Loading...
DIR-2023-011 - Site Plan and massing diagramI I I I I I I 1 (E) PROPERTY LINE, TYF 0 VEHICLE SIGN GENERAL NOTES - SITE 1 (E) SITE HAS BEEN EVALUATED AND FOUND TO PROVIDE AN ACCESSIBLE PATH OF TRAVEL INTO THE MAIN ENTRY OF THE BUILDING FROM (E) ACCESSIBLE PARKING. 2. (E) ACCESSIBLE PATH OF TRAVEL IS A CONTINUOUS COMMON SURFACE, NOT INTERRUPTED BY STEPS OR BY ABRUPT CHANGES IN LEVEL EXCEEDING 1/2 INCH AND A MINIMUM OF 48 INCHES IN WIDTH. i A CH I T E ITS 21 85 The Alameda, Ste. 100 San Jose, CA 95126 www.davidwhitneyarch.com Workspace for Vital Chemicals 20725 Valley Green Dr. Suite 100 Cupertino, CA 95014 Project Name: VG DRIVE Project No.: VC23.01 Issue Date: # R Description Issue Date PANNING REVIEW 07.31.2023 Title: REFERENCE SITE PLAN scale: AS NOTED REFERENCE SITE PLAN I/8"=1'-0" Sheet: A 0 . I 7 t� JO a l A-ln R t. `.yam AA d 1 ra � - � � a I