 110 feet away. With the
proposed 13 foot-tall noise barrier along the east side of the project area, we expect equipment noise
to be reduced to 55 dBA and meet both the daytime and nighttime City noise limits at the TA09
property. For context, this noise level is expected to be in-line with the quietest typical Interstate 280
traffic noise that occurs in the middle of the night and notably quieter than daytime traffic noise (for
more information on ambient noise, see Appendix B).
2. Across Interstate 280, to the southwest, with natural shielding from the equipment and terrain, we
calculate that the Megapack noise would be reduced to 55 dBA, meeting the City nighttime noise
limit. We also note that the freeway traffic noise is expected to be louder than the Megapack noise at
the south side of the freeway.
3. Distant residences towards the northwest of the site are at least 1,900 feet away and on the other
side of the Apple parking garages. Residences to the east are located approximately 850 feet away
and on the other side of the 2-story Tantau buildings. The Megapack noise is calculated to be 35 dBA
to 40 dBA or quieter at those residences, well below the City noise limits. No further reduction is
needed.
Table 1: Battery Equipment Noise Analysis Summary
Neighboring Location Calculated Equipment
Noise Level
Nearest edge of Tantau 09 (TA09) office property to
the southeast (110 feet away) 55 dBA
Commercial property line to the southwest (across
Interstate 280, 350 feet away) 55 dBA
Distant Santa Clara residences beyond Tantau Ave to
the east (850 feet away) 40 dBA
Nearest corner of Residential Property to northwest
(1,900 feet away) 35 dBA
Our calculations are based on the following:
● Source sound data provided by the equipment manufacturer. Each unit is rated to generate between
63 and 71 dBA (depending on direction) at a distance of 10 meters.
● Sound propagation based on the industry standard that sound attenuates at 6 dB per doubling of
distance from the source.
54
AH 8-28-2554 of 59
Apple Park Battery Units
21 July 2025
Noise Study
Page 4
● We accounted for sound reflections from large nearby surfaces (such as building faces) and acoustical
shielding (attenuation) from terrain and intervening structures, such as a sound barrier wall and
buildings, which are expected to provide between 5 and 15 decibels of noise reduction (based on
industry standard calculation methods and our experience).
Proposed Noise Barrier Details
The recommended extent of the noise barrier is highlighted in red in the plan excerpt below (Figure 3).
Figure 3. Recommended extent of noise barrier wall.
Notes on noise barrier requirements and materials are also provided below. Based on our review of the
latest plans, the proposed noise barrier design aligns with these recommendations.
1. We recommend that the noise barrier be at least 13 feet high, approximately 3 feet taller than the
Megapack units.
2. The barrier should be solid from top to bottom, have no gaps between panels or at the
ground/footing.
3. The barrier should have a minimum surface weight of 3 psf (per square foot) if building the wall from
construction materials, such as CMU block, precast concrete panels, or a framed wall with solid
sheathing.
55
AH 8-28-2555 of 59
Apple Park Battery Units
21 July 2025
Noise Study
Page 5
4. In addition, the “interior” face of the noise barrier screen that faces the equipment should be sound
absorbing. This can typically be achieved using minimum 2-inch insulation behind a perforated metal
sheet (minimum 20% open area) or a similar acoustical treatment that is adequately durable for
outdoor use.
5. Alternatively, the solid materials and sound absorbing surface could also be provided by a
prefabricated noise barrier system, such as the examples listed below. In this case, the selected
system should have a minimum STC2 rating of 28 (sound reduction) and a minimum NRC3 rating of
0.85 (at the sound absorbing face).
o AIL Sound Wall – Model Silent Protector
https://www.ailsoundwalls.com/product/silent-protector-absorptive/
o Koch Finishing Systems – Acoustical Noise Barriers
https://kochllc.com/solutions/system-components/acoustical-solutions/acoustical-noise-barriers
o Sound Fighter Systems – Model SonaGuard
https://www.soundfighter.com/products/fiberglass-wall-panels/
o Kinetics Noise Control – Model V-Stack or Model SL
https://www.noisebarriers.com/barrier-walls.html
* * *
Please let us know if you have any questions.
2 STC (Sound Transmission Class) – A single-number rating defined in ASTM E90 that quantifies the airborne sound insulating
performance of a partition under laboratory conditions. Increasing STC ratings correspond to improved sound insulation.
3 NRC (Noise Reduction Coefficient) – A single-number rating defined in ASTM C423 that quantifies the sound absorbing
performance of a material. NRC is calculated by averaging the material’s octave-band sound absorption coefficients in the
speech frequency range – i.e., at 250, 500, 1000, and 2000 hertz. An NRC of 1.00 represents 100% absorption (no sound
reflections). An updated version of the NRC is SAA (sound absorption average).
56
AH 8-28-2556 of 59
Apple Park Battery Units
21 July 2025
Noise Study
Page 6
APPENDIX A: CITY NOISE LIMITS
Cupertino
The Cupertino Municipal Code states the following:
10.48.040 Daytime and Nighttime Maximum Noise Levels. Individual noise sources, or the combination of
a group of noise sources located on the same property, shall not produce a noise level exceeding those
specified on property zoned as follows, unless specifically provided in another section of this chapter:
Land Use at
Point of Origin
Maximum Noise Level at Complaint Site of Receiving Property
Nighttime Daytime
Residential 50 dBA 60 dBA
Nonresidential 55 dBA 65 dBA
Santa Clara
For reference, we are also listing the Santa Clara noise limits as distant single-family residences to the far
east are located in Santa Clara. The Santa Clara Municipal Code states the following:
9.10.040 Noise or Sound Regulation: It shall be unlawful for any person to operate or cause to allow to be
operated, any fixed source of disturbing, excessive or offensive sound or noise on property owned, leased,
occupied or otherwise controlled by such person, such that the sound or noise originating from that source
causes the sound or noise level on any other property to exceed the maximum noise or sound levels which
are set forth in Schedule A, as follows:
Schedule A - Exterior Sound or Noise Limits [excerpt]
Receiving Zone
(Zoning Category) Time Period Noise Level
(dBA)
Category 1 - Single-
family and duplex
residential (R1, R2)
Commencing at 7:00am and ending
at 10:00pm that evening 55
Commencing at 10:00pm and ending
at 7:00am the following morning 50
57
AH 8-28-2557 of 59
Apple Park Battery Units
21 July 2025
Noise Study
Page 7
APPENDIX B: ESTIMATED RANGE OF AMBIENT NOISE LEVELS
For this project, we recently conducted ambient noise levels at the area of the proposed battery
equipment in November 2023. At a setback distance of 160 feet from the centerline of Interstate 280, we
measured an average noise level of 70 dBA. The traffic noise was rather consistent over the duration of
approximately 9:00 to 10:00 am. To estimate the range of freeway traffic noise over the course of the
day, we reviewed long-term measurements of Interstate 280 conducted previously in a nearby area.
Those measurements were conducted over a four-day period. We used those data along with the recent
daytime measurements at the subject project site to estimate how Interstate 280 traffic noise varies over
the course of day and nighttime hours in the project area. The results indicate that between setback
distances of 150 feet and 350 feet from the centerline of Interstate 280 the average noise levels are
approximately:
● Daytime: 65 to 73 dBA
● Nighttime: 55 to 70 dBA
* * *
58
AH 8-28-2558 of 59
CLOVIS
IRVINE
LOS ANGELES
POINT RICHMOND
ROSEVILLEMEMORANDUM
DATE August 5, 2025
O Gian Martire, Senior Planner, City of Cupertino
ROM J.T. Stephens, Principal
UBJECT Second Peer Review of the Technical Noise Memoranda for the Apple Park (AC2)
Utility Yard Project
LSA has completed its follow-up review of the two memorandums prepared by Salter, Apple Park
(AC2) Utility Yard – Megapack Units – Noise Study and City Noise Limits dated July 21, 2025 (further
referred to as the Megapack Unit Noise Memorandum), and Apple Park (AC2) Utility Yard – Backup
Electrical Generators – Noise Study and City Noise Limits dated July 21, 2025 (further referred to as
the Backup Electrical Generators Noise Memorandum). The purpose of this peer review is to
determine whether the documents conform to accepted noise and vibration methodologies and
procedures, City of Cupertino (City) requirements for a technical study to support an environmental
document, and applicable provisions of the California Environmental Quality Act (CEQA).
Based on LSA’s review, the technical memoranda have been prepared consistent with the City’s
standards and meets the needs of CEQA. No further comments are provided.
Please contact J.T. Stephens at (510) 462-1327 or jt.stephens@lsa.net if any further discussion is
necessary.
59