CC Resolution No. 25-033 establishing a list of projects proposed to be funded by $1,583,075 of SB 1 revenues
RESOLUTION NO. 25‐033
A RESOLUTION OF THE CUPERTINO CITY COUNCIL
ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2025‐26 FUNDED BY
SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of
2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into
law by the Governor in April 2017 to address the significant multi‐modal
transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that
will ensure the residents of our City are aware of the projects proposed for funding
in our community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to
receive fiscal year funding from the Road Maintenance and Rehabilitation Account
(RMRA), created by SB 1, which must include a description and the location of
each proposed project, a proposed schedule for the project’s completion, and the
estimated useful life of the improvement; and
WHEREAS, the City will receive an estimate $1,583,075 in RMRA funding
in Fiscal Year 2025‐26 from SB 1; and
WHEREAS, This is the ninth year in which the City is receiving SB1 funding
and will enable the City to continue essential road maintenance and rehabilitation
projects, safety improvements, repairing and replacing aging bridges, and
increasing access and mobility options for the traveling public that would not have
otherwise been possible without SB 1; and
WHEREAS, the City uses a Pavement Management System to develop the
SB1 pavement project lists to ensure revenues are being used on the most high
priority and cost effective projects; and
WHEREAS, the funding from SB 1 will help the City maintain and
rehabilitate multiple streets/roads; and
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs
Assessment found the City streets and roads are in “good” condition and this
revenue will help us maintain the overall quality of our road system; and
Resolution 25‐033
Page 2
WHEREAS, the SB 1 project list and overall investment in our local streets
and roads infrastructure with focus on basic maintenance and safety, and
investing in complete streets infrastructure, will have significant benefits citywide.
NOW, THEREFORE, BE IT RESOLVED, ORDERED AND FOUND by the
City Council of the City of Cupertino, State of California as follows:
1. The forgoing recitals are true and correct.
2. The following list of newly proposed projects will be funded in‐part or
solely with FY 2025‐26 Road Maintenance and Rehabilitation Account
revenues.
Project Title: 2025/26 Pavement Maintenance Phase 1
Project Description: Design, Engineering and Preparation of Contract
Documents for Pavement Rehabilitation including asphalt overlay and
patch repairs.
Project Location: City of Cupertino ‐ various streets
Project Phase: Pre‐Construction
Project Schedule: August 2025 – May 2026
Estimated Useful life: 15 Years
Project Title: 2025/26 Pavement Maintenance Phase 2
Project Description: Design, Engineering and Preparation of Contract
Documents for Pavement Preservation including crack seal, slurry seal and
fog seal.
Project Location: City of Cupertino – various streets
Project Phase: Pre‐Construction
Project Schedule: February 2026 – June 2026
Estimated Project Useful Life: 2 to 7 years
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 20th day of May 2025, by the following vote:
Resolution No. 25‐033
Page 3
Members of the City Council
AYES: Chao, Moore, Fruen, Mohan, Wang
NOES: None
ABSENT: None
ABSTAIN: None
SIGNED:
Liang Chao, Mayor
City of Cupertino
Date
ATTEST:
Kirsten Squarcia, City Clerk
Date
06/03/2025
06/03/2025