Loading...
HomeMy WebLinkAboutAH 07-25-2024 Searchable PacketCITY OF CUPERTINO ADMINISTRATIVE HEARING AGENDA 10300 Torre Avenue, City Hall Conference Room C Thursday, July 25, 2024 5:00 PM ROLL CALL APPROVAL OF MINUTES 1.Subject: Approve the December 14, 2023 Administrative Hearing Minutes. Recommended Action: Approve the December 14, 2023 Administrative Hearing Minutes. 1 - Draft Minutes POSTPONEMENTS ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the Committee on any matter within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Commission from making any decisions with respect to a matter not on the agenda. PUBLIC HEARINGS OLD BUSINESS NEW BUSINESS Effective January 1, 2023, Government Code Section 65103.5 (SB 1214) limits the distribution of copyrighted material associated with the review of development projects. Members of the public wishing to view plans that cannot otherwise be distributed under SB 1214 may make an appointment with the Planning Division to view them at City Hall by sending an email to planning@cupertino.org. Plans will also be made available digitally during the hearing to consider the proposal. Page 1 1 AH 07-25-2024 1 of 47 Administrative Hearing Agenda July 25, 2024 2.Subject: Architectural and Site Approval permit to consider exterior façade improvements for five existing structures, two new covered walkways, new landscaping and lighting and parking lot improvements, including ADA upgrades and associated CEQA actions. Tree Removal Permit for removal and replacement of fourteen protected trees. (Application No(s).: ASA-2023-006, TR-2023-039; Applicant: Michael Paluso (Steele Group) on behalf of Front Porch Communities and Services; Location: 22445 Cupertino Road; APN(s): 326-15-130, 326-15-133, 326-15-123, 326-15-124) Recommended Action: Staff recommends that the Hearing Officer, in accordance with the Draft Resolutions: 1. Find the actions exempt from CEQA and approve the Architectural and Site Approval, and 2. Approve the Tree Removal Permit Staff Report 1- Draft Resolution ASA-2023-006 2- Draft Resolution TR-2023-039 3 - Project Plans ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue, Cupertino, California 95014, during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. Do not include any personal or private information in written communications to the City that you do not wish to make public, as written communications are considered public records and will be made publicly available on the City website. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 2 2 AH 07-25-2024 2 of 47 Administrative Hearing Agenda July 25, 2024 Page 3 3 AH 07-25-2024 3 of 47 CITY OF CUPERTINO Agenda Item 24-13299 Agenda Date: 7/25/2024 Agenda #: 1. Subject: Approve the December 14, 2023 Administrative Hearing Minutes. Approve the December 14, 2023 Administrative Hearing Minutes. CITY OF CUPERTINO Printed on 7/19/2024Page 1 of 1 powered by Legistar™4 AH 07-25-2024 4 of 47 City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3308 DRAFT MINUTES OF THE ADMINISTRATIVE HEARING REGULAR MEETING HELD December 14, 2023 CALL TO ORDER Hearing officer Luke Connolly opened the meeting at 5:11 p.m. ROLL CALL Staff present: Luke Connolly, Assistant Community Development Director Emi Sugiyama, Associate Planner Jon de Ridder, Administrative Assistant Outside attendee(s): Marc Fasnacht, Applicant Kiran Prabhakar, Applicant Queen Mein Foo, Applicant APPROVAL OF MINUTES 1. Subject: Approve the October 26, 2023, Administrative Hearing meeting minutes Recommended Action: Approve the October 26, 2023, Administrative Hearing meeting minutes. Minutes of the October 26, 2023, meeting approved as written. POSTPONEMENTS – None ORAL COMMUNICATIONS - None PUBLIC HEARINGS - None OLD BUSINESS – None NEW BUSINESS 2. Subject: Architectural and Site Approval Permit and Director’s Minor Modification Permit to consider a remodel and addition to an existing locker room building, construction of a new storage area, and modifications to an existing parking lot located a t the Cupertino Hills Swim & Racquet Club and associated Categorical Exemption under CEQA. (Application No.: ASA-2022-008; DIR-2022-018 Applicant: Cupertino Hills Swim and Racquet Club; Location: 22090 Rae Lane; APN# 356 07 027) 5 AH 07-25-2024 5 of 47 2 Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachment 1 & 2) to: 1. Find the actions exempt from the California Environmental Quality Act (“CEQA”); and 2. Approve the Architectural and Site Approval (ASA-2022-008); and 3. Approve the Director’s Minor Modification (DIR-2022-018) Emi Sugiyama, Associate Planner, provided a brief overview of the proposed project. She stated that the existing storage space will be relocated and that the parking will be rearranged to meet ADA requirements. She clarified that number of parking spaces will still meet the requirements of the original conditional use permit. Hearing Officer Connolly asked if the applicants had anything to add or present. The applicants stated they had nothing to add. Decision: The project is categorically exempt from CEQA and the application was approved by the Hearing Officer per staff recommendation. ADJOURNMENT: The meeting was adjourned at 5:14 p.m. to the next regularly scheduled meeting. Respectfully submitted: ___________________________ Piu Ghosh Planning Manager 6 AH 07-25-2024 6 of 47 CITY OF CUPERTINO Agenda Item 24-13298 Agenda Date: 7/25/2024 Agenda #: 2. Subject: Architectural and Site Approval permit to consider exterior façade improvements for five existing structures, two new covered walkways, new landscaping and lighting and parking lot improvements, including ADA upgrades and associated CEQA actions. Tree Removal Permit for removal and replacement of fourteen protected trees. (Application No(s).: ASA-2023-006, TR-2023- 039; Applicant: Michael Paluso (Steele Group) on behalf of Front Porch Communities and Services; Location: 22445 Cupertino Road; APN(s): 326-15-130, 326-15-133, 326-15-123, 326-15-124) Staff recommends that the Hearing Officer, in accordance with the Draft Resolutions: 1. Find the actions exempt from CEQA and approve the Architectural and Site Approval, and 2. Approve the Tree Removal Permit CITY OF CUPERTINO Printed on 7/19/2024Page 1 of 1 powered by Legistar™7 AH 07-25-2024 7 of 47 ADMINISTRATIVE HEARING STAFF REPORT Meeting Date: July 25, 2024 Subject Architectural and Site Approval permit to consider exterior façade improvements for five existing structures, two new covered walkways, new landscaping and lighting and parking lot improvements, including ADA upgrades and associated CEQA actions. Tree Removal Permit for removal and replacement of fourteen protected trees. (Application No(s).: ASA-2023-006, TR-2023-039; Applicant: Michael Paluso (Steele Group) on behalf of Front Porch Communities and Services; Location: 22445 Cupertino Road; APN(s): 326- 15-130, 326-15-133, 326-15-123, 326-15-124 Recommended Action Staff recommends that the Hearing Officer, in accordance with the Draft Resolutions, (Attachment 1 and 2): 1. Find the actions exempt from CEQA and approve the Architectural and Site Approval, ASA-2023-006, and 2. Approve the Tree Removal Permit, TR-2023-039 Discussion Project Data: General Plan Land Use Designation Quasi-Public / Institutional General Plan Neighborhood Creston-Pharlap Neighborhood Zoning Designation BQ Lot Size 10.1 net acres (no change) Consistency with General Plan Yes Consistency with Zoning Yes Environmental Assessment Categorically Exempt per Section 15301of the California Environmental Quality Act (CEQA) OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org 8 AH 07-25-2024 8 of 47 ASA-2023-006, Sunnyview Retirement Community July 25, 2024 TR-2023-039 Façade Renovation & Parking Improvements Page 2 Project location The Sunnyview Retirement Community is located in the Creston- Pharlap neighborhood in the northwestern portion of the City, at the northeast corner of the intersection of North Foothill Boulevard and Cupertino Road. It is bordered by Cupertino Road to the south, North Foothill Boulevard to the west, Salem Avenue to the North, and adjacent to Hillcrest Road to the east (see Figure 1, vicinity map). Application Summary The applicant, Michael Paluso, is requesting to change the facades of five existing structures with new exterior siding and roof enhancements. Additional improvements include new landscaping in all improved areas, surface parking restriping and repaving, ADA updates, new lighting, and two new covered walkways. Additionally, to facilitate these improvements, a Tree Removal Permit for removal and replacement of fourteen protected (development) trees is required. Background The subject property is zoned quasi-public building (BQ). The Sunnyview Retirement Community is a congregate living facility in operation since the 1970s and include several federally funded and subsidized units. The operations at this facility have expanded over time with Use Permits processed with the City’s review. A modification in the late 1990s (U-1997-13) indicated that the site was approved with 182 parking stalls. In 2008, the parking count was reduced onsite to 178 stalls due to the addition of a trash enclosure 1. Analysis Architectural and Site Approval Covered Walkways: The project scope includes the construction of two new covered walkways, one above an existing uncovered pathway (see figure 2, location 1) and one replacing an existing covered walkway (see Figure 2, location 2). 1 Building Permit No. 08060182: https://chl-lf-app.cupertino.org/WebLink/PDFExport10.aspx?f=dd241bbb-ec18-4e7a- 8f8e-5aee1d29d1ea&id=817226&t=0 Figure 1: Vicinity Map Steven’s Creek Blvd Cupertino Rd. N 9 AH 07-25-2024 9 of 47 ASA-2023-006, Sunnyview Retirement Community July 25, 2024 TR-2023-039 Façade Renovation & Parking Improvements Page 3 Improvements related to the first covered walkway include widening the existing pathway from approximately 5’-9” to 8’-6” by modifying an existing adjacent landscape area. The new covered structure will be in two sections – the pathway section (about 12 feet tall) and the portion leading into the Wellness Center (about 15 feet tall). Construction of the second walkway will involve the removal of an existing covered walkway, and installation of a new accessible ramp, with steel handrails, under the new walkway. The covered structure will be approximately 13’ in height and terraced into sections to follow the approximate 8% slope. The materials for the two covered walkways match and consist of wood framing, with decorative ledge stacked stone veneer—extending about 3’ in height from base of each column. The covered walkways will have a gabled roof design, with asphalt shingles to match the existing roof structures. All exposed wood will be painted with a mixture of cool and warm earthtone colors; blending with the materials and colors schedule for the new façade improvements further discussed below. Upper Patio: No changes are proposed to the existing upper patio slab (see Figure 2, area in blue). New steel guardrail will be installed along the covered accessible ramp discussed above and connect to the existing 42” guard rail that runs along the perimeter of the upper patio. New landscape and irrigation is proposed around the perimeter of the upper patio. The planting schedule includes both native and adaptive native flowering shrubs and leafy ground cover. Façade improvements: Exterior renovation of the front entry (building 7), the lower villas, upper villas, and the two villa garages (located on the east side of the property) is proposed (see Figure 2, areas in red). New exterior siding and roof enhancements will be added to the exterior of each building, for a craftsman style resemblance. The improvements include the following for each structure: Figure 2: Locations of the proposed site improvements Covered Walks, Upper Patio, Villas, Façade Improvments, Drive Ailse & Parking, Storm Water treament, 1 2 BLDG. 7 10 AH 07-25-2024 10 of 47 ASA-2023-006, Sunnyview Retirement Community July 25, 2024 TR-2023-039 Façade Renovation & Parking Improvements Page 4  Front Entry-Building 7: The existing boxed gable roof is proposed to remain. Three new cross-gables will be added to the west elevation, replacing the existing shed roof that extends over the existing second floor balconies. The first-floor wall plane will receive a new color coat of paint. New shingle siding is proposed on the second story walls and to areas of the second story balcony walls. The fenestration pattern will remain unchanged, with some door replacements.  Lower Villas and Upper Villas: The existing Dutch gable roof is proposed to remain on each of the single-story buildings. Several new cross-gable roofs will be added, with asphalt shingles to match existing. New gable roofed entry features will be added at each unit. The existing stucco walls on the north elevation will be painted a new color. New shingle siding, with lap siding wainscot below shall be installed on the west, east and south elevations on both villas. The fenestration pattern will remain unchanged, with some door replacements.  Lower and Upper Villa Garages: No roof changes are proposed to the villa garages. The existing stucco walls on the east elevation will be repainted, while the south, west and north elevations of the two garages will receive new lap siding, with shingle siding wainscot below. The closed, short panel, garage doors will be replaced with a new craftsman style garage door; with decorative trellis that extends over the opening. Drive Aisles & Parking: Two locations on site will undergo drive aisle replacement and/or parking lot restriping.  Front Entry-Building 7: The existing landscape island at the front parking area has been reduced to accommodate two accessible parking spaces. Reduction of the size of the landscape island also made it possible to widen the drive aisle to meet city standards and to restripe 9 parking stalls in this area. Additionally, a new landscape planter island has been added in the center of the curved parking area. Additional improvements include new stamped concrete in the parking area and front entry roundabout.  Lower and Upper Villa Parking Lot: The existing parking lot is proposed to be repaved with stamped concrete. An existing tree planter located in the north-east corner of the lot is proposed to be removed due to its odd placement, with which staff concurs. This will allow the addition of one new parking stall at this location. A new landscaped parking island, to replace the one removed, is proposed at center of the parking row along the north side of the lot. All restriped parking stalls meet the city standards. Trash Enclosure: The existing trash enclosure located to the west of the 12-stall garage is proposed to be replaced by an expanded steel panel enclosure with a covered roof, with a shed design. The replacement and expansion of the trash enclosure will result in the 11 AH 07-25-2024 11 of 47 ASA-2023-006, Sunnyview Retirement Community July 25, 2024 TR-2023-039 Façade Renovation & Parking Improvements Page 5 loss of one existing parking stall at this location. However, as previously discussed, the project proposes to create a new parking stall at the north end of the villa parking lot. The new trash enclosure will comply with the City’s standards. Additional Improvements: Additional improvements to the site will include removal and replacement of existing pole lighting with shielded pole lighting fixtures, new stormwater treatment system, ADA improvements, landscaping and irrigation that meet the city’s water efficient landscape checklist and water budget calculation worksheets. Tree Removal Permit Seventy-six (76) trees – sixty-one (61) on site and fifteen (15) off site – were assessed in the Arborist Report. However, only fourteen trees have been identified for removal and replacement, of which three (3) trees (Tree no.s 8, 10 and 11) are California native species— Coast Live Oak. Table 1 below indicates the species, size, condition and reason for removal for each of the fourteen trees. Table 1: Tree Removal Summary # Tree ID Common Name (Scientific Name) DBH Inches Condition Reason for Removal 1 8 Coast Live Oak (Quercus agrifolia) 26 2.5 Structural defects that cannot be corrected, internal decay and loss of trunk strength 2 10 Coast Live Oak (Quercus agrifolia) 10 3.5 Impacts due to modifications required to the planter to meet Building Code standards for required accessible parking2 3 11 Coast Live Oak (Quercus agrifolia) 9 3.5 4 12 Japanese maple (Acer palmatum) 5, 4, 4 3 Within construction footprin 5 13 Modesto ash (Fraxinus velutina) 10 2 Within construction footprin 6 14 Raywood ash (Fraxinus angustifolia) 13 2.5 Within construction footprint 7 24 Cherry (Prunus 6 3 Within construction footprint 2 The original proposal, as noted in the arborist report, contemplated the removal of 12 protected trees. However, during the review process it was determined that the landscape island alteration was necessary to accommodate code compliant accessible parking, which necessitated the removal of two additional trees (#10 and 11). 12 AH 07-25-2024 12 of 47 ASA-2023-006, Sunnyview Retirement Community July 25, 2024 TR-2023-039 Façade Renovation & Parking Improvements Page 6 # Tree ID Common Name (Scientific Name) DBH Inches Condition Reason for Removal spp.) 8 25 Cherry (Prunus spp.) 6 3 Within construction footprint 9 26 Chinese Evergreen Pear (Pyrus kawakamii) 12 3 Within construction footprint 10 30 Cherry (Prunus spp.) 4 2.5 Within construction footprint 11 31 Cherry (Prunus spp.) 5 2.5 Within construction footprint 12 32 Cherry (Prunus spp.) 5 2.5 Within construction footprint 13 43 Carob (Ceratonia siliqua) 16, 14, 14 3 Within construction footprint 14 75 Persimmon (Diospyros spp.) 3, 3, 2 2.5 Within construction footprint Note: Tree Condition is identified on a scale of 2 thru 4: 2 being “poor”, 2.5 being “fair-poor”, 3 being “fair”, 3.5 being “fair-good” & 4 being “good” The City’s consultant arborist has conducted site visits, reviewed the preservation measures for the trees being retained and found the applicant’s proposal acceptable and consistent with current urban forestry standards. Conditions of approval require regular inspections and reporting by an ISA certified arborist to ensure the trees are in good condition through construction. Additionally, conditions have been added that require that any tree removed be replaced in a manner consistent with the requirements of the Municipal Code (CMC 14.18.160 Tree Replacement.) Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 Class 1, categorical exemption allows for minor alteration of existing public or private facilities or topographical features, involving negligible or no expansion of existing or former use. The project proposes resurfacing existing parking lots, façade updates to existing structures and new covered walkways at an existing retirement facility. No expansion of the existing use is proposed. Furthermore, the project is not located in an environmentally sensitive area. Other Department/Agency Review 13 AH 07-25-2024 13 of 47 ASA-2023-006, Sunnyview Retirement Community July 25, 2024 TR-2023-039 Façade Renovation & Parking Improvements Page 7 The Building Division, Environmental Programs Division, Public Works Department and the Santa Clara County Fire Department have no objections to the project. Public Noticing A summary of noticing on the project is presented in the table below: Notice of Public Hearing, Site Notice & Legal Ad Agenda  Site Signage (14 days prior to the hearing). Sign Posted: July 10th, 2024  Noticing to adjacent neighbors (10 days prior to the hearing): Notices Mailed: July 11, 2024  Posted on the City's official notice bulletin board (one week prior to the hearing)  Posted on the City of Cupertino’s Website Public Comments As of the publishing of this report, one public comment has been received. The stake holder expressed concerns regarding construction noise, impacts to street parking and increased traffic from construction activity. Chapter 10.48.053 of the Cupertino Municipal Code regulates construction activity days, times and decibel level within residential and non-residential areas, which the contractor must adhere to. Furthermore, per city requirements, as a condition of approval, a Construction Management Plan 3 must be prepared and submitted for review, prior to building permit issuance. Conclusion Staff recommends approval of the Architectural and Site Approval permit and Tree Removal Permit, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all applicable findings for approval of the proposed project, consistent with chapters 19.168 and 14.18 of the Cupertino Municipal Code, may be made as indicated in draft Resolutions. Next Steps The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period. 3 The Construction Management Plan typically includes procedures to attempt to minimize potential construction impacts related to construction crew parking, equipment staging, off-site circulation, noise, and air quality on neighbors during the construction phase. 14 AH 07-25-2024 14 of 47 ASA-2023-006, Sunnyview Retirement Community July 25, 2024 TR-2023-039 Façade Renovation & Parking Improvements Page 8 This approval is valid until July 31, 2026. The applicant may apply for a one-time two-year extension before the approval expires. Prepared by: Danielle Condit, Associate Planner Reviewed and Approved for Submission by: Piu Ghosh, Planning Manager ATTACHMENTS 1. Draft Resolution ASA-2023-006 2. Draft Resolution TR-2023-039 3. Project Plans (abridged due to limitations of state law pursuant to SB1214) 15 AH 07-25-2024 15 of 47 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. XXX OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW EXTERIOR FAÇADE RENOVATIONS TO FIVE EXISTING STRUCTURES AND SITE IMPROVEMENTS, INCLUDING PARKING LOT IMPROVEMENTS AT THE SUNNYVIEW RETIREMENT COMMUNITY LOCATED AT 22445 CUPERTINO RD SECTION I: PROJECT DESCRIPTION Application No.: ASA-2023-006 Applicant: Michael Paluso (Steele Group) Location: 22445 Cupertino Road APN(s): 326-15-130, 326-15-133, 326-15-123, 326-15-124 SECTION II: FINDINGS: WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider changes to the facades of five existing structures with new exterior siding and roof enhancements. Additional improvements include new landscaping in all improved areas, surface parking restriping and repaving, ADA updates, new lighting, and two new covered walkways., as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Cupertino Municipal Code, and the Administrative Hearing Officer has held at least one public meeting with regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) ("CEQA"), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons set forth in the staff report dated July 25, 2024 and incorporated herein; and 16 AH 07-25-2024 16 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 2 WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The proposed façade improvements are minor in nature. There will be no change to the building height and no expansion of use. The applicant proposes to resurface and restripe existing parking areas. The paving will be at grade and not visible from neighboring properties. All the proposed changes are minor improvements to the existing site and will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria; The proposal complies with the General Plan. The proposal with the modifications that are required as conditions of approval will comply with the City’s adopted standards and Municipal Code. a. Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There is no change to the existing building heights on site—and no new buildings have been proposed in this application. The surface parking area is located at grade and is uncovered. The proposed exterior renovation will help improve the massing of the structures by breaking up the wall planes with new material changes, as opposed to the original all stucco design. b. In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to 17 AH 07-25-2024 17 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 3 prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. The improved structures will not be visible from neighboring properties or the public right-of-way. The material and color schedule incorporates neutral earthtones to the renovated facades. Existing mature trees are proposed to be retained on site. New landscaping has been proposed around the parking areas to match existing planting on site. Outdoor lighting incorporates appropriate shielding and is designed to meet the dark-sky requirements of the Municipal Code. c. The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signs are approved as part of this project. d. With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and will maintain the existing setbacks established adjacent to the existing residential neighbors. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof,: The application for a Architectural and Site Approval, Application no. ASA-2023-006 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing record concerning Application no. ASA-2023-006 as set forth in the Minutes of the Administrative Hearing Meeting of July 25, 2024 and are incorporated by reference as though fully set forth herein. 18 AH 07-25-2024 18 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 4 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by MW Seele Group “Sunnyview Retirement Community” consisting of seventy-six (76) sheets labeled A0.1, A1.0, A1.0a, A1.1- A1.4, A2.0-A2.3, A3.0-A3.1.1, A4.0-A4.2, A5.0-A5.2, A6.0-A6.1, A7.0, A10.0, C1.0-C4.0, E002-E207, G0.0, G0.3, and L1.0-L6.4, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. U-1989-07 and TR-2023-039 shall be applicable to this approval. 4. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated with notes to indicate how compliance is met, on the the building plans. 5. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 6. SURFACE PARKING LOT The new surface parking lot shall conform with the Department of Public Works City of Cupertino Standard Detail document. Parking stall length may be decreased by up to two feet but must provide an equivalent vehicle overhang into landscaped areas. 19 AH 07-25-2024 19 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 5 7. WHEEL STOPS Concrete wheel stops shall be placed on top of a flat curb and shall be provided at a rate of one per two stalls. 8. DEMOLITION REQUIREMENTS All demolished site materials shall be recycled to the maximum extent feasible, subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy. 9. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department 10. DARK SKY COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved lighting plans to comply with development standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting Requirements. In the event changes are proposed from the approved plans, said changes must be reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all documentation required to determine compliance with the Municipal Code. 11. FUGITIVE DUST CONTROL Prior to issuance of the any demolition, grading, or building permit, include on all permit plans, the full text of each of the Bay Area Air Quality Management District's Basic Control Measures from the latest version of BAAQMD's CEQA Air Quality Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive dust (i.e., particulate matter PM2.5 and PMlO) during demolition, ground disturbing activities and/or construction. 12. AVOID NESTING BIRDS DURING CONSTRUCTION Prior to issuance of the any demolition, grading and building permit, indicate the following on all construction plans: a. Demolition, construction, ground-disturbing, and tree removal/pruning activities shall be scheduled to be completed prior to nesting season (February 1 through August 31), if feasible. b. If demolition, construction, ground-disturbing, or tree removal/pruning activities occur during the nesting season (February 1 and August 31), preconstruction surveys shall be conducted as follows: 20 AH 07-25-2024 20 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 6 i. No more than 7 days prior to the start of demolition, construction, ground- disturbing, or tree removal/pruning activities, in order to identify any active nests with eggs or young birds on the site and surrounding area within 100 feet of construction or tree removal activities. ii. Preconstruction surveys shall be repeated at 14-day intervals until demolition, construction, ground-disturbing, or tree removal/pruning activities have been initiated in the area, after which surveys can be stopped. As part of the preconstruction survey(s), the surveyor shall inspect all trees and other possible nesting habitats in, and immediately adjacent to, the construction areas for active nests, while ensuring that they do not disturb the nests as follows: 1) For projects that require the demolition or construction one single- family residence, ground disturbing activities affecting areas of up to 500 square feet, or the removal of up to three trees, the property owner or a tree removal contractor, if necessary, is permitted to conduct the preconstruction surveys to identify if there are any active nests. If any active nests with eggs or young birds are identified, the project applicant shall retain a qualified ornithologist or biologist to identify protective measures. 2) For any other demolition, construction and ground disturbing activity or the removal of four or more trees, a qualified ornithologist or biologist shall be retained by the project applicant to conduct the preconstruction surveys. iii. If the preconstruction survey does not identify any active nests with eggs or young birds that would be affected by demolition, construction, ground- disturbing or tree removal/pruning activities, no further mitigating action is required. If an active nest containing eggs or young birds is found sufficiently close to work areas to be disturbed by these activities, their locations shall be documented, and the qualified ornithologist or biologist shall identify protective measures to be implemented under their direction until the nests no longer contain eggs or young birds. iv. Protective measures may include, but are not limited to, establishment of clearly delineated exclusion zones (i.e., demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by the qualified ornithologist or biologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting 21 AH 07-25-2024 21 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 7 season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified ornithologist or biologist, if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified ornithologist or biologist only in consultation with California Department of Fish and Wildlife. The protection measures and buffers shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. v. A final report on nesting birds and raptors, including survey methodology, survey date(s), map of identified active nests (if any), and protection measures (if required), shall be prepared by the qualified ornithologist or biologist and submitted to the Director of Community Development or his or her designee, through the appropriate permit review process (e.g., demolition, construction, tree removal, etc.), and be completed to the satisfaction of the Community Development Director prior to the start of demolition, construction, ground- disturbing, or tree removal/pruning activities. 13. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES Prior to the issuance of any demolition, grading or building permit involving soil disturbance, the project applicant shall provide written verification, including the materials provided to contractors and construction crews, to the City confirming that contractors and construction crews have been notified of basic archaeological site indicators, the potential for discovery of archaeological resources, laws pertaining to these resources, and procedures for protecting these resources as follows: a. Basic archaeological site indicators that may include, but are not limited to, darker than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of stone, bone, or shellfish; evidence of living surfaces (e.g., floors); and burials, either human or animal. b. The potential for undiscovered archaeological resources or tribal cultural resources on site. c. The laws protecting these resources and associated penalties, including, but not limited to, the Native American Graves Protection and Repatriation Act of 1990, Public Resources Code Section 5097, and California Health and Safety Code Section 7050 and Section 7052. d. The protection procedures to follow should construction crews discover cultural resources during project-related earthwork, include the following: i. All soil disturbing work within 25 feet of the find shall cease. ii. The project applicant shall retain a qualified archaeologist to provide and implement a plan for survey, subsurface investigation, as needed, to define the 22 AH 07-25-2024 22 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 8 deposit, and assessment of the remainder of the site within the project area to determine whether the resource is significant and would be affected by the project. iii. Any potential archaeological or tribal cultural resources found during construction activities shall be recorded on appropriate California Department of Parks and Recreation forms by a qualified archaeologist. If the resource is a tribal cultural resource, the consulting archaeologist shall consult with the appropriate tribe, as determined by the Native American Heritage Commission, to evaluate the significance of the resource and to recommend appropriate and feasible avoidance, testing, preservation or mitigation measures, in light of factors such as the significance of the find, proposed project design, costs, and other considerations. The archeologist shall perform this evaluation in consultation with the tribe. 14. HUMAN REMAINS AND NATIVE AMERICAN BURIALS Prior to issuance of the any demolition, grading and building permits that involve soil disturbance, include on plans a note that, during project construction, the project applicant shall comply with California Health and Safety Code Section 7050.5 and California Public Resources Code Section 5097.98. a. In the event of discovering human remains during construction activities, there shall be no further excavation or disturbance of the site within a 100-foot radius of the remains, or any nearby area reasonably suspected to overlie adjacent remains. b. The Santa Clara County Coroner shall be notified immediately and shall make a determination as to whether the remains are Native American. c. If the Santa Clara County Coroner determines that the remains are not subject to his authority, he shall notify the Native American Heritage Commission (NAHC) within 24 hours. d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of the deceased Native American. e. The Most Likely Descendant has 48 hours following access to the project site to make recommendations or preferences regarding the disposition of the remains. If the Most Likely Descendant does not make recommendations within 48 hours after being allowed access to the project site, the owner shall, with appropriate dignity, reinter the remains in an area of the property secure from further disturbance and provide documentation about this determination and the location of the remains to the NAHC and the City of Cupertino. Alternatively, if the owner does not accept the Most Likely Descendant's recommendations, the owner or the descendent may request mediation by the NAHC. Construction shall halt until the mediation has concluded. 23 AH 07-25-2024 23 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 9 15. NOISE AND VIBRATION NOTICE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall send notices of the planned activity by first class mail as follows: a. For projects on sites that are more than 0.5 acres or four or more residential units the notices shall be sent to off-site businesses and residents within 500 feet of the project site; b. For projects on sites between 0.25 to 0.5 acres, or two or three residential units (not including Accessory Dwelling Units) notices shall be sent to off-site businesses and residents within 250 feet of the project site; or c. For projects on sites less than 0.25 acres or one residential unit, the notices shall be sent to off-site businesses and residents within 100 feet of the project site. The notification shall include a brief description of the project, the activities that would occur, the hours when activity would occur, and the construction period's overall duration. The notification should include the telephone numbers of the contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint. The City will provide mailing addresses for the Applicant's use. The project applicant shall provide the City with evidence of mailing of the notice, upon request. If pile driving, see additional noticing requirements below. 16. NOISE AND VIBRATION SIGNAGE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall ensure that a sign measuring at least two feet by three feet shall be posted on construction fencing at the entrance(s) to the job site, clearly visible to the public, and include the following: a. Permitted construction days and hours; b. A description of proposed construction activities; c. Telephone numbers of the City's and contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint; and d. Contact information for City's and contractor's authorized representatives that are assigned to respond in the event of a complaint related to fugitive dust, pursuant to the requirements for compliance with BAAQMD's CEQA Air Quality Guidelines. If the authorized contractor's representative receives a complaint, they shall investigate, take appropriate corrective action, and report the complaint and the action taken to the City within three business days of receiving the complaint. 24 AH 07-25-2024 24 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 10 17. NOISE DURING CONSTRUCTION Prior to issuance of any demolition, grading or building permit, include on plans a note that, during project construction, the project applicant shall incorporate the following measures to reduce noise during construction and demolition activity: a. The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City's Planning Department for review and approval prior to issuance of the first permit. The Construction Noise Plan shall demonstrate compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The details of the Construction Noise Control Plan shall be included in the applicable construction documents and implemented by the on-site Construction Manager. Noise reduction measures selected and implemented shall be based on the type of construction equipment used on the site, distance of construction activities from sensitive receptor(s), site terrain, and other features on and surrounding the site (e.g., trees, built environment) and may include, but not be limited to, temporary construction noise attenuation walls, high quality mufflers. During the entire active construction period, the Construction Noise Control Plan shall demonstrate that compliance with the specified noise control requirements for construction equipment and tools will reduce construction noise in compliance with the City's daytime and nighttime decibel limits. b. Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. c. Signs will be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. d. During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells will be for safety warning purposes only. The construction manager will use smart back-up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and law. 18. PALEONTOLOGICAL RESOURCES Prior to issuance of the any demolition, grading or building permit, include on plans a note that, during project construction, the project applicant shall implement the following measures: a. If paleontological resources are encountered during ground disturbing and/or other construction activities, all construction shall be temporarily halted or 25 AH 07-25-2024 25 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 11 redirected to allow a qualified paleontologist, which shall be retained by the project applicant, to assess the find for significance and the Applicant shall notify the City. b. If paleontological resources are found to be significant, the paleontological monitor shall determine appropriate actions, in coordination with a qualified paleontologist, City staff, and property owner. Appropriate actions may include, but are not limited to, a mitigation plan formulated pursuant to guidelines developed by the Society of Vertebrate Paleontology and implemented to appropriately protect the significance of the resource by preservation, documentation, and/or removal, prior to recommencing activities. Measures may include, but are not limited to, salvage of unearthed fossil remains and/or traces (e.g., tracks, trails, burrows); screen washing to recover small specimens; preparation of salvaged fossils to a point of being ready for curation (e.g., removal of enclosing matrix, stabilization and repair of specimens, and construction of reinforced support cradles); and identification, cataloging, curation, and provision for repository storage of prepared fossil specimens. 19. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees 26 AH 07-25-2024 26 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 12 awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 20. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. PASSED AND ADOPTED this 25th day of July 2024 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: _________ ________ Danielle Condit Luke Connolly Associate Planner Administrative Hearing Officer 27 AH 07-25-2024 27 of 47 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. XXX OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW EXTERIOR FAÇADE RENOVATIONS TO FIVE EXISTING STRUCTURES AND SURFACE PARKING LOT IMPROVEMENTS AT THE SUNNYVIEW RETIREMENT COMMUNITY LOCATED AT 22445 CUPERTINO RD SECTION I: PROJECT DESCRIPTION Application No.: TR-2023-039 Applicant: Michael Paluso (Steele Group) Location: 22445 Cupertino Road; APN: 326-15-130, 326-15-133, 326-15-123, 326-15-124 SECTION II: FINDINGS FOR TREE REMOVAL PERMIT: WHEREAS, the City of Cupertino received an application for a Tree Removal permit as described in Section I of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Cupertino Municipal Code, and the Administrative Hearing Officer has held at least one public meeting with regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) ("CEQA"), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons set forth in the staff report dated July 25, 2024 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 28 AH 07-25-2024 28 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 2 1. That the location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by owners of similarly zoned and situated property, and the applicant has demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the tree(s). The applicant’s and the City’s consultant arborists have found that the area in which the improvements have been proposed cannot maintain the trees as they are currently planted due to a combination of the proposed project scope and existing tree conditions. Tree replacements are required and have been reviewed and incorporated as a part of the approved plans. 2. That the tree or trees are irreversibly diseased, are in danger of falling, can cause potential damage to existing or proposed essential structures, or interferes with private on-site utility services and cannot be controlled or remedied through reasonable relocation or modification of the structure or utility services; The applicant’s and the City’s consultant arborists agree that Tree ID 8, a 26” Coast live Oak should be recommend for removal. Due to the tree’s structural defects that cannot be corrected, internal decay and loss of trunk strength, it is recommended that the tree be removed for public safety NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof,: The application for a Tree Removal Permit, Application no. TR-2023-039 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing record concerning Application no. TR-2023-039 as set forth in the Minutes of the Administrative Hearing Meeting of July 25, 2024 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by MW Seele Group “Sunnyview Retirement Community” consisting of seventy-six (76) sheets labeled A0.1, A1.0, A1.0a, A1.1- A1.4, A2.0-A2.3, A3.0-A3.1.1, A4.0-A4.2, A5.0-A5.2, A6.0-A6.1, A7.0, A10.0, C1.0-C4.0, E002-E207, G0.0, G0.3, and L1.0-L6.4, except as may be amended by conditions in this resolution. 29 AH 07-25-2024 29 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 3 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. U-1989-07 and ASA-2023-006 shall be applicable to this approval. 4. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans 5. TREE REMOVAL Tree removal for trees 8, 12-14, 24-26, 30-32, 43, and 75 shall be performed by an ISA (International Society of Arboriculture) Certified Arborist or Tree Worker, not construction personnel. Care must be taken not to damage the roots, trunks, or canopies of adjacent trees. If roots are encountered, they shall be cut cleanly perpendicular to the root with a sharp saw. All brush and tree debris must be removed off site and properly disposed. 6. TREE PROTECTION The contractor and Consulting Arborist shall meet to establish tree protection zones (TPZ) for trees 9, 19, 52, 60-62, 29, 39, 41, 44, 45, 47-51. Tree protection fencing shall be installed prior to construction and remain in place for the duration of the project, unless approved by the project arborist. Fencing shall be 6’ chain link fencing secured into the ground and fully enclose the TPZ. Tree protection regulations shall be posted on all tree protection fencing. The fencing shall remain in place for the duration of the project. a. Tree protection fencing distances shall follow Table 6. Tree Protection Zones located on page 16 of the BUENA VISTA TREE SERVICE ARBORIST REPORT, dated February 2024. 7. STORAGE OF MATERIALS No work shall be performed, or storage of materials shall occur within the TPZ without arborist approval and supervision as needed to prevent damage to tree trunks and tree roots, and to document development impacts (see table 6 and illustration 1, following pages). 30 AH 07-25-2024 30 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 4 8. TREE TRUNK WRAPPING Trunks of trees 9, 19, 28, 29, 34-42, 44-52, and 60-64 shall be wrapped up the trunk to 6’ to the lowest branch with straw wattle. 9. CRITICIAL ROOT ZONE Root buffers, configured to provide the most protection possible, are required at the base of tree #29, and in the courtyard within the TPZ of trees #40-42, and 44 to provide worker and equipment access when working within or around the TPZ consisting of a 4-6” base course of ¾” bark chips, a cap of ¾” quarry gravel to stabilize, with ¾” plywood on top to provide an access path without compacting the soil within tree driplines. 10. TREE PRUNING Perform reduction pruning to balance asymmetrical canopies and reduce heavy end weights and any other trees that may be subject to equipment or material clearance and to avoid branch breakage. This would apply to trees #9-11, 19, 33, 52, 63, 64, and any other trees requiring equipment or material access. No interior branches should be removed. All pruning shall be performed by an International Society of Arboriculture Certified Arborist in compliance with ANSI A300 Part 1 Pruning (2017) and companion Best Management Practices – Tree Pruning and comply with the Migratory Bird Treaty Act and California Fish and Wildlife Code 3503-3513 to avoid nesting bird disturbance. 11. DURING CONSTRUCTION a. All excavation work within the TPZ of protected trees shall be monitored by the Consulting Arborist. If any injury should occur to any tree, contact the Consulting Arborist for evaluation and appropriate treatment. b. TPZ fencing is to remain in place for the duration of the project. c. If any roots are encountered outside the TPZ, they shall be cut perpendicular to the root with a sharp saw or loppers. Do not tear the root or rip it from the soil. If roots larger than 2” are encountered, contact the Consulting Arborist for proper treatment. d. No storage of materials, equipment, soil, waste, oil, gasoline, rinsates, etc. should be deposited in the TPZ. e. Avoid idling of any equipment as the exhaust may damage foliage and branches of subject trees and other landscape plants in the area. 12. POST-CONSTRUCTION a. The subject tree resource will experience a change in environment from the development on site. The health, structural stability, and vitality of the trees 31 AH 07-25-2024 31 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 5 should be documented post-construction by the Consulting Arborist and monitored for changes in condition. b. With site disturbance, soil compaction, and the potential for root loss, tree decline is possible for the sixty-five (65) trees retained. Photo documentation is recommended and effective in monitoring any visible changes in tree health. c. Employing best management practices including proper irrigation management, occasional pruning, and maintaining a dripline clear of materials and activities that cause root disturbance and compaction will promote tree health. 13. DEMOLITION REQUIREMENTS All demolished site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy. 14. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department 15. FUGITIVE DUST CONTROL Prior to issuance of the any demolition, grading, or building permit, include on all permit plans, the full text of each of the Bay Area Air Quality Management District's Basic Control Measures from the latest version of BAAQMD's CEQA Air Quality Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive dust (i.e., particulate matter PM2.5 and PMlO) during demolition, ground disturbing activities and/or construction. 16. AVOID NESTING BIRDS DURING CONSTRUCTION Prior to issuance of the any demolition, grading and building permit, indicate the following on all construction plans: a. Demolition, construction, ground-disturbing, and tree removal/pruning activities shall be scheduled to be completed prior to nesting season (February 1 through August 31), if feasible. b. If demolition, construction, ground-disturbing, or tree removal/pruning activities occur during the nesting season (February 1 and August 31), preconstruction surveys shall be conducted as follows: i. No more than 7 days prior to the start of demolition, construction, ground- disturbing, or tree removal/pruning activities, in order to identify any active 32 AH 07-25-2024 32 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 6 nests with eggs or young birds on the site and surrounding area within 100 feet of construction or tree removal activities. ii. Preconstruction surveys shall be repeated at 14-day intervals until demolition, construction, ground-disturbing, or tree removal/pruning activities have been initiated in the area, after which surveys can be stopped. As part of the preconstruction survey(s), the surveyor shall inspect all trees and other possible nesting habitats in, and immediately adjacent to, the construction areas for active nests, while ensuring that they do not disturb the nests as follows: 1) For projects that require the demolition or construction one single- family residence, ground disturbing activities affecting areas of up to 500 square feet, or the removal of up to three trees, the property owner or a tree removal contractor, if necessary, is permitted to conduct the preconstruction surveys to identify if there are any active nests. If any active nests with eggs or young birds are identified, the project applicant shall retain a qualified ornithologist or biologist to identify protective measures. 2) For any other demolition, construction and ground disturbing activity or the removal of four or more trees, a qualified ornithologist or biologist shall be retained by the project applicant to conduct the preconstruction surveys. iii. If the preconstruction survey does not identify any active nests with eggs or young birds that would be affected by demolition, construction, ground- disturbing or tree removal/pruning activities, no further mitigating action is required. If an active nest containing eggs or young birds is found sufficiently close to work areas to be disturbed by these activities, their locations shall be documented, and the qualified ornithologist or biologist shall identify protective measures to be implemented under their direction until the nests no longer contain eggs or young birds. iv. Protective measures may include, but are not limited to, establishment of clearly delineated exclusion zones (i.e., demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by the qualified ornithologist or biologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified ornithologist or biologist, if 33 AH 07-25-2024 33 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 7 project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified ornithologist or biologist only in consultation with California Department of Fish and Wildlife. The protection measures and buffers shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. v. A final report on nesting birds and raptors, including survey methodology, survey date(s), map of identified active nests (if any), and protection measures (if required), shall be prepared by the qualified ornithologist or biologist and submitted to the Director of Community Development or his or her designee, through the appropriate permit review process (e.g., demolition, construction, tree removal, etc.), and be completed to the satisfaction of the Community Development Director prior to the start of demolition, construction, ground- disturbing, or tree removal/pruning activities. 17. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES Prior to the issuance of any demolition, grading or building permit involving soil disturbance, the project applicant shall provide written verification, including the materials provided to contractors and construction crews, to the City confirming that contractors and construction crews have been notified of basic archaeological site indicators, the potential for discovery of archaeological resources, laws pertaining to these resources, and procedures for protecting these resources as follows: a. Basic archaeological site indicators that may include, but are not limited to, darker than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of stone, bone, or shellfish; evidence of living surfaces (e.g., floors); and burials, either human or animal. b. The potential for undiscovered archaeological resources or tribal cultural resources on site. c. The laws protecting these resources and associated penalties, including, but not limited to, the Native American Graves Protection and Repatriation Act of 1990, Public Resources Code Section 5097, and California Health and Safety Code Section 7050 and Section 7052. d. The protection procedures to follow should construction crews discover cultural resources during project-related earthwork, include the following: i. All soil disturbing work within 25 feet of the find shall cease. 34 AH 07-25-2024 34 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 8 ii. The project applicant shall retain a qualified archaeologist to provide and implement a plan for survey, subsurface investigation, as needed, to define the deposit, and assessment of the remainder of the site within the project area to determine whether the resource is significant and would be affected by the project. iii. Any potential archaeological or tribal cultural resources found during construction activities shall be recorded on appropriate California Department of Parks and Recreation forms by a qualified archaeologist. If the resource is a tribal cultural resource, the consulting archaeologist shall consult with the appropriate tribe, as determined by the Native American Heritage Commission, to evaluate the significance of the resource and to recommend appropriate and feasible avoidance, testing, preservation or mitigation measures, in light of factors such as the significance of the find, proposed project design, costs, and other considerations. The archeologist shall perform this evaluation in consultation with the tribe. 18. HUMAN REMAINS AND NATIVE AMERICAN BURIALS Prior to issuance of the any demolition, grading and building permits that involve soil disturbance, include on plans a note that, during project construction, the project applicant shall comply with California Health and Safety Code Section 7050.5 and California Public Resources Code Section 5097.98. a. In the event of discovering human remains during construction activities, there shall be no further excavation or disturbance of the site within a 100-foot radius of the remains, or any nearby area reasonably suspected to overlie adjacent remains. b. The Santa Clara County Coroner shall be notified immediately and shall make a determination as to whether the remains are Native American. c. If the Santa Clara County Coroner determines that the remains are not subject to his authority, he shall notify the Native American Heritage Commission (NAHC) within 24 hours. d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of the deceased Native American. e. The Most Likely Descendant has 48 hours following access to the project site to make recommendations or preferences regarding the disposition of the remains. If the Most Likely Descendant does not make recommendations within 48 hours after being allowed access to the project site, the owner shall, with appropriate 35 AH 07-25-2024 35 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 9 dignity, reinter the remains in an area of the property secure from further disturbance and provide documentation about this determination and the location of the remains to the NAHC and the City of Cupertino. Alternatively, if the owner does not accept the Most Likely Descendant's recommendations, the owner or the descendent may request mediation by the NAHC. Construction shall halt until the mediation has concluded. 19. NOISE AND VIBRATION NOTICE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall send notices of the planned activity by first class mail as follows: a. For projects on sites that are more than 0.5 acres or four or more residential units the notices shall be sent to off-site businesses and residents within 500 feet of the project site; b. For projects on sites between 0.25 to 0.5 acres, or two or three residential units (not including Accessory Dwelling Units) notices shall be sent to off-site businesses and residents within 250 feet of the project site; or c. For projects on sites less than 0.25 acres or one residential unit, the notices shall be sent to off-site businesses and residents within 100 feet of the project site. The notification shall include a brief description of the project, the activities that would occur, the hours when activity would occur, and the construction period's overall duration. The notification should include the telephone numbers of the contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint. The City will provide mailing addresses for the Applicant's use. The project applicant shall provide the City with evidence of mailing of the notice, upon request. If pile driving, see additional noticing requirements below. 20. NOISE AND VIBRATION SIGNAGE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall ensure that a sign measuring at least two feet by three feet shall be posted on construction fencing at the entrance(s) to the job site, clearly visible to the public, and include the following: a. Permitted construction days and hours; b. A description of proposed construction activities; 36 AH 07-25-2024 36 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 10 c. Telephone numbers of the City's and contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint; and d. Contact information for City's and contractor's authorized representatives that are assigned to respond in the event of a complaint related to fugitive dust, pursuant to the requirements for compliance with BAAQMD's CEQA Air Quality Guidelines. If the authorized contractor's representative receives a complaint, they shall investigate, take appropriate corrective action, and report the complaint and the action taken to the City within three business days of receiving the complaint. 21. NOISE DURING CONSTRUCTION Prior to issuance of any demolition, grading or building permit, include on plans a note that, during project construction, the project applicant shall incorporate the following measures to reduce noise during construction and demolition activity: a. The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City's Planning Department for review and approval prior to issuance of the first permit. The Construction Noise Plan shall demonstrate compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The details of the Construction Noise Control Plan shall be included in the applicable construction documents and implemented by the on-site Construction Manager. Noise reduction measures selected and implemented shall be based on the type of construction equipment used on the site, distance of construction activities from sensitive receptor(s), site terrain, and other features on and surrounding the site (e.g., trees, built environment) and may include, but not be limited to, temporary construction noise attenuation walls, high quality mufflers. During the entire active construction period, the Construction Noise Control Plan shall demonstrate that compliance with the specified noise control requirements for construction equipment and tools will reduce construction noise in compliance with the City's daytime and nighttime decibel limits. b. Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. c. Signs will be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of 37 AH 07-25-2024 37 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 11 unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. d. During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells will be for safety warning purposes only. The construction manager will use smart back-up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and law. 22. PALEONTOLOGICAL RESOURCES Prior to issuance of the any demolition, grading or building permit, include on plans a note that, during project construction, the project applicant shall implement the following measures: a. If paleontological resources are encountered during ground disturbing and/or other construction activities, all construction shall be temporarily halted or redirected to allow a qualified paleontologist, which shall be retained by the project applicant, to assess the find for significance and the Applicant shall notify the City. b. If paleontological resources are found to be significant, the paleontological monitor shall determine appropriate actions, in coordination with a qualified paleontologist, City staff, and property owner. Appropriate actions may include, but are not limited to, a mitigation plan formulated pursuant to guidelines developed by the Society of Vertebrate Paleontology and implemented to appropriately protect the significance of the resource by preservation, documentation, and/or removal, prior to recommencing activities. Measures may include, but are not limited to, salvage of unearthed fossil remains and/or traces (e.g., tracks, trails, burrows); screen washing to recover small specimens; preparation of salvaged fossils to a point of being ready for curation (e.g., removal of enclosing matrix, stabilization and repair of specimens, and construction of reinforced support cradles); and identification, cataloging, curation, and provision for repository storage of prepared fossil specimens. 23. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as 38 AH 07-25-2024 38 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 12 “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 24. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. PASSED AND ADOPTED this 25th day of July 2024 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. 39 AH 07-25-2024 39 of 47 Resolution No. XXX ASA-2023-006 July 25, 2024 Page 13 ATTEST: APPROVED: _________ ________ Danielle Condit Luke Connolly Associate Planner Administrative Hearing Officer 40 AH 07-25-2024 40 of 47 41 AH 07-25-2024 41 of 47 42 AH 07-25-2024 42 of 47 43 AH 07-25-2024 43 of 47 44 AH 07-25-2024 44 of 47 45 AH 07-25-2024 45 of 47 46 AH 07-25-2024 46 of 47 47 AH 07-25-2024 47 of 47