CC Resolution No. 25-028 approving the Architectural and Site Approval Permit (ASA-2024-003)
RESOLUTION NO. 25-028
A RESOLUTION OF THE CUPERTINO CITY COUNCIL
APPROVING AN ARCHITECTURAL AND SITE APPROVAL TO MODIFY THE
PREVIOUSLY APPROVED WESTPORT PROJECT INCLUDING, BUT NOT LIMITED
TO, DWELLING COUNT AND GROUND FLOOR RETAIL, PARK LAND
DEDICATION FEES AND MINOR CHANGES TO BUILDING 1 LOCATED AT 21267
STEVENS CREEK BOULEVARD (APN: 326-27-048)
SECTION I: PROJECT DESCRIPTION
Application No.: ASA-2024-003
Applicant: Related California (Cascade Zak)
Property Owner: Related California
Location: 21267 Stevens Creek Boulevard (APN: 326-27-048)
SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL:
WHEREAS, the Planning Commission of the City of Cupertino received an application
for an Architectural and Site Approval Permit as described in Section I of this resolution;
and
WHEREAS, after consideration of evidence contained in the entire administrative record,
at the public hearing on August 18, 2020, the City Council adopted Resolution No. 20-
105, adopting an Environmental Impact Report (EIR) for the Westport Development; and
WHEREAS, environmental analysis and peer reviews were conducted by Placeworks,
Inc. pursuant to the requirements of CEQA, and an addendum to the EIR was prepared
which found that no new or substantially increased significant environmental effects; and
WHEREAS, on March 11, 2025 the Planning Commission recommended on a 5-0 vote
that the City Council adopt the Addendum to the EIR (EA-2018-04) and approve the
Modification to the Development Permit (M-2024-003) in substantially similar form to the
Resolution presented (Resolution No. 2025-06), and approve the Architectural and Site
Approval Permit (ASA-2024-003) in substantially similar form to the Resolution
presented(Resolution No. 2025-05); and
WHEREAS, all necessary public notices having been given as required by the City of
Cupertino Municipal Code and the Government Code, and the Planning Commission
held at least one public hearing in regard to this application, and
WHEREAS, on May 20, 2025, the City Council held a public hearing to consider the
Project; and
Resolution No. 25-028
Page 2
WHEREAS, the City Council of the City of Cupertino is the decision-making body for
this Resolution; and
WHEREAS, the applicant has met the burden of proof required to support the application
for a Development Permit.
WHEREAS, the analysis in the Addendum prepared by Placeworks, Inc. indicates that
the proposed project would not require major revisions to the EIR adopted on August 18,
2020, due to new or substantially increased significant environmental effects.
Furthermore, there have been no substantial changes with respect to the circumstances
under which these minor modifications would be undertaken that would require major
revisions of the Adopted EIR due to new or substantially increased significant
environmental effects, and there has been no discovery of new information of substantial
importance that would trigger or require major revisions to the EIR due to new or
substantially increased significant environmental effects.
WHEREAS, the adopted EIR adequately identifies all environmental effects and adequate
mitigation measures for the proposed modifications to the previously approved project.
Therefore, no subsequent or supplemental EIR is required prior to approval of the
proposed project.
WHEREAS, the City Council finds as follows with regard to this application:
1. The proposed development, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental
to the public health, safety, general welfare, or convenience;
With the conditions of approval and the approved density bonus, waivers, and
incentive/concession the project is consistent with the General Plan and Zoning
Ordinance. All mitigation measures identified in the Initial Study/Mitigated Negative
Declaration that are within the responsibility and jurisdiction of the City have been adopted
and incorporated into the project in order to mitigate potential impacts to a less than
significant level. The modifications do not influence the programming of the site and are
all within the provisions of state law. As a result, the project will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to the
public health, safety, general welfare, or convenience.
2. The proposed development is consistent with the purposes of this chapter, the
General Plan, any specific plan, zoning ordinances, applicable planned
development permit, conditional use permits, variances, subdivision maps or
other entitlements which regulate the subject property including, but not limited
to, adherence to the following specific criteria:
Resolution No. 25-028
Page 3
a. Abrupt changes in building scale should be avoided. A gradual transition
related to height and bulk should be achieved between new and existing
buildings.
The project is within the approved Building 1 proposal as approved by City Council on
December 21, 2021. This maintains the mix of housing types that include two
multistory high-density structures, as well as lower density townhome/rowhouse
condominiums. The site is bordered by high density residential to the north and De
Anza College to the South, across Stevens Creek Boulevard. The development is
designed to concentrate the taller structures on the northwest corner of Mary Avenue
and Stevens Creek Boulevard intersection while the shorter townhome/rowhouse
structures are placed closer to the lower scale apartment and townhomes developments
along Mary Avenue. This design provides a gradual transition between buildings of
different height and bulk.
b. In order to preserve design harmony between new and existing buildings and
in order to preserve and enhance property values, the materials, textures and
colors of new buildings should harmonize with adjacent development by being
consistent or compatible with design and color schemes, and with the future
character of the neighborhood and purposes of the zone in which they are
situated. The location, height and materials of walls, fencing, hedges and
screen planting should harmonize with adjacent development. Unsightly
storage areas, utility installations and unsightly elements of parking lots
should be concealed. The planting of ground cover or various types of
pavements should be used to prevent dust and erosion, and the unnecessary
destruction of existing healthy trees should be avoided. Lighting for
development should be adequate to meet safety requirements as specified by
the engineering and building departments and provide shielding to prevent
spill-over light to adjoining property owners.
The design quality of the development is consistent with the original approval of
Westport development from August 2020, as further modified in December 2021. Both
the high-density structures and townhome/rowhouse buildings are consistent with the
design qualities of a Mediterranean-type development and the architectural style is
consistent throughout the development. Further, the planting plan is consistent with
the intent of the Heart of the City Specific Plan guidelines. Unsightly uses such as
loading and trash pickup have been placed within the buildings away from view of
neighboring uses. Utility installations have been designed to be screened by
landscaping and or incorporated into the building design. The final lighting for the
development will be reviewed as part of the review of the project construction
Resolution No. 25-028
Page 4
documents to ensure that they meet safety requirements while avoiding spill-over light
to adjacent properties.
c. The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures shall minimize traffic hazards and shall
positively affect the general appearance of the neighborhood and harmonize
with adjacent development.
Signage approval is not included in this application.
d. With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light
and visually intrusive effects by use of buffering, setbacks, landscaping, walls
and other appropriate design measures.
The project does not abut any existing residential development. The existing multi-
family development located across Mary Avenue (Glenbrook Apartments) will be
buffered from any impact because the project has been designed to maintain trees along
the frontage and has been designed with adequate parking on-site. The buildings have
been designed with setbacks from the curb line greater than the 9-feet required within
the General Plan and Heart of the City Specific Plan.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, subject to the conditions which are enumerated in this Resolution
beginning on PAGE 4 thereof, and those contained in all other Resolutions approved for
this Project, the City Council hereby Approves the application for a Architectural and Site
Approval, Application No. ASA-2024-003
That the subconclusions upon which the findings and conditions specified in this
Resolution are based are contained in the Public Hearing record concerning Application
no. ASA-2024-003 as set forth in the Minutes of the City Council Meeting of May 20, 2025
and are incorporated by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on the plan set dated September 6, 2024 consisting of 17 sheets
labeled as Westport Building 1: 21267 Stevens Creek Boulevard, Cupertino,
CA 95014,
Resolution No. 25-028
Page 5
G00-G14, and A10 – A34, LSK 1, drawn by Studio Architects, Steinberg Hart,
except as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or
construction records. Any misrepresentation of any property data may invalidate
this approval and may require additional review.
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. M-2024-003 shall be applicable to this
approval.
4. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
first page of the building plans.
5. FINAL ARCHITECTURAL DETAILS AND EXTERIOR BUILDING MATERIALS
The final building exterior plan shall closely resemble the details shown on the
original approved plans. The final building design and exterior treatment plans
(including but not limited to details on exterior color, materials, architectural
treatments, doors, windows, lighting fixtures, and/or embellishments) shall be
reviewed and approved by the Director of Community Development prior to issuance
of building permits and through an in-field mock-up of colors prior to application to
ensure quality and consistency. Any exterior changes determined to be substantial by
the Director of Community Development shall either require a modification to this
permit or a new permit based on the extent of the change.
6. LANDSCAPE INSTALLATION REPORT
The project is subject to all provisions delineated in the Landscape Ordinance (CMC,
Chapter 14.15). A landscape installation audit shall be conducted by a certified
landscape professional after the landscaping and irrigation system have been
installed. The findings of the assessment shall be consolidated into a landscape
installation report.
The landscape installation report shall include, but is not limited to: inspection to
confirm that the landscaping and irrigation system are installed as specified in the
landscape and irrigation design plan, system tune-up, system test with distribution
uniformity, reporting overspray or run-off that causes overland flow, and preparation
of an irrigation schedule.
Resolution No. 25-028
Page 6
The landscape installation report shall include the following statement: “The
landscape and irrigation system have been installed as specified in the landscape and
irrigation design plan and complies with the criteria of the ordinance and the permit.”
7. LANDSCAPE AND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be
established and submitted to the Director of Community Development or his/her
designee, either with the landscape application package, with the landscape
installation report, or any time before the landscape installation report is submitted.
a. Schedules should take into account water requirements for the plant establishment
period and water requirements for established landscapes.
b. Maintenance shall include, but not be limited to the following: routine inspection;
pressure testing, adjustment and repair of the irrigation system; aerating and de-
thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed
plants; weeding; pest control; and removing obstructions to emission devices.
c. Failed plants shall be replaced with the same or functionally equivalent plants that
may be size-adjusted as appropriate for the stage of growth of the overall
installation. Failing plants shall either be replaced or be revived through
appropriate adjustments in water, nutrients, pest control or other factors as
recommended by a landscaping professional.
8. LANDSCAPE PROJECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a full Landscape
Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape
Ordinance, for projects with landscape area 500 square feet or more or elect to submit
a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects
with landscape area between 500 square feet and 2,500 square feet. The Landscape
Documentation Package or Prescriptive Compliance Application shall be reviewed
and approved to the satisfaction of the Director of Community Development prior to
issuance of building permits, and additional requirements per sections 14.15.040 D, E,
F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved
prior to final inspections.
9. SOIL ANALYSIS REPORT
A soils analysis report shall document the various characteristics of the soil (e.g.
texture, infiltration rate, pH, soluble salt content, percent organic matter, etc) and
provide recommendations for amendments as appropriate to optimize the
productivity and water efficiency of the soil. The soil analysis report shall be made
available to the professionals preparing the landscape and irrigation design plans in
a timely manner either before or during the design process. A copy of the soils analysis
Resolution No. 25-028
Page 7
report shall be submitted to the Director of Community Development as part of the
landscape documentation package.
10. LANDSCAPE AND IRRIGATION PLANS
The applicant shall submit detailed landscape and irrigation plans to be reviewed and
approved by Community Development prior to issuance of building permits. The
landscape plan shall include water conservation and pesticide reduction measures in
conformance with Chapter 14.15, Landscape Ordinance, and the pesticide control
measures referenced in Chapter 9.18, Stormwater Pollution Prevention and
Watershed Protection, of the Cupertino Municipal Code.
11. SIGN PROGRAM
A sign program is required for this project. The sign program shall be approved by
the Director of Community Development prior to issuance of sign permits.
12. SITE IMPROVEMENTS
All proposed site improvements shall be completed prior to final occupancy of any
structures approved in conjunction with the project.
13. TRANSFORMERS
Electrical transformers, telephone cabinets and similar equipment shall be placed in
underground vaults. The developer must receive written approval from both the
Public Works Department and the Community Development Department prior to
installation of any above ground equipment. Should above ground equipment be
permitted by the City, equipment and enclosures shall be screened with fencing and
landscaping such that said equipment is not visible from public street areas, as
determined by the Community Development Department. Transformers shall not be
located in the front or side building setback area.
14. SCREENING
All mechanical and other equipment on the building or on the site shall be screened
so they are not visible from public street areas or adjoining developments. Screening
materials/colors shall match building features and materials. The height of the
screening shall be taller than the height of the mechanical equipment that it is
designed to screen. The location of equipment and necessary screening shall be
reviewed and approved by the Director of Community Development prior to issuance
of building permits.
15. TREE PROTECTION
As part of the demolition or building permit drawings, a tree protection plan shall be
prepared by a certified arborist for the trees to be retained. In addition, the following
measures shall be added to the protection plan:
Resolution No. 25-028
Page 8
• For trees to be retained, chain link fencing and other root protection shall be
installed around the dripline of the tree prior to any project site work.
• No parking or vehicle traffic shall be allowed under root zones, unless using buffers
approved by the Project Arborist.
• No trenching within the critical root zone area is allowed. If trenching is needed in
the vicinity of trees to be retained, the City’s consulting arborist shall be consulted
before any trenching or root cutting beneath the dripline of the tree.
• Wood chip mulch shall be evenly spread inside the tree projection fence to a four-
inch depth.
• Tree protection conditions shall be posted on the tree protection barriers.
• Retained trees shall be watered to maintain them in good health.
• A covenant on the property shall be recorded that identifies all the protected trees,
prior to final occupancy.
The tree protection measures shall be inspected and approved by the certified arborist
prior to issuance of building permits. The City’s consulting arborist shall inspect the
trees to be retained and shall provide reviews prior to issuance of demolition, grading
or building permits. A report ascertaining the good health of the trees mentioned
above shall be provided prior to issuance of final occupancy.
16. UTILITY STRUCTURE PLAN
Prior to issuance of building permits, the applicant shall work with staff to provide a
detailed utility plan to demonstrate screening or undergrounding of all new utility
structures [including, but not limited to backflow preventers (BFP), fire department
connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of
the Director of Community Development, Public Works, Fire Department, and
applicable utility agencies.
17. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
18. INDEMNIFICATION
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold
harmless the City, its City Council, and its officers, employees, and agents
(collectively, the “indemnified parties”) from and against any liability, claim,
action, cause of action, suit, damages, judgment, lien, levy, or proceeding
(collectively referred to as “proceeding”) brought by a third party against one or
Resolution No. 25-028
Page 9
more of the indemnified parties or one or more of the indemnified parties and the
applicant related to any Ordinance, Resolution, or action approving the project,
the related entitlements, environmental review documents, finding or
determinations, or any other permit or approval authorized for the project. The
indemnification shall include but not be limited to damages, fees, and costs
awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs,
liabilities, and expenses incurred in connection with such proceeding whether
incurred by the Applicant, the City, or the parties initiating or bringing such
proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees
and costs shall include amounts paid to the City’s outside counsel and shall
include City Attorney time and overhead costs and other City staff overhead costs
and any costs directly related to the litigation reasonably incurred by City. The
applicant shall likewise agree to indemnify, defend, and hold harmless the
indemnified parties from and against any damages, attorneys’ fees, or costs
awards, including attorneys’ fees awarded under Code of Civil Procedure section
1021.5, assessed or awarded against the indemnified parties. The Applicant shall
cooperate with the City to enter a Reimbursement Agreement to govern any such
reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary
by proceedings challenging the project approvals and related environmental
review, if the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
19. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant
to Government Code Section 66020(d) (1), these Conditions constitute written
notice of a statement of the amount of such fees, and a description of the
dedications, reservations, and other exactions. You are hereby further notified that
the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section 66020(a),
has begun. If you fail to file a protest within this 90-day period complying with all
of the requirements of Section 66020, you will be legally barred from later
challenging such exactions.
Resolution No. 25-028
Page 10
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Cupertino this 20th day of May, 2025, by the following vote:
Members of the City Council
AYES: Chao, Moore, Fruen, Wang
NOES: Mohan
ABSENT: None
ABSTAIN: None
SIGNED:
Liang Chao, Mayor
City of Cupertino
Date
ATTEST:
Kirsten Squarcia, City Clerk
Date
06/03/2025
06/03/2025