14040199 Inspection RecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 6072 WILLOWGROVE LN CUPERTINO, CA 95014-4649
CUPERTINO APN: 375 38 020 PERMIT NO: 14040199
OWNER'S NAME: OWNER INFO MISSING FROM RECORD OWNER'S PHONE: 408-252-4451
CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE:
DATE ISSUED 1/30/2024 10:53:36 AM ISSUED BY:VALUATION: $150000
JOB DESCRIPTION
ONE STORY ADDITION 451 SQFT-GARAGE ADDITION 75 SQFT, INTERIOR REMODEL 639 SQFT, INSTALL NEW WATER HEATER, INSTALL NEW A/C & REPLACE RADIANT HEAT PIPING.
REVISION #1-REVISE BEDROOM LAYOUT, MOVE LAUNDRY ROOM- ISSD OTC 1/8/2015
INSPECTION TYPE DATE STATUS INSPECTOR
ELECTRIC METER RELEASE 2015-07-14 Passed
EXTERIOR SHEAR 2015-03-09 Passed
FINAL BUILDING 2015-10-19 Failed
FINAL ELECTRICAL 2015-10-19 Failed
FINAL MECHANICAL 2015-10-19 Failed
FINAL PLUMBING 2015-10-19 Failed
FOUNDATION 2015-01-15 Passed
FOUNDATION 2015-01-16 Passed
FOUNDATION 2015-01-29 Failed
FOUNDATION 2015-02-02 Passed
FOUNDATION 2015-02-02 Passed
GAS TEST 2015-05-18 Passed
INSULATION 2015-05-11 Passed
INTERIOR LATH 2015-05-18 Passed
ROOF NAIL 2015-03-09 Passed
ROUGH ELECTRICAL 2015-03-31 Failed
ROUGH ELECTRICAL 2015-05-05 Cancelled
ROUGH ELECTRICAL 2015-05-11 Passed
ROUGH ELECTRICAL 2015-07-14 Passed
ROUGH FRAME 2015-03-09 Cancelled
ROUGH FRAME 2015-05-05 Cancelled
ROUGH FRAME 2015-05-06 Failed
ROUGH FRAME 2015-05-11 Passed
ROUGH MECHANICAL 2015-05-11 Passed
SHEETROCK 2015-05-18 Passed
SHOWER PAN 2015-05-18 Passed
UNDERFLOOR PLUMBING 2015-01-15 Failed
UNDERFLOOR PLUMBING 2015-01-16 Passed
UNDERFLOOR PLUMBING 2015-02-02 Failed
UNDERFLOOR PLUMBING 2015-03-09 Passed
FINAL BUILDING 2024-01-16 Failed James Lee
FINAL ELECTRICAL 2024-01-16 Failed James Lee
FINAL MECHANICAL 2024-01-16 Passed James Lee
FINAL PLUMBING 2024-01-16 Passed James Lee
FINAL BUILDING 2024-01-30 Passed James Lee
FINAL ELECTRICAL 2024-01-30 Passed James Lee
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.