CC Resolution No. 7842
RESOIlJI'ION NO. 7842
A RESOIlJI'ION OF '!HE CITY CXXJNCIL OF T.HE CITY OF aJPERI'INO
APPROVING 00NTRACl' aIANGE ORDER NO, 1 FOR C. D. B. G.
EMPIREjGRAND ¡:;'J.=J.' IMPROVEMENT, PR:\JECI' 88-120
RESOLVED by the City Council of the city of CUpertino, California,
that Chan;¡'e Order No.1 for chan;Jes to work which has been approved by the
Director of Public Works an:1 this èlay presented to this Council, be, an:1
it is hereby awroved in conjunction with the project known as
C.D.B.G. EMPIREjGRAND ¡:;'J.1<t;t.'J.' IMPROVEMENT
PR:\JECI' 88-120
BE: IT FURI'HER RESOLVED that fI.Irx:ls are available an:1 no further
appropriation is necessary.
PASSED AND AOOPI'ED at a
City of CUpertino this ~th
following vote:
regular meeting of the city Council of the
day of June 1989, by the
vote
AYES:
Members of the citv Council
Gatto, Johnson, Koppel, Rogers, Plungy
NOES:
None
ABSENl':
None
ABSTAIN:
None
A'ITEST:
APPROVED:
Isl Dorothv Cornelius
City Clerk
Isl John J, Plungy, Jr,
Mayor, City of CUpertino
CITY OF CUPERI'INO
C.D.B.G. EMPIRE/GRAND STREEl' IMPROVEMENT
PRC\JECI' 88-120
OONTRACI' CHANGE ORDER NO. 1
<XJN'rnACIOR
Bellicitti & Pellicciotti
Construction Co., Inc.
P. O. Box 606
Santa Clara, CA 95052
'!he following changes are hereby approved:
lA. Relocate existing sanitary sewer laterals (8)
due to conflict with storm drain
lB, 'l\mnel under existing utilities not shown
on plans
lC, Excavate along an:1 shore 2" gas main from
Sta 0+00 to 1+00
lD. Remove existing 2" water line (abandoned)
IE. 'l\mnel under existing 6" water main lateral
to catch basin No.3
IF, 'l\mnel under existing electrical lines
lateral to catch basin No.1
$ 5,121.73
4,161. 39
1,342.39
1,073.91
805.43
536.96
$ 13,041.81
P.O. NO. 20906
Original Contract
Change Order No. 1
Revised Contract
$ 192,039.80
13.041. 81
$ 205,081. 61
CONl'RACIOR
CITY OF QJ1-'lSKL'.i..NO
By:
Bert J. Visk.ovich
Director of Public Works
Title:
City Council: 6/2/89
Res. No. 7842
Date: