Loading...
CC Resolution No. 25-033 establishing a list of projects proposed to be funded by $1,583,075 of SB 1 revenues    RESOLUTION NO. 25‐033    A RESOLUTION OF THE CUPERTINO CITY COUNCIL  ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2025‐26 FUNDED BY  SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017  WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of  2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into  law by the Governor in April 2017 to address the significant multi‐modal  transportation funding shortfalls statewide; and    WHEREAS, SB 1 includes accountability and transparency provisions that  will ensure the residents of our City are aware of the projects proposed for funding  in our community and which projects have been completed each fiscal year; and    WHEREAS, the City must adopt by resolution a list of projects proposed to  receive fiscal year funding from the Road Maintenance and Rehabilitation Account  (RMRA), created by SB 1, which must include a description and the location of  each proposed project, a proposed schedule for the project’s completion, and the  estimated useful life of the improvement; and  WHEREAS, the City will receive an estimate $1,583,075 in RMRA funding  in Fiscal Year 2025‐26 from SB 1; and    WHEREAS, This is the ninth year in which the City is receiving SB1 funding  and will enable the City to continue essential road maintenance and rehabilitation  projects, safety improvements, repairing and replacing aging bridges, and  increasing access and mobility options for the traveling public that would not have  otherwise been possible without SB 1; and  WHEREAS, the City uses a Pavement Management System to develop the  SB1 pavement project lists to ensure revenues are being used on the most high  priority and cost effective projects; and    WHEREAS, the funding from SB 1 will help the City maintain and  rehabilitate multiple streets/roads; and    WHEREAS, the 2023 California Statewide Local Streets and Roads Needs  Assessment found the City streets and roads are in “good” condition and this  revenue will help us maintain the overall quality of our road system; and  Resolution 25‐033   Page 2      WHEREAS, the SB 1 project list and overall investment in our local streets  and roads infrastructure with focus on basic maintenance and safety, and  investing in complete streets infrastructure, will have significant benefits citywide.  NOW, THEREFORE, BE IT RESOLVED, ORDERED AND FOUND by the  City Council of the City of Cupertino, State of California as follows:      1. The forgoing recitals are true and correct.    2. The following list of newly proposed projects will be funded in‐part or  solely with FY 2025‐26 Road Maintenance and Rehabilitation Account  revenues.    Project Title: 2025/26 Pavement Maintenance Phase 1  Project Description: Design, Engineering and Preparation of Contract  Documents for Pavement Rehabilitation including asphalt overlay and  patch repairs.  Project Location: City of Cupertino ‐ various streets  Project Phase: Pre‐Construction  Project Schedule: August 2025 – May 2026  Estimated Useful life: 15 Years  Project Title: 2025/26 Pavement Maintenance Phase 2  Project Description: Design, Engineering and Preparation of Contract  Documents for Pavement Preservation including crack seal, slurry seal and  fog seal.  Project Location: City of Cupertino – various streets  Project Phase: Pre‐Construction  Project Schedule: February 2026 – June 2026  Estimated Project Useful Life: 2 to 7 years    PASSED AND ADOPTED at a regular meeting of the City Council of the City of  Cupertino this 20th day of May 2025, by the following vote:                Resolution No. 25‐033  Page 3       Members of the City Council    AYES:              Chao, Moore, Fruen, Mohan, Wang  NOES:  None  ABSENT:        None   ABSTAIN:      None       SIGNED:        Liang Chao, Mayor  City of Cupertino          Date  ATTEST:        Kirsten Squarcia, City Clerk          Date  06/03/2025 06/03/2025