DIR-2023-011 - Site Plan and massing diagramI
I
I
I
I I
I
1
(E) PROPERTY LINE, TYF
0
VEHICLE SIGN
GENERAL NOTES - SITE
1 (E) SITE HAS BEEN EVALUATED AND FOUND TO PROVIDE AN ACCESSIBLE PATH
OF TRAVEL INTO THE MAIN ENTRY OF THE BUILDING FROM (E) ACCESSIBLE
PARKING.
2. (E) ACCESSIBLE PATH OF TRAVEL IS A CONTINUOUS COMMON SURFACE, NOT
INTERRUPTED BY STEPS OR BY ABRUPT CHANGES IN LEVEL EXCEEDING 1/2
INCH AND A MINIMUM OF 48 INCHES IN WIDTH.
i
A CH I T E ITS
21 85 The Alameda, Ste. 100
San Jose, CA 95126
www.davidwhitneyarch.com
Workspace for
Vital Chemicals
20725 Valley Green Dr.
Suite 100
Cupertino, CA 95014
Project Name: VG DRIVE
Project No.: VC23.01
Issue Date:
# R Description Issue Date
PANNING REVIEW 07.31.2023
Title: REFERENCE
SITE PLAN
scale: AS NOTED
REFERENCE SITE PLAN
I/8"=1'-0"
Sheet: A 0 . I
7
t�
JO
a
l A-ln
R
t.
`.yam
AA
d
1
ra � -
� � a
I