Loading...
BLD-2023-1364InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 21992 WOODBURY DR Cupertino APN: 326 39 019 PERMIT NO: BLD-2023-1364 OWNER'S NAME: FANG XIAOZHOU AND PANG RAN OWNER'S PHONE: 919-348-3049 CONTRACTOR: JIACHENG HOME IMPROVEMENTS, 3300 VERNICE AVE SAN JOSE CONTRACTOR PHONE: 6504077898 DATE ISSUED 4/25/2024 10:06:46 AM ISSUED BY:VALUATION: $120000 JOB DESCRIPTION REMODEL OTHER TO EXISTING 1-STORY SFD (1,183 SF) INCLUDING TO CONVERT (E) FAMILY ROOM INTO NEW BEDROOM, NEW BATHROOM, RELOCATE LAUNDRY ROOM; KITCHEN RELOCATION AND REMODEL (248 SF); (2) BATHROOM REMODELS (201 SF); DEMO (2) EXISTING FIREPLACES; MAIN PANEL UPGRADE (200A); REPLACE FURNACE WITH HEAT PUMP IN ATTIC AND NEW CONDENSER; NEW TANKLESS GAS WATER HEATER; NEW SKYLIGHT; (2) NEW SLIDING DOORS INSPECTION TYPE DATE STATUS INSPECTOR ROUGH PLUMBING 2023-10-19 Passed Antonio Torrez FOUNDATION 2023-10-19 Passed Antonio Torrez ROUGH ELECTRICAL 2023-10-19 Failed Antonio Torrez ROUGH FRAME 2023-10-19 Failed Antonio Torrez ROUGH MECHANICAL 2023-10-19 Failed Antonio Torrez ROUGH PLUMBING 2023-10-19 Passed Antonio Torrez ROUGH FRAME 2023-10-27 Passed Antonio Torrez INTERIOR SHEAR 2023-10-27 Passed Antonio Torrez SHOWER PAN 2023-10-27 Failed Antonio Torrez EXTERIOR LATH 2023-10-27 Cancelled Antonio Torrez AIR CONDITIONER 2023-10-27 Cancelled Antonio Torrez ROUGH MECHANICAL 2023-10-27 Passed Antonio Torrez ROUGH ELECTRICAL 2023-10-27 Passed Antonio Torrez INSULATION 2023-11-13 Passed Antonio Torrez SHOWER PAN 2023-11-13 Passed Antonio Torrez SHEETROCK 2023-11-28 Passed Antonio Torrez SANITARY - VISUAL 2024-01-04 Passed cupsanitary SANITARY - FINAL 2024-01-09 Passed cupsanitary FINAL BUILDING 2024-02-20 Failed Antonio Torrez FINAL ELECTRICAL 2024-02-20 Passed Antonio Torrez FINAL MECHANICAL 2024-02-20 Passed Antonio Torrez FINAL PLUMBING 2024-02-20 Passed Antonio Torrez ELECTRIC METER RELEASE 2024-02-20 Passed Antonio Torrez FINAL BUILDING 2024-04-25 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.