CC Resolution No. 7631
RESOIlJTION NO. 7631
A RESOIlJTION OF '!HE CITY CXXJNCIL OF THE CITY OF aJPERl'INO
APPROVING OONTRACI' æANGE ORDER NO.1 FUR TRAFFIC SIGNAL
mDIFICATION M MARY AVENUE AND STEVENS æEEK BXJIE\7ARD,
PROJECl' 5006
RESOLVED by the city Council of the city of CUpertino, California,
that 01arxJe Order No.1 for changes to work which has been approved by the
Director of Public Works and this day presented to this Council, be, and
it is hereby apprcved in conjunction with the project known as
TRAFFIC SIGNAL mDIFICATION M MARY AVENUE AND
STEVENS æEEK BXJIE\7ARD, PROJECl' 5006
BE IT FURIHER RESOLVED that funds are available and no further
appropriation is neces~.
PASSED AND ADOPI'ED at a regular meeting of the City Council of the
city of CUpertino this 3rd day of October , 1988, by the
follCMing vote:
vote
Members of the citv Council
AYES:
Johnson, Koppel, Plungy, Rogers, Gatto
NOES:
None
ABSENT:
None
ABSTAIN:
None
ATl'EST:
APPROVED:
/s/ Roberta A. Wolfe
city Clerk, Deputy
/s/ John M. Gatto
Mayor, City of CUpertino
.·.....__i'-' ,._.,t\~
Sf? 1 2 1988,
CITY OF CUPERTINO
TRAFFIC SIGNAL MODIFICATION AT MARY AVENUE
AND STEVENS CREEK BOULEVARD'
PROJECT 5006
CHANGE ORDER No. 1
ROSENDIN ELECTRIC. INC.
P.O. BOX 5061
SAN JOSE, CA 95150-5061
The tenth section of Bid Item No. 1 of the Special Provisions.
"Detectors". is amended to read in its entirety as follows:
DETECTORS ,
Detectors shall conform to the provisions in Section 86-5.
"Detectors". of the Standard Specifications, and the Standard
Plans. After conductors are installed in the slots cut in the
pavement for ths detsctors. the slots shall be filled with
sealant in conformance to the requirements in Section 86-5.01A(5).
"Installation ,Detslls". of the Standard Specifications.
ORIGINAL CONTRACT
CHANGE ORDER No. 1
REVISED CONTRACT
\
$ 28.619.00
N/C
$ 28.619.00
CONTnACTOR: ROSENDIN ELECTRIC. ¡INC.
d{y: øui-ß,t¡¡il
DATE
City Council Meeting 10/3/88
P.O.: 20056
File: 74.650.01
Resolution No. 7631
Be t J. V~ kovich
Di ector 0 Public Works
GG:bc