Loading...
CC Resolution No. 7631 RESOIlJTION NO. 7631 A RESOIlJTION OF '!HE CITY CXXJNCIL OF THE CITY OF aJPERl'INO APPROVING OONTRACI' æANGE ORDER NO.1 FUR TRAFFIC SIGNAL mDIFICATION M MARY AVENUE AND STEVENS æEEK BXJIE\7ARD, PROJECl' 5006 RESOLVED by the city Council of the city of CUpertino, California, that 01arxJe Order No.1 for changes to work which has been approved by the Director of Public Works and this day presented to this Council, be, and it is hereby apprcved in conjunction with the project known as TRAFFIC SIGNAL mDIFICATION M MARY AVENUE AND STEVENS æEEK BXJIE\7ARD, PROJECl' 5006 BE IT FURIHER RESOLVED that funds are available and no further appropriation is neces~. PASSED AND ADOPI'ED at a regular meeting of the City Council of the city of CUpertino this 3rd day of October , 1988, by the follCMing vote: vote Members of the citv Council AYES: Johnson, Koppel, Plungy, Rogers, Gatto NOES: None ABSENT: None ABSTAIN: None ATl'EST: APPROVED: /s/ Roberta A. Wolfe city Clerk, Deputy /s/ John M. Gatto Mayor, City of CUpertino .·.....__i'-' ,._.,t\~ Sf? 1 2 1988, CITY OF CUPERTINO TRAFFIC SIGNAL MODIFICATION AT MARY AVENUE AND STEVENS CREEK BOULEVARD' PROJECT 5006 CHANGE ORDER No. 1 ROSENDIN ELECTRIC. INC. P.O. BOX 5061 SAN JOSE, CA 95150-5061 The tenth section of Bid Item No. 1 of the Special Provisions. "Detectors". is amended to read in its entirety as follows: DETECTORS , Detectors shall conform to the provisions in Section 86-5. "Detectors". of the Standard Specifications, and the Standard Plans. After conductors are installed in the slots cut in the pavement for ths detsctors. the slots shall be filled with sealant in conformance to the requirements in Section 86-5.01A(5). "Installation ,Detslls". of the Standard Specifications. ORIGINAL CONTRACT CHANGE ORDER No. 1 REVISED CONTRACT \ $ 28.619.00 N/C $ 28.619.00 CONTnACTOR: ROSENDIN ELECTRIC. ¡INC. d{y: øui-ß,t¡¡il DATE City Council Meeting 10/3/88 P.O.: 20056 File: 74.650.01 Resolution No. 7631 Be t J. V~ kovich Di ector 0 Public Works GG:bc