Loading...
14040199 Inspection RecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 6072 WILLOWGROVE LN CUPERTINO, CA 95014-4649 CUPERTINO APN: 375 38 020 PERMIT NO: 14040199 OWNER'S NAME: OWNER INFO MISSING FROM RECORD OWNER'S PHONE: 408-252-4451 CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE: DATE ISSUED 1/30/2024 10:53:36 AM ISSUED BY:VALUATION: $150000 JOB DESCRIPTION ONE STORY ADDITION 451 SQFT-GARAGE ADDITION 75 SQFT, INTERIOR REMODEL 639 SQFT, INSTALL NEW WATER HEATER, INSTALL NEW A/C & REPLACE RADIANT HEAT PIPING. REVISION #1-REVISE BEDROOM LAYOUT, MOVE LAUNDRY ROOM- ISSD OTC 1/8/2015 INSPECTION TYPE DATE STATUS INSPECTOR ELECTRIC METER RELEASE 2015-07-14 Passed   EXTERIOR SHEAR 2015-03-09 Passed   FINAL BUILDING 2015-10-19 Failed   FINAL ELECTRICAL 2015-10-19 Failed   FINAL MECHANICAL 2015-10-19 Failed   FINAL PLUMBING 2015-10-19 Failed   FOUNDATION 2015-01-15 Passed   FOUNDATION 2015-01-16 Passed   FOUNDATION 2015-01-29 Failed   FOUNDATION 2015-02-02 Passed   FOUNDATION 2015-02-02 Passed   GAS TEST 2015-05-18 Passed   INSULATION 2015-05-11 Passed   INTERIOR LATH 2015-05-18 Passed   ROOF NAIL 2015-03-09 Passed   ROUGH ELECTRICAL 2015-03-31 Failed   ROUGH ELECTRICAL 2015-05-05 Cancelled   ROUGH ELECTRICAL 2015-05-11 Passed   ROUGH ELECTRICAL 2015-07-14 Passed   ROUGH FRAME 2015-03-09 Cancelled   ROUGH FRAME 2015-05-05 Cancelled   ROUGH FRAME 2015-05-06 Failed   ROUGH FRAME 2015-05-11 Passed   ROUGH MECHANICAL 2015-05-11 Passed   SHEETROCK 2015-05-18 Passed   SHOWER PAN 2015-05-18 Passed   UNDERFLOOR PLUMBING 2015-01-15 Failed   UNDERFLOOR PLUMBING 2015-01-16 Passed   UNDERFLOOR PLUMBING 2015-02-02 Failed   UNDERFLOOR PLUMBING 2015-03-09 Passed   FINAL BUILDING 2024-01-16 Failed James Lee FINAL ELECTRICAL 2024-01-16 Failed James Lee FINAL MECHANICAL 2024-01-16 Passed James Lee FINAL PLUMBING 2024-01-16 Passed James Lee FINAL BUILDING 2024-01-30 Passed James Lee FINAL ELECTRICAL 2024-01-30 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.