Loading...
Phase II columbarium drawingsC V PERTIN Case t ommunity Development Department Planning Division — Cupertino APPROVED DIR-2023-008 Application Number(s) IN THE EVENT ANY OR ALL PORTIONS OF THIS BUILDING IS CONSTRUCTED BY SOME ONE OTHER THAN COLDSPRING OR ONE OF ITS DESIGNATED SUBCONTRACTORS, COLDSPRING MAKES NO WARRANTIES OR REPRESENTATION THAT THE STRUCTURE DEPICTED IN THESE DRAWINGS WHEN CONSTRUCTED WILL BE STRUCTURALLY SOUND OR WILL MEET STATE AND LOCAL BUILDING CODE REQUIREMENTS, UNLESS A LICENSED ARCHITECT OR ENGINEER HAS CERTIFIED, STAMPED AND AFFIXES A WET SIGNATURE OF APPROVAL TO THESE DRAWINGS AND THE STRUCTURE HAS BEEN CONSTRUCTED IN COMPLIANCE WITH SAID STAMPED AND WET SIGNED DRAWINGS. Appro Appro Signat I Date Gian Paolo Martire Case Manage DR-039(09Jan2020) 1/5 - FOUNDATION PLAN SCALE: 1/2" = 1'-0" REF: N/A NOTE: REBAR SIZE, LOCATION & CONFIGURATION SHOWN FOR REFERENCE ONLY. CONSULT A CERTIFIED ENGINEER FOR SPECIFIC DETAILS. R 18'-47/ " NOTE: CONCRETE USED FOR FOUNDATION SHOULD BE MIN. 3000 PSI. FOLLOW LOCAL OR STATE GOVERNING CODES. NOTE: THE SOIL ON WHICH THIS FOUNDATION RESTS SHOULD BE CAPABLE OF CARRYING A CONTACT PRESSURE OF AT LEAST 2,500 PSF. 3" 1'-10�/s" 3" a1 I a I a° I I° a -� ° aO vi a I a I la. moo O Z O �OV �a i ° = Ln z wU_w #5 REBAR VERTICAL & HORIZONTAL. I I I o o p HORIZONTAL REBAR 16" O.C. MAX 14 4 I ZO a WITH 3" MINIMUM COVER. 1 I I Q O a ou J <1 ° I o a I I a ° Q I ° 2'-47/" s 2/5 - FOUNDATION SECTION SCALE: 1 1/2 = 1-0 REF: N/A FOUNDATION DRAWINGS HAVE NOT BEEN REVIEWED OR CERTIFIED BY A LICENSED ENGINEER. THESE DRAWINGS ARE FOR REFERENCE ONLY, PLEASE CONSULT YOUR LOCAL BUILDING OFFICIAL FOR CODE COMPLIANCE AND OR CERTIFIED ENGINEERING REQUIREMENTS. SHIP DATE WILL BE A MINIMUM OF 4 WEEKS FROM THE RECEIPT OF APPROVED CARVING DETAILS ALONG WITH ALL PERTINENT CUTTING INFORMATION NOTE: STATE AND LOCAL BUILDING CODE REVIEW MAY NECESSITATE CHANGES TO STAMPED ARCHITECTURAL AND ENGINEERED DRAWINGS. FURTHER, COLDSPRING'S WARRANTY DOES NOT APPLY TO ANY PORTION OF THE STRUCTURE DEPICTED IN THESE DRAWINGS THAT IS NOT CONSTRUCTED BY COLDSPRING OR ITS DESIGNATED SUBCONTRACTOR. DISTRIBUTION DATE 1ST APPROVAL 12/5/2022 00 0 LO 0 N N LO L0 Ln OL0 � Z co� U O Z O U CL �c/) oQz U N \c) Lo IJ ° 00 \0 0 U) W N u LLJ W ~ Z Z O Q = � EL U N 00 PROJECT ST. JAMES LAKESIDE COLUMBARIUM LOCATION LOS ALTOS, CA PURCHASER GATE OF HEAVEN CEMETERY DRAWN BY RYAN LANE MATERIAL / FINISH CARNELIAN / POLISH CARNELIAN / DIAMOND 8 DESIGN NUMBER 0145-A © 11/29/2022 COLDSPRING ALL RIGHTS RESERVED DESIGNED BY RYAN HOFFARTH THIS DESIGN IS PROPERTY OF COLDSPRING AND PROTECTED BY APPLICABLE COPYRIGHT LAWS. UNAUTHORIZED USE OR DUPLICATION IS PROHIBITED. JOB NUMBER 1023849 SHEET NUMBER 5