INT-2022-001, DIR-2022-017 - Reso No. 141 (Signed) CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 141
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO TO ALLOW A FRONT YARD INTERPRETATION AND
DIRECTOR'S MINOR MODIFICATION TO DESIGNATE THE
PROPERTY LINE ALONG OAKLEAF COURT AS THE FRONT LOT
LINE TO ALLOW FOR AN 491-SQUARE-FOOT FIRST-FLOOR
ADDITION TO AN EXISTING RESIDENCE LOCATED AT 21966
OAKLEAF COURT (A.P.N. 326-18-062)
SECTION I: PROTECT DESCRIPTION
Application No.: INT-2022-001, DIR-2022-017
Applicant: Pravil and Pratibha Gupta
Location: 21966 Oakleaf Court;APN: 32618 062
SECTION II: FINDINGS
WHEREAS, the City of Cupertino received an application for a Front Yard Interpretation
and Director's Minor Modification to'designate the property line along Oakleaf Court as
the front lot line and to permit a 491-square-foot first-floor addition to an existing single-
family residence in a Planned zoning district; and
WHEREAS, the project is categorically exempt under the California Environmental
Quality Act (CEQA) Class 1, Section 15301(e) —Existing Facilities,; and
WHEREAS, the necessary public notices have.been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative.Hearing Officer finds that:
A. Fro •Yard Interpretation
1. The project is consistent with the Cupertino General Plan, any applicable specific
plans, zoning ordinance,' and the purposes of this title and complies with the
California Environmental Quality Act (CEQA); and
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 2
The proposed project is consistent with the existing residential land use designations
surrounding the site and is consistent with Title 19, Zoning, and Chapter 19.28, Single-
Family Residential (R1) Ordinance, of the Cupertino Municipal Code for setbacks, lot
coverage,floor area ratio, and other development standards. A portion of the front setback
of the first floor will be inconsistent with the setback standard, however, the now non-
conforming rear setback will become a conforming side setback and none of the non-
conforming portions of the building are being modified structurally. Furthermore, the
proposed modifications to the site are categorically exempt under CEQA in that it involves
a minor change to an existing use or site.
2. The proposed project is harmonious in scale and design with the general
neighborhood; and
The interpretation would reinforce the existing residential building relationship as
established by the original development approved in 1980. Most corner lot residences
within the original tract have functional front yards along the shorter line, but none, other
than the subject property,face Oakleaf Place. The proposed project would eliminate the rear
non-conforming status of the existing residence under the Cupertino Municipal Code,
maintain the frontage orientation of the subject site and surrounding properties, and
improve the relationship of existing residences and future developments.
3. The granting of the permit will not result in a condition that is detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental
to the public health, safety, or welfare.
The proposed project will not be detrimental or injurious to property or improvements in
the vicinity, and will not be detrimental to the public health, safety, or welfare because no
changes to site access are proposed. The proposed project is consistent with the existing
residential land uses surrounding the site.
B. Director's Minor Modification
1. The project has been diverted to administrative approval pursuant to Chapter
19.164 as the following conditions have been met:
i. The project is minor when considered in conjunction with other minor
changes to the project; and
ii. The proposed change will not be controversial; and
iii. The proposed change is not likely to be denied by the Director of
Community Development; and
iv. The proposed change is not likely to be denied by the City Council
The proposed project is considered minor as it will not significantly increase the size of the
residence and the proposed addition will be consistent with the existing design of the
residence.Additionally,staff does not expect,given the scope of the project, that the project
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 3
will be controversial, be denied by the Director of Community Development, or be denied
by the City Council.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony, and other evidence
submitted in this matter, the Hearing Officer of the Administrative Hearing does
determine that Application No.(s) INT-2022-001 and DIR-2022-017 is categorically
exempt from CEQA and approves said application; and
That the subconclusions upon which the findings and conditions specified in Section III
of this Resolution are based and contained in the public meeting record concerning
Application No.(s) INT-2022-001 and DIR-2022-017 as set forth in the Minutes of the
Administrative Hearing Meeting of June 8, 2023, and are incorporated by reference
herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled, "Remodel Pratibha Gupta 21966 Oakleaf
Ct. Cupertino, CA" drawn by Keith Royster Architects dated January 31, 2023
consisting of thirteen (13) sheets labeled Sheet 1 through Sheet 12 and 21966 Oakleaf
Court-TOPO; except as may be amended by conditions in this resolution.
2. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
building plans.
2. BUILDING PERMITS
The applicant shall consult with the City Building Division to obtain the necessary
building permits prior to commencement of work.
3. ACCURACY OF PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations,building setbacks,property
size, building square footage, any relevant easements, and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
4. CONSULTATION WITH OTHER DEPARTMENTS
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 4
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
5. FRONT YARD INTERPRETATION
An Interpretation is granted to allow the lot line adjoining Oakleaf Court to be
considered the front lot line. Any future additions or modifications to the residence
shall be consistent with the interpretation of the lot line adjoining Oakleaf Court as
the front lot line.
3. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a) All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b) Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c) Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d) Construction activities shall be limited to Monday through Friday, 7 a.m.to 8 p.m.
and Saturday and Sunday,9 a.m. to 6 p.m. Construction activities are not allowed
on holidays as defined in Chapter 10.48 of the Municipal Code. Night time
construction is allowed if compliant with nighttime standards of Section 10.48 of
the Cupertino Municipal Code.
e) Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f) The applicant shall be responsible for educating all contractors and subcontractors
of said construction restrictions.
The applicant shall comply with the above grading and construction hours and noise
limit requirements unless otherwise indicated.
5. DARK SKY COMPLIANCE
Prior to issuance of Building Permits, the applicant/property owner shall submit final
plans in compliance with the approved lighting plans to comply with development
i
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 5
I
standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting
Requirements. In the event changes are proposed from the approved plans, said
changes must be reviewed and approved by the Director of Community Development
or their designee. The applicant shall provide all documentation required to
determine compliance with the Municipal Code.
6. FUGITIVE DUST CONTROL {
Prior to issuance of the any demolition, grading, or building permit, include on all
permit plans, the full text of each of the Bay Area Air Quality Management District's j
Basic Control Measures from the latest version of BAAQMD's CE A Air Oualitv
Guidelines as subsequently revised, supplemented, or replaced, to control fugitive
dust (i.e., particulate matter PM2.5 and PM10) during demolition, ground disturbing
activities and/or construction.
7. VOLATILE ORGANIC COMPOUND EMISSIONS FROM PAINT
Prior to issuance of the first building permit, the Applicant shall include a note on all
plans where paint specifications or other design specifications are listed, that the
project design will incorporate only low-VOC paint (i.e., 50 grams per liter [g/L] or
less) for interior and exterior wall architectural coatings.
8. AVOID NESTING BIRDS DURING CONSTRUCTION
Prior to issuance of the any demolition, grading and building permit, indicate the
following on all construction plans:
a. Demolition, construction, ground-disturbing, and tree removal/pruning activities
shall be scheduled to be completed prior to nesting season (February 1 through
August 31), if feasible.
b. If demolition, construction, ground-disturbing, or tree removal/pruning activities
occur during the nesting season (February 1 and August 31), preconstruction
surveys shall be conducted as follows:
i. No more than 7 days prior to the start of demolition, construction, ground-
disturbing, or tree removal/pruning activities, in order to identify any active
nests with eggs or young birds on the site and surrounding area within 100
feet of construction or tree removal activities.
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 6
ii. Preconstruction surveys shall be repeated at 14-day intervals until
demolition, construction, ground-disturbing, or tree removal/pruning
activities have been initiated in the area, after which surveys can be stopped.
As part of the preconstruction survey(s), the surveyor shall inspect all trees
and other possible nesting habitats in, and immediately adjacent to, the
construction areas for active nests,while ensuring that they do not disturb the
nests as follows:
1) For projects that require the demolition or construction one single-
family residence, ground disturbing activities affecting areas of up to
500 square feet, or the removal of up to three trees, the property owner
or a tree removal contractor, if necessary, is permitted to conduct the
preconstruction surveys to identify if there are any active nests. If any
active nests with eggs or young birds are identified,the project applicant
shall retain a qualified ornithologist or biologist to identify protective
measures.
2) For any other demolition, construction and ground disturbing activity
or the removal of four or more trees,a qualified ornithologist or biologist
shall be retained by the project applicant to conduct the preconstruction
surveys.
iii. If the preconstruction survey does not identify any active nests with eggs or
young birds that would be affected by demolition, construction, ground-
disturbing or tree removal/pruning activities, no further mitigating action is
required.If an'active nest containing eggs or young birds is found sufficiently
close to work areas to be disturbed by these activities, their locations shall be
documented, and the qualified ornithologist or biologist shall identify
protective measures to be implemented under their direction until the nests
no longer contain eggs or young birds.
iv. Protective measures may include, but are not limited to, establishment of
clearly delineated exclusion zones (i.e., demarcated by identifiable fencing,
such as orange construction fencing or equivalent) around each nest location
as determined by the qualified ornithologist or biologist, taking into account
the species of birds nesting, their tolerance for disturbance and proximity to
existing development.In general, exclusion zones shall be a minimum of 300
feet for raptors and 75 feet for passerines and other birds. The active nest
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 7
within an exclusion zone shall be monitored on a weekly basis throughout
the nesting season to identify signs of disturbance and confirm nesting status.
The radius of an exclusion zone may be increased by the qualified
ornithologist or biologist, if project activities are determined to be adversely
affecting the nesting birds. Exclusion zones may be reduced by the qualified
ornithologist or biologist only in consultation with California Department of
Fish and Wildlife. The protection measures and buffers shall remain in effect
until the young have left the nest and are foraging independently or the nest
is no longer active.
V. A final report on nesting birds and raptors, including survey methodology,
survey date(s), map of identified active nests (if any), and protection
measures (if required), shall be prepared by the qualified ornithologist or
biologist and submitted to the Director of Community Development or his or
her designee, through the appropriate permit review process (e.g.,
demolition, construction, tree removal, etc.), and be completed to the
satisfaction of the Community Development Director prior to the start of
demolition, construction, ground-disturbing, or tree removal/pruning
activities.
9. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES
Prior to the issuance of any demolition, grading or building permit involving soil
disturbance, the project applicant shall provide written verification, including the
materials provided to contractors and construction crews, to the City confirming that
contractors and construction crews have been notified of basic archaeological site
indicators, the potential for discovery of archaeological resources, laws pertaining to
these resources, and procedures for protecting these resources as follows:
a. Basic archaeological site indicators that may include,but are not limited to, darker
than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire
affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of
stone, bone, or shellfish; evidence of living surfaces (e.g., floors); and burials,
either human or animal.
b. The potential for undiscovered archaeological resources or tribal cultural
resources on site.
i
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 8
c. The laws protecting these resources and associated penalties, including, but not
limited to, the Native American Graves Protection and Repatriation Act of 1990,
Public Resources Code Section 5097, and California Health and Safety Code
Section 7050 and Section 7052.
d. The protection procedures to follow should construction crews discover cultural
resources during project-related earthwork, include the following:
i. All soil disturbing work within 25 feet of the find shall cease.
ii. The project applicant shall retain a qualified archaeologist to provide and
implement a plan for survey, subsurface investigation, as needed, to define
the deposit, and assessment of the remainder of the site within the project area
to determine whether the resource is significant and would be affected by the
project.
iii. Any potential archaeological or tribal cultural resources found during
construction activities shall be recorded on appropriate California Department
of Parks and Recreation forms by a qualified archaeologist. If the resource is a
tribal cultural resource, the consulting archaeologist shall consult with the
appropriate tribe, as determined by the Native American Heritage
Commission, to evaluate the significance of the resource and to recommend
appropriate and feasible avoidance, testing, preservation or mitigation
measures, in light of factors such as the significance of the find, proposed
project design,costs, and other considerations. The archeologist shall perform
this evaluation in consultation with the tribe.
10. HUMAN REMAINS AND NATIVE AMERICAN BURIALS
Prior to issuance of the any demolition, grading and building permits that involve soil
disturbance, include on plans a note that, during project construction, the project
applicant shall comply with California Health and Safety Code Section 7050.5 and
California Public Resources Code Section 5097.98.
a. In the event of discovering human remains during construction activities, there
shall be no further excavation or disturbance of the site within a 100-foot radius
of the remains, or any nearby area reasonably suspected to overlie adjacent
remains.
b. The Santa Clara County Coroner shall be notified immediately and shall make a
determination as to whether the remains are Native American.
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 9
c. If the Santa Clara County Coroner determines that the remains are not subject to
his authority, he shall notify the Native American Heritage Commission
(NAHC) within 24 hours.
d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of
the deceased Native American.
e. The Most Likely Descendant has 48 hours following access to the project site to
make recommendations or preferences regarding the disposition of the remains.
If the Most Likely Descendant does not make recommendations within 48 hours
after being allowed access to the project site, the owner shall, with appropriate
dignity, reinter the remains in an area of the property secure from further
disturbance and provide documentation about this determination and the
location of the remains to the NAHC and the City of Cupertino. Alternatively, if
the owner does not accept the Most Likely Descendant's recommendations, the
owner or the descendent may request mediation by the NAHC. Construction
shall halt until the mediation has concluded.
11. STORMWATER RUNOFF CONTAMINATION
Prior to issuance of any grading or building permits, the project applicant shall
demonstrate. compliance with Chapter 9.18 (Stormwater Pollution Prevention and
Watershed Protection)of the Cupertino Municipal Code, to the satisfaction of the City
Engineer or his or her designee. All identified stormwater runoff control measures
shall be included in the applicable construction documents.
12. NOISE AND VIBRATION NOTICE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall send notices of the
planned activity by first class mail as follows:
a. For projects on sites that are more than 0.5 acres or four or more residential units
the notices shall be sent to off-site businesses and residents within 500 feet of the
project site;
b. For projects on sites between 0.25 to 0.5 acres, or two or three residential units
(not including Accessory Dwelling Units) notices shall be sent to off-site
businesses and residents within 250 feet of the project site; or
c. For projects on sites less than 0.25 acres or one residential unit, the notices shall
be sent to off-site businesses and residents within 100 feet of the project site.
The notification shall include a brief description of the project, the activities that
would occur, the hours when activity would occur, and the construction period's
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 10
overall duration. The notification should include the telephone numbers of the
contractor's authorized representatives that are assigned to respond in the event of a
noise or vibration complaint. The City will provide mailing addresses for the
Applicant's use. The project applicant shall provide the City with evidence of mailing
of the notice,upon request.If pile driving, see additional noticing requirements below.
13. NOISE AND VIBRATION SIGNAGE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least two feet by three feet shall be posted on construction fencing at the
entrance(s) to the job site, clearly visible to the public, and include the following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
c. Telephone numbers of the City's and contractor's authorized representatives
that are assigned to respond in the event of a noise or vibration complaint; and
d. Contact information for City's and contractor's authorized representatives that
are assigned to respond in the event of a complaint related to fugitive dust,
pursuant to the requirements for compliance with BAA MD's CEQA Air
Quality Guidelines.
If the authorized contractor's representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
14. NOISE DURING CONSTRUCTION
Prior to issuance of any demolition, grading or building permit, include on plans a
note that, during project construction, the project applicant shall incorporate the
following measures to reduce noise during construction and demolition activity:
a. The project applicant and contractors shall prepare and submit a Construction
Noise Control Plan to the City's Planning Department for review and approval
prior to issuance of the first permit. The Construction Noise Plan shall
demonstrate compliance with daytime and nighttime decibel limits pursuant to
Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The
details of the Construction Noise Control Plan shall be included in the applicable
construction documents and implemented by the on-site Construction Manager.
Noise reduction measures selected and implemented shall be based on the type
of construction equipment used on the site, distance of construction activities
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 11
from sensitive receptor(s), site terrain, and other features on and surrounding
the site (e.g., trees, built environment) and may include, but not be limited to,
temporary construction noise attenuation walls, high quality mufflers. During
the entire active construction period, the Construction Noise Control Plan shall
demonstrate that compliance with the specified noise control requirements for
construction equipment and tools will reduce construction noise in compliance
with the City's daytime and nighttime decibel limits.
b. Select haul routes that avoid the greatest amount of sensitive use areas and
r
submit to the City of Cupertino Public Works Department for approval prior to
the start of the construction phase.
c. Signs will be posted at the job site entrance(s), within the on-site construction
zones, and along queueing lanes (if any) to reinforce the prohibition of
unnecessary engine idling. All other equipment will be turned off if not in use
for more than 5 minutes.
d. During the entire active construction period and to the extent feasible, the use of
noise producing signals, including horns, whistles, alarms, and bells will be for
safety warning purposes only.The construction manager will use smart back-up
alarms,,which automatically adjust the alarm level based. on the background
noise level or switch off back-up alarms and replace with human spotters in
compliance with all safety requirements and law.
15. PALEONTOLOGICAL RESOURCES
Prior to issuance of the any demolition, grading or building permit, include on plans
a note that, during project construction, the project applicant shall implement the
following measures:
a. If paleontological resources are encountered during ground disturbing and/or
other construction activities, all construction shall be temporarily halted or
redirected to allow a qualified paleontologist, which shall be retained by the
project applicant,to assess the find for significance and the Applicant shall notify
the City.
b. If paleontological resources are found to be significant, the paleontological
monitor shall determine appropriate actions, in coordination with a qualified
paleontologist, City staff, and property owner.Appropriate actions may include,
but are not limited to, a mitigation plan formulated pursuant to guidelines
developed by the Society of Vertebrate Paleontology and implemented to
appropriately protect the significance of the resource by preservation,
documentation, and/or removal, prior to recommencing activities. Measures
{
i
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 12
may include, but are not limited to, salvage of unearthed fossil remains and/or
traces (e.g., tracks, trails, burrows); screen washing to recover small specimens;
preparation of salvaged fossils to a point of being ready for curation (e.g.,
removal of enclosing matrix, stabilization and repair of specimens, and
construction of reinforced support cradles); and identification, cataloging,
curation, and provision for repository storage of prepared fossil specimens.
16. INDEMNIFICATION
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City's choice, and hold harmless
the City, its City Council, and its officers, employees, and agents (collectively, the
"indemnified parties") from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
"proceeding")brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant related to any Ordinance,
Resolution, or action approving the project, the related entitlements, environmental
review documents, finding or determinations, or any other permit or approval
authorized for the project. The indemnification shall include but not be limited to
damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys'
fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or
bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys' fees and costs incurred in defense of the litigation. Such attorneys' fees and
costs shall include amounts paid to the City's outside counsel and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City. The applicant shall
likewise agree to indemnify, defend, and hold harmless the indemnified parties from
and against any damages, attorneys' fees, or costs awards, including attorneys' fees
awarded under Code of Civil Procedure section 1021.5, assessed or awarded against
the indemnified parties. The Applicant shall cooperate with the City to enter a
Reimbursement Agreement to govern any such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
Resolution No. 141 INT-2022-001,DIR-2022-017 June 8,2023
Page 13
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
17. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
PASSED AND ADOPTED this 8th day of June, 2023 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST: r APPROVED:
Emi Sugi ma Luke Connolly
Associate anner Assistant Director of Community Development