HomeMy WebLinkAboutAH 04-20-2023 Searchable PacketCITY OF CUPERTINO
ADMINISTRATIVE HEARING
AGENDA
10300 Torre Avenue, City Hall Conference Room C
Thursday, April 20, 2023
5:00 PM
ROLL CALL
APPROVAL OF MINUTES
1.Subject: Approve the February 23 Administrative Hearing Minutes
Recommended Action: Approve the February 23 Administrative Hearing Minutes
1 - Draft Minutes
POSTPONEMENTS
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the Committee on any matter
within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3)
minutes. In most cases, State law will prohibit the Commission from making any decisions with respect
to a matter not on the agenda.
PUBLIC HEARINGS
2.Subject: Consider an Architectural and Site Approval permit application for a new
7,407 square foot surface parking lot and tree removal permit to transplant 3 trees, and
the removal and replacement of 8 trees at The Hamptons Apartment Homes and a
Categorical Exemption under the California Environmental Quality Act (CEQA).
(Application No(s).: ASA-2022-007, TR-2022-034; Applicant: Blair Evans (ima) on behalf
of Irvine Apartment Communities, L.P; Location: 19500 Pruneridge Avenue; APN(s):
316-06-058)
Recommended Action: Staff recommends that the Hearing Officer, in accordance with
the Draft Resolutions:
1. Find the actions exempt from CEQA and approve the Architectural and Site
Approval, ASA-2022-007, and
2. Approve the Tree Removal Permit, TR-2022-034
Staff Report
1 - Draft Resolution ASA-2022-007
2 - Draft Resolution TR-2022-034
3 - Project Plans (abridged due to limitations of state law pursuant to SB1214)
Page 1
AH 04/20/2023
1 of 35
Administrative Hearing Agenda April 20, 2023
OLD BUSINESS
NEW BUSINESS
STAFF AND COMMITTEE REPORTS
FUTURE AGENDA SETTING
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this
meeting who is visually or hearing impaired or has any disability that needs special assistance should
call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for
assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and
writings distributed for the meeting that are public records will be made available in the appropriate
alternative format.
Any writings or documents provided to a majority of the members after publication of the agenda will
be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at
10300 Torre Avenue, Cupertino, California 95014, during normal business hours.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section
2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff
concerning a matter on the agenda are included as supplemental material to the agendized item. These
written communications are accessible to the public through the City’s website and kept in packet
archives. Do not include any personal or private information in written communications to the City
that you do not wish to make public, as written communications are considered public records and will
be made publicly available on the City website.
Members of the public are entitled to address the members concerning any item that is described in the
notice or agenda for this meeting, before or during consideration of that item. If you wish to address the
members on any other item not on the agenda, you may do so during the public comment.
Page 2
AH 04/20/2023
2 of 35
CITY OF CUPERTINO
Agenda Item
23-12211 Agenda Date: 4/20/2023
Agenda #: 1.
Subject: Approve the February 23 Administrative Hearing Minutes
Approve the February 23 Administrative Hearing Minutes
CITY OF CUPERTINO Printed on 4/13/2023Page 1 of 1
powered by Legistar™
AH 04/20/2023
3 of 35
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
(408) 777-3308
MINUTES OF THE ADMINISTRATIVE HEARING REGULAR MEETING
HELD FEBRUARY 23, 2023
CALL TO ORDER
Hearing officer Luke Connolly opened the meeting at 5:06 p.m. Meeting was held via teleconference
with no physical location.
ROLL CALL
Staff present: Luke Connolly, Acting Community Development Director
Gian Martire, Senior Planner
Emi Sugiyama, Associate Planner
Cyrah Caburian, Administrative Assistant
Outside attendee(s): Aditi Mukherjee, Applicant
Suejane Han, Property Owner
APPROVAL OF MINUTES
1. Subject: Approve the February 9 Administrative Hearing meeting minutes
Recommended Action: Approve the February 9 Administrative Hearing meeting minutes
Minutes of the February 9 meeting were approved as written.
POSTPONEMENTS – None
ORAL COMMUNICATIONS
Jennifer Griffin spoke about City Council proposals to dissolve the Design Review and Environmental
Review Committees and concerns on limitations sharing SB1214 copyrighted plans.
WRITTEN COMMUNICATIONS – None
CONSENT CALENDAR – None
PUBLIC HEARINGS
2. Subject: Subdivision of one 18,000-square-foot lot into two lots of roughly equal size, and permits to
allow the construction of two, two-story single-family residences. (Application No.(s): TM-2021-001, R-
2021-014, & R-2021-015; Applicant: Aditi Mukherjee; Location: 7752 Orion Lane; APN(s): 362-18-008)
Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachment 1 & 2) to:
1. Find the actions exempt from the California Environmental Quality Act (“CEQA”); and
2. Approve the Tentative Parcel Map (TM-2021-001); and
3. Approve the Two-Story Permits (R-2021-014 and R-2021-015).
AH 04/20/2023
4 of 35
2
Staff member Sugiyama provided presentation and brief overview of proposed subdivision. The
applicant’s proposal includes conditions for privacy plantings and no balconies would be installed.
Project was found to be consistent with Municode regulations.
One written communication was received for this item and forwarded to Hearing officer and staff.
Member of the public, Jennifer Griffin, supported project and asked about where in the parcel property
the gas tank was located. Staff member Sugiyama responded gas tank was located on parcel A of
property, and has not been in use since the 1980’s; condition of approval requires environmental
approval if moved.
Member of the public, caller 2417, asked that the properties be moved closer to Orion lane and allow for
continuous sunlight for the backyard neighbors. Staff member Sugiyama responded that sunlight would
not be blocked.
Hearing officer concurred with Staff’s findings.
DECISION: The application and draft resolutions were approved by the Hearing Officer.
OLD BUSINESS – None
NEW BUSINESS – None
STAFF UPDATES AND COMMISSION REPORTS – None
FUTURE AGENDA – None
ADJOURNMENT:
The meeting was adjourned at 5:25 p.m. to the next regularly scheduled meeting.
Respectfully submitted:
/s/Cyrah Caburian___
Cyrah Caburian
Administrative Assistant
AH 04/20/2023
5 of 35
CITY OF CUPERTINO
Agenda Item
23-12210 Agenda Date: 4/20/2023
Agenda #: 2.
Subject: Consider an Architectural and Site Approval permit application for a new 7,407 square foot
surface parking lot and tree removal permit to transplant 3 trees, and the removal and replacement of
8 trees at The Hamptons Apartment Homes and a Categorical Exemption under the California
Environmental Quality Act (CEQA). (Application No(s).: ASA-2022-007, TR-2022-034; Applicant:
Blair Evans (ima) on behalf of Irvine Apartment Communities, L.P; Location: 19500 Pruneridge
Avenue; APN(s): 316-06-058)
Staff recommends that the Hearing Officer, in accordance with the Draft Resolutions:
1. Find the actions exempt from CEQA and approve the Architectural and Site Approval, ASA-
2022-007, and
2. Approve the Tree Removal Permit, TR-2022-034
CITY OF CUPERTINO Printed on 4/13/2023Page 1 of 1
powered by Legistar™
AH 04/20/2023
6 of 35
ADMINISTRATIVE HEARING STAFF REPORT
Meeting Date: April 20, 2023
Subject
Consider an Architectural and Site Approval permit application for a new 7,407 square
foot surface parking lot and tree removal permit to transplant 3 trees, and the removal
and replacement of 8 trees at The Hamptons Apartment Homes and a Categorical
Exemption under the California Environmental Quality Act (CEQA). (Application No(s).:
ASA-2022-007, TR-2022-034; Applicant: Blair Evans (ima) on behalf of Irvine Apartment
Communities, L.P; Location: 19500 Pruneridge Avenue; APN(s): 316-06-058)
Recommended Action
Staff recommends that the Hearing Officer, in accordance with the Draft Resolutions,
(Attachment 1 and 2):
1. Find the actions exempt from CEQA and approve the Architectural and Site
Approval, ASA-2022-007, and
2. Approve the Tree Removal Permit, TR-2022-034
Discussion
Project Data:
General Plan Land Use
Designation
High Density Residential (>35 DU/Ac.)
General Plan Special Area North Vallco Gateway Subarea within the North
Vallco Special Area
Zoning Designation P(Res)-70
Lot Size 12.5 net acres (no change)
Consistency with General Plan Yes
Consistency with Zoning Yes
Environmental Assessment Categorically Exempt per Section 15301of the
California Environmental Quality Act (CEQA)
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org
AH 04/20/2023
7 of 35
Project location
The property Hamptons Apartment
Homes is located north of I-280
freeway at the southeast corner of
north Wolf Road and Pruneridge
Avenue, adjacent to the Apple Park
campus.
Application Summary
The applicant, Irvine Apartment
Communities, L.P., is requesting to
add twenty-one (21) new parking
stalls, along with associated
improvements, on site to serve the
existing apartment complex (see
Figure 1 for location of project area).
Background
The subject property is zoned planned development community and was developed
under use permit U-1996-14 as a 342-unit apartment complex, that is still in use today.
The development was approved with a parking count of 669 stalls, with a condition of
approval that the parking count may be reduced below the approved number by no more
than ten (10) spaces to protect the redwood stand at the southwest corner of the site. The
apartment complex was eventually developed with 659 parking stalls— provided on site
and via a recorded access easement, located at the southernmost tip of the prop erty
immediately east of the site. In 2013, when the adjacent property was developed as part
of the Apple Park development1, this easement was vacated, and the Hamptons
development lost access to fifty-three (53) parking stalls used by Hamptons Apartment
Homes (see Figure 1 above). The development continued to provide 607 parking spaces
to serve the 342-unit apartment complex.
Analysis
Architectural and Site Approval
The proposed parking lot will be located along the eastern property line that abuts Apple
Campus 2—and is approximately 200 feet south of Pruneridge Avenue in an area that
contains approximately thirty-one (31) trees but is otherwise undeveloped (See
1 https://s3.amazonaws.com/apple-campus2-project/Site_Plan2_Submittal7.pdf , Page 1, keynote 59 in “Easement
Disposition Table” from 2013 Site Plan & Landscaping-Part 2.
Figure 1: Proposed site plan showing the location of the surface
parking lot (Red Star). The approximate location of the vacated access
easement has been indicated with red shading.
N.
Wo
l
f
e Ro
a
d
AH 04/20/2023
8 of 35
ASA-2022-007, TR-2022-034 The Hamptons Apartment Homes—Parking Improvement April 20, 2023
Page 3
Attachment 3).2 The project proposes removal of five (5) existing uncovered parking stalls
to provide access to the new parking lot (see blue outline in Figure 2). The new parking
lot will provide twenty (20) uncovered parking stalls. An additional six (6) uncovered
parking stalls will be
created outside the
proposed parking lot—
three (3) along the
existing drive aisle (see
red shaded area in Figure
2) and three (3) abutting
an existing carport (see
red rectangle near top of
Figure 2).
Conditions of approval
require the following
amendments to comply
with the City’s Public Works Department’s standard details for parking lots and
Municipal Code Chapter 19.124:
1. Modify drive aisle width in the new parking lot to be 24 feet. This can be achieved
by restriping the proposed parking stall depths to a minimum 18-foot length. The
Municipal Code allows a 2-foot overhang into landscaped areas to achieve the
required 20-foot stall depth.
2. Wheel stops shall be provided at the rate of one for every two spaces (i.e. they can
be shared between two spaces).
Additional improvements to the site would include removal and replacement of existing
pole lighting with shielded pole lighting fixtures, new landscaped parking islands, new
stormwater trash capture system, biotreatment planter, landscaping, and irrigation.
The new parking areas will not be visible from the public right-of-way. The planting will
serve as a continuation of the existing planting in the apartment complex rather than new
planting. The only change to the planting palette is a low water replacement – from the
Trachelospermum asiaticum (Star Jasmine) to the Carissa macrocarpa 'Green Carpet'
2 Due to limitations of state law ((Government Code § 65103.5 (SB 1214)), the distribution of copyrighted
material associated with the review of development projects is limited. Plans have been emailed under
separate cover to allow the decision makers to review the proposed plans. Decision makers, including but
not limited to, Commissioners and Councilmembers, cannot share plans with outside parties, including
community members. The public is able to make an appointment with the Planning Division to view these
plans at City Hall.
Figure 2: Locations of the proposed parking improvements (within red and blue boxes
and shaded areas)
AH 04/20/2023
9 of 35
ASA-2022-007, TR-2022-034 The Hamptons Apartment Homes—Parking Improvement April 20, 2023
Page 4
(Green Carpet Natal Plum). A proposed mixture of native and adaptive native trees,
shrubs and ground covers are proposed within the new landscaped areas and bio-
retention basin. The project scope includes an eighty-nine (89) percent low water use
planting schedule—exceeding the landscape ordinance eighty (80) percent requirement.
Tree Removal Permit
Thirty-one (31) trees, representing five species of which only two species are California
native, were assessed. Overall, 16 trees were in good condition, 11 were in fair condition,
and four were in poor condition. Eight (8) trees have been identified for removal and
replacement within areas of the proposed improvement. Of the eight trees, none are
California native species, and eighty percent (80) were rated as in either fair or poor
condition.
Three (3) redwood trees have been proposed to be transplanted on site. The arborist has
assessed a high vitality rating for the transplanted redwood trees due to a combination
of age and high endurance to root severance and general construction impacts. The
redwood trees will follow the procedures outlined in the arborist report for transplanting
trees by boxing. The draft resolution includes a condition of approval that the trees be
side boxed further to increase the odds of the trees survival as recommended in the
arborist report. Each tree has been reviewed and a recommendation has been made to
either protect in place, transplant, or remove and replace with a like sized tree.
The City’s consultant arborist has conducted site visits, reviewed the preservation
measures, and found the applicant’s proposal acceptable and consistent with current
urban forestry standards. Conditions of approval would require regular inspections and
reporting by a ISA certified arborist to ensure the trees are in good condition through
construction and final reports after transplantation are required to verify that the trees
were transplanted according to the transplantation plan. Additionally, conditions have
been added to the draft Tree Removal Permit Resolution that require that any tree
removed and any side boxed tree that dies, reflect the replacement standards mandated
in CMC 14.18.160 Tree Replacement.
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15301 Class 1, categorical exemption
allows for minor alteration of existing public or private facilities or topographical
features, involving negligible or no expansion of existing or former use. The project
proposes a new paved surface parking lot, providing twenty-one (21) net new parking
spaces and will supplement the loss of approximately fifty (50) parking stalls that were
originally apart of the use permit. The supplemental parking will bring the site closer to
AH 04/20/2023
10 of 35
ASA-2022-007, TR-2022-034 The Hamptons Apartment Homes—Parking Improvement April 20, 2023
Page 5
compliance with the original use permit and would not be considered an expansion of
use. The project is located in an area developed with commercial and residential uses,
maintaining access to public services and facilities. Furthermore, the project is not located
in an environmentally sensitive area.
Other Department/Agency Review
The City’s Building Division, Environmental Programs Division, Public Works
Department and the Santa Clara County Fire Department have no objections to the
project.
Public Noticing
A summary of noticing on the project is presented in the table below:
Notice of Public Hearing, Site Notice &
Legal Ad
Agenda
Site Signage (14 days prior to the
hearing). Sign Posted: April 5th, 2023
Noticing to neighbors within 300’
radius (10 days prior to the hearing):
Notices Mailed: April 7, 2023
Posted on the City's official notice
bulletin board (one week prior to the
hearing)
Posted on the City of Cupertino’s
Website
Public Comments
As of the publishing of this report, no comments have been received.
Conclusion
Staff recommends approval of the Architectural and Site Approva l permit and Tree
Removal Permit, since the plans and conditions of approval address all concerns related
to the proposed project. Additionally, all applicable findings for approval of the proposed
project, consistent with chapters 19.168 and 14.18 of the Cupertino Municipal Code, may
be made as follows:
Architectural and Site Approval
1. The proposed development, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety, general welfare, or convenience;
The applicant proposes to add a 7,407 square foot surface parking lot within the 12.5-acre site.
The paving will be at grade and not visible from neighboring properties. All the proposed
changes are minor improvements to the existing site and will not be detrimental or injurious
to property or improvements in the vicinity.
AH 04/20/2023
11 of 35
ASA-2022-007, TR-2022-034 The Hamptons Apartment Homes—Parking Improvement April 20, 2023
Page 6
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any
specific plan, zoning ordinances, applicable planned development permit, conditional
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following specific
criteria:
The proposal complies with the General Plan. The proposal with the modifications that are
required as conditions of approval will comply with the City’s adopted standards and
Municipal Code.
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
There are no changes to existing buildings on site—the surface parking structure will be
at grade and is uncovered. No other height or scale modifications are proposed that will
impact the existing massing.
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments and
provide shielding to prevent spill-over light to adjoining property owners.
The proposed structure will not be visible from neighboring properties or the Public right-
of-way. Existing mature trees are proposed to be retained, and or relocated on site. New
landscaping has been proposed around the parking areas and will blend seamlessly with the
existing planting schedule. Outdoor lighting incorporates appropriate shielding and is
designed to meet the dark-sky requirements of the Municipal Code.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
At this point, no signs are approved as part of this project.
AH 04/20/2023
12 of 35
ASA-2022-007, TR-2022-034 The Hamptons Apartment Homes—Parking Improvement April 20, 2023
Page 7
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
This application is not a new project and will maintain the existing buffering and setbacks
established adjacent to the existing residential neighborhoods.
Tree Removal Permit
1. That the location of the trees restricts the economic enjoym ent of the property by
severely limiting the use of property in a manner not typically experienced by owners
of similarly zoned and situated property, and the applicant has demonstrated to the
satisfaction of the approval authority that there are no reason able alternatives to
preserve the tree(s).
The applicant’s and the City’s consultant arborists have found that the area in which the
structure will be located cannot maintain the trees as they are currently planted. Tree
replacements, as well as side boxing healthy trees for replanting, have been conditioned into
the project.
Next Steps
The permit will be effective 14 calendar days from the date of the hearing. The decision
of the Administrative Hearing Officer is final, unless appealed within 14 calendar days
from the date of the hearing. The applicant team may apply for building and/or other
permits with the City at the end of the appeal period.
This approval is valid until April 20, 2025. The applicant may apply for a one-time two-
year extension before the approval expires.
Prepared by: Danielle Condit, Associate Planner
Reviewed and Approved for Submission by: Piu Ghosh, Planning Manager
ATTACHMENTS
1. Draft Resolution ASA-2022-007
2. Draft Resolution TR-2022-034
3. Project Plans (abridged due to limitations of state law pursuant to SB1214)
AH 04/20/2023
13 of 35
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION 139
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO APPROVING AN ARCHITECTURAL AND SITE
APPROVAL PERMIT TO ALLOW A NEW 7,407 SQUARE FOOT
SURFACE PARKING LOT AT THE HAMPTONS APARTMENT
HOMES LOCATED AT 19500 PRUNERIDGE AVENUE
SECTION I: PROJECT DESCRIPTION
Application No.: ASA-2022-007
Applicant: Irvine Apartment Communities, L.P.
Location: 19500 Pruneridge Avenue; APN: 316-06-058
SECTION II: FINDINGS
WHEREAS, the City of Cupertino received an application for an Architectural and Site
Approval to consider allowing a new 7,407 square foot surface parking lot at the
Hamptons Apartment Homes, as described in Section I. of this Resolution; and
WHEREAS, the necessary public notices have been given as required by the Cupertino
Municipal Code, and the Administrative Hearing Officer has held at least one public
meeting with regard to the application; and
WHEREAS, pursuant to the provisions of the California Environmental Quality Act of
1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State
CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.)
(hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed
Project and has determined that the Project is exempt from environmental review
pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons
set forth in the staff report dated April 20, 2023 and incorporated herein; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
AH 04/20/2023
14 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 2
1. The proposal, at the proposed location, will not be detrimental or injurious to property
or improvements in the vicinity, and will not be detrimental to the public health ,
safety, general welfare, or convenience;
The applicant proposes to add a 7,407 square foot square foot surface parking lot within the
12.5-net acre Hamptons Apartment Homes. The surface parking lot will be paved at grade
and not likely visible from neighboring properties. All the proposed changes are minor
improvements to the existing site and will not be detrimental or injurious to property or
improvements in the vicinity.
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any
specific plan, zoning ordinances, applicable planned development permit, conditional
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following spec ific
criteria:
The proposal complies with the General Plan. The proposal with the modifications that are
required as conditions of approval will comply with the City’s adopted standards and
Municipal Code.
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
There are no changes to existing buildings on site—the surface parking structure will be
at grade and is uncovered. No other height or scale modifications are proposed that will
impact the existing massing.
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees sho uld
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments and
provide shielding to prevent spill-over light to adjoining property owners.
The proposed structure will not be visible from neighboring properties or the public right-
of-way. Existing mature trees are proposed to be retained, and or relocated on site. New
AH 04/20/2023
15 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 3
landscaping has been proposed around the parking areas and will blend seamlessly with the
existing planting schedule. Outdoor lighting incorporates appropriate shielding and is
designed to meet the dark-sky requirements of the Municipal Code.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
At this point, no signs are approved as part of this project.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
This application is not a new project and will maintain the existing buffering and setbacks
established adjacent to the existing residential neighborhoods.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 3 thereof,
The application for an Architectural and Site Approval, Application no. ASA-2022-007 is
hereby approved and that the subconclusions upon which the findings and conditions
specified in this resolution are based and contained in the Public Meeting record
concerning Application no. ASA-2022-007 as set forth in the Minutes of the
Administrative Hearing Meeting of April 20, 2023 and are incorporated by reference as
though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by ima titled “The Hampton Apartment
Homes” consisting of twenty-eight (28) sheets labeled L-001 thru L-1203, C1 thru C4,
and E-1 thru E-8, except as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
AH 04/20/2023
16 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 4
property size, building square footage, any relevant easements and/or
construction records. Any misrepresentation of any property data may invalidate
this approval and may require additional review.
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. U-1996-14 and TR-2022-034 shall
be applicable to this approval.
4. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on
the first page of the building plans.
5. SURFACE PARKING LOT
The new surface parking lot shall conform with the Department of Public Works
City of Cupertino Standard Detail document. In the building permit submittal, the
applicant shall provide a revised site plan demonstrating compliance the
minimum two-way drive aisle width of 24’. Parking stall length may be decreased
by up to two feet but must provide an equivalent vehicle overhang into
landscaped areas. The Landscaping Plan must be revised, prior to issuance of
building permits, in a manner to indicate that proposed landscaping does not
conflict with the vehicle overhang.
6. WHEEL STOPS
Concrete wheel stops shall be placed on top of the flat curb and shall be provided
at a rate of one per two stalls.
7. SIGNAGE
Signage is not approved with this application. Signage shall conform to the City
Sign Code.
8. DEMOLITION REQUIREMENTS
All demolished site materials shall be recycled to the maximum extent feasible
subject to the Building Official. The applicant shall provide evidence that materials
were recycled prior to occupancy.
9. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies
with regard to the proposed project for additional conditions and requirements.
Any misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
AH 04/20/2023
17 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 5
10. DARK SKY COMPLIANCE
Prior to issuance of Building Permits, the applicant/property owner shall submit
final plans in compliance with the approved lighting plans to comply with
development standards of Cupertino Municipal Code Section 19.102.040 Outdoor
Lighting Requirements. In the event changes are proposed from the approved
plans, said changes must be reviewed and approved by the Director of
Community Development or their designee. The applicant shall provide all
documentation required to determine compliance with the Municipal Code.
11. FUGITIVE DUST CONTROL
Prior to issuance of the any demolition, grading, or building permit, include on all
permit plans, the full text of each of the Bay Area Air Quality Management
District’s Basic Control Measures from the latest version of BAAQMD’s CEQA Air
Quality Guidelines, as subsequently revised, supplemented, or replaced, to
control fugitive dust (i.e., particulate matter PM2.5 and PM10) during demolition,
ground disturbing activities and/or construction.
12. AVOID NESTING BIRDS DURING CONSTRUCTION
Prior to issuance of the any demolition, grading and building permit, indicate the
following on all construction plans:
a. Demolition, construction, ground-disturbing, and tree removal/pruning
activities shall be scheduled to be completed prior to nesting season (February
1 through August 31), if feasible.
b. If demolition, construction, ground-disturbing, or tree removal/pruning
activities occur during the nesting season (February 1 and August 31),
preconstruction surveys shall be conducted as follows:
i. No more than 7 days prior to the start of demolition, construction, ground -
disturbing, or tree removal/pruning activities, in order to identify any
active nests with eggs or young birds on the site and surrounding area
within 100 feet of construction or tree removal activities.
ii. Preconstruction surveys shall be repeated at 14-day intervals until
demolition, construction, ground-disturbing, or tree removal/pruning
activities have been initiated in the area, after which surveys can be
stopped. As part of the preconstruction survey(s), the surveyor shall inspect
all trees and other possible nesting habitats in, and immediately adjacent
to, the construction areas for active nests, while ensuring that they do not
disturb the nests as follows:
1) For projects that require the demolition or construction one single-
family residence, ground disturbing activities affecting areas of up to
500 square feet, or the removal of up to three trees, the property owner
AH 04/20/2023
18 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 6
or a tree removal contractor, if necessary, is permitted to co nduct the
preconstruction surveys to identify if there are any active nests. If any
active nests with eggs or young birds are identified, the project applicant
shall retain a qualified ornithologist or biologist to identify protective
measures.
2) For any other demolition, construction and ground disturbing activity
or the removal of four or more trees, a qualified ornithologist or
biologist shall be retained by the project applicant to conduct the
preconstruction surveys.
iii. If the preconstruction survey does not identify any active nests with eggs
or young birds that would be affected by demolition, construction, ground-
disturbing or tree removal/pruning activities, no further mitigating action
is required. If an active nest containing eggs or young birds is found
sufficiently close to work areas to be disturbed by these activities, their
locations shall be documented, and the qualified ornithologist or biologist
shall identify protective measures to be implemented under their direction
until the nests no longer contain eggs or young birds.
iv. Protective measures may include, but are not limited to, establishment of
clearly delineated exclusion zones (i.e., demarcated by identifiable fencing,
such as orange construction fencing or equivalent) around each nest
location as determined by the qualified ornithologist or biologist, taking
into account the species of birds nesting, their tolerance for disturbance and
proximity to existing development. In general, exclusion zones shall be a
minimum of 300 feet for raptors and 75 feet for passerines and other birds.
The active nest within an exclusion zone shall be monitored on a weekly
basis throughout the nesting season to identify signs of disturbance and
confirm nesting status. The radius of an exclusion zone may be increas ed
by the qualified ornithologist or biologist, if project activities are
determined to be adversely affecting the nesting birds. Exclusion zones may
be reduced by the qualified ornithologist or biologist only in consultation
with California Department of Fish and Wildlife. The protection measures
and buffers shall remain in effect until the young have left the nest and are
foraging independently or the nest is no longer active.
v. A final report on nesting birds and raptors, including survey methodology,
survey date(s), map of identified active nests (if any), and protection
measures (if required), shall be prepared by the qualified ornithologist or
biologist and submitted to the Director of Community Development or his
or her designee, through the appropriate permit review process (e.g.,
demolition, construction, tree removal, etc.), and be completed to the
AH 04/20/2023
19 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 7
satisfaction of the Community Development Director prior to the start of
demolition, construction, ground-disturbing, or tree removal/pruning
activities.
13. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES
Prior to the issuance of any demolition, grading or building permit involving soil
disturbance, the project applicant shall provide written verification, including the
materials provided to contractors and construction crews, to the City confirming
that contractors and construction crews have been notified of basic archaeological
site indicators, the potential for discovery of archaeological resources, laws
pertaining to these resources, and procedures for protecting these resources as
follows:
a. Basic archaeological site indicators that may include, but are not limited to,
darker than surrounding soils of a friable nature; evidence of fires (ash,
charcoal, fire affected rock or earth); concentrations of stone, bone, or shellfish;
artifacts of stone, bone, or shellfish; evidence of living surfaces (e.g., floors);
and burials, either human or animal.
b. The potential for undiscovered archaeological resources or tribal cultural
resources on site.
c. The laws protecting these resources and associated penalties, including, but
not limited to, the Native American Graves Protection and Repatriation Act of
1990, Public Resources Code Section 5097, and California Health and Safety
Code Section 7050 and Section 7052.
d. The protection procedures to follow should construction crews discover
cultural resources during project-related earthwork, include the following:
i. All soil disturbing work within 25 feet of the find shall cease.
ii. The project applicant shall retain a qualified archaeologist to provide and
implement a plan for survey, subsurface investigation, as needed, to define
the deposit, and assessment of the remainder of the site within the project
area to determine whether the resource is significant and would be affected
by the project.
iii. Any potential archaeological or tribal cultural resources found during
construction activities shall be recorded on appropriate California
Department of Parks and Recreation forms by a qualified archaeologist. If
the resource is a tribal cultural resource, the consulting archaeologist shall
consult with the appropriate tribe, as determined by the Native American
Heritage Commission, to evaluate the significance of the resource and to
recommend appropriate and feasible avoidance, testing, preservation or
mitigation measures, in light of factors such as the significance of the find,
AH 04/20/2023
20 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 8
proposed project design, costs, and other considerations. The archeologist
shall perform this evaluation in consultation with the tribe.
14. HUMAN REMAINS AND NATIVE AMERICAN BURIALS
Prior to issuance of the any demolition, grading and building permits that involve
soil disturbance, include on plans a note that, during project construction, the
project applicant shall comply with California Health and Safety Code Section
7050.5 and California Public Resources Code Section 5097.98.
a. In the event of discovering human remains during construction activities, there
shall be no further excavation or disturbance of the site within a 100-foot radius
of the remains, or any nearby area reasonably suspected to overlie adjacent
remains.
b. The Santa Clara County Coroner shall be notified immediately and shall make
a determination as to whether the remains are Native American.
c. If the Santa Clara County Coroner determines that the remains are not subject
to his authority, he shall notify the Native American Heritage Commission
(NAHC) within 24 hours.
d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of
the deceased Native American.
e. The Most Likely Descendant has 48 hours following access to the project site to
make recommendations or preferences regarding the disposition of the
remains. If the Most Likely Descendant does not make recommendations
within 48 hours after being allowed access to the project site, the owner shall,
with appropriate dignity, reinter the remains in an area of the property secure
from further disturbance and provide documentation about this determination
and the location of the remains to the NAHC and the City of Cupertino.
Alternatively, if the owner does not accept the Most Likely Descendant’s
recommendations, the owner or the descendent may request mediation by the
NAHC. Construction shall halt until the mediation has concluded.
15. NOISE AND VIBRATION NOTICE
At least 10 days prior to the start of any demolition, gr ound disturbing, or
construction activities, the project applicant/contractor shall send notices of the
planned activity by first class mail as follows:
a. For projects on sites that are more than 0.5 acres or four or more residential
units the notices shall be sent to off-site businesses and residents within 500
feet of the project site;
b. For projects on sites between 0.25 to 0.5 acres, or two or three residential units
(not including Accessory Dwelling Units) notices shall be sent to off-site
businesses and residents within 250 feet of the project site; or
AH 04/20/2023
21 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 9
c. For projects on sites less than 0.25 acres or one residential unit, the notices shall
be sent to off-site businesses and residents within 100 feet of the project site.
The notification shall include a brief description of the project, the activities that
would occur, the hours when activity would occur, and the construction period’s
overall duration. The notification should include the telephone numbers of the
contractor’s authorized representatives that are assigned to respond in the event
of a noise or vibration complaint. The City will provide mailing addresses for the
Applicant’s use. The project applicant shall provide the City with evidence of
mailing of the notice, upon request. If pile driving, see add itional noticing
requirements below.
16. NOISE AND VIBRATION SIGNAGE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least two feet by three feet shall be posted on construction fencing at
the entrance(s) to the job site, clearly visible to the public, and include the
following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
c. Telephone numbers of the City’s and contractor’s authorized representatives
that are assigned to respond in the event of a noise or vibration complaint; and
d. Contact information for City’s and contractor’s authorized representatives that
are assigned to respond in the event of a complaint related to fugitive dust,
pursuant to the requirements for compliance with BAAQMD’s CEQA Air
Quality Guidelines.
If the authorized contractor’s representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
17. NOISE DURING CONSTRUCTION
Prior to issuance of any demolition, grading or building permit, include on plans
a note that, during project construction, the project applicant shall incorporate the
following measures to reduce noise during construction and demolition activity:
a. The project applicant and contractors shall prepare and submit a Construction
Noise Control Plan to the City’s Planning Department for review and approval
prior to issuance of the first permit. The Construction Noise Plan shall
demonstrate compliance with daytime and nighttime decibel limits pursuant
to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code.
The details of the Construction Noise Control Plan shall be included in the
AH 04/20/2023
22 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 10
applicable construction documents and implemented by the on-site
Construction Manager. Noise reduction measures selected and implemented
shall be based on the type of construction equipment used on the site, distance
of construction activities from sensitive receptor(s), site terrain, and other
features on and surrounding the site (e.g., trees, built environment) and may
include, but not be limited to, temporary construction noise attenuation walls,
high quality mufflers. During the entire active construction period, the
Construction Noise Control Plan shall demonstrate that compliance with the
specified noise control requirements for construction equipment and tools will
reduce construction noise in compliance with the City’s daytime and nighttime
decibel limits.
b. Select haul routes that avoid the greatest amount of sensitive use areas and
submit to the City of Cupertino Public Works Department for approval prior
to the start of the construction phase.
c. Signs will be posted at the job site entrance(s), within the on -site construction
zones, and along queueing lanes (if any) to reinforce the prohibition of
unnecessary engine idling. All other equipment will be turned off if not in use
for more than 5 minutes.
d. During the entire active construction period and to the extent feasible, the use
of noise producing signals, including horns, whistles, alarms, and bells will be
for safety warning purposes only. The construction manager will use smart
back-up alarms, which automatically adjust the alarm level based on the
background noise level or switch off back-up alarms and replace with human
spotters in compliance with all safety requirements and law.
18. PALEONTOLOGICAL RESOURCES
Prior to issuance of the any demolition, grading or building permit, include on
plans a note that, during project construction, the project applicant shall
implement the following measures:
a. If paleontological resources are encountered during ground disturbing and/or
other construction activities, all construction shall be temporarily halted or
redirected to allow a qualified paleontologist, which shall be retained by the
project applicant, to assess the find for significance and the Applicant shall
notify the City.
b. If paleontological resources are found to be significant, the paleontological
monitor shall determine appropriate actions, in coordination with a qualified
paleontologist, City staff, and property owner. Appropriate actions may
include, but are not limited to, a mitigation plan formulated pursuant to
guidelines developed by the Society of Vertebrate Paleontology and
AH 04/20/2023
23 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 11
implemented to appropriately protect the significance of the resource by
preservation, documentation, and/or removal, prior to recommencing
activities. Measures may include, but are not limited to, salvage of unearthed
fossil remains and/or traces (e.g., tracks, trails, burrows); screen washing to
recover small specimens; preparation of salvaged fossils to a point of being
ready for curation (e.g., removal of enclosing matrix, stabilization and repair
of specimens, and construction of reinforced support cradles); and
identification, cataloging, curation, and provision for repository storage of
prepared fossil specimens.
19. INDEMNIFICATION AND LIMITATION OF LIABILITY
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold
harmless the City, its City Council, and its officers, employees, and agents
(collectively, the “indemnified parties”) from and against any liability, claim,
action, cause of action, suit, damages, judgment, lien, levy, or proceeding
(collectively referred to as “proceeding”) brought by a third party against one or
more of the indemnified parties or one or more of the indemnified parties and the
applicant related to any Ordinance, Resolution, or action approving the project,
the related entitlements, environmental review documents, finding or
determinations, or any other permit or approval authorized for the project. The
indemnification shall include but not be limited to damages, fees, and costs
awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs,
liabilities, and expenses incurred in connection with such proceeding whether
incurred by the Applicant, the City, or the parties initiating or bringing such
proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such at torneys’ fees
and costs shall include amounts paid to the City’s outside counsel and shall
include City Attorney time and overhead costs and other City staff overhead costs
and any costs directly related to the litigation reasonably incurred by City. The
applicant shall likewise agree to indemnify, defend, and hold harmless the
indemnified parties from and against any damages, attorneys’ fees, or costs
awards, including attorneys’ fees awarded under Code of Civil Procedure section
1021.5, assessed or awarded against the indemnified parties. The Applicant shall
cooperate with the City to enter a Reimbursement Agreement to govern any such
reimbursement.
AH 04/20/2023
24 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 12
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary
by proceedings challenging the project approvals and related environmental
review, if the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
20. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS
DEPARTMENT
1. C.3 REQUIREMNTS
C.3 regulated improvements are required for all projects creating and/or replacing
5,000 S.F. or more of impervious surface, collectively over the entire project site (if
project receives entitlement after June 30, 2023). The developer shall reserve a
minimum of 4% of developable surface area for the placement of low impact
development measures, for storm water treatment, unless an alternative storm water
treatment plan, that satisfies C.3 requirements, is approved by the Director of Public
Works.
The developer must include the use and maintenance of site design, source control
and storm water treatment Best Management Practices (BMPs), which must be
designed per approved numeric sizing criteria. A Storm Water Management Plan and
a Storm Water Facilities Operation, Maintenance and Easement Agreement, and
certification of ongoing operation and maintenance of treatment BMPs are each
required.
All storm water management plans are required to obtain certification from a City
approved third party reviewer.
2. GRADING
Grading shall be as approved and required by the Director of Public Works in
accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications
AH 04/20/2023
25 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 13
and 404 permits maybe required. Please contact Army Corp of Engineers and/or
Regional Water Quality Control Board as appropriate.
3. DRAINAGE
Drainage shall be provided to the satisfaction of the Director of Public Works.
Hydrology and pre- and post-development hydraulic calculations must be provided
to indicate whether additional storm water control measures are to be constructed or
renovated. The storm drain system may include, but is not limited to, subsurface
storage of peak stormwater flows (as needed), bioretention basins, vegetated swales,
and hydrodynamic separators to reduce the amount of runoff from the site and
improve water quality. The storm drain system shall be designed to detain water on-
site (e.g., via buried pipes, retention systems or other approved syst ems and
improvements) as necessary to avoid an increase of the ten percent flood water surface
elevation to the satisfaction of the Director of Public Works. Any storm water
overflows or surface sheeting should be directed away from neighboring private
properties and to the public right of way as much as reasonably possible.
All storm drain inlets shall be clearly marked with the words “No Dumping – Flows
to Creek” using permanently affixed metal medallions or equivalent, as approved by
the Environmental Programs Division.
Additional comments will be provided and shall be incorporated prior to Building
Permit issuance.
4. EROSION CONTROL PLAN
Developer must provide an approved erosion control plan by a Registered Civil
Engineer. This plan should include all erosion control measures used to retain
materials on site. Erosion control notes shall be stated on the plans.
5. NPDES CONSTRUCTION GENERAL PERMIT
When and where it is required by the State Water Resources Control Board (SWRCB),
the developer must obtain a Notice of Intent (NOI) from the SWRCB, which
encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use
of construction Best Management Practices (BMPs) to control storm water runoff
quality, and BMP inspection and maintenance.
AH 04/20/2023
26 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 14
6. BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water Resources
Control Board, for construction activity, which disturbs soil. BMP plans shall be
included in grading and street improvement plans.
7. DEVELOPMENT FEES AND BONDS
The project developer shall provide for payment of fees and bonds, including but not
limited to checking and inspection fees, storm drain fees, transportation impact fees,
park dedication fees and fees for under grounding of utilities. Said fees a nd bonds
shall be paid prior to issuance of building permit.
Fees:
a. Checking & Inspection Fees: Per current fee schedule ($1,117)
b. Grading Permit: Per current fee schedule ($3,683 or
6% of improvement costs)
c. Storm Drainage Fee: Per current fee schedule ($4,250 per
AC)
d. Storm Management Plan Fee Per current fee schedule ($1,670)
Bonds:
a. On-site Grading Bond: 100% of site improvements.
The fees described above are imposed based upon the current fee schedule adopted
by the City Council. However, the fees imposed herein may be modified at the time
of recordation of a final map or issuance of a building permit in the event of said
change or changes, the fees changed at that time will reflect the then current fee
schedule.
SECTION V: CONDITIONS ADMINISTERED BY BUILDING DEPARTMENT
1. ADA
The building was built in 1998 and will be subject to the requirements of Chapter 11A
of the 2022 CBC. Assigned and unassigned parking stalls and their accessible
counterparts will be reviewed during Building Permit Application.
PASSED AND ADOPTED this 20th day of April 2023 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
AH 04/20/2023
27 of 35
Resolution No. 139 ASA-2022-007 April 20, 2023
Page 15
ATTEST: APPROVED:
Danielle Condit Luke Connolly
Associate Planner Administrative Hearing Officer
AH 04/20/2023
28 of 35
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION 140
OF THE ADMINISTRATIVE HEARING OFFICER
OF THE CITY OF CUPERTINO APPROVING A TREE REMOVAL
PERMIT TO ALLOW THE TRANSPLANTATION OF 3 TREES, AND
THE REMOVAL AND REPLACEMENT OF 8 TREES AT HAMPTON
APARTMENT HOMES
LOCATED AT 19500 PRUNRIDGE AVENUE
SECTION I: PROJECT DESCRIPTION
Application No.: TR-2022-034
Applicant: Irvine Apartment Communities, L.P.
Location: 19500 Pruneridge Avenue; APN: 316-06-058
SECTION II: FINDINGS TREE REMOVAL PERMIT:
WHEREAS, the City of Cupertino received an application for a Tree Removal permit as
described in Section I of this Resolution; and
WHEREAS, the necessary public notices have been given as required by the Cupertino
Municipal Code, and the Administrative Hearing Officer has held at least one public
meeting with regard to the application; and
WHEREAS, pursuant to the provisions of the California Environmental Quality Act of
1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State
CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.)
(hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed
Project and has determined that the Project is exempt from environmental review
pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons
set forth in the staff report dated April 20, 2023 and incorporated herein; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
AH 04/20/2023
29 of 35
Resolution No. 140 TR-2022-034 April 20, 2023
Page 2
2. That the location of the trees restricts the economic enjoyment of the property by
severely limiting the use of property in a manner not typically experienced by
owners of similarly zoned and situated property, and the applicant has
demonstrated to the satisfaction of the approval authority that there are no
reasonable alternatives to preserve the tree(s).
The applicant’s arborist, as well as the City’s consultant arborist, has found that the area
in which the surface parking lot will be located cannot maintain the trees as they are
currently planted. Tree replacements, as well as side boxing healthy trees for replanting,
have been conditioned into the project.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 2 thereof:
The application for a Tree Removal permit, Application no. TR-2022-034 is hereby
approved and that the subconclusions upon which the findings and conditions specified
in this resolution are based and contained in the Public Meeting record concerning
Application no. TR-2022-034 as set forth in the Minutes of the Administrative Hearing
Meeting of April 20, 2023 and are incorporated by reference as though fully set forth
herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
This approval for tree removals is based on the certified arborist report prepared by
Ryan Suttle (ISA Board Certified Master Arborist, Utility Specialist No. WE-12647BU)
with HortScience | Bartlett Consulting, Revised January 2023 consisting of twenty-
five (25) pages, except as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, pr operty
size, building square footage, any relevant easements and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
AH 04/20/2023
30 of 35
Resolution No. 140 TR-2022-034 April 20, 2023
Page 3
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. ASA-2022-007 shall be applicable to
this approval.
4. PROJECT ARBORIST.
The property owner shall retain a certified arborist to ensure the project conforms to
all Planning conditions related to landscaping/trees, as shown in the approve d plan
set and arborist report.
5. EXCAVATION RESTRICTIONS APPLY:
Any approved grading, digging or trenching beneath a tree canopy shall be
performed using ‘air-spade’ method as a preference, with manual hand shovel as a
backup. For utility trenching, including sewer line, roots exposed with diameter of 1.5
inches and greater shall remain intact and not be damaged. If directional boring
method is used to tunnel beneath roots, an ISA certified arborist shall be on site to
monitor the work, or the arborist report can be amended to instruct the contractor—
instructions shall be a printed on the approved plan set prior to building permit
issuance.
6. REDWOOD TRANSPLANT
The transplant of trees 181, 183 and 184 shall follow the recommendation and
procedures for transplant identified in the arborist report prepared by HortScience |
Bartlett Consulting and dated January 2023. In preparation for transplant, the
hardscape within the root ball footprint will be removed prior to digging. The trees
shall be hand irrigated several days prior to transplant date to ensure soil is moist, but
not saturated; prune to provide adequate access for digging. The excavation of the
root ball shall be dug by hand, with a backhoe or mechanically with specialized
equipment using air-spade method with manual hand shovel as backup. Excavation
of the root ball shall be no smaller than 15’W x15’L for each tree. Each tree shall be
side boxed for at least 90 days as recommended by the arborist report.
7. POST-TRANSPLANT CARE
Ensure that the trees are adequately irrigated and provide inspection schedule for guy
wire support systems to be assessed periodically by the project arborist. Prior to
building permit issuance, the applicant shall provide a post-transplantation
maintenance program as prepared by a licensed ISA arborist for peer-review and
approval by the city consulting arborist at the expense of the property owner.
8. TREE AND LANDSCAPE MAINTENANCE
The property owner shall be responsible for ensuring that the existing trees and newly
planted trees are properly maintained including but not limited to ensuring that there
AH 04/20/2023
31 of 35
Resolution No. 140 TR-2022-034 April 20, 2023
Page 4
is adequate soil drainage, that the soil is well-aerated, and irrigation systems are
thoroughly tested to provide sufficient water to landscaped areas while reducing
water waste. All landscape material shall be well maintained and replaced, if
necessary, to the satisfaction of the City Urban Forester and Director of Planning
9. TREE REPLACEMENTS
Any trees impacted by the project scope either on site and/or on adjacent properties
that cannot be saved as demonstrated by an arborist report, as prepared by an ISA
certified arborist—the property owner of 19500 Pruneridge Ave shall be respo nsible
for replacing the trees in accordance with CMC 14.18.160 Tree Replacement.
10. ARBORIST VERIFICATION LETTER
Prior to Final Occupancy, an ISA Board Certified Master Arborist shall confirm in
writing that all replacement trees have been planted and transplanted trees have been
installed per the procedures outline in the arborist report.
11. TREE PRESERVATION
The following general tree preservation measures apply to all trees to be retained: No
storage of material, topsoil, vehicles or equipment shall be permitted within the tree
enclosure area. The ground under and around the tree canopy area shall not be
altered. Trees to be retained shall be irrigated, aerated and maintained as necessary to
ensure survival.
12. PROJECT ARBORIST CERTIFICATION LETTER
Prior to building permit submittal, attach a Project Arborist Certification Letter that
they have;
(a) Reviewed the entire building permit plan set submittal and,
(b) Affirm that ongoing Project Arborist shall provide site monitoring inspections
arranged with the contractor or owner—conducted prior demolition and through
the demolition and construction process to monitor the transplanted trees and
conformance with the outline producers in the arborist report and field work.
(c) understands that design revisions (site or plan changes) within the critical root
zone or change to transplanted tree locations will be reviewed by Project Arborist.
An amended arborist report prior to submittal to the City will be obtained by the
applicant and submitted to the City for peer-review by the city consulting arborist
at the cost of the property owner.
13. LANDSCAPE PLAN CHANGES
Revisions and/or changes to plans before or during construction shall be reviewed
and responded to by the (a) project site arborist, or (b) landscape architect with written
AH 04/20/2023
32 of 35
Resolution No. 140 TR-2022-034 April 20, 2023
Page 5
letter of acceptance before submitting the revision to the Building Department for
review by Planning and City Consulting Arborist at the cost of the property owner.
14. INDEMNIFICATION
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless
the City, its City Council, and its officers, employees, and agents (collectively, the
“indemnified parties”) from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
“proceeding”) brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant related to any Ordinance,
Resolution, or action approving the project, the related entitlements, environmental
review documents, finding or determinations, or any other permit or approval
authorized for the project. The indemnification shall include but not be limited to
damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’
fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or
bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and
costs shall include amounts paid to the City’s outside counsel and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City . The applicant shall
likewise agree to indemnify, defend, and hold harmless the indemnified parties from
and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees
awarded under Code of Civil Procedure section 1021.5, assessed or awarded against
the indemnified parties. The Applicant shall cooperate with the City to enter a
Reimbursement Agreement to govern any such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
AH 04/20/2023
33 of 35
Resolution No. 140 TR-2022-034 April 20, 2023
Page 6
15. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
PASSED AND ADOPTED this 20th day of April 2023 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST: APPROVED:
Danielle Condit Luke Connolly
Associate Planner Administrative Hearing Officer
AH 04/20/2023
34 of 35
AH 04/20/2023
35 of 35