Loading...
HomeMy WebLinkAboutAH 09-28-2023 Searchable PacketCITY OF CUPERTINO ADMINISTRATIVE HEARING AGENDA 10300 Torre Avenue, City Hall Conference Room C Thursday, September 28, 2023 5:00 PM ROLL CALL APPROVAL OF MINUTES 1.Subject: Approve the June 8, 2023 Administrative Hearing Minutes Recommended Action: Approve the June 8, 2023 Administrative Hearing Minutes 1 - Draft Minutes POSTPONEMENTS ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the Committee on any matter within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Commission from making any decisions with respect to a matter not on the agenda. PUBLIC HEARINGS OLD BUSINESS NEW BUSINESS 2.Subject: Architectural and Site Approval to allow exterior improvements to the front and side facade of Shane Co. located at 19900 Stevens Creek Boulevard. (Application No(s).: ASA-2023-004; Applicant: Kevin Tallman, Shane Co.; Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-044) Recommended Action: That the Hearing Officer adopt the draft resolution to: 1.Find that the proposed actions are exempt from CEQA; and 2.Approve the Architectural and Site Approval Permit Staff Report 1. Draft Resolution for ASA-2023-004 2. Rendering Package 3. Site Plan ADJOURNMENT Page 1 1 Administrative Hearing Agenda September 28, 2023 In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue, Cupertino, California 95014, during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. Do not include any personal or private information in written communications to the City that you do not wish to make public, as written communications are considered public records and will be made publicly available on the City website. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment . Page 2 2 CITY OF CUPERTINO Agenda Item 23-12562 Agenda Date: 9/28/2023 Agenda #: 1. Subject: Approve the June 8, 2023 Administrative Hearing Minutes Approve the June 8, 2023 Administrative Hearing Minutes CITY OF CUPERTINO Printed on 9/22/2023Page 1 of 1 powered by Legistar™3 City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3308 MINUTES OF THE ADMINISTRATIVE HEARING REGULAR MEETING HELD June 8, 2023 CALL TO ORDER Hearing officer Luke Connolly opened the meeting at 5:00 p.m. ROLL CALL Staff present: Luke Connolly, Assistant Community Development Director Piu Ghosh, Planning Manager Gian Martire, Senior Planner Emi Sugiyama, Associate Planner Abby Ayende, Management Analyst Outside attendee(s): Pravil Gupta, Applicant Pratibha Gupta, Applicant Keith Royster, Applicant Representative Ezzat Hashemi, Applicant APPROVAL OF MINUTES 1. Subject: Approve the April 20, 2023, Administrative Hearing meeting minutes Recommended Action: Approve the April 20, 2023, Administrative Hearing meeting minutes. Minutes of the April 20, 2023, meeting approved as written. POSTPONEMENTS – None ORAL COMMUNICATIONS - None PUBLIC HEARINGS - None OLD BUSINESS – None NEW BUSINESS 2. Subject: Interpretation Permit to consider allowing the current street side lot line (facing Oakleaf Court) as the front lot line on a corner lot and a Director’s Minor Modification Permit to allow an addition to the existing residence. (Application No.(s): INT-2022-001, DIR-2022-017; Applicant: Keith Royster on behalf of Pravil and Pratibha Gupta; 4 2 Location: 21966 Oakleaf Court; APN(s): 326 18 062) Recommended Action: That the Hearing Officer adopt the draft resolution (Attachment 1) to: 1. Find the actions exempt from the California Environmental Quality Act (“CEQA”); and 2. Approve the Interpretation Permit (INT-2022-001); and 3. Approve the Director’s Minor Modification (DIR-2022-017) Emi Sugiyama, Associate Planner, provided a brief overview of the proposed project and stated that it met all set-back requirements within the city code. Hearing Officer Connolly asked the applicants if they had any comments and if they agreed with the conditions and staff report. Applicants Pravil and Pratibha Gupta and Applicant Representative Keith Royster stated that they had no comments and agreed with the material as presented. Decision: The application was approved by the Hearing Officer. 3. Subject: Fence Exception for a side yard fence on a corner lot of an existing single-family residence. (Application No.: EXC-2022-007; Applicant: Ezzat Hashemi; Location: 7485 Kingsbury Place; APN: 362-29-022) Recommended Action: That the Administrative Hearing Officer adopt the draft resolution (Attachment 1) to: 1. Find the project exempt from CEQA; and 2. Approve the Fence Exception (EXC-2022-007). Gian Martire, Senior Planner, provided a brief overview of the proposed project and stated that staff was confident findings were met for the fence exception. Applicant Hashemi requested clarification if the public notice needed to remain in place another 2 weeks. Staff member Martire clarified that the notice needed to remain throughout the appeal period. Decision: The application was approved by the Hearing Officer. ADJOURNMENT: The meeting was adjourned at 5:10 p.m. to the next regularly scheduled meeting. Respectfully submitted: 5 3 /s/ Jon de Ridder Jon de Ridder Administrative Assistant 6 CITY OF CUPERTINO Agenda Item 23-12568 Agenda Date: 9/28/2023 Agenda #: 2. Subject:Architectural and Site Approval to allow exterior improvements to the front and side facade of Shane Co.located at 19900 Stevens Creek Boulevard.(Application No(s).:ASA-2023-004; Applicant: Kevin Tallman, Shane Co.; Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-044) That the Hearing Officer adopt the draft resolution to: 1.Find that the proposed actions are exempt from CEQA; and 2.Approve the Architectural and Site Approval Permit CITY OF CUPERTINO Printed on 9/22/2023Page 1 of 1 powered by Legistar™7 ADMINISTRATIVE HEARING STAFF REPORT Meeting Date: September 28, 2023 Subject Architectural and Site Approval to allow exterior improvements to the front and side facade of Shane Co. located at 19900 Stevens Creek Boulevard. (Application No(s).: ASA- 2023-004; Applicant: Kevin Tallman, Shane Co.; Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-044) Recommended Action That the Hearing Officer adopt the draft resolution (Attachment 1) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit Discussion Project Data: General Plan Designation Office/Commercial/Residential General Plan Special Area Central Stevens Creek Sub-area of the Heart of the City Special Area Zoning Designation P(CG, Res) Lot Size 83,766 sq. ft. (no change) Allowed Existing Proposed Floor Area N/A 28,813 SF 29,374 SF Building Height 45 feet 20’-1” 22 feet max. Setbacks Required Existing Proposed Front 35 feet from back of curb 50’-6” No change Side (Greater of one-half (1/2) times height of building, or ten (10) feet) 10’-8” West side - 11’-1” East side - 71’-10” No change Rear (Greater of one and one-half (1.5) times height of building or 20 feet) 30’-11” 117 feet No change 8 19900 Stevens Creek Blvd. September 28, 2023 ASA-2023-004 Page 2 Project Consistency With: General Plan Yes Zoning Yes Environmental Assessment Categorically Exempt per Section 15301 and 15332 (Class 1) of the California Environmental Quality Act (CEQA) Background: The property is located south of Stevens Creek Blvd, between S. Blaney and S. Portal Avenues. The property is located within the Central Stevens Creek sub-area of the Heart of the City Special Area, which serves as the main commercial corridor in the City. The property is currently occupied by Keller Williams, Shane Co. Jewelers, and Dance Academy USA. The site is surrounded by other commercial and commercial office uses (Cort Furniture, Pacific Workplaces, Travigne retail) to the north, single family residences to the south, a condominium complex to the east, and commercial uses (Arya Restaurant, a bank and a gas station) to the west. On September 22, 2022, the Administrative Hearing Officer previously approved a Development Permit and Architectural and Site Approval (DP-2022-003 & ASA-2022- 005) for a 561 square foot addition for Shane Co. However, the applicant has modified the scope of work as explained below. Application Summary The applicant, Kevin Tallman of Shane Co., is proposing exterior improvements to the front and side facade of the existing building occupied by Shane Co. with no changes to the size of the building or parking layout. Analysis: Architectural and Site Approval The design team for Shane Co. proposes façade upgrades to complement the existing contemporary architectural style, as well as distinguish the storefront to improve Figure 1: Site aerial STEVENS CREEK BLVD BL A N E Y A V E N U E PO R T A L A V E N U E 9 19900 Stevens Creek Blvd. September 28, 2023 ASA-2023-004 Page 3 visibility and street presence, while better marketing the business. The materials existing brick veneer is being replaced with a combination of natural stone, wood, and frosted glass. Further, a new entry feature, that is two feet higher than the rest of the facade is proposed on the east façade. The feature is further accentuated by a canopy. The proposed design adheres to the contemporary architectural style. The City’s architectural consultant, RRM Design Group, has reviewed the design and ensured that the entry and building corner remain prominent, the windows (particularly along the east façade) are aligned and proportionate, and that the materials used are compatible with the existing building, while also being durable. This includes using composite wood, and metal paneling. Please refer to Figures 2 & 3 above to compare the existing and proposed elevations. No signs are being approved as part of this application. Figure 3 Proposed facades. Figure 2 Existing facades. 10 19900 Stevens Creek Blvd. September 28, 2023 ASA-2023-004 Page 4 Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 – Existing Facilities and 15332 - In- Fill Development Projects. Other Department/Agency Review The City’s Building Division, Environmental Programs Division, Public Works Department, Cupertino Sanitary District, and the Santa Clara County Fire Department have no objections to the project. Public Noticing and Community Outreach The following table is a summary of the noticing for this project: Notice of Public Hearing Agenda  Site Signage (at least 10 days prior to hearing)  8 notices mailed to property owners adjacent of the project site (at least 10 days prior to the hearing)  Posted on the City's official notice bulletin board (five days prior to hearing)  Posted on the City of Cupertino’s Web site (five days prior to hearing) No comments have been received at the time of production of this staff report. Conclusion Staff recommends approval of the Architectural and Site Approval permit, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all applicable findings for approval of the proposed project, consistent with chapter 19.168 of the Cupertino Municipal Code, may be made as follows: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes to enhance portions of the north and east elevations The upgrades include a corner tower element and enhanced main entrance completed in a contemporary style, and with materials that are considered quality and durable. All the proposed changes are minor improvements to the existing building and site and will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate 11 19900 Stevens Creek Blvd. September 28, 2023 ASA-2023-004 Page 5 the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale except the minor height addition of the entry feature and at one corner. The building will remain under the 45 foot height limit and the required 1:1 slope line of the General Plan. No other height or scale modifications are proposed that will impact the existing massing. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. Through this proposal the applicant has incorporated existing materials with attractive contemporary stone, metal, and composite wood elements that are suited and compatible with the character of the area. Existing mature trees are proposed to be retained. Outdoor lighting incorporates appropriate shielding and is designed to meet the dark-sky requirements of the Municipal Code. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. There is currently a ground sign located within the front setback area and no modifications are proposed. At this point, no signs are approved as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. 12 19900 Stevens Creek Blvd. September 28, 2023 ASA-2023-004 Page 6 This application is not a new project and will maintain the existing buffering and setbacks established adjacent to the existing residential neighborhoods. Next Steps The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until September 28, 2025. The applicant may apply for a one-time two-year extension before the approval expires. Prepared by: Gian Paolo Martire, Senior Planner Reviewed and Approved for submission by: Piu Ghosh, Planning Manager ATTACHMENTS 1. Draft Resolution for ASA-2023-004 2. Rendering Package 3. Site Plan 13 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW FAÇADE IMPROVEMENTS TO AN EXISTING COMMERICAL BUILDING LOCATED AT 19900 STEVENS CREEK BLVD. SECTION I: PROJECT DESCRIPTION Application No.: ASA-2023-004 Applicant: Kevin Tallman Location: 19900 Stevens Creek Blvd. (APN 369-05-044) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing modifications to the exterior building materials and landscaping for an existing retail building, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Cupertino Municipal Code, and the Administrative Hearing Officer has held at least one public meeting with regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for the reasons set forth in the staff report dated September 28, 2023 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and 14 Draft Resolution ASA-2023-004 September 28, 2023 Page 2 WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes to enhance portions of the north and east elevations. The upgrades include a corner tower element and enhanced main entrance completed in a contemporary style, and with materials that are considered quality and durable. All the proposed changes are minor improvements to the existing building and site and will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale except the minor height addition of the entry feature and corner. The building will remain under the 45 foot height limit and the required 1:1 slope line of the General Plan. No other height or scale modifications are proposed that will impact the existing massing. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. 15 Draft Resolution ASA-2023-004 September 28, 2023 Page 3 Through this proposal the applicant has incorporated existing materials with attractive contemporary stone, metal, and composite wood elements that are suited and compatible with the character of the area. Existing mature trees are proposed to be retained. Outdoor lighting incorporates appropriate shielding and is designed to meet the dark-sky requirements of the Municipal Code. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. There is currently a ground sign located within the front setback area and no modifications are proposed. At this point, no signs are approved as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and will maintain the existing buffering and setbacks established adjacent to the existing residential neighborhoods. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, The application for an Architectural and Site Approval, Application no. ASA-2023-004 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. ASA-2023-004 as set forth in the Minutes of the Administrative Hearing Meeting of September 23, 2023 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Stacey Hall titled “Shane Co. Exterior Improvements” consisting of five (5) sheets labeled G0.0, G0.1, and A-1 – A-3, except as may be amended by conditions in this resolution. 16 Draft Resolution ASA-2023-004 September 28, 2023 Page 4 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. EXTERIOR BUILDING MATERIALS/TREATMENTS a. The final building exterior plan shall closely resemble the details shown on the original approved plans. b. No fencing is approved within the front setback area. c. All final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permit s to ensure quality and consistency. d. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 5. WINDOW DETAILS AND BIRD SAFETY All storefront windows shall be kept open and transparent to the greatest extent possible. The final storefront design and window display shall be reviewed and approved by the Director of Community Development prior to issuance of building permits for tenant improvements. No changes shall be made to the transparency of the windows without the express approval of the Director of Community Development. Further, all new and replaced windows shall be in conformance with CMC 19.102.030 Bird-safe Development Requirements. 6. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the 17 Draft Resolution ASA-2023-004 September 28, 2023 Page 5 mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 7. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 8. BAAQMD BASIC CONTROL MEASURES (DUST CONTROL) Project shall comply with the Bay Area Quality Management District’s Basic Construction Mitigation Measures as follows: a. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. b. All haul trucks transporting soil, sand, or other loose material off -site shall be covered. c. All visible mud or dirt tracked-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. 18 Draft Resolution ASA-2023-004 September 28, 2023 Page 6 d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. A publicly visible sign shall be posted with the telephone number and person to contact at the City of Cupertino regarding dust complaints. This person shall respond and take corrective action within 48 hours. The BAAQMD phone number shall also be visible to ensure compliance with applicable regulations. Applicant shall indicate compliance with BAAQMD’s basic control measures on all demolition, construction and grading permits and construction management plan(s). 9. NOISE AND VIBRATION NOTICE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall send notices of the planned activity by first class mail to off-site businesses and residents within 500 feet of the project site. The City will provide a template notice and mailing addresses for the Applicant’s use. The notice must be approved by City staff prior to sending. The project applicant shall provide the City with evidence of mailing of the notice, upon request. Please note that, if pile driving, the requirements for noticing and monitoring outlined in City Code Section 17.04.050 G (3) shall apply. 10. NOISE AND VIBRATION SIGNAGE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall ensure that a sign measuring at least four feet by six feet shall be posted on construction fencing at the entrance(s) to the job site, clearly visible to the public, and include the following: a. Permitted construction days and hours; b. A description of proposed construction activities; 19 Draft Resolution ASA-2023-004 September 28, 2023 Page 7 c. Telephone numbers of the City’s and contractor’s authorized representatives that are assigned to respond in the event of a noise or vibration complaint; and d. Contact information for City’s and contractor’s authorized representatives that are assigned to respond in the event of a complaint related to fugitive dust, pursuant to the requirements for compliance w ith BAAQMD’s CEQA Air Quality Guidelines. If the authorized contractor’s representative receives a complaint, they shall investigate, take appropriate corrective action, and report the complaint and the action taken to the City within three business days of receiving the complaint. 11. NOISE DURING CONSTRUCTION Prior to issuance of any demolition, grading or building permit, include on plans a note that, during project construction, the project applicant shall incorporate the following measures to reduce noise during construction and demolition activity: a. The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City’s Planning Department for review and approval prior to issuance of the first permit. The Construction Noise Plan shall demonstrate compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The details of the Construction Noise Control Plan shall be included in the applicable construction documents and implemented by the on-site Construction Manager. Noise reduction measures selected and implemented shall be based on the type of construction equipment used on the site, distance of construction activities from sensitive receptor(s), site terrain, and other features on and surrounding the site (e.g., trees, built environment) and may include, but not be limited to, temporary construction noise attenuation walls, high quality mufflers. During the entire active construction period, the Construction Noise Control Plan shall demonstrate that compliance with the specified noise control requirements for construction equipment and tools will reduce construction noise in compliance with the City’s daytime and nighttime decibel limits. b. Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for ap proval prior to the start of the construction phase. c. Signs will be posted at the job site entrance(s), within the on -site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. d. During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells will be 20 Draft Resolution ASA-2023-004 September 28, 2023 Page 8 for safety warning purposes only. The construction manager will use smart back-up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and law. 12. FUGITIVE DUST CONTROL Prior to issuance of the any demolition, grading, or building permit, include on all permit plans, the full text of each of the Bay Area Air Quality Management District’s Basic Control Measures from the latest version of BAAQMD’s CEQA Air Quality Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive dust (i.e., particulate matter PM2.5 and PM10) during demolition, ground disturbing activities and/or construction. 13. DARK SKY COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved lighting plans to comply with development standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting Requirements. In the event changes are proposed from the approved plans, said changes must be reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all documentation required to determine compliance with the Municipal Code. 14. SIGNAGE Signage is not approved with this application. Signage shall conform to the City Sign Code. 15. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy. 16. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 17. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the 21 Draft Resolution ASA-2023-004 September 28, 2023 Page 9 “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connectio n with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 18. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. PASSED AND ADOPTED this 28th day of September 2023 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by 22 Draft Resolution ASA-2023-004 September 28, 2023 Page 10 the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Gian Martire Luke Connolly Senior Planner Administrative Hearing Officer 23 03.14.2023 CUPERTINO FACADE REVISED DESIGN THIS DOCUMENT CONTAINS INFORMATION THAT IS PRIVILEGED AND CONFIDENTIAL. ANY UNAUTHORIZED DISCLOSURE, REPRODUCTION, DISTRIBUTION OR USE OF THIS INFORMATION WITHOUT EXPRESS WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED. 24 CHAPTER ONE VISUALIZATION CUPERTINO FACADE - REVISED DESIGN l 03.14.2023 25 3 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 03.14.2023 03.14.2023 CHAPTER ONE - VISUALIZATION BIRDSEYE VIEW CURRENT STATE 26 4 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 03.14.2023 03.14.2023 FRONT VIEW CURRENT STATE CHAPTER ONE - VISUALIZATION 27 5 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 03.14.2023 03.14.2023 CHAPTER ONE - VISUALIZATION PARKING LOT VIEW CURRENT STATE 28 6 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 03.14.2023 03.14.2023 CHAPTER ONE - VISUALIZATION SIDE FACADE VIEW CURRENT STATE 29 7 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 03.14.2023 03.14.2023 CHAPTER ONE - VISUALIZATION BIRDSEYE VIEW REVISED DESIGN 30 8 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 03.14.2023 03.14.2023 FRONT VIEW REVISED DESIGN CHAPTER ONE - VISUALIZATION 31 9 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 03.14.2023 03.14.2023 CHAPTER ONE - VISUALIZATION PARKING LOT VIEW REVISED DESIGN 32 10 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 03.14.2023 03.14.2023 CHAPTER ONE - VISUALIZATION SIDE FACADE VIEW REVISED DESIGN 33 11 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 03.14.2023 03.14.2023 34 CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV S 0°13'00" E 372.28' N 0°13'00" W 372.28' S 8 9 ° 36 ' 0 0 " W 22 4. 9 6 ' N 8 9 ° 3 6 ' 0 0 " E 22 4 . 9 6 ' PR O P E R T Y L I N E PROPERTY LINE PR O P E R T Y L I N E PROPERTY LINE PARKING NO PARKING NO NO PARKING VANVAN Exception #8 of Prelim Title G A-3 2 A-3 4 A-3 3 A-3 1 A-1 2 ADJACENT TENANT SPACE S T E V E N S C R E E K B L V D. SHANE CO SUITE S2 S3S3 S3S3 S3S3 S3S3S3S3 S3S3 S3S3 S3 S3S3 S3S3 S3 S3S3 S6 S7 S7 S7 S7 S7 S7S7 S7 S7 S7 S7 S7 S7 S7 S8 S8 S11 S12 S13 S14 S15 S16 S16 S17 S18 S21 S22 S24 S24 S24 S24 S24 S26S26 S26S26 S31 S33S33 CL R . 4' - 3 " M I N . S19 S34 S35 S35 S35 S35 S35 S35 L1 L1 L3 L2 L3 L3 L3 L3 L3 L3 DEMO PROPOSED DE M O PR O P O S E D S3 S3 S7 S36S36 S37 S38S38 S38S38 S38S38 SETBACK DIAGRAM 49' - 3" S2 L4 L4 L4 L4L4 L4 (E) ROOF LINE (VARIEIS) 113' -6" FIRST FLOOR (F.F.) 100' - 0" (E) HIGH PARAPET LEVEL 120' - 1" (E) LOW PARAPET LEVEL 116' -1" (N) ENTRY TOWER LEVEL 122' - 0" 45°1:1 SLOPEMARK DESCRIPTION TYPE L1 4" OUTDOOR CYLINDER -FC OUTDOOR LIGHTING ZFCC410 (DOWN LT ONLY)WALL MTD L2 4" RECESSED SOFFIT -LITHONIA LIGHTING LBR4 RECESSED L3 LED FLOOD LIGHT -RSXF1 (FIXTURE TO MATCH (E) L.L. PROVIDED FIXTURES)WALL MTD L4 18" WALL SCONCE -WDGE3 LED (FIXTURE TO MATCH (E) L.L. PROVIDED FIXTURES) WALL MTD NOTES BE N J A M I N T A L P O S REVISIONS: C-31704 5/ 1 0 / 2 0 2 3 2 : 0 7 : 0 7 P M E: \ S h a n e C o _ C u p e r t i n o \ E X T E R I O R \ V E O p t i o n \ S H A N E C O _ C U P E R T I N O _ V E . r v t 5/10/23 SH A N E C O . E X T E R I O R I M P R O V E M E N T S PL A N N I N G SU B M I T T A L SI T E P L A N A-1 STACEY HALL 19 9 0 0 S T E V E N S C R E E K B L V D . , C U P E R T I N O , C A KEYNOTES - SITE Key Value Keynote Text S2 (E) ACCESSIBLE PARKING STALLS AND SIGNAGE TO REMAIN. S3 (E) PARKING STALL TO REMAIN, TYP. S6 (E) PAVING/WALKABLE SURFACE TO REMAIN, TYP. S7 (E) LANDSCAPE PLANTING AREA TO REMAIN. GC TO REPLACE (E) PLANTINGS AS REQ'D FOR NEW WORK. VERIFY PLANTING TYPE w/ AS-BUILTS AND MATCH (E). GC TO MODIFY (E) IRRIGATION SYSTEM AS REQ'D FOR NEW WORK. VERIFY EXTENTS IN THE FIELD. S8 (E) SHORT-TERM BIKE RACK TO REMAIN. S11 (E) TRANSFORMER TO REMAIN. S12 (E) TRUNCATED INDICATOR DOMES, TYP. S13 (E) TRASH ENCLOSURE TO REMAIN. S14 (E) FIRE DEPARTMENT VEHICLE TURNING RADIUS - PREVIOUSLY APPROVED, TYP. S15 (E) GAS METER AND FIRE SPRINKLER SERVICE TO REMAIN. S16 (E) "FUTURE" ELECTRIC VEHICLE PARKING STALL, TYP. VERIFY FINAL LOCATION AND QUANTITY W/ L.L. DWGS. S17 (E) MAIL/PARCEL BOX TO REMAIN. S18 (E) WHEELSTOP TO REMAIN, TYP. S19 ACCESSIBLE PATH OF TRAVEL. S21 (E) LONG-TERM BIKE STORAGE ROOM TO REMAIN. NOT PART OF SHANE CO LEASABLE AREA. S22 (E) MAIN BUILDING ELECTRICAL ROOM AND MAIN DISTRIBUTION PANEL TO REMAIN. NOT PART OF SHANE CO LEASABLE AREA. S23 (E) ADJACENT STRUCTURES TO REMAIN, TYP. S24 (E) BUILDING ENTRANCE TO REMAIN. S26 (E) PARKING AREA TO REMAIN, TYP. S31 (N) PLANTER AND INTEGRAL BENCH - REQUIRED AS A SECURITY ELEMENT TO PROTECT FRONT ENTRY FROM VEHICLE ENTRY. S33 (N) SUITE ENTRANCE AND ENTRANCE TOWER ELEMENT. ENTRANCE TOWER IS NON-CONDITIONED SPACE AND NOT CONSIDERED AS PART OF THE OVERALL OCCUPIABLE BUILDING AREA. S34 (E) DEMISING WALL TO REMAIN. S35 (N) DECORATIVE SITE BOLLARD W/ INTEGRAL LIGHTING COMPONENT (LIGHTWAVE 2 STRAIGHT BOLLARD, ULW-10874, W/ SECURITY CORE IN FRONT OF ALL FENESTRATION AREAS), TYP. S36 (N) PERMEABLE PAVER HARDSCAPE PATIO w/ MAX. 2% SLOPE IN ANY DIRECTION. MAX BEVEL TRANSITIONS BETWEEN ALL PAVERS TO BE 1/2" OR LESS w/ MAX. 1/4" BEVEL. PAVERS TO MATCH PREVIOUSLY L.L. APPROVED DESIGN. S37 (N) CONCRETE WALKWAY. MAX 2% SLOPE IN ANY DIRECTION w/ 0" TRANSITION BETWEEN (E) CONCRETE WALKWAY/LANDING AND PAVER PATIO. S38 (N) LANDSCAPE AREA. PLANTING TO MATCH (E) AREA PLANTERS. SCALE: 1/16" = 1'-0" SITE PLAN -PROPOSED PLANNING VE SCALE: 1/16" = 1'-0"A-1 2 ELEVATION -EAST (BUILDING BULK SETBACK DIAGRAM) LOT AREA 83,766 SF BUILDING AREA EXISTING BUILDING AREA:28,813 SF LOT COVERAGE:35.1% REQUIRED PARKING *THERE IS NO NEW SF PROPOSED AS PART OF THIS SCOPE OF WORK TOTAL PARKING PROVIDED:114 SPACES SITE STATISTICS / PARKING ANALYSIS NOTE: WITH THE EXCEPTION OF WORK REQUIRED TO PREPARE EXISTING SITE ELEMENTS FOR THE NEW ENTRY TOWER AND PERMEABLE HARDSCAPING PATIO PROPOSED HEREIN AS PART OF THE SCOPE WORK, ALL SITE ELEMENTS ARE EXISTING TO REMAIN AND NOT INCLUDED IN THIS APPLICATION. THE (E) SITE PLAN AND SITE ELEMENTS NOT IDENTIFIED AS (N) WERE PREPARED AND PROVIDED BY L.L. AND SHOWN FOR REFERENCE ONLY. ORIGINAL SITE WORK COMPLETED UNDER PERMIT # BLD-2020-0387. NORTH LIGHTING SCHEDULE 35