October 24, 2024 - First Quarterly Update for Year Two of FY 23-25 City Work Program CITY COUNCIL INFORMATIONAL MEMORANDUM Date: October 24, 2024 To: Cupertino City Council From: Pamela Wu, City Manager Re: First Quarterly Update for Year Two of the Fiscal Year (FY) 23-25 City Work Program Purpose This report focuses on City Work Program (CWP) updates from the first quarter (July – September) for FY 2024-2025. Background On April 4, 2023, the City Council adopted its first two-year CWP with the expectation of reevaluation on an annual basis. On April 3, 2024, Council reaffirmed the continuation of 11 ongoing projects and added nine new projects for the second year of the two-year CWP. These 20 projects make up the current adopted CWP (Attachment A), which can be viewed on the CWP Dashboard at cupertino.org/cityworkprogram. The Dashboard includes Q1 updates for all 20 projects with the addition of the following two projects, that were also carried over from the previous CWP: • Commission Governance Reform Package – Project Complete • Bicycle Facilities – Project expected to be completed by June 2025 Attachment B is a printout of the Dashboard that includes updates for each project. As done with previous quarterly updates, this update can be found on the city webpage at cupertino.org/cityworkprogram. Below are highlights from notable items: Council and Commission Governance Reform Package In March, Council adopted modifications to the Commissioner’s Handbook and made relevant changes to the Municipal Code and Resolution relating to advisory bodies. These changes were required to remain consistent with the City Council Procedures Manual adopted in February 2023 and the revised Ethics Code adopted by the City Council in November 2023. In September, staff surveyed all commissions to gather feedback on the 2 commission application to include relevant questions to better understand an applicant’s knowledge and qualifications for the commission. The new commission applications are complete and are scheduled to go live on the City webpage once recruitment begins in November. Public Safety Automated License Plate Readers (ALPR) On October 1, 2024, Council adopted an ALPR policy and authorized a memorandum of understanding with Santa Clara County regarding the use of ALPRs in Cupertino. Staff conducted outreach through the Public Safety and Technology, Information, and Communication Commissions. The Public Safety Commission unanimously recommended the policy, memorandum of understanding, and vendor selection for Council adoption. Staff is currently working on executing an agreement to lease and install 15 cameras throughout Cupertino. Block Leader Program Enhancements Staff has developed a framework to engage with community members and encourage recruitment of the Block Leader Program, which includes bi-monthly focus group meetings to engage volunteers and community members. Staff launched new community event programs such as Block Leader organized Personal and Family Preparedness classes and Block Party grants. Staff will continue ongoing promotion of these programs through various outreach channels. Poet Laureate Playbook Update Established in 2010, the Poet Laureate program aims to introduce the benefits of poetry to the Cupertino Community. Working closely with the Library Commission, City staff is creating an updated Poet Laureate Playbook to help streamline processes, attract a more diverse group of applicants, and outline clear expectations of the Poet Laureate and partnering agencies. The Library Commission and current Poet Laureate have provided feedback on the first draft of the updated Playbook and staff expects the Commission to approve the final draft on December 4. Housing Element In September, the City received full State certification for its Housing Element. The Department of Housing and Community Development’s (HCD) notified the City that the adopted housing element is in full compliance with the State Housing Element Law. The State of California requires cities to review their Housing Element every eight years to ensure that each city can effectively achieve its Regional Housing Needs Allocation (RHNA). To meet this requirement, the City of Cupertino must plan for the development of at least 4,588 new housing units. Municipal Water System On July 16, Council authorized the City Manager to execute a lease agreement with San Jose Water Company for the operation of the Cupertino Municipal Water System. This long term lease ensures that these services will continue for the next 12 years. 3 Speed Limit Lowering Cities are able to lower speed limits in certain areas designated through state Assembly Bill 43. Staff have conducted studies in designated corridors with potentially high concentration of bicyclists and pedestrians due to recent bike or ped related improvements, specifically around Blaney, Bubb, Mary, Prospect, and McClellan Rd. Staff is currently working on making adjustments of posted speed limit signage around these areas. This is expected to be completed early 2025. Support for the Unhoused The City partnered with Santa Clara County and West Valley Community Services in order to provide support for the Unhoused. The agreement was fully expended as of 9/30/2024. During this time the Haven to Home program gave supportive services and case management to 97 clients, held 2 outreach and resource fairs, and gave transportation services to 36 clients. The Rotating Safe Car Park program was held at 2 approved sites in the City of Cupertino: Bethel Lutheran Church and St Jude’s Episcopal Church and served a total of 26 clients. An overview of the Haven to Home program and the Unhoused Task Force was presented to Council at a study session on October 15, 2024. Per council direction, staff will bring an update and recommendation to Council in October 2025. So far, 4 of all 22 projects have been completed this Fiscal Year and 18 projects are in progress. The breakdown is shown in the table below. Refer to Attachment B for additional details and updates on each project listed below. Completed In Progress • Fiscal Procedures and Policies Handbook • Support for the Unhoused • Municipal Water System • Commission Governance Reform Package • Tree List – CDD • Tree List – Public Works • License Plate Readers • Block Leader & Neighborhood Watch • Preserve Existing and Develop New BMR/ELI Housing • Whole City Policy Review • 5G Ordinance • Residential and Mixed Use Design Standards • Art in Public and Private Areas • Speed Limit Lowering • Homestead Bike Lane Study and Safe Routes to School • Poet Laureate Playbook Update • Electrification Study • Recycled Water Feasibility Study • Sign Ordinance • The Rise Construction Stakeholder Engagement • Active Transportation Plan • Bicycle Facilities 4 Next Steps The next quarterly update will be provided in early 2025 as part of the new two-year City Work Program discussion with Council. The proposed approach and plan for the upcoming City Work Program discussion is being shared through a separate informational memo, published on October 24, 2024. Sustainability Impact There are no sustainability impacts associated with this update. Fiscal Impact To see the budget for each project and the total funds spent on the entire City Work Program, visit the City Work Program Dashboard. California Environmental Quality Act Not applicable. Prepared by: Astrid Robles, Senior Management Analyst Reviewed by: Christopher Jensen, City Attorney Tina Kapoor, Interim Assistant City Manager Approved by: Pamela Wu, City Manager Attachments: A – FY 24-25 Adopted City Work Program B – FY 24-25 City Work Program Q1 Dashboard Printout Adopted April 3, 2024 #Project Description Goal 1 Tree List (CDD) Review and revise development tree list (per Ch. 14.18: Protected Trees) with an emphasis on appropriate trees and native species. Sustainability and Fiscal  Strategy 2 Tree List (PW) Project Phases: 1)Review, revise, and communicate street tree list with an emphasis on appropriate trees and naƟve species. 2)Develop an Urban Forest program scope and cost for future consideraƟon. Sustainability and Fiscal  Strategy 3 Public Safety (License Plate Readers) Deploy city‐owned license plate readers and implement policies to allow neighborhood‐owned ones. Quality of Life 4 Public Safety (Block Leader) Strengthen Block Leader/Neighborhood Watch programs to ensure the leaders are active and expand the coverage of active  neighborhoods.  Quality of Life 5 Preserve existing and develop new BMR/ELI Housing Explore opportunities to preserve existing expiring BMR housing. Develop ELI (Extremely Low Income) and BMR housing units for Developmentally Disabled individuals (IDD) on City‐owned property as  well as the County‐owned sites. Housing 6 Whole City Policy Review Repeat the 2013 process of compiling and reviewing all City Policies including 1) Administrative and 2) Council policies and provide  recommendations/updates, e.g. Green Purchasing, Property Acquisition  Public Engagement and  Transparency 7 Fiscal Procedures and Policies Handbook Develop the handbook to ensure standardization of accounting, budget, investment, procurement policies, procedures, rules and  regulations.  Sustainability and Fiscal  Strategy 8 Support for the unhoused Collaborate and fund jointly with West Valley efforts to address regional needs and find workable support for the Unhoused. Housing 9 Municipal Water System To analyze and recommend options for the continued operation of the system currently and at the end of lease with San Jose Water  Company in September 2024. Sustainability and Fiscal  Strategy 10 5G Ordinance Update 5G Ordinance Quality of Life 11 Residential and Mixed Use Residential Design Standards Create objective design standards for residential projects, including ensuring adequate buffers from neighborhood low‐density  residential development Quality of Life 12 Art in Public and Private Areas  (Proposed by Arts & Culture Commission) Revisit Municipal Code standards for art in public and private development, including the standards in the Municipal Code and  developing an Art‐in‐lieu fee policy. Quality of Life 13 Speed Limit Lowering (AB 43) (Proposed by Bike Ped Commission) Lower speed limits where feasible pursuant to state adopted Assembly Bill 43 Transportation 14 Homestead Bike Lane Study & Safe Routes to School (Proposed by Bike Ped Commission) Support collaboration efforts on multi‐jurisdictional projects along Homestead Road that include upgrading pedestrian and bicycle  infrastructure. (The current project phase is focused on preliminary design and is funded to 35%. Future phases, when funded, will  focus on 100% plan design construction) Transportation 15 Poet Laureate Playbook Update (Proposed by Library Commission) Update the Cupertino Poet Laureate Playbook to streamline processes, outline clear expectations, and expand applicant qualifications.  The playbook has not been updated since 2016. Quality of Life 16 Electrification Study (Proposed by Sustainability Commission) Conduct public outreach, policy research, and coordinate with regional efforts to develop policy options for electrification of  Cupertino's buildings in light of recent legal rulings inhibiting certain electrification efforts. Sustainability and Fiscal  Strategy 17 Recycled Water Feasibility Study (Proposed by Library and Sustainability Commissions) Develop Recycled Water Feasibility Study.  Include Blackberry Farm focus and extension of recycled water from SCVWD.Sustainability and Fiscal  Strategy 18 Sign Ordinance Update Sign Ordinance Quality of Life 19 The Rise: Construction stakeholder engagement Improve engagement with stakeholders to ensure progress with construction and reduce barriers. Quality of Life 20 Active Transportation Plan (Proposed by Teen, Bike Ped, and Planning Commission) This item is a consolidation of existing and new transportation efforts aiming to further goals outlined in the City's Vision Zero Initiative,  including: 1) Review and update the bike plan 2) Review and update the pedestrian plan 3) Review current Complete Streets Policy and propose adjustments to create a better interface between all modes of transportation Transportation Adopted FY 24‐25 City Work Program  Ongoing Projects New Projects* *Budget for new items will be considered in May 2024 Attachment A - Adopted FY 24-25 City Work Program Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $50,000 $50,000 $0.00 $50,000 7/2/2024 # Task Status Task Start Task End % Complete 1.2 Planning Phase In Progress 1/1/2024 9/15/2024 95 1.3 Procurement Future 9/15/2024 1/29/2025 0 1.4 Closing Processes Future 1/29/2025 6/29/2025 0 Updates Commission Lead Department Community Development Update Project was on hold until after completion of the Housing Element. Staff has worked with Public Works on an RFP. The document is to be finalized by both departments by Mid-October 2024; and advertised on the City's webpage in November 2024. Consultant Bid collection will remain open approximately 3-4 weeks. Public Works and Planning aim to negotiate and finalize a contract agreement and secure a consultant in December 2024. Staff will work with Public Works and consultant as project continues. Scheduled community outreach and public meetings to take place in 2025, dates TBD Details Sustainability and Fiscal Strategy Tree List - Community Development N/A Review and revise development tree list (per Ch. 14.18: Protected Trees) with an emphasis on appropriate trees and native species. Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 1 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $60,000 $60,000 $0.00 $60,000 10/14/2024 # Task Status Task Start Task End % Complete 1.2 Planning Phase Complete 4/30/2023 7/30/2023 100 1.3 Procurement In Progress 7/30/2023 11/30/2024 75 1.4 Execution Phase Future 11/30/2024 4/30/2025 0 1.5 Closing Processes Future 4/30/2025 6/30/2025 0 Details Sustainability and Fiscal Strategy Tree List - Public Works N/A 2) Review, revise, and communicate street tree list with an emphasis on appropriate trees and native species. 3) Develop an Urban Forest program scope and cost for future consideration. Update Staff developed a plan to revise the City's street tree list. Staff currently working on RFP with hopes to publish by Nov 2024. Updates Commission Lead Department Public Works Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 2 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $60,000 $60,000 $0.00 $60,000 6/26/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 7/1/2022 4/1/2024 100 1.3 Outreach Complete 2/1/2024 9/30/2024 100 1.4 Procurement In Progress 5/1/2024 12/30/2024 50 1.5 Execution Phase Future 9/30/2024 12/30/2024 0 1.6 Closing Processes Future 12/30/2024 6/30/2025 0Staff will continue to monitor data as project continues. Updates Commission Lead Department City Manager's Office Update The Santa Clara County Sheriff's Office and the Santa Clara County Board of Supervisors approved the Automated License Plate Readers policy in January 2024 that allows data sharing among law enforcement agencies. Staff have conducted public meetings with the TICC and Public Safety Commissions in March 2023. Staff returned to the Public Safety Commission on 9/12/24 for a final recommendation. City Council adopted the Policy, authorized the MOU, and deployment model on 10/1/24. Staff is working to execute an agreement to purchase cameras. Upon contract execution, 15 cameras will be installed throughout Cupertino. Details Quality of Life License Plate Readers Public Safety Deploy city-owned license plate readers and implement policies to allow neighborhood-owned ones. Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 3 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $10,000 $10,000 $0.00 $10,000 6/26/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 7/1/2023 1/31/2024 100 1.3 Planning Phase Complete 7/1/2023 6/1/2024 100 1.4 Execution Phase In Progress 4/1/2024 5/31/2025 85 1.5 Closing Processes Future 6/1/2025 6/30/2025 0 Details Quality of Life Public Safety - Block Leader and Neighborhood Watch Public Safety Strengthen Block Leader/Neighborhood Watch programs to ensure the leaders are active and expand the coverage of active neighborhoods. Update Staff secured a grant opportunity with CA Volunteers to support expansion of the Block Leader program. Staff researched and submitted a proposal with best practices to encourage engagement with Block Leaders, which is modeled from the City of Saratoga. Staff have developed a framework to engage with community members and encourage recruitment of the Block Leader Program. Staff have scheduled bi-monthly focus groups to engage volunteers and community members. Staff launched new community engagement programs such as Block Leader organized Personal and Family Preparedness classes and Block Party grants. The CA Volunteers grant ended on September 30, 2024. Staff will continue ongoing promotion with the website, Block Leader Newsletter, and regular IOI entries. Close out pending completion of execution phase. Updates Commission Lead Department City Manager's Office Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 4 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $250,000 $250,000 $14,703.62 $235,296.38 7/2/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 7/1/2019 10/30/2019 100 1.3 Planning Phase Complete 7/1/2021 8/16/2022 100 1.4 Outreach Complete 10/1/2021 8/16/2022 100 1.5 Procurement Complete 2/9/2021 1/31/2023 100 1.6 Execution Phase In Progress 1/31/2023 12/30/2024 25 1.7 Closing Processes Future 1/30/2025 1/30/2025 0 City Council selected developer through approval of an ENA for the Mary Avenue Site in February. Next steps include approve time sheet and enter into Disposition and Development Agreement early Winter 2024. Will present final DDA to Council at the end of winter 2024. Construction will commence. Details Housing Preserve existing and develop new BMR/ELI Housing Planning Explore opportunities to preserve existing expiring BMR housing. Develop ELI (Extremely Low Income) and BMR housing units for Developmentally disabled individuals (IDD) on City- Owned property as well as the County-owned sites. Update Researched need for ELI developmentally disabled housing and moderate income housing and determined possible City locations. Scoped affordable housing project with non- profits/developers and worked with Public Works to determine feasibility of project on City sites. Had Council study session March 15. RFP was released in August . Marketed City's capital housing funds for development of affordable housing. Evaluated Notice of Financial Assistance (NOFA) applications. One responses to the RFP was received in October and staff is evaluating next steps in the execution phase. Updates Commission Lead Department Community Development Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 5 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $10,000 $10,000 $10,000 $0.00 7/23/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 11/1/2023 9/11/2024 100 1.3 Execution Phase In Progress 10/7/2024 11/19/2024 95 1.5 Closing Processes In Progress 10/7/2024 11/30/2024 90 Update Staff gathered and submited policies to the City's internal auditor, Moss Adams, for review. The auditor issued a report with recommendations. Staff will review final internal auditor report on Whole City Policy inventory with Audit Committee October 2024. Staff will bring this item to Council in November 2024. Whole City Policy document will be finalized and compiled. Updates Details Public Engagement & Transparency Whole City Policy Review N/A Repeat the 2013 process of compiling and reviewing all City Policies including 1) Administrative and 2) Council policies and provide recommendations/updates, e.g. Green Purchasing, Property Acquisition Commission Lead Department Administrative Services Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 6 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $45,000 $45,000 $45,000 $0.00 7/2/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 7/1/2023 8/30/2023 100 1.3 Execution Phase Complete 9/1/2023 4/30/2024 100 1.4 Closing Processes Complete 6/30/2024 6/30/2024 100 Update Staff reviewed Moss Adams' observations and recommendations identified in the fiscal policy inventory gap analysis report. All high-risk policies identified in the fiscal policy inventory gap analysis report by the City's internal auditor have been revised and adopted. Staff will continue to finalize edits to existing policies identified as medium to low risk. Project is complete. Updates Details Sustainability and Fiscal Strategy Fiscal Procedures and Policies Handbook N/A Develop the handbook to ensure standardization of accounting, budget, investment, procurement policies, procedures, rules and regulations. Commission Lead Department Administrative Services Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 7 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $50,000 $50,000 $50,000 $0.00 10/7/2024 # Task Status Task Start Task End % Complete 1.2 Planning Phase Complete 7/1/2023 7/18/2023 100 1.3 Execution Phase Complete 7/18/2023 9/30/2024 100 1.4 Closing Processes Complete 9/30/2024 9/30/2024 100 Details Housing Support for the Unhoused Housing Collaborate and fund jointly with West Valley efforts to address regional needs and find workable support for the Unhoused. Update City has partnered with Santa Clara County and West Valley Community Services in order to provide support for the Unhoused. Services are ongoing to assist Unhoused residents in Cupertino with case management and social services, as well as with their vehicle needs, in partnership with Santa Clara County and West Valley Community Services. The agreement was fully expended as of 9/30/2024 Throughout FY23-24 the Haven to Home program gave supportive services and case management to 97 clients, held 2 outreach and resource fairs, and gave transportaiton services to 36 clients. The Rotating Safe Car Park program was held at 2 approved sites in the CIty of Cupertino: Bethel Lutheran Church and St Judes Episcopal Church and served a total of 26 clients. Updates Commission Lead Department Community Development Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 8 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $181,500 $181,500 $168,498 $13,002 7/11/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 11/2/2020 7/1/2021 100 1.3 Planning Phase Complete 9/21/2021 9/30/2024 100 1.4 Closing Processes Complete 8/6/2024 9/30/2024 100 Update Researched Legal and other requirements if system is leased, sold or City Operated in the future. Original RFP issued on 12/14/21. RFP process was canceled on 3/3/22 and then re-issued in July 2023. Staff presented a new lease agreement to the City Council in July 2024. City Council approved a new 12-year lease agreement in July. Project is now Complete. Updates Details Sustainability and Fiscal Strategy Municipal Water System FY 23 N/A To analyze and recommend options for the continued operation of the system currently and at the end of lease with San Jose Water Company in September 2024. Commission Lead Department Public Works Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 9 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $0 $250,000 $0 $250,000 7/2/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 7/1/2022 9/30/2022 100 1.3 Planning Phase In Progress 4/1/2023 1/1/2025 90 1.4 Closing Processes Future 1/1/2025 2/28/2025 0 Update Researched 5G ordinance regulations in other cities. Staff is finalizing a municipal code update based on input from City Council at the 12/6/22 CC meeting. This update will govern the installation of wireless small cell facilities within the Public Right of Way. This will go to Council by Spring 2025. Updates Details Quality of Life 5G Ordinance N/A Adopt regulations based on aesthetics. Commission Lead Department Public Works Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 10 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $240,000 $240,000 $50,274 $189,726 6/24/2024 # Task Status Task Start Task End % Complete 1.2 Procurement Complete 10/9/2020 4/30/2024 100 1.3 Outreach Future 12/1/2024 2/28/2025 0 1.4 Execution Phase Future 2/28/2025 6/27/2025 0 1.5 Closing Processes Future 6/30/2025 7/7/2025 0Complete project Update RFP sent out in Oct 2020. Proposals evaluated and RRM Design Group was selected for this project, but was put on hold in October 2023. RRM Design Group contract terminated in late 2023. Council approved a new agreement with Placeworks in April 2024. Staff will be conducting outreach after project kickoff. Project review and approval by Planning Commission and City Council prior to the end of the fiscal year 24-25. Updates Details Quality of Life Residential and Mixed Use Residential Design Standards FY 23 Planning Create objective design standards for residential and mixed-use residential projects, including ensuring adequate buffers from neighboring low-density residential development. Commission Lead Department Community Development Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 11 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $10,000 $10,000 $0 $10,000 # Task Status Task Start Task End % Complete 1.2 Research Complete 1/30/2024 8/30/2024 100 1.3 Planning Phase In Progress 9/1/2024 1/10/2025 50 1.4 Procurement Future 1/10/2025 4/30/2025 0 1.5 Execution Phase Future 4/1/2025 5/30/2025 0 1.6 Closing Processes Future 5/31/2025 6/30/2025 0 This will be brought to the City Council for a First and Second Reading. Muni Code will be updated based on Council direction. Update Research was compled by CDD and CIP Staff. Examined multiple Bay Area jurisdictions. Study session held at the 9/23/24 Arts and Culture Commission. Staff will return in early 2025 with modifications to the existing policy and Municipal Code for the Commission's review. Planning Commission and City Council to review Arts and Culture Commission recommendations. Updates Details Quality of Life Art in Public and Private Areas Arts & Culture Revisit Municipal Code standards for art in public and private development, including the sta ndards in the Municipal Code and developing an Art-in-lieu fee policy. Commission Lead Department Community Development Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 12 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $0 $0 $0 $0 # Task Status Task Start Task End % Complete 1.2 Planning Phase Complete 7/1/2024 7/1/2024 100 1.3 Execution Phase In Progress 7/1/2024 12/31/2024 10 1.4 Closing Processes Future 1/1/2025 1/1/2025 0 Update Studies on designated corridors with potentially high concentration of bikes and peds due to recent bike or ped related improvements (Blaney, Bubb, Mary, Prospect, McClellan) Adjustment of posted speed limits in the field. Completion of CWP. Updates Details Transportation Speed Limit Lowering Bicycle Pedestrian Revisit Municipal Code standards for art in public and private development, including the sta ndards in the Municipal Code and developing an Art-in-lieu fee policy. Commission Lead Department Public Works Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 13 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $0 $0 $0 $0 # Task Status Task Start Task End % Complete 1.2 Outreach Complete 7/1/2024 7/8/2024 100 1.3 Execution Phase In Progress 7/1/2024 9/11/2024 90 1.4 Closing Processes In Progress 7/1/2024 5/16/2025 50 Update Staff has been coordinating with VTA, Sunnyvale, Los Altos, Santa Clara County, Schools and other stakeholder groups since 12/2023. Project currently funded for 35% design drawings. Completion of current project includes 35% design drawings. Final comment submittal of 35% design anticipated 9/11/2024. This CWP wil close upon receipt of environmental clearance, expected 5/16/25. Staff will continue to support the project through completion once/if additinal funding is identified. Staff will continue to support efforts to identify funding sources. Updates Details Transportation Homestead Bike Lane Study & Safe Routes to School Bicycle Pedestrian Support collaboration efforts on multi-jurisdictional projects along Homestead Road that include upgrading pedestrian and bicycle infrastructure. (The current project phase is focused on preliminary design and is funded to 35%. Future phases, when funded, will focus on 100% plan design construction) Commission Lead Department Public Works Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 14 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $0 $0 $0 $0 10/14/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 7/1/2024 8/1/2024 100 1.3 Execution Phase In Progress 8/7/2024 12/4/2024 14 1.4 Closing Processes Future 2/5/2025 6/30/2025 0 Update City Staff researched similar Poet Laureate programs from other Bay Area agencies. City Staff presented the first draft of the Poet Laureate Playbook and logo to the Library Commission and current Poet Laureate to receive feedback. City Staff will update the Playbook and present the final draft to the Library Commission for approval. The Library Commission will appoint a Poet Laureate Sub-Committee to facilitate the recruitment and selection process for next Poet Laureate using the updated Poet Laureate Playbook. Updates Details Quality of Life Poet Laureate Playbook Library Update the Cupertino Poet Laureate Playbook to streamline processes, outline clear expectations, and expand applicant qualifications. The playbook has not been updated since 2016. Commission Lead Department Parks and Recreation Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 15 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $50,000 $50,000 $36,057 $13,943 10/10/2024 # Task Status Task Start Task End % Complete 1.1 Research In Progress 1/31/2024 4/1/2025 60 1.2 Execution Phase In Progress 5/1/2024 12/31/2024 95 1.3 Design Phase In Progress 1/31/2024 4/1/2025 30 1.4 Outreach In Progress 8/1/2024 6/30/2025 40 1.5 Execution Phase Future 4/1/2025 6/30/2025 0 1.6 Closing Processes Future 6/30/2025 6/30/2025 0 Policy outreach for existing building electrification is in progress. Workshops and stakeholder calls with local businesses have been completed. Residential outreach campaign and survey coming soon. Draft policy for existing buildings electrification will be developed based on feedback from community and regional approach. Project will be completed, upon policy adoption Update Researched and coordinated with neighboring jurisdictions about policy options for new and existing buildings. Hired consultant existing building policy options. The conversation is on- going. In light of the recent legal rulings, a Reach Code replacement for new building electrification was presented to City Council and approved. CEC and CBSC must approve the code before going into effect. Policy options for existing buildings are being assessed in partnership with regional jurisdictions and contractors. Updates Details Sustainability and Fiscal Strategy Electrification Study Sustainability Conduct public outreach, policy research, and coordinate with regional efforts to develop policy options for electrification of Cupertino's buildings in light of recent legal rulings inhibiting certain electrification efforts. Commission Lead Department Public Works Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 16 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $200,000 $200,000 $0 $200,000 10/14/2024 # Task Status Task Start Task End % Complete 1.2 Planning Phase In Progress 10/15/2024 12/31/2024 10 1.3 Execution Phase Future 1/11/2025 9/30/2025 0 1.4 Closing Processes Future 10/1/2025 10/17/2025 0 Update Staff drafting the RFP with hopes to issue before Dec 2024 Development of recycled water feasibility study Project closeout Updates Details Sustainability and Fiscal Strategy Recycled Water Feasibility Study Sustainability Develop Recycled Water Feasibility Study. Include Blackberry Farm focus and extension of recycled water from SCVWD. Commission Lead Department Public Works Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 17 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $200,000 $200,000 $0 $200,000 # Task Status Task Start Task End % Complete 1.2 Procurement Future 1/2/2025 1/31/2025 0 1.3 Research Future 2/1/2025 3/31/2025 0 1.4 Design Phase Future 4/1/2025 5/31/2025 0 1.5 Outreach Future 5/1/2025 6/30/2025 0 1.6 Execution Phase Future 7/1/2025 10/1/2025 0 Outreach with community and businesses Draft Ordinances/hearings Update RFP for services anticipated in Jan 2025 Determine what needs to be changed Determine what changes may be proposed Updates Details Quality of Life Sign Ordinance N/A Update Sign Ordinance Commission Lead Department Community Development Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 18 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $100,000 $100,000 $0 $100,000 # Task Status Task Start Task End % Complete 1.2 Procurement Complete 5/1/2024 5/14/2024 100 1.3 Execution Phase In Progress 5/15/2024 12/31/2024 50 1.4 Closing Processes Future 12/31/2024 12/31/2024 0 Update The City executed an agreement for Real Estate Project Management Support to support staff's efforts related to The Rise construction project. In July, Council voted on an agreement regarding the payment of impact fees by the Rise Project. In September, the Silicon Valley Business Journal recognized The Rise during the 2024 Structures Awards. In October, the City issued a grading permit to prepare the site for future work to begin in late Fall. The City will continue engagement with this project on an ongoing basis. Updates Details Quality of Life The Rise: Construction Stakeholder Engagement N/A Improve engagement with stakeholders to ensure progress with construction and reduce barriers. Commission Lead Department City Manager's Office Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 19 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $300,000 $300,000 $0 $300,000 # Task Status Task Start Task End % Complete 1.2 Procurement In Progress 7/1/2024 12/31/2024 75 1.3 Execution Phase Future 12/1/2024 5/31/2026 0 1.4 Closing Processes Future 6/1/2026 6/30/2026 0 Update Proposals received and being evaluated. Agreement expected to be executed December 2024. Plan development phase. Will include significant outreach and meetings with BPC. City Council adoption of Plan. Updates Details Transportation Active Transportation Plan N/A This item is a consolidation of existing and new transportation efforts aiming to further goals outlined in the City's Vision Zero Initiative, including: 1) Review and update the bike plan 2) Review and update the pedestrian plan 3) Review current Complete Streets Policy and propose adjustments to create a better interface between all modes of transportation Commission Lead Department Public Works Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 20 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $0 $0 $0 $0 7/2/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 7/1/2023 3/30/2024 100 1.3 Execution Phase Complete 2/1/2024 5/30/2024 100 1.4 Outreach Complete 3/5/2024 9/30/2024 100 1.5 Closing Processes Complete 10/1/2024 10/20/2024 100New applications are available for the next round of Commission Recruitment, which will begin in November. Update Staff researched commission info from other cities. Staff presented this item to the City Council at the 3/5 City Council meeting. At this meeting, Council adopted amendments to the Muni Code, Commission resolution, and Commissioners Handbook. Staff surveyed commissioners on new criteria questions for new applicants. Updates Details Public Engagement & Transparency Commission Governance Reform Package N/A 1. Revised Commissioner’s Handbook to align it with Council Procedures Manual 2. Investigate & report back on incidents of violations of the Muni Code re: the Commission- Staff relationship 3. Realignment of Commissioner terms of office 4. Establishment/revision of commissioner qualifications Commission Lead Department City Manager's Office Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 21 Estimated Budget Allocated Budget Budget Expended/ Encumbered Budget Remaining Last Updated $50,000 $50,000 $0 $50,000 7/7/2024 # Task Status Task Start Task End % Complete 1.2 Research Complete 10/5/2022 2/15/2023 100 1.3 Outreach In Progress 10/19/2022 10/16/2024 60 1.4 Planning Phase In Progress 9/4/2023 10/31/2024 28 1.5 Execution Phase Future 7/31/2024 6/30/2025 0 1.6 Closing Processes Future 6/30/2025 6/30/2025 0 Purchase and install bike racks Project will be complete once bike racks are installed. Update Research bike rack and installation requirements Gathering feedback and recommendations from commissions BPC Subcommittee and Rotary performing outreach with private businesses to allow bike rack installation on private property. Updates Details Transportation Bicycle Facilities FY 23 Bicycle Pedestrian Increase the inventory of bicycle facilities and amenities, such as bike racks, citywide. Commission Lead Department Public Works Attachment B - FY 24-25 City Work Program Q1 Dashboard Printout Page 22