HomeMy WebLinkAboutAH 07-25-2024 Searchable PacketCITY OF CUPERTINO
ADMINISTRATIVE HEARING
AGENDA
10300 Torre Avenue, City Hall Conference Room C
Thursday, July 25, 2024
5:00 PM
ROLL CALL
APPROVAL OF MINUTES
1.Subject: Approve the December 14, 2023 Administrative Hearing Minutes.
Recommended Action: Approve the December 14, 2023 Administrative Hearing
Minutes.
1 - Draft Minutes
POSTPONEMENTS
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the Committee on any matter
within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3)
minutes. In most cases, State law will prohibit the Commission from making any decisions with respect
to a matter not on the agenda.
PUBLIC HEARINGS
OLD BUSINESS
NEW BUSINESS
Effective January 1, 2023, Government Code Section 65103.5 (SB 1214) limits the distribution of
copyrighted material associated with the review of development projects. Members of the public wishing
to view plans that cannot otherwise be distributed under SB 1214 may make an appointment with the
Planning Division to view them at City Hall by sending an email to planning@cupertino.org. Plans
will also be made available digitally during the hearing to consider the proposal.
Page 1
1
AH 07-25-2024
1 of 47
Administrative Hearing Agenda July 25, 2024
2.Subject: Architectural and Site Approval permit to consider exterior façade
improvements for five existing structures, two new covered walkways, new
landscaping and lighting and parking lot improvements, including ADA upgrades and
associated CEQA actions. Tree Removal Permit for removal and replacement of
fourteen protected trees. (Application No(s).: ASA-2023-006, TR-2023-039; Applicant:
Michael Paluso (Steele Group) on behalf of Front Porch Communities and Services;
Location: 22445 Cupertino Road; APN(s): 326-15-130, 326-15-133, 326-15-123,
326-15-124)
Recommended Action: Staff recommends that the Hearing Officer, in accordance with
the Draft Resolutions:
1. Find the actions exempt from CEQA and approve the Architectural and Site
Approval, and
2. Approve the Tree Removal Permit
Staff Report
1- Draft Resolution ASA-2023-006
2- Draft Resolution TR-2023-039
3 - Project Plans
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this
meeting who is visually or hearing impaired or has any disability that needs special assistance should
call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for
assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and
writings distributed for the meeting that are public records will be made available in the appropriate
alternative format.
Any writings or documents provided to a majority of the members after publication of the agenda will
be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at
10300 Torre Avenue, Cupertino, California 95014, during normal business hours.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section
2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff
concerning a matter on the agenda are included as supplemental material to the agendized item. These
written communications are accessible to the public through the City’s website and kept in packet
archives. Do not include any personal or private information in written communications to the City
that you do not wish to make public, as written communications are considered public records and will
be made publicly available on the City website.
Members of the public are entitled to address the members concerning any item that is described in the
notice or agenda for this meeting, before or during consideration of that item. If you wish to address the
members on any other item not on the agenda, you may do so during the public comment.
Page 2
2
AH 07-25-2024
2 of 47
Administrative Hearing Agenda July 25, 2024
Page 3
3
AH 07-25-2024
3 of 47
CITY OF CUPERTINO
Agenda Item
24-13299 Agenda Date: 7/25/2024
Agenda #: 1.
Subject: Approve the December 14, 2023 Administrative Hearing Minutes.
Approve the December 14, 2023 Administrative Hearing Minutes.
CITY OF CUPERTINO Printed on 7/19/2024Page 1 of 1
powered by Legistar™4
AH 07-25-2024
4 of 47
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
(408) 777-3308
DRAFT MINUTES OF THE ADMINISTRATIVE HEARING
REGULAR MEETING
HELD December 14, 2023
CALL TO ORDER
Hearing officer Luke Connolly opened the meeting at 5:11 p.m.
ROLL CALL
Staff present: Luke Connolly, Assistant Community Development Director
Emi Sugiyama, Associate Planner
Jon de Ridder, Administrative Assistant
Outside attendee(s): Marc Fasnacht, Applicant
Kiran Prabhakar, Applicant
Queen Mein Foo, Applicant
APPROVAL OF MINUTES
1. Subject: Approve the October 26, 2023, Administrative Hearing meeting minutes
Recommended Action: Approve the October 26, 2023, Administrative Hearing meeting
minutes.
Minutes of the October 26, 2023, meeting approved as written.
POSTPONEMENTS – None
ORAL COMMUNICATIONS - None
PUBLIC HEARINGS - None
OLD BUSINESS – None
NEW BUSINESS
2. Subject: Architectural and Site Approval Permit and Director’s Minor Modification
Permit to consider a remodel and addition to an existing locker room building,
construction of a new storage area, and modifications to an existing parking lot located a t
the Cupertino Hills Swim & Racquet Club and associated Categorical Exemption under
CEQA. (Application No.: ASA-2022-008; DIR-2022-018 Applicant: Cupertino Hills Swim
and Racquet Club; Location: 22090 Rae Lane; APN# 356 07 027)
5
AH 07-25-2024
5 of 47
2
Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachment
1 & 2) to:
1. Find the actions exempt from the California Environmental Quality Act
(“CEQA”); and
2. Approve the Architectural and Site Approval (ASA-2022-008); and
3. Approve the Director’s Minor Modification (DIR-2022-018)
Emi Sugiyama, Associate Planner, provided a brief overview of the proposed project. She
stated that the existing storage space will be relocated and that the parking will be rearranged
to meet ADA requirements. She clarified that number of parking spaces will still meet the
requirements of the original conditional use permit.
Hearing Officer Connolly asked if the applicants had anything to add or present.
The applicants stated they had nothing to add.
Decision: The project is categorically exempt from CEQA and the application was approved by
the Hearing Officer per staff recommendation.
ADJOURNMENT:
The meeting was adjourned at 5:14 p.m. to the next regularly scheduled meeting.
Respectfully submitted:
___________________________
Piu Ghosh
Planning Manager
6
AH 07-25-2024
6 of 47
CITY OF CUPERTINO
Agenda Item
24-13298 Agenda Date: 7/25/2024
Agenda #: 2.
Subject: Architectural and Site Approval permit to consider exterior façade improvements for five
existing structures, two new covered walkways, new landscaping and lighting and parking lot
improvements, including ADA upgrades and associated CEQA actions. Tree Removal Permit for
removal and replacement of fourteen protected trees. (Application No(s).: ASA-2023-006, TR-2023-
039; Applicant: Michael Paluso (Steele Group) on behalf of Front Porch Communities and Services;
Location: 22445 Cupertino Road; APN(s): 326-15-130, 326-15-133, 326-15-123, 326-15-124)
Staff recommends that the Hearing Officer, in accordance with the Draft Resolutions:
1. Find the actions exempt from CEQA and approve the Architectural and Site Approval, and
2. Approve the Tree Removal Permit
CITY OF CUPERTINO Printed on 7/19/2024Page 1 of 1
powered by Legistar™7
AH 07-25-2024
7 of 47
ADMINISTRATIVE HEARING STAFF REPORT
Meeting Date: July 25, 2024
Subject
Architectural and Site Approval permit to consider exterior façade improvements for five
existing structures, two new covered walkways, new landscaping and lighting and
parking lot improvements, including ADA upgrades and associated CEQA actions. Tree
Removal Permit for removal and replacement of fourteen protected trees. (Application
No(s).: ASA-2023-006, TR-2023-039; Applicant: Michael Paluso (Steele Group) on behalf
of Front Porch Communities and Services; Location: 22445 Cupertino Road; APN(s): 326-
15-130, 326-15-133, 326-15-123, 326-15-124
Recommended Action
Staff recommends that the Hearing Officer, in accordance with the Draft Resolutions,
(Attachment 1 and 2):
1. Find the actions exempt from CEQA and approve the Architectural and Site
Approval, ASA-2023-006, and
2. Approve the Tree Removal Permit, TR-2023-039
Discussion
Project Data:
General Plan Land Use Designation Quasi-Public / Institutional
General Plan Neighborhood Creston-Pharlap Neighborhood
Zoning Designation BQ
Lot Size 10.1 net acres (no change)
Consistency with General Plan Yes
Consistency with Zoning Yes
Environmental Assessment Categorically Exempt per Section 15301of the
California Environmental Quality Act (CEQA)
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org
8
AH 07-25-2024
8 of 47
ASA-2023-006, Sunnyview Retirement Community July 25, 2024
TR-2023-039 Façade Renovation & Parking Improvements Page 2
Project location
The Sunnyview Retirement
Community is located in the Creston-
Pharlap neighborhood in the
northwestern portion of the City, at the
northeast corner of the intersection of
North Foothill Boulevard and
Cupertino Road. It is bordered by
Cupertino Road to the south, North
Foothill Boulevard to the west, Salem
Avenue to the North, and adjacent to
Hillcrest Road to the east (see Figure 1,
vicinity map).
Application Summary
The applicant, Michael Paluso, is requesting to change the facades of five existing
structures with new exterior siding and roof enhancements. Additional improvements
include new landscaping in all improved areas, surface parking restriping and repaving,
ADA updates, new lighting, and two new covered walkways. Additionally, to facilitate
these improvements, a Tree Removal Permit for removal and replacement of fourteen
protected (development) trees is required.
Background
The subject property is zoned quasi-public building (BQ). The Sunnyview Retirement
Community is a congregate living facility in operation since the 1970s and include several
federally funded and subsidized units. The operations at this facility have expanded over
time with Use Permits processed with the City’s review. A modification in the late 1990s
(U-1997-13) indicated that the site was approved with 182 parking stalls. In 2008, the
parking count was reduced onsite to 178 stalls due to the addition of a trash enclosure 1.
Analysis
Architectural and Site Approval
Covered Walkways: The project scope includes the construction of two new covered
walkways, one above an existing uncovered pathway (see figure 2, location 1) and one
replacing an existing covered walkway (see Figure 2, location 2).
1 Building Permit No. 08060182: https://chl-lf-app.cupertino.org/WebLink/PDFExport10.aspx?f=dd241bbb-ec18-4e7a-
8f8e-5aee1d29d1ea&id=817226&t=0
Figure 1: Vicinity Map
Steven’s Creek Blvd
Cupertino Rd.
N
9
AH 07-25-2024
9 of 47
ASA-2023-006, Sunnyview Retirement Community July 25, 2024
TR-2023-039 Façade Renovation & Parking Improvements Page 3
Improvements related to the first covered walkway include widening the existing
pathway from approximately 5’-9” to 8’-6” by modifying an existing adjacent landscape
area. The new covered structure will be in two sections – the pathway section (about 12
feet tall) and the portion leading into the Wellness Center (about 15 feet tall). Construction
of the second walkway will involve the removal of an existing covered walkway, and
installation of a new accessible ramp, with steel handrails, under the new walkway. The
covered structure will be approximately 13’ in height and terraced into sections to follow
the approximate 8% slope.
The materials for the two
covered walkways match and
consist of wood framing, with
decorative ledge stacked stone
veneer—extending about 3’ in
height from base of each
column. The covered
walkways will have a gabled
roof design, with asphalt
shingles to match the existing
roof structures. All exposed
wood will be painted with a
mixture of cool and warm
earthtone colors; blending
with the materials and colors
schedule for the new façade
improvements further
discussed below.
Upper Patio: No changes are proposed to the existing upper patio slab (see Figure 2, area
in blue). New steel guardrail will be installed along the covered accessible ramp
discussed above and connect to the existing 42” guard rail that runs along the perimeter
of the upper patio. New landscape and irrigation is proposed around the perimeter of the
upper patio. The planting schedule includes both native and adaptive native flowering
shrubs and leafy ground cover.
Façade improvements: Exterior renovation of the front entry (building 7), the lower villas,
upper villas, and the two villa garages (located on the east side of the property) is
proposed (see Figure 2, areas in red). New exterior siding and roof enhancements will be
added to the exterior of each building, for a craftsman style resemblance. The
improvements include the following for each structure:
Figure 2: Locations of the proposed site improvements
Covered Walks, Upper Patio, Villas, Façade Improvments,
Drive Ailse & Parking, Storm Water treament,
1
2
BLDG. 7
10
AH 07-25-2024
10 of 47
ASA-2023-006, Sunnyview Retirement Community July 25, 2024
TR-2023-039 Façade Renovation & Parking Improvements Page 4
Front Entry-Building 7: The existing boxed gable roof is proposed to remain. Three
new cross-gables will be added to the west elevation, replacing the existing shed roof
that extends over the existing second floor balconies. The first-floor wall plane will
receive a new color coat of paint. New shingle siding is proposed on the second story
walls and to areas of the second story balcony walls. The fenestration pattern will
remain unchanged, with some door replacements.
Lower Villas and Upper Villas: The existing Dutch gable roof is proposed to remain
on each of the single-story buildings. Several new cross-gable roofs will be added,
with asphalt shingles to match existing. New gable roofed entry features will be
added at each unit. The existing stucco walls on the north elevation will be painted a
new color. New shingle siding, with lap siding wainscot below shall be installed on
the west, east and south elevations on both villas. The fenestration pattern will remain
unchanged, with some door replacements.
Lower and Upper Villa Garages: No roof changes are proposed to the villa garages.
The existing stucco walls on the east elevation will be repainted, while the south, west
and north elevations of the two garages will receive new lap siding, with shingle
siding wainscot below. The closed, short panel, garage doors will be replaced with a
new craftsman style garage door; with decorative trellis that extends over the
opening.
Drive Aisles & Parking: Two locations on site will undergo drive aisle replacement and/or
parking lot restriping.
Front Entry-Building 7: The existing landscape island at the front parking area has
been reduced to accommodate two accessible parking spaces. Reduction of the size of
the landscape island also made it possible to widen the drive aisle to meet city
standards and to restripe 9 parking stalls in this area. Additionally, a new landscape
planter island has been added in the center of the curved parking area. Additional
improvements include new stamped concrete in the parking area and front entry
roundabout.
Lower and Upper Villa Parking Lot: The existing parking lot is proposed to be
repaved with stamped concrete. An existing tree planter located in the north-east
corner of the lot is proposed to be removed due to its odd placement, with which staff
concurs. This will allow the addition of one new parking stall at this location. A new
landscaped parking island, to replace the one removed, is proposed at center of the
parking row along the north side of the lot. All restriped parking stalls meet the city
standards.
Trash Enclosure: The existing trash enclosure located to the west of the 12-stall garage is
proposed to be replaced by an expanded steel panel enclosure with a covered roof, with
a shed design. The replacement and expansion of the trash enclosure will result in the
11
AH 07-25-2024
11 of 47
ASA-2023-006, Sunnyview Retirement Community July 25, 2024
TR-2023-039 Façade Renovation & Parking Improvements Page 5
loss of one existing parking stall at this location. However, as previously discussed, the
project proposes to create a new parking stall at the north end of the villa parking lot. The
new trash enclosure will comply with the City’s standards.
Additional Improvements: Additional improvements to the site will include removal and
replacement of existing pole lighting with shielded pole lighting fixtures, new
stormwater treatment system, ADA improvements, landscaping and irrigation that meet
the city’s water efficient landscape checklist and water budget calculation worksheets.
Tree Removal Permit
Seventy-six (76) trees – sixty-one (61) on site and fifteen (15) off site – were assessed in
the Arborist Report. However, only fourteen trees have been identified for removal and
replacement, of which three (3) trees (Tree no.s 8, 10 and 11) are California native
species— Coast Live Oak. Table 1 below indicates the species, size, condition and reason
for removal for each of the fourteen trees.
Table 1: Tree Removal Summary
# Tree
ID
Common Name
(Scientific
Name)
DBH
Inches Condition Reason for Removal
1 8
Coast Live Oak
(Quercus
agrifolia)
26 2.5
Structural defects that cannot be
corrected, internal decay and
loss of trunk strength
2 10
Coast Live Oak
(Quercus
agrifolia)
10 3.5 Impacts due to modifications
required to the planter to meet
Building Code standards for
required accessible parking2 3 11
Coast Live Oak
(Quercus
agrifolia)
9 3.5
4 12 Japanese maple
(Acer palmatum) 5, 4, 4 3 Within construction footprin
5 13
Modesto ash
(Fraxinus
velutina)
10 2 Within construction footprin
6 14
Raywood ash
(Fraxinus
angustifolia)
13 2.5 Within construction footprint
7 24 Cherry (Prunus 6 3 Within construction footprint
2 The original proposal, as noted in the arborist report, contemplated the removal of 12 protected trees.
However, during the review process it was determined that the landscape island alteration was necessary
to accommodate code compliant accessible parking, which necessitated the removal of two additional
trees (#10 and 11).
12
AH 07-25-2024
12 of 47
ASA-2023-006, Sunnyview Retirement Community July 25, 2024
TR-2023-039 Façade Renovation & Parking Improvements Page 6
# Tree
ID
Common Name
(Scientific
Name)
DBH
Inches Condition Reason for Removal
spp.)
8 25 Cherry (Prunus
spp.) 6 3 Within construction footprint
9 26
Chinese
Evergreen Pear
(Pyrus
kawakamii)
12 3 Within construction footprint
10 30 Cherry (Prunus
spp.) 4 2.5 Within construction footprint
11 31 Cherry (Prunus
spp.) 5 2.5 Within construction footprint
12 32 Cherry (Prunus
spp.) 5 2.5 Within construction footprint
13 43
Carob
(Ceratonia
siliqua)
16, 14, 14 3 Within construction footprint
14 75 Persimmon
(Diospyros spp.) 3, 3, 2 2.5 Within construction footprint
Note: Tree Condition is identified on a scale of 2 thru 4: 2 being “poor”, 2.5 being “fair-poor”, 3 being
“fair”, 3.5 being “fair-good” & 4 being “good”
The City’s consultant arborist has conducted site visits, reviewed the preservation
measures for the trees being retained and found the applicant’s proposal acceptable and
consistent with current urban forestry standards. Conditions of approval require regular
inspections and reporting by an ISA certified arborist to ensure the trees are in good
condition through construction. Additionally, conditions have been added that require
that any tree removed be replaced in a manner consistent with the requirements of the
Municipal Code (CMC 14.18.160 Tree Replacement.)
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15301 Class 1, categorical exemption
allows for minor alteration of existing public or private facilities or topographical
features, involving negligible or no expansion of existing or former use. The project
proposes resurfacing existing parking lots, façade updates to existing structures and new
covered walkways at an existing retirement facility. No expansion of the existing use is
proposed. Furthermore, the project is not located in an environmentally sensitive area.
Other Department/Agency Review
13
AH 07-25-2024
13 of 47
ASA-2023-006, Sunnyview Retirement Community July 25, 2024
TR-2023-039 Façade Renovation & Parking Improvements Page 7
The Building Division, Environmental Programs Division, Public Works Department and
the Santa Clara County Fire Department have no objections to the project.
Public Noticing
A summary of noticing on the project is presented in the table below:
Notice of Public Hearing, Site Notice &
Legal Ad Agenda
Site Signage (14 days prior to the
hearing). Sign Posted: July 10th, 2024
Noticing to adjacent neighbors (10
days prior to the hearing): Notices
Mailed: July 11, 2024
Posted on the City's official notice
bulletin board (one week prior to the
hearing)
Posted on the City of Cupertino’s
Website
Public Comments
As of the publishing of this report, one public comment has been received. The stake
holder expressed concerns regarding construction noise, impacts to street parking and
increased traffic from construction activity. Chapter 10.48.053 of the Cupertino Municipal
Code regulates construction activity days, times and decibel level within residential and
non-residential areas, which the contractor must adhere to. Furthermore, per city
requirements, as a condition of approval, a Construction Management Plan 3 must be
prepared and submitted for review, prior to building permit issuance.
Conclusion
Staff recommends approval of the Architectural and Site Approval permit and Tree
Removal Permit, since the plans and conditions of approval address all concerns related
to the proposed project. Additionally, all applicable findings for approval of the proposed
project, consistent with chapters 19.168 and 14.18 of the Cupertino Municipal Code, may
be made as indicated in draft Resolutions.
Next Steps
The permit will be effective 14 calendar days from the date of the hearing. The decision
of the Administrative Hearing Officer is final, unless appealed within 14 calendar days
from the date of the hearing. The applicant team may apply for building and/or other
permits with the City at the end of the appeal period.
3 The Construction Management Plan typically includes procedures to attempt to minimize potential
construction impacts related to construction crew parking, equipment staging, off-site circulation, noise,
and air quality on neighbors during the construction phase.
14
AH 07-25-2024
14 of 47
ASA-2023-006, Sunnyview Retirement Community July 25, 2024
TR-2023-039 Façade Renovation & Parking Improvements Page 8
This approval is valid until July 31, 2026. The applicant may apply for a one-time two-year
extension before the approval expires.
Prepared by: Danielle Condit, Associate Planner
Reviewed and Approved for Submission by: Piu Ghosh, Planning Manager
ATTACHMENTS
1. Draft Resolution ASA-2023-006
2. Draft Resolution TR-2023-039
3. Project Plans (abridged due to limitations of state law pursuant to SB1214)
15
AH 07-25-2024
15 of 47
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. XXX
OF THE ADMINISTRATIVE HEARING OFFICER
OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL
AND SITE APPROVAL PERMIT TO ALLOW EXTERIOR FAÇADE
RENOVATIONS TO FIVE EXISTING STRUCTURES AND SITE
IMPROVEMENTS, INCLUDING PARKING LOT IMPROVEMENTS AT
THE SUNNYVIEW RETIREMENT COMMUNITY
LOCATED AT 22445 CUPERTINO RD
SECTION I: PROJECT DESCRIPTION
Application No.: ASA-2023-006
Applicant: Michael Paluso (Steele Group)
Location: 22445 Cupertino Road
APN(s): 326-15-130, 326-15-133, 326-15-123, 326-15-124
SECTION II: FINDINGS:
WHEREAS, the City of Cupertino received an application for an Architectural and Site
Approval to consider changes to the facades of five existing structures with new exterior
siding and roof enhancements. Additional improvements include new landscaping in all
improved areas, surface parking restriping and repaving, ADA updates, new lighting,
and two new covered walkways., as described in Section I. of this Resolution; and
WHEREAS, the necessary public notices have been given as required by the Cupertino
Municipal Code, and the Administrative Hearing Officer has held at least one public
meeting with regard to the application; and
WHEREAS, pursuant to the provisions of the California Environmental Quality Act of
1970 (Public Resources Code section 21000 et seq.) ("CEQA"), together with the State
CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.)
(hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed
Project and has determined that the Project is exempt from environmental review
pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons
set forth in the staff report dated July 25, 2024 and incorporated herein; and
16
AH 07-25-2024
16 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 2
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
1. The proposal, at the proposed location, will not be detrimental or injurious to
property or improvements in the vicinity, and will not be detrimental to the public
health, safety, general welfare, or convenience;
The proposed façade improvements are minor in nature. There will be no change to the
building height and no expansion of use. The applicant proposes to resurface and restripe
existing parking areas. The paving will be at grade and not visible from neighboring
properties. All the proposed changes are minor improvements to the existing site and will
not be detrimental or injurious to property or improvements in the vicinity.
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any
specific plan, zoning ordinances, applicable planned development permit,
conditional use permits, variances, subdivision maps or other entitlements to use
which regulate the subject property including, but not limited to, adherence to the
following specific criteria;
The proposal complies with the General Plan. The proposal with the modifications that are
required as conditions of approval will comply with the City’s adopted standards and
Municipal Code.
a. Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
There is no change to the existing building heights on site—and no new buildings have
been proposed in this application. The surface parking area is located at grade and is
uncovered. The proposed exterior renovation will help improve the massing of the
structures by breaking up the wall planes with new material changes, as opposed to the
original all stucco design.
b. In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being
consistent or compatible with design and color schemes with the future character
of the neighborhoods and purposes of the zone in which they are situated. The
location, height and materials of walls, fencing, hedges and screen planting
should harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to
17
AH 07-25-2024
17 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 3
prevent dust and erosion, and the unnecessary destruction of existing healthy
trees should be avoided. Lighting for development should be adequate to meet
safety requirements as specified by the engineering and building departments
and provide shielding to prevent spill-over light to adjoining property owners.
The improved structures will not be visible from neighboring properties or the public
right-of-way. The material and color schedule incorporates neutral earthtones to the
renovated facades. Existing mature trees are proposed to be retained on site. New
landscaping has been proposed around the parking areas to match existing planting on
site. Outdoor lighting incorporates appropriate shielding and is designed to meet the
dark-sky requirements of the Municipal Code.
c. The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize
with adjacent development.
No signs are approved as part of this project.
d. With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light
and visually intrusive effects by use of buffering, setbacks, landscaping, walls
and other appropriate design measures.
This application is not a new project and will maintain the existing setbacks established
adjacent to the existing residential neighbors.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 3 thereof,:
The application for a Architectural and Site Approval, Application no. ASA-2023-006 is
hereby approved and that the subconclusions upon which the findings and conditions
specified in this resolution are based and contained in the Public Hearing record
concerning Application no. ASA-2023-006 as set forth in the Minutes of the Administrative
Hearing Meeting of July 25, 2024 and are incorporated by reference as though fully set
forth herein.
18
AH 07-25-2024
18 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 4
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by MW Seele Group “Sunnyview Retirement
Community” consisting of seventy-six (76) sheets labeled A0.1, A1.0, A1.0a, A1.1-
A1.4, A2.0-A2.3, A3.0-A3.1.1, A4.0-A4.2, A5.0-A5.2, A6.0-A6.1, A7.0, A10.0, C1.0-C4.0,
E002-E207, G0.0, G0.3, and L1.0-L6.4, except as may be amended by conditions in this
resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. U-1989-07 and TR-2023-039 shall be
applicable to this approval.
4. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated with
notes to indicate how compliance is met, on the the building plans.
5. EXTERIOR BUILDING MATERIALS/TREATMENTS
The final building exterior plan shall closely resemble the details shown on the
original approved plans. Final building exterior treatment plan (including but not
limited to details on exterior color, materials, architectural treatments, doors,
windows, lighting fixtures, and/or embellishments) shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits to
ensure quality and consistency. Any exterior changes determined to be substantial
by the Director of Community Development shall either require a modification to this
permit or a new permit based on the extent of the change.
6. SURFACE PARKING LOT
The new surface parking lot shall conform with the Department of Public Works City
of Cupertino Standard Detail document. Parking stall length may be decreased by up
to two feet but must provide an equivalent vehicle overhang into landscaped areas.
19
AH 07-25-2024
19 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 5
7. WHEEL STOPS
Concrete wheel stops shall be placed on top of a flat curb and shall be provided at a
rate of one per two stalls.
8. DEMOLITION REQUIREMENTS
All demolished site materials shall be recycled to the maximum extent feasible, subject
to the Building Official. The applicant shall provide evidence that materials were
recycled prior to occupancy.
9. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department
10. DARK SKY COMPLIANCE
Prior to issuance of Building Permits, the applicant/property owner shall submit final
plans in compliance with the approved lighting plans to comply with development
standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting
Requirements. In the event changes are proposed from the approved plans, said
changes must be reviewed and approved by the Director of Community Development
or their designee. The applicant shall provide all documentation required to
determine compliance with the Municipal Code.
11. FUGITIVE DUST CONTROL
Prior to issuance of the any demolition, grading, or building permit, include on all
permit plans, the full text of each of the Bay Area Air Quality Management District's
Basic Control Measures from the latest version of BAAQMD's CEQA Air Quality
Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive
dust (i.e., particulate matter PM2.5 and PMlO) during demolition, ground disturbing
activities and/or construction.
12. AVOID NESTING BIRDS DURING CONSTRUCTION
Prior to issuance of the any demolition, grading and building permit, indicate the
following on all construction plans:
a. Demolition, construction, ground-disturbing, and tree removal/pruning activities
shall be scheduled to be completed prior to nesting season (February 1 through
August 31), if feasible.
b. If demolition, construction, ground-disturbing, or tree removal/pruning activities
occur during the nesting season (February 1 and August 31), preconstruction
surveys shall be conducted as follows:
20
AH 07-25-2024
20 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 6
i. No more than 7 days prior to the start of demolition, construction, ground-
disturbing, or tree removal/pruning activities, in order to identify any active
nests with eggs or young birds on the site and surrounding area within 100 feet
of construction or tree removal activities.
ii. Preconstruction surveys shall be repeated at 14-day intervals until demolition,
construction, ground-disturbing, or tree removal/pruning activities have been
initiated in the area, after which surveys can be stopped. As part of the
preconstruction survey(s), the surveyor shall inspect all trees and other
possible nesting habitats in, and immediately adjacent to, the construction
areas for active nests, while ensuring that they do not disturb the nests as
follows:
1) For projects that require the demolition or construction one single- family
residence, ground disturbing activities affecting areas of up to 500 square
feet, or the removal of up to three trees, the property owner or a tree
removal contractor, if necessary, is permitted to conduct the
preconstruction surveys to identify if there are any active nests. If any
active nests with eggs or young birds are identified, the project applicant
shall retain a qualified ornithologist or biologist to identify protective
measures.
2) For any other demolition, construction and ground disturbing activity or
the removal of four or more trees, a qualified ornithologist or biologist
shall be retained by the project applicant to conduct the preconstruction
surveys.
iii. If the preconstruction survey does not identify any active nests with eggs or
young birds that would be affected by demolition, construction, ground-
disturbing or tree removal/pruning activities, no further mitigating action is
required. If an active nest containing eggs or young birds is found sufficiently
close to work areas to be disturbed by these activities, their locations shall be
documented, and the qualified ornithologist or biologist shall identify
protective measures to be implemented under their direction until the nests no
longer contain eggs or young birds.
iv. Protective measures may include, but are not limited to, establishment of
clearly delineated exclusion zones (i.e., demarcated by identifiable fencing,
such as orange construction fencing or equivalent) around each nest location
as determined by the qualified ornithologist or biologist, taking into account
the species of birds nesting, their tolerance for disturbance and proximity to
existing development. In general, exclusion zones shall be a minimum of 300
feet for raptors and 75 feet for passerines and other birds. The active nest within
an exclusion zone shall be monitored on a weekly basis throughout the nesting
21
AH 07-25-2024
21 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 7
season to identify signs of disturbance and confirm nesting status. The radius
of an exclusion zone may be increased by the qualified ornithologist or
biologist, if project activities are determined to be adversely affecting the
nesting birds. Exclusion zones may be reduced by the qualified ornithologist
or biologist only in consultation with California Department of Fish and
Wildlife. The protection measures and buffers shall remain in effect until the
young have left the nest and are foraging independently or the nest is no longer
active.
v. A final report on nesting birds and raptors, including survey methodology,
survey date(s), map of identified active nests (if any), and protection measures
(if required), shall be prepared by the qualified ornithologist or biologist and
submitted to the Director of Community Development or his or her designee,
through the appropriate permit review process (e.g., demolition, construction,
tree removal, etc.), and be completed to the satisfaction of the Community
Development Director prior to the start of demolition, construction, ground-
disturbing, or tree removal/pruning activities.
13. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES
Prior to the issuance of any demolition, grading or building permit involving soil
disturbance, the project applicant shall provide written verification, including the
materials provided to contractors and construction crews, to the City confirming that
contractors and construction crews have been notified of basic archaeological site
indicators, the potential for discovery of archaeological resources, laws pertaining to
these resources, and procedures for protecting these resources as follows:
a. Basic archaeological site indicators that may include, but are not limited to, darker
than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire
affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of stone,
bone, or shellfish; evidence of living surfaces (e.g., floors); and burials, either
human or animal.
b. The potential for undiscovered archaeological resources or tribal cultural
resources on site.
c. The laws protecting these resources and associated penalties, including, but not
limited to, the Native American Graves Protection and Repatriation Act of 1990,
Public Resources Code Section 5097, and California Health and Safety Code
Section 7050 and Section 7052.
d. The protection procedures to follow should construction crews discover cultural
resources during project-related earthwork, include the following:
i. All soil disturbing work within 25 feet of the find shall cease.
ii. The project applicant shall retain a qualified archaeologist to provide and
implement a plan for survey, subsurface investigation, as needed, to define the
22
AH 07-25-2024
22 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 8
deposit, and assessment of the remainder of the site within the project area to
determine whether the resource is significant and would be affected by the
project.
iii. Any potential archaeological or tribal cultural resources found during
construction activities shall be recorded on appropriate California Department
of Parks and Recreation forms by a qualified archaeologist. If the resource is a
tribal cultural resource, the consulting archaeologist shall consult with the
appropriate tribe, as determined by the Native American Heritage
Commission, to evaluate the significance of the resource and to recommend
appropriate and feasible avoidance, testing, preservation or mitigation
measures, in light of factors such as the significance of the find, proposed
project design, costs, and other considerations. The archeologist shall perform
this evaluation in consultation with the tribe.
14. HUMAN REMAINS AND NATIVE AMERICAN BURIALS
Prior to issuance of the any demolition, grading and building permits that involve soil
disturbance, include on plans a note that, during project construction, the project
applicant shall comply with California Health and Safety Code Section 7050.5 and
California Public Resources Code Section 5097.98.
a. In the event of discovering human remains during construction activities, there
shall be no further excavation or disturbance of the site within a 100-foot radius of
the remains, or any nearby area reasonably suspected to overlie adjacent remains.
b. The Santa Clara County Coroner shall be notified immediately and shall make a
determination as to whether the remains are Native American.
c. If the Santa Clara County Coroner determines that the remains are not subject to
his authority, he shall notify the Native American Heritage Commission (NAHC)
within 24 hours.
d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of the
deceased Native American.
e. The Most Likely Descendant has 48 hours following access to the project site to
make recommendations or preferences regarding the disposition of the remains.
If the Most Likely Descendant does not make recommendations within 48 hours
after being allowed access to the project site, the owner shall, with appropriate
dignity, reinter the remains in an area of the property secure from further
disturbance and provide documentation about this determination and the location
of the remains to the NAHC and the City of Cupertino. Alternatively, if the owner
does not accept the Most Likely Descendant's recommendations, the owner or the
descendent may request mediation by the NAHC. Construction shall halt until the
mediation has concluded.
23
AH 07-25-2024
23 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 9
15. NOISE AND VIBRATION NOTICE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall send notices of the
planned activity by first class mail as follows:
a. For projects on sites that are more than 0.5 acres or four or more residential units
the notices shall be sent to off-site businesses and residents within 500 feet of the
project site;
b. For projects on sites between 0.25 to 0.5 acres, or two or three residential units (not
including Accessory Dwelling Units) notices shall be sent to off-site businesses and
residents within 250 feet of the project site; or
c. For projects on sites less than 0.25 acres or one residential unit, the notices shall be
sent to off-site businesses and residents within 100 feet of the project site.
The notification shall include a brief description of the project, the activities that
would occur, the hours when activity would occur, and the construction period's
overall duration. The notification should include the telephone numbers of the
contractor's authorized representatives that are assigned to respond in the event of a
noise or vibration complaint. The City will provide mailing addresses for the
Applicant's use. The project applicant shall provide the City with evidence of mailing
of the notice, upon request. If pile driving, see additional noticing requirements
below.
16. NOISE AND VIBRATION SIGNAGE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least two feet by three feet shall be posted on construction fencing at the
entrance(s) to the job site, clearly visible to the public, and include the following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
c. Telephone numbers of the City's and contractor's authorized representatives that
are assigned to respond in the event of a noise or vibration complaint; and
d. Contact information for City's and contractor's authorized representatives that are
assigned to respond in the event of a complaint related to fugitive dust, pursuant
to the requirements for compliance with BAAQMD's CEQA Air Quality
Guidelines.
If the authorized contractor's representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
24
AH 07-25-2024
24 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 10
17. NOISE DURING CONSTRUCTION
Prior to issuance of any demolition, grading or building permit, include on plans a
note that, during project construction, the project applicant shall incorporate the
following measures to reduce noise during construction and demolition activity:
a. The project applicant and contractors shall prepare and submit a Construction
Noise Control Plan to the City's Planning Department for review and approval
prior to issuance of the first permit. The Construction Noise Plan shall demonstrate
compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48
(Community Noise Control) of Cupertino Municipal Code. The details of the
Construction Noise Control Plan shall be included in the applicable construction
documents and implemented by the on-site Construction Manager. Noise
reduction measures selected and implemented shall be based on the type of
construction equipment used on the site, distance of construction activities from
sensitive receptor(s), site terrain, and other features on and surrounding the site
(e.g., trees, built environment) and may include, but not be limited to, temporary
construction noise attenuation walls, high quality mufflers. During the entire
active construction period, the Construction Noise Control Plan shall demonstrate
that compliance with the specified noise control requirements for construction
equipment and tools will reduce construction noise in compliance with the City's
daytime and nighttime decibel limits.
b. Select haul routes that avoid the greatest amount of sensitive use areas and submit
to the City of Cupertino Public Works Department for approval prior to the start
of the construction phase.
c. Signs will be posted at the job site entrance(s), within the on-site construction
zones, and along queueing lanes (if any) to reinforce the prohibition of
unnecessary engine idling. All other equipment will be turned off if not in use for
more than 5 minutes.
d. During the entire active construction period and to the extent feasible, the use of
noise producing signals, including horns, whistles, alarms, and bells will be for
safety warning purposes only. The construction manager will use smart back-up
alarms, which automatically adjust the alarm level based on the background noise
level or switch off back-up alarms and replace with human spotters in compliance
with all safety requirements and law.
18. PALEONTOLOGICAL RESOURCES
Prior to issuance of the any demolition, grading or building permit, include on plans
a note that, during project construction, the project applicant shall implement the
following measures:
a. If paleontological resources are encountered during ground disturbing and/or
other construction activities, all construction shall be temporarily halted or
25
AH 07-25-2024
25 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 11
redirected to allow a qualified paleontologist, which shall be retained by the
project applicant, to assess the find for significance and the Applicant shall notify
the City.
b. If paleontological resources are found to be significant, the paleontological
monitor shall determine appropriate actions, in coordination with a qualified
paleontologist, City staff, and property owner. Appropriate actions may include,
but are not limited to, a mitigation plan formulated pursuant to guidelines
developed by the Society of Vertebrate Paleontology and implemented to
appropriately protect the significance of the resource by preservation,
documentation, and/or removal, prior to recommencing activities. Measures may
include, but are not limited to, salvage of unearthed fossil remains and/or traces
(e.g., tracks, trails, burrows); screen washing to recover small specimens;
preparation of salvaged fossils to a point of being ready for curation (e.g., removal
of enclosing matrix, stabilization and repair of specimens, and construction of
reinforced support cradles); and identification, cataloging, curation, and provision
for repository storage of prepared fossil specimens.
19. INDEMNIFICATION AND LIMITATION OF LIABILITY
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless
the City, its City Council, and its officers, employees, and agents (collectively, the
“indemnified parties”) from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
“proceeding”) brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant related to any Ordinance,
Resolution, or action approving the project, the related entitlements, environmental
review documents, finding or determinations, or any other permit or approval
authorized for the project. The indemnification shall include but not be limited to
damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’
fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or
bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and
costs shall include amounts paid to the City’s outside counsel and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City. The applicant shall
likewise agree to indemnify, defend, and hold harmless the indemnified parties from
and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees
26
AH 07-25-2024
26 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 12
awarded under Code of Civil Procedure section 1021.5, assessed or awarded against
the indemnified parties. The Applicant shall cooperate with the City to enter a
Reimbursement Agreement to govern any such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
20. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
PASSED AND ADOPTED this 25th day of July 2024 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST: APPROVED:
_________ ________
Danielle Condit Luke Connolly
Associate Planner Administrative Hearing Officer
27
AH 07-25-2024
27 of 47
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. XXX
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO APPROVING AN ARCHITECTURAL AND SITE
APPROVAL PERMIT TO ALLOW EXTERIOR FAÇADE
RENOVATIONS TO FIVE EXISTING STRUCTURES AND SURFACE
PARKING LOT IMPROVEMENTS AT THE SUNNYVIEW
RETIREMENT COMMUNITY LOCATED AT 22445 CUPERTINO RD
SECTION I: PROJECT DESCRIPTION
Application No.: TR-2023-039
Applicant: Michael Paluso (Steele Group)
Location: 22445 Cupertino Road; APN: 326-15-130, 326-15-133, 326-15-123, 326-15-124
SECTION II: FINDINGS FOR TREE REMOVAL PERMIT:
WHEREAS, the City of Cupertino received an application for a Tree Removal permit as
described in Section I of this Resolution; and
WHEREAS, the necessary public notices have been given as required by the Cupertino
Municipal Code, and the Administrative Hearing Officer has held at least one public
meeting with regard to the application; and
WHEREAS, pursuant to the provisions of the California Environmental Quality Act of
1970 (Public Resources Code section 21000 et seq.) ("CEQA"), together with the State
CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.)
(hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed
Project and has determined that the Project is exempt from environmental review
pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons
set forth in the staff report dated July 25, 2024 and incorporated herein; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
28
AH 07-25-2024
28 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 2
1. That the location of the trees restricts the economic enjoyment of the property by
severely limiting the use of property in a manner not typically experienced by
owners of similarly zoned and situated property, and the applicant has
demonstrated to the satisfaction of the approval authority that there are no
reasonable alternatives to preserve the tree(s).
The applicant’s and the City’s consultant arborists have found that the area in which the
improvements have been proposed cannot maintain the trees as they are currently planted
due to a combination of the proposed project scope and existing tree conditions. Tree
replacements are required and have been reviewed and incorporated as a part of the approved
plans.
2. That the tree or trees are irreversibly diseased, are in danger of falling, can cause
potential damage to existing or proposed essential structures, or interferes with
private on-site utility services and cannot be controlled or remedied through
reasonable relocation or modification of the structure or utility services;
The applicant’s and the City’s consultant arborists agree that Tree ID 8, a 26” Coast live Oak should be
recommend for removal. Due to the tree’s structural defects that cannot be corrected, internal decay and loss of
trunk strength, it is recommended that the tree be removed for public safety
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 2 thereof,:
The application for a Tree Removal Permit, Application no. TR-2023-039 is hereby
approved and that the subconclusions upon which the findings and conditions specified
in this resolution are based and contained in the Public Hearing record concerning
Application no. TR-2023-039 as set forth in the Minutes of the Administrative Hearing
Meeting of July 25, 2024 and are incorporated by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by MW Seele Group “Sunnyview Retirement
Community” consisting of seventy-six (76) sheets labeled A0.1, A1.0, A1.0a, A1.1-
A1.4, A2.0-A2.3, A3.0-A3.1.1, A4.0-A4.2, A5.0-A5.2, A6.0-A6.1, A7.0, A10.0, C1.0-C4.0,
E002-E207, G0.0, G0.3, and L1.0-L6.4, except as may be amended by conditions in this
resolution.
29
AH 07-25-2024
29 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 3
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. U-1989-07 and ASA-2023-006 shall
be applicable to this approval.
4. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
first page of the building plans
5. TREE REMOVAL
Tree removal for trees 8, 12-14, 24-26, 30-32, 43, and 75 shall be performed by an ISA
(International Society of Arboriculture) Certified Arborist or Tree Worker, not
construction personnel. Care must be taken not to damage the roots, trunks, or
canopies of adjacent trees. If roots are encountered, they shall be cut cleanly
perpendicular to the root with a sharp saw. All brush and tree debris must be removed
off site and properly disposed.
6. TREE PROTECTION
The contractor and Consulting Arborist shall meet to establish tree protection zones
(TPZ) for trees 9, 19, 52, 60-62, 29, 39, 41, 44, 45, 47-51. Tree protection fencing shall be
installed prior to construction and remain in place for the duration of the project,
unless approved by the project arborist. Fencing shall be 6’ chain link fencing secured
into the ground and fully enclose the TPZ. Tree protection regulations shall be posted
on all tree protection fencing. The fencing shall remain in place for the duration of the
project.
a. Tree protection fencing distances shall follow Table 6. Tree Protection Zones
located on page 16 of the BUENA VISTA TREE SERVICE ARBORIST REPORT,
dated February 2024.
7. STORAGE OF MATERIALS
No work shall be performed, or storage of materials shall occur within the TPZ
without arborist approval and supervision as needed to prevent damage to tree
trunks and tree roots, and to document development impacts (see table 6 and
illustration 1, following pages).
30
AH 07-25-2024
30 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 4
8. TREE TRUNK WRAPPING
Trunks of trees 9, 19, 28, 29, 34-42, 44-52, and 60-64 shall be wrapped up the trunk to
6’ to the lowest branch with straw wattle.
9. CRITICIAL ROOT ZONE
Root buffers, configured to provide the most protection possible, are required at the
base of tree #29, and in the courtyard within the TPZ of trees #40-42, and 44 to provide
worker and equipment access when working within or around the TPZ consisting of
a 4-6” base course of ¾” bark chips, a cap of ¾” quarry gravel to stabilize, with ¾”
plywood on top to provide an access path without compacting the soil within tree
driplines.
10. TREE PRUNING
Perform reduction pruning to balance asymmetrical canopies and reduce heavy end
weights and any other trees that may be subject to equipment or material clearance
and to avoid branch breakage. This would apply to trees #9-11, 19, 33, 52, 63, 64, and
any other trees requiring equipment or material access. No interior branches should
be removed. All pruning shall be performed by an International Society of
Arboriculture Certified Arborist in compliance with ANSI A300 Part 1 Pruning (2017)
and companion Best Management Practices – Tree Pruning and comply with the
Migratory Bird Treaty Act and California Fish and Wildlife Code 3503-3513 to avoid
nesting bird disturbance.
11. DURING CONSTRUCTION
a. All excavation work within the TPZ of protected trees shall be monitored by the
Consulting Arborist. If any injury should occur to any tree, contact the Consulting
Arborist for evaluation and appropriate treatment.
b. TPZ fencing is to remain in place for the duration of the project.
c. If any roots are encountered outside the TPZ, they shall be cut perpendicular to
the root with a sharp saw or loppers. Do not tear the root or rip it from the soil. If
roots larger than 2” are encountered, contact the Consulting Arborist for proper
treatment.
d. No storage of materials, equipment, soil, waste, oil, gasoline, rinsates, etc. should
be deposited in the TPZ.
e. Avoid idling of any equipment as the exhaust may damage foliage and branches
of subject trees and other landscape plants in the area.
12. POST-CONSTRUCTION
a. The subject tree resource will experience a change in environment from the
development on site. The health, structural stability, and vitality of the trees
31
AH 07-25-2024
31 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 5
should be documented post-construction by the Consulting Arborist and
monitored for changes in condition.
b. With site disturbance, soil compaction, and the potential for root loss, tree decline
is possible for the sixty-five (65) trees retained. Photo documentation is
recommended and effective in monitoring any visible changes in tree health.
c. Employing best management practices including proper irrigation management,
occasional pruning, and maintaining a dripline clear of materials and activities
that cause root disturbance and compaction will promote tree health.
13. DEMOLITION REQUIREMENTS
All demolished site materials shall be recycled to the maximum extent feasible subject
to the Building Official. The applicant shall provide evidence that materials were
recycled prior to occupancy.
14. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department
15. FUGITIVE DUST CONTROL
Prior to issuance of the any demolition, grading, or building permit, include on all
permit plans, the full text of each of the Bay Area Air Quality Management District's
Basic Control Measures from the latest version of BAAQMD's CEQA Air Quality
Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive
dust (i.e., particulate matter PM2.5 and PMlO) during demolition, ground disturbing
activities and/or construction.
16. AVOID NESTING BIRDS DURING CONSTRUCTION
Prior to issuance of the any demolition, grading and building permit, indicate the
following on all construction plans:
a. Demolition, construction, ground-disturbing, and tree removal/pruning activities
shall be scheduled to be completed prior to nesting season (February 1 through
August 31), if feasible.
b. If demolition, construction, ground-disturbing, or tree removal/pruning activities
occur during the nesting season (February 1 and August 31), preconstruction
surveys shall be conducted as follows:
i. No more than 7 days prior to the start of demolition, construction, ground-
disturbing, or tree removal/pruning activities, in order to identify any active
32
AH 07-25-2024
32 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 6
nests with eggs or young birds on the site and surrounding area within 100 feet
of construction or tree removal activities.
ii. Preconstruction surveys shall be repeated at 14-day intervals until demolition,
construction, ground-disturbing, or tree removal/pruning activities have been
initiated in the area, after which surveys can be stopped. As part of the
preconstruction survey(s), the surveyor shall inspect all trees and other
possible nesting habitats in, and immediately adjacent to, the construction
areas for active nests, while ensuring that they do not disturb the nests as
follows:
1) For projects that require the demolition or construction one single- family
residence, ground disturbing activities affecting areas of up to 500 square
feet, or the removal of up to three trees, the property owner or a tree
removal contractor, if necessary, is permitted to conduct the
preconstruction surveys to identify if there are any active nests. If any
active nests with eggs or young birds are identified, the project applicant
shall retain a qualified ornithologist or biologist to identify protective
measures.
2) For any other demolition, construction and ground disturbing activity or
the removal of four or more trees, a qualified ornithologist or biologist
shall be retained by the project applicant to conduct the preconstruction
surveys.
iii. If the preconstruction survey does not identify any active nests with eggs or
young birds that would be affected by demolition, construction, ground-
disturbing or tree removal/pruning activities, no further mitigating action is
required. If an active nest containing eggs or young birds is found sufficiently
close to work areas to be disturbed by these activities, their locations shall be
documented, and the qualified ornithologist or biologist shall identify protective
measures to be implemented under their direction until the nests no longer
contain eggs or young birds.
iv. Protective measures may include, but are not limited to, establishment of clearly
delineated exclusion zones (i.e., demarcated by identifiable fencing, such as
orange construction fencing or equivalent) around each nest location as
determined by the qualified ornithologist or biologist, taking into account the
species of birds nesting, their tolerance for disturbance and proximity to existing
development. In general, exclusion zones shall be a minimum of 300 feet for
raptors and 75 feet for passerines and other birds. The active nest within an
exclusion zone shall be monitored on a weekly basis throughout the nesting
season to identify signs of disturbance and confirm nesting status. The radius of
an exclusion zone may be increased by the qualified ornithologist or biologist, if
33
AH 07-25-2024
33 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 7
project activities are determined to be adversely affecting the nesting birds.
Exclusion zones may be reduced by the qualified ornithologist or biologist only
in consultation with California Department of Fish and Wildlife. The protection
measures and buffers shall remain in effect until the young have left the nest and
are foraging independently or the nest is no longer active.
v. A final report on nesting birds and raptors, including survey methodology,
survey date(s), map of identified active nests (if any), and protection measures
(if required), shall be prepared by the qualified ornithologist or biologist and
submitted to the Director of Community Development or his or her designee,
through the appropriate permit review process (e.g., demolition, construction,
tree removal, etc.), and be completed to the satisfaction of the Community
Development Director prior to the start of demolition, construction, ground-
disturbing, or tree removal/pruning activities.
17. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES
Prior to the issuance of any demolition, grading or building permit involving soil
disturbance, the project applicant shall provide written verification, including the
materials provided to contractors and construction crews, to the City confirming that
contractors and construction crews have been notified of basic archaeological site
indicators, the potential for discovery of archaeological resources, laws pertaining to
these resources, and procedures for protecting these resources as follows:
a. Basic archaeological site indicators that may include, but are not limited to, darker
than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire
affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of stone,
bone, or shellfish; evidence of living surfaces (e.g., floors); and burials, either
human or animal.
b. The potential for undiscovered archaeological resources or tribal cultural
resources on site.
c. The laws protecting these resources and associated penalties, including, but not
limited to, the Native American Graves Protection and Repatriation Act of 1990,
Public Resources Code Section 5097, and California Health and Safety Code
Section 7050 and Section 7052.
d. The protection procedures to follow should construction crews discover cultural
resources during project-related earthwork, include the following:
i. All soil disturbing work within 25 feet of the find shall cease.
34
AH 07-25-2024
34 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 8
ii. The project applicant shall retain a qualified archaeologist to provide and
implement a plan for survey, subsurface investigation, as needed, to define the
deposit, and assessment of the remainder of the site within the project area to
determine whether the resource is significant and would be affected by the
project.
iii. Any potential archaeological or tribal cultural resources found during
construction activities shall be recorded on appropriate California Department
of Parks and Recreation forms by a qualified archaeologist. If the resource is a
tribal cultural resource, the consulting archaeologist shall consult with the
appropriate tribe, as determined by the Native American Heritage
Commission, to evaluate the significance of the resource and to recommend
appropriate and feasible avoidance, testing, preservation or mitigation
measures, in light of factors such as the significance of the find, proposed
project design, costs, and other considerations. The archeologist shall perform
this evaluation in consultation with the tribe.
18. HUMAN REMAINS AND NATIVE AMERICAN BURIALS
Prior to issuance of the any demolition, grading and building permits that involve soil
disturbance, include on plans a note that, during project construction, the project
applicant shall comply with California Health and Safety Code Section 7050.5 and
California Public Resources Code Section 5097.98.
a. In the event of discovering human remains during construction activities, there
shall be no further excavation or disturbance of the site within a 100-foot radius of
the remains, or any nearby area reasonably suspected to overlie adjacent remains.
b. The Santa Clara County Coroner shall be notified immediately and shall make a
determination as to whether the remains are Native American.
c. If the Santa Clara County Coroner determines that the remains are not subject to
his authority, he shall notify the Native American Heritage Commission (NAHC)
within 24 hours.
d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of the
deceased Native American.
e. The Most Likely Descendant has 48 hours following access to the project site to
make recommendations or preferences regarding the disposition of the remains.
If the Most Likely Descendant does not make recommendations within 48 hours
after being allowed access to the project site, the owner shall, with appropriate
35
AH 07-25-2024
35 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 9
dignity, reinter the remains in an area of the property secure from further
disturbance and provide documentation about this determination and the location
of the remains to the NAHC and the City of Cupertino. Alternatively, if the owner
does not accept the Most Likely Descendant's recommendations, the owner or the
descendent may request mediation by the NAHC. Construction shall halt until the
mediation has concluded.
19. NOISE AND VIBRATION NOTICE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall send notices of the
planned activity by first class mail as follows:
a. For projects on sites that are more than 0.5 acres or four or more residential units
the notices shall be sent to off-site businesses and residents within 500 feet of the
project site;
b. For projects on sites between 0.25 to 0.5 acres, or two or three residential units (not
including Accessory Dwelling Units) notices shall be sent to off-site businesses and
residents within 250 feet of the project site; or
c. For projects on sites less than 0.25 acres or one residential unit, the notices shall be
sent to off-site businesses and residents within 100 feet of the project site.
The notification shall include a brief description of the project, the activities that
would occur, the hours when activity would occur, and the construction period's
overall duration. The notification should include the telephone numbers of the
contractor's authorized representatives that are assigned to respond in the event of a
noise or vibration complaint. The City will provide mailing addresses for the
Applicant's use. The project applicant shall provide the City with evidence of mailing
of the notice, upon request. If pile driving, see additional noticing requirements
below.
20. NOISE AND VIBRATION SIGNAGE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least two feet by three feet shall be posted on construction fencing at the
entrance(s) to the job site, clearly visible to the public, and include the following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
36
AH 07-25-2024
36 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 10
c. Telephone numbers of the City's and contractor's authorized representatives that
are assigned to respond in the event of a noise or vibration complaint; and
d. Contact information for City's and contractor's authorized representatives that
are assigned to respond in the event of a complaint related to fugitive dust,
pursuant to the requirements for compliance with BAAQMD's CEQA Air Quality
Guidelines.
If the authorized contractor's representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
21. NOISE DURING CONSTRUCTION
Prior to issuance of any demolition, grading or building permit, include on plans a
note that, during project construction, the project applicant shall incorporate the
following measures to reduce noise during construction and demolition activity:
a. The project applicant and contractors shall prepare and submit a Construction
Noise Control Plan to the City's Planning Department for review and approval
prior to issuance of the first permit. The Construction Noise Plan shall demonstrate
compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48
(Community Noise Control) of Cupertino Municipal Code. The details of the
Construction Noise Control Plan shall be included in the applicable construction
documents and implemented by the on-site Construction Manager. Noise
reduction measures selected and implemented shall be based on the type of
construction equipment used on the site, distance of construction activities from
sensitive receptor(s), site terrain, and other features on and surrounding the site
(e.g., trees, built environment) and may include, but not be limited to, temporary
construction noise attenuation walls, high quality mufflers. During the entire
active construction period, the Construction Noise Control Plan shall demonstrate
that compliance with the specified noise control requirements for construction
equipment and tools will reduce construction noise in compliance with the City's
daytime and nighttime decibel limits.
b. Select haul routes that avoid the greatest amount of sensitive use areas and submit
to the City of Cupertino Public Works Department for approval prior to the start
of the construction phase.
c. Signs will be posted at the job site entrance(s), within the on-site construction
zones, and along queueing lanes (if any) to reinforce the prohibition of
37
AH 07-25-2024
37 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 11
unnecessary engine idling. All other equipment will be turned off if not in use for
more than 5 minutes.
d. During the entire active construction period and to the extent feasible, the use of
noise producing signals, including horns, whistles, alarms, and bells will be for
safety warning purposes only. The construction manager will use smart back-up
alarms, which automatically adjust the alarm level based on the background noise
level or switch off back-up alarms and replace with human spotters in compliance
with all safety requirements and law.
22. PALEONTOLOGICAL RESOURCES
Prior to issuance of the any demolition, grading or building permit, include on plans
a note that, during project construction, the project applicant shall implement the
following measures:
a. If paleontological resources are encountered during ground disturbing and/or
other construction activities, all construction shall be temporarily halted or
redirected to allow a qualified paleontologist, which shall be retained by the
project applicant, to assess the find for significance and the Applicant shall notify
the City.
b. If paleontological resources are found to be significant, the paleontological
monitor shall determine appropriate actions, in coordination with a qualified
paleontologist, City staff, and property owner. Appropriate actions may include,
but are not limited to, a mitigation plan formulated pursuant to guidelines
developed by the Society of Vertebrate Paleontology and implemented to
appropriately protect the significance of the resource by preservation,
documentation, and/or removal, prior to recommencing activities. Measures may
include, but are not limited to, salvage of unearthed fossil remains and/or traces
(e.g., tracks, trails, burrows); screen washing to recover small specimens;
preparation of salvaged fossils to a point of being ready for curation (e.g., removal
of enclosing matrix, stabilization and repair of specimens, and construction of
reinforced support cradles); and identification, cataloging, curation, and provision
for repository storage of prepared fossil specimens.
23. INDEMNIFICATION AND LIMITATION OF LIABILITY
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless
the City, its City Council, and its officers, employees, and agents (collectively, the
“indemnified parties”) from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
38
AH 07-25-2024
38 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 12
“proceeding”) brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant related to any Ordinance,
Resolution, or action approving the project, the related entitlements, environmental
review documents, finding or determinations, or any other permit or approval
authorized for the project. The indemnification shall include but not be limited to
damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’
fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or
bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and
costs shall include amounts paid to the City’s outside counsel and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City. The applicant shall
likewise agree to indemnify, defend, and hold harmless the indemnified parties from
and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees
awarded under Code of Civil Procedure section 1021.5, assessed or awarded against
the indemnified parties. The Applicant shall cooperate with the City to enter a
Reimbursement Agreement to govern any such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
24. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
PASSED AND ADOPTED this 25th day of July 2024 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
39
AH 07-25-2024
39 of 47
Resolution No. XXX ASA-2023-006 July 25, 2024
Page 13
ATTEST: APPROVED:
_________ ________
Danielle Condit Luke Connolly
Associate Planner Administrative Hearing Officer
40
AH 07-25-2024
40 of 47
41
AH 07-25-2024
41 of 47
42
AH 07-25-2024
42 of 47
43
AH 07-25-2024
43 of 47
44
AH 07-25-2024
44 of 47
45
AH 07-25-2024
45 of 47
46
AH 07-25-2024
46 of 47
47
AH 07-25-2024
47 of 47