Loading...
CC 02-06-2024 Item No. 12. Cost Allocation Plan, User Fee Study, and Cost Recovery Policy_Consultant PresentationCUPERTINO, CA AGENDA Cost Allocation and Fee Study Results Project Goals and Objectives Fee Study Background / Objectives Fee Study Methodology 4 Fee Study Results 5. Fee Considerations A Fee Study Key Outcomes Comparative Survey Results matrix& consulting group 3 Overall Project Goals and Objectives • Identify indirect costs associated with programs — incorporation into User Fee Study • Calculation of administrative overhead rate. • Compliance with GAAP and OMB Principles • Justify transfers from non -general fund sources • Review and identify potential fees for service • Streamline fee structure for cost recovery • Ensure compliance with Props 218 and 26 • Determine the Full Cost (direct and indirect) of fee -related activities. matrix& consulting group Fee Study Objectives Streamline Fee Structures Consolidate and expand fees where appropriate to better reflect existing services. Average Time Assumptions Identify the average level of effort associated with different permits and applications. Fully Burdened Hourly Rates Determine direct and indirect costs associated with staff time. M Comparative Survey Benchmark against other jurisdictions. Compliance with Prop 218 and 26 Ensure that the direct and indirect costs do not exceed current fees. Updated Fee Schedule Provide an updated fee schedule reflective of current costs. matrix& consulting group Fee Study Background City last conducted a fee study in 2015. It is best practice to conduct a comprehensive update every 3-5 years. Current study reviewed all citywide fees for service. Comparative Survey was conducted of surrounding jurisdictions for sample of fees from each Department. matrix& consulting group Fee Calculation Methodology Avg staff time by Fully Burdened Position Title per Hourly Rate per Permit / Application Position Title Represents the reasonable amount of time necessary to provide the services based upon City of Cupertino staff. Includes salaries, benefits, productive working hours, services & supplies, departmental overhead, and citywide overhead based on City of Cupertino expenses. Maximum Justifiable fee that can be assessed to projects and applications. matrix& consulting group Fee Study Results Planning $716,696 $886,158 ($169,462) 81 % PW Engineering $1,122,328 $1,182,734 ($60,407) 95% Building $3,800,581 $4,337,761 ($537,180) 88% matrix& consulting group Fee Considerations (1) Zoning & Site Approvals Building Permits and Review Eng. Development Review Code Enforcement Recreation Police Fire Suppression Streets 0 matrix& consulting group Fee Considerations (2) No fee can be set at more than 100% cost recovery. Any fees showing over - recovery will need to be reduced. Any state or local / ordinance -based fees would remain unchanged. Setting fees at less than 100% cost recovery, means fees are subsidized through other funding sources AND funding is unavailablefor other activities (i.e., public safety, streets, parks, etc.) Typical considerations for lower cost recovery is given to fees that: Encourage compliance (i.e., water heaters, tree removals, etc.) Don't serve as barrier to entry (i.e., appeals, etc.) I matrix consulting group Fee Study Key Outcomes Consolidated of Building fees from three (3) construction types and IBC classes to one (1) - the most common construction type and IBC Class. Added and eliminated flat fees to better represent current and future city services. Building - Miscellaneous and Mechanical / Electrical / Plumbing permit fees were added to better capture new services. Eliminated outdated fees in those categories as well. Planning - New fees for sign permit, preliminary application reviews, etc. PW Eng - New fees for Environmental Reviews and Traffic Reviews. Created surcharges for Credit Card and Technology. Reviewed and updated General Plan Maintenance Fee. HI matrix consulting group Comparative Survey Results Surrounding jurisdictions have recently updated their fees. Current fees are generally lower, but full cost is more in alignment with other jurisdictions. Technology Fee, General Plan Fee, and Credit Card Surcharges are consistent fees charged by other jurisdictions. 11 matrix& consulting group Questions / Discussion 12 matrix& consulting group