DIR-2023-008 - Action Letter CITY OF CUPERTINO
10300 Torre Avenue, Cupertino,California 95014(408)777-3308
To: Mayor and City Council Members
Chairperson and Planning Commissioners
From: Luke Connolly,Assistant Director of Community Development
Prepared by: Gian Paolo Martire, Senior Planner
Date: June 27, 2023
Subject: Director's Minor Modification, DIR-2023-008, to install Phase II of manufactured
columbarium unit that was previously approved (DIR-2012-17) and the replacement
of a modular building in the maintenance yard at the Gate of Heaven Cemetery
located at 22555 Cristo Rey Drive.
Chapter 19.164 of the Cupertino Municipal Code allows for administrative
approval of minor changes in a project. The Director reports his decision to the
City Council and Planning Commission in time to allow an appeal of the
decision within fourteen calendar days.
DISCUSSION
The applicant, Heather Gloster, on behalf of Gate of Heaven Cemetery, is requesting approval
of a minor modification to install Phase 2 of a manufactured columbarium unit that was
previously approved (DIR-2012-17) and the replacement of a modular building in the
maintenance yard.
Columbarium
In 2012, the Director of Community Development approved DIR-2012-17 for a columbarium
designed as an "infinity loop" figure eight located adjacent to, and on the north side of the lake
at the center of the Gate of Heaven Cemetery. The proposal was anticipated to be developed in
two phases, with the second phase conditioned to be constructed and completed within three
(3) years of the date of approval. Phase 1 of the development has been constructed; however,
Phase 2 of the development has not been completed. Therefore, a Directors Minor Modification
has been submitted to entitle Phase 2. Refer to Figure 1 to show existing conditions of the
project site.
DIR-2023-008
22555 Cristo Rey Drive Page 2
The Phase 2 of the columbarium
5 is approximately 700 feet away
from the nearest residences on
Canyon Oak Way. Along with
the Phase 1 portion, the
completed columbaria will be
composed of two identical,
6t mirrored half circle niche walls
that will slope from a height of 2
feet 6 inches to a maximum
height of six (6) feet, and will
comprise a development area of
approximately 3,500 square feet,
including the surrounding
Figure 1 Existing condition. 0�r,iy: arrow indicates completed Phase 1. exterior landscape area. The
Red arrow indicates proposed location of Phase 2. niche walls will be clad on the
front and back faces in granite and will also have interior and exterior seating benches. The
ground area in and around the columbaria will also be improved with flagstone to match the
existing flagstone around the lake, decomposed granite, and new landscaping to accent and
soften the aesthetics of the niche walls. Two existing trees around the columbarium that will be
preserved, including a 12" trunk diameter California Redbud tree and a 12" trunk diameter
Camphor tree. These trees will be retained as part of this project and will be centered in the
middle of each infinity loop niche wall. Please refer to Enclosure 1, Plan Set, for specifications of
the design.
Modular Unit
The applicant further proposes to remove and replace an existing modular unit with another
approximately 600 square foot modular unit that contains an office and restroom. The unit will
be in the maintenance area
t Remove arxi servicing the cemetery
� replace modular
una wan restoom ! grounds, west of the site. The
unit will be on wheels and not
4
'� �-- intended to be permanently
attached to the ground. No
trees will be removed from
the area, as well as any
further modifications to the
=� maintenance yard
landscaping. The current site
is not visible from any public
Figure 2 Maintenance yard and modular unit replacement. right-of-way, and is screened
from any trails that visitors to
the neighboring San Antonio County Park may be using.
DIR-2023-008
22555 Cristo Rey Drive Page 3
Conclusion
The applicant's proposal is not an expansion of the current use and does not impact the
neighboring residents or land uses. Staff supports the project because it is consistent with the
previously approved Director's Minor Modification(DIR-2012-17), as well as the cemetery's Use
Permit(U-2005-04).
ACTION
The Director of Community Development deems the modification minor and approves the
project with the following conditions of approval:
1. APPROVED EXHIBITS
Approval is based on exhibits titled: "St. James Lakeside Columbarium' for Gate of Heaven
Cemetery located at 22555 Cristo Rey Drive prepared by Coldspring dated November 29,
2022, except as may be amended by the conditions contained in this resolution.
2. ACCURACY OF THE PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data including
but not limited to property boundary locations, building setbacks, property size, building
square footage, any relevant easements and/or construction records. Any misrepresentation
of any property data may invalidate this approval and may require additional review.
3. BUILDING PERMITS
The applicant shall consult with the City Building Division to obtain the necessary building
permits, or building permit revisions, prior to commencement of work.
4. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the first
page of the building plans.
5. PREVIOUS CONDITIONS OF APPROVAL
All prior conditions of approval through past approvals shall remain in effect unless
superseded by or in conflict with subsequent conditions of approval and as specifically
amended by this Director's Minor Modification approval.
6. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible for consulting with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the Community
Development Department.
7. EXTERIOR BUILDING MATERIALS/TREATMENTS
The final building exterior plan shall closely resemble the details shown on the original
approved plans. Final building exterior treatment plan (including but not limited to details
on exterior color, materials, architectural treatments, doors, windows, lighting fixtures,
DIR-2023-008
22555 Cristo Rey Drive Page 4
and/or embellishments) shall be reviewed and approved by the Director of Community
Development prior to issuance of building permits to ensure quality and consistency. Any
exterior changes determined to be substantial by the Director of Community Development
shall either require a modification to this permit or a new permit based on the extent of the
change.
8. BIRD SAFE COMPLIANCE
Prior to issuance of Building Permits, the applicant/property owner shall submit final plans
in compliance with the approved plans to comply with development standards of Cupertino
Municipal Code Section 19.102.030 Bird-Safe Development Requirements. In the event
changes are proposed from the approved plans, said changes must be reviewed and
approved by the Director of Community Development or their designee. The applicant shall
provide all necessary documentation required to determine compliance with the Municipal
Code.
9. DARK SKY COMPLIANCE
Prior to issuance of Building Permits, the applicant/property owner shall submit final plans
in compliance with the approved lighting plans to comply with development standards of
Cupertino Municipal Code Section 19.102.040 Outdoor Lighting Requirements. In the event
changes are proposed from the approved plans, said changes must be reviewed and
approved by the Director of Community Development or their designee. The applicant shall
provide all documentation required to determine compliance with the Municipal Code.
10. INDEMNIFICATION
As part of the application, to the fullest extent permitted by law, the applicant shall agree to
indemnify, defend with the attorneys of the City's choice, and hold harmless the City, its
City Council, and its officers, employees, and agents (collectively, the "indemnified parties")
from and against any liability, claim, action, cause of action, suit, damages, judgment, lien,
levy, or proceeding (collectively referred to as "proceeding") brought by a third party
against one or more of the indemnified parties or one or more of the indemnified parties
and the applicant related to any Ordinance, Resolution, or action approving the project, the
related entitlements, environmental review documents, finding or determinations, or any
other permit or approval authorized for the project. The indemnification shall include but
not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit,
attorneys' fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing
such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual attorneys' fees
and costs incurred in defense of the litigation. Such attorneys' fees and costs shall include
amounts paid to the City's outside counsel and shall include City Attorney time and
overhead costs and other City staff overhead costs and any costs directly related to the
litigation reasonably incurred by City. The applicant shall likewise agree to indemnify,
defend, and hold harmless the indemnified parties from and against any damages,
attorneys' fees, or costs awards, including attorneys' fees awarded under Code of Civil
DIR-2023-008
22555 Cristo Rey Drive Page 5
Procedure section 1021.5, assessed or awarded against the indemnified parties. The
Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any
such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in
additional investigation or study of, or for supplementing, redrafting, revising, or
amending, any document (such as an Environmental Impact Report, negative declaration,
specific plan, or general plan amendment) if made necessary by proceedings challenging the
project approvals and related environmental review, if the applicant desires to continue to
pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for business
interruption,punitive, speculative, or consequential damages.
11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions.
This approval of the modification is effective June 29, 2023. The fourteen-calendar day appeal
period will expire on July 13, 2023.
Enclosures:
1. Plan Set
2. Satellite location of Modular Unit
ST. JAMES LAKESIDE COLUMBARIUM
GATE OF HEAVEN CEMETERY --=--®
LOS ALTOS, CA
CSG # 1023849
on,NleunDN wTE
t9
z
U) �a
O „
.RD�QT
EDCAT,D
DMWN W
BYITENEAL/NINpH
° 0
0
0
,��.� DEmaNNDN.WE
DGWWI®�Y
FOR 15T APPROVAL
FIELD SET ANpiOR LIST PRELIMINARY . ��+-orb
NOT FOR CONSTRUCRON a w�Nuwu
DMWMCS HOVE NOT BEEN REVIEWED OR CERTINED BY A 1023849
ll(ENB®ENONRER.IF Q•]tTIFR:ATIQV IS REQUIRED FOR
N DAIF WILL BE ANWINUN OFa WEFNS iRWN
THESE DRAWINGS HAVE NOT BEEN REVIFNED OR APPROVED
BV LOOLL AVNIORRIES TINFNi OIE11NG WFOWWIEON E�1
WPIMaHRIN
"r' S I wr 'A• ..
? I xar a« an x ss .y, wu wu i
2/2
t 2/31I �_ — _—i-�2/3
e
T "T rflueurmx wte
1/4 1/4
__
4/2 F mnea... .mew.. l 2/2
1/2-FRONT ELEVATION
SCALE:3/4"=1'-0" REF:N/A
3/2
5/2-SECTION
REF:N/A
ux.ow. , i NZ z 7
3 Ilm aal •ss wla § III �' °=✓m.-5
m •a,3T •"o m •"o m r.m w � �a�
= m5 OU
3/2
M-RIGHT ELEVATION
SCALE:3/4"=1'-0" REF:N/A
Pw1[R
.m m Iwo m m 9 uaalrmelmam.
t owvm m
3/2-BACK ELEVATION
tea.. SCALE:3/4"=1'-0" REF:N/A
O
ws xumm
4/2-LEFT ELEVATION
SCALE:3/4"=1'-0" REF:N/A 1023849
ar.wmcs wom�w;
�°`w.c�nn�rcin"r�,.wa,unoNOHGu �2
1t %'
s rw' rv,k• ,•1k.
3/3-DETAIL
SCALE:1"=1'-0" REF:N/A
%, Ol81RIWIlON MlE
a
313
5/2
I 41
Y, K
N1RC14�5[R
2�
+4L• rwao���mamr
IMTFRpI/WNm
4�
IT
D�mm BY
� 2/3-SECTION
1/3-PLAN VIEW SG1LE:1/2"=1'-0" REF:N/A
SCALE:1/2"=1'-0" REF:N/A °oN xuxxNa
1023849
Nlro onrexaux:nxmu%w ov<wmsxmn r� mrc�rxuwerx
�i»,v�1 °""�r�en°cumeic l°n�rouurmn""" 3
b xouw�umx�a+uuu ixa '0iON7�,&o•
YiYYNN1133N4 HlVI,9NON STYJ3(I�NV,1M J[FD3tl
i1L YpW S]®Mbi0 MYi1NIW MCIHS
6b8EZOT
wwvmi as
V/N::13N ,A-.T=„Z/T:31VJ5
•�aaxorna NO LQS•b T
ioaww•ecsao
�I
x ua
.nua
.M�
IMDItl/lYIYtIYX
]QYWWI�
IbLYJ01
1W[O1N
�P
�em O
gNa r
fag �
cn
Z
m asi
uw raunm/na
S xouaaraww axuunuawn3arnsunw3amb3n sNna3xisx3 a3�3�m3> asd aas'x ism lY eo axros3nd urixm savl3a o�eo3esaw ie3x�ox3 a3�euan �.,ory..wi.,o..
NIIM ONON SxW30 ewna»03A011ddV i0Jdl3>]]tl n00Ntl 3>MxldH003WJ UOJ IY➢tel0`.NA01Iwl YONU.aaVJ e03aNdYJ 39 Qlw%a cirn Yli6NW'A1X03>N3n3J3n nOJ NNAM6
nawwuaxa auNows�xNeoNawww we�xs TMJ01 nnox l,,,sxw 3s�e'Arxo 3>Na'esu np33W xouraxno3 nNl wwmxo nos3w:
s>mmrea 353NL'xl3wox3 a3sN�n YAe wuun3> 3wx uouvurowmexouwo3'3z�s m®n:a3or3
6KEZOi n003NdN3a N33N lON 3A w S MUAtlNO N011WNOP
�aam wnNmwo azvu uo mm tlM:daa .o-,c=.z/c:gw,)s
o3xa.�aaaEuw 3e anoxs
a�nN�o[ xouvaxnoi nm a3sn 313uwm:3wx N1/ld N011tlONflOd-5 i
A�OaNlLL30
113a1NIN NNISiY
0
0
0
xsaxu/iYnazYN
6 c
x®msmm .Y.r+n
l�a[ww
2
f- r
$a NOLIJ3S N011tlON00j-5 z
I I I
uva Nounxnuua
I I Ie°
.vn„�
r•
ARC",
' �� t -• 'r• -Gateiot He, r
r o 1 ~• y �w - + rli Catholic Cem`et 411
-40
: i _ .., y, , 1 '� •�.� {'fib,;..
• n
s.
`avee ofjlns
L hangLN
� r
a.. �"^ate Q`,t ,�'-�f�� !�' � � � .: • �-:. r� �.i;_
to _� •+.;
rcemetery grounds
Existing maint
Remove and
replace modular
*le unit with restroom
Existing buildin
canopy
'' y {
#.ter t �- rr� ' .!'� �:;��.y iylc s �? ,.�,''• i..
{
r;,.. ,�,r�`sr��� �: t .4 .�_ ;tea+■ ��f�
JVL,71
.. ' .-�`�` •..... ,... -r��+..._ ..�- .�_� -:-w-�. ++ems: - _ -
ate" -weJ.r
ICI
c�
-�
0
m
z
l�rr
_...
� �
.�
� _�„__
�..
,—,_
��..,__._.__.s
__�_�
_._�._�
i
s
1
IVYhC
New Modular +°E
t �
New Modular
{
New Modular
.4
F
F
New Modular
t ,s,
5h
r�