Action Letter - Notice of Decision
February 16, 2024
Via Electronic and Regular Mail
Reed Moulds, Managing Director
Vallco Property Owner LLC
965 Page Mill Road
Palo Alto, CA 94304
SUBJECT: APPROVAL LETTER – THE RISE SB 35 DEVELOPMENT (FORMERLY
VALLCO TOWN CENTER) – SECOND MODIFICATION APPLICATION
This letter serves as ministerial approval (“Approval”) of the “The Rise SB 35
Application” (“Application”), requesting modification of the Vallco Town Center
project approved pursuant to Government Code Section 65913.4 under Senate Bill 35
(“SB 35”). The Application, which included four requested project entitlements, was
submitted to the City by Vallco Property Owner, LLC (“Applicant”) on December 5,
2023 for the 50.82-acre Vallco Mall property located between Interstate 280 and Steven’s
Creek Boulevard and on both sides of North Wolfe Road.
This Approval is based on the Application and the additional updated plans and
responses, in response to comments from the City, submitted by the Applicant on
February 6 and February 14, together which is referred to as the “Project Application.”
I. Project Approval
The following entitlements are approved:
a. Modification to Development Permit
b. Architectural and Site Approval - Major
c. Tentative Subdivision Map for Condominium Purposes
d. Tree Removal Permit
Under the State’s and City’s Density Bonus Laws, the Applicant requests a 50% density
bonus in compliance with State Law provisions in place on the date of Application. This
allows an increase in the unit count in the project from 2,402 units to 2,669 units.
2
The Applicant continues to request three concessions under the Density Bonus Laws,
due to the amount of affordable housing proposed in the Project Application. These
concessions have been modified and are as follows:
1. A concession to allow the Below Market Rate (BMR) units to deviate from the
requirement that unit types be comparable to the market rate units within the
development pursuant to BMR Housing Mitigation Procedure Manual Section 2.3.4
(A);
2. A concession to allow the studio and one-bedroom BMR affordable units to be
smaller in size than the studio and one bedroom market rate units pursuant to BMR
Housing Mitigation Procedure Manual Section 2.3.4 (B); and
3. A concession to allow 200,000 square feet of retail, a reduction of 400,000 square feet,
where 600,000 square feet is required in the General Plan pursuant to Strategy LU-
19.1.4.
In 2018 and 2022, the City determined that these three concessions: a) will result in
identifiable and actual costs to provide for affordable housing costs; b) will not result
in specific, adverse impacts upon public health or safety or the physical environment
or any property that is listed in the California Register of Historical Resources; and c)
will not be contrary to state or federal law. (Gov. Code, § 65915(d)(1)(A)-(C). The award
of the density bonus and concessions are not affected by the request for modification of
the approved project.
In addition to the density bonus, density bonus concessions, with this Application, the
applicant is additionally requesting a density bonus waiver. A density bonus waiver is
to a development standard that the project cannot meet due to the proposed design,
and if the project were required to meet the standard, it would cause the project to lose
units in the housing development. State law disallows the City to reject the request for
a waiver under the presumption that a differently designed project could meet the
existing standard.
The applicant is proposing to not meet the 1:1 setback to height (slope line) standard
established in the General Plan in Figure LU-2 (Community Form Diagram). This
would allow structures as proposed in Blocks 2, 5, 8, 10, 11, 13, 14 and 15 to encroach
into this setback. The encroachment is identified in the plan set in Sheet P-508 and P-
508.1. These diagrams indicate that imposition of the slope line standard would cause
the project as designed to lose residential units. As a result, the City must grant the
proposed density bonus waiver.
These Approvals, including the density bonus, the three concessions and the waiver
identified above, are collectively referred to as the “Project,” and are reflected in the
plan set included in Attachment “A.”
3
This Approval does not cover encroachments or other improvements within the public
right-of-way, including but not limited to, the proposed intersection located between
Vallco Parkway and Highway 280 (right of way encroachments are subject to the City’s
permitting review process) or proposed tree removals within the public right of way.
In addition, this Approval does not cover any signage, sign programs, construction
permits, or final map(s). Subsequent applications for these permits will be reviewed
prior to approval, consistent with the City’s permit approval processes and the
requirements of Government Code section 65913.4.
II. Basis for Approval
Government Code Section 65913.4 (SB 35, as amended) sets forth a streamlined,
ministerial approval process for certain housing developments in jurisdictions that
have not made sufficient progress toward meeting their affordable housing goals for
above-moderate and lower income levels as mandated by the State. The California
Department of Housing and Community Development (“HCD”) determined that the
City made sufficient progress toward its above moderate income housing goals but
made insufficient progress toward its lower (very low and low) income housing goals.
Therefore, HCD determined that the City is subject to the streamlined, ministerial
review and approval provisions in Government Code Section 65913.4 for very low and
low income housing projects.
On September 21, 2018, the Vallco Town Center project was approved pursuant to SB
35, which was subsequently modified in 2022. The Applicant submitted a second
request for modification of the approved project on December 5, 2023. In addition to
the Project Plans, the Project Application supporting information provided by the
Applicant that the City reviewed in making this determination is available on the City’s
website.
The Applicant’s modification request is subject to a limited scope of review under
Government Code section 65913.4(h) unless the modification changes the total number
of residential units or total square footage of construction by 15 percent or more, not
including underground space. (Gov. Code, § 65913.4(h)(3).) The scope of review of a
qualified modification request under section 65913.4(h) is limited to determining
whether the modified project meets the statutory criteria for SB 35 eligibility and
whether the project complies with objective planning standards in effect at the time the
original project application was submitted. (Gov. Code, § 65913.4(h)(1)(B).) Staff
generally may not apply objective planning standards adopted after the March 2018
submittal date of the original Vallco SB 35 application if these requirements are met. In
addition, the City may not reconsider “prior determinations that are not affected by the
modification” (Gov. Code, § 65913.4(h)(4)) and must use “the same assumptions and
4
analytical methodology” that it used in approving the original application. (Gov. Code,
§ 65913.4(h)(1)(C).)
The modification request also includes a request for modification of the approved
tentative subdivision map for the project. The streamlined approval provisions of SB 35
apply to approval of the tentative subdivision map. (Gov. Code, §65913.4(d)(2).)).
Under Government Code section 65913.4(h), review must be limited to objective
subdivision standards that were in place at the time of the original application.
Under Government Code section 65913.4(h)(2), the City must complete ministerial
review of the proposed modification request within 60 days. The deadline for
completing review of the Vallco/Rise modification request was February 5, 2024.
However, the Applicant agreed to an extension of time, until February 16, 2024, in
review of the proposed modification to allow additional time for coordination between
the Applicant, the City and other local agencies. This letter, which serves as notice of
the Approval of the modification request pursuant to Government Code section
65913.4(h), is being issued within that time period.
The City has identified its basis for approval of the project in Attachment B.
III. Standard Project Requirements and Project Implementation Requirements
The Project Application is approved subject to the Standard Project Requirements and
Project Implementation Requirements (collectively “Requirements”) set forth in
Attachment B. These Requirements identify objective General Plan, zoning, and/or
objective design review standards that were applied to the project at the time the
original Application was submitted to the City on March 27, 2018. These Requirements
are uniformly applied to similar entitlement applications and are within the City’s rules
and regulations, including its General Plan, General Plan Environmental Impact
Report, Municipal Code (including the zoning, subdivision and density bonus
provisions), BMR Housing Mitigation Procedural Manual, and other applicable permit
application forms and approvals, or reflect legal requirements imposed by other
agencies and/or state law.
Further, Government Code Section 65913.4 contains specific requirements and criteria
for a project to be subject to the streamlined, ministerial review and approval process.
In order to assure the Approval is implemented as required by Government Code
Section 65913.4, the City has included those in the Requirements in Attachment C.