FEIR - Supplemental Text Revisions Memo dated Aug 20181
MEMORANDUM
DATE: August 30, 2018
TO: Piu Ghosh, City of Cupertino
FROM: Judy Shanley and Kristy Weis
SUBJECT: Supplemental Text Revisions to the Vallco Special Area Specific Plan Final
Environmental Impact Report
This memorandum describes changes made to the text of the Final Environmental Impact Report for
the Vallco Special Area Specific Plan (“Final EIR” or “EIR”) following publication of the Final EIR
on August 27, 2018.1
The text revisions include typographical corrections, insignificant modifications, amplifications and
clarifications of the EIR. These text revisions are not considered “significant new information”
pursuant to CEQA Guidelines Section 15088.5 because: (1) the text revisions would not result in a
new environmental impact; (2) the text revisions would not cause a substantial increase in the
severity of an environmental impact; (3) the project sponsor would adopt the revised mitigation
measures, if the measures are selected by the City Council; and (4) the text revisions do not preclude
meaningful public review and comment because they are substantively similar to the previously-
identified measures. Therefore, recirculation of the Draft EIR is not required.
Underlined text represents language that has been added to the EIR; text with strikeout has been
deleted from the EIR.
Final EIR, page 2, Section 2.1, Second paragraph is revised as follows:
The revised project includes 460,000 square feet of commercial uses (including a 60,000 square foot
performing arts theater), 1,750,000 square feet of office uses, 339 hotel rooms, 2,923 residential
units, 35,000 square feet of civic uses (including 10,000 square foot of governmental use and 35,000
25,000 square feet of education space), and a 30-acre green roof. A comparison of the revised
project to the previous project and project alternatives is provided in Table 2.1-1.
1 The Final EIR consists of the May 2018 Draft Environmental Impact Report (“Draft EIR”), the July 2018
Environmental Impact Report Amendment (“EIR Amendment”), and the August 2018 Final EIR.
2
Final EIR, page 32, Standard Permit Condition, 2nd and 3rd bullets, are revised as follows:
• To reduce exterior noise levels to meet the normally acceptable thresholds of 65 dBA CNEL
at multi-family residences or 70 dBA CNEL at commercial uses, locate noise-sensitive
outdoor use areas away from major roadways or other significant sources of noise when
developing site plans. Shield noise-sensitive spaces with buildings or other methods noise
barriers to reduce exterior noise levels. The final detailed design of these measures heights
and limits of proposed noise barriers shall be completed at the time that the final site and
grading plans are submitted.
• The following shall be implemented to reduce interior noise levels to meet the normally
acceptable thresholds of 45 dBA CNEL at multi-family residences or 50 dBA Leq(1-hr) at
commercial uses during hours of operations:
− If future exterior noise levels at residential building facades are between 60 and
65 dBA CNEL, incorporate adequate forced-air mechanical ventilation to reduce
interior noise levels to acceptable levels by closing the windows to control noise.
− If future exterior noise levels at residential building facades exceed 65 dBA
CNEL, forced-air mechanical ventilation systems and sound-rated construction
methods are normally required. Such methods or materials may include a
combination of smaller window and door sizes as a percentage of the total
building façade facing the noise source, sound-rated windows and doors, sound-
rated exterior wall assemblies, and mechanical ventilation so windows may be
kept closed at the occupant’s discretion.
− If the 50 dBA Leq(1-hr) threshold would not be met, other site-specific measures,
such as increasing setbacks of the buildings from the adjacent roadways, or using
shielding by other buildings or noise barriers to reduce noise levels,
implementing additional sound treatments to the building design, etc. shall be
considered to reduce interior noise levels to meet the Cal Green Code threshold.
Final EIR, page 32, Standard Permit Condition, 2nd to last bullet, is revised as follows:
• Outdoor dining areas and playgrounds shall demonstrate that appropriate design and noise
attenuation measures including, but not limited to, increased setbacks and/or noise barriers
have been incorporated to meet the daytime threshold of 65 dBA and the nighttime threshold
of 55 dBA in the City’s Municipal Code at the existing, adjacent residences.
3
MM NOI-1.1: Construction activities under the revised project shall be conducted in accordance
with provisions of the City’s Municipal Code which limit temporary construction work to daytime
hours,2 Monday through Friday. Certain types of construction is are prohibited on weekends and all
holidays pursuant to Municipal Code Sections 10.48.053(B), (C), and (D).3 Further, the City
requires that all equipment have high-quality noise mufflers and abatement devices installed and are
in good condition. Additionally, the construction crew shall adhere to the following construction
best management practices listed in MM NOI-1.2 below to reduce construction noise levels
emanating from the site and minimize disruption and annoyance at existing noise-sensitive receptors
in the project vicinity.
Final EIR, page 34, is revised as follows:
MM NOI-1.3: A qualified acoustical consultant shall be retained for development under the revised
project to review mechanical noise, as these systems are selected, to determine specific noise
reduction measures necessary to ensure noise complies with the City’s noise level requirements.
Mechanical equipment shall be selected and designed to reduce impacts on surrounding uses to meet
the City’s noise level requirements. Noise reduction measures could include, but are not limited to:
• Selection of equipment that emits low noise levels;
• Installation of noise dampening techniques barriers, such as enclosures and parapet walls, to
block the line-of-sight between the noise source and the nearest receptors;
• Locating equipment in less noise-sensitive areas, where feasible.
Final EIR, page 35, is revised as follows:
Impact NOI-2. The revised project would not expose persons to or generation of generate
excessive groundborne vibration.
Final EIR, page 35, is revised as follows:
2 Per Municipal Code Section 10.48.010, daytime is defined as the period from 7:00 AM to 8:00 PM weekdays.
3 Municipal Code Section 10.48.053(B): Notwithstanding Section 10.48.053A, it is a violation of this chapter to
engage in any grading, street construction, demolition or underground utility work within seven hundred fifty feet of
a residential area on Saturdays, Sundays and holidays, and during the nighttime period, except as provided in
Section 10.48.030. Municipal Code Section 10.48.053(C): Construction, other than street construction, is prohibited
on holidays, except as provided in Sections 10.48.029 and 10.48.030. Municipal Code Section 10.48.053(D):
Construction, other than street construction, is prohibited during nighttime periods unless it meets the nighttime
standards of Section 10.48.040.
4
MM NOI-2.1: Where vibration levels due to construction activities under the revised project would
exceed 0.3 in/sec PPV at nearby sensitive uses, development shall:
• Comply with the construction noise ordinance to limit hours of exposure. The City’s Municipal
Code allows construction noise to exceed limits discussed in Section 10.48.040 during daytime
hours. No construction is permitted on Sundays or holidays. Certain types of construction are
prohibited on weekends and all holidays pursuant to Municipal Code Sections 10.48.053(B), (C),
and (D).
• In the event pile driving would be required, all receptors within 300 feet of the project site shall
be notified of the schedule a minimum of one week prior to its commencement. The contractor
shall implement “quiet” pile driving technology (such as pre-drilling of piles, the use of more
than one pile driver to shorten the total pile driving duration, or the use of portable acoustical
barriers), in consideration of geotechnical and structural requirements and conditions.
• To the extent feasible, the project contractor shall phase high-vibration generating construction
activities, such as pile driving/ground-impacting operations, so they do not occur at the same
time with demolition and excavation activities in locations where the combined vibrations would
potentially impact sensitive areas.
• The project contractor shall select demolition methods not involving impact tools, where possible
(for example, milling generates lower vibration levels than excavation using clam shell or chisel
drops).
• The project contractor shall avoid using vibratory rollers and packers near sensitive areas.
• Impact pile driving shall be prohibited within 90 feet of an existing structure surrounding the
project site. Vibratory pile driving shall be prohibited within 60 feet of an existing structure
surrounding the project site.
• Prohibit the use of heavy vibration-generating construction equipment, such as vibratory rollers
or clam shovel, within 20 feet of any adjacent sensitive land use.
• If pile driving is required in the vicinity of vibration-sensitive structures adjacent to the project
site, survey conditions of existing structures and, when necessary, perform site-specific vibration
studies to direct construction activities. Contractors shall continue to monitor effects of
construction activities on surveyed sensitive structures and offer repair or compensation for
damage.
Construction management plans for substantial construction projects, particularly those involving
pile driving, shall include predefined vibration reduction measures, notification requirements for
properties within 200 feet of scheduled construction activities, and contact information for on-site
coordination and complaints.
Final EIR, page 36, is revised as follows:
MM NOI-3.1: Future development under the revised project shall implement available measures to
reduce project-generated noise level increases from project traffic on Perimeter Road. The noise
attenuation measures shall be studied on a case-by-case basis at receptors that would be significantly
impacted. Noise reduction methods could include the following:
• New or larger noise barriers or other noise reduction techniques constructed to protect existing
residential land uses. Final design of such barriers shall be completed during project level
review.
5
• Alternative noise reduction techniques, such as re-paving Perimeter Road with “quieter”
pavement types including Open-Grade Rubberized Asphaltic Concrete. The use of “quiet”
pavement can reduce noise levels by two to five dBA, depending on the existing pavement type,
traffic speed, traffic volumes, and other factors.
• Traffic calming measures to slow traffic, such as speed bumps.
Building sound insulation for affected residences, such as sound-rated windows and doors, on a case-
by-case basis as a method of reducing noise levels in interior spaces.
Final EIR, page 45, is revised as follows:
MM TRN-1.3: A fair-share payment contribution of $3,865,182.00 to improvements identified in
VTA’s VTP 2040 for freeway segments on SR 85, I-280, and I-880 that the project (or project
alternative) significantly impacts shall be paid by future development associated with the revised
project.
The VTA’s VTP 2040 identifies several freeway projects that are relevant to the identified freeway
segment impacts, including:
• VTP ID H1: SR 85 Express Lanes: US 101 (South San José to Mountain View). This project
would convert 24 miles of existing HOV lanes to express lanes, and allow single-occupancy
vehicles access to the express lanes by paying a toll. An additional express lane will be added to
create a two-lane express lane along a portion of the corridor. On November 13, 2017, the cities
of Cupertino and Saratoga and the Town of Los Gatos entered into a settlement agreement4 with
VTA and Caltrans that requires VTA to implement the 2016 Measure B State Route 85 Corridor
Program Guidelines which include preparing a Transit Guideway Study for this corridor to
identify the most effective transit and congestion relief projects on SR 85 that will be candidates
for funding. Upon completion of the study, and implementation plan for these projects will be
developed.
• VTP ID H11: I-280 Express Lanes: Leland Avenue to Magdalena Avenue. This project converts
existing HOV lanes to express lanes.
• VTP ID H13: I-280 Express Lanes: Southbound El Monte Avenue to Magdalena Avenue. This
project builds new express lanes.
• VTP ID H15: I-880 Express Lanes: US 101 to I-280. This project would build new express lanes
on I-880.
• VTP ID H35: I-280 Northbound: Second Exit Lane to Foothill Expressway. This project
constructs a second exit lane from northbound I-280 to Foothill Expressway.
• VTP ID H45: I-280 Northbound Braided Ramps between Foothill Expressway and SR 85: This
project would conduct preliminary engineering, environmental studies, and design to widen the
existing off-ramp to Foothill Expressway from Northbound I-280 from a single-lane exit to a
two-lane exit opening at I-280.
4 As part of the Settlement Agreement, City of Saratoga, et al. v. California Department of Transportation, et al.
(Santa Clara County Superior Court Case No. 115CV281214), which was a suit by the three cities challenging
Caltrans’s approval of the State Route 85 Express Lanes Project, was dismissed on November 17, 2017.
6
Final EIR, page 47, is revised as follows:
MM TRN-2.5: Intersections 43-45, Contribute a fair-share of $96,000.00 to a traffic signal timing
study and implementation of the revised timings on Stevens Creek Boulevard at Stern Avenue,
Calvert Drive, and Agilent Driveway. The revised project impacts would likely improve with
modifications to the signal timings as traffic volumes change, but the impact is concluded to be
significant and unavoidable because the effectiveness of the improvement would be determined
through the signal timing study and because the intersection is under the jurisdiction of another
agency and the City cannot guarantee the implementation of the signal timing study. (Significant
and Unavoidable Impact with Mitigation Incorporated)
MM TRN-2.6: Intersection 48, Lawrence Expressway/Homestead Road: Pay a fair-share
contribution of $291,000.00 to the near-term improvement identified in the Santa Clara County’s
Expressway Plan 2040 Study for this intersection. The Expressway Plan 2040 Study identifies a
near-term improvement of an additional eastbound through lane on Homestead Road. With this
improvement, intersection operations would improve, but the intersection would continue to operate
at LOS F with delays greater than under background conditions.
The ultimate improvement identified by the County’s Expressway Plan 2040 is to grade-separate the
intersection. That is a long-term improvement, however, which would not be implemented within
the next 10 years. Therefore, the impact is considered significant and unavoidable. (Significant and
Unavoidable Impact with Mitigation Incorporated)
MM TRN-2.6: Intersection 48, Lawrence Expressway/Homestead Road: Pay a fair-share
contribution of $219,000.00 to the near-term improvement identified in the Santa Clara County’s
Expressway Plan 2040 Study for this intersection. The Expressway Plan 2040 Study identifies a
near-term improvement of an additional eastbound through lane on Homestead Road. With this
improvement, intersection operations would improve, but the intersection would continue to
operate at LOS F with delays greater than under background conditions.
The ultimate improvement identified by the County’s Expressway Plan 2040 is to grade-separate
the intersection. That is a long-term improvement, however, which would not be implemented
within the next 10 years. Furthermore, the improvement is under the jurisdiction of another
agency and the City cannot guarantee its implementation. Therefore, the impact is considered
significant and unavoidable. (Significant and Unavoidable Impact with Mitigation
Incorporated)
MM TRN-2.7: Intersection 51, Lawrence Expressway/Calvert Drive-I-280 Southbound Ramp:
Improvements to mitigate the impact would include providing a fourth northbound through lane (for
a total of four through lanes and one right-turn lane). This would require four receiving lanes north
of Calvert Drive-I-280 Southbound Ramps. With this improvement, the intersection would operate
at acceptable LOS E or better. The widening of Lawrence Expressway from three to four lanes in
each direction between Moorpark Avenue to south of Calvert Drive is included in the VTP 2040 as a
constrained project (VTP 2040 Project# X10). The VTP 2040 does not include widening of
7
Lawrence Expressway at or north of Calvert Drive, however. The fourth northbound through lane on
Lawrence Expressway could potentially be provided with an added receiving lane that would connect
directly to the off-ramp to Lawrence Expressway (also known as “trap” lane) just north of the I-280
overcrossing. The City shall coordinate with the County of Santa Clara to and Caltrans to determine
if a fourth through lane could be provided. Future development under the proposed project shall be
required to pay a fair-share contribution of $133,380.00 if the improvement is feasible. The impact
would remain significant and unavoidable because the feasibility of the improvement is yet to be
determined, and because the intersection is within the responsibility and jurisdiction of another
agency and the City cannot guarantee the improvement would be constructed concurrent with the
proposed project. (Significant and Unavoidable Impact with Mitigation Incorporated)
Final EIR, page 48, is revised as follows:
MM TRN-2.8: Intersection 53, Lawrence Expressway/Bollinger Road: Improvements to mitigate
the revised project’s impact would include providing a fourth northbound through lane (for the PM
peak hour impact) and fourth southbound through lane (for the AM peak hour impact). The
widening of Lawrence Expressway from three to four lanes in each direction between Moorpark
Avenue to south of Calvert Drive is included in the VTP 2040 as a constrained project (VTP 2040
Project# X10). This VTA project also includes the provision of an additional westbound through
lane on Moorpark Avenue.
Assuming that both the northbound and southbound approaches would be modified to accommodate
four through lanes, the intersection would operate at or better than acceptable LOS E under the
revised project during the AM and PM peak hours. Future development under the revised project
shall be required to pay a fair-share contribution of $133,380.00 to VTP Project# X10. The impact
would remain significant and unavoidable, however, because the intersection is within the
responsibility and jurisdiction of another agency and the City cannot guarantee the improvement
would be constructed concurrent with the proposed project. (Significant and Unavoidable Impact
with Mitigation Incorporated)
Final EIR, page 49, is revised as follows:
MM TRN-6.1: The VTA’s VTP 2040 identifies the Stevens Creek Bus Rapid Transit project (VTP
ID T4) as an improvement near the project site. Ultimately, the VTP ID T4 would enhance travel
choice for the revised project and make more efficient use of the transportation network. Thus,
future development under the revised project would be required to contribute its fair-share
contribution of $4,832,000.00 to VTP ID T4. However, the impact would remain significant and
unavoidable because the implementation of the VTP projects are within the responsibility and
jurisdiction of another agency and the City cannot guarantee the improvement would be implemented
concurrent with the revised project. (Significant and Unavoidable Cumulative Impact with
Mitigation Incorporated)
8
Final EIR, page 50, is revised as follows:
MM TRN-7.5: Intersection 23, Wolfe Road/Fremont Avenue: Provide a dedicated southbound right-
turn lane from Wolfe Road onto westbound Fremont Avenue. This would improve intersection delay
to lower than cumulative conditions under the revised project. Thus, the impact would be mitigated
to a less than significant level.
The City of Sunnyvale recently approved improvements to the “Triangle” area of Wolfe Road/El
Camino Real, Wolfe Road/Fremont Avenue, and El Camino Real/Fremont Avenue. The “Triangle”
improvements include the provision of a southbound right-turn lane from Wolfe Road to Fremont
Avenue. Thus, future development under the revised project would be required to contribute their
fair-share contribution of $527,000.00 to the “Triangle” improvement project. However, the impact
would remain significant and unavoidable because the intersection is within the responsibility and
jurisdiction of another agency and the City cannot guarantee the improvement would be constructed
concurrent with the proposed project. (Significant and Unavoidable Cumulative Impact with
Mitigation Incorporated)
Final EIR, page 51, is revised as follows:
MM TRN-7.10: Intersection 48, Lawrence Expressway/Homestead Road: Implement MM TRN-
2.6. As discussed under MM TRN-2.6, the revised project shall pay a fair-share contribution of
$291,000.00 to the long-term improvement identified in the Santa Clara County’s Expressway Plan
2040 Study for this intersection. The impact would remain significant and unavoidable, however,
because the intersection is within the responsibility and jurisdiction of another agency and the City
cannot guarantee the improvement would be constructed concurrent with the proposed project.
(Significant and Unavoidable Cumulative Impact with Mitigation Incorporated)
MM TRN-7.13: Intersection 60, Stevens Creek Boulevard/Cabot Avenue: Contribute a fair-share
contribution of $23,000.00 to a traffic signal timing study and implementation of the revised timings
on Stevens Creek Boulevard at Cabot Avenue. The revised project impact would likely improve
with modifications to the signal timings as traffic volumes change. The impact would be significant
and unavoidable, however, because the effectiveness of the improvement would be determined
through the signal timing study and because the intersection is within the responsibility and
jurisdiction of another agency and the City cannot guarantee the implementation of the signal timing
study. (Significant and Unavoidable Cumulative Impact with Mitigation Incorporated)
Final EIR, page 53, Conditions of Approval, first bullet is revised as follows:
• To ensure neighborhood cut-through traffic and parking intrusion are minimized, future
development under the revised project shall fund neighborhood cut-through traffic
monitoring studies and provide fees in the amount of $500,000 to the City of Cupertino,
$150,000 to the City of Santa Clara, and $250,000 to the City of Sunnyvale to monitor and
implement traffic calming improvements and a residential parking permit program to
9
minimize neighborhood cut-through traffic and parking intrusion, if determined to be needed
by the respective City’s Public Works Department. The details of the neighborhood parking
and traffic intrusion monitoring program shall be determined when the conditions of approval
for project development are established. The monitoring program shall include the following
components: (1) identifying the monitoring areas (roadways where the monitoring would
occur), (2) setting baseline conditions (such as, number of parked vehicles and traffic
volumes on the roadways), (3) determining thresholds for parking and traffic volume
increases requiring action, (4) establishing the monitoring schedule, and (5) creating
reporting protocols. The baseline conditions shall be established prior to but within one year
of initial occupancy. Monitoring shall then occur annually for five years.
Final EIR, page 55, is revised as follows:
MM UTIL-2.3: No certificates of occupancy building permits shall be issued by the City for
structures or units that would result in the permitted peak wet weather flow capacity of 13.8 mgd
through the Santa Clara sanitary sewer system being exceeded. The estimated sewage generation by
the revised project shall be calculated using the sewer generation rates used by the San Jose - Santa
Clara Water Pollution Control Plant Specific Use Code & Sewer Coefficient table, and from the City
of Santa Clara Sanitary Sewer Capacity Assessment, May 2007,5 unless alternative (i.e., lower)
sewer generation rates achieved by future development are substantiated by the developer based on
evidence to the satisfaction of the CuSD.
5 The average dry weather sewerage generation rates used by the San Jose - Santa Clara Water Pollution Control
Plant Specific Use Code & Sewer Coefficient table, and the City of Santa Clara Sanitary Sewer Capacity
Assessment, May 2007, for the different uses within the project are as follows: High Density Residential = 121
gpd/unit; Commercial/Retail = 0.076 gpd/SF; Commercial/Restaurant = 1.04 gpd/SF; Office = 0.1 gpd/SF;
Hotel = 100 gpd/Room; Civic Space (office) = 0.21 gpd/SF; Adult Education = 15 gpd/Person; and Civic Space
(Auditorium) = 0.11 gpd/SF.