BLD-2023-1364InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 21992 WOODBURY DR Cupertino APN: 326 39 019 PERMIT NO: BLD-2023-1364
OWNER'S NAME: FANG XIAOZHOU AND PANG RAN OWNER'S PHONE: 919-348-3049
CONTRACTOR: JIACHENG HOME IMPROVEMENTS, 3300 VERNICE AVE SAN JOSE CONTRACTOR PHONE: 6504077898
DATE ISSUED 4/25/2024 10:06:46 AM ISSUED BY:VALUATION: $120000
JOB DESCRIPTION
REMODEL OTHER TO EXISTING 1-STORY SFD (1,183 SF) INCLUDING TO CONVERT (E) FAMILY ROOM INTO NEW BEDROOM, NEW BATHROOM, RELOCATE LAUNDRY ROOM; KITCHEN
RELOCATION AND REMODEL (248 SF); (2) BATHROOM REMODELS (201 SF); DEMO (2) EXISTING FIREPLACES; MAIN PANEL UPGRADE (200A); REPLACE FURNACE WITH HEAT PUMP IN
ATTIC AND NEW CONDENSER; NEW TANKLESS GAS WATER HEATER; NEW SKYLIGHT; (2) NEW SLIDING DOORS
INSPECTION TYPE DATE STATUS INSPECTOR
ROUGH PLUMBING 2023-10-19 Passed Antonio Torrez
FOUNDATION 2023-10-19 Passed Antonio Torrez
ROUGH ELECTRICAL 2023-10-19 Failed Antonio Torrez
ROUGH FRAME 2023-10-19 Failed Antonio Torrez
ROUGH MECHANICAL 2023-10-19 Failed Antonio Torrez
ROUGH PLUMBING 2023-10-19 Passed Antonio Torrez
ROUGH FRAME 2023-10-27 Passed Antonio Torrez
INTERIOR SHEAR 2023-10-27 Passed Antonio Torrez
SHOWER PAN 2023-10-27 Failed Antonio Torrez
EXTERIOR LATH 2023-10-27 Cancelled Antonio Torrez
AIR CONDITIONER 2023-10-27 Cancelled Antonio Torrez
ROUGH MECHANICAL 2023-10-27 Passed Antonio Torrez
ROUGH ELECTRICAL 2023-10-27 Passed Antonio Torrez
INSULATION 2023-11-13 Passed Antonio Torrez
SHOWER PAN 2023-11-13 Passed Antonio Torrez
SHEETROCK 2023-11-28 Passed Antonio Torrez
SANITARY - VISUAL 2024-01-04 Passed cupsanitary
SANITARY - FINAL 2024-01-09 Passed cupsanitary
FINAL BUILDING 2024-02-20 Failed Antonio Torrez
FINAL ELECTRICAL 2024-02-20 Passed Antonio Torrez
FINAL MECHANICAL 2024-02-20 Passed Antonio Torrez
FINAL PLUMBING 2024-02-20 Passed Antonio Torrez
ELECTRIC METER RELEASE 2024-02-20 Passed Antonio Torrez
FINAL BUILDING 2024-04-25 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.