Loading...
CC Resolution No. 9860RESOLUTION NO: 9860 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO RESCINDING RESOLUTION NO. 9626 AND ESTABLISHING USER FEES WHEREAS, the State of California requires fees charged for service rendered not to exceed the cost of delivering said services; and WHEREAS, a public hearing has been held to review user fees; and WHEREAS, the City Council of the City of Cupertino has established guidelines for setting user fees; NOW, THEREFORE, BE IT RESOLVED that: 1. User fees are established per attachments A through F. 2. All user fees previously established by Council action or resolution are hereby superseded. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 2nd day of June, 1997, by the following vote: Vote AYES: NOES: ABSENT: ABSTAIN: Members of the City Council Bumett, Chang, Dean, Sorensen, Bautista None None None ATTEST: APPROVED: CITY OF CUPERTINO SUMMARY OF USER FEES Department General Engineering Planning Building Water Recreation Schedule A B C D E F Schedule A CITY OF CUPERTINO General Copy Service - per sheet Retumed Check Late Payment on 30 Day Delinquent City Invoices Bicycle License Municipal Code Book Williamson Act Filings Damage to City Property Grounds Streets Facilities Traffic - Engineering Traffic - Maintenance Tape Dubbing Full Tape Selective Dubbing Plus material cost Fingerprinting Processing Code Enforcement Massage Establishment Administrative Fee Duplicate Licenses (Business/Animal) Taxi Permits - Administrative Fee Library Community Room Use Fee $0.10 20.00 7% per annum 2.00/year 67.00 100.00 Actual Cost * 20.00/tape 24.00/tape Current State Fee 42.00 Plus 10.00 processing fee Actual Cost * 67.00 5.00 10.00 25.00 Non-Refundable Fee 100.00 Cleaning Deposit 2 Schedule A CITY OF CUPERTINO General (continued) Exempt Business License Administrative Fee Police Disturbances Abatement Fee Research Fee (For information requests greater than 1/2 hour.) Graffiti Cleanup Property Liens 25.00 Actual Cost * Actual Cost * Actual Cost * Actual Cost * $25 per book/block/parcel lien * Includes salary, benefits, out-of-pocket expenditures (e.g., Sheriff's time, graffiti cleanup, etc.) plus 10% overhead. 3 Schedule B CITY OF CUPERTINO Engineering Street Cuts Permit to excavate in public right-of-way. Grading Permit To insure grading conforms to City ordinances and council approvals. Minimum Fee Or 6% of Improvement Value Parcel Map/Tract Maps To insure maps conform to state map act and council approvals. Parcel Map Tract Map Plan Checking and Inspection Review only (no permit issued) Permit Fee or Residential 5% of Site Improvement Commercial/Office/Industrial 6% of Site Improvement Annexation (plus county filing fees) Certificates of Compliance To verily lots were not created in violation of local ordinances or state map act. $185.00 $156.00 $419.00 1-4 lots $419.00 + 9.00 each lot over 4 $293.00 $1,918.00 minimum $564.00 $592.00 Schedule B CITY OF CUPERTINO Engineering (continued) Encroachment Permit To allow private facilities or improvements to be placed in public right-of-way. To allow a storage box to be placed in public right-of-way. Lot Line Adjustment City must verify that lots after adjusment conform to zoning and setbacks. Power Cost Developer is responsible for one year power cost for streetlights. The latest effective PG&E rate schedule approved by the PUC. Soil and Geology Report Plus any materials/service fees. Engineering Copies Microfiche Engineering Copies Microfilm Blueline Banners Transportation Permit Special Event/Block Party $137.00 Residential $177.00 Non-Residemial $137.00 Residential $308.00 $26.00 Sho~Repoff $153.00 Long Report 7.00/copy 8.00/copy 9.00/copy 4.00/copy $242.00 $16.00 Single plus $35.00 $90.00 Annual plus $35.00 $35.00/hour Schedule C CITY OF CUPERTINO DEFINITION OF PLANNING FEE SERVICES Full Application An application which typically involves all steps of the development review process including Pre-application Review, Environmental Review Committee, the Planning Commission, and the City Council. The application requires an advertised public heating before the Planning Commission and a public hearing or agendized review before the City Council. Applications requiring the preparation of an Environmental Impact Report (EIR) are included in this category. The application fee for particularly complicated applications and those requiring the preparation of an EIR will be based upon an hourly rate as described in the fee schedule. Limited Application An application which involves all steps of the development review process outlined in the Full Application description with the exception of the City Council. Minor Application An application which involves minimal steps in the review process and is exempt from the California Environmental Quality Act. The staff evaluation and report preparations are less extensive. The application requires Planning Commission review. Miscellaneous Aur~lication An application which typically involves a non-noticed review by the Planning Commission. The application does not typically require pre-application meetings or Environmental Review and involves minimal staff preparation. Examples of this application are interpretation or clarification of conditions of approval or ordinance requirements, sign exceptions, fence exceptions, and tentative map and use permit extensions. Appeal A request from the project applicant or interested party to reverse or amend a decision made by staff or an advisory body. An appointed public official serving on the board that made the decision subject to the appeal, an appointed public official serving on a board that is directly affected by the decision and the City Council members are exempted from the fee requirement. 6 Schedule C CITY OF CUPERTINO DEFINITION OF PLANNING FEE SERVICES (continued) Directors Application An application which receives final approval by staff either via an advertised public heating or non-hearing format. The application may involve a pre-application meeting and/or Environmental Review committee review. Temporary_ Si_ma Permit A staff review of a temporary sign application which includes an evaluation of the sign request, the entry into the temporary log and site review by Code Enforcement Officers. The permit fee is in addition to the submittal of a deposit to guarantee removal of the sign upon expiration of the temporary permit. NOTES: Combined applications which are processed simultaneously (i.e., filed at the same time) will be classified based on highest rating. Mixed use applications will be classified based upon the highest intensity and review process. The Director of Community Development will have discretion to classify projects based upon the above criteria. 7 Schedule C CITY OF CUPERTINO Planning Full Application Zoning Tentative Map Use Permit Applicable base fee plus hourly staff rate in excess of 48 hours Limited Application Use Permit Tentative Map Amendment Minor Application Use Permit Tentative Map Hillside Exception Miscellaneous Application General Architectural and Site Approval Sign Exception Fence Exception Tentative Map and Use Permit Extension Planning Commission Intrepretation Director Tentative Map - Lot Consolidation Variance Minor Amendment/Temporary Use Permit Sign Permit Temporary Sign Pernfit Address Change Appeal Amount to be refunded if appeal is granted. $2,152.00 $2,152.00 $! ,759.00 $ 44.00 $1,237.00 $1,325.00 $1,021.00 $1,186.00 $1,186.00 $1,133.00 $ 447.00 $ 381.00 $ 162.O0 $ 162.00 $ 435.00 $ 367.00 $ 749.00 $ 823.00 $ 170.00 $ 81.00 $ 38.00/ calendar year $ 107.00 $ 117.00 Schedule C CITY OF CUPERTINO Planning (continued) General Plan Amendment Direct costs for staff, consultants, and materials. Sign agreement before application is accepted. Development Agreement Direct cost of City Attorney plus full application zoning fee. Sign agreement before application is accepted. $2,100.00 (Retainer) $2,100.00 (Retainer) 9 Schedule D CITY OF CUPERTINO Building Valuation Schedule OCCUPANCY AND TYPE 1. APARTMENT HOUSES *Type I or II F.R. Type V - Masonry or Type III Type V - Wood Frame Type 1 - Basement Garage REMODEL COST PER SO. FT. $34.65 $28.35 $26.25 $16.74 2o AUDITORIUMS Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 - N Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N $35.70 $26.25 $26.25 $26.25 $26.25 $26.25 $26.25 BANKS *Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 - N Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N $45.15 $45.15 $45.15 $46.2O $46.2O $36.75 $36.75 e BOWLING ALLEYS Type II - 1-Hour Type 11 - N Type 111 - 1-Hour Type 111 -N Type V - 1-1 Hour $22.05 $22.05 $22.05 $22.05 $22.05 CHURCHES Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 - N Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N $32.55 $26.25 $26.25 $26.25 $26.25 $26.25 $26.25 *Add 0.5 percent to total cost for each story over three **Deduct 11 percent for mini-warehouses ***Deduct 20 percent for "shell only" buildings COST PER NEW SO. FT. $100.57 $ 81.14 $ 74.47 $ 34.80 $ 96.95 $ 69.5O $ 66.44 $ 73.00 $ 69.72 $ 69.38 $ 66.10 $137.18 $ 99.67 $ 96.73 $110.40 $106.56 $ 99.33 $ 96.05 $ 46.44 $ 43.28 $ 50.74 $ 47.35 $ 42.38 $ 91.76 $ 68.O3 $ 64.64 $ 74.02 $ 70.63 $ 68.70 $ 65.54 10 Schedule D OCCUPANCY AND TYPE 6. CONVALESCENT HOSPITALS *Type 1 or 11 F.R. Type 11 1-Hour Type 111 - 1-Hour Type V - 1-Hour DWELLINGS Type V - Masonry Type V - Wood Frame Basements Semi-Finished Un£mished FIRE STATIONS Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 - N Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N HOMES FOR THE ELDERLY Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 -N Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N 10. HOSPITALS *Type 1 or 11 F.R. Type 111 - 1-Hour Type V - 1-Hour CITY OF CUPERTINO Building Valuation Schedule REMODEL COST PER SO. FT. $46.20 $33.6O $33.6O $33.60 $31.50 $31.50 $13.65 $13.65 $37.80 $27.30 $27.30 $27.30 $27.30 $27.30 $27.30 $34.65 $27.30 $27.30 $27.30 $27.3O $27.30 $27.3O $53.55 $45.15 $42.00 COST PER NEW SQ. FT $128.59 $106.45 $ 90.51 $ 84.86 $ 88.14 $ 88.O3 $ 20.91 $ 16.16 $104.86 $ 68.37 $ 64.98 $ 75.37 $ 72.09 $ 70.29 $ 66.90 $ 96.05 $ 77.29 $ 73.68 $ 80.46 $ 77.07 $ 77.52 $ 74.24 $150.86 $123.62 $116.96 *Add 0.5 percent to total cost for each story over three **Deduct 11 percent for mini-warehouse ***Deduct 20 percent for "shell only" buildings ****Add 25% for hazardous occupancy or high tech 11 Schedule D CITY OF CUPERTINO Building Valuation Schedule OCCUPANCY AND TYPE REMODEL COST PER SO. FT. 11. HOTELS AND MOTELS *Type 1 or 11 F.R. Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N $34.65 $32.50 $27.30 $27.30 $27.30 12. INDUSTRIAL PLANTS **** Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 - (Stock) Type 111 - 1-Hour Type 111 -N Tilt-Up Type V - 1-Hour Type V - N $21.00 $21.00 $21.00 $21.00 $21.00 $21.00 $21.00 $21.00 13. JAILS Type 1 or 11 F.R. Type 111 - 1-Hour Type V - 1-Hour $52.50 $49.35 $39.90 14. LIBRARIES Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 - N Type 111 - 1-1-Hour Type 111 -N Type V - 1-Hour Type V - N $38.85 $27.3O $27.3O $27.30 $27.30 $27.3O $27.30 15. MEDICAL OFFICES **** Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 -N Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N $46.20 $34.65 $34.65 $34.65 $34.65 $34.65 $34.65 *Add 0.5 percent to total cost for each story over three **Deduct 11 percent for mini-warehouse ***Deduct 20 percent for "shell only" buildings ****Add 25% for hazardous or high tech occupancies COST PER NEW SQ. FT. $ 92.89 $ 80.23 $ 76.39 $ 71.08 $ 67.69 $ 52.66 $ 36.27 $ 33.22 $ 37.06 $ 37.06 $ 27.23 $ 37.29 $ 34.13 $146.90 $132.10 $118.90 $107.80 $ 77.86 $ 74.02 $ 82.15 $ 78.20 $ 77.07 $ 73.68 $110.06 $ 84.30 $ 80.46 $ 88.82 $ 85.54 $ 82.38 $ 79.10 12 Schedule D CITY OF CUPERTINO Building Valuation Schedule OCCUPANCY AND TYPE REMODEL COST PER SQ. FT. 16. OFFICES Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 - N Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N $42.00 $28.35 $28.35 $28.35 $28.35 $28.35 $28.35 17. PRIVATE GARAGES Wood Frame Masonry Open carports/covered decks/porches Uncovered decks $13.65 $13.65 $ 9.45 $ 8.40 18. PUBLIC BUILDINGS Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 -N Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N $48.30 $36.75 $36.75 $36.75 $36.75 $36.75 $36.75 19. PUBLIC GARAGES Type 1 or 11 F.R. Type 1 or 11 Open Parking Type 11 - N Type 111 - 1-Hour Type 111 -N Type V - 1-Hour $21.00 $21.00 $21.00 $21.00 $21.00 $21.00 20. RESTAURANTS *Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N $52.55 $52.55 $47.30 $45.15 *Add 0.5 percent to total cost for each story over three **Deduct 11 percent for mini-warehouse ***Deduct 20 percent for "shell only" buildings ****Add 25% for hazardous or high tech occupancies COST PER NEW SQ. FT $ 98.54 $ 65.31 $ 62.38 $ 70.51 $ 67.35 $ 65.31 $ 62.04 $ 22.15 $ 24.86 $ 15.03 $ 13.56 $114.58 $ 91.42 $ 87.76 $ 94.7O $ 91.64 $ 86.67 $ 83.73 $ 44.75 $ 35.03 $ 26.22 $ 33.79 $ 30.17 $ 30.16 $ 89.04 $ 86.11 $ 81.36 $ 78.09 13 Schedule D OCCUPANCY AND TYPE 21. SCHOOLS Type 1 or 11 F.R. Type 11 - 1-Hour Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N 22. SERVICE STATIONS Type 11 - N Type 111 - 1-Hour Type V - 1-Hour Canopies 23. STORES *Type 1 or 11 F.R. Type 11 - 1-Hour Type 11 - N Type 111 - 1-Hour Type 111 -N Type V- 1 Hour Type V - N 24. THEATERS Type 1 or 11 F.R. Type 111 - 1-Hour Type 111 -N Type V - 1-Hour Type V - N 25. WAREHOUSES** Type 1 or 11 F.R. Type 11 or V-1-Hour Type 11 or V-N Type 111 - 1-Hour Type 111 -N CITY OF CUPERTINO Building Valuation Schedule REMODEL COST PER sO. FT. $52.55 $38.85 $38.85 $36.75 $36.75 $36.75 $36.25 $36.25 $36.25 $13.65 $32.55 $29.40 $29.40 $29.4O $29.40 $29.40 $29.40 $42.00 $30.45 $29.40 $28.35 $27.3O $29.40 $14.70 $14.70 $14.70 $14.70 COST PER NEW SQ. FT. $102.72 $ 69.16 $ 74.24 $ 70.40 $ 69.16 $ 65.99 $ 61.47 $ 63.96 $ 54.35 $ 25.54 $ 76.16 $ 45.88 $ 44.97 $ 56.05 $ 52.88 $ 47.01 $ 43.39 $101.47 $ 73.00 $ 69.61 $ 68.25 $ 64.86 $ 45.65 $ 26.67 $ 25.O9 $ 30.62 $ 29.27 *Add 0.5 percent to total cost for each story over three **Deduct 11 percent for mini-warehouse ***Deduct 20 percent for "shell only" buildings ****Add 25% for hazardous or high tech occupancies 14 Schedule D CITY OF CUPERTINO Building Valuation Schedule EOUIPMENT AND AIR CONDITIONING Commercial Residential Sprinkler Systems $ 3.92 $ 3.38 $ 1.92 RETAINING WALLS. PER sO. FT. (HEIGHT X LENGTH) AREA ABOVE GRADE Masonry $ 25.54 Concrete $ 22.48 The Building Official is authorized to implement new Building Valuation Schedules approved by the I.C.B.O. *Add 0.5 percent to total cost for each story over three **Deduct 11 percent for mini-warehouse ***Deduct 20 percent for "shell only" buildings ****Add 25% for hazardous or high tech occupancies 15 Permit Valuation $1 - $3,000 $3,001 - 25,000 $25,001- 50,000 $50,001- 100,000 $100,001- 500,000 $500,001- 1,000,000 $1,000,001- PLAN CHECKING Structural and Non-Structural Schedule D CITY OF CUPERTINO Building Permit $77.00 $87,00 for the first $3,000 plus $10.00 for each additional $1,000 or fraction thereof, to and including $25,000. $300.00 for the first $25,000 plus $8.00 for each additional $1,000 or fraction thereof, to and including $50,000. $500.00 for the first $50,000 plus $6.00 for each additional $1,000 or fraction thereof, to and including $100,000. $788.00for the first $100,000 plus $4.00 for each additional $1,000 or fraction thereof, to and including $500,000. $2,609.00 for the first $500,000 plus $3.00for each additional $1,000 or fraction thereof, to and including $1,000,000. $4,440.00 for the first $1,000,000 and up plus $2.00 for each additional $1,000 or fraction thereof. 85% of building permit fee for each plan submitted. Each additional identical repeat plan for multi unit residential developments will be assessed at $22.20 each unit. Energy 30% of building permit fee for each plan submitted. Each additional identical repeat plan for multi-trait residential developments will be assessed at $22.20 each unit. Repeat plan checks that exceed 2 reviews will be charged an hourly rate at $55.50 per hour. 16 · ' Schedule D CITY OF CUPERTINO Building - Electrical Fees New Residential Buildings and Remodels that add additional square footage The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time. Permit Fee $ 35.52 New multi-family residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per square foot $ 0.06 New single and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot 0.07 For other types of residential occupancies and alterations, additions and modifications to existing residential buildings, use the UNIT FEE SCHEDULE 17 Schedule D CITY OF CUPERTINO Building - Electrical UNIT FEE SCHEDULE Remodel - No additional square footage Permit Fee Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall-mounted electric ovens; counter mounted cooking tops; electric ranges, self-contained room console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers washing machines; water heaters; clothes dryers; or other motor operated appliances not exceeding one horsepower (HP) in rating each NOTE: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Non-Residential Appliances For residential appliances and self-contained factory-wired, non-residential appliances non exceeding one horsepower (HP), kilowatt (KW), or kilovotampere (KVA) in rating including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each NOTE: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Services For services of 600 volts or less and not over 200 amperes in rating, each For services of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each For services over 600 volts over 1,000 amperes in rating, each 35.52 4.44 4.44 22.20 44.40 88.80 18 Schedule D CITY OF CUPERTINO Building - Electrical USER FEE SCHEDULE (continued) Remodel - No additional square footage Signs, Outline Lighting and Marquees For signs, outline lighting systems or marquees supplied from one branch circuit, each For additional branch circuits within the same sign, outline lighting system or marquee, each Miscellaneous Apparatus, Conduits, Conductors, and Special Circuits For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth Power Device/Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatuses, as follows: Rating in horsepower (HP), kilowatts (KW), kilovolt-amperes (KVA), or kilovolt-amperes-reactive (KVAR): 1 unit 2 through 5 units, each additional 6 and over, each additional NOTE: 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equipment. $ 22.20 $ 4.44 $ 25.53 $ 44.40 $ 16.65 $ 11.10 19 Schedule D CITY OF CUPERTINO Building - Electrical UNIT FEE SCHEDULE (continued) Remodel - No additional square footage Busways For trolley and plug-in-type busways, each 100 feet or fraction thereof Note: An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in-type busways. No fee is required for portable tools. Receptacle, Switch and Lighting Outlets For receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters. First 20 each Additional outlets, each NOTE: For multi-outlet assemblies, each 5 feet or fraction thereof may be considered as one outlet. Lighting Fixtures For lighting fixtures, sockets or other lamp holding devices First 20 each Additional fixtures, each For pole or platform-mounted lighting fixtures each For theatrical-type lighting fixtures or assemblies each $6.11 $1.11 $0.67 $1.11 $0.67 $1.11 $1.11 20 Schedule D CITY OF CUPERTINO Building - Mechanical Fees New Residential Buildings and Remodels that add additional square footage. The following fees shall include all mechanical equipment in or on each building, or other mechanical equipment on the same premised constructed at the same time. New multi-family residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per square foot $0.06 New and sinele and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $0.07 21 Permit Fee Schedule D CITY OF CUPERTINO Building - Mechanical Fees UNIT FEE SCHEDULE Remodels - No additional Square Footage For the repair of alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, VAV boxes, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this Code. For each air-handling unit, A/C units, heat pumps to and including 10,000 cubic feet per minute, including ducts attached thereto. Does not apply to central type. NOTE: This fee shall not apply to an air-handling unit that is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this Code. For each air-handling unit A/C unit, heat pump over 10,000 cfm For the installation or relocation of each commercial or industrial-type hood For the installation of each residential hood that is served by a mechanical exhaust, including the ducts for such hood For the installation or relocation of each forced-air or gravity-type furnace or bumer, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit For each ventilation fan connected to a single duct For the installation or relocation of each forced air or gravity type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h $ 35.52 $ 12.21 $ 8.33 $ 14.43 $127.65 $ 8.33 $ 12.21 $ 8.33 $ 6.11 $ 14.43 22 Schedule D CITY OF CUPERTINO Building - Mechanical Fees UNIT FEE SCHEDULE (continued) Remodels - No additional Square Footage For the installation or relocation of each floor furnace, including vent For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu/h and including 500,000 Btu/la For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h For each appliance or piece of equipment regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this Code $12.21 $12.21 $ 6.11 $12.21 $22.20 $31.08 $45.51 $77.70 $ 8.33 23 Schedule D CITY OF CUPERTINO Building - Plumbing Fees New Residential Buildings and Remodels that add additional square footage The following fees shall include all plumbing equipment in or on each building, or other plumbing equipment on the same premises constructed at the same time. New multi-family residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same, per square foot $0.06 New single and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $0.07 24 Permit Fee Schedule D CITY OF CUPERTINO Building - Plumbing Fees UNIT FEE SCHEDULE Remodel - No additional Square Footage For installation, alteration or repair of water piping water treating equipment For repair or alteration of drainage or vent piping, floor, area, condensate piping For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection therefor) For each gas piping system of one (1) to four (4) outlets For each gas piping system of five (5) or more, per outlet For each industrial waste pre-treatment interceptor, including its trap and vent, excepting kitchen type grease traps functioning as fixture traps Kitchen type trap and/or system For each building sewer, sanitary sewer, and each trailer park sewer Storm/rainwater systems per drain For each water heater and/or vent Water service Re-pipe per fixture $35.52 $ 8.33 $ 8.33 $ 8.33 $ 4.44 $ 1.11 $16.65 $ 8.33 $19.98 $ 8.33 $ 9.99 $ 8.33 $ 8.33 25 Schedule D CITY OF CUPERTINO Building - Plumbing Fees UNITS FEE SCHEDULE Remodel - No additional Square Footage (continued) For each lawn sprinkler system on any one meter, including backflow protection devices therefor Five (5) or more, each For atmospheric type vacuum breakers/backflow not included in item 1 1 to5 over 5 each additional For each private sewage disposal system For each cesspool $12.21 $ 0.67 $ 9.99 $ 2.00 $62.16 $31.08 26 CITY OF CUPERTINO OTHER BUILDING INSPECTION FEES Private Swimming Pools For new private, residential, in-ground, swimming pools for single-family and multi-family occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool, each For other types of swimming pools, therapeutic whirlpools, spas and alterations to existing swimming pools, use the UNIT FEE SCHEDULE Temporary Power Service For a temporary service power pole or pedestal including all pole or pedestal-mounted receptacle outlets and appurtenances, each For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative light, Christmas tree sales lots, fireworks stands, etc. each Inspection outside of the normal business hours (minimum charge two hours) Inspection for which no fee is specifically established (minimum charge one hour) Reinspection - A fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made $75.00 $30.00 $ 7.75 $69.00/hr. $47.00/hr. $47.00/hr. 27 Schedule E CITY OF CUPERTINO Water Reconnection/Non-payment of service Normal working hours After working hours Meter installation or special services (minimum 1 hour) $21.00 $43.00 $43.00/hr. 28 Schedule F CITY OF CUPERTINO Recreation Recreation classes and excursion fees shall be determined as follows: Classes 1. Determine the maximum hourly rate paid to instructor. 2. Multiply the instructor's hourly rate by the number of class meetings. 3. Determine the minimum number of participants and divide into the instructor's cost. 4. Add indirect overhead percent - 32%. 5. Add 20% to establish non-resident fee. 6. Add cost for specialized equipment or supplies. Special conditions: If participation does not meet minimum enrollment requirements and class continues, the instructor may receive 80% of the registration fee. Excursions 1. Transpiration cost divided by the number of participants plus overhead transfer. 2. Add 20% to establish non-resident fee. 3. Add any admission cost, supplies or leadership cost. Additional factors that may be used to determine the class or excursion user fee: The total number of participants in a given activity may generate additional revenue whereby the total program cost may be reduced. Classes that traditionally have waiting lists may have the user fee increased. Programs in competition with adjacent cities or the private sector may require fees to be increased or decreased to remain competitive. 29 Schedule F CITY OF CUPERTINO Recreation (continued) Facility Use Fee Schedule (Staff Use Only) CLASSIFICATIONS: Priority of l. Ys~ Group I: City of Cupertino activities that are open to the public. Official city sponsored programs. Group II: Clubs with 51% resident membership, recreation programs and events with full or affiliated city co-sponsorship and open to the public. Group III: Programs and events sponsored by Cupertino based non-profit recreation, education or community service organization with 51% resident participation. These organizations must show an official structure and status. Group IV: Private, special interest or business groups for functions not open to the public. These functions would include parties, banquets, receptions, industrial conferences, seminars, trade shows, etc. Group V: Programs and events sponsored by non-resident non-profit recreation, education or community service organization. These organizations must show official structure and status. Group VI: Cupertino Businesses using the Cupertino Room of the Quinlan Community Center for promotional and business related purposes other than negotiation or direct sale. 30 Schedule F CITY OF CUPERTINO Recreation (continued) ROOM RENTAL SCHEDULE PER HOUR Quinlan Community Center Senior Center Multi-Purpose (Mon- Thurs) (Fri - Sun) (After hours only) Group III $15 $40 $35 Group IV $50 $125 $50 Group V $25 $75 $40 Group VI $150 $150 Monta Vista N/A N/A N/A Classroom Group III $10 $35 $15 $15 Group IV $25 $50 $25 $25 Group V $15 $40 $15 $15 $15 $15 N/A $20 $20 N/A $15 $15 N/A Conference Room Group III $ 5 Group IV $20 Group V $15 Kitchenette Group III $1 O/hr Groups serving alcohol, add $15.00/hour for security personnel. A security deposit of $100 may be required based on the nature of the event. deposit is required for Group IV Quinlan Center Multi-Purpose. Groups I & II pay only staffing cost of $8.50/hour if needed. A $500 security 31 Schedule F CITY OF CUPERTINO Recreation (continued) OUTDOOR FACILITIES Memorial Softball Field Cupertino residents/businesses only Non-Residents Field can be reserved for a maximum of 2 hours THERE IS NO FEE FOR CURRENT SOFTBALL TEAMS PLAYING IN CUPERTINO LEAGUES Field preparation (includes dragging, watering, chalking, and bases) Field Attendant (2 hour minimum) Field Attendant is required any time lights or field preparation is requested. Lights (in the evening) Memorial Park Amphitheater Cupertino resident Non-resident Electricity Memorial Park Gazebo Cupertino resident Non-resident Picnic Areas Cupertino residents Non-residents Cupertino business Non-resident business If electricity is required $25.00 $40.00 $36.50 $ 8.25/hr. $ 5.00~hr. $25.00 $40.00 $16.50 $25.00 $4O.OO $30.00 $50.00 $50.00 $75.00 $17.00 (Add'l) 32 Schedule F CITY OF CUPERTINO Recreation (continued) BLACKBERRY FARM PICNIC GROUNDS General Administration: ADULT (13 years and over) CHILD (6 through 12) Children under 6 are free when accompanied by their parents Group Rates: 100 - 500 persons 501 - 1,000 persons 1,001 or more persons BLACKBERRY FARM GOLF COURSE Weekends & Holidays $6.50 $4.50 Adult Child (13 & over)(6 through 12) $6.00 $4.00 $5.50 $3.50 $5.00 $3.00 Weekends 9-Holes $11.00 Junior & Seniors (under 16 and over 62) N/A Second Nine (all players) $ 9.00 All green fee prices; deduct $1.00 when you present a Cupertino I.D. All groups and toumaments pay the full rate (Cupertino resident still applies). Staff is authorized to set merchandise fees according to current cost. BLACKBERRY FARM RETREAT CENTER Conference Room $30.00/person Weekdays $4.00 $3.00 Adult Child $3.75 $2.75 $3.50 $2.50 $3.25 $2.25 Weekdays $9.00 $8.0o $8.00 33 Schedule F CITY OF CUPERTINO SUMMARY OF USER FEES Recreation (continued) CUPERTINO SPORTS CENTER Resident: Day Use $ 7.00 Single Monthly $ 55.00 Couple Monthly $ 75.00 Family Monthly $ 95.00 Single Annual $350.00 Couple Annual $700.00 Family Annual $840.00 Non-Resident: Day Use $ 10.00 Single Monthly $ 55.00 Couple Monthly $ 75.00 Family Monthly $ 95.00 Single Annual $350.00 Couple Annual $700.00 Family Annual $840.00 ADDITIONAL CONDITIONS 1. Annual fee for Juniors (17 years and younger) of $240.00. 2. Annual fee for Seniors (62 years and older) of $315.00. 3. The Cupertino Tennis Club will be charged $10.00/hour per court for all C.T.C. sponsored activities other than U.S.T.A. leagues and practices. 4. All competitors in C.T.C./U.S.T.A. leagues participating at the Sports Center must purchase an annual pass. 5. An annual pass holder may purchase one block often (10) guest passes per year for $60.00. A guest must be accompanied by the pass holder who purchased the guest pass. 34