Loading...
BLD-2021-1941InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 21965 HYANNISPORT DR Cupertino APN: 356 07 017 PERMIT NO: BLD-2021-1941 OWNER'S NAME: BHATTACHARYA MEGHDOOT AND MOUSHUMI TRUSTEE OWNER'S PHONE: 408-332-1137 CONTRACTOR: BUILD BY TITAN INC, 325 PHELAN AVE SAN JOSE CONTRACTOR PHONE: 408-338-7788 DATE ISSUED 3/21/2024 7:13:46 AM ISSUED BY:VALUATION: $600000 JOB DESCRIPTION NEW 2 STORY SFD (3,290 SF); NEW ATTACHED GARAGE (441 SF); COVERED PORCH (71 SF); COVERED PATIO (186 SF) REV #1 - ADDED (2) WINDOWS IN BEDROOM 3; ADDED (1) WINDOW IN CORRIDOR-APPROVED 1/13/23 REV #2 - RELOCATE EXTERIOR ELECTRICAL PANEL; LANDSCAPE - APPROVED 8/23/2023 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2022-06-30 Passed Antonio Torrez PIERS 2022-06-30 Passed Antonio Torrez UNDERFLOOR FRAMING 2022-08-02 Passed Antonio Torrez UNDERFLOOR MECHANICAL 2022-08-02 Passed Antonio Torrez UNDERFLOOR PLUMBING 2022-08-02 Passed Antonio Torrez EXTERIOR SHEAR 2022-09-28 Passed Antonio Torrez INTERIOR SHEAR 2022-09-28 Passed Antonio Torrez ROOF NAIL 2022-09-28 Passed Antonio Torrez SLAB 2023-01-20 Passed Rodney Weathers FIRE DEPT - SPRINKLERS - ROUGH 2023-02-14 Passed Santa Clara County Fire ROUGH ELECTRICAL 2023-02-23 Failed Rodney Weathers ROUGH FRAME 2023-02-23 Failed Rodney Weathers ROUGH MECHANICAL 2023-02-23 Passed Rodney Weathers ROUGH PLUMBING 2023-02-23 Passed Rodney Weathers INSULATION 2023-03-20 Passed Antonio Torrez ROUGH FRAME 2023-03-20 Passed Antonio Torrez ROUGH ELECTRICAL 2023-03-20 Passed Antonio Torrez SHEETROCK 2023-03-27 Passed Antonio Torrez EXTERIOR LATH 2023-03-27 Passed Antonio Torrez UNDERFLOOR INSULATION 2023-03-27 Passed Antonio Torrez SCRATCH COAT 2023-04-27 Passed Antonio Torrez INTERIOR LATH 2023-05-11 Cancelled   INTERIOR LATH 2023-05-04 Passed Antonio Torrez SHOWER PAN 2023-05-04 Passed Antonio Torrez UNDERGROUND SEWER 2023-05-25 Passed Antonio Torrez UNDERGROUND WATER SERVICE 2023-05-25 Passed Antonio Torrez ELECTRIC METER RELEASE 2023-06-21 Passed Antonio Torrez SANITARY - FINAL 2024-01-26 Passed cupsanitary FIRE DEPT - SPRINKLERS - FINAL 2024-01-30 Passed Santa Clara County Fire FINAL PLANNING 2024-03-04 Passed Danielle Condit PW – DEV SERVICES FINAL 2024-03-08 Passed Kevin Rieden FINAL ELECTRICAL 2024-03-20 Passed Antonio Torrez FINAL MECHANICAL 2024-03-20 Passed Antonio Torrez FINAL PLUMBING 2024-03-20 Passed Antonio Torrez FINAL BUILDING 2024-03-21 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.