Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
10-28-2021 Searchable Packet
CITY OF CUPERTINO ADMINISTRATIVE HEARING AGENDA This will be a teleconference meeting with no physical location Thursday, October 28, 2021 5:00 PM TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION TO HELP STOP THE SPREAD OF COVID-19 In accordance with Government Code 54953(e), this will be a teleconference meeting without a physical location to help stop the spread of COVID-19. Members of the public wishing comment on an item on the agenda may do so in the following ways: 1) E-mail comments by 4:00 p.m. on Thursday, October 28 to the Committee at planning@cupertino.org. These e-mail comments will be received by the Committee members before the meeting and posted to the City’s website after the meeting. 2) E-mail comments during the times for public comment during the meeting to the Committee at planning@cupertino.org. The staff liaison will read the emails into the record, and display any attachments on the screen, for up to 3 minutes (subject to the Chair’s discretion to shorten time for public comments). Members of the public that wish to share a document must email planning@cupertino.org prior to speaking. 3) Teleconferencing Instructions Members of the public may observe the teleconference meeting or provide oral public comments as follows: Oral public comments will be accepted during the teleconference meeting. Comments may be made during “oral communications” for matters not on the agenda, and during the public comment period for each agenda item. To address the Committee, click on the link below to register in advance and access the meeting: Online Please click the link below to join the webinar: Page 1 1 AH 10-28-2021 1 of 82 Administrative Hearing Agenda October 28, 2021 https://cityofcupertino.zoom.us/webinar/register/WN_IKjoYGk2QZW9Ug1eDE9UxA Phone Dial: (669) 900 6833 and enter Webinar ID: 973 8582 5564 (Type *9 to raise hand to speak) Unregistered participants will be called on by the last four digits of their phone number. Or an H.323/SIP room system: H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) Meeting ID: 973 8582 5564 SIP: 97385825564@zoomcrc.com After registering, you will receive a confirmation email containing information about joining the webinar. Please read the following instructions carefully: 1. You can directly download the teleconference software or connect to the meeting in your internet browser. If you are using your browser, make sure you are using a current and up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain functionality may be disabled in older browsers, including Internet Explorer. 2. You will be asked to enter an email address and a name, followed by an email with instructions on how to connect to the meeting. Your email address will not be disclosed to the public. If you wish to make an oral public comment but do not wish to provide your name, you may enter “Cupertino Resident” or similar designation. 3. When the Chair calls for the item on which you wish to speak, click on “raise hand.” Speakers will be notified shortly before they are called to speak. 4. When called, please limit your remarks to the time allotted and the specific agenda topic. ROLL CALL APPROVAL OF MINUTES 1.Subject: Approve the July 22 Administrative Hearing minutes Recommended Action: Approve the July 22 Administrative Hearing minutes 1 - Draft Minutes POSTPONEMENTS Page 2 2 AH 10-28-2021 2 of 82 Administrative Hearing Agenda October 28, 2021 ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the Committee on any matter within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Commission from making any decisions with respect to a matter not on the agenda. PUBLIC HEARINGS 2.Subject: Architectural and Site Approval to consider exterior and landscape alterations to an existing office building, and a Tree Removal Permit to allow for the removal of six (6) development trees. (Application No(s).: ASA-2021-002, TR-2021-037; Applicant: Brice Colton (Habitec Architecture); Location 18920-18922 Forge Dr.: (APN: 316-09-030) Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachments 1 and 2) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit (ASA-2021-002) and the Tree Removal Permit (TR-2021-037). Staff Report 1 - Draft Resoution for ASA-2021-002 2 - Draft Resolution for TR-2021-037 3 - Plan Set 4 - Arborist Report OLD BUSINESS NEW BUSINESS STAFF AND COMMITTEE REPORTS FUTURE AGENDA SETTING ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this teleconference meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue, Cupertino, California 95014, during normal business hours. Page 3 3 AH 10-28-2021 3 of 82 Administrative Hearing Agenda October 28, 2021 IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. Do not include any personal or private information in written communications to the City that you do not wish to make public, as written communications are considered public records and will be made publicly available on the City website. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 4 4 AH 10-28-2021 4 of 82 CITY OF CUPERTINO Agenda Item 21-10041 Agenda Date: 10/28/2021 Agenda #: 1. Subject: Approve the July 22 Administrative Hearing minutes Approve the July 22 Administrative Hearing minutes CITY OF CUPERTINO Printed on 10/22/2021Page 1 of 1 powered by Legistar™5 AH 10-28-2021 5 of 82 Cupertino, CA 95014 (408) 777‐3308 ACTION MINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON JULY 22, 2021 ROLL CALL Hearing Officer present: Albert Salvador, Assistant Community Development Director Staff present: Erika Poveda, Associate Planner Applicant(s) present: Thomas Cox, Applicant APPROVAL OF MINUTES: 1. Subject: Draft Minutes of June 24, 2021 The minutes of June 24, 2021 were approved as written. POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATIONS: None WRITTEN COMMUNICATIONS: None PUBLIC MEETING ITEMS: 2. Subject: Architectural and Site Approval Permit to consider façade and landscape alterations to a bank building (Bank of America) located in the Crossroads Area of the Heart of the City Specific Plan Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachment 1) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit (ASA‐2020‐007) 6 AH 10-28-2021 6 of 82 2 Administrative Hearing July 22, 2021 Erika Poveda, Associate Planner gave a presentation consisting of the proposed modifications. The Hearing Officer opened the public comment period. ‐ Gale Connor, spoke on behalf of the property in support of the project. He also expressed concerns about condition 14 (driveway and mobility) and future residential development. The Hearing Officer closed the comment period. The Hearing Officer asked a question about the trash area enclosure and made comments. The Hearing Officer concurred with Staff’s findings. DECISION: The application was approved by the Hearing Officer per the revised draft resolution: Revised the Dark Sky Compliance condition to apply only to new, modified, and/or replacement on‐site lighting. ADJOURNMENT Respectfully submitted: _____/s/Abby Ayende Abby Ayende Management Analyst 7 AH 10-28-2021 7 of 82 CITY OF CUPERTINO Agenda Item 21-10037 Agenda Date: 10/28/2021 Agenda #: 2. Subject: Architectural and Site Approval to consider exterior and landscape alterations to an existing office building, and a Tree Removal Permit to allow for the removal of six (6) development trees. (Application No(s).: ASA-2021-002, TR-2021-037; Applicant: Brice Colton (Habitec Architecture); Location 18920-18922 Forge Dr.: (APN: 316-09-030) That the Hearing Officer adopt the draft resolutions (Attachments 1 and 2) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit (ASA-2021-002) and the Tree Removal Permit (TR-2021-037). CITY OF CUPERTINO Printed on 10/22/2021Page 1 of 1 powered by Legistar™8 AH 10-28-2021 8 of 82 ADMINISTRATIVE HEARING STAFF REPORT Meeting Date: October 28, 2021 Subject Architectural and Site Approval to consider exterior and landscape alterations to an existing office building, and a Tree Removal Permit to allow for the removal of six (6) development trees. (Application No(s).: ASA-2021-002, TR-2021-037; Applicant: Brice Colton (Habitec Architecture); Location 18920-18922 Forge Dr., APN: 316-09-030) Recommended Action That the Hearing Officer adopt the draft resolutions (Attachments 1 and 2) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit (ASA-2021-002) and the Tree Removal Permit (TR-2021-037). Discussion Project Data General Plan Designation: Industrial/Residential Special Area: North Vallco Park Zoning Designation: P(MP), Planned Development with Industrial Park intent Existing Proposed Lot Size: 252,779 sq. ft. No change Floor Area: 91,404 sq. ft. No change Maximum Existing Height: 60 feet 21’0” Project Consistency with: General Plan: Yes Zoning: Yes Environmental Assessment: Categorically Exempt per Section 15301 (Existing Facilities) of California Quality Act (CEQA) 9 AH 10-28-2021 9 of 82 ASA-2021-002, TR-2021-037 18920-18922 Forge Dr. October 28, 2021 Page 2 Background The project site is located in the northeast corner of the City. The surrounding land uses are offices to the north and west, single-family residential homes in the City of Santa Clara to the south, and a parking area for the nearby Kaiser Hospital to the east, also within the City of Santa Clara (see Figure 1). The existing site contains a single-story office building with surrounding parking and associated landscaped areas. The proposed project is limited to exterior modifications to the building and landscaping. Municipal Code Chapters 19.12 and 19.168 requires that an Architectural and Site Approval Permit is obtained for such modifications. Analysis The applicant is requesting exterior modifications to the site and to the building. Building modifications include a new main entry, patio, and back entry. Site modifications include new landscaping and partial parking reconfiguration. To accommodate the proposed modifications, the applicant proposes the removal of six (6) protected trees, and to pay the in-lieu fee instead of planting replacements. Exterior Modifications Building Modifications: The east (side) elevation contains an entry feature to the structure along with several windows, see Sheet A1.4 of Attachment 3. As part of the project, the applicant proposes the removal of the entry feature and windo ws, and the replacement with a new entry door and canopy. The entry point will include a canopy over the door. The canopy is proposed to be a dark gray canvas that is fastened to the building. Similar canopies are proposed at most exit doors around the building. The west (side) elevations seek to create a new entry feature into the building. The result would in a new entry point, windows, a retaining wall for landscaping, and an entry wall. The entry wall will be 21’-0” and painted stucco to match the existing building. N 10 AH 10-28-2021 10 of 82 ASA-2021-002, TR-2021-037 18920-18922 Forge Dr. October 28, 2021 Page 3 As part of the overall building improvements, the applicant proposes two new skylights. The skylights will be three (3) tall, projecting above the roof and located to the center and rear of the building. Along the rear of the building, the project incorporates a new outdoor patio space. The space is to be used by the tenant for outdoor gathering space and will be concealed by a new 8’-4 ½” foot fence and gate made of Ipe plank. The project also proposes a storage mezzanine in the interior of the building. The proposed storage mezzanine measures approximately 630 square feet with a height between 7’-0” and 7’-5”. This space is existing high volume interior space within the building that is being converted for use as storage space. A condition of approval has been added to the draft resolution (Attachment 1) that prohibits the use of the space to be anything other than storage. Landscape Modifications: The project seeks to revitalize the landscaped areas in conjunction with the proposed exterior modifications and site improvements. The project will result in the reduction of landscaped area from 36,640 sq. ft. to 36,154 sq. ft. The decrease in landscaped area is due to the conversation of landscaped areas into parking areas. The proposed plantings range from low to very low water usage. The project also includes the removal of trees as discussed further below. Vehicle Parking: The current parking requirement based on the size of the building is 321 parking spaces, and a total of 294 are currently provided. In conjunction with the site improvements and ADA parking requirements the applicant will increase the parking supply to 295 parking spaces. The property owner (Apple) proposes to utilize the Apple Park Transit Center to accommodate users of the building. Users of the Forge building will have access to the Apple Park Transit Center that is located approximately 1000 feet away. Using the transit facilities at Apple Park will help to reduce the parking requirement. The Apple Park EIR found that 28% of Apple employees, in general, use alternative transportation and found a parking ratio of 1 stall per 311.5 square feet was accurate to use for their Infinite Loop Campus. Since Apple provides their TDM program to all employees, it can reasonably be assumed that the project site would need fewer parking spaces that required by the Municipal Code. Using this alternative parking ratio, the site would need 287 parking spaces; however, 295 spaces are provided. In order to formalize this assumption, a condition of approval has been added to ensure that the uses in the building would provide a Transportation Demand Management (TDM) program that allows for a reduction of single occupancy vehicles to 295 vehicles. 11 AH 10-28-2021 11 of 82 ASA-2021-002, TR-2021-037 18920-18922 Forge Dr. October 28, 2021 Page 4 Tree Removals/Replacements Per the Protected Trees Ordinance (Chapter 14.18) of the Cupertino Municipal Code (CMC), all approved development trees (i.e., trees required to be planted or retained as part of a development application, building permit, tree removal permit, or code enforcement action) are considered “protected” and require approval of a Tree Removal Permit prior to removal. The applicant is proposing to remove a total of six (6) protected development trees as part of the proposed site modification. No trees adjacent to the public right of way or along the perimeter of the site are proposed for removal. The arborist report pro vided (Attachment 4) assesses the location, size, current conditions, and overall health of the proposed tree removals. Table 1 below lists the trees proposed for removal. The arborist report was peer reviewed by the City’s consulting arborist, who agreed with the findings in the report. Number* Species Trunk Diameter Condition 1 Coast Redwood 36" Good 2 Japanese Maple 4" Good 3 Southern Live Oak 5" Good 4 Modesto Ash 13" Poor 5 Southern Live Oak 5" Good 6 London Plan 4" Good * Note: tree ID # corresponds with the tree inventory provided with the arborist report The required replacement trees per Chapter 14.18 is either eight (8) 24” box trees or four (4) 24”box trees and two (2) 36” box trees. The applicant is proposing to pay the in-lieu replacement fee instead of planting replacement trees. Both the applicant arborist and the City’s consulting arborist agree that there is no adequate space for replacement trees on site due to a large number and amount of existing landscaping on the property . A condition of approval has been added requiring the applicant to pay in-lieu fees prior to tree removal. Lighting: The applicant is also proposing new lighting fixtures as part of the scope of work, see Sheet A1.21 (see Attachment 3). The applicant proposes new exterior wall sconces. The application was submitted during the City’s transition to a new lighting ordinance, CMC Chapter 19.102 Glass and Lighting Standards. To ensure consistency with the City’s ordinance, the City will verify compliance with the applicable provisions of the ordinance prior to issuance of building permits. This includes lighting color, placement, and orientation. 12 AH 10-28-2021 12 of 82 ASA-2021-002, TR-2021-037 18920-18922 Forge Dr. October 28, 2021 Page 5 Dark Sky: The proposed project was submitted as the City implemented the new ordinance for Bird-Safe and Dark Sky Regulations, Cupertino Municipal Code (CMC) Chapter 19.102 Glass and Lighting Standards. The project will be required to implement bird-safe treatments as applicable to the project, which shall be verified prior to issuance of building permits. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 – Existing Facilities. Other Department/Agency Review The City’s Building Division, Environmental Programs Division, Public Works Department, and the Santa Clara County Fire Department have no objections to the project. Public Noticing & Community Outreach The following table is a brief summary of the noticing for this project: Notice of Public Hearing Agenda Site Signage (at least 10 days prior to hearing) 13 notices mailed to property owners adjacent to the project site (at least 10 days prior to the hearing) Posted on the City's official notice bulletin board (five days prior to hearing) Posted on the City of Cupertino’s Web site (five days prior to hearing) No comments have been received at the time of production of this staff report. Permit Streamlining Act This project is subject to the Permit Streamlining Act (Govern ment Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: February 9, 2021; Deemed Incomplete: March 1, 2021 Revisions Received: May 1, 2021; Deemed Incomplete: June 7, 2021 Revisions Received: July 10, 2021; Deemed Incomplete: August 9, 2021 Revisions Received: September 2, 2021; Deemed Incomplete: September 30, 2021 Revisions Received: September 30, 2021; Deemed Complete: October 5, 2021 The City has 60 days from when the project is deemed categorically exempt to decide on the project. 13 AH 10-28-2021 13 of 82 ASA-2021-002, TR-2021-037 18920-18922 Forge Dr. October 28, 2021 Page 6 Conclusion Staff recommends approval of the Architectural and Site Approval Permit and the Tree Removal Permit as the proposed project will not create adverse impacts to the surrounding area. Additionally, all the findings for approval of the proposed project, consistent with Chapter 19.168 and 14.18 of the Cupertino Municipal Code, may be made as reflected in the draft resolutions. With respect to the Architectural and Site Approval Permit, the following findings may be made: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be det rimental to the public health, safety, general welfare, or convenience: The proposal includes exterior and landscape modifications to an existing office building and site. The improvements to the exterior will allow for a better architectural aesthetic, improved drought tolerant landscaping, and a new exterior gathering spaces for building users. There is a deed restriction recorded against the property requiring a minimum setback of 175 feet from the properties in Santa Clara. The closest building improvements is 179’-3” from the nearest residential property. Therefore, the exterior and landscape modifications will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlement s to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The project scope does not include an increase in floor area of the existing building. The project will increase design elements and components of the building by consolidating entrances, new outdoor gathering space, and other associated site improvements. Further, the project will preserve trees along the permitter of the property to help alleviate any visual impact from adjacent properties Therefore, there will be abrupt changes in the building scale related to height and bulk, and no new buildings are proposed. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, 14 AH 10-28-2021 14 of 82 ASA-2021-002, TR-2021-037 18920-18922 Forge Dr. October 28, 2021 Page 7 height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. The proposed exterior and landscape improvements are harmonious with the existing building form and compatible with recent developments and upgrades in the project vicinity. The proposed materials (stucco, glass, Ipe) incorporated into the project harmonize with the proposed improvements and the proposed landscape improvements. Proposed tree removals are a result of poor planting location, health, and conflict with the proposed improvements. Because of the amount of trees on site and no adequate space for replacements, the applicant has proposed to pay the in-lieu replacement fee. The City’s consulting arborist also concluded that there was no adequate space for replacements. Lighting for the development has been conditioned to be consistent with the City’s lighting standards and to prevent intrusive effects on adjacent properties. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signs are proposed as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new development project. With respect to the Tree Removal Permit, the following findings may be made: 2. That the location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by owners of similarly zoned and situated property, and the applicant has demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the tree(s). The trees are proposed for removal due to the poor planting locations, and due to conflict 15 AH 10-28-2021 15 of 82 ASA-2021-002, TR-2021-037 18920-18922 Forge Dr. October 28, 2021 Page 8 with the proposed improvements. The applicant has worked with Staff to minimize the number of removals to those that are in poor health, direct conflict with proposed improvements, or both. 3. That the protected trees are a detriment to the subject property and cannot be adequately supported according to good urban forestry practices due to the overplanting or overcrowding of trees on the subject property. The trees are proposed for removal due to poor health, poor planting locations, and due to conflict with the proposed improvements. The applicant has worked with Staff to minimize the number of removals to those that are in poor health, direct conflict with proposed improvements, or both. The City’s consulting arborist has reviewed the arborist report and takes no exception to the proposal for removal. Next Steps The permit will become effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period (November 11, 2021 at 5:00 pm). This approval is valid until October 28, 2023. The applicant team may apply for a one-time two-year extension before the approval expires. Prepared by: Erick Serrano, Senior Planner Reviewed and Approved for submission by: Piu Ghosh, Planning Manager ATTACHMENTS 1. Draft Resolution for ASA-2021-002 2. Draft Resolution for TR-2021-037 3. Plan Set 4. Arborist Report 16 AH 10-28-2021 16 of 82 ASA-2021-002 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE PERMIT TO EXTERIOR AND LANDSCAPE ALTERATIONS TO AN EXISTING OFFICE BUILDING LOCATED AT 18920-18922 FORGE DRIVE SECTION I: PROJECT DESCRIPTION Application No.: ASA-2021-002 Applicant: Brice Colton (Habitec Architecture) Location: 18920-18922 Forge Dr. (APN: 316-09-030) SECTION II: FINDINGS WHEREAS, the City of Cupertino received and application for an Architectural and Site Approval to consider allowing modifications to the exterior of an existing office building and landscape and outdoor amenity improvements, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting with regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 for the reasons set forth in the staff report dated October 28, 2021 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 17 AH 10-28-2021 17 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 2 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public he alth, safety, general welfare, or convenience. The proposal includes exterior and landscape modifications to an existing office building and site. The improvements to the exterior will allow for a better architectural aesthetic, improved drought tolerant landscaping, and a new exterior gathering spaces for building users. There is a deed restriction recorded against the property requiring a minimum setback of 175 feet from the properties in Santa Clara. The closest building improvements is 179’-3” from the nearest residential property. Therefore, the exterior and landscape modifications will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The project scope does not include an increase in floor area of the existing building. The project will increase design elements and components of the building by consolidating entrances, new outdoor gathering space, and other associated site improvements. Further, the project will preserve trees along the permitter of the property to help alleviate any visual impact from adjacent properties Therefore, there will be abrupt changes in the building scale related to height and bulk, and no new buildings are proposed. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety 18 AH 10-28-2021 18 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 3 requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. The proposed exterior and landscape improvements are harmonious with the existing building form and compatible with recent developments and upgrades in the project vicinity. The proposed materials (stucco, glass, Ipe) incorporated into the project harmonize with the proposed improvements and the proposed landscape improvements. Proposed tree removals are a result of poor planting location, health, and conflict with the proposed improvements. Because of the amount of trees on site and no adequate space for replacements, the applicant has proposed to pay the in-lieu replacement fee. The City’s consulting arborist also concluded that there was no adequate space for replacements. Lighting for the development has been conditioned to be consistent with the City’s lighting standards and to prevent intrusive effects on adjacent properties. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. No signs are proposed as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light, and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new development project. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof, The application for an Architectural and Site Approval, Application no. ASA-2021-002 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. ASA-2021-002 as set forth in the Minutes of the Administrative Hearing Meeting of October 28, 2021 and are incorporated by reference as though fully set forth herein. 19 AH 10-28-2021 19 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 4 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set drawn by J. Brice Colton of Habitec Architecture and Interior Design, titled “AN APPLICATION FOR: ASA-2021-002 AT FG01” consisting of 40 pages labeled as A0.1-A5.7, C3.2-C4.3, and L1-L-25, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. AWNINGS Awnings shall be maintained in good condition and if they appear to be deteriorating, they shall be replaced with appropriate permits from the City. 5. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall, or their designee, to determine that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. 6. MEZZANINE SPACE The interior mezzanine space is not to be habitable space and shall not be used for anything other than storage purposes. In the event that the mezzanine space is used for anything other than for storage, the property owner shall be responsible for obtaining the necessary entitlements for additional office area. 7. TRANSPORTATION DEMAND MANAGEMENT PROGRAM Prior to building permit issuance, the property owner shall provide a Transportation Demand Management (TDM) program that allows for a reduction of single occupancy vehicles to 295 vehicles, for review and approval by the City. 20 AH 10-28-2021 20 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 5 8. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 9. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. TR-2021-037 shall be applicable to this approval. 10. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy. 11. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a. Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked 21 AH 10-28-2021 21 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 6 by a certified mechanic and determined to be running in proper condition prior to operation. h. Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations. The applicant shall incorporate the City’s construction best management practices into the building permit plan set prior to any grading, excavation, foundation or building permit issuance. 12. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatmen ts, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 13. OUTDOOR LIGHTING All outdoor lighting shall be downward directed and shielded. Uplighting for trees shall be low voltage. Lighting shall be turned off after 11:00 p.m. or when people are no longer present, whichever occurs later, except lighting required for security purposes. Lighting spillover is not allowed onto neighboring properties. 14. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. 22 AH 10-28-2021 22 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 7 d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Nighttime construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 15. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 16. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the La ndscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. 23 AH 10-28-2021 23 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 8 The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” 17. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a. Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b. Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment, and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c. Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors a s recommended by a landscaping professional. 18. NESTING BIRDS Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code. a. Construction and tree removal/pruning activities shall be scheduled to avoid the nesting season to the extent feasible. If feasible, tree removal and/or pruning shall be completed before the start of the nesting season to help preclude nesting. The nesting season for most birds and raptors in the San Francisco Bay area extends from February 1 through August 31. Preconstruction surveys (described below) are not required for tree removal or construction activities outside the nesting period. b. If construction activities and any required tree removal occur during the nesting season (February 1 and August 31), a qualified ornithologist shall be required to conduct surveys prior to tree removal or construction activities. Preconstruction surveys shall be conducted no more than 14 days prior to the start of tree removal, pruning or construction. Preconstruction surveys shall be 24 AH 10-28-2021 24 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 9 repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. During this survey, the ornithologist shall inspect all trees and other possible nesting habitats in and immediately adjacent to the construction areas for nests. c. If the survey does not identify any nesting birds that would be affected by construction activities, no further mitigation is required. If an active nest containing viable eggs or young birds is found sufficiently close to work areas to be disturbed by these activities, their locations shall be documented, and protective measures implemented under the direction of the qualified ornithologist until the nests no longer contain eggs or young birds. d. Protective measures shall include establishment of clearly delineated exclusion zones (i.e., demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by the qualified ornithologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified biologist, if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. The protection measures and buffers shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. e. A final report on nesting birds and raptors, including survey methodology, survey date(s), map of identified active nests (if any), and protection measures (if required), shall be submitted to the Planning Manager, through the building permit review process, and be completed to the satisfaction of the Community Development Director prior to the start of grading. 19. SIGNAGE Signage is not approved with this application. Signage shall conform to the City Sign Code. 20. TREE AND LANDSCAPE MAINTENANCE The property owner shall be responsible for ensuring that the existing trees and newly planted trees are properly maintained including but not limited to ensuring that there is adequate soil drainage, that the soil is well -aerated, and irrigation systems are thoroughly tested to provide sufficient water to landscaped areas while reducing water waste. 25 AH 10-28-2021 25 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 10 21. TREE PROTECTION As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the trees to be retained. In addition, the following measures shall be added to the protection plan: For trees to be retained, chain link fencing and other root protection shall be installed around the dripline of the tree prior to any project site work. No parking or vehicle traffic shall be allowed under root zones, unless using buffers approved by the Project Arborist. No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City’s consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree. Wood chip mulch shall be evenly spread inside the tree projection fence to a four-inch depth. Tree protection conditions shall be posted on the tree protection barriers. Retained trees shall be watered to maintain them in good health. A covenant on the property shall be recorded that identifies all the protected trees, prior to final occupancy. The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City’s consulting arborist shall inspect the trees to be retained and shal l provide reviews prior to issuance of demolition, grading or building permits. A report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. 22. DARK SKY AND BIRD SAFE COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved lighting plans to comply with development standards of Cupertino Municipal Code Section 19.102.030 Bird-Safe Development Requirements and Section 19.102.040 Outdoor Lighting Requirements. In the event changes are proposed from the approved plans, said changes must be reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all documentation required to determine compliance with the Municipal Code. 23. INDEMNIFICATION As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding 26 AH 10-28-2021 26 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 11 (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such att orneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 24. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. 27 AH 10-28-2021 27 of 82 Draft Resolution ASA-2021-002 October 28, 2021 Page 12 SECTION IV: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 25. AWNINGS AND CANOPIES Awning and canopies shall comply with the requirements of CFC Section 3105.2 and 3105.3 for design, construction, and materials. 26. FIRE DEPARTMENT ACCESS Fire Department access to the site, the building, and to all fire protection systems shall be maintained at all times, in accordance with CFC Chapter 5. No obstruction such as vehicles, storage, and other materials or objects shall be placed or kept near fire hydrants, fire department inlet connections, or fire protection system control valves in a manner that would prevent such equipment or fire hydrants from being immediately discernible, in accordance with CFC 508.5.4. SECTION V: CONDITIONS ADMINISTERED BY THE OFFICE OF COMMUNITY DEVELOPMENT – BUILDING DIVISION The project will be reviewed at the time of building permit submittal and there will be additional requirements related to stormwater pollutant management and solid waste diversion and management. 27. ACCESSIBLE PATH OF TRAVEL Each tenant space of 18920 and 18922 Forge Drive shall have an accessible path of travel from the Public Right of Way to an accessible entrance to each tenant. 28. ACCESSIBLE EV CHARGING STATIONS Each tenant space of 18920 and 18922 Forge Drive shall have an accessible path of travel to the accessible parking stalls and accessible EV charging stations. PASSED AND ADOPTED this 28th day of October 2021 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Erick Serrano Albert Salvador Senior Planner Assistant Director of Community Development 28 AH 10-28-2021 28 of 82 TR-2021-037 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A TREE REMOVAL PERMIT TO ALLOW THE REMOVAL SIX PROTECTED TREES LOCATED AT 18920 – 18922 FORGE DRIVE SECTION I: PROJECT DESCRIPTION Application No.: TR-2021-037 Applicant: Brice Colton (Habitec Architecture) Location: 18920-18922 Forge Dr. (APN: 316-09-030) SECTION II: FINDINGS TREE REMOVAL PERMIT: WHEREAS, the City of Cupertino received an application for a Tree Removal permit as described in Section I of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15304 for the reasons set forth in the staff report dated October 28, 2021 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 2. That the location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by owners of similarly zoned and situated property, and the applicant has 29 AH 10-28-2021 29 of 82 Draft Resolution TR-2021-037 October 28, 2021 Page 2 demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the tree(s). The trees are proposed for removal due to the poor planting locations, and due to conflict with the proposed improvements. The applicant has worked with Staff to minimize the number of removals to those that are in poor health, direct conflict with proposed improvements, or both. 3. That the protected trees are a detriment to the subject property and cannot be adequately supported according to good urban forestry practices due to the overplanting or overcrowding of trees on the subject property. The trees are proposed for removal due to poor health, poor planting locations, and d ue to conflict with the proposed improvements. The applicant has worked with Staff to minimize the number of removals to those that are in poor health, direct conflict with proposed improvements, or both. The City’s consulting arborist has reviewed the arborist report and takes no exception to the proposal for removal. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof: The application for a Tree Removal permit, Application no. TR-2021-037 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. TR-2021-037 as set forth in the Minutes of the Administrative Hearing Meeting of October 28, 2021 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS This approval for tree removals is based on the certified arborist report prepared by Samuel Oakley (ISA Board Certified Master Arborist, WE-9474 B) with Arborwell, dated June 23, 2021 consisting of nine (9) pages, except as may be amended by conditions in this resolution. 30 AH 10-28-2021 30 of 82 Draft Resolution TR-2021-037 October 28, 2021 Page 3 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to v erify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. ASA-2021-002 shall be applicable to this approval. 4. TREE AND LANDSCAPE MAINTENANCE The property owner shall be responsible for ensuring that the existing trees and newly planted trees are properly maintained including but not limited to ensuring that there is adequate soil drainage, that the soil is well-aerated, and irrigation systems are thoroughly tested to provide sufficient water to landscaped areas while reducing water waste. 5. IN-LIEU TREE REPLACEMENT FEES The Director of Community Development has determined that it is physically infeasible to plant the eight (8) 24” box trees or four (4) 24” box trees and two (2) 36” box replacement trees on the subject site. Therefore, the applicant shall pay the tree replacement in-lieu fee, consistent with Protected Tree Ordinance Section 14.18.160 (B) (1), prior to tree removal or building permit issuance. 6. TREE PROTECTION For trees the trees that are to remain adjacent to Tree #4 and #6, the following measures are to take place prior to removal of Tree #4 and #6: Tree protection fecing at the back of the planter and/or wrapping the trunks with straw wattle to a height of eight (8) feet to provide a minimum protection against incidential contact by equipment. Root pruning guidelines to minimize damage to roots two (2) inches and larger in dimater (i.e. expose roots two (2) inches and larger in diameter by hand and prune them square and clean outside the limit of the proposed grading). Maintain the existing irrigation system or provide the trees with supplemental irrigation until irrigation system is operational. The tree protection measures shall be inspected and approved by the certified arborist prior to issuance of building permits. The City’s consulting arborist shall inspect the 31 AH 10-28-2021 31 of 82 Draft Resolution TR-2021-037 October 28, 2021 Page 4 trees to be retained and shall provide reviews prior to issuance of demolition, grading or building permits. Additionally, a report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. Any trees identified to be in poor health shall be required to be removed and replaced. 7. INDEMNIFICATION As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified partie s or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City . The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. 32 AH 10-28-2021 32 of 82 Draft Resolution TR-2021-037 October 28, 2021 Page 5 The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. PASSED AND ADOPTED this 28th day of October 2021 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Erick Serrano Albert Salvador Senior Planner Assistant Director of Community Development 33 AH 10-28-2021 33 of 82 NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:1587-7FG01PHASE 218922 FORGE DRIVECUPERTINO, CA 95014- INITIAL CITY SUBMITTAL 12/16/20192290 North First Street #304, San Jose, CA 95131P 408.977.0606 - F 408.298.4245www.habitec.comarchitecture and interior design1 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/2021J. BRICECOLTONC-3827330 SEP 2021RENEWALDATE7 DESIGN CHANGES 03/08/20218 RESUBMITTAL 03/08/20219 COMMENT RESPONSES 03/26/202110 COMMENT RESPONSES 06/29/202111 PLANNING RESPONSES 09/01/2021PROJECTSITE1. FIRE DETECTION / FIRE ALARM SYSTEM1.1. THE BUILDING SHALL BE EQUIPPED THROUGHOUT WITH AN EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM IN ACCORDANCEWITH CFC 907.5.2.2 AND 1005.3.1.2. FIRE SPRINKLER SYSTEM2.1. THE BUILDING SHALL BE EQUIPPED THROUGHOUT WITH AN AUTOMATIC FIRE SPRINKLER SYSTEM INSTALLED IN ACCORDANCE WITH CFC903.3.1.1 OR 903.3.1.2.2.1. FIRE SPRINKLERS SHALL BE PROVIDED IN ALL COMBUSTIBLE CONCEALED SPACES, IN ACCORDANCE WITH NFPA 13, 8.15.1.2.2. FIRE SPRINKLER SYSTEM SUBMITTAL SHALL CONTAIN THE FIRE SPRINKLER SYSTEM'S HYDRAULIC CALCULATION.2.3. PROOF OF 5-YEAR CERTIFICATION STICKER ON THE FIRE SPRINKLER RISER SHALL BE PROVIDED AT FINAL SPRINKLER INSPECTION.2.4. FIRE SPRINKLERS SHALL BE PROVIDED TO CHEMICAL FUME HOODS.3. SKYLIGHT SHOP DRAWINGS.4. RAISED ACCESS FLOOR SHOP DRAWINGS, SPECIFICATIONS, AND STRUCTURAL ANCHORAGE METHODS. SHOP DRAWINGS REQUIREAPPROVAL FROM THE ARCHITECT OF RECORD. ANCHORAGE REQUIRES APPROVAL FROM THE STRUCTURAL ENGINEER OF RECORD.5. MEZZANINE STAIR AND GUARDRAIL SHOP DRAWINGS, SPECIFICATIONS, AND STRUCTURAL ANCHORAGE METHODS. SHOP DRAWINGSREQUIRE APPROVAL FROM THE ARCHITECT OF RECORD. ANCHORAGE REQUIRES APPROVAL FROM THE STRUCTURAL ENGINEER OF RECORD.6. RELOCATED CHAMBER SHOP DRAWINGS AND ANCHORAGE. SHOP DRAWINGS REQUIRE APPROVAL FROM THE ARCHITECT OF RECORD.ANCHORAGE REQUIRES DESIGN BY THE CHAMBER VENDOR'S ENGINEER. NOTE ON CHAMBERS: NEW CHAMBER DRAWINGS ARE INCLUDEDIN THE MAIN PERMIT SUBMITTAL. ONLY RELOCATED CHAMBERS NEED TO BE DEFERRED.7. ISOLATED FLOATING SLAB ENGINEERED SHOP DRAWINGS. SHOP DRAWINGS REQUIRE APPROVAL FROM THE ARCHITECT AND STRUCTURALENGINEER OF RECORD.AB ANCHOR BOLT AC ASPHALT CONCRETEAD AREA DRAINADJ. ADJACENTAFF ABOVE FINISH FLOORALUM. ALUMINUMALT. ALTERNATEARCH. ARCHITECT/ARCHITECTURALAVG. AVERAGEAWC ACOUSTICAL WALL COVERINGBD. BOARDBLDG. BUILDINGBLKG. BLOCKINGBRZ. BRONZEBTM. BOTTOMBTWN. BETWEENBUR BUILT UP ROOFINGBW BOTH WAYSCB CATCH BASINCF CUBIC FEETCG CORNER GUARDCJ CONTROL JOINTCLKG. CAULKINGCLG. CEILINGCLR. CLEARCMU CONCRETE MASONRY UNITCO. CLEANOUTCOTG. CLEANOUT TO GRADECOL. COLUMNCONC. CONCRETECONT. CONTINUOUSCPT. CARPETCT CERAMIC TILECTR. CENTERCW COLD WATERDBL. DOUBLEDEPT. DEPARTMENTDF. DOUGLAS FIRDIA. DIAMETERDIAG. DIAGONALDIM. DIMENSIONDISP. DISPENSERDL DEAD LOADDN. DOWNDR. DOORDWG. DRAWINGDW DISHWASHER(E) EXISTINGEA. EACHEB. EXPANSION BOLTEIFS EXTERIOR INSULATION FINISH SYSTEMEJ. EXPANSION JOINTELEC. ELECTRIC/ELECTRICALELEV. ELEVATOR/ELEVATIONEN. EDGE NAILINGENCL. ENCLOSUREEP. ELECTRICAL PANELEQUIP. EQUIPMENTETR EXISTING TO REMAINEXT. EXTERIORFA FIRE ALARMFD FLOOR DRAINFDC FIRE DEPARTMENT CONNECTIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FLOORFH FIRE HYDRANTFHC FIRE HOSE CABINETFIN. FINISHFL FLOW LINEFLSHG. FLASHINGFLR. FLOORFLUOR. FLUORESCENTFOC FACE OF CONCRETEFOS FACE OF STUDFOW FACE OF WALLFRP FIBERGLASS REINFORCED PLASTICFRMG. FRAMINGFT. FOOTFTG. FOOTINGGA. GAUGEGALV. GALVANIZEDGC GENERAL CONTRACTORGLB GLUE LAMINATED BEAMGRDR. GIRDERGSM GALVANIZED SHEET METALGWB GYPSUM WALL BOARDHB HOSE BIBBHD HOLDOWNHDR. HEADERHGR. HANGERHM. HOLLOW METALHORIZ. HORIZONTALHR. HOURHT. HEIGHTHVAC HEATING/VENTILATING/AIR CONDITIONINGHW HOT WATERIN. INCH/INCHESINFO. INFORMATIONINSUL. INSULATIONINT. INTERIORJAN. JANITORJT. JOINTKP KICK PLATEKIT. KITCHENLAV. LAVATORYLB LAG BOLTLBS POUNDLF LINEAR FOOTLL LIVE LOADLS LAG SCREWLVL LAMINATED VENEER LUMBERMAX. MAXIMUMMB MACHINE BOLTMECH. MECHANICALMFD. MANUFACTUREDMFR. MANUFACTURERMICRO. MICROWAVEMIN. MINIMUMMISC. MISCELLANEOUSMTD. MOUNTEDMTL. METAL(N) NEWNIC NOT IN CONTRACTNA NOT APPLICABLENTS NOT TO SCALEO/ OVEROC ON CENTEROH OVERHEADOPNG. OPENINGPL. PLATEPLF POUNDS PER LINEAL FOOTPLAM. PLASTIC LAMINATEPLYWD. PLYWOODPNT. PAINTPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT PRESSURE TREATEDPVC. POLYVINYLCHLORIDEPVMT. PAVEMENTRA RETURN AIRRAD. RETURN AIRRB RUBBER BASERCP REFLECTED CEILING PLANRD ROOF DRAINRWD. REDWOODREF. REFERENCEREFR. REFRIGERATORREG. REGISTERREQD. REQUIREDREV. REVISIONRM. ROOMRO ROUGH OPENINGRWL RAINWATER LEADERSCHED. SCHEDULESD STORM DRAINSEC. SECTIONS.E.D SEE ELECTRICAL DRAWINGSSF SQUARE FOOTS.F.S.D. SEE FOOD SERVICE DRAWINGSSHTG. SHEATHINGSHWR. SHOWERSIM. SIMILARS.M.D. SEE MECHANICAL DRAWINGSSPEC. SPECIFICATIONS.P.D. SEE PLUMBING DRAWINGSS.S.D. SEE STRUCTURAL DRAWINGSS.S. STAINLESS STEELSS SOLID SURFACES.T.C. SOUND TRANSMISSION COEFFICIENTSTD. STANDARDSTL. STEELSTRUCT. STRUCTURALSUSP. SUSPENDEDSYS. SYSTEMT.TEMPEREDTEL. TELEPHONET.O.C. TOP OF CURBT&G TONGUE & GROOVETS TUBE STEELT.V. TELEVISIONTYP. TYPICALU.O.N. UNLESS OTHERWISE NOTEDVCT VINYL COMPOSITION TILEVENT. VENTILATION/VENTILATORVERT. VERTICALV.I.F. VESTIBULEW/ WITHWC WATER CLOSETWD. WOODWH WATER HEATERWDW. WINDOWW/O WITHOUTWP. WATERPROOFWSCT. WAINSCOTWT. WEIGHTWWF WELDED WIRE FABRIC1. HIGH PILED COMBUSTIBLE STORAGE SHALL REQUIRE A SEPARATE PERMIT AND SHALL COMPLY WITH SECTION903.2.7.1 OF THE 2016 C.B.C.2. SMOKE AND HEAT VENTING SHALL COMPLY WITH SECTION 910 OF THE 2016 C.B.C.3. THE TENANT IMPROVEMENT WORK SHALL BE DESIGNED AND CONSTRUCTED TO BE IN COMPLIANCE WITHSECTIONS 1203 AND 1205 (VENTILATION AND LIGHT) OF THE 2016 C.B.C.4. PROVIDE ILLUMINATED EXIT SIGNS ON A DEDICATED CIRCUIT COMPLYING WITH SECTION 1006, 2016 C.B.C.5. WALL OUTLETS SHALL BE LOCATED A MINIMUM OF 1'-3" ABOVE FINISH FLOOR. CONTROLS FOR LIGHTS, HVACSYSTEMS, ETC. SHALL BE LOCATED AS FOLLOWS:MAXIMUM HEIGHT: 4'-0" ABOVE FINISH FLOORMINIMUM HEIGHT: 3'-0" ABOVE FINISH FLOOR6. AN ASSEMBLY PERMIT IS REQUIRED FOR GROUP A OCCUPANCIES WHEN OCCUPANT IS 50 OR GREATER (49OCCUPANTS IS THE MAXIMUM OCCUPANT LOAD FOR A "B" OCCUPANCY)7. INSULATION SHALL COMPLY WITH SECTION 720.2, 2016 CBC. WITH A FLAME SPREAD RATING OF 25 OR LESSAND A MAXIMUM SMOKE DENSITY OF 450.AN APPLICATION FOR:ASA-2021-002 AT FG01T.I. AND NEW ENTRY18922 FORGE DRIVECUPERTINO, CA 95014ABBREVIATIONSMATERIAL SYMBOLSANNOTATIONSCONCRETEWOOD MEMBER(BLOCKING)WOOD MEMBER (CONTINUOUS,NOMINAL SIZE INDICATED)PLYWOODGYPSUM WALL BOARD SECTIONRIGID INSULATION BOARD OR TILEBASE ROCKEXISTING WALL SECTIONEARTH (SECTION)METAL (STEEL OR IRON)& AND∠ANGLE@AT℄CENTER LINE°DEGREESΔDELTAØDIAMETERFLOWLINE> GREATER THAN OR EQUAL TO< LESS THAN OR EQUAL TO± PLUS OR MINUS⅊PROPERTY LINE OR PLATE#POUNDABBREVIATIONSCOLUMN GRID LINESECTIONSECTION #SHEET #DETAILDETAIL #SHEET #INTERIOR ELEVATIONELEVATION #DETAIL #SHEET #ELEVATIONROOMIDENTIFICATIONNAME#INDICATESWINDOW TYPEFOLD/MATCH LINEDELTAREVISION CLOUDREVISION #ELEVATIONELEVATION #SHEET #AOPENINGINDICATES WINDOWOPENING NUMBERNAMEPROJECT DATAAPN................................................................................... 316-09-030RELATED BUILDING PERMIT SUBMITTALS.......................... BLD-2019-1123, BLD-2019-1600EXISTING BUILDING AREA, TOTAL FOOTPRINT................ ±91,404 SFEXISTING BUILDING AREA, INTERIOR............................... ±88,854 SF (BOTH PHASES COMBINED)PROPOSED AREA INCREASE, MEZZANINE...................... 612 SF (USABLE FOR STORAGE ONLY)PROPOSED TOTAL NEW INTERIOR AREA........................ ±89,466 SF (BOTH PHASES COMBINED, SEE A2.0.4 FOR CODE ANALYSIS)PHASE 2 AREA OF WORK................................................ ±71,199 SFSPRINKLER.......................................................................... YESNUMBER OF STORIES......................................................... 1TYPE OF CONSTRUCTION................................................. TYPE III-BTYPE OF OCCUPANCY..................................................... B (OFFICE AND NON-HAZARDOUS LAB)PROVIDED SITE PARKING ................................................. NO CHANGE, SEE OVERALL NEW SITE PLAN, SHEET A1.2CODES USED......................................................................2016 CBC, CPC, CMC, CEC, CFC, CA ENERGY CODE, CA GREEN BUILDING STANDARDSCODE, ACCESSIBILITY REGULATIONS, AND LOCALLY ADOPTED CODES.THIS PROJECT SHALL MEET THE REQUIREMENTS OF LEED CERTIFICATION.DEFERRED SUBMITTALSARCHITECTCONTRACTORAPPLE, INC.CONTACT: CARL BACONONE APPLE PARK WAY, MS 119-00CUPERTINO, CA 95014P: 408.783.1712E: carlbacon@apple.comCLIENT/TENANTNOTE: SHEETS MARKED WITH A STRIKETHROUGH ARE SUBMITTEDONLY WITH THE BUILDING APPLICATION, NOT THE PLANNINGAPPLICATION.ARCHITECTURALA0.1 COVER SHEET & GENERAL NOTESA0.2.0TYPICAL ADA DETAILS (FOR REFERENCE ONLY)A0.2.1TYPICAL ADA DETAILS (FOR REFERENCE ONLY) (CONT'D)A0.3.0CUPERTINO CALGREEN CHECKLISTA0.3.1CUPERTINO CALGREEN CHECKLIST (CONT'D)A0.4DOOR SCHEDULE & DETAILSA0.5WALL LEGEND & DETAILSA0.6WINDOW SCHEDULE & DETAILSA1.1 DEMO SITE PLANA1.2 NEW SITE PLANA1.2.1 SITE PHOTOSA1.3 NEW ENLARGED SITE PLANA1.4 EXTERIOR ELEVATIONSA1.5 EXTERIOR ELEVATIONS (CONT'D)A2.0.1PHASING PLAN (FOR REFERENCE ONLY)A2.0.2OVERALL DEMOLITION PLANA2.0.3OVERALL NEW PLANA2.0.4OVERALL EGRESS PLANA2.1.0BOULEVARD ENLARGED DEMOLITION PLANA2.1.2BOULEVARD ENLARGED DIMENSIONAL PLANA2.1.3BOULEVARD ENLARGED NOTATIONAL PLANA2.1.4BOULEVARD ENLARGED FINISH PLANA2.1.5BOULEVARD ENLARGED POWER PLANA2.2.0PLAZA AND ENTRY ENLARGED DEMOLITION PLANA2.2.2PLAZA AND ENTRY ENLARGED DIMENSIONAL PLANA2.2.3PLAZA AND ENTRY ENLARGED NOTATIONAL PLANA2.2.4PLAZA AND ENTRY ENLARGED FINISH PLANA2.2.5PLAZA AND ENTRY ENLARGED POWER PLANA2.3.0NORTH LABS ENLARGED DEMOLITION PLANA2.3.1NORTH LABS ENLARGED EQUIPMENT PLANA2.3.2NORTH LABS ENLARGED DIMENSIONAL PLANA2.3.3NORTH LABS ENLARGED NOTATIONAL PLANA2.3.4NORTH LABS ENLARGED FINISH PLANA2.3.5NORTH LABS ENLARGED POWER PLANA2.4.0SOUTHEAST LABS ENLARGED DEMOLITION PLANA2.4.1SOUTHEAST LABS ENLARGED EQUIPMENT PLANA2.4.2SOUTHEAST LABS ENLARGED DIMENSIONAL PLANA2.4.3SOUTHEAST LABS ENLARGED NOTATIONAL PLANA2.4.4SOUTHEAST LABS ENLARGED FINISH PLANA2.4.5SOUTHEAST LABS ENLARGED POWER PLANA2.5.0SOUTHWEST LABS ENLARGED DEMOLITION PLANA2.5.1SOUTHWEST LABS ENLARGED EQUIPMENT PLANA2.5.2 SOUTHWEST LABS ENLARGED DIMENSIONAL PLANA2.5.3 SOUTHWEST LABS ENLARGED NOTATIONAL PLANA2.5.4SOUTHWEST LABS ENLARGED FINISH PLANA2.5.5SOUTHWEST LABS ENLARGED POWER PLANA3.0.1OVERALL NEW REFLECTED CEILING PLANA3.1.0BOULEVARD ENLARGED DEMO RCPA3.1.1BOULEVARD ENLARGED NEW RCPA3.2.0PLAZA AND ENTRY ENLARGED DEMO RCPA3.2.1PLAZA AND ENTRY ENLARGED NEW RCPA3.3.0NORTH LABS ENLARGED DEMO RCPA3.3.1NORTH LABS ENLARGED NEW RCPA3.4.0SOUTHEAST LABS ENLARGED DEMO RCPA3.4.1SOUTHEAST LABS ENLARGED NEW RCPA3.5.0SOUTHWEST LABS ENLARGED DEMO RCPA3.5.1SOUTHWEST LABS ENLARGED NEW RCPA4.0.0OVERALL DEMOLITION ROOF PLANA4.0.1OVERALL NEW ROOF PLANA5.1BUILDING SECTIONSA5.2BUILDING SECTIONSA5.3BUILDING SECTIONSA5.4BUILDING SECTIONSA5.5BUILDING SECTIONSA5.6BUILDING SECTIONSA5.7 BUILDING SECTIONSA7.1.1INTERIOR ELEVATIONSA7.1.2INTERIOR ELEVATIONSA7.2.1BOULEVARD ELEVATIONSA7.2.2BOULEVARD ELEVATIONSA7.3.1LAB ELEVATIONSA7.3.2LAB ELEVATIONSA7.4.1RESTROOM ELEVATIONS AND ENLARGED FLOOR PLANSA7.4.2RESTROOM ELEVATIONS AND ENLARGED FLOOR PLANSA7.4.3RESTROOM ELEVATIONS AND ENLARGED FLOOR PLANSA7.5LOBBY DESK ELEVATIONS AND SECTIONSA8.1TYPICAL CEILING DETAILSA8.2WALL DETAILSA8.3WINDOW AND DOOR DETAILSA8.4MILLWORK DETAILSA8.5SLAB DETAILSA8.6EXTERIOR AND SITE DETAILSCIVILC1.0 TITLE SHEETC2.0 EXISTING CONDITIONSC2.1 EXISTING CONDITIONSC2.2 EXISTING CONDITIONSC2.3 EXISTING CONDITIONSC3.0 DEMOLITION PLANC3.1 DEMOLITION PLANC3.2 DEMOLITION PLANC3.3 DEMOLITION PLANC4.0 IMPROVEMENT PLANC4.1 IMPROVEMENT PLANC4.2 IMPROVEMENT PLANC4.3 IMPROVEMENT PLANC5.0 EROSION CONTROL PLANC5.1 EROSION CONTROL PLANC5.2 BEST MANAGEMENT PRACTICESC6.0 CONSTRUCTION DETAILSC6.1 CONSTRUCTION DETAILSLANDSCAPEL-1CONSTRUCTION PLANL-2CONSTRUCTION PLANL-3CONSTRUCTION PLANL-4CONSTRUCTION DETAILSL-5CONSTRUCTION DETAILSL-6CONSTRUCTION DETAILSL-7PLANTING SOILS PLANL-8PLANTING SOILS PLANL-9PLANTING SOILS PLANL-10 IRRIGATION PLANL-11 IRRIGATION PLANL-12 IRRIGATION PLANL-13 IRRIGATION DETAILSL-14 IRRIGATION DETAILSL-15TREE & GROUNDCOVER PLANL-16TREE & GROUNDCOVER PLANL-17TREE & GROUNDCOVER PLANL-18SHRUB PLANTING PLANL-19SHRUB PLANTING PLANL-20SHRUB PLANTING PLANL-21 PLANTING DETAILS & NOTESL-22SPECIFICATIONSL-23SPECIFICATIONSL-24SPECIFICATIONSL-25SPECIFICATIONSSTRUCTURALS0.1GENERAL NOTESS1.0FOUNDATION PLANS2.0ROOF FRAMING PLANS2.1ROOF FRAMING PLANS AND DETAILSS3.0DETAILSS4.0DETAILSS5.0DETAILSS5.1DETAILSS6.0DETAILSMECHANICALM0.00COVER SHEET, DRAWING INDEX & SYMBOL LEGENDM0.01CONSTRUCTION REQUIREMENTSM0.02EQUIPMENT SCHEDULESM0.03EQUIPMENT SCHEDULES (CONT'D)M0.04EQUIPMENT SCHEDULES (CONT'D)M1.01APARTIAL 1ST FLOOR NORTHEAST HVAC PLANM1.01BPARTIAL 1ST FLOOR SOUTHEAST HVAC PLANM1.01CPARTIAL 1ST FLOOR NORTHWEST HVAC PLANM1.01DPARTIAL 1ST FLOOR SOUTHWEST HVAC PLANM1.02APARTIAL ROOF NORTHEAST HVAC PLANM1.02BPARTIAL ROOF SOUTHEAST HVAC PLANM1.02CPARTIAL ROOF NORTHWEST HVAC PLANM1.02DPARTIAL ROOF SOUTHWEST HVAC PLANM2.01APARTIAL 1ST FLOOR NORTHEAST PIPING PLANM2.01BPARTIAL 1ST FLOOR SOUTHEAST PIPING PLANM2.01CPARTIAL 1ST FLOOR NORTHWEST PIPING PLANM2.01DPARTIAL 1ST FLOOR SOUTHWEST PIPING PLANM3.01APARTIAL 1ST FLOOR NORTHEAST DEMO HVAC PLANM3.01BPARTIAL 1ST FLOOR SOUTHEAST DEMO HVAC PLANM3.01CPARTIAL 1ST FLOOR NORTHWEST DEMO HVAC PLANM3.01DPARTIAL 1ST FLOOR SOUTHWEST DEMO HVAC PLANM5.01MECHANICAL DETAILSM5.02MECHANICAL DETAILS (CONT'D)M9.01APARTIAL 1ST FLOOR NORTHEAST ZONING PLANM9.01BPARTIAL 1ST FLOOR SOUTHEAST ZONING PLANM9.01CPARTIAL 1ST FLOOR NORTHWEST ZONING PLANM9.01DPARTIAL 1ST FLOOR SOUTHWEST ZONING PLANM10.01TITLE-24M10.02TITLE-24 (CONT'D)ELECTRICALE0.00DRAWING INDEX AND NOTESE0.01LEGENDE0.02LUMINAIRE, FEEDER & TRANSFORMER SCHEDULESE0.03TITLE 24 INDOOR LIGHTINGE0.04TITLE 24 INDOOR LIGHTING CONTROLSE0.05TITLE 24 OUTDOOR LIGHTINGE0.06TITLE 24 OUTDOOR LIGHTING CONTROLSE1.00SINGLE LINE DIAGRAM EXISTINGE1.01SINGLE LINE DIAGRAM NEW DISTRIBUTIONE1.02SINGLE LINE DIAGRAM GROUNDING RISERE3.00OVERALL POWER PLANE3.01PARTIAL LEVEL 1 POWER PLAN AREA AE3.02PARTIAL LEVEL 1 POWER PLAN AREA BE3.03PARTIAL LEVEL 1 POWER PLAN AREA CE3.04PARTIAL LEVEL 1 POWER PLAN AREA DE3.05PARTIAL LEVEL 1 SPECIAL POWER PLAN AREA AE3.06PARTIAL LEVEL 1 SPECIAL POWER PLAN AREA BE3.07PARTIAL LEVEL 1 SPECIAL POWER PLAN AREA CE3.08PARTIAL LEVEL 1 SPECIAL POWER PLAN AREA DE3.09OVERALL ROOF POWER PLANE4.01PARTIAL LEVEL 1 LIGHTING PLAN AREA AE4.02PARTIAL LEVEL 1 LIGHTING PLAN AREA BE4.03PARTIAL LEVEL 1 LIGHTING PLAN AREA CE4.04PARTIAL LEVEL 1 LIGHTING PLAN AREA DE6.00PANEL SCHEDULESE6.01PANEL SCHEDULESE6.02PANEL SCHEDULESE7.01WIRING DIAGRAMSE7.02NAMEPLATESE8.01ALEVEL 1 PHOTOMETRIC PLANE8.01BLEVEL 1 EMERGENCY PHOTOMETRIC PLANPLUMBINGP0.00COVER SHEET, DRAWING INDEX & SYMBOL LEGENDP0.01CONSTRUCTION REQUIREMENTSP0.02EQUIPMENT SCHEDULESP0.03EQUIPMENT SCHEDULESP1.01APARTIAL 1ST FLOOR NORTHEAST PLUMBING DEMO PLANP1.01BPARTIAL 1ST FLOOR SOUTHEAST PLUMBING DEMO PLANP1.01CPARTIAL 1ST FLOOR NORTHWEST PLUMBING DEMO PLANP1.01DPARTIAL 1ST FLOOR SOUTHWEST PLUMBING DEMO PLANP1.02BPARTIAL ROOF SOUTHEAST PLUMBING DEMO PLANP1.02CPARTIAL ROOF NORTHWEST PLUMBING DEMO PLANP1.02DPARTIAL ROOF SOUTHWEST PLUMBING DEMO PLANP2.00APARTIAL UNDERGROUND NORTHEAST PLUMBING PLANP2.00BPARTIAL UNDERGROUND SOUTHEAST PLUMBING PLANP2.00CPARTIAL UNDERGROUND NORTHWEST PLUMBING PLANP2.00DPARTIAL UNDERGROUND SOUTHWEST PLUMBING PLANP2.01APARTIAL 1ST FLOOR NORTHEAST PLUMBING PLANP2.01BPARTIAL 1ST FLOOR SOUTHEAST PLUMBING PLANP2.01CPARTIAL 1ST FLOOR NORTHWEST PLUMBING PLANP2.01DPARTIAL 1ST FLOOR SOUTHWEST PLUMBING PLANP2.02APARTIAL ROOF NORTHEAST PLUMBING PLANP2.02BPARTIAL ROOF SOUTHEAST PLUMBING PLANP2.02CPARTIAL ROOF NORTHWEST PLUMBING PLANP2.02DPARTIAL ROOF SOUTHWEST PLUMBING PLANP3.01.2ENLARGED BATHROOM CORE B DEMO/NEWP3.01.3ENLARGED BATHROOM CORE C DEMO/NEWP5.01.1SANITARY SEWER AND VENT RISER DIAGRAMP5.01.2SANITARY SEWER AND VENT RISER DIAGRAMP5.02WATER RISER DIAGRAMP5.04.3CDA FLOW DIAGRAMP5.04.4CDA FLOW DIAGRAMP5.05LAB WASTE FLOW DIAGRAMP6.01PLUMBING DETAILSP6.02PLUMBING DETAILSP6.03PLUMBING DETAILSP7.01POWER LOAD DIAGRAMSP10.01TITLE-24P10.02TITLE-24 (CONT'D)STUDIO INTERIOR DESIGNX001COVER SHEET - SYMBOLSX101STRUCTURAL SLAB DEPRESSION PLANX102FLOATING SLAB LAYOUT PLANX103CONSTRUCTION PLANX104ACOUSTIC FINISH PLANX105ELECTRICAL PLANX106ELECTRICAL DIAGRAMS, SCHEDULES, AND NOTESX107EQUIPMENT PLANX201REFLECTED CEILING PLANX202REFLECTED CEILING FINISH FRAMING PLANX203REFLECTED CEILING SHELL FRAMING PLANX301SECTIONSX302ELEVATIONSX303ELEVATIONSX401DETAILS - SHELL CONSTRUCTIONX402DETAILS - FRONT WALL ST 1-3 AND ACOUSTICSX403DETAILS - FRONT WALL ST 4-5 AND ACOUSTICSX404DETAILS - KAOS STUDIO ACOUSTICSX501DOOR SCHEDULE AND DETAILSCHAMBERS IAS-0COVER PAGEAS-1FACILITY LAYOUTAS-1.1FACILITY LAYOUTAS-2FLOOR PLANSAS-2.1ELEVATIONSAS-3FLOOR PLANSAS-3.1ELEVATIONSAS-4FLOOR PLANSAS-4.1ELEVATIONSAS-5CHAMBER VIEWS (RH) 772303RAS-6CHAMBER VIEWS (LH) 772303LAS-7SD DETAILSAS-8STANDARD DETAILS (4" WALLS)AS-9ELECTRICAL DETAILS (4" WALLS)AS-10STANDARD DETAILS (6" WALLS)AS-11ELECTRICAL DETAILS (6" WALLS)AS-12SILENCER DETAILAS-13SEISMIC DETAILSAS-14STABILIZER DETAILS (4" WALLS)AS-15STABILIZER DETAILS (6" WALLS)AS-16SEISMIC DETAILSAS-17SC SEISMIC DETAILSCHAMBERS IIACS1GENERAL NOTES AND PLANACS3STRUCTURAL PLANS AND ELEVATIONS — 200 HzACS6STRUCTURAL DETAILS — 200 HzACS7STRUCTURAL DETAILS — 200 HzFIRE DEPARTMENT NOTESMECHANICALELECTRICALCIVILPLUMBINGHABITEC ARCHITECTURECONTACT: BRICE COLTON2290 NORTH FIRST STREET, # 304SAN JOSE, CA 95131P: 408.977.0606E: bcolton@habitec.comNOVO CONSTRUCTIONCONTACT: JEFF BILINSKI1460 O'BRIEN DRIVEMENLO PARK, CA 94025P: 650.690.6373E: jbilinski@novoconstruction.comBKF ENGINEERSCONTACT: KYLE BRINKMAN1730 NORTH FIRST STREET, # 600SAN JOSE, CA 95112P: 408.467.9183E: kbrinkman@bkf.comSPRIG ELECTRICCONTACT: NAI SAECHAO1860 SOUTH TENTH STREETSAN JOSE, CA 95112P: 408.334.7141E: nsaechao@sprigelectric.comCOVER SHEET &GENERAL NOTESAS NOTED1. COMPLY WITH APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS PERTAINING TO SAFETY OFPERSONS, PROPERTY AND ENVIRONMENTAL PROTECTION.2. PROVIDE AN MAINTAIN BARRICADES, LIGHTING, AND GUARDRAILS AS REQUIRED BY APPLICABLE CODES ANDREGULATIONS TO PROTECT OCCUPANTS OF BUILDING AND WORKERS.3. ERECT AND MAINTAIN DUSTPROOF PARTITIONS AS REQUIRED TO PREVENT SPREAD OF DUST, FUMES ANDSMOKE, ETC. TO OTHER PARTS OF THE BUILDING. ON COMPLETION, REMOVE PARTITIONS AND REPAIRDAMAGED SURFACES TO MATCH ADJACENT SURFACES.4. IF DEMOLITION IS PERFORMED IN EXCESS OF THAT REQUIRED, RESTORE AFFECTED AREAS AT NO COST TO THEOWNER.5. REMOVE FROM SITE DAILY AND LEGALLY DISPOSE OF REFUSE, DEBRIS, RUBBISH AND OTHER MATERIALSRESULTING FROM DEMOLITION OPERATIONS.6. REMOVE DESIGNATED PARTITIONS, COMPONENTS, BUILDING EQUIPMENT AND FIXTURES AS REQUIRED FORNEW WORK.7. REMOVE ABANDONED ELECTRICAL, TELEPHONE AND DATA CABLING AND DEVICES, UNLESS OTHERWISENOTED.8. REMOVE EXISTING FLOOR FINISHES AND PREPARE SUB-FLOOR AS REQUIRED FOR NEW FLOOR FINISHES.9. SCOPE OF DEMOLITION INDICATED IS TO BE IN ITS ENTIRETY UNLESS NOTED OTHERWISE.DRAWING INDEXVICINITY MAPDEMOLITION NOTESGENERAL CONTRACTOR NOTESTENANT IMPROVEMENT NOTESSCOPE OF WORKTHIS PROJECT PROPOSES TO RENOVATE THE INTERIOR OF AN EXISTING SINGLE-STORY OFFICE AND LAB BUILDING. THE TENANT WILL NOT CHANGEAND THE BUILDING WILL CONTINUE TO BE USED AS AN OFFICE AND LAB. THIS PROJECT ALSO PROPOSES WORK TO THE MAIN ENTRY TO THEOFFICE AND LAB SPACE, THE RESTROOMS, AND THE BUILDING ELECTRICAL ROOM. THIS PROJECT IS PHASE 2 OF A WHOLE-BUILDINGRENOVATION. PHASE 1 WAS PREVIOUSLY SUBMITTED FOR PERMIT AS BLD-2019-1123.LAB SPACES ARE ANTICIPATED TO HAVE LOW CHEMICAL QUANTITIES AND WILL COUNT AS GROUP 'B' OCCUPANCIES.DEMOLITION OF INTERIOR IMPROVEMENTS ON SOUTH SIDE OF EXISTING DEMISING WALLRECONFIGURATION OF EXISTING RESTROOM CORES AND ADDITION OF NEW SINGLE-USE RESTROOMSCONSTRUCTION OF INTERIOR IMPROVEMENTS INCLUDING LAB SPACES, OFFICE SPACES, MEETING ROOMS, MILLWORK ETC.ROOF WORK IN PHASE 2 INCLUDES ADDITION OF 3 NEW SKYLIGHTS WITH OPENINGS DESIGNED BY THE STRUCTURAL ENGINEER.EXTERIOR WORK IN PHASE 2 INCLUDES A NEW MAIN ENTRY, A NEW PATIO, A NEW BACK ENTRY, PARTIAL RECONFIGURATION OF THE PARKINGLOT, A NEW ACCESSIBLE PATH TO FORGE DRIVE, AND LANDSCAPE WORK.PROJECT TEAM1. APPROVED ADDRESS NUMBERS SHALL BE VISIBLE AND LEGIBLE FROM STREET FRONTAGE AND SHALL CONTRASTWITH THEIR BACKGROUND.2. PROVIDE AN EMERGENCY TELEPHONE ON THE JOB PRIOR TO ANY CONSTRUCTION.3. A MINIMUM NUMBER SETS OF DRAWINGS APPROVED BY THE CITY FIRE DEPARTMENT SHALL BE SUBMITTED TOTHE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF WORK.4. KNOX BOX IS RECOMMENDED FOR BUILDINGS AND REQUIRED FOR ALL FIRE DEPARTMENT ACCESS GATES.CONTACT LOCAL FIRE DEPARTMENT FOR ADDITIONAL INFORMATION.5. FIRE DEPARTMENT ACCESS ROADWAYS SHALL BE MAINTAINED CLEAR & UNOBSTRUCTED. PROVIDE PROPERFIRE LANE SIGNAGE AND CURB STRIPING PER THE VEHICLE CODE SECTION 22500.1. CONTACT THE FIREDEPARTMENT FOR FIRE LANE PROGRAM GUIDELINES.6. NO HAZARDOUS MATERIALS WILL BE STORED AND/OR USED WITHIN THE BUILDING WHICH WILL EXCEED THEQUANTITIES LISTED IN CBC TABLES 3-D AND 3-E.7. CONSTRUCTION SITE FIRE SAFETY: ALL CONSTRUCTION SITES MUST COMPLY WITH APPLICABLE PROVISIONS OFTHE CFC CHAPTER 33 AND THE SANTA CLARA COUNTY CENTRAL FIRE PROTECTION DISTRICT SPECIFICATIONSI-7 (CONSTRUCTION SITE FIRE SAFETY).9. FIRE DEPARTMENT ACCESS TO THE SITE, THE BUILDING, AND TO ALL FIRE PROTECTION SYSTEMS SHALL BEMAINTAINED AT ALL TIMES, IN ACCORDANCE WITH CFC CHAPTER 5. NO OBSTRUCTIONS SHALL BE PLACEDNEAR FIRE HYDRANTS, FIRE DEPARTMENT CONNECTIONS, OR FIRE SPRINKLER CONTROL VALVES IN A MANNERTHAT WOULD PREVENT SUCH EQUIPMENT FROM BEING IMMEDIATELY DISCERNIBLE, IN ACCORDANCE WITHCFC 505.5.4.10. AT ANY TIME THAT THE FIRE SPRINKLER SYSTEM AND/OR FIRE DETECTION AND ALARM SYSTEM IS IMPAIRED, AFIRE WATCH SHALL BE PROVIDED. THE SYSTEM SHALL BE TAGGED, AND A CORRESPONDING IMPAIRMENTPROGRAM SHALL BE PROVIDED FOR THE FIRE PROTECTION SYSTEM, IN ACCORDANCE WITH CFC CHAPTER 9.11. THE INTEGRITY OF FIRE-RATED CONSTRUCTION SHALL BE MAINTAINED, IN ACCORDANCE WITH CFC AND CBCCHAPTER 7.12. FREE AND UNOBSTRUCTED EGRESS SHALL BE MAINTAINED AT ALL MEANS OF EGRESS, EXIT ACCESS ROUTES,AND EXITS. THIS SHALL APPLY TO THE ENTIRE BUILDING, REGARDLESS OF THE SCOPE OF WORK.LANDSCAPEWOOD ARCHITECTURECONTACT: TYSON CARROLL1512 W. MINERAL KING AVENUEVISALIA, CA 93291P: 559.786.9600E: tyson@iwoodarchitecture.comSTRUCTURALSTRUCTURAL ENGINEERS INC.CONTACT: JEROME FISHPAW2901 TASMAN DRIVE, # 100SANTA CLARA, CA 95054P: 408.380.8403E: fishpaw@structuralengineersinc.comUNITED MECHANICALCONTACT:2185 OAKLAND ROADSAN JOSE, CA 95131P: 408.232.9000E:LEEDBRIGHTWORKS SUSTAINABILITYCONTACT: HEATH BLOUNT2319B SHATTUCK AVENUEBERKELEY, CA 94704P: 415.230.2135E: heath.blount@brightworks.netACOUSTICSCHARLES M. SALTERCONTACT: JEREMY L. DECKER130 SUTTER STREETSAN FRANCISCO, CA 94104P: 415.470.5440E: jeremy.decker@cmsalter.comESASSESSOR'S MAPPROJECTSITESTUDIO INTERIORSFRANCIS MANZELLA DESIGNCONTACT: FRANCIS MANZELLA961 ROUTE 6MAHOPAC, NY 10541P: 941.248.7680E: fmanzella@fmdesign.com1. MATERIALS STORED ON THE SITE SHALL BE PROPERLY STACKED AND PROTECTED TO PREVENT DAMAGE ANDDETERIORATION UNTIL USE. FAILURE TO PROTECT MATERIALS MAY BE CAUSE FOR REJECTION OF WORK.2. VERIFY ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO COMMENCING ANY WORK. THE GENERALCONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OF THESE PLANS AND SPECIFICATIONS3. MAINTAIN THE JOB SITE IN A CLEAN AND ORDERLY CONDITION FREE OF DEBRIS AND LITTER. EACHSUB-CONTRACTOR IMMEDIATELY UPON COMPLETION OF EACH PHASE OF HIS OR HER WORK SHALL REMOVEALL TRASH AND DEBRIS AS A RESULT OF HIS OR HER OPERATIONS.4. NO PORTION OF THE WORK REQUIRING A SHOP DRAWING OR SAMPLE SUBMISSION SHALL BE COMMENCEDUNTIL THE SUBMISSION HAS BEEN REVIEWED AND ACTED UPON BY THE ARCHITECT. ALL SUCH PORTIONS OF THEWORK SHALL BE IN ACCORDANCE WITH THE REVIEWED SHOP DRAWINGS AND SAMPLES.5. CONFINE OPERATIONS AT THE SITE TO AREAS PERMITTED BY THE PROPERTY OWNER, LAWS, ORDINANCES,PERMITS, AND THE CONTRACT DOCUMENTS.6. SHOULD AN ERROR APPEAR IN THE NOTES, SPECIFICATIONS, OR DRAWINGS, OR IN WORK DONE BY OTHERS,EFFECTING THIS WORK, NOTIFY THE ARCHITECT AT ONCE FOR INSTRUCTIONS AS TO PROCEDURE. IF THECONTRACTOR PROCEEDS WITH WORK AFFECTED WITHOUT INSTRUCTIONS FROM THE ARCHITECT, THECONTRACTOR SHALL MAKE GOOD ANY RESULTING DAMAGE OR DEFECT.7. SHOULD CONFLICT OCCUR IN OR BETWEEN DRAWINGS AND SPECIFICATIONS, OR WHERE DETAIL REFERENCESON CONTRACT DRAWINGS HAVE BEEN OMITTED, CONTRACTOR IS DEEMED TO HAVE ESTIMATED THE MOSTEXPENSIVE MATERIALS AND CONSTRUCTION INVOLVED UNLESS HE OR SHE SHALL HAVE ASKED FOR ANDOBTAINED ANY WRITTEN DECISIONS FROM THE ARCHITECT AS TO WHICH METHOD OR MATERIALS WILL BEREQUIRED.8. PATCHING, REPAIRING, AND REPLACING OF MATERIAL SURFACES CUT OR DAMAGED IN EXECUTION OF WORKSHALL BE DONE WITH MATCHING MATERIALS SO THAT SURFACES REPLACED WILL, UPON COMPLETION, MATCHSURROUNDING SIMILAR SURFACES.9. ALL MECHANICAL AND ELECTRICAL EQUIPMENT SHALL HAVE A U.L. DESIGN LISTING NUMBER, OR EQUAL. THISLISTING NUMBER SHALL BE DISPLAYED ON THE INSTALLED EQUIPMENT. ANY EQUIPMENT NOT LISTED WILLREQUIRE FIELD TESTING AND CERTIFICATION BY AN APPROVED TESTING AGENCY.10. HAZARDOUS MATERIALS: THE ARCHITECT AND THE ARCHITECT'S CONSULTANTS SHALL HAVE NO RESPONSIBILITYFOR THE DISCOVERY, PRESENCE, HANDLING, REMOVAL, OR DISPOSAL OF OR EXPOSURE OF PERSONS TOASBESTOS OR HAZARDOUS OR TOXIC SUBSTANCES IN ANY FORM AT THE PROJECT SITE. PROFESSIONALSERVICES RELATED OR IN ANY WAY CONNECTED WITH THE INVESTIGATION, DETECTION, ABATEMENT,REPLACEMENT, USE, SPECIFICATION, OR REMOVAL OF PRODUCTS, MATERIALS, OR PROCESSES CONTAININGASBESTOS OR HAZARDOUS OR TOXIC MATERIALS ARE BEYOND THE SCOPE OF THIS AGREEMENT.11. IF PROJECT IS BID PRIOR TO RECEIVING ALL AGENCY APPROVALS FOR PERMIT, THE CONTRACTOR SHALLCARRY CONTINGENCIES IN BIDDING TO COVER CHANGES THAT MAY RESULT FROM PLAN CHECK COMMENTS.CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS AND UPDATING THE THE BUDGET BASED ONPERMITTED DRAWINGS.12. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION OF THE PROJECT AND ALL OF ITS COMPONENT PARTS.LAYOUT ENGINEERING AND DIMENSIONAL INFORMATION, IN ADDITION TO THE INFORMATION CONTAINED ONTHE CONTRACT DRAWINGS, THAT MAY BE DETERMINED BY THE CONTRACTOR AS NECESSARY TO ACCURATELYCONSTRUCT THE PROJECT IN CONFORMANCE WITH THE DESIGN INTENT AS SHOWN IN THE CONTRACTDRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR.SPECIAL CONDITIONS1. LEED CERTIFICATION REQUIRED. PROVIDE DOCUMENTATION; REQUIRED FOR BUILDING FINAL.UNITED MECHANICALCONTACT:2185 OAKLAND ROADSAN JOSE, CA 95131P: 408.232.9000E:1. FILLET WELDING (CHAMBERS)2. FULL-PENETRATION GROOVE WELDING (CHAMBERS)3. EXPANSION ANCHORS (CHAMBERS)4. THIRD-PARTY FIELD-LISTING OF UNLISTED EQUIPMENT (ETS LINDGREN CHAMBERS)5. THIRD-PARTY FIELD-LISTING OF UNLISTED EQUIPMENT (ECKEL CHAMBERS)6. WELDING (GUARDRAILS AT MEZZANINE)SPECIAL INSPECTIONS LIST11111134AH 10-28-2021 34 of 82 NOPARKINGXXELECTRICVEHICLECHARGINGSTATIONABCC.1DEFGHJKLMNOPQRST13.15.17.29.2121234567891112AFTBCDEGHJKLMNOPQRSC.110ELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONVANNOPARKINGELECTRICVEHICLECHARGINGSTATIONNO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:1587-7FG01PHASE 218922 FORGE DRIVECUPERTINO, CA 95014- INITIAL CITY SUBMITTAL 12/16/20192290 North First Street #304, San Jose, CA 95131P 408.977.0606 - F 408.298.4245www.habitec.comarchitecture and interior design1 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/2021J. BRICECOLTONC-3827330 SEP 2021RENEWALDATE7 DESIGN CHANGES 03/08/20218 RESUBMITTAL 03/08/20219 COMMENT RESPONSES 03/26/202110 COMMENT RESPONSES 06/29/202111 PLANNING RESPONSES 09/01/2021KEY NOTESLEGENDGENERAL NOTES1. WALKS AND SIDEWALKS SHALL BE A CONTINUOUS COMMON SURFACE, NOT INTERRUPTED BY STEPS OR BYABRUPT CHANGES IN LEVEL EXCEEDING 1/2 INCH, AND SHALL BE A MINIMUM OF 48 INCHES IN WIDTH.2. SURFACE CROSS SLOPES SHALL NOT EXCEED 1/4 INCH PER FOOT.3. WHEN THE SLOPE IN THE DIRECTION OF TRAVEL OF ANY WALK EXCEEDS 1:20, IT SHALL COMPLY WITH THEPROVISIONS FOR PEDESTRIANS RAMPS.4. ABRUPT CHANGES IN LEVEL ALONG ANY ACCESSIBLE ROUTE SHALL NOT EXCEED 1/2 INCH. WHEN CHANGES INLEVEL DO OCCUR, THEY SHALL BE BEVELED WITH A SLOPE NO GREATER THEN 1:2 EXCEPT THAT LEVEL CHANGESNOT EXCEEDING 1/2 INCH NOT BE VERTICAL. WHEN CHANGES IN LEVELS GREATER THAN 1/2 INCH ARENECESSARY THEY SHALL COMPLY WITH THE REQUIREMENTS FOR RAMPS.5. SURFACE SLOPES OF ACCESSIBLE PARKING SPACES SHALL NOT EXCEED 1/4 INCH PER FOOT IN ANY DIRECTION.6. ALL DAMAGED OR DETERIORATE FIRE LANE MARKING SHALL BE RE-STRIPED7. ALL CURBS WHICH OUTLINE THE FIRE LANE SHALL BE PAINTED RED WITH WHITE LETTERING READING "NOPARKING - FIRE LANE". THE TEXT SHALL BE FOUR INCHES TALL AND SHALL BE PLACED EVERY 30 FEET OR PORTIONTHEREOF, ON TOP OF DESIGNATED CURBING.8. ACCESSIBLE ROUTE, OTHER THAN RAMPS, SHALL HAVE A MAXIMUM RUNNING SLOPE OF 1:20 AND A MAXIMUMCROSS-SLOPE OF 1:48.4DEMO SITE PLAN AND ROOF PLAN1" = 20'-0"0 20' 40' 60'1" = 20'-0"10' 30'12(E) BUILDING.3(E) DRIVEWAY ENTRY.4(E) PARKING STALLS.56(E) ACCESSIBLE WALK.(E) ACCESSIBLE PARKING SIGN.(E) LANDSCAPING.8910717(E) ACCESSIBLE ENTRANCE TO OTHER PHASE OF PROJECT.REMOVE (E) CONCRETE CURB AND PAVING, SEE CIVIL DRAWINGS.REMOVE (E) LANDSCAPING, SEE LANDSCAPE DRAWINGS.NOT USED(E) TRASH ENCLOSURE.1112(E) ACCESSIBLE PARKING STALLS.13(E) ACCESSIBLE CURB RAMP (MAX 8.33% SLOPE).141516(E) SITE ACCESSIBLE TOW-AWAY SIGN.2334416799101410101010101212121213PROPERTY LINE(E) LANDSCAPE AND TREE TO REMAIN.(E) LANDSCAPE AND TREE TO BE REMOVED.115REMOVE (E) PARKING SPACES, S.C.D.18REMOVE (E) TREE, S.L.D.171415171415171415171515REMOVE (E) FENCEM S.L.D.14181616158611415DEMO SITE PLAN218(E) ELECTRIC VEHICLE PARKING STALLS.758881315.7A1.5.5A1.47A1.4REMOVE (E) CANOPY191920(E) ENTRY PATIO, INCLUDES CONCRETE RETAINING WALLS, PRECAST CONCRETE PAVERS,CONCRETE STAIRS, CONCRETE RAMP, GUARDRAILS, AND HANDRAIL.20REMOVE (E) ASPHALT, S.C.D.21221514522(E) ACCESSIBLE VAN STALL.721FORGE DRIVE TREE REMOVAL SCHEDULE(E) PARKING SPACE AND STRIPED LOADING AISLE TO BE REMOVED.16PARKING TABULATIONABCDGENUS: SOUTHERNLIVE OAK, QUERCUSVIRGINIANA, NOT ACALIFORNIA NATIVE.TRUNK DIAMETER: 5"SPECIES: LONDON PLANEPLATANUS x ACERIFOLIATRUNK DIAMETER: 4"SPECIES: VELVET ASH(AKA MODESTO ASH)FRAXINUS VELUTINATRUNK DIAMETER: 13"SPECIES: SOUTHERN LIVEOAK, QUERCUSVIRGINIANA, NOT ACALIFORNIA NATIVE.TRUNK DIAMETER: 5"ABCDAESPECIES: JAPANESERED MAPLEACER PALMATUMTRUNK DIAMETER: 4"EFUTURE DEMISING WALL BETWEENPHASES 1 AND 2. SEE A2.0.1.FUTURE DEMISING WALL BETWEENPHASES 1 AND 2. SEE A2.0.18920 FORGE DRIVENOT IN SCOPE OF WORK. REFER TO PERMIT BLD-2019-1123.18922 FORGE DRIVE16EXISTING BUILDING AREA, INTERIOR............................................................... ±88,854 SF (BOTH PHASES COMBINED)PROPOSED AREA INCREASE, NON-OCCUPIABLE STORAGE MEZZANINE... 612 SFPROPOSED TOTAL NEW INTERIOR AREA......................................................... ±89,466 SF (BOTH PHASES COMBINED)TYPE OF OCCUPANCY..................................................... B (OFFICE AND NON-HAZARDOUS LAB)FSPECIES: COASTREDWOOD, SEQUOIASEMPERVIRENS.TRUNK DIAMETER: 36"FPARKINGSTALL TYPEEXISTING, TOBE DEMO'DEXISTING, TOREMAINEXISTING, TOBE RELOCATEDEXISTING,TOTALNEWPROPOSED,TOTALSTANDARD2151128281 279ACCESSIBLE41516VAN ACCESS.1112E.V.CHARGING666STANDARDACCESS E.V.C.011VAN ACCESSE.V.C.011TOTAL 294 295(E) SOLID WOOD FENCE ±6'-0" TALL TO REMAIN. SEE "SOUTH FENCE PHOTO" ON SHEET A1.2.1.2311232325111111(E) HEDGE ±6'-0" TALL TO REMAIN. SEE "EAST FENCE AND HEDGE PHOTO" ON SHEET A1.2.1.24(E) METAL FENCE AND HEDGE ±6'-0" TALL TO REMAIN. SEE "WEST HEDGE AND FENCE PHOTO" ON SHEET A1.2.1.25241135AH 10-28-2021 35 of 82 NOPARKINGXXELECTRICVEHICLECHARGINGSTATIONFORGE DRIVE, A PRIVATE STREET 33030303415156EV4A7471131KAISER PERMANENTE PARKING LOT,IN THE CITY OF SANTA CLARA,NOT IN AREA OF WORKSINGLE-FAMILY RESIDENCES, IN THE CITY OF SANTA CLARA, NOT IN AREA OF WORK ABCC.1DEFGHJKLMNOPQRST13.15.17.29.2121234567891112AFTBCDEGHJKLMNOPQRSC.1103010900 NORTH TANTAU AVENUE,NOT IN AREA OF WORK81184ELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONVANNO PARKING NO PARKING NOPARKINGLOADING ZONE ONLYNOPARKINGEV CHARGINGONLYELECTRICVEHICLECHARGINGSTATIONEV CHARGINGONLY3A11EV1EV1A30"x48"CLR.30"x48" CLR. 30"x48" CLR.30"x48"CLR.30"x48" CLR. ±6 L.F.±6 L.F. ±6 L.F.±3 L.F. 22'-0"22'-0"R42'-0"22'-0"R42'-0"204'-5"EXISTING REAR SETBACK72'-0"EXISTING SIDE SETBACK 67'-9"50'-1"FRONT SETBACK67'-10"EXISTING SIDE SETBACK 48'-11"NEW SIDE SETBACK 51'-2"NEW SIDE SETBACK FROM FENCE 179'-3"NEW REAR SETBACKFROM FENCE53'-6"NEW SIDE SETBACK FROM FENCE 27'-9"18'-0"18'-0"18'-0"33'-3"26'-2"18'-0"NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:1587-7FG01PHASE 218922 FORGE DRIVECUPERTINO, CA 95014- INITIAL CITY SUBMITTAL 12/16/20192290 North First Street #304, San Jose, CA 95131P 408.977.0606 - F 408.298.4245www.habitec.comarchitecture and interior design1 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/2021J. BRICECOLTONC-3827330 SEP 2021RENEWALDATE7 DESIGN CHANGES 03/08/20218 RESUBMITTAL 03/08/20219 COMMENT RESPONSES 03/26/202110 COMMENT RESPONSES 06/29/202111 PLANNING RESPONSES 09/01/2021KEY NOTESLEGENDGENERAL NOTES(N) ENTRY PATIO, CONFORM TO (E) FINISH FLOORAT (N) DOOR. INCLUDES THE FOLLOWING (N)FEATURES: CAST-IN-PLACE CONCRETE FLATWORK,PRECAST CONCRETE PAVERS, AND CONCRETERETAINING WALLS.(N) FENCE, S.L.D.(N) BICYCLE LOCKERS. LOCKERS SHALL HAVELOCKING DOORS ON BOTH SIDES AND SHALL HAVEWEATHER-RESISTANT TOPS. PROVIDE 20 BICYCLEPARKING SPACES BY STACKING LOCKERS.(N) CONCRETE PAVING, CONFORM TO (E) GRADESAND MAINTAIN ACCESSIBLE SLOPES, S.C.D.(N) TRUNCATED DOME DETECTABLE WARNING,S.C.D.4NEW SITE PLAN AND ROOF PLAN1" = 20'-0"0 20' 40' 60'1" = 20'-0"10' 30'(N) PRECAST CONCRETE PAVERS.PROPERTY LINEACCESSIBLE PATH OF TRAVEL(N) CONCRETE PAVING AND CURB..16A1.3(N) LANDSCAPE, S.L.D.(E) LANDSCAPE AND TREE.(N) DECORATIVE CLADDING ON (E) WALL.(N) WALL WITH (N) PAINTED STUCCO.FINISH SHALL MATCH THE (E) BUILDING.20(N) ACCESSIBLE PARKING STALLS, SEE 8/A0.2.21(N) STANDARD PARKING STALLS, S.C.D.,EACH STALL SHALL BE 8'-6" x 18'-0" MINIMUM.22(N) 12'-0" WIDE STRIPED LOADING AISLE,SEE 10/A0.2.23(N) ACCESSIBLE PARKING SIGN, SEE 3/A0.2.2412(E) BUILDING.3(E) DRIVEWAY ENTRY.4(E) PARKING STALLS.56(E) ACCESSIBLE WALK.(E) ACCESSIBLE PARKING SIGN, SEE DETAIL 3/A0.2(E) LANDSCAPING.8910717(E) ACCESSIBLE ENTRANCE TO OTHER PHASE OFPROJECT.(E) ACCESSIBLE SIDEWALK.(E) TRASH ENCLOSURE.1112(E) ACCESSIBLE PARKING STALLS, SEE DETAIL 8/A0.213(E) ACCESSIBLE CURB RAMP (MAX 8.33% SLOPE),SEE DETAIL 11/A0.2141516(E) SITE ACCESSIBLE TOW-AWAY SIGN, SEE DETAIL2/A0.218(E) ELECTRIC VEHICLE PARKING STALLS.19LOT COVERAGE ANALYSISPARKING TABULATIONNEW SITE PLAN2334991014101011111212121312022151715188611428881315161019202122(N) ACCESSIBLE ENTRANCE, SEE DETAIL 4/A0.2252424242522222215.6A1.3.4A1.3.8A1.5.6A1.48A1.423(N) CANOPY OVER DOOR. CANOPY CONSISTSOF STEEL FRAME FASTENED TO CONCRETE WALLCOVERED WITH DARK GRAY CANVAS.26FIRE ACCESS LANE, MINIMUM 22'-0" WIDE,MINIMUM 42'-0" OUTSIDE RADIUS AT TURNS,MINIMUM 13'-6" CLEAR HEIGHT.27272727272626342627(E) ACCESSIBLE VAN STALL, SEE 8/A0.2.2830(E) ENTRY PATIO, INCLUDES CONCRETE RETAININGWALLS, PRECAST CONCRETE PAVERS, CONCRETESTAIRS, CONCRETE RAMP, GUARDRAILS, ANDHANDRAILS, OTHER PHASE OF PROJECT.293855(N) ACCESSIBLE VAN STALL, SEE DETAIL 8/A0.230(N) 3' CONCRETE APRON AROUND BUILDING TODIVERT WATER AWAY FROM FOUNDATION.3131311414(N) TRUNCATED DOME DETECTABLE WARNING1715(N) WASTEWATER HOLDING TANK.3232PER 2016 CBC TABLE 11B-208.2, THE PARKING PROVIDED MUST INCLUDE A MINIMUM OF 7 ACCESSIBLE STALLS.PROPOSED LONG-TERM BICYCLE PARKING SPACES: 20PROPOSED SHORT-TERM BICYCLE PARKING SPACES: 161. WALKS AND SIDEWALKS SHALL BE A CONTINUOUS COMMON SURFACE, NOT INTERRUPTED BY STEPS OR BYABRUPT CHANGES IN LEVEL EXCEEDING 1/2 INCH, AND SHALL BE A MINIMUM OF 48 INCHES IN WIDTH.2. SURFACE CROSS SLOPES SHALL NOT EXCEED 1/4 INCH PER FOOT.3. WHEN THE SLOPE IN THE DIRECTION OF TRAVEL OF ANY WALK EXCEEDS 1:20, IT SHALL COMPLY WITH THEPROVISIONS FOR PEDESTRIANS RAMPS.4. ABRUPT CHANGES IN LEVEL ALONG ANY ACCESSIBLE ROUTE SHALL NOT EXCEED 1/2 INCH. WHEN CHANGES INLEVEL DO OCCUR, THEY SHALL BE BEVELED WITH A SLOPE NO GREATER THEN 1:2 EXCEPT THAT LEVEL CHANGESNOT EXCEEDING 1/2 INCH NOT BE VERTICAL. WHEN CHANGES IN LEVELS GREATER THAN 1/2 INCH ARENECESSARY THEY SHALL COMPLY WITH THE REQUIREMENTS FOR RAMPS.5. SURFACE SLOPES OF ACCESSIBLE PARKING SPACES SHALL NOT EXCEED 1/4 INCH PER FOOT IN ANY DIRECTION.6. ALL DAMAGED OR DETERIORATE FIRE LANE MARKING SHALL BE RE-STRIPED7. ALL CURBS WHICH OUTLINE THE FIRE LANE SHALL BE PAINTED RED WITH WHITE LETTERING READING "NOPARKING - FIRE LANE". THE TEXT SHALL BE FOUR INCHES TALL AND SHALL BE PLACED EVERY 30 FEET OR PORTIONTHEREOF, ON TOP OF DESIGNATED CURBING.8. ACCESSIBLE ROUTE, OTHER THAN RAMPS, SHALL HAVE A MAXIMUM RUNNING SLOPE OF 1:20 AND A MAXIMUMCROSS-SLOPE OF 1:48..11A1.3SPECIFIC ENLARGED PLANFUTURE DEMISING WALL BETWEENPHASES 1 AND 2. SEE A2.0.1.FUTURE DEMISING WALL BETWEENPHASES 1 AND 2. SEE A2.0.18920 FORGE DRIVENOT IN SCOPE OF WORK. REFER TO PERMIT BLD-2019-1123.18922 FORGE DRIVE3334(N) ACCESSIBLE EXIT ONLY.35(E) ACCESSIBLE EXIT ONLY.36(N) GATES IN PATIO FENCE SHALL BE ACCESSIBLEENTRIES/EXITS AND SHALL COMPLY WITH ACCESSIBILITYDETAILS PROVIDED IN ARCHITECTURAL DRAWINGS. SEELANDSCAPE DRAWINGS FOR ADDITIONAL DETAILS.(N) ACCESSIBLE SECONDARY ENTRY/EXIT.263433263533363633343437(E) RAISED CURB BETWEEN PEDESTRIAN WALKWAY ANDVEHICLE DRIVE AISLE AND/OR PARKING STALL.CONTRACTOR SHALL VERIFY IN FIELD THAT CURB ISAPPROXIMATELY 4" TO 6" HIGH. NOTIFY ARCHITECT ANDCIVIL ENGINEER IF CURB DOES NOT COMPLY.37372222PARKINGSTALL TYPEEXISTING, TOBE DEMO'DEXISTING, TOREMAINEXISTING, TOBE RELOCATEDEXISTING,TOTALNEWPROPOSED,TOTALSTANDARD2151128281 279ACCESSIBLE41516VAN ACCESS.1112E.V.CHARGING666STANDARDACCESS E.V.C.011VAN ACCESSE.V.C.011TOTAL 294 2952838CONVERT (E) ACCESSIBLE PARKING STALL INTO (N)STANDARD ACCESSIBLE ELECTRIC VEHICLE CHARGINGSTATION. SEE DETAIL 10/A0.2.1.39CONVERT (E) STANDARD PARKING SPACE INTO (N)VAN ACCESSIBLE ELECTRIC VEHICLE CHARGINGSTATION. SEE DETAIL 15/A0.2.1.39.9A0.2.1TYP. ACCESSIBILITY DETAILEXISTING BUILDING AREA, INTERIOR............................................................... ±88,854 SF (BOTH PHASES COMBINED)PROPOSED AREA INCREASE, NON-OCCUPIABLE STORAGE MEZZANINE... 612 SFPROPOSED TOTAL NEW INTERIOR AREA......................................................... ±89,466 SF (BOTH PHASES COMBINED)TYPE OF OCCUPANCY.................................................................................... B (OFFICE AND NON-HAZARDOUS LAB)21151540(N) SIGN DISPLAYING THE INTERNATIONAL SYMBOL OFACCESSIBILITY AND THE WORDS "VAN ACCESSIBLE".THE BOTTOM OF THE SIGN SHALL BE MINIMUM 60"ABOVE THE GROUND.40.12A1.3SPECIFIC ENLARGED PLAN15ACCESSIBLE AISLE ALTERNATE MATERIALSAND METHODSA FORTHCOMING REVISION TO THE 2019 CALIFORNIA BUILDING CODE, WHICH IS EXPECTED TO GO INTO EFFECTON JULY 1, 2021, WILL ALLOW ACCESSIBLE PARKING SPACES AND ELECTRIC VEHICLE CHARGING STATIONS TOSHARE AN ACCESSIBLE AISLE. WE WOULD LIKE TO USE ALTERNATE MATERIALS AND METHODS TO APPLY THISCODE REVISION EARLY TO THE ACCESS AISLE AT GRIDLINE E1. PLEASE SEE THE SPECIAL CONDITIONS LIST ONSHEET A0.1 AND A COPY OF THE ALTERNATE MATERIALS AND METHODS APPLICATION ON SHEET A0.2.1.41(N) SCCFD-APPROVED KNOX BOX OR KNOXKEY-SWITCH ADJACENT TO DOOR.414141.15A0.2.1TYP. ACCESSIBILITY DETAILEXISTINGNEWTOTAL SITE AREA± 252,779 S.F. (5.803 ACRES) ± 252,779 S.F. (5.803 ACRES)TOTAL IMPERVIOUS AREA± 208,889 S.F.± 211,077 S.F.ROOF AREA± 94,734 S.F.±94,458 S.F.ROOF LOT COVERAGE37%37%TOTAL PERVIOUS AREA± 36,154 S.F.± 33,966 S.F.LANDSCAPE AREA± 36,154 S.F.± 32,640 S.F.PERVIOUS PAVING AREA0 S.F.± 1,326 S.F.LANDSCAPE LOT COVERAGE14%13%42424242(E) FENCE TO REMAIN. SEE PHOTOS ON SHEET A1.2.1.1111111136AH 10-28-2021 36 of 82 NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:1587-7FG01PHASE 218922 FORGE DRIVECUPERTINO, CA 95014- INITIAL CITY SUBMITTAL 12/16/20192290 North First Street #304, San Jose, CA 95131P 408.977.0606 - F 408.298.4245www.habitec.comarchitecture and interior design1 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/2021J. BRICECOLTONC-3827330 SEP 2023RENEWALDATE7 DESIGN CHANGES 03/08/20218 RESUBMITTAL 03/08/20219 COMMENT RESPONSES 03/26/202110 COMMENT RESPONSES 06/29/202111 PLANNING RESPONSES 09/01/2021SITE PHOTOSEAST FENCE AND HEDGE PHOTO, EXISTING TO REMAIN. FENCE IS ±6'-0" TALL.WEST FENCE AND HEDGE PHOTO, EXISTING TO REMAIN. FENCE IS ±6'-0" TALL.SOUTH FENCE PHOTO, EXISTING TO REMAIN. FENCE IS ±6'-0" TALL.INDICATED ON SHEET A1.2 BY THE HATCH AT LEFT. ALSO SEE KEYNOTE 18.STEPSTONE "NARROW MODULAR" PRECAST CONCRETE PAVERS.COLOR 1813 "PORCELAIN".LIGHT SANDBLAST FINISH.PHOTOS BELOW REPRESENT MANUFACTURER'S TYPICAL CATALOG COLOR.NEW CONCRETE PAVERSNEW CONCRETE AND TRUNCATED DOMESCONCRETE FLATWORK AND CURBINDICATED ON SHEET A1.2 BY THE HATCHAT LEFT. ALSO SEE KEYNOTE 14.NATURAL-COLORED, BROOM-FINISHEDCONCRETE.TRUNCATED DOME DETECTABLE WARNINGINDICATED ON SHEET A1.2 BY THE HATCHAT LEFT. ALSO SEE KEYNOTE 15.COLOR: FEDERAL YELLOW.NEW PAINT ON EXISTING STUCCOTHE INTENT IS TO MAINTAIN THE BUILDING'S EXISTING EXTERIOR COLOR. STUCCO PATCHES AND REPAIRS AROUNDTHE BUILDING WILL REQUIRE NEW PAINT. IN THE PHOTO BELOW, SEVERAL PAINT SWATCHES ARE HELD AGAINST THEACTUAL EXISTING STUCCO. THE BEST MATCH SEEMS TO BE "SW7071 SCREEN GRAY". THE CONTRACTOR WILLPROVIDE MOCK-UPS ON THE BUILDING TO VERIFY THE COLOR MATCH.NEW FENCESEE KEYNOTE 17 ON SHEET A1.2 FOR LOCATIONS. ENCLOSES NEW PATIO, BICYCLE STORAGE AREA, ANDEQUIPMENT AREA. FENCE CONSISTS OF SEALED, NATURAL-COLORED IPE WOOD 1x6 BOARDS PLACEDHORIZONTALLY IN FRONT OF A STEEL FRAME ABOVE A CONCRETE CURB (AT EQUIPMENT AREA) ORCONCRETE SEAT WALL (AT PATIO). PHOTO BELOW IS A TYPICAL EXAMPLE SIMILAR TO THE SPECIFICATION.NEW CANVAS AWNINGSEE KEYNOTE 26 ON SHEET A1.2 FOR LOCATIONS. OCCURS OVER SIDE AND REAR DOORS OF THE BUILDING.AWNING CONSISTS OF GRAY CANVAS OVER A GRAY-PAINTED STEEL FRAME. PHOTO BELOW IS A TYPICALEXAMPLE SIMILAR TO THE SPECIFICATION.PHOTO BELOW IS FROM A RECENT PROJECT WITH THE SAME SPECIFICATIONS.NEW EXTERIOR WALL SCONCECONTECH LIGHTING "CYL6 SERIES".LED DOWNLIGHT.28 WATTS, 2600 LUMENS, 3500K COLOR TEMPERATURE.LOCATION: AT NEW PATIO NEAR GRID T1.PHOTO BELOW IS FROM THE MANUFACTURER'S CATALOG.EAST FENCE AND HEDGE PHOTO, EXISTING TO REMAIN. FENCE IS ±6'-0" TALL.1111111137AH 10-28-2021 37 of 82 FEGHJK22'-0"±21'-738"±21'-738"±21'-738"±21'-738"EFGHJKLMNOP-0"22'-0"±21'-738"±21'-738"±21'-738"±21'-738"±21'-678"±21'-778"±21'-738"±21'-738"±21'-738"281'-0"NOPARKINGLOADING ZONE ONLYNOPARKINGEV CHARGINGONLY22'-0"CLEAR DRIVE AISLE92'-3 1/2"4'-0"8'-0"9'-0"8'-0"9'-0"9'-3"5'-0"18'-0"4'-0"9'-6"5'-0"14'-0"9'-0"9'-3"9'-3"8'-10"3'-0" 18'-0"12'-0"7'-0"18'-0"3'-0"QRST13.1±21'-738"±21'-738"±21'-738"49'-412"30"x48"CLR.30"x48" CLR. 30"x48" CLR.30"x48"CLR.30"x48" CLR. ±6 L.F.±6 L.F. ±6 L.F. ±3 L.F. 5'-0"2'-6"±19'-6"14'-5"5'-0"8"10'-6"4'-0"2'-0"3'-0"4'-0"4'-0"2'-1"±4'-0" S.L.D. ±6'-0" S.L.D. ±37'-6", S.L.D.±4'-0"S.L.D.±6'-0"S.L.D.±33'-6", S.L.D.5'-0" MIN.6'-0" MIN. 3'-10"3'-10"OPQ±21'-738"±21'-738"RICLENGONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATION12'-0"5'-0"18'-0" 5'-0"4'-0"MIN.3'-0"5'-0"MIN.5'-0" MIN. 3'-0"EV CHARGINGONLY5'-0"MIN.12'-0"MIN.18'-0" MIN.- BACKGROUNDS 09/11/2019NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:1587-7FG01PHASE 218922 FORGE DRIVECUPERTINO, CA 95014- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20192290 North First Street #304, San Jose, CA 95131P 408.977.0606 - F 408.298.4245www.habitec.comarchitecture and interior design1 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/2021J. BRICECOLTONC-3827330 SEP 2021RENEWALDATE7 DESIGN CHANGES 03/08/20218 RESUBMITTAL 03/08/20219 COMMENT RESPONSES 03/26/2021KEY NOTESLEGEND16NEW FRONT ENTRY1/8" = 1'-0"(N) PRECAST CONCRETE PAVERS.PROPERTY LINEACCESSIBLE PATH OF TRAVEL(N) CONCRETE PAVING AND CURB.(N) CONCRETE PAVING BY OTHERS. AT THE TIME OF WRITING, THIS WORK IS SUBMITTED TO THE CITYBY OTHERS FOR PERMIT, BUT NOT YET UNDER CONSTRUCTION.(E) LANDSCAPE AND TREE.ENLARGED SITE PLANS102'4' 8' 16' 24'1/8" = 1'-0"1(E) CONCRETE WALL TO REMAIN.2(N) FURRING, SHEATHING, AND STUCCO ON (E) STRUCTURE AND FOUNDATION.SEE WALL TYPE 1 ON SHEET A0.5 AND SEE DETAILS 17 AND 18/A5.7.3(N) PRECAST CONCRETE PAVERS, SET ON A BED OF SAND OVER A SUB-GRADE SLAB OVER GRAVELOVER COMPACTED EARTH.4(N) CONCRETE SLAB-ON-GRADE OVER GRAVEL OVER COMPACTED EARTH.5(N) CONCRETE RETAINING WALL, SEE 11/A8.6.6(N) TRUNCATED DOME DETECTABLE WARNING. REFER TO DETAIL 10/A0.27(N) LANDSCAPING, S.L.D.(N) BICYCLE STORAGE LOCKERS.8(N) FENCE AND GATE, S.L.D. AND ELEVATION 2/A8.6. ALL GATES SHALL COMPLY WITH EGRESS ANDACCESSIBILITY CODES AND SHALL INCLUDE KICK PLATES AND PANIC HARDWARE.9123455667789456NEW REAR ENTRY1/8" = 1'-0"02'4' 8' 16' 24'1/8" = 1'-0"4NEW BREAK AREA PATIOAND WASTEWATER HOLDING TANK ENCLOSURE1/8" = 1'-0"02'4' 8' 16' 24'1/8" = 1'-0"19(N) GRAVEL OR DECOMPOSED GRANITE GROUNDCOVER, S.L.D.1020(N) CANOPY OVER DOOR, SEE ELEVATION 8/A1.4 AND DETAIL 3/A8.6.11111111(N) LANDSCAPE, S.L.D.4(N) PARKING STALL WITH STRIPING AND WHEEL STOP. REFER TO DETAIL 8/A0.212121213(N) ACCESSIBLE PARKING SPACE WALL-MOUNTED IDENTIFICATION SIGN. REFER TO DETAIL 3/A0.214(N) CONTINUOUS TRUNCATED DOME DETECTABLE WARNING. REFER TO DETAIL 10/A0.212131313149515(N) WASTEWATER HOLDING TANK. THIS TANK WILL HOLD WASTEWATER THAT IS NOT SUITABLE FOR DISCHARGEINTO THE SEWER SYSTEM, BUT IS ALSO NON-HAZARDOUS. THIS TANK WILL BE CUSTOM-BUILT TO APPROXIMATELY84"W x 126"L x 96"T. WEIGHT WHEN FULL WILL BE APPROXIMATELY 30,000 POUNDS. TANK WILL BE ANCHOREDTO CONCRETE SLAB AT 8 TO 10 POINTS. FINAL TANK DESIGN WILL BE A DEFERRED SUBMITTAL.151612NEW VAN ACCESSIBLEE.V. CHARGING STATION1/8" = 1'-0"02'4' 8' 16' 24'1/8" = 1'-0"16(N) WASTEWATER PUMP-OUT CONNECTION. HAUL-OFF TRUCK WILL USE THIS CONNECTION TO EMPTY TANK.64517CONVERT (E) PARKING STALL INTO (N) VAN-ACCESSIBLE E.V. CHARGING STATION. SEE DETAIL 15/A0.2.1 FORADDITIONAL INFORMATION.18(N) STRIPED LOADING AISLE AND ACCESSIBLE PATH OF TRAVEL.19(N) CONCRETE CURB.1718194RAMP 20CONCRETE BENCH, SEE LANDSCAPE DRAWINGS FOR ADDITIONAL DETAILS AND EXACT DIMENSIONS.9.10A0.2.1TYP. ACCESSIBILITY DETAIL921WHEELCHAIR SPACE. MINIMUM CLEARANCE 30" WIDE AND 48" LONG. WHEEL SPACE UNDER TABLESSHALL COMPLY WITH DETAIL 16/A0.2.1.22(N) FURNITURE. WHERE WHEELCHAIR SPACES ARE SHOWN AT TABLES, TABLE LEGS SHALL NOT IMPEDETHE FLOOR, KNEE, OR TOE SPACE SHOWN IN DETAILS 2 AND 16/A0.2.1.23MAINTAIN CLEAR AISLES MINIMUM 44" WIDE TO EGRESS GATES.20202121222222222323911NEW ACCESSIBLE PATHAT EXISTING E.V. CHARGING STATION1/8" = 1'-0"02'4' 8' 16' 24'1/8" = 1'-0"222221222222212122991819938AH 10-28-2021 38 of 82 39AH 10-28-2021 39 of 82 40AH 10-28-2021 40 of 82 9.2OPQST01UP35'-8"34'-10"4'-2"3'-6"22'-8"9'-2"3'-1"4'-8"13'-4"17'-8"3'-6"3'-11"4'-2"35'-8"MEZZANINE ABOVE60''CLR.60''CLR.60''CLR.7.29.212TLMNOPQRS±21'-778"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"281'-0"49'-412"49'-5" 30"x48"CLR.30"x48"CLR.41'-11"11'-8"2'-10"3'-2 1/2"2'-5"11'-8"7'-0"13'-1"4'-4"5'-0"16'-1"6'-0"7'-2"20'-7" 6'-11"7'-0"EQ.EQ.8'-2"±11'-2"5'-0"7'-3"7'-7"12'-7"1'-5"6'-10"13'-7"±33'-10"7'-9"8'-0"7'-4"7'-0"10'-3"3'-6"3'-6"3'-11"4'-2"2WHWHBCC.1DEGHJKLMNOPQRS235791234567891112AFTBCDEGHJKLMNOPQRSC.11022'-0"22'-0"22'-0"22'-0"22'-0"±21'-738"±21'-738"±21'-738"±21'-738"±21'-678"±21'-778"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"281'-0"110'-0"11'-0"11'-0"22'-0"22'-0"22'-0"22'-0"22'-0"±21'-738"±21'-738"±21'-738"±21'-738"±21'-678"±21'-778"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"281'-0"110'-0"11'-0"11'-0"24'-6"22'-0" 198'-0" 22'-0"22'-0"22'-0"22'-0"22'-0"22'-0"22'-0"22'-0"24'-6" 24'-6"24'-1012" 49'-5"49'-412"49'-5"49'-5"49'-412"- BACKGROUNDS 09/11/2019NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:1587-7FG01PHASE 218922 FORGE DRIVECUPERTINO, CA 95014- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20192290 North First Street #304, San Jose, CA 95131P 408.977.0606 - F 408.298.4245www.habitec.comarchitecture and interior design1 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/2021J. BRICECOLTONC-3827330 SEP 2021RENEWALDATE7 DESIGN CHANGES 03/08/20218 RESUBMITTAL 03/08/20219 COMMENT RESPONSES 03/26/2021LEGENDKEY NOTESWALL TO BE CENTERED ON (E) COLUMN1GENERAL NOTES1. VERIFY ALL DIMENSIONS IN FIELD PRIOR TO CONSTRUCTION.2. "ALIGN" SHALL MEAN TO ACCURATELY LOCATE FINISH FACES IN THE SAME PLANE.3. "SIMILAR" SHALL MEAN COMPARABLE CHARACTERISTICS FOR THE CONDITION NOTED. VERIFY DIMENSIONSAND ORIENTATION ON PLANS AND ELEVATIONS.4. ADJUST PARTITION THICKNESS AND CAVITY FOR INCLUSION OF INTERNAL ELEMENTS, SUCH AS PLUMBING,AND FOR CORRECT INSTALLATION OF FIXTURES, PANELS, BOXES, ETC..5. FINISH GYPSUM DRYWALL COMPLETELY TO WITHIN 1/4" OF FLOOR TO ENSURE A SOLID WALL BASEINSTALLATION.6. GENERAL: AT ALTERED CONSTRUCTION, REPAIR CUT EDGES, REPLACE CONSTRUCTION AND FIT NEW TOEXISTING CONSTRUCTION AS REQUIRED TO MATCH EXISTING WORK. WHERE NEW PAINT OR OTHER NEWFINISHES ARE JOINED, CARRY TO NEAREST BREAK IN SURFACES, CORNER, OR OTHER BREAK INCONSTRUCTION AS REQUIRED FOR NEW AND FINISHED APPEARANCE.7. WHERE CONCRETE FLOORS REQUIRE LEVELING, PROVIDE SELF LEVELING CEMENTITIOUS FILLER FLOATED TO AFEATHER EDGE. MIX AND APPLY IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.02'4' 8' 16' 24'1/8" = 1'-0"SOUTHWEST LABSENLARGED DIMENSIONALPLAN1/8" = 1'-0"(E) WINDOW TO REMAIN(E) DOOR TO REMAIN(N) DOOR..#ROOM TAGALIGN FINISH FACES OF (E) AND (N) CONSTRUCTION(N) WALL, SEE A0.5 AND A2.2.110(N) WINDOW.AA#.##ELEVATION TAG4KEY PLAN1/64"=1'-0"8ACOUSTICAL LABSENLARGED DIMENSIONAL FLOOR PLANSCALE: 1/8" = 1'-0"PLAZA1299CORRIDOR1296VEST.1268OPEN LAB1130PROJECT1132PROJECT1136PROJECT1137PROJECT1138OPEN LAB1139OPEN LAB1134OPEN OFFICE1270OPEN OFFICE1276OPEN OFFICE1280COPY / PRINT1282SMALL CONF.1278PHONE1279LAB1104LAB1105LAB1100LAB1101SMALL CONF.1272PHONE1273SMALL CONF.1274CORRIDOR1297CONTROL1096(E) CHAMBER1097VEST.1092LAB1094PROJECT1091LAB1090PROJECT1093PHONE1294STORAGE12981ALIGNALIGNALIGNALIGN1ALIGNALIGNALIGN ALIGN 1ALIGNALIGNALIGNALIGNALIGN WALL OFFSET FROM (E) COLUMN.222ALIGN.20-20ACOUSTICAL LABSENLARGED DIMENSIONAL MEZZANINNE FLOOR PLANSCALE: 1/8" = 1'-0"1OPEN TO BELOWOPEN TO BELOWPHONE ROOM, SINGLE OCCUPANCY.3333STORAGEMEZZANINE11469941AH 10-28-2021 41 of 82 60''CLR.60''CLR.60''CLR.7.29.2LMNOPQRS±21'-778"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"281'-0"49'-412"49'-5"BCC.1DEGHJKLMNOPQRS235791234567891112AFTBCDEGHJKLMNOPQRSC.11022'-0"22'-0"22'-0"22'-0"22'-0"±21'-738"±21'-738"±21'-738"±21'-738"±21'-678"±21'-778"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"281'-0"110'-0"11'-0"11'-0"22'-0"22'-0"22'-0"22'-0"22'-0"±21'-738"±21'-738"±21'-738"±21'-738"±21'-678"±21'-778"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"±21'-738"281'-0"110'-0"11'-0"11'-0"24'-6"22'-0" 198'-0" 22'-0"22'-0"22'-0"22'-0"22'-0"22'-0"22'-0"22'-0"24'-6" 24'-6"24'-1012" 49'-5"49'-412"49'-5"49'-5"49'-412"129.2OPQST01UPTVEST.1092- BACKGROUNDS 09/11/2019NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:1587-7FG01PHASE 218922 FORGE DRIVECUPERTINO, CA 95014- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20192290 North First Street #304, San Jose, CA 95131P 408.977.0606 - F 408.298.4245www.habitec.comarchitecture and interior design1 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/2021J. BRICECOLTONC-3827330 SEP 2021RENEWALDATE7 DESIGN CHANGES 03/08/20218 RESUBMITTAL 03/08/202102'4' 8' 16' 24'1/8" = 1'-0"SOUTHWEST LABSENLARGED NOTATIONALPLAN1/8" = 1'-0"4KEY PLAN1/64"=1'-0"8ACOUSTICAL LABSENLARGED NOTATIONAL FLOOR PLANSCALE: 1/8" = 1'-0".1053.1091.1093.1094.1096.1092.1101.1100.1105.1104.1280.1283.1278.1279.1130A.1136.1137.1138.1272.1273.1274.1130C.1268.1132.1130B.1294.1090PLAZA1299CORRIDOR1296VEST.1268OPEN LAB1130PROJECT1132PROJECT1136PROJECT1137PROJECT1138OPEN LAB1139OPEN LAB1134OPEN OFFICE1270COPY / PRINT1282SMALL CONF.1278PHONE1279LAB1104LAB1105LAB1100LAB1101SMALL CONF.1272PHONE1273SMALL CONF.1274CONTROL1096(E) CHAMBER1097LAB1094PROJECT1091LAB1090PROJECT1093PHONE1294STORAGE129818131313444444444121216777777777666677677655556998888688999.5.1.2.112A7.1.11KEY NOTESGENERAL NOTES1. VERIFY ALL DIMENSIONS IN FIELD PRIOR TO CONSTRUCTION.2. "ALIGN" SHALL MEAN TO ACCURATELY LOCATE FINISH FACES IN THE SAME PLANE.3. "SIMILAR" SHALL MEAN COMPARABLE CHARACTERISTICS FOR THE CONDITION NOTED. VERIFY DIMENSIONSAND ORIENTATION ON PLANS AND ELEVATIONS.4. ADJUST PARTITION THICKNESS AND CAVITY FOR INCLUSION OF INTERNAL ELEMENTS, SUCH AS PLUMBING,AND FOR CORRECT INSTALLATION OF FIXTURES, PANELS, BOXES, ETC..5. FINISH GYPSUM DRYWALL COMPLETELY TO WITHIN 1/4" OF FLOOR TO ENSURE A SOLID WALL BASEINSTALLATION.6. GENERAL: AT ALTERED CONSTRUCTION, REPAIR CUT EDGES, REPLACE CONSTRUCTION AND FIT NEW TOEXISTING CONSTRUCTION AS REQUIRED TO MATCH EXISTING WORK. WHERE NEW PAINT OR OTHER NEWFINISHES ARE JOINED, CARRY TO NEAREST BREAK IN SURFACES, CORNER, OR OTHER BREAK INCONSTRUCTION AS REQUIRED FOR NEW AND FINISHED APPEARANCE.7. WHERE CONCRETE FLOORS REQUIRE LEVELING, PROVIDE SELF LEVELING CEMENTITIOUS FILLER FLOATED TO AFEATHER EDGE. MIX AND APPLY IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS..41.5(N) CASEWORK, SEE INTERIOR ELEVATIONS IN SHEET A7.1.1..1EXTEND (E) COLUMN DOWNWARD AT (N) PIT. SEE STRUCTURAL DRAWINGS.2SEE STRUCTURAL DRAWINGS FOR FRAMING DETAILS UNDER MEZZANINE.3PREFABRICATED METAL STAIRS. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO ARCHITECT FOR REVIEWPRIOR TO CONSTRUCTION. STAIRS SHALL CONFORM TO ALL ACCESSIBILITY AND EGRESS REQUIREMENTS,INCLUDING THOSE SHOWN ON 3/A0.2.1.4.2.3.4.8.8.8CORRIDOR1297.1270CR13126.6A5.7(N) MOTION CAPTURE SYSTEM, SEE INTERIOR ELEVATION A7.3.2.5.5.5.5.8A5.7.5.5.1.2.2LEGEND(E) WINDOW TO REMAIN(E) DOOR TO REMAIN(N) DOOR..#ROOM TAGALIGN FINISH FACES OF (E)AND (N) CONSTRUCTION.110(N) WINDOW.AA#.##ELEVATION TAG(E) WALL EXTENDED TOFULL-HEIGHT1(N) EXTERIOR OPENING INFILL(N) FURRED WALL OVER (E)WALL(N) THROUGH GRID, STC 35(N) FURRED WALL OVER (E)WALL(N) FULL HEIGHT, STC 35(N) THROUGH GRID, STC 40(N) FULL HEIGHT, STC 40(N) THROUGH GRID, STC 45(N) FULL HEIGHT, STC 45(N) THROUGH GRID, STC 50(N) FULL HEIGHT, STC 50(N) THROUGH GRID, STC 55(N) FULL HEIGHT, STC 55(N) THROUGH GRID, STC 60(N) FULL HEIGHT, STC 60(N) THROUGH GRID, STC 65(N) FULL HEIGHT, STC 65234567891011121314151716FOR REFERENCE WALL AND BRACING DETAILS, SEE SHEET A0.5.(N) FURRED WALL OVER (E)WALL18(N) FURRED WALL OVER (E)WALL1919191912(N) FURRED WALL WITH TV POCKET. COORDINATE SIZE WITH OWNER'S A.V. TEAM.67.6.6.6.7TYP..7TYP..7TYP.UPUPWHERE (E) WINDOW SILL IS BELOW EXTERIOR FINISH GRADE, PROVIDE (N) 6" CONCRETE CURB AND (N)WINDOW, SEE DETAIL 13/A8.6 AND SEE CIVIL DRAWINGS. MATCH APPEARANCE OF (E) WINDOWS.AT (E) AND (N) EXTERIOR WINDOWS AT LAB AND OFFICE SPACE, PROVIDE (N) PRIVACY FILM.20ACOUSTICAL LABSENLARGED NOTATIONAL MEZZANINNE FLOOR PLANSCALE: 1/8" = 1'-0"910.20-MEZZ. ABOVE.6A5.7STORAGEMEZZANINE1146161618188488(N) PREFABRICATED STEEL TUBE GUARDRAIL. GC SHALL SUBMIT SHOP DRAWINGS FOR REVIEW BY ARCHITECT.GUARDRAIL SHALL GENERALLY CONSIST OF 1" ROUND STEEL TUBES WITH LESS THAN 4" CLEAR SPACEBETWEEN TUBES.79FORKLIFT LOADING GATE IN MEZZANINE GUARDRAIL. GATE SHALL BE SELF-CLOSING, SHALL LOCK WHENEVERCLOSED, SHALL OPEN INTO THE MEZZANINE, AND SHALL INCLUDE A WARNING SIGN. GC SHALL SUBMIT SHOPDRAWINGS FOR REVIEW BY ARCHITECT.8.4.8.987742AH 10-28-2021 42 of 82 12'-0" RISE21 EQUAL STEPS ± 3'-6" 7" MAX.11" MIN.42" MINIMUM 23"23"12"MIN.34" MIN. - 38" MAX. 34" MIN. - 38" MAX.4'-2"4'-4"6" MAX.4" MAX.4-3/8"MAX.10'-0"12'-0"42" MIN. 12'-0" 7'-0" MIN. TO 7'-5" MAX.2"21'-6"3'-0"6"7'-0"- BACKGROUNDS 09/11/2019NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:1587-7FG01PHASE 218922 FORGE DRIVECUPERTINO, CA 95014- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20192290 North First Street #304, San Jose, CA 95131P 408.977.0606 - F 408.298.4245www.habitec.comarchitecture and interior design1 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/2021J. BRICECOLTONC-3827330 SEP 2021RENEWALDATE7 DESIGN CHANGES 03/08/20218 RESUBMITTAL 03/08/20219 COMMENT RESPONSES 03/26/202110 COMMENT RESPONSES 06/29/2021BUILDING SECTIONSKEYNOTES12(E) ROOF STRUCTURE TO REMAIN.3(E) ROOF TO REMAIN.4(E) CONCRETE HEADER TO REMAIN.5(E) EQUIPMENT WELL TO REMAIN.6(N) HEADER.78910(N) MEZZANINE CONSISTS OF PLYWOOD DECK OVER METAL STUD JOISTS, SEE STRUCTURAL DRAWINGS.(N) WALL WITH (1) LAYER PLYWOOD AND (1) LAYER GYPSUM BOARD EACH SIDE. SEESTRUCTURAL DRAWINGS.(N) WALL. ON ONE SIDE, PROVIDE (1) LAYER PLYWOOD UNDER GYPSUM BOARD. S.S.D.(E) CONCRETE COLUMN TO REMAIN, BEYOND.(N) T.BAR CEILING, SEE R.C.P.87654321109OPEN LAB 1130PROJECT 1137CORRIDOROPEN OFFICE 12766A8.24A8.25A8.26NEW PARTIAL BUILDING SECTIONMEZZANINESCALE: 1/2"=1'-0"18NEW EXTERIOR WALL SECTIONSCALE: 1/2"=1'-0"3/4" ACRYLIC STUCCO OVER GALVANIZEDMETAL LATH AND (2) LAYERS GRADE 'D' PAPER.COLOR AND TEXTURE SHALL MATCH NEARBYEXISTING WALLS. PROVIDE CONTROL JOINTSEVERY 144 SF, SEE ELEVATIONS FOR ADDITIONALINFORMATION.METAL STUD.STEEL POST, SSD.EMBED POST IN CONCRETE FOOTING, SSD.(N) FOOTING SHALL MATCH (E) FOOTINGLOCATIONS. HAND-DUG AROUND TREEROOTS. CONSULT WITH ARBORIST DURINGEXCAVATION.G.S.M. FLASHING.13A8.2SIM.14A8.2SIM.17NEW EXTERIOR WALL SECTIONSCALE: 1/2"=1'-0"13A8.214A8.28NEW PARTIAL BUILDING SECTIONMEZZANINE STAIRSSCALE: 1/2"=1'-0"1111(N) WALL BEYOND3/4" ACRYLIC STUCCO OVER GALVANIZEDMETAL LATH AND (2) LAYERS GRADE 'D' PAPER.COLOR AND TEXTURE SHALL MATCH NEARBYEXISTING WALLS. PROVIDE CONTROL JOINTSEVERY 144 SF, SEE ELEVATIONS FOR ADDITIONALINFORMATION.EXTERIOR-GRADE, FIRE-TREATED PLYWOODSHEATHING OR EXTERIOR-GRADEGYPSUM-BASED SHEATHING.6" METAL STUD.G.S.M. FLASHING.STORAGE MEZZANINE 1146OPEN LAB 1130CORRIDOR OPEN OFFICE 12761212(N) PREFAB METAL STAIRS. GC SHALL SUBMIT SHOP DRAWINGS FOR REVIEW BY ARCHITECT.SEE 3/A0.2.1 FOR ADDITIONAL DETAIL AND DIMENSIONS.1313(N) HANDRAIL SHALL COMPLY WITH 3/A0.2.1.STEEL TUBE, SEE STRUCTURAL DRAWINGS.CONCRETE SPREAD FOOTING, SEE STRUCTURALDRAWINGS.EXTERIOR-GRADE, FIRE-TREATED PLYWOODSHEATHING OR EXTERIOR-GRADEGYPSUM-BASED SHEATHING.14GENERAL CONTRACTOR SHALL VERIFY MEZZANINE HEAD CLEARANCE IN THE FIELD. MINIMUM CLEAR HEIGHTFROM FINISH FLOOR OF MEZZANINE TO OVERHEAD OBSTRUCTIONS SHALL BE 7'-0". IF EXISTING OBSTRUCTIONSARE LOWER THAN 7'-0" ABOVE MEZZANINE, THEN GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT ANDDISCUSS MOVING OBSTRUCTIONS OR LOWERING MEZZANINE FLOOR HEIGHT.1415(N) PREFABRICATED STEEL TUBE GUARDRAIL. GC SHALL SUBMIT SHOP DRAWINGS FOR REVIEW BY ARCHITECT.GUARDRAIL SHALL GENERALLY CONSIST OF 1" ROUND STEEL TUBES WITH LESS THAN 4" CLEAR SPACEBETWEEN TUBES.1515151043AH 10-28-2021 43 of 82 1730 N. First Street, Suite 600, San Jose, CA 95112 T 408.467.9100 BKF PROJECT# 20190456-10 K:\2019\190456_Cupertino_18920_ForgeDR\ENG\ENGINEERING\SHEETS\PHASE 2\C3.0_FG01_DM.dwg 23 Apr 2021 8:41:42am brik- BACKGROUNDS 09/11/2019 NO. DESCRIPTION: DATE: SCALE: CIVIL ENGINEER: PROJECT INFO: ARCHITECT: REVIEWED BY: PROJECT NO: DRAWN BY: APPROVED BY: 1587-7 FG01 PHASE 2 18922 FORGE DRIVE CUPERTINO, CA 95014 - DD PROGRESS 09/27/2019 - DD ISSUED FOR REVIEW 10/18/2019 - INITIAL CITY SUBMITTAL 12/16/2019 1 COMMENT RESPONSES 06/22/2020 2 DESIGN CHANGES 06/22/2020 3 DESIGN CHANGES 07/24/2020 4 DESIGN CHANGES 11/06/2020 5 RESUBMITTAL 12/11/2020 2290 North First Street #304, San Jose, CA 95131 P 408.977.0606 - F 408.298.4245 www.habitec.com architecture and interior design AS SHOWN KB PC PC 7 DESIGN CHANGES 03/08/2021 8 RESUBMITTAL 03/08/2021 6 PLANNING APPLICATION 01/29/2021 9 RESUBMITTAL 04/23/2021 44 AH 10-28-2021 44 of 82 1730 N. First Street, Suite 600, San Jose, CA 95112 T 408.467.9100 BKF PROJECT# 20190456-10 K:\2019\190456_Cupertino_18920_ForgeDR\ENG\ENGINEERING\SHEETS\PHASE 2\C4.0_FG01_IMP.dwg 28 Apr 2021 10:48:03pm brik- BACKGROUNDS 09/11/2019 NO. DESCRIPTION: DATE: SCALE: CIVIL ENGINEER: PROJECT INFO: ARCHITECT: REVIEWED BY: PROJECT NO: DRAWN BY: APPROVED BY: 1587-7 FG01 PHASE 2 18922 FORGE DRIVE CUPERTINO, CA 95014 - DD PROGRESS 09/27/2019 - DD ISSUED FOR REVIEW 10/18/2019 - INITIAL CITY SUBMITTAL 12/16/2019 1 COMMENT RESPONSES 06/22/2020 2 DESIGN CHANGES 06/22/2020 3 DESIGN CHANGES 07/24/2020 4 DESIGN CHANGES 11/06/2020 5 RESUBMITTAL 12/11/2020 2290 North First Street #304, San Jose, CA 95131 P 408.977.0606 - F 408.298.4245 www.habitec.com architecture and interior design AS SHOWN KB PC PC 7 DESIGN CHANGES 03/08/2021 8 RESUBMITTAL 03/08/2021 6 PLANNING APPLICATION 01/29/2021 9 RESUBMITTAL 04/23/2021 45 AH 10-28-2021 45 of 82 1730 N. First Street, Suite 600, San Jose, CA 95112 T 408.467.9100 BKF PROJECT# 20190456-10 K:\2019\190456_Cupertino_18920_ForgeDR\ENG\ENGINEERING\SHEETS\PHASE 2\C4.0_FG01_IMP.dwg 28 Apr 2021 10:48:48pm brik- BACKGROUNDS 09/11/2019 NO. DESCRIPTION: DATE: SCALE: CIVIL ENGINEER: PROJECT INFO: ARCHITECT: REVIEWED BY: PROJECT NO: DRAWN BY: APPROVED BY: 1587-7 FG01 PHASE 2 18922 FORGE DRIVE CUPERTINO, CA 95014 - DD PROGRESS 09/27/2019 - DD ISSUED FOR REVIEW 10/18/2019 - INITIAL CITY SUBMITTAL 12/16/2019 1 COMMENT RESPONSES 06/22/2020 2 DESIGN CHANGES 06/22/2020 3 DESIGN CHANGES 07/24/2020 4 DESIGN CHANGES 11/06/2020 5 RESUBMITTAL 12/11/2020 2290 North First Street #304, San Jose, CA 95131 P 408.977.0606 - F 408.298.4245 www.habitec.com architecture and interior design AS SHOWN KB PC PC 7 DESIGN CHANGES 03/08/2021 8 RESUBMITTAL 03/08/2021 6 PLANNING APPLICATION 01/29/2021 9 RESUBMITTAL 04/23/2021 46 AH 10-28-2021 46 of 82 1730 N. First Street, Suite 600, San Jose, CA 95112 T 408.467.9100 BKF PROJECT# 20190456-10 K:\2019\190456_Cupertino_18920_ForgeDR\ENG\ENGINEERING\SHEETS\PHASE 2\C4.0_FG01_IMP.dwg 28 Apr 2021 10:49:43pm brik- BACKGROUNDS 09/11/2019 NO. DESCRIPTION: DATE: SCALE: CIVIL ENGINEER: PROJECT INFO: ARCHITECT: REVIEWED BY: PROJECT NO: DRAWN BY: APPROVED BY: 1587-7 FG01 PHASE 2 18922 FORGE DRIVE CUPERTINO, CA 95014 - DD PROGRESS 09/27/2019 - DD ISSUED FOR REVIEW 10/18/2019 - INITIAL CITY SUBMITTAL 12/16/2019 1 COMMENT RESPONSES 06/22/2020 2 DESIGN CHANGES 06/22/2020 3 DESIGN CHANGES 07/24/2020 4 DESIGN CHANGES 11/06/2020 5 RESUBMITTAL 12/11/2020 2290 North First Street #304, San Jose, CA 95131 P 408.977.0606 - F 408.298.4245 www.habitec.com architecture and interior design AS SHOWN KB PC PC 7 DESIGN CHANGES 03/08/2021 8 RESUBMITTAL 03/08/2021 6 PLANNING APPLICATION 01/29/2021 9 RESUBMITTAL 04/23/2021 47 AH 10-28-2021 47 of 82 1730 N. First Street, Suite 600, San Jose, CA 95112 T 408.467.9100 BKF PROJECT# 20190456-10 K:\2019\190456_Cupertino_18920_ForgeDR\ENG\ENGINEERING\SHEETS\PHASE 2\C4.0_FG01_IMP.dwg 28 Apr 2021 10:50:21pm brik- BACKGROUNDS 09/11/2019 NO. DESCRIPTION: DATE: SCALE: CIVIL ENGINEER: PROJECT INFO: ARCHITECT: REVIEWED BY: PROJECT NO: DRAWN BY: APPROVED BY: 1587-7 FG01 PHASE 2 18922 FORGE DRIVE CUPERTINO, CA 95014 - DD PROGRESS 09/27/2019 - DD ISSUED FOR REVIEW 10/18/2019 - INITIAL CITY SUBMITTAL 12/16/2019 1 COMMENT RESPONSES 06/22/2020 2 DESIGN CHANGES 06/22/2020 3 DESIGN CHANGES 07/24/2020 4 DESIGN CHANGES 11/06/2020 5 RESUBMITTAL 12/11/2020 2290 North First Street #304, San Jose, CA 95131 P 408.977.0606 - F 408.298.4245 www.habitec.com architecture and interior design AS SHOWN KB PC PC 7 DESIGN CHANGES 03/08/2021 8 RESUBMITTAL 03/08/2021 6 PLANNING APPLICATION 01/29/2021 9 RESUBMITTAL 04/23/2021 48 AH 10-28-2021 48 of 82 Limit of WorkLimit of WorkNOPARKING NOPARKINGNOPARKINGVANEV CHARGINGONLYExisting Redwoods tobe protected in place32-9432-94S-101PLANTING ACCESSORIESSYMBOLDESCRIPTIONQTYDETAILProposed planting area.5,570 sfCONCRETESYMBOLDESCRIPTIONQTYDETAILAckerstone Aqua Lina Permeable Paver. Color: Graphite. Finish: FM 1,286 sfGrindRunning bond pattern. For pedestrian, light vehicular, and heavyvehicular applications.SITE FURNISHINGSSYMBOLDESCRIPTIONQTYDETAILKornegay Larkspur Planter LS-30. Size: 30" tall x 48" dia. Color: Davis Colors: Outback. Drainage: No Drainage Hole. Exterior Finish:Sandblast. Interior Finish: Bituminuos Sealer. Note: Contractor to install3" perferated observation pipe & 6" layer of 3/8" peagravel in bottom ofplanter. Cap observation pipe with black NDS drain cap.32-94P-101S-101REFERENCE NOTES SCHEDULENotes:1- Cross sections shall be per soils report recommendations. See civil plans.2- All concrete specialty finishes shall be as indicated on the landscapeconstruction plans.3- Contractor shall provide one sample pour (min. 3' x 3') for each color/finish onsite prior to installation and notify the Owner's Representative 72 hours for reviewand observation. The Owner's Representative reserves the right to change theselected color after the sample is poured. Contractor shall include in their bid thecost of the additional sample for the Owner's Representative's approval.4- All quantities and amount shown on the plans are best estimates for the benefitof the contractor. In field conditions may vary compared to what is shown on theplans. Therefore, it is the Contractor's responsibility to verify all lengths, squarefootages,and amount prior to bidding the project.2NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Construction PlanL-1Crown drip line or other limit of Tree Protection area. Seetree preservation plan for fence alignment.4'-0"Maintain existinggrade with the treeprotection fenceunless otherwiseindicated on theplans.2" x 6' steel postsor approved equal.Tree Protectionfence: High densitypolyethylene fencingwith 3.5" x 1.5"openings; Color-orange. Steel postsinstalled at 8' o.c.5" thicklayer of mulch.Notes:1- See specifications for additional treeprotection requirements.2- If there is no existing irrigation, seespecifications for watering requirements.3- No pruning shall be performed exceptby approved arborist.4- No equipment shall operate inside theprotective fencing including during fenceinstallation and removal.5- See site preparation plan for anymodifications with the Tree Protectionarea.SECTION VIEWKEEP OUTTREEPROTECTIONAREA8.5" x 11"signlaminated inplastic spacedevery 50'along thefence.TREE PROTECTION1P-CO-19036_WA-05Crown drip line of tree.Maintain existinggrade.5" thicklayer of mulch.Notes:1- Apply 10 gallons of water per 1" oftrunk size measured at diameter breastheight every 2-3 weeks.2- Water application should be determinedby irrigation emitter. ie. overhead, drip, orhand held.3- Longer, slower application of water isideal which allows water to slowlypercolate into the trees root zone and beutilized by the trees root system.4- Do not spray the tree trunk or applywater directly adjacent to the trunk.SECTION VIEWWATERING MATURE TREESRoot profile 2' - 5'Root watering zone.P-CO-19036_WA-06249AH 10-28-2021 49 of 82 Limit of WorkNOPARKING LOADING ZONE ONLY NOPARKINGEV CHARGINGONLYExisting Redwoods tobe protected in place32-9432-94S-101PLANTING ACCESSORIESSYMBOLDESCRIPTIONQTYDETAILProposed planting area.5,570 sfCONCRETESYMBOLDESCRIPTIONQTYDETAILAckerstone Aqua Lina Permeable Paver. Color: Graphite. Finish: FM 1,286 sfGrindRunning bond pattern. For pedestrian, light vehicular, and heavyvehicular applications.SITE FURNISHINGSSYMBOLDESCRIPTIONQTYDETAILKornegay Larkspur Planter LS-30. Size: 30" tall x 48" dia. Color: Davis Colors: Outback. Drainage: No Drainage Hole. Exterior Finish:Sandblast. Interior Finish: Bituminuos Sealer. Note: Contractor to install3" perferated observation pipe & 6" layer of 3/8" peagravel in bottom ofplanter. Cap observation pipe with black NDS drain cap.32-94P-101S-101REFERENCE NOTES SCHEDULENotes:1- Cross sections shall be per soils report recommendations. See civil plans.2- All concrete specialty finishes shall be as indicated on the landscapeconstruction plans.3- Contractor shall provide one sample pour (min. 3' x 3') for each color/finish onsite prior to installation and notify the Owner's Representative 72 hours for reviewand observation. The Owner's Representative reserves the right to change theselected color after the sample is poured. Contractor shall include in their bid thecost of the additional sample for the Owner's Representative's approval.4- All quantities and amount shown on the plans are best estimates for the benefitof the contractor. In field conditions may vary compared to what is shown on theplans. Therefore, it is the Contractor's responsibility to verify all lengths, squarefootages,and amount prior to bidding the project.2NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Construction PlanL-250AH 10-28-2021 50 of 82 Limit of WorkLimit of WorkELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONNOPARKINGNOPARKINGELECTRICVEHICLECHARGINGSTATIONExisting tree to be relocatedCourtyard Perimeter Wall and FenceSeatwall/Planter Wall83 LF of total seatingHanging Market Lights. Contractor to coordinateconnection to building with Architect.Man Gate (egress)Maintenance Access Gate32-9432-94Man Gate (egress)Patio access from buildingP-10137'-6"6'-0"33'-6"6'-0"NOTE: SEE ARCHITECTS PLAN FOR ALLFURNITURE INFORMATION & LAYOUTPLANTING ACCESSORIESSYMBOLDESCRIPTIONQTYDETAILProposed planting area.5,570 sfCONCRETESYMBOLDESCRIPTIONQTYDETAILAckerstone Aqua Lina Permeable Paver. Color: Graphite. Finish: FM 1,286 sfGrindRunning bond pattern. For pedestrian, light vehicular, and heavyvehicular applications.SITE FURNISHINGSSYMBOLDESCRIPTIONQTYDETAILKornegay Larkspur Planter LS-30. Size: 30" tall x 48" dia. Color: Davis Colors: Outback. Drainage: No Drainage Hole. Exterior Finish:Sandblast. Interior Finish: Bituminuos Sealer. Note: Contractor to install3" perferated observation pipe & 6" layer of 3/8" peagravel in bottom ofplanter. Cap observation pipe with black NDS drain cap.32-94P-101S-101REFERENCE NOTES SCHEDULENotes:1- Cross sections shall be per soils report recommendations. See civil plans.2- All concrete specialty finishes shall be as indicated on the landscapeconstruction plans.3- Contractor shall provide one sample pour (min. 3' x 3') for each color/finish onsite prior to installation and notify the Owner's Representative 72 hours for reviewand observation. The Owner's Representative reserves the right to change theselected color after the sample is poured. Contractor shall include in their bid thecost of the additional sample for the Owner's Representative's approval.4- All quantities and amount shown on the plans are best estimates for the benefitof the contractor. In field conditions may vary compared to what is shown on theplans. Therefore, it is the Contractor's responsibility to verify all lengths, squarefootages,and amount prior to bidding the project.2NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Construction PlanL-377751AH 10-28-2021 51 of 82 SECTION ELEVATION: Patio Planter Wall SouthSCALE: 1/2" = 1'-0"EQ.EQ.EQ.EQ.EQ.EQ.EQ.10'-6"8'-5"5'-0"1'-8"8"2'-4"1'-6"3"WEST FENCE & GATE ELEVATIONSCALE: 1/2" = 1'-0"+/- 7'-5"51'-9"1" x 6" Ipe Plank1" x 4" Ipe Plank1" x 3" Ipe Plank1" x 6" Ipe Plank.Finish SurfaceSeatwallPlanter finish grade8"Board Form concrete wall.1" ChamferIpe planks.Market Lighting. to beapproved by owner3/8" Steel plate eyelet for hanginglights. Weld in place4" x 4" tubular steel fence post.exterior viewinterior view1" x 6" Ipe Plank1" x 4" Ipe Plank1" x 3" Ipe Plank1" x 6" Ipe Plank.Repeat to Finish Grade.Finish Surface.4" x 4" tubular steel gate post.3/4" Steel rod door handle.Exterior wall of building.Roller bearing hinge, typ.Ipe planks.Exit Door Hardware.Note: Door to be mounted with VonDuprin AX-98 Series Panic Bar.1" x 3" Tubular steel gate frame.Anchor all posts per structuralengineers recommendations.Board Form concrete wall.1" Chamfer.3/8" Steel Plate bracket for Ipe woodattachment. All screw heads to be recessedand attachments from exterior side.Interior limit of wall and seatwall.4" x 4" tubular steel gate post.10" Solid Kickplate at exit door.4'-0"8'-5"Note: Man Gate for egress only.5'-9"10" Solid Kickplate at exit door.4'-0"ADA seating nook at seatwall.6'-0"NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Construction DetailsL-4NOTE TO CONTRACTOR:Contractor to supply shop drawing for construction ofgates and fencing elements. Shop drawing shall beapproved by Landscape Architect or OwnersRepresentative prior to commencement of work.77752AH 10-28-2021 52 of 82 NORTH FENCE & GATE ELEVATIONSCALE: 1/2" = 1'-0"cane post bracketweld to gate frameexterior viewinterior viewSECTION ELEVATION: Patio Planter Wall East8'-41 2"10'-6"5'-0"1'-8"EQ.EQ.EQ.EQ.EQ.EQ.1'-6"3"SCALE: 1/2" = 1'-0"7'-6"4'-2"Board Form concrete wall1" ChamferInterior limit of wall and seatwall3/8" Steel plate eyelet for hanginglights. Weld in place4" x 4" tubular steel fence post.3/8" Steel Plate bracket for Ipewood attachment+/- 8'-0"47'-10"4" x 6" tubular steel gate post.3/4" Steel rod door handle.Exterior wall of building.Roller bearing hinge, typ.Ipe planks8'-5"4'-5"2"4'-0"7'-4"5'-0" 10'-6"Cane Bolt.1" x 6" Ipe Plank1" x 4" Ipe Plank1" x 3" Ipe Plank1" x 6" Ipe Plank.Repeat to Finish Grade.Board Form concrete wall1" Chamfer3/8" Steel plate eyelet for hanginglights. Weld in place4" x 4" tubular steel fence post.3/8" Steel Plate bracket for Ipe woodattachment. All screw heads to be recessedand attachments from exterior side.SeatwallPlanter finish grade1'-8" 4"Market Lighting. to beapproved by owner3/8" Flange for Ipe board attachment.Offset to exterior to provide centeredalignment of boards to posts.1" x 6" Ipe Plank1" x 4" Ipe Plank1" x 3" Ipe Plank1" x 6" Ipe Plank.Finish SurfaceFinish Surface8"Post Plan View10" Solid Kickplate at exit door.Note: Secondary Gate for maintenanceaccess only. Not an ingress /egress pointfor building access.Note: Man Gate for egress only.1" x 3" Tubular steel gate frame.10" Solid Kickplate at exit door.4'-0"ADA seating nook at seatwall.6'-0"Exit Door Hardware.Note: Door to be mountedwith Von Duprin AX-98Series Panic Bar.NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Construction DetailsL-577753AH 10-28-2021 53 of 82 Egress only gateNote: Door to be mounted withVon Duprin AX-98 Series Panic Bar.Secondary gate formaintenance access.Egress only gateSee above note for gatehardware.83'-0" total seatwall lengthADA cutout in seatwallNO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Construction DetailsL-61" = 1'-0"RAISED PLANTER BACKFILL, 30" SOIL DEPTHP-CO-19036_WA-243PATIO SEATWALL LAYOUTSCALE: 1/4" = 1'-0"77NOTE:SEE ARCHITECTS PLANS FOR ALL INFORMATION ONOUTDOOR FURNITURE AND FURNITURE LAYOUT.754AH 10-28-2021 54 of 82 Limit of WorkLimit of WorkNOPARKING NOPARKINGNOPARKINGVANEV CHARGINGONLY Finished grade of all planting areasshall be 1-2" below the adjacent pavementafter settling.PS-102See detail for modification of soilunder drip line of existing trees.SYMBOLDESCRIPTIONQTYDETAILCertified Compost: 2" thick layer of compost shall be applied in all 74.62 cyplanting areas. Compost shall be certifed by the U.S. CompostingCouncil`s STA Program. See specifications for further information.Modified Existing Soil - Compacted sub soil: Fracturing5,657 sfFor planting areas less than eight feet. See detail and specifications forfurther information.PS-101PS-102Planting Soils LegendNotes:1 - All quantities and amounts shown on the plans are best estimatesfor the benefit of the contractor. In field conditions may vary comparedto what is shown on the plans. Therefore, it is the contractor 'sresponsibility to verify all lengths, square footages, and amounts priorto bidding the project.2- Contractor shall verify site compaction using the Standard ProctorMethod prior to the beginning of work. If compaction rates are between75% - 85% only minimal modification shall occur. See soil modification- compacted surface soil detail.All Planting AreasNO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Planting Soils PlanL-71. Existing utilities- information on the drawings relating to existing utility lines and servicesfrom the best sources available. All such information is furnished only for information and isnot guaranteed. The Contractor shall excavate test pits as required to determine the exactlocation of existing utilities.Call utility locating service for precise utility locations before beginning of any work. DIGALERT, 8112. Utility Requirements- The Contractor shall notify the following agencies at least 48 hours inadvance of excavating around any of their structures. The utility companies listed below shallbe contacted.- Gas Company- Telephone Company- Electrical Power Company- Cable Television Company- Water Supply CompanyThe California Public Utilities Commission mandates that in, in the interest of public safety,main line gas valves be maintained in a manner to be readily accessible and in goodoperating condition. The Contractor shall notify the gas company's headquarters planningoffice 48 hours prior to the start of construction.3. Contractor shall be responsible for making himself familiar with all underground utilities,pipes, and structures. Contractor shall take sole responsibility for any cost incurred due todamage of said utilities.4. All scaled dimensions on the drawings are approximate. Before proceeding with any work,the Contractor shall carefully check and verify all dimensions and quantities, and shallimmediately inform the Owner's Representative of any discrepancies between the informationon the drawings and the actual conditions refraining from doing any work in said areas untilgiven approval to do so by the Owner's Representative.5. The Contractor shall obtain and pay for all permits related to this section of the work unlesspreviously excluded under provision of the contract or general conditions. The Contractorshall comply with all laws and ordinances bearing on the operation of conduct of the work asdrawn and specified. If the contractor observes that a conflict exist between permitrequirements and the work outlined in the contract documents, the Contractor shall promptlynotify the Owner's Representative in writing including a description of any necessary changesand changes to the contract price resulting from changes in the work.6. Wherever references are made to standards or coded in accordance with which works is tobe performed or tested, the edition or revision of the standards and codes current on theeffective date of this contract shall apply, unless expressly set forth.7. In case of conflict among any referenced standards or codes or between any referencedstandards and codes and the specifications, the more restrictive standard shall apply orOwner's Representative shall determine which shall govern.8. Comply with the requirements for the California code of Regulation title 23 waters, division2 department of water resources chapter 2.7 model water efficient landscape ordinance,492.5 soil management report.a. Where the requirements of specification section Planting Soil are more stringent thanthe California code, the more stringent requirements shall prevail.9. The Contractor shall adequately protect the work, adjacent property, and the public, andshall be responsible for any damages or injury due to the Contractor's actions.10. The Contractor shall be responsible for any coordination with subcontractors as requiringto accomplish the soil preparation operations.11. Top soil, existing site soil and Planting Soil Mix testing; Submit soil test analysis report foreach sample of Topsoil, existing site soil and Planting Soil from an approved soil testinglaboratory.12. Submit all testing required by California code of Regulation title 23 waters, division 2department of water resources chapter 2.7 model efficient landscape ordinance, 492.5 soilmanagement report.13. Soil testing shall be at the expense of the Contractor. Copies of the soil test analysis alongwith receipts and delivery slips of recommended amendments shall be provided to theOwner's Representative.14. Contractor shall be aware of all surface and subsurface conditions, and to notify theOwner's Representative, in writing of any circumstances that would negatively impact thehealth of plantings. Contractor shall not proceed with work until corrected.a. Should subsurface drainage or soil conditions be encountered which would be detrimental to growth or survival of plant material, the Contractor shall notify the Owner's Representative in writing, stating the conditions and submit a proposal covering the cost of corrections. If the contractor fails to notify the Owner's Representative of such conditions, he/she shall remain responsible for the plant material under the warrantee clause of the specifications.15. Imported top soil shall be fertile, friable soil containing less than 5% total volume of thecombination of subsoil, refuse, roots larger than 1" diameter, heavy or stiff clay, stones largerthan 2 inches in diameter, noxious seeds, sticks, brush, litter, or any substances deleteriousto planter growth. The % of the above objects shall be controlled by source selection not byscreening the soil. Topsoil shall be suitable for the germination of seeds and the support ofvegetative growth. Imported Topsoil shall not contain weed seeds in quantities that causenoticeable weed infestation in the final planting beds.16. Compost shall be organic blended material, composted for a minimum of 9 months and attemperatures sufficient to break down all woody fibers, seeds and leaf structures, free of toxicand non-organic matter. Source material shall be yard waste trimmings blended with otherorganic material designed to produce Compost high in fungal material. a. Organic matter shall be commercially prepared compost and meet US CompostingCouncil STA/TMECC.17. Existing trees shall be protected and cared for as required in the details andspecifications.18. The Owner's Representative shall approve all rough grading prior to the installation oforganic matter, fine grading, and mulching.19. The Owner's Representative shall be informed of the progress of the work so the workmay be observed at the following key times in the construction process. The Owner'sRepresentative shall be afforded sufficient time to schedule visit to the site. Failure of theOwner's Representative to make field observations shall not relieve the Contractor frommeeting all the requirements in the plans, details and specifications.a. Pre - Construction meetingb. Existing soil conditions reviewc. Completion of site preparation reviewd. Completion of finished grading and surface soil modification review.20. If the work fails to pass inspection, any subsequent inspections must be rescheduled asrequired in the specifications. The cost to the Owner for additional inspections will be chargedto the Contractor at the prevailing hourly rate of the inspector.21. Contractor shall include in the bid continued maintenance (warranty) period of 1 year aftercompletion of construction and acceptance of the project by the Owner's Representative.GENERAL PLANTING SOIL NOTES18 - 24" 18-24"2'±Before starting soil fracturingapply 1 - 2" of compost overexisting grade.Existing gradeafter rough grading.Pavement. Donot fracturesoil adjacentto pavement.Notes:1- For planting areas narrower than 8' reduce the distance betweenpaving and soil fracturing from 2' to 1'.2- See planting soil specification for additional requirements.Apply 1 - 2" of compost andrequired chemical adjustmentprior to final tilling.Proposed finishedgrade aftersettling.Finish gradeadjacent to pavingshall be 1 - 2"below pavementsurface.STEP ONESTEP TWOFracture soil using abackhoe. Dig into thesoil and the compost.Lift the soil and dropin place to fracturecompaction. Repeatover entire plantingarea.URBAN TREE FOUNDATION ©2014OPEN SOURCE FREE TO USESOIL MODIFICATION - FRACTURING1P-CO-19036_WA-11Remove turf and weeds.Existing grade beforetreatment.9 - 12"Notes:1- Prior to the start of work remove all thatch, sod, and/or weeds.2- Loosen soil with Air Knife or approved equal to a depth of 9 - 12" and work around encountered roots.3- Apply 2 - 3" of compost over loosened soil. Using an air knife mix compost into loosened soil.4- Water entire root zone at end of each work day.5- See planting soil specifications for additional requirements.Existing soil.Loosened soil with air knife.Apply 2 - 3" of compost andmix into loosened soil.Step 1Step 2Step 3SECTION VIEWCOMPACTED SOIL IN TREE DRIPLINE2P-CO-19036_WA-1055AH 10-28-2021 55 of 82 Limit of WorkNOPARKING LOADING ZONE ONLY NOPARKINGEV CHARGINGONLY Finished grade of all planting areasshall be 1-2" below the adjacent pavementafter settling.PS-102See detail for modification of soilunder drip line of existing trees.SYMBOLDESCRIPTIONQTYDETAILCertified Compost: 2" thick layer of compost shall be applied in all 74.62 cyplanting areas. Compost shall be certifed by the U.S. CompostingCouncil`s STA Program. See specifications for further information.Modified Existing Soil - Compacted sub soil: Fracturing5,657 sfFor planting areas less than eight feet. See detail and specifications forfurther information.PS-101PS-102Planting Soils LegendNotes:1 - All quantities and amounts shown on the plans are best estimatesfor the benefit of the contractor. In field conditions may vary comparedto what is shown on the plans. Therefore, it is the contractor 'sresponsibility to verify all lengths, square footages, and amounts priorto bidding the project.2- Contractor shall verify site compaction using the Standard ProctorMethod prior to the beginning of work. If compaction rates are between75% - 85% only minimal modification shall occur. See soil modification- compacted surface soil detail.All Planting AreasNO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Planting Soils PlanL-856AH 10-28-2021 56 of 82 Limit of WorkLimit of WorkELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONNOPARKINGNOPARKINGELECTRICVEHICLECHARGINGSTATIONFinished grade of all planting areasshall be 1-2" below the adjacent pavementafter settling.PS-102SYMBOLDESCRIPTIONQTYDETAILCertified Compost: 2" thick layer of compost shall be applied in all 74.62 cyplanting areas. Compost shall be certifed by the U.S. CompostingCouncil`s STA Program. See specifications for further information.Modified Existing Soil - Compacted sub soil: Fracturing5,657 sfFor planting areas less than eight feet. See detail and specifications forfurther information.PS-101PS-102Planting Soils LegendNotes:1 - All quantities and amounts shown on the plans are best estimatesfor the benefit of the contractor. In field conditions may vary comparedto what is shown on the plans. Therefore, it is the contractor 'sresponsibility to verify all lengths, square footages, and amounts priorto bidding the project.2- Contractor shall verify site compaction using the Standard ProctorMethod prior to the beginning of work. If compaction rates are between75% - 85% only minimal modification shall occur. See soil modification- compacted surface soil detail.All Planting AreasNO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Planting Soils PlanL-9Notes:1- Means and methods of soil compaction shall be determined at time of soil mock up.2- Soil compaction after installation shall be 75 - 250 PSI at soil moisture between field capacity and wilting point.3- For soil depths see planting soil specifications.4- See planting soil specification for additional requirements.Finish grade afterinstallation butbefore settlement.Proposed finishedgrade after settlement.12"± Lifts. 12"± Lifts. 10-15% of soil depth.Loosen subgrade bydragging teeth ofbucket.Existing soil.Confirm subgradedrains one - half inchper hour orgreater.Install lifts in 6 - 8' rows.8 - 14"Pavement.SECTION VIEWINSTALLED PLANTING MIX1P-CO-19036_WA-097757AH 10-28-2021 57 of 82 Limit of WorkLimit of WorkNOPARKING NOPARKINGNOPARKINGVANEV CHARGINGONLY Connect lateral line toexisiting irrigationinadjacent planter, typ.SYMBOLMANUFACTURER/MODEL/DESCRIPTIONQTYPipe Transition Point above grade 24Pipe transition point from PVC lateral to drip tubing with riser toabove grade installation.Area to Receive DriplineNetafim TLCV-09-18 3,771 l.f.Techline Pressure Compensating Landscape Dripline withCheck Valve. 0.9 GPH emitters at 18" O.C. Dripline lateralsspaced at 18" apart, with emitters offset for triangular pattern.17mm.SYMBOLMANUFACTURER/MODEL/DESCRIPTIONQTYIrrigation Lateral Line: PVC Class 200 SDR 21 (Shrubs) 164.4 l.f.See irrigation detail.Irrigation Lateral Line: PVC Class 200 SDR 21 (Trees) 597.7 l.f.See irrigation detail.Irrigation Lateral Line: PVC Class 200 SDR 21 (Trees) 12.3 l.f.See irrigation detail.Pipe Sleeve: PVC Schedule 40 254.1 l.f.Standard pipe sleeve for irrigation pipe. Pipe sleeve shall be twotimes the diameter of pipe being sleeved. Irrigation mainline,lateral lines, and wire shall all be in separate sleeves.Irrigation LegendNotes:1- The system indicated on the drawing is diagrammatic. All equipment shown in paved areas is diagrammatic.All equipment shall be located in planting areas. Avoid any conflicts between the irrigation system, planting, orarchitectural features.2- All quantities and amounts shown on the plans are best estimates for the benefit of the Contractor. In fieldconditions may vary compared to what is shown on the plans. Therefore, it is the Contractor's responsibility toverify all lengths, square footages, and amounts prior to bidding the project.3- Contractor shall verify point of connection and minimum static pressure prior to commencing of work. Anydiscrepancies shall be brought to the attention of the Owner and Landscape Architect prior to starting work.4- Any remote control irrigation valves located within the limits of work shall be removed and replaced with aHunter-ICV valve of the same size as what is being removed. See irrigation detail for further information.5- Any additional wire to be installed as need shall be placed in Sch. 40 electrical conduit. Size to be aminimum 2".6- Two (2) drip flush valve indicators shall be installed for each inline remote control drip irrigation valve at thefurthest point on either end of the irrigation zone. Contractor shall mark in the field for review and approval bythe Owner's Representative.7- Prior to project completion and beginning of the maintenance period the Contractor shall provide as-builtdrawings and updated controller charts and colored irrigation maps.a. The maps at a minimum shall show zone numbering and areas each specific zone irrigation8- Irrigation plans were designed in accordance with CA AB 1881; the Model Water Efficient LandscapeOrdinance. It is the responsibility of the Irrigation Contractor to adhere to that ordinance. Any portion of theirrigation systems installation that comes into conflict with the state ordinance shall be immediately brought tothe attention of the Owner and Landscape Architect. In the event that notification does not occur, the IrrigationContractor assumes any and all responsibility for changes to the work which must be done in order to meetcompliance.NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Irrigation PlanL-10NOTE TO CONTRACTOR:1. Contractor to protect all irrigation lines andequipment in place. Existing controller, mainline,valves and related equipment shall be reused forlandscape improvements.2. Contractor shall locate and verify working orderof irrigation system prior to comencment of work.Any discrepancies in the irrigation system shallbe documented and reported the ownersrepresentative prior to groundbreaking.3. Contractor shall install Rainbird (QKCHK100)pressure regulating basket filters after each valveassembly. Locate in same valve box as RemoteControl Valve.MWELO Calculations58AH 10-28-2021 58 of 82 Limit of WorkNOPARKING LOADING ZONE ONLY NOPARKINGEV CHARGINGONLY Connect lateral line toexisiting irrigationinadjacent planter, typ.SYMBOLMANUFACTURER/MODEL/DESCRIPTIONQTYPipe Transition Point above grade 24Pipe transition point from PVC lateral to drip tubing with riser toabove grade installation.Area to Receive DriplineNetafim TLCV-09-18 3,771 l.f.Techline Pressure Compensating Landscape Dripline withCheck Valve. 0.9 GPH emitters at 18" O.C. Dripline lateralsspaced at 18" apart, with emitters offset for triangular pattern.17mm.SYMBOLMANUFACTURER/MODEL/DESCRIPTIONQTYIrrigation Lateral Line: PVC Class 200 SDR 21 (Shrubs) 164.4 l.f.See irrigation detail.Irrigation Lateral Line: PVC Class 200 SDR 21 (Trees) 597.7 l.f.See irrigation detail.Irrigation Lateral Line: PVC Class 200 SDR 21 (Trees) 12.3 l.f.See irrigation detail.Pipe Sleeve: PVC Schedule 40 254.1 l.f.Standard pipe sleeve for irrigation pipe. Pipe sleeve shall be twotimes the diameter of pipe being sleeved. Irrigation mainline,lateral lines, and wire shall all be in separate sleeves.Irrigation LegendNotes:1- The system indicated on the drawing is diagrammatic. All equipment shown in paved areas is diagrammatic.All equipment shall be located in planting areas. Avoid any conflicts between the irrigation system, planting, orarchitectural features.2- All quantities and amounts shown on the plans are best estimates for the benefit of the Contractor. In fieldconditions may vary compared to what is shown on the plans. Therefore, it is the Contractor's responsibility toverify all lengths, square footages, and amounts prior to bidding the project.3- Contractor shall verify point of connection and minimum static pressure prior to commencing of work. Anydiscrepancies shall be brought to the attention of the Owner and Landscape Architect prior to starting work.4- Any remote control irrigation valves located within the limits of work shall be removed and replaced with aHunter-ICV valve of the same size as what is being removed. See irrigation detail for further information.5- Any additional wire to be installed as need shall be placed in Sch. 40 electrical conduit. Size to be aminimum 2".6- Two (2) drip flush valve indicators shall be installed for each inline remote control drip irrigation valve at thefurthest point on either end of the irrigation zone. Contractor shall mark in the field for review and approval bythe Owner's Representative.7- Prior to project completion and beginning of the maintenance period the Contractor shall provide as-builtdrawings and updated controller charts and colored irrigation maps.a. The maps at a minimum shall show zone numbering and areas each specific zone irrigation8- Irrigation plans were designed in accordance with CA AB 1881; the Model Water Efficient LandscapeOrdinance. It is the responsibility of the Irrigation Contractor to adhere to that ordinance. Any portion of theirrigation systems installation that comes into conflict with the state ordinance shall be immediately brought tothe attention of the Owner and Landscape Architect. In the event that notification does not occur, the IrrigationContractor assumes any and all responsibility for changes to the work which must be done in order to meetcompliance.NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Irrigation PlanL-11NOTE TO CONTRACTOR:1. Contractor to protect all irrigation lines andequipment in place. Existing controller, mainline,valves and related equipment shall be reused forlandscape improvements.2. Contractor shall locate and verify working orderof irrigation system prior to comencment of work.Any discrepancies in the irrigation system shallbe documented and reported the ownersrepresentative prior to groundbreaking.3. Contractor shall install Rainbird (QKCHK100)pressure regulating basket filters after each valveassembly. Locate in same valve box as RemoteControl Valve.59AH 10-28-2021 59 of 82 Limit of WorkLimit of WorkELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONNOPARKINGNOPARKINGELECTRICVEHICLECHARGINGSTATIONContractor to find andverify working order ofexisting irrigation valvefor this irrigation zone.Contractor to find andverify working order ofexisting irrigation valvefor this irrigation zone.SYMBOLMANUFACTURER/MODEL/DESCRIPTIONQTYPipe Transition Point above grade 24Pipe transition point from PVC lateral to drip tubing with riser toabove grade installation.Area to Receive DriplineNetafim TLCV-09-18 3,771 l.f.Techline Pressure Compensating Landscape Dripline withCheck Valve. 0.9 GPH emitters at 18" O.C. Dripline lateralsspaced at 18" apart, with emitters offset for triangular pattern.17mm.SYMBOLMANUFACTURER/MODEL/DESCRIPTIONQTYIrrigation Lateral Line: PVC Class 200 SDR 21 (Shrubs) 164.4 l.f.See irrigation detail.Irrigation Lateral Line: PVC Class 200 SDR 21 (Trees) 597.7 l.f.See irrigation detail.Irrigation Lateral Line: PVC Class 200 SDR 21 (Trees) 12.3 l.f.See irrigation detail.Pipe Sleeve: PVC Schedule 40 254.1 l.f.Standard pipe sleeve for irrigation pipe. Pipe sleeve shall be twotimes the diameter of pipe being sleeved. Irrigation mainline,lateral lines, and wire shall all be in separate sleeves.Irrigation LegendNotes:1- The system indicated on the drawing is diagrammatic. All equipment shown in paved areas is diagrammatic.All equipment shall be located in planting areas. Avoid any conflicts between the irrigation system, planting, orarchitectural features.2- All quantities and amounts shown on the plans are best estimates for the benefit of the Contractor. In fieldconditions may vary compared to what is shown on the plans. Therefore, it is the Contractor's responsibility toverify all lengths, square footages, and amounts prior to bidding the project.3- Contractor shall verify point of connection and minimum static pressure prior to commencing of work. Anydiscrepancies shall be brought to the attention of the Owner and Landscape Architect prior to starting work.4- Any remote control irrigation valves located within the limits of work shall be removed and replaced with aHunter-ICV valve of the same size as what is being removed. See irrigation detail for further information.5- Any additional wire to be installed as need shall be placed in Sch. 40 electrical conduit. Size to be aminimum 2".6- Two (2) drip flush valve indicators shall be installed for each inline remote control drip irrigation valve at thefurthest point on either end of the irrigation zone. Contractor shall mark in the field for review and approval bythe Owner's Representative.7- Prior to project completion and beginning of the maintenance period the Contractor shall provide as-builtdrawings and updated controller charts and colored irrigation maps.a. The maps at a minimum shall show zone numbering and areas each specific zone irrigation8- Irrigation plans were designed in accordance with CA AB 1881; the Model Water Efficient LandscapeOrdinance. It is the responsibility of the Irrigation Contractor to adhere to that ordinance. Any portion of theirrigation systems installation that comes into conflict with the state ordinance shall be immediately brought tothe attention of the Owner and Landscape Architect. In the event that notification does not occur, the IrrigationContractor assumes any and all responsibility for changes to the work which must be done in order to meetcompliance.NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Irrigation PlanL-12NOTE TO CONTRACTOR:1. Contractor to protect all irrigation lines andequipment in place. Existing controller, mainline,valves and related equipment shall be reused forlandscape improvements.2. Contractor shall locate and verify working orderof irrigation system prior to comencment of work.Any discrepancies in the irrigation system shallbe documented and reported the ownersrepresentative prior to groundbreaking.3. Contractor shall install Rainbird (QKCHK100)pressure regulating basket filters after each valveassembly. Locate in same valve box as RemoteControl Valve.7760AH 10-28-2021 60 of 82 NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Irrigation DetailsL-13NOTES:1- See irrigation legend for mainline and lateral line pipe size and type.2- Direct burial control wires shall be installed in Sch. 40 PVC electrical conduit if required.3- 2-wire irrigation wire shall be installed in 1-1/2" Sch. 40 PVC electrical conduit.4- Detectable locator tape shall be located six inches (6") above the entire mainline run.Direct burial low voltagecontrol wires.Pavement.24" min.1'-0" In planting area 1'-6" in planting area 3'-0" underneath pavement Non-pressurized line (lateral line).Detectable locator tape.Pressurized line (mainline).6"Finished grade.IRRIGATION TRENCHING1P-CO-19036_WA-20Pavement.Base rock.3'-0"Notes:1- See irrigation legend for mainline size and type.2- All sleeves shall be Sch. 40 PVC pipe.3- All sleeves shall extend 12" beyond the edge of pavement.4- End of sleeves shall be located with a wooden stake or PVC pipe. Locators shall run continuously from the end of the sleeve to finished grade.Clean backfill, 95% relative compactionunder paving or per civil engineer's plans.Control wires, sleeve under paving. Installadjacent to pressurized mainline. Bundleshall be no more than 50% of pipe diameter.Mainline, sleeve under paving to be twotimes the diameter of the pressurizedmainline pipe.Non-pressurized line, sleeve under paving tobe two times the diameter of the lateral line.PIPE AT PAVEMENT2P-CO-19036_WA-191'-0"1'-0"1'-0"1'-0"BVICVSAQCVGRJumbo rectangularvalve box(22" x 16" x 12")Standardrectangularvalve box(18" x 12" x 12")1'- 0" Typ.Wate r type Cont ro l le r Designa t ion Box s ize Lid Co lo r # 1# 2# 3# 4# 5Identification GuidePWPWPWPWPWPWPWPWPWPWPWPWPWAAAAAAAAAAAAAMVFSHMBVBVGVARVQCVRCVMSGRSBFC# 2# 2# 2# 2# 1# 2# 2# 4# 2# 2# 5# 4# 2GreenGreenGreenGreenGreenGreenGreenGreenGreenGreenGreenGreenGreenMaster valveFlow sensorHydrometerBall valve 3" or lessBall valve 4" or moreGate valveAir release valveQuick coupler valveRemote control valveMoisture sensorGrounding rodSplice boxFuture connectionEXAMPLEPotable water system on Controller 'A', Remote control valvestation # 3.PLAN VIEWPavement,wall, orbuilding.Notes:1- Valve box # 1 thru # 4 shall have stainless steel lockinghardware.2- Valve boxes shall be labeled by hot iron branding or aluminumasphaltic base water proof paint.3- Locate valve assemblies in planting area.4- Valve locations shall be approved by the Owner's Representativeprior to installation.5- Valve boxes shall be centered above valve assemblies tofacilitate access and maintenance.6- Valve boxes shall be flush with finished grade.7- Valve boxes shall be set parallel to each other and perpendicularto the edge of pavement.8- See other irrigation details for further information.Standardrectangularvalve box(18" x 12" x 24")Circularvalve box(10" D)Circularvalve box(6" D)PW A SA # 3 Green Surge ArrestorVALVE BOX LAYOUT3P-CO-19036_WA-2124" min.Note:1- Valve boxes shall be located in planting areas.2- Splices shall only be made at electrical pull boxes.3- Low voltage wires under roadways must be in continuous conduit with 90° Sch. 40 PVC sweeps terminating in pull boxes.4- All wire connections shall be made using DBR/Y-6 connectors or approved equal.5- Valve box shall be wrapped with minimum 3 mil. thick plastic and secure it using duct tape or electrical tape.Pavement.Circular valvebox with locking lid.Water proof wire connectors.Controller wires with 24" min. expansioncurls.Finished grade.38" welded wire mesh.Four (4) 4" x 8" bricks.Direct burial (low voltage)irrigation controller wires.SPLICE BOX4P-CO-19036_WA-22Note:1- Common wire and controller wire shall be direct burial 14 AWG or larger. Color: Common (white), controller wire for turf (blue), and controller wire for shrubs(red).2- All wire runs shall be continuous without any splices unless approved by the Owner's Representative. See splice box detail. Wire connections shall be madeusing DBR/Y-6 connectors or approved equal.3-Valve box shall be wrapped with min. 3 mil thick plastic and secured using duct tape or electrical tape.4- Mainlines 4" or larger shall use saddles at the connection points to the irrigation valve. (See specifications for irrigations saddles).5- All Sch. 80 PVC to Sch. 40 PVC threaded connections shall be made using teflon tape.6- Valve boxes shall be located in planting areas.Rectangular valvebox with locking lid.Remote control irrigation valve. (Seeirrigation plans for size and model).Controller wires with 12" min. expansioncurls.Finished grade.Common wires.Four (4) 4" x 8" bricks.Sch. 80 PVC male adapter.Sch. 80 PVC tru-unionball valve.Sch. 40 PVC 90° elbow.38" welded wire mesh.Sch. 40 PVC pipe.Sch. 40 or 80 PVC tee or elbow. (Seeirrigation plan mainline size and type).Plastic tag with valve station number ID.Valve wire.Sch. 80 PVC male union.Mainline. (See irrigation plans for size and type).Pavement.24" min.4"- 8"REMOTE CONTROL VALVEThree inch (3") thick layer of pea gravel.5P-CO-19036_WA-231" BASKET DRIP FILTER/PRESSURE REGULATORRound lockingvalve box.Finished grade.1" Basket filter/pressureregulator. See irrigationlegend for make andmodel #.1" Sch. 80 threadedunion.1" Sch. 80 maleadapter.Lateral line pipeto the remote controlirrigation valve.See irrigation plans forpipe size.4" x 8" bricks.14" stainless steel mesh. Three inch thick(3") pea gravel.Notes:1- Contractor shall threaded fittings with no more than two (2) wraps of teflon tape or monster tape.2- Prior to the installation of the drip filter/pressure regulator, the Contractor shall flush the lines a minimum of two (2) times to remove all glue, tapeand/or debris from the mainline and lateral lines.3- After the installation of the drip filter/pressure regulator, the Contractor shall cap all lateral lines downstream of the filter and pressurize the irrigationsystem and verify there are no leaks or breaks. 3" - 4" typ.6P-CO-19036_WA-181. Existing utilities- information on the drawings relating to existing utility lines and servicesfrom the best sources available. All such information is furnished only for information and isnot guaranteed. The Contractor shall excavate test pits as required to determine the exactlocation of existing utilities.Call utility locating service for precise utility locations before beginning of any work. 811, DIGALERT.2. Utility Requirements- The Contractor shall notify the following agencies at least 48 hours inadvance of excavating around any of their structures. The utility companies listed below shallbe contacted.- Gas Company- Telephone Company- Electrical Power Company- Cable Television Company- Water Supply CompanyThe California Public Utilities Commission mandates that in, in the interest of public safety,main line gas valves be maintained in a manner to be readily accessible and in goodoperating condition. The Contractor shall notify the gas company's headquarters planningoffice 48 hours prior to the start of construction.3. Contractor shall be responsible for making himself familiar with all underground utilities,pipes, and structures. Contractor shall take sole responsibility for any cost incurred due todamage of said utilities.4. Irrigation piping and related equipment are drawn diagrammatically. Scaled dimensions areapproximate only. Before proceeding with work, carefully check and verify dimensions andimmediately notify the Owner's Representative of discrepancies between the drawings orspecifications and the actual conditions. Although sites and locations of plants and or irrigationequipment are drawn to scale wherever possible, it is not within the scope of the drawings toshow all necessary offsets, obstructions, or site conditions. The Contractor shall beresponsible to install the work in such a manner that it will be in conformance to siteconditions, complete, and in good working order.5. The Contractor shall obtain and pay for all permits related to this section of the work unlesspreviously excluded under provision of the contract or general conditions. The Contractorshall comply with all laws and ordinances bearing on the operation of conduct of the work asdrawn and specified. If the contractor observes that a conflict exist between permitrequirements and the work outlined in the contract documents, the Contractor shall promptlynotify the Owner's Representative in writing including a description of any necessary changesand changes to the contract price resulting from changes in the work.6. Wherever references are made to standards or coded in accordance with which works is tobe performed or tested, the edition or revision of the standards and codes current on theeffective date of this contract shall apply, unless expressly set forth.7. In case of conflict among any referenced standards or codes or between any referencedstandards and codes and the specifications, the more restrictive standard shall apply orOwner's Representative shall determine which shall govern.8. Comply with the requirements for the California code of Regulation title 23 waters, division2 department of water resources chapter 2.7 model water efficient landscape ordinance,492.3 water efficient landscape worksheet, 492.7 irrigation design plan and irrigationscheduling.a. Where the requirements of specification section Irrigation are more stringent thanthe California code, the more stringent requirements shall prevail.9. The Contractor shall adequately protect the work, adjacent property, and the public, andshall be responsible for any damages or injury due to the Contractor's actions.10. The Contractor shall be responsible for any coordination with subcontractors as requiringto accomplish the irrigation installation operations.11. It is the responsibility of the Contractor to be aware of all surface and sub - surfaceconditions, and to notify the Owner's Representative, in writing, of any circumstances thatwould negatively impact the installation of the work. Do not proceed with work untilunsatisfactory conditions have been corrected.12. Before final acceptance of work, the Contractor shall provide a record set of drawingshowing the irrigation system works as built. The drawings shall be transmitted to the Owner'sRepresentative in paper format and as a pdf file of each document on compact disk or flashdrive. The drawing shall include all of the information on the original document and revised toreflect all changes in the work. See specification section Irrigation for further information.13. Contractor shall prepare and deliver to the Owner's Representative within ten calendardays prior to completion of construction, two 3 - ring binders, of Operation & Maintenancemanuals. See specification section Irrigation for further information.14. Existing trees shall be protected and cared for as required in the details andspecifications.15. The Owner's Representative shall be informed of the progress of the work so the workmay be observed at the following key times in the construction process. The Owner'sRepresentative shall be afforded sufficient time to schedule visit to the site. Failure of theOwner's Representative to make field observations shall not relive the Contractor frommeeting all the requirements in the plans, details and specifications.a. Pre - Construction meeting.b. Trenching and sleeving review.c. Pressure mainline test.d. Adjustment and coverage test.e. Pre - maintenance observation.f. Final site observation and acceptance.16. If the work fails to pass inspection, any subsequent inspections must be rescheduled asrequired in the specifications. The cost to the Owner for additional inspections will be chargedto the Contractor at the prevailing hourly rate of the inspector.17. Contractor shall include in the bid continued maintenance (warranty) period of1 year aftercompletion of construction and acceptance of the project by the Owner's Representative.18. Pipe sizes shall conform to those shown on the plans with no smaller substitutions. Largersize pipe substitutions may be approved.19. After completion and prior to the installation of any terminal fittings, the entire pipelinesystem shall be thoroughly flushed to remove dirt, debris, and other material.20. Contractor shall verify existing water pressure prior to installation. Any difference betweenthe pressure indicated on the plans and that at the actual point of connection shall be broughtto the attention of the Owner's Representative immediately.21. A 120 volt electrical power outlet at the irrigation controller location shall be provided bythe Contractor. It shall be the responsibility of the Contractor to make the final hook up fromthe electrical outlet to the irrigation controller.22. Irrigation between the hours of 10:00 pm and 6:00 am only. Watering outside this timeframe must be done manually with qualified supervisory personnel on-site. No system shall beleft unattended during use outside the normal schedule.23.The irrigation plans have designed in accordance with the state model water efficientlandscape ordinance (MWELO). It is the Contractors responsibility to adhere to therequirements and regulations of that ordinance during the installation of the landscape designplan. During the installation of the irrigation design plans, any portion which comes intoconflict with MWELO shall be brought to the attention of the Owner/Owner's Representative.In the event that notification does not take place, the Contractor assumes responsibility for allnecessary changes and work in order to meet compliance.GENERAL IRRIGATION NOTES61AH 10-28-2021 61 of 82 NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Irrigation DetailsL-14END FEED EXAMPLEINLINE DRIP LAYOUT3/4" = 1'-0"END FEED EXAMPLESee chart for maximum length of single lateral.Drip indicator & flush valve. See irrigation legend formake and model. See irrigation plan for location.See irrigation detail for further information.Sch. 40 PVC supply header.See header sizing chart forfurther information.Lateral line from the remotecontrol irrigation valve. See irrigationplans for pipe size.Blank drip tubingheader around theedge of tree root ball6"12" o.c.typ.12" o.c. typ.6" typ.Edge of pavement.Remote control irrigation valve,pressure regulator/filter.Irrigation mainline.DRIPPER SPACING12"18"24" DRIPPER FLOW RATE (GPH)15 127 109 86 65 177 151 120 91 152 11625 427 325 256 194 604 459 361 274 458 34835 539 409 322 244 763 579 456 346 580 44045 618 469 369 280 877 664 523 397 666 506TECHLINE CV MAXIMUM LENGTH OF SINGLE LATERAL (FEET)0.26 GPH DRIPPER 0.4 GPH DRIPPER 0.6 GPH DRIPPER 0.9 GPH DRIPPERGPH GPM GPH GPM GPH GPM GPH GPM12" 26.40 0.44 40.00 0.67 61.00 1.02 92.00 1.5318" 17.58 0.29 26.67 0.44 41.00 0.68 61.00 1.0224" N/A N/A N/A N/A 31.00 0.51 46.00 0.77 INLET PRESSURE (PSI)TECHLINE FLOW PER 100 FEET0.26 0.4 0.6 0.9 0.26 0.4 0.6 0.9 0.6 0.9TURFSHRUB & GROUND COVERCLAY LOAM SANDY CLAY LOAM SANDYDIPPER FLOW (GPH)0.26 0.4 0.6 0.26 0.4 0.6DRIPPER INTERVAL18" 12" 12" 18" 18" 12"LATERAL (ROW) SPACING 18"-22" 18"-22" 12"-16" 18"-24" 18"-24" 16"-20" APPLICATION RATE (IN/HR) .19-0.15 .43-.35 .96-.72 .19-.21 .29-.21 .72-.58TIME TO APPLY 1/4"79-100 35-43 16-21 79-107 52-71 21-26TECHLINE CV GENERAL GUIDELINES FOR WATERING TIMESTEP 1: ADD LENGTH OF ALL TECHLINE LATERAL TUBING CONNECTED TO THE HEADER.STEP 2: DIVIDE THIS TOTAL LENGTH BY 100 TO INDICATE THE LENGHT IN UNITS OF 100.STEP 3: LOCATE THE GPM THAT APPLIES FOR EACH UNIT OF 100 FEET LENGTH ON THE CHART"TECHLINE FLOW PER 100 FEET". MULTIPLY THIS GPM NUMBER TIMES THE UNITS OF 100FEET FOR THE TOTAL GPM AT THIS HEADER.STEP 4: SIZE THE HEADER WITH THE FOLLOWING:1 TO 6 GPM: 1" HEADER.6 TO 10 GPM: 1" HEADER.10 TO 20 GPM: 1 1/2" HEADER.20 TO 30 GPM: 1 1/2" HEADER.SUPPLY AND EXHAUST HEADER SIZING CHART (UNLESS NOTED ON PLANS)6" typ.6" typ.Notes:- Drip tubing stakes shall be installed 24" o.c. spaced equidistant betweeneach emitter. Staples shall be installed at all Tees and Elbows.- Drip tubing stakes shall be 9" PVC coated galvainzed. GPH Model #GDTS130900.- Drip tubing located on slopes greater than 10% shall have drip shut offvalves installed on grade at the lowest three (3) drip laterals. For sub-surfacedrip shut off valves shall be located in a 6" round valve box.Inline drip tubing with checkvalve. See irrigation legendfor emitter size and spacing.See irrigation plansfor tree irrigation.1P-CO-19036_WA-17DRIP TUBING CONNECTION1" = 1"Finished grade.1" Sch. 40 PVC tee or90° elbow.34" MIPT x 17 mm malebarb adapter fitting.Two (2) required for teefitting and one (1) for90° elbow.1" PVC pipe.Sch. 40 PVCS x S x S tee or elbow.Drip tubing supply ordischarge header. PVClateral line pipe.Minimum size 1-1/2".Inline drip tubing withinternal emitters andcheck valves. Seeirrigation legend foremitter size and spacing.3" in planting areas and 4" in turf areas. 12" min. See irrigation trenching detail.9" PVC coated wirestake. Install 12" o.c.1" x 34" threaded reducer.Notes:1- Contractor shall flush out each PVC line prior toconnecting drip tubing.2- Drip tubing connection required for allconnections between drip tubing and PVC headers.2- For connections at end runs of tubing use a 90°ELL fitting and one (1) adapter for connection.3- For connection in the middle of runs of tubing usea tee fitting and two (2) adapter fittings for theconnection.2P-CO-19036_WA-15Pop-up drip indicator head withan orange GPH Irrigation dripflush nozzle. Model # GDFN.Nozzle to remain in the closedposition during system operationand opened for flushing of thesystem. Flushing shall bedirected into planting areas.Note:1- Install 12" off any adjacent pavement inplanting areas.2- Contractor shall settle soil around the popup after installation.3- All pop up spray heads shall have checkvalves.4- All Sch. 40 PVC to Sch. 80 PVCconnections shall be made using teflon tape.Top of pop up set atfinish grade.Finish grade.Rainbird 12" pop up spray head.Model # 1812-SAM-PRS.Hunter 12" x 12" swing joint.Lateral irrigation line. (Seeirrigation plans for size andtype).Sch. 40 PVC tee or elbow.DRIP FLUSH INDICATORDrip connection assembly. See drip tubingconnection detail.Subsurface drip tubing. See detail.P-CO-19036_WA-163PLAN VIEWSch. 40 PVC Tee or 90° elbow.Edge of root ball.6" drip staple.Lateral line irrigation. (See irrigationplans for sizing).Drip shut of valve.DRIP TREE RING WITH EMITTER SPACING AT 12" O.C.3/4" = 1'-0"6"typ.Last ring shall wrap ±6" outside of theedge of the root ball.Air/vacuum relief valve. Locateapproximately 12" past the lastdrip ring and place in a 6" roundvalve box with locking lid.12"Air/vacuum relief valve. Locateapproximately 12" past the lastdrip ring and place in a 6" roundvalve box with locking lid.Sch. 40 PVC Tee or 90° elbow.Drip shut off valve.6" drip staple.Lateral line irrigation. (See irrigationplans for sizing).Sch. 40 to drip connector.Last ring shall wrap ±6" outside of theedge of the root ball.Notes:1- The approximate length of drip tubing for each box size are as follows.a. 36" box- 36 linear foot of inline drip tubing at 12" o.c. (Min/max flow per tree = .24 gpm/ .54 gpm)b. 48" box- 48 linear feet of inline drip tubing at 12" o.c. (Min/max flow per tree = .32 gpm/ .72 gpm)c. 60" box- 60 linear feet of inline drip tubing at 12" o.c. (Min/max flow per tree = .40 gpm/ .90 gpm)d. 72" box- 72 linear feet of inline drip tubing at 18" o.c. (Min/max flow per tree = .48 gpm/ 1.08 gpm)e. 84" box- 84 linear feet of inline drip tubing at 12" o.c.(Min/max flow per tree = .56 gpm/ 1.26 gpm)f. 96" box- 96 linear feet of inline drip tubing at 12" o.c. (Min/max flow per tree = .64 gpm/ 1.44 gpm)g. 108" box- 108 linear feet of inline drip tubing at 12" o.c. (Min/max flow per tree = .72 gpm/ 1.62 gpm)h. 120" box- 120 linear feet of inline drip tubing at 12" o.c(Min/max flow per tree = .80 gpm/ 1.80 gpm)i. 132" box- 132 linear feet of inline drip tubing at 12" o.c. (Min/max flow per tree = .88 gpm/ 1.98 gpmj. 144" box- 144 linear feet of inline drip tubing at 12" o.c. (Min/max flow per tree = .96 gpm/ 2.16 gpm)2- Drip tubing shall be staked at twenty-four inches (24") on center.3- Drip tree ring shall be flushed two (2) times or until water leaving the tubing is clear. Flush/air relief valves and staples will be installed afterwards.4- Vacuum/air relief valve shall be installed twelve inches (12") past the last drip ring at the highest elevation of the surrounding finished grade.Inline drip tubing. See irrigationfor make, model and emission rate.Inline drip tubing. See irrigationfor make, model and emission rate.4P-CO-19036_WA-1462AH 10-28-2021 62 of 82 Limit of WorkLimit of WorkNOPARKING NOPARKINGNOPARKINGVANEV CHARGINGONLY 1FM2TG-01S-101TG-04TREESBOTANICAL NAMECOMMON NAMESIZETYPEUSEWUCOLSSTYLECA NATIVEQTYFicus macrophyllaMoreton Bay Fig36"box Evergreen Specimen Tree Medium Standard No2Platanus racemosa `Roberts`Roberts Western Sycamore 36"box Deciduous Accent Tree Low Standard Yes2Platanus racemosa `Roberts`Existing Relocated Tree36"box Deciduous Accent Tree Low Standard Yes1Tree LegendSITE FURNISHINGSSYMBOLDESCRIPTIONQTYDETAILKornegay Larkspur Planter LS-30. Size: 30" tall x 48" dia. Color: Davis Colors: Outback. Drainage: No Drainage Hole. Exterior Finish:Sandblast. Interior Finish: Bituminuos Sealer. Note: Contractor to install3" perferated observation pipe & 6" layer of 3/8" peagravel in bottom ofplanter. Cap observation pipe with black NDS drain cap.BARK MULCHSYMBOLDESCRIPTIONQTYDETAIL4" thick layer of Landscape Mulch. Type: Redwood Chip Mulch. 5,657 sfContractor to provide material samples for approval prior to instalation.18" linear root barriers shall be installed within eight feet (8`) of any 96 lfpavement. Linear root barriers shall be by Deep Root model number18-2. Install per manufactuer`s specifications and recommendations. Seedetail.3" thick layer of 3/8" crushed Rock Mulch. Color: Dark Grey. Contractor sfto provide material samples for approvalS-101TG-01TG-02TG-04Materials LegendNotes:1 - Graphic quantities take precedence over written quantities2 - All trees shall be of quality as prescribed in the details and specifications.Any tree not meeting such requirements shall be removed from the site andreplaced at no cost to the owner.3 - Trees shall not be planted within:a. 6'-0" of drive approachesb. 6'-0" of sewer linesc. 6'-0" of water linesd. 10'-0" of fire hydrantse. 10'-0" of light standards4 - All quantities and amounts shown on the plans are best estimates for thebenefit of the contractor. In field conditions may vary compared to what isshown on the plans. Therefore, it is the Contractor 's responsibility to verify alllengths, square footages, and amounts prior to bidding the project.2NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Tree & Groundcover PlanL-1563AH 10-28-2021 63 of 82 Limit of WorkNOPARKING LOADING ZONE ONLY NOPARKINGEV CHARGINGONLYFM21 TG-01S-101TG-04TREESBOTANICAL NAMECOMMON NAMESIZETYPEUSEWUCOLSSTYLECA NATIVEQTYFicus macrophyllaMoreton Bay Fig36"box Evergreen Specimen Tree Medium Standard No2Platanus racemosa `Roberts`Roberts Western Sycamore 36"box Deciduous Accent Tree Low Standard Yes2Platanus racemosa `Roberts`Existing Relocated Tree36"box Deciduous Accent Tree Low Standard Yes1Tree LegendSITE FURNISHINGSSYMBOLDESCRIPTIONQTYDETAILKornegay Larkspur Planter LS-30. Size: 30" tall x 48" dia. Color: Davis Colors: Outback. Drainage: No Drainage Hole. Exterior Finish:Sandblast. Interior Finish: Bituminuos Sealer. Note: Contractor to install3" perferated observation pipe & 6" layer of 3/8" peagravel in bottom ofplanter. Cap observation pipe with black NDS drain cap.BARK MULCHSYMBOLDESCRIPTIONQTYDETAIL4" thick layer of Landscape Mulch. Type: Redwood Chip Mulch. 5,657 sfContractor to provide material samples for approval prior to instalation.18" linear root barriers shall be installed within eight feet (8`) of any 96 lfpavement. Linear root barriers shall be by Deep Root model number18-2. Install per manufactuer`s specifications and recommendations. Seedetail.3" thick layer of 3/8" crushed Rock Mulch. Color: Dark Grey. Contractor sfto provide material samples for approvalS-101TG-01TG-02TG-04Materials LegendNotes:1 - Graphic quantities take precedence over written quantities2 - All trees shall be of quality as prescribed in the details and specifications.Any tree not meeting such requirements shall be removed from the site andreplaced at no cost to the owner.3 - Trees shall not be planted within:a. 6'-0" of drive approachesb. 6'-0" of sewer linesc. 6'-0" of water linesd. 10'-0" of fire hydrantse. 10'-0" of light standards4 - All quantities and amounts shown on the plans are best estimates for thebenefit of the contractor. In field conditions may vary compared to what isshown on the plans. Therefore, it is the Contractor 's responsibility to verify alllengths, square footages, and amounts prior to bidding the project.2NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Tree & Groundcover PlanL-1664AH 10-28-2021 64 of 82 Limit of WorkLimit of WorkELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONNOPARKINGNOPARKINGELECTRICVEHICLECHARGINGSTATION1PS22PSTG-04TG-01TG-01TG-02Existing tree to be relocatedTG-02TREESBOTANICAL NAMECOMMON NAMESIZETYPEUSEWUCOLSSTYLECA NATIVEQTYFicus macrophyllaMoreton Bay Fig36"box Evergreen Specimen Tree Medium Standard No2Platanus racemosa `Roberts`Roberts Western Sycamore 36"box Deciduous Accent Tree Low Standard Yes2Platanus racemosa `Roberts`Existing Relocated Tree36"box Deciduous Accent Tree Low Standard Yes1Tree LegendSITE FURNISHINGSSYMBOLDESCRIPTIONQTYDETAILKornegay Larkspur Planter LS-30. Size: 30" tall x 48" dia. Color: Davis Colors: Outback. Drainage: No Drainage Hole. Exterior Finish:Sandblast. Interior Finish: Bituminuos Sealer. Note: Contractor to install3" perferated observation pipe & 6" layer of 3/8" peagravel in bottom ofplanter. Cap observation pipe with black NDS drain cap.BARK MULCHSYMBOLDESCRIPTIONQTYDETAIL4" thick layer of Landscape Mulch. Type: Redwood Chip Mulch. 5,657 sfContractor to provide material samples for approval prior to instalation.18" linear root barriers shall be installed within eight feet (8`) of any 96 lfpavement. Linear root barriers shall be by Deep Root model number18-2. Install per manufactuer`s specifications and recommendations. Seedetail.3" thick layer of 3/8" crushed Rock Mulch. Color: Dark Grey. Contractor sfto provide material samples for approvalS-101TG-01TG-02TG-04Materials LegendNotes:1 - Graphic quantities take precedence over written quantities2 - All trees shall be of quality as prescribed in the details and specifications.Any tree not meeting such requirements shall be removed from the site andreplaced at no cost to the owner.3 - Trees shall not be planted within:a. 6'-0" of drive approachesb. 6'-0" of sewer linesc. 6'-0" of water linesd. 10'-0" of fire hydrantse. 10'-0" of light standards4 - All quantities and amounts shown on the plans are best estimates for thebenefit of the contractor. In field conditions may vary compared to what isshown on the plans. Therefore, it is the Contractor 's responsibility to verify alllengths, square footages, and amounts prior to bidding the project.2NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Tree & Groundcover PlanL-177765AH 10-28-2021 65 of 82 Limit of WorkLimit of WorkNOPARKING NOPARKINGNOPARKINGCHARGINGVANEV CHARGINGONLY Notes:1- Graphic symbols take precedence over written quantities. Contractor to verify total quantities.2- Plant quality shall be as prescribed in the details and specifications. Any plant not meetingsuch requirement shall be removed from the site and replaced at no cost to the Owner orLandscape Architect.3- All quantities and amounts shown on the plans are best estimates for the benefit of theContractor. In field conditions may vary compared to what is shown on the plans. Therefore, it isthe Contractor 's responsibility to verify all lengths, square footages, and amounts prior tobidding the project.SHRUBSBOTANICAL NAMECOMMON NAMESIZETYPEWUCOLSCA NATIVEQTYDETAILAloe feroxBitter Aloe15 gal Evergreen Very Low No3Aloe x `Blue Elf`Aloe1 gal Evergreen Very Low No13Aloe x `Erik the Red`Erik the Red Sunbird Aloe 5 gal Evergreen Very Low No3Aloe x `Hercules`Hercules Aloe24"box Evergreen Very Low No6Arctostaphylos x `Pacific Mist`Pacific Mist Manzanita 1 gal Evergreen Very Low Yes12Carex divulsaBerkeley Sedge1 gal Evergreen Low Yes196Ceanothus maritimus `Valley Violet` Maritime Ceanothus1 gal Evergreen Low Yes5Crassula multicavaCape Provence Pygmyweed 1 gal Evergreen Very Low No50Festuca maireiAtlas Fescue5 gal Evergreen Low No52Heuchera maximaIsland Alum Root1 gal Evergreen Low Yes105Polystichum munitumWestern Sword Fern5 gal Evergreen Low Yes34Rhamnus californica `Mound San Bruno` California Coffeeberry 1 gal Evergreen Low Yes10Ribes viburnifolium `Spooner`s Mesa` Catalina Currant1 gal Evergreen Low Yes57Symphoricarpos albus `Betsy Berry` Betsy`sSnowberry5 gal Deciduous Low Yes5Woodwardia fimbriataGiant Chain Fern1 gal Evergreen Low Yes56Zauschneria canum `Calistoga`California Fuchsia1 gal Evergreen Low Yes12GROUND COVERSBOTANICAL NAMECOMMON NAMECONTWATER USEFIELD3SPACINGQTYFragaria chiloensisBeach Strawberryflat Low6" o.c. 648 sfPLANT SCHEDULE SHRUBSNO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Shrub Planting PlanL-1866AH 10-28-2021 66 of 82 Limit of WorkNOPARKING NOPARKING LOADING ZONE ONLY NOPARKINGEV CHARGINGONLY Contractor match planting inthis location to existingplanting in adjacent planter.Notes:1- Graphic symbols take precedence over written quantities. Contractor to verify total quantities.2- Plant quality shall be as prescribed in the details and specifications. Any plant not meetingsuch requirement shall be removed from the site and replaced at no cost to the Owner orLandscape Architect.3- All quantities and amounts shown on the plans are best estimates for the benefit of theContractor. In field conditions may vary compared to what is shown on the plans. Therefore, it isthe Contractor 's responsibility to verify all lengths, square footages, and amounts prior tobidding the project.SHRUBSBOTANICAL NAMECOMMON NAMESIZETYPEWUCOLSCA NATIVEQTYAloe feroxBitter Aloe15 gal Evergreen Very Low No3Aloe x `Blue Elf`Aloe1 gal Evergreen Very Low No13Aloe x `Erik the Red`Erik the Red Sunbird Aloe 5 gal Evergreen Very Low No3Aloe x `Hercules`Hercules Aloe24"box Evergreen Very Low No6Arctostaphylos x `Pacific Mist`Pacific Mist Manzanita 1 gal Evergreen Very Low Yes12Carex divulsaBerkeley Sedge1 gal Evergreen Low Yes196Ceanothus maritimus `Valley Violet` Maritime Ceanothus1 gal Evergreen Low Yes5Crassula multicavaCape Provence Pygmyweed 1 gal Evergreen Very Low No50Festuca maireiAtlas Fescue5 gal Evergreen Low No52Heuchera maximaIsland Alum Root1 gal Evergreen Low Yes105Polystichum munitumWestern Sword Fern5 gal Evergreen Low Yes34Rhamnus californica `Mound San Bruno` California Coffeeberry 1 gal Evergreen Low Yes10Ribes viburnifolium `Spooner`s Mesa` Catalina Currant1 gal Evergreen Low Yes57Symphoricarpos albus `Betsy Berry` Betsy`sSnowberry5 gal Deciduous Low Yes5Woodwardia fimbriataGiant Chain Fern1 gal Evergreen Low Yes56Zauschneria canum `Calistoga`California Fuchsia1 gal Evergreen Low Yes12GROUND COVERSBOTANICAL NAMECOMMON NAMECONTWATER USEFIELD3SPACINGQTYFragaria chiloensisBeach Strawberryflat Low6" o.c. 648 sfPLANT SCHEDULE SHRUBSNO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Shrub Planting PlanL-1967AH 10-28-2021 67 of 82 Limit of WorkLimit of WorkELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONELECTRICVEHICLECHARGINGSTATIONNOPARKINGNOPARKINGELECTRICVEHICLECHARGINGSTATIONSHRUBSBOTANICAL NAMECOMMON NAMESIZETYPEWUCOLSCA NATIVEQTYAloe feroxBitter Aloe15 gal Evergreen Very Low No3Aloe x `Blue Elf`Aloe1 gal Evergreen Very Low No13Aloe x `Erik the Red`Erik the Red Sunbird Aloe 5 gal Evergreen Very Low No3Aloe x `Hercules`Hercules Aloe24"box Evergreen Very Low No6Arctostaphylos x `Pacific Mist`Pacific Mist Manzanita 1 gal Evergreen Very Low Yes12Carex divulsaBerkeley Sedge1 gal Evergreen Low Yes196Ceanothus maritimus `Valley Violet` Maritime Ceanothus1 gal Evergreen Low Yes5Crassula multicavaCape Provence Pygmyweed 1 gal Evergreen Very Low No50Festuca maireiAtlas Fescue5 gal Evergreen Low No52Heuchera maximaIsland Alum Root1 gal Evergreen Low Yes105Polystichum munitumWestern Sword Fern5 gal Evergreen Low Yes34Rhamnus californica `Mound San Bruno` California Coffeeberry 1 gal Evergreen Low Yes10Ribes viburnifolium `Spooner`s Mesa` Catalina Currant1 gal Evergreen Low Yes57Symphoricarpos albus `Betsy Berry` Betsy`sSnowberry5 gal Deciduous Low Yes5Woodwardia fimbriataGiant Chain Fern1 gal Evergreen Low Yes56Zauschneria canum `Calistoga`California Fuchsia1 gal Evergreen Low Yes12GROUND COVERSBOTANICAL NAMECOMMON NAMECONTWATER USEFIELD3SPACINGQTYFragaria chiloensisBeach Strawberryflat Low6" o.c. 648 sfPLANT SCHEDULE SHRUBSNotes:1- Graphic symbols take precedence over written quantities. Contractor to verify total quantities.2- Plant quality shall be as prescribed in the details and specifications. Any plant not meetingsuch requirement shall be removed from the site and replaced at no cost to the Owner orLandscape Architect.3- All quantities and amounts shown on the plans are best estimates for the benefit of theContractor. In field conditions may vary compared to what is shown on the plans. Therefore, it isthe Contractor 's responsibility to verify all lengths, square footages, and amounts prior tobidding the project.NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R EN O R T HR0feet201" =10'103040SITE KEY NTS1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Shrub Planting PlanL-207768AH 10-28-2021 68 of 82 NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020Planting DetailsL-21Trunk caliper shallmeet ANSI Z60 currentedition for root ball size.Modified soil. Depthvaries. (See soil preparationplan).Finished grade.Bottom of root ball rests onexisting or recompactedsoil.Central leader. (See crownobservations detail).SECTION VIEWRoot ball modified asrequired. Round-topped soil berm 4" high x 8" wideabove root ball surfaceshall be constructed aroundthe root ball. Berm shallbegin at root ball periphery.Top of root ball shall be flush withfinished grade.Prior to mulching, lightly tamp soilaround the root ball in 6" lifts tobrace tree. Do not over compact.When the planting hole has beenbackfilled, pour water around theroot ball to settle the soil.4" layer of mulch.No more than 1" of mulch ontop of root ball. (Seespecifications for mulch).Notes:1- Trees shall be of qualityprescribed in crownobservations and rootobservations details andspecifications.2- See specifications forfurther requirements related tothis detail.Existing soil.TREE W/ BERM - MODIFIED SOIL1P-CO-19036_WA-01Notes:1- Shrubs shall be of quality prescribed in the root observations detail and specifications.2- See specifications for further requirements related to this detail.Modified soil.Depth varies. (Seespecifications for soilmodification).Root ball.4" high x 8" wide round - topped soilberm above root ball surface shall beconstructed around the root ball.Berm shall begin at root ball periphery.Prior to mulching, lightly tamp soilaround the root ball in 6" lifts to braceshrub. Do not over compact. When theplanting hole has been backfilled, pourwater around the root ball to settle thesoil.4" layer of mulch.No more than 1" ofmulch on top ofroot ball. (Seespecifications formulch).Root ball rests onexisting orrecompacted soil.Existing soil.Finished grade.Shrub.SECTION VIEWSHRUB - MODIFIED SOIL2P-CO-19036_WA-02EQ.EQ.Notes:1- See planting legend for groundcover species, size, and spacing dimension.2- Small roots (14" or less) that grow around, up, or down the root ball periphery are considered anormal condition in container production and are acceptable however they should be eliminated at thetime of planting. Roots on the periperhy can be removed at the time of planting. (See root ball shaving container detail).3- Settle soil around root ball of each groundcover prior to mulching.PLANSECTION VIEWPavement.Mulch.Groundcover plants to betriangularly spaced.Existing soil.Modified soil. Depth varies. (Seespecifications for soil modification).2 - 3" thick layer of mulch.Finished grade.6" min.GROUNDCOVER3P-CO-19036_WA-03SECTION VIEW6'-0"2'-0"Two (2) three inch lodge pole pinestakes. Install approximately 2"away from the edge of the rootball. Stake location shall notinterfere with permanent branches.PLAN VIEWRubber tree ties.Lodge polestakes.Remove nursery stake. Ifcentral leader needs to bestraightened or held erect, it isacceptable to attach a 12" x 8'bamboo pole to the central leaderand trunk.32" long non - abrasive rubber ties.Prevailingwind.TREE STAKING - LODGEPOLES (2)4P-CO-19036_WA-04ACCEPTABLEREJECTABLEStructural roots primarily grow to one side.Structural roots missing from one side,and/or grow tangent to trunk.Root collar.Structural roots circle interior of root ball. Nostructural roots are horizontal and reach theroot ball periphery near the top of the rootball.Structural roots descend into root ball interior.No structural roots are horizontal and reach theroot ball periphery near the top of the root ball.Roots radiate from trunk and reach side of root ball withoutdeflecting down or around.Root ball periphery.Notes:1- Observations of roots shall occur prior to acceptance. Roots and substrate may be removed during the observation process; substrate/soil shall be replacedafter observation has been completed.2- Small roots (14" or less) that grow around, up, or down the root ball periphery are considered a normal condition in container production and are acceptablehowever they should be eliminated at the time of planting. Roots on the periperhy can be removed at the time of planting. (See root ball shaving container detail).3- See specifications for observation process and requirements.Absorbing roots.Structuralroots.Rootsgrowingtangent totrunk.Structural root.0-2"Top ofrootball.Pointwhere top-most rootemergesfrom trunk.Only absorbing roots reach the peripherynear the top of the root ball. Structuralroots mostly wrap or are deflected on theroot ball interior.The point where top-most root(s) emerges from the trunk (root collar)should be within the top 2" of substrate. The root collar and the rootball interior should be free of defects including circling, kinked,ascending, and stem girdling roots. Structural roots shall reach theperiphery near the top of the root ball.Structural roots circle and do not radiatefrom the trunk.ROOT OBSERVATION DETAIL - CONTAINER5P-CO-19036_WA-12ExampleA BAspectRatio2.50" 1.80" 0.722.0" 2.0" 1.02.50" 2.0" 0.804.0" 3.0" 0.75ABABNotes:1- Aspect ratio shall be less than 0.66 on all branch unions. Aspect ratio is the diameter of branch(B) divided by the diameter of the trunk (A) as measured 1" above the top of the branch union.2- Any tree not meeting the crown observations detail may be rejected.ExampleA BAspectRatio1.50" 0.50" 0.332.50" 0.90" 0.362.0" 1.00" 0.502.50" 1.60" 0.64One central leader(No codominantleaders)Aspect ratio is lessthan 0.66.Aspect ratio isgreater than 0.66.Multiple leaders(Several codominantleaders)ACCEPTABLEREJECTABLEABABABBAspect ratio of B:A less than 0.66as measured 1" above the top ofthe branch union.Aspect ratio of B:A greater than or equal to 0.66 as measured1" above the top of the branch union.CROWN OBSERVATION DETAIL - HIGH BRANCHED6P-CO-19036_WA-131. Existing utilities- information on the drawings relating to existing utility lines and services from the best sources available. All suchinformation is furnished only for information and is not guaranteed. The Contractor shall excavate test pits as required to determine the exactlocation of existing utilities.Call utility locating service for precise utility locations before beginning of any work. 811, DIG ALERT.2. Utility Requirements- The Contractor shall notify the following agencies at least 48 hours in advance of excavating around any of theirstructures. The utility companies listed below shall be contacted.- Gas Company- Telephone Company- Electrical Power Company- Cable Television Company- Water Supply CompanyThe California Public Utilities Commission mandates that in, in the interest of public safety, main line gas valves be maintained in a manner tobe readily accessible and in good operating condition. The Contractor shall notify the gas company's headquarters planning office 48 hoursprior to the start of construction.3. Contractor shall be responsible for making himself familiar with all underground utilities, pipes, and structures. Contractor shall take soleresponsibility for any cost incurred due to damage of said utilities.4. All scaled dimensions on the drawings are approximate. Before proceeding with any work, the Contractor shall carefully check and verify alldimensions and quantities, and shall immediately inform the Owner's Representative of any discrepancies between the information on thedrawings and the actual conditions refraining from doing any work in said areas until given approval to do so by the Owner's Representative.5. The Contractor shall obtain and pay for all permits related to this section of the work unless previously excluded under provision of thecontract or general conditions. The Contractor shall comply with all laws and ordinances bearing on the operation of conduct of the work asdrawn and specified. If the contractor observes that a conflict exist between permit requirements and the work outlined in the contractdocuments, the Contractor shall promptly notify the Owner's Representative in writing including a description of any necessary changes andchanges to the contract price resulting from changes in the work.6. Wherever references are made to standards or coded in accordance with which works is to be performed or tested, the edition or revision ofthe standards and codes current on the effective date of this contract shall apply, unless expressly set forth.7. In case of conflict among any referenced standards or codes or between any referenced standards and codes and the specifications, themore restrictive standard shall apply or Owner's Representative shall determine which shall govern.8. The Contractor shall adequately protect the work, adjacent property, and the public, and shall be responsible for any damages or injury dueto the Contractor's actions.9. The Contractor shall be responsible for any coordination with subcontractors as requiring to accomplish the planting operations.10. Contractor shall be aware of all surface and subsurface conditions, and to notify the Owner's Representative, in writing of anycircumstances that would negatively impact the health of plantings. Contractor shall not proceed with work until corrected.a. Should subsurface drainage or soil conditions be encountered which would be detrimental to growth or survival of plant material, theContractor shall notify the Owner's Representative in writing, stating the conditions and submit a proposal covering the cost of corrections. Ifthe contractor fails to notify the Owner's Representative of such conditions, he/she shall remain responsible for the plant material under thewarrantee clause of the specifications.11. Irrigation and site preparation work shall be completed and accepted prior to the installation of any plants.a. Planting operations shall not begin until such time that the irrigation system is completely operational for the areas to be planted, andthe irrigation system for that area has been preliminarily inspected and approved by the Owner's Representative.12. The Owner's Representative shall be informed of the progress of the work so the work may be observed at the following key times in theconstruction process. The Owner's Representative shall be afforded sufficient time to schedule visit to the site. Failure of the Owner'sRepresentative to make field observations shall not relive the Contractor from meeting all the requirements in the plans, details andspecifications.a. Pre - Construction meeting.b. Site conditions prior to the start of planting.c. Plant quality.d. Completion of planting.13. If the work fails to pass inspection, any subsequent inspections must be rescheduled as required in the specifications. The cost to theOwner for additional inspections will be charged to the Contractor at the prevailing hourly rate of the inspector.14. Contractor shall include in the bid continued maintenance (warranty) period of 1 year after completion of construction and acceptance ofthe project by the Owner's Representative.15. Submit to the Owner's representative, for approval, plant sources including the names and locations of nurseries proposed as sources ofacceptable plants, and a list of the plants they will provide. The plant list shall include the botanical and common name and the size at the timeof selection. Inspect all nursery materials to determine that the materials meet the requirements of the specification.16. Any plant replacements shall be of the same type and quality as prescribed in these plans, details and specifications.17. Mulch shall be Redwood Chip. Provide samples for approval by Owner's representative.18. The landscape plans have designed in accordance with the state model water efficient landscape ordinance (MWELO). It is theContractors responsibility to adhere to the requirements and regulations of that ordinance during the installation of the landscape design plan.During the installation of the landscape design plan, any portion which comes into conflict with MWELO shall be brought to the attention of theOwner/Owner's Representative. In the even that notification does not take place, the Contractor assumes responsibility for all necessarychanges and work in order to meet compliance.GENERAL PLANTING NOTES4'-0"Min.8'-0"8'-0"PLAN VIEWCurb.Eighteen inch (18") deeplinear root barrier (See specifications).Pavement.Tamp soil adjacent to root barriers to stabilizethem.Notes:1- Root barriers shall be installed permanufacturer's specifications andrecommendations.2- Root barriers shall be installed when rootball is located within 8' of pavement.Finished grade2" below adjacentpavement.1' - 6"18" deep linear root barrier(See specifications).Curb.SECTION VIEWTop of root barrier 1" above finished grade.8'-0" or lessExisting soil.3" MaxLINEAR ROOT BARRIERS7P-RE-17009_WA-025' Min. (See specifications). 3" MaxFinished grade2" below adjacentpavement.1' - 6"Notes:1- Root barriers shall be installed per manufacturer's specifications and recommendations.2- Root barriers shall be installed when root ball is located within 8' of pavement.Existing soil.Curb.SECTION VIEWPLAN VIEWPLAN VIEW8' Min.Curb.18" deep linear rootbarrier. (Seespecifications).Tamp soil adjacent toroot barriers to stabilizethem.18" deep linear root barrier.(See specifications).Top of root barrier 1" above finished grade.LINEAR ROOT BARRIERS - PARKING LOT ISLANDS8P-CO-16013_WA-0969AH 10-28-2021 69 of 82 NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020SpecificationsL-22GENERAL CONDITIONSA. CONTRACT DOCUMENTS: Shall consist of specifications and its general conditions and the drawings. The intent of these documents is to include all labor, materials, and services necessary for the proper execution of the work. The documents are to be considered as one. Whatever is called for by any parts shall be as binding as if called for in all parts.B. VERIFICATION: The Contractor shall verify measurements on the drawings before beginning work. In case of error or discrepancy in the drawings or specifications or in the work of others affecting his/her work, he/she shall notify the Owner's Representative immediately. The Contractor shall be held responsible for any damages or loss due to his/her failure to observe these instructions.C. MATERIALS, MACHINERY, EMPLOYEES: Except as otherwise noted, the Contractorshall provide and pay for all materials, labor, tools, and other items necessary andincidental to the completion of his/her work.D. SURVEYS, PERMITS, REGULATIONS: The Owner shall furnish an adequate survey ofthe property. The Contractor shall obtain and pay for all permits and comply with all lawsand ordinances bearing on the operation or conduct of the work as drawn and specified.If the Contractor observes that a variance exists therewith he/she shall promptly notifythe Owner's Representative in writing and any necessary changes shall be adjusted asprovided in the contract for changes in the work.E. PROTECTION OF WORK, PROPERTY AND PERSON: The Contractor shall adequatelyprotect the work, adjacent property, and the public, and shall be responsible for anydamages or injury due to his/her actions.F. CHANGES IN THE WORK: The owner may order changes in the work, and the contractsum being adjusted accordingly. All such orders and adjustments plus claims by theContractor for extras must be made in writing before executing the work involved.G. CORRECTION OF WORK: The Contractor shall re-execute any work that fails toconform to the requirements of the contract and shall remedy defects due to faultymaterials or workmanship upon written notice from the Owner's Representative for aperiod of ninety (90) days from the date of completion of the contract.H. Owner's Authorized Representative: The Owner's authorized representative acts as theauthorized representative of the Owner in conjunction with the project manager, and hasauthority to accept or reject materials or workmanship and to make minor changes in thework not involving extra cost. He will also interpret the meaning of the contractdocuments and may stop the work if necessary to ensure its proper execution.I. CLARIFICATION OF DRAWINGS BEFORE BIDDING: After reviewing the drawingsthoroughly it is the Contractor's responsibility to clarify with the Owner's Representativeany questions the Contractor may have regarding the method of construction, quantities,or quality of materials included or called out. If the Contractor cannot contact theOwner's Representative, the Contractor must qualify his/her bid or accept theinterpretation of the Owner's Representative on the questionable areas as they developduring construction.J. SAMPLES: The Owner's Representative reserves the right to take and analyze samplesof materials for conformity to specifications at any time. The Contractor shall furnishsamples upon request by the Owner's Representative. Rejected materials shall beimmediately removed from the site and replaced at the Contractor's expense. The cost oftesting materials not meeting specifications shall be paid by the Contractor.K. PRE-CONSTRUCTION CONFERENCE: Schedule a pre-construction meeting with theOwner's Representative at least seven (7) days before beginning work. The purpose ofthis conference is to review any questions the Contractor may have regarding the work,administrative procedures during construction and project work schedule.01 56 39Tree and Plant ProtectionPART 1 GENERAL1.1 SUMMARYNote to specifier: Remove parts of this work description that do not apply.A. The scope of work includes all labor, materials, tools, equipment, facilities, transportation and servicesnecessary for, and incidental to performing all operations in connection with protection of existing trees and other plantsas shown on the drawings and as specified herein.1. Provide preconstruction evaluations2. Provide tree and plant protection fencing.3. Provide protection of root zones and above ground tree and plants4. Provide pruning of existing trees and plants.5. Coordinate with the requirements of Section Planting Soil for modifications to the soil within the root zoneof existing trees and plants.6. Provide all insect and disease control.7. Provide maintenance of existing trees and plants including irrigation during the construction period asrecommended by the arborist report.8. Provide maintenance of existing trees and plants including irrigation during the post construction plantmaintenance period.9. Remove tree protection fencing and other protection from around and under trees and plants.10.Clean up and disposal of all excess and surplus material.1.2 CONTRACT DOCUMENTSA. Shall consist of specifications and general conditions and the drawings. The intent of these documents is toinclude all labor, materials, and services necessary for the proper execution of the work. The documents are to beconsidered as one. Whatever is called for by any parts shall be as binding as if called for in all parts.B. It is the intent of this section that the requirements apply to all sections of the project specification such that anysubcontractor must comply with the restrictions on work within designated Tree and Plant Protection Areas.1.3 RELATED DOCUMENTS AND REFERENCESA. Related Documents:Note to specifier: Coordinate this list with the other related specification sections. Add or delete sections asappropriate.1. Drawings and general provisions of contract including general and supplementary conditions and Division Ispecifications apply to work of this section.2. Section - Planting Soil3. Section - Irrigation4. Section - Planting5. Section - LawnB. References: The following specifications and standards of the organizations and documents listed in thisparagraph form a part of the specification to the extent required by the references thereto. In the event that therequirements of the following referenced standards and specification conflict with this specification section therequirements of this specification shall prevail. In the event that the requirements of any of the following referencedstandards and specifications conflict with each other the more stringent requirement shall prevail.1. ANSI A 300 (Part 5) - Standard Practices for Tree, Shrub and other Woody Plant Maintenance, mostcurrent editions.2. Pruning practices shall conform with recommendations “Structural Pruning: A Guide For The GreenIndustry”; Published by Urban Tree Foundation, Visalia, California; most current edition.3. Glossary of Arboricultural Terms, International Society of Arboriculture, Champaign IL, most current edition.1.4 VERIFICATIONA. All scaled dimensions on the drawings are approximate. Before proceeding with any work, the Contractor shallcarefully check and verify all dimensions and quantities, and shall immediately inform the Owner's Representative ofany discrepancies between the information on the drawings and the actual conditions, refraining from doing any work insaid areas until given approval to do so by the Owner's Representative.1.5 PERMITS AND REGULATIONSA. The Contractor shall obtain and pay for all permits related to this section of the work unless previously excludedunder provision of the contract or general conditions. The Contractor shall comply with all laws and ordinances bearingon the operation or conduct of the work as drawn and specified. If the Contractor observes that a conflict exists betweenpermit requirements and the work outlined in the contract documents, the Contractor shall promptly notify the Owner'sRepresentative in writing including a description of any necessary changes and changes to the contract price resultingfrom changes in the work.B. Wherever references are made to standards or codes in accordance with which work is to be performed ortested, the edition or revision of the standards and codes current on the effective date of this contract shall apply, unlessotherwise expressly set forth.C. In case of conflict among any referenced standards or codes or between any referenced standards and codesand the specifications, the more restrictive standard shall apply or Owner's Representative shall determine which shallgovern.1.6 PROTECTION OF WORK, PROPERTY AND PERSONA. The Contractor shall protect the work, adjacent property, and the public, and shall be responsible for anydamages or injury due to his/her actions.1.7 CHANGES IN THE WORKA. The Owner's Representative may order changes in the work, and the contract sum should be adjustedaccordingly. All such orders and adjustments plus claims by the Contractor for extra compensation must be made andapproved in writing before executing the work involved.1.8 CORRECTION OF WORKA. The Contractor shall re-execute any work that fails to conform to the requirements of the contract and shallremedy defects due to faulty materials or workmanship upon written notice from the Owner's Representative, at thesoonest possible time that can be coordinated with other work and seasonal weather demands.1.9 DEFINITIONSNote to specifier: Delete any words below that are not used in the final specification.All terms in this specification shall be as defined in the “Glossary of Arboricultural Terms” or as modified below.A. Owner's Representative: The person appointed by the Owner to represent their interest in the review andapproval of the work and to serve as the contracting authority with the Contractor. The Owner's Representative mayappoint other persons to review and approve any aspects of the work.B. Reasonable and reasonably: When used in this specification is intended to mean that the conditions cited willnot affect the establishment or long term stability, health or growth of the plant. This specification recognizes that plantsare not free of defects, and that plant conditions change with time. This specification also recognizes that somedecisions cannot be totally based on measured findings and that profession judgment is required. In cases of differingopinion, the Owner's Representative expert shall determine when conditions within the plant are judged as reasonable.C. Shrub: Woody plants with mature height approximately less than 25 feet.D. Tree and Plant Protection Area: Area surrounding individual trees, groups of trees, shrubs, or other vegetationto be protected during construction, and defined by a circle centered on the trunk with each tree with a radius equal tothe clown dripline unless otherwise indicated by the owner's representative.E. Tree: Single and multi-stemmed plants, including palms with anticipated mature height approximately greaterthan 25 feet or any plant identified on the plans as a tree.1.10 SUBMITTALSNote to specifier: The arborist report, described below is to provide a current assessment of all trees to remainand serve as the basis for determining if trees are damaged. The Contractor is made responsible for thepreparation of this report with the Owner's Representative responsible for approval of the report so that bothsides of the contract are satisfied that the condition of these trees is accurately reported before any work hasstarted. Add or delete any portions that do not apply.A. ARBORIST REPORT: Prior to the start of construction, submit, for approval by the Owner's Representative,the report of a consulting arborist who is a registered Consulting Arborist® (RCA) with American Society of ConsultingArborists or an ISA Board Certified Master Arborist, which details the following information for all trees to remain withinthe area designated on the drawings as the Tree and Plant Protection Area. The report shall include the following:1. A description of each tree to remain indicating its genus and species, condition including any visibledamage to the root system or soil within the root zone, tree diameter at breast height (dbh) andapproximate height, size and any visible disease, insect infestations and or branch and trunk structuraldeficiencies.2. The report shall note all trees or parts of trees, which are considered a hazard or significant or extreme risklevel. Include the International Society of Arboriculture hazard evaluation sheet for each tree, which mayreasonably be identified as a potential hazard tree.3. Recommendations as to treatment of all insect, disease and structural problems encountered.4. Recommendations for fertilizer treatments, if any.5. A plan of the site showing the location of all trees included in the report.B. PRODUCT DATA: Submit manufacturer product data and literature describing all products required by thissection to the Owner's Representative for approval. Provide submittal four weeks before the start of any work at the site.Note to specifier: Confirm submittal time is appropriate for project schedule.C. QUALIFICATIONS SUBMITTAL: For each applicable person expected to work on the project, provide copies ofthe qualifications and experience of the Consulting arborist, proof of either the registered Consulting Arborist® (RCA)with American Society of Consulting Arborists or an ISA Board Certified Master Arborist and any requiredHerbicide/Pesticide license to the Owner's Representative, for review prior to the start of work.1.11 OBSERVATION of the workA. The Owner's Representative may inspect the work at any time.1.12 PRE-CONSTRUCTION CONFERENCEA. Schedule a pre - construction meeting with the Owner's Representative at least seven (7) days beforebeginning work to review any questions the Contractor may have regarding the work, administrative procedures duringconstruction and project work schedule.1. The following Contractors shall attend the preconstruction conference:a. General Contractor.b. Consulting Arborist.c. Subcontractor assigned to install Tree and Plant Protection measures.d. Earthwork Contractor.e. All site utility Contractors that may be required to dig or trench into the soil.f. Landscape subcontractor.g. Irrigation subcontractorB. Prior to this meeting, mark all trees and plants to remain and or be removed as described in this specificationfor review and approval by the Owner's Representative.1.13 QUALITY ASSURANCEA. Contractor qualifications:1. All pruning, branch tie back, tree removal, root pruning, and fertilizing required by this section shall beperformed by or under the direct supervision of ISA Certified Arborist Submit aforementioned individual'squalifications for approval by the Owner's Representative.2. All applications of pesticide or herbicide shall be performed by a person maintaining a current state licenseto apply chemical pesticides valid in the jurisdiction of the project. Submit copies of all required statelicensing certificates including applicable chemical applicator licenses.PART 2 PRODUCTS2.1 MULCHNote to specifier: Revise this paragraph to reflect regionally available mulch materials or project specificmulch quality or type requirements where appropriate. The coarse grade Mulch specified here is consideredsuperior for its water retention and soil building properties in areas of tree and shrub roots when irrigation isdrip, bubblers or flood methods.A. Mulch shall be coarse, ground, from tree and woody brush sources. The minimum range of fine particles shallbe 3/8 inch or less in size and a maximum size of individual pieces shall be approximately 1 to 1-1/2 inch in diameterand maximum length of approximately 4 to 8 inches. No more that 25% of the total volume shall be fine particles and nomore than 20% of total volume be large pieces.1. It is understood that Mulch quality will vary significantly from supplier to supplier and region to region. Theabove requirements may be modified to conform to the source material from locally reliable suppliers asapproved by the Owner's Representative.B. Submit suppliers product data that product meets the requirements and two gallon sample for approval.2.2 WOOD CHIPS:Note to specifier: Wood chips if available may be a suitable and more sustainable alternative to other typesof Mulch. Consider permitting Mulch or Wood Chips; however be sure to coordinate requirements with thedrawings. Remove this paragraph if Wood Chips are not to be permitted.A. Wood Chips from an arborist chipping operation with less than 20% by volume green leaves. Chips stockpiledfrom the tree removal process may be used.2.3 TREE PROTECTION FENCING:Note to specifier: Two fencing options are provided. The more robust chain link fencing is often required aturban sites where there are significant conflicts between tree preservation and other work tasks. Amend thisspecification and the tree protection details to be clear as to the required fencing. Remove the paragraph ofthe fence type that is not to be used. If both types are to be permitted coordinate with the drawings so that useis correctly identified.A. PLASTIC MESH FENCE: Heavy - duty orange plastic mesh fencing fabric 48 inches wide. Fencing shall beattached to metal “U” or “T” post driven into the ground of sufficient depth to hold the fabric solidly in place with outsagging. The fabric shall be attached to the post using attachment ties of sufficient number and strength to hold up thefabric without sagging. The Owner's Representative may request, at any time, additional post, deeper post depths andor additional fabric attachments if the fabric begins to sag, lean or otherwise not present a sufficient barrier to access.B. CHAIN LINK FENCE: 6 feet tall metal chain link fence set in metal frame panels on movable core drilledconcrete blocks of sufficient size to hold the fence erect in areas of existing paving to remain.C. GATES: For each fence type and in each separate fenced area, provide a minimum of one 3 foot wide gate.Gates shall be lockable. The location of the gates shall be approved by the Owner's Representative.D. Submit suppliers product data that product meets the requirements for approval.2.4 tree protection sign:A. Heavy-duty cardboard signs, 8.5 inches x 11 inches, white colored background with black 2 inch high or largerletters block letters. The signs shall be attached to the tree protection fence every 50 feet o.c. The tree protection signshall read “Tree and Plant Protection Area- Keep Out”.2.5 TREE GROWTH REGULATOR (TGR)A. Cambistat 25C.B. Submit suppliers product data that product meets the requirements for approval.2.6 MATTINGA. Matting for vehicle and work protection shall be heavy duty matting designed for vehicle loading over tree roots,Alturnamats as manufactured by Alturnamats, Inc. Franklin, PA 16323 or approved equal.B. Submit suppliers product data that product meets the requirements for approval.2.7 GEOGRIDA. Geogrid shall be woven polyester fabric with PVC coating, Uni-axial or biaxial geogrid, inert to biologicaldegradation, resistant to naturally occurring chemicals, alkalis, acids.1. Geogrid shall be Miragrid 2XT as manufactured by Ten Cate Nicolon, Norcross, GA.http://www.tencate.com or approved equal.B. Submit suppliers product data that product meets the requirements for approval.2.8 FILTER FABRICA. Filter Fabric shall be nonwoven polypropylene fibers, inert to biological degradation and resistant of naturallyoccurring chemicals, alkalis and acids.1. Mirafi 135 N as manufactured by Ten Cate Nicolon, Norcross, GA. http://www.tencate.com or approvedequal.B. Submit suppliers product data that product meets the requirements for approval.PART 3 EXECUTION3.1 SITE EXAMINATIONA. Examine the site, tree, plant and soil conditions. Notify the Owner's Representative in writing of any conditionsthat may impact the successful Tree and Plant Protections that is the intent of this section.3.2 COORDINATION WITH PROJECT WORKA. The Contractor shall coordinate with all other work that may impact the completion of the work.B. Prior to the start of Work, prepare a detailed schedule of the work for coordination with other trades.C. Coordinate the relocation of any irrigation lines currently present on the irrigation plan, heads or the conduits ofother utility lines or structures that are in conflict with tree locations. Root balls shall not be altered to fit around lines.Notify the Owner's Representative of any conflicts encountered.3.3 TREE AND PLANT PROTECTION AREA: The Tree and Plant Protection Area is defined as all areas indicatedon the tree protection plan. Where no limit of the Tree and Plant Protection area is defined on the drawings, thelimit shall be the drip line (outer edge of the branch crown) of each tree.3.4 Preparation:A. Prior to the preconstruction meeting, layout the limits of the Tree and Plant Protection Area and thenalignments of required Tree and Plant Protection Fencing and root pruning. Obtain the Owner's Representative'sapproval of the limits of the protection area and the alignment of all fencing and root pruning.B. Flag all trees and shrubs to be removed by wrapping orange plastic ribbon around the trunk and obtain theOwner's Representative's approval of all trees and shrubs to be removed prior to the start of tree and shrub removal.After approval, mark all trees and shrubs to be removed with orange paint in a band completely around the base of thetree or shrub 4.5 feet above the ground.C. Flag all trees and shrubs to remain with white plastic ribbon tied completely around the trunk or each tree andon a prominent branch for each shrub. Obtain the Owner's Representative's approval of all trees and shrubs to beremain prior to the start of tree and shrub removal.D. Prior to any construction activity at the site including utility work, grading, storage of materials, or installation oftemporary construction facilities, install all tree protection fencing, Filter Fabric, silt fence, tree protection signs, Geogrid,Mulch and or Wood Chips as shown on the drawings.3.5 SOIL MOISTUREA. Volumetric soil moisture level, in all soils within the Tree and Plant Protection Area shall be maintained abovepermanent wilt point to a depth of at least 8 inches. No soil work or other activity shall be permitted within the Tree andPlant Protection Area when the volumetric soil moisture is above field capacity. The permanent wilt point and fieldcapacity for each type of soil texture shall be defined as follows (numbers indicate percentage volumetric soil moisture).Soil typePermanent wilt point v/v Field capacityv/vSand, Loamy sand, Sandy loam 5 - 8%12 - 18%Loam, Sandy clay, Sandy clay loam 14 - 25%27 -36%Clay loam, Silt loam11 - 22%31 - 36%Silty clay, Silty clay loam22 - 27%38 - 41%1. Volumetric soil moisture shall be measured with a digital, electric conductivity meter. The meter shall bethe Digital Soil Moisture Meter, DSMM500 by General Specialty Tools and Instruments, or approvedequivalent meter.B. The Contractor shall confirm the soil moisture levels with a moisture meter. If the moisture is too high, suspendoperations until the soil moisture drains to below field capacity.3.6 ROOT PRUNING:A. Prior to any excavating into the existing soil grade within 25 feet of the limit of the Tree and Plant ProtectionArea or trees to remain, root prune all existing trees to a depth of 24 inches below existing grade in alignments followingthe edges of the Tree and Plant Protection Area or as directed by the Owner's Representative. Root pruning shall be inconformance with ANSI A300 (part 8) latest edition.1. Using a rock saw, chain trencher or similar trenching device, make a vertical cut within 2 feet of the limit ofgrading.2. After completion of the cut, make clean cuts with a lopper, saw or pruner to remove all torn root ends onthe tree side of the excavation, and backfill the trench immediately with existing soil, filling all voids.3.7 INSTALLATION OF GEOGRIDS, FILTER FABRIC, MATTING, WOOD CHIPS AND OR MULCHA. Install Geogrids, Filter Fabric, matting, Wood Chips and or Mulch in areas and depths shown on the plans anddetails or as directed by the Owner's representative. In general it is the intent of this specification to provide thefollowing levels of protection:1. All areas within the Tree and Plant Protection area provide a minimum of 5 inches of Wood Chips or Mulch.2. Areas where foot traffic or storage of lightweight materials is anticipated to be unavoidable provide a layerof Filter Fabric under the 5 inches of Wood Chips or Mulch.3. Areas where occasional light vehicle traffic is anticipated to be unavoidable provide a layer of Geogridsunder 8 inches of Wood Chips or Mulch.4. Areas where heavy vehicle traffic is unavoidable provide a layer of Geogrids under 8 - 12 inches of WoodChips or Mulch and a layer of matting over the Wood Chips or Mulch.B. The Owner's Representative shall approve the appropriate level of protection.C. In the above requirements, light vehicle is defined as a track skid steer with a ground pressure of 4 psi orlighter. A heavy vehicle is any vehicle with a tire or track pressure of greater than 4 psi. Lightweight materials are anypackaged materials that can be physically moved by hand into the location. Bulk materials such as soil, or aggregateshall never be stored within the Tree and Plant Protection Area.3.8 PROTECTION:A. Protect the Tree and Plant Protection Area at all times from compaction of the soil; damage of any kind totrunks, bark, branches, leaves and roots of all plants; and contamination of the soil, bark or leaves with constructionmaterials, debris, silt, fuels, oils, and any chemicals substance. Notify the Owner's Representative of any spills,compaction or damage and take corrective action immediately using methods approved by the Owner's Representative.3.9 GENERAL REQUIREMENTS AND LIMITATIONS FOR OPERATIONS WITHIN THE TREE AND PLANTPROTECTION AREA:A. The Contractor shall not engage in any construction activity within the Tree and Plant Protection Area withoutthe approval of the Owner's Representative including: operating, moving or storing equipment; storing supplies ormaterials; locating temporary facilities including trailers or portable toilets and shall not permit employees to traverse thearea to access adjacent areas of the project or use the area for lunch or any other work breaks. Permitted activity, ifany, within the Tree and Plant Protection Area maybe indicated on the drawings along with any required remedialactivity as listed below.B. In the event that construction activity is unavoidable within the Tree and Plant Protection Area, notify theOwner's Representative and submit a detailed written plan of action for approval. The plan shall include: a statementdetailing the reason for the activity including why other areas are not suited; a description of the proposed activity; thetime period for the activity, and a list of remedial actions that will reduce the impact on the Tree and Plant ProtectionArea from the activity. Remedial actions shall include but shall not be limited to the following:1. In general, demolition and excavation within the drip line of trees and shrubs shall proceed with extremecare either by the use of hand tools, directional boring and or Air Knife excavation where indicated or withother low impact equipment that will not cause damage to the tree, roots or soil.2. When encountered, exposed roots, 1 inches and larger in diameter shall be worked around in a mannerthat does not break the outer layer of the root surface (bark). These roots shall be covered in Wood Chipsand shall be maintained above permanent wilt point at all times. Roots one inch and larger in diametershall not be cut with out the approval of the owners representative. Excavation shall be tunneled underthese roots without cutting them. In the areas where roots are encountered, work shall be performed andscheduled to close excavations as quickly as possible over exposed roots.3. Tree branches that interfere with the construction may be tied back or pruned to clear only to the pointnecessary to complete the work. Other branches shall only be removed when specifically indicated by theOwner's Representative. Tying back or trimming of all branches and the cutting of roots shall be inaccordance with accepted arboricultural practices (ANSI A300, part 8) and be performed under supervisionof the arborist.4. Matting: Install temporary matting over the Wood Chips or Mulch to the extent indicated. Do not permit foottraffic, scaffolding or the storage of materials within the Tree and Plant Protection Area to occur off of thetemporary matting.5. Trunk Protection: Protect the trunk of each tree to remain by covering it with a ring of 8 foot long 2 inch x 6- inch planks loosely banded onto the tree with 3 steel bands. Staple the bands to the planks as necessaryto hold them securely in place. Trunk protection must by kept in place no longer than 12 months. Ifconstruction requires work near a particular tree to continue longer than 12 months, the steel bands shallbe inspected every six months and loosened if they are found to have become tight.6. Air Excavation Tool: If excavation for footings or utilities is required within the Tree and Plant ProtectionArea, air excavation tool techniques shall be used where practical or as designed on the drawings.a. Remove the Wood Chips from an area approximately 18 inches beyond the limits of the hole or trenchto be excavated. Cover the Wood Chips for a distance of not less than 15 feet around the limit of theexcavation area with Filter Fabric or plastic sheeting to protect the Wood Chips from silt. Mound theWood Chips so that the plastic slopes towards the excavation.b. Using a sprinkler or soaker hose, apply water slowly to the area of the excavation for a period of at least4 hours, approximately 12 hours prior to the work so that the ground water level is at or near fieldcapacity at the beginning of the work. For excavations that go beyond the damp soil, rewet the soil asnecessary to keep soil moisture near field capacity.c. Using an air excavation tool specifically designed and manufactured for the intended purpose, and atpressures recommended by the manufacturer of the equipment, fracture the existing soil to the shapeand the depths required. Work at rates and using techniques that do not harm tree roots. Air pressureshall be a maximum of 90-100 psi.1.) The air excavation tool shall be “Air-Spade” as manufactured by Concept Engineering Group, Inc.,Verona, PA (412) 826-8800, or Air Knife as manufactured by Easy Use Air Tools, Inc. Allison Park,Pa (866) 328-5723 or approved equal.d. Using a commercial, high-powered vacuum truck if required, remove the soil from the excavationproduced by the Air Knife excavation. The vacuum truck should generally operate simultaneously withthe hose operator, such that the soil produced is picked up from the excavation hole, and the exposedroots can be observed and not damaged by the ongoing operation. Do not drive the vacuum truck intothe Tree and Plant Protection Area unless the area is protected from compaction as approved inadvance by the Owner's Representative.e. Remove all excavated soil and excavated Wood Chips, and contaminated soil at the end of theexcavation.f. Schedule the work so that foundations or utility work is completed immediately after the excavation. Donot let the roots dry out. Mist the roots several times during the day. If the excavated area must remainopen over night, mist the roots and cover the excavation with black plastic.g. Dispose of all soil in a manner that meets local laws and regulations.h. Restore soil within the trench as soon as the work is completed. Utilize soil of similar texture to theremoved soil and lightly compact with hand tools. Leave soil mounded over the trench to a height ofapproximately 10% of the trench depth to account for settlement.i. Restore any Geogrids, Filter Fabric, Wood Chips or Mulch and or matting that was previously requiredfor the area.3.10 TREE REMOVAL:A. Remove all trees indicated by the drawings and specifications, as requiring removal, in a manner that will notdamage adjacent trees or structures or compacts the soil.B. Remove trees that are adjacent to trees or structures to remain, in sections, to limit the opportunity of damageto adjacent crowns, trunks, ground plane elements and structures.C. Do not drop trees with a single cut unless the tree will fall in an area not included in the Tree and PlantProtection Area. No tree to be removed within 50 feet of the Tree and Plant Protection Area shall be pushed over orup-rooted using a piece of grading equipment.D. Protect adjacent paving, soil, trees, shrubs, ground cover plantings and understory plants to remain fromdamage during all tree removal operations, and from construction operations. Protection shall include the root system,trunk, limbs, and crown from breakage or scarring, and the soil from compaction.E. Remove stumps and immediate root plate from existing trees to be removed. Grind trunk bases and largebuttress roots to a depth of the largest buttress root or at least 18 inches below the top most roots which ever is lessand over the area of three times the diameter of the trunk (DBH).1. For trees where the stump will fall under new paved areas, grind roots to a total depth of 18 inches belowthe existing grade. If the sides of the stump hole still have greater than approximately 20% wood visible,continue grinding operation deeper and or wider until the resulting hole has less than 20% wood. Removeall wood chips produced by the grinding operation and back fill in 8 inch layers with controlled fill of aquality acceptable to the site engineer for fill material under structures, compacted to 95% of the maximumdry density standard proctor. The Owner's Representative shall approve each hole at the end of thegrinding operation.2. In areas where the tree location is to be a planting bed or lawn, remove all woodchips and backfill stumpholes with planting soil as defined in Specification Section Planting Soil, in maximum of 12 inch layers andcompact to 80 - 85% of the maximum dry density standard proctor.3.11 PRUNING:A. Within six months of the estimated date of substantial completion, prune all dead or hazardous branches largerthan 2 inch in diameter from all trees to remain.B. Implement all pruning recommendations found in the arborist report.C. Prune any low, hanging branches and vines from existing trees and shrubs that overhang walks, streets anddrives, or parking areas as follows:1. Walks - within 8 feet vertically of the proposed walk elevation.2. Parking areas - within 12 feet vertically of the proposed parking surface elevation.3. Streets and drives - within 14 feet vertically of the proposed driving surface elevation.D. All pruning shall be done in accordance with ANSI A300 (part 1), ISA BMP Tree Pruning (latest edition, and the"Structural Pruning: A Guide for the Green Industry", Edward Gilman, Brian Kempf, Nelda Matheny and Jim Clark, 2013Urban Tree Foundation, Visalia CA.E. Perform other pruning task as indicated on the drawings or requested by the Owner's Representative.F. Where tree specific disease vectors require, sterilize all pruning tools between the work in individual trees.3.12 TREE GROWTH REGULATOR INJECTION (TGR)Note to specifier: Confirm that Tree Growth Regulator is appropriate for the project. If not remove thisparagraph and the TGR product in Part 2. If appropriate, be sure that the specific trees to be treated arelabeled on the Tree and Plant Protection Plan. There is little data on the effectiveness of TGR treatments. Useyou own judgment on including it in the requirements.A. At the start of the construction contract period, treat all trees, indicated on the Plan, with Tree Growth Regulatorat recommended rates, time of year and methods indicated by the product distributor.3.13 WATERINGA. The Contractor shall be fully responsible to ensure that adequate water is provided to all plants to be preservedduring the entire construction period. Adequate water is defined to be maintaining soil moisture above the permanentwilt point to a depth of 8 inches or greater.B. The Contractor shall adjust the automatic irrigation system, if available, and apply additional water, using hosesor water tanks as required.C. Periodically test the moisture content in the soil within the root zone to determine the water content.3.14 WEED REMOVALA. During the construction period, control any plants that seed in and around the fenced Tree and Plant Protectionarea at least three times a year.1. All plants that are not shown on the planting plan or on the Tree and Plant Protection Plan to remain shallbe considered as weeds.B. At the end of the construction period provide one final weeding of the Tree and Plant Protection Area.3.15 INSECT AND DISEASE CONTROLLERA. Monitor all plants to remain for disease and insect infestations during the entire construction period. Provide alldisease and insect control required to keep the plants in a healthy state using the principles of Integrated PlantManagement (IPM). All pesticides shall be applied by a certified pesticide applicator.3.16 CLEAN - UPA. During tree and plant protection work, keep the site free of trash, pavements reasonably clean and work area inan orderly condition at the end of each day. Remove trash and debris in containers from the site no less than once aweek.1. Immediately clean up any spilled or tracked soil, fuel, oil, trash or debris deposited by the Contractor fromall surfaces within the project or on public right of ways and neighboring property.B. Once tree protection work is complete, wash all soil from pavements and other structures. Ensure that Mulch isconfined to planting beds.C. Make all repairs to grades, ruts, and damage to the work or other work at the site.D. Remove and dispose of all excess Mulch, Wood Chips, packaging, and other material brought to the site by theContractor.3.17 Removal of fencing and other Tree and plant protectionA. At the end of the construction period or when requested by the Owner's Representative remove all fencing,Wood Chips or Mulch, Geogrids and Filter Fabric, trunk protection and or any other Tree and Plant Protection material.3.18 DAMAGE OR LOSS TO EXISTING PLANTS TO REMAINNote to specifier: This clause is not written to cover high value heritage trees. A specification to address highvalue heritage trees should be added here if any exist on the project.A. Any trees or plants designated to remain and which are damaged by the Contractor shall be replaced in kind bythe Contractor at their own expense. Trees shall be replaced with a tree of similar species and of equal size or 6 inchcaliper which ever is less. Shrubs shall be replaced with a plant of similar species and equal size or the largest sizeplants reasonably available which ever is less. Where replacement plants are to be less than the size of the plant that isdamaged, the Owner's Representative shall approve the size and quality of the replacement plant.1. All trees and plants shall be installed per the requirements of Specification Section Planting.B. Plants that are damaged shall be considered as requiring replacement or appraisal in the event that thedamage affects more than 25 % of the crown, 25% of the trunk circumference, or root protection area, or the tree isdamaged in such a manner that the tree could develop into a potential hazard. Trees and shrubs to be replaced shall beremoved by the Contractor at his own expense.1. The Owner's Representative may engage an independent arborist to assess any tree or plant that appearsto have been damaged to determine their health or condition.C. Any tree that is determined to be dead, damaged or potentially hazardous by the Owner's arborist and upon therequest of the Owner's Representative shall be immediately removed by the Contractor at no additional expense to theowner. Tree removal shall include all clean up of all wood parts and grinding of the stump to a depth sufficient to plantthe replacement tree or plant, removal of all chips from the stump site and filling the resulting hole with topsoil.D. Any remedial work on damaged existing plants recommended by the consulting arborist shall be completed bythe Contractor at no cost to the owner. Remedial work shall include but is not limited to: soil compaction remediationand vertical mulching, pruning and or cabling, insect and disease control including injections, compensatory watering,additional mulching, and could include application tree growth regulators (TGR).E. Remedial work may extend up to two years following the completion of construction to allow for anyrequirements of multiple applications or the need to undertake applications at required seasons of the year.END OF SECTION 01 56 39SECTION 32 9100PLANTING SOILPART 1 GENERAL1.1 SUMMARYNote to specifier: Remove parts of this work description that do not apply.A. The scope of work includes all labor, materials, tools, supplies, equipment, facilities, transportation andservices necessary for, and incidental to performing all operations in connection with furnishing, delivery, and installationof Planting Soil and /or the modification of existing site soil for use as Planting Soil, complete as shown on the drawingsand as specified herein.B. The scope of work in this section includes, but is not limited to, the following:1. Locate, purchase, deliver and install Imported Planting Soil and soil amendments.2. Harvest and stockpile existing site soils suitable for Planting Soil.3. Modify existing stockpiled site soil.a. Modify existing site soil in place for use as Planting Soil.b. Install existing or modified existing soil for use as Planting Soil.4. Locate, purchase, deliver and install subsurface Drain Lines.5. Fine grade Planting Soil.6. Install Compost into Planting Soil.7. Clean up and disposal of all excess and surplus material.1.2 CONTRACT DOCUMENTSA. Shall consist of specifications, general conditions, and the drawings. The intent of these documents is toinclude all labor, materials, and services necessary for the proper execution of the work. The documents are to beconsidered as one. Whatever is called for by any parts shall be as binding as if called for in all parts.1.3 RELATED DOCUMENTS AND REFERENCESA. Related Documents:Note to specifier: Coordinate this list with the other related specification sections. Add or delete sections asappropriate.1. Drawings and general provisions of contract, including general and supplementary conditions and Division Ispecifications, apply to work of this section.2. Related Specification Sectiona. Section - Plantingb. Section - Irrigationc. Section - Lawnd. Section - Tree and Plant ProtectionB. References: The following specifications and standards of the organizations and documents listed in thisparagraph form a part of the Specification to the extent required by the references thereto. In the event that therequirements of the following referenced standards and specification conflict with this specification section therequirements of this specification shall prevail. In the event that the requirements of any of the following referencedstandards and specifications conflict with each other the more stringent requirement shall prevail.1. ASTM: American Society of Testing Materials cited section numbers.2. U.S. Department of Agriculture, Natural Resources Conservation Service, 2003. National Soil SurveyHandbook, title 430-VI. Available Online.3. US Composting Council www.compostingcouncil.org andhttp://compostingcouncil.org/admin/wp-content/plugins/wp-pdfupload/pdf/191/LandscapeArch_Specs.pdf.4. Methods of Soil Analysis, as published by the Soil Science Society of America (http://www.soils.org/).5. Up by Roots: healthy soils and trees in the built environment. 2008. J. Urban. International Society ofArboriculture, Champaign, IL.1.4 VERIFICATIONA. All scaled dimensions on the drawings are approximate. Before proceeding with any work, the Contractor shallcarefully check and verify all dimensions and quantities, and shall immediately inform the Owner's Representative ofany discrepancies between the information on the drawings and the actual conditions, refraining from doing any work insaid areas until given approval to do so by the Owner's Representative.1.5 PERMITS AND REGULATIONSA. The Contractor shall obtain and pay for all permits related to this section of the work unless previously excludedunder provision of the contract or general conditions. The Contractor shall comply with all laws and ordinances bearingon the operation or conduct of the work as drawn and specified. If the Contractor observes that a conflict exists betweenpermit requirements and the work outlined in the contract documents, the Contractor shall promptly notify the Owner'sRepresentative in writing including a description of any necessary changes and changes to the contract price resultingfrom changes in the work.B. Wherever references are made to standards or codes in accordance with which work is to be performed ortested, the edition or revision of the standards and codes current on the effective date of this contract shall apply, unlessotherwise expressly set forth.C. In case of conflict among any referenced standards or codes or among any referenced standards and codesand the specifications, the more restrictive standard shall apply or Owner's Representative shall determine which shallgovern.Note to specifier: Remove the paragraph below if the project is not in California.D. Comply with the requirements of the California code of regulation title 23 waters, division 2 department of waterresources chapter 2.7 model water efficient landscape ordinance, 492.5 soil management report.1. Where requirements of specification section Planting Soil are more stringent than the California code, themore stringent requirements shall prevail.1.6 PROTECTION OF WORK, PROPERTY AND PERSONA. The Contractor shall adequately protect the work, adjacent property, and the public, and shall be responsiblefor any damages or injury due to the Contractor's actions.1.7 CHANGES IN WORKA. The Owner's Representative may order changes in the work, and the contract sum adjusted accordingly. Allsuch orders and adjustments plus claims by the Contractor for extra compensation must be made and approved inwriting before executing the work involved.B. All changes in the work, notifications and contractor's request for information (RFI) shall conform to the contractgeneral condition requirements.1.8 CORRECTION OF WORKA. The Contractor shall re - execute any work that fails to conform to the requirements of the contract and shallremedy defects due to faulty materials or workmanship upon written notice from the Owner's Representative, at thesoonest possible time that can be coordinated with other work and seasonal weather demands but not more than 180(one hundred and eighty) days after notification.1.9 DEFINITIONSNote to specifier: Use the following definitions as needed to define words used in this specification. Delete andwords that are not used.A. Acceptable drainage: Drainage rate is sufficient for the plants to be grown. Not too fast and not too slow.Typical rates for installed Planting Soil are between 1 - 5 inches per hour. Turf soils are often higher, but drainage ratesabove 2 - 3 inches per hour will dry out very fast. In natural undisturbed soil a much lower drainage rate, as low as 1/8thinch per hour can still support good plant growth. Wetland plants can grow on top of perched water layers or even withinseasonal perched water layers, but could become unstable in high wind events.B. Amendment: material added to Topsoil to produce Planting Soil Mix. Amendments are classified as general soilamendments, fertilizers, biological, and pH amendments.C. Biological Amendment: Amendments such as Mycorrhizal additives, compost tea or other products intended tochange the soil biology.D. Compacted soil: soil where the density of the soil is greater that the threshold for root limiting, and furtherdefined in this specification.E. Compost: well decomposed stable organic material as defined by the US Composting Council and furtherdefined in this specification.F. Drainage: The rate at which soil water moves through the soil transitioning the soil from saturated condition tofield capacity. Most often expressed as saturated hydraulic conductivity (Ksat; units are inches per hour).Note to specifier: The following is a general introduction to soil drainage terminology and is intended for thebenefit of the specifier only. Do not include the following information in the completed specifications.The drainage rate of any soil is also influenced by the drainage rate of the soil lower in the profile. Acompacted hard pan or Cliché layer below a free drainage soil can create poor drainage in the upper soilprofile. To understand soil drainage one must investigate the total profile. Measured drainage rates are alsohighly influenced by soil compaction particularly in installed soil. A soil that drains at 1 inch per hour at 200 psimight become anaerobic if compacted to 350 psi. The amount of organic matter also influences drainageparticularly if the organic matter is the result of adding Compost to the soil. A little Compost (10% by volume)will almost always increase drainage, but at higher amounts of Compost above 20% by volume will begin toslow drainage in the lower level of the profile because the Compost also holds water. In general it is notadvisable to add much Compost to Planting Soil Mixes that are to be placed deeper than 12 inches but lots ofCompost can be added to the upper 6 inches of the soil profile.G. End of Warranty Acceptance: The date when the Owner's Representative accepts that the plants and work inthis section meet all the requirements of the warranty. It is intended that the materials and workmanship warranty forPlanting, Planting Soil, and Irrigation (if applicable) work run concurrent with each other, and further defined in thisspecification.H. Existing Soil: Mineral soil existing at the locations of proposed planting after the majority of the constructionwithin and around the planting site is completed and just prior to the start of work to prepare the planting area for soilmodification and/or planting, and further defined in this specification.I. Fertilizer: amendment used for the purpose of adjusting soil nutrient composition and balance.J. Fine grading: The final grading of the soil to achieve exact contours and positive drainage, often accomplishedby hand rakes or drag rakes other suitable devices, and further defined in this specification, and further defined in thisspecification.K. Finished grade: surface or elevation of Planting Soil after final grading and 12 months of settlement of the soil,and further defined in this specification.L. Graded soil: Soil where the A horizon has been stripped and relocated or re-spread; cuts and fills deeper than12 inches, and further defined in this specification.M. Installed soil: Planting soil and existing site soil that is spread and or graded to form a planting soil, and furtherdefined in this specification.N. Minor disturbance: Minor grading as part of agricultural work that only adjusts the A horizon soil, minor surfacecompaction in the top 6 inches of the soil, applications of fertilizers, installation of utility pipes smaller than 18 inches indiameter thru the soil zone.O. Owner's Representative: The person or entity, appointed by the Owner to represent their interest in the reviewand approval of the work and to serve as the contracting authority with the Contractor. The Owner's Representative mayappoint other persons to review and approve any aspects of the work.P. Ped: a clump or clod of soil held together by a combination of clay, organic matter, and fungal hyphae, retainingthe original structure of the harvested soil.Q. Planting Soil: Topsoil, or Planting Soil Mixes which are imported or existing at the site, or made fromcomponents that exist at the site, or are imported to the site; and further defined in this specification.R. Poor drainage: Soil drainage that is slower than that to which the plants can adapt. This is a wide range ofmetrics, but generally if the soil is turning gray in color it is reasonable preferable to either to plant moistureadaptive plants at smaller sizes that are young in age with shallow root balls or look at options to improve thedrainageS. Scarify: Loosening and roughening the surface of soil and sub soil prior to adding additional soil on top, andfurther defined in this specification.T. Soil Fracturing: Deep loosening the soil to the depths specified by using a back hoe, and further defined in thisspecification.Note to specifier: The following paragraph is a general introduction to soil fracturing terminology and isintended for the benefit of the specifier only. Do not include the following information in the completedspecifications.The back hoe method of soil fracturing is more practical in small spaces and can be more selective in areasand depths loosened when constrained by utility lines and structures such as walks, curbing or walls. Theback hoe digs into the soil lifting and then dropping the soil immediately back into the hole. The bucket thenmoves to the adjacent soil and repeats. Optimally, a layer of Compost is spread over the soil before fracturingis begun and the Compost falls into the spaces between the soil chunks created by the effort. The deeper thefracturing and the more compact and dryer the soil the more difficult the operation becomes, but is generallyless limited by built objects than soil ripping. Fracturing is not practical when soil moisture is close to or abovefield capacity. Fracturing leaves the soil surface quite rough with large soil clods. These must be broken byadditional tilling. Tilling in more Compost to the surface after fracturing will help create an A horizon soil and/orimported or reused Topsoil can be added on top of the fractured soil.U. Soil Horizons: as defined in the USDA National Soil Survey Handbookhttp://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/scientists/?cid=nrcs142p2_054242V. Soil Tilling: Loosening the surface of the soil to the depths specified with a rotary tine tilling machine, rototiller, (or spade tiller), and further defined in this specification.W. Subgrade: surface or elevation of subsoil remaining after completing excavation, or top surface of a fill orbackfill, before placing Planting Soil.X. Substantial Completion Acceptance: The date at the end of the Planting, Planting Soil, and Irrigation installation(if applicable) where the Owner's Representative accepts that all work in these sections is complete and the Warrantyperiod has begun. This date may be different than the date of substantial completion for the other sections of theproject, and further defined in this specification.Y. Topsoil: naturally produced and harvested soil from the A horizon or upper layers or the soil as further definedin this specification.BB. Undisturbed soil: Soils with the original A horizon intact that have not been graded or compacted. Soils thathave been farmed, subjected to fire or logged but not graded, and natural forested land will be considered asundisturbed.1.10 SUBMITTALSA. See the contract General Conditions for policy and procedures related to submittals.B. Submit all product submittals eight weeks prior to the start of the soil work.Note to specifier: Confirm submittal time above is appropriate for project schedule.C. Product data and certificates: For each type of manufactured product, submit data and certificates that theproduct meets the specification requirements, signed by the product manufacturer, and complying with the following:1. Submit manufacturers or supplier's product data and literature certified analysis for standard products andbulk materials, complying with testing requirements and referenced standards and specific requestedtesting.a. For each Compost product submit the following analysis by a recognized laboratory:1.) pH2.) Salt concentration (electrical conductivity)3.) Moisture content %, wet weight basis4.) Particle size % passing a selected mesh size, dry weight basis5.) Stability carbon dioxide evolution rate mg CO2-C per g OM per day6.) Solvita maturity test7.) Physical contaminants (inerts) %, dry weight basis8.) US EPA Class A standard, 40CFR § 503.13, Tables 1 and 3 levels Chemical Contaminants mg/kg(ppm)b. For Coarse Sand product submit the following analysis by a recognized laboratory:1.) pH2.) Particle size distribution (percent passing the following sieve sizes):3/8 inch (9.5 mm)No 4 (4.75 mm)No 8 (2.36 mm)No 16(1.18 mm)No 30 (.60 mm)No 50 (.30 mm)No 100 (.15 mm)No 200 (.075 mm)D. Samples: Submit samples of each product and material, where required by Part 2 of the specification, to theOwner's Representative for approval. Label samples to indicate product, characteristics, and locations in the work.Samples will be reviewed for appearance only.1. Submit samples a minimum of 8 weeks prior to the anticipated date of the start of soil installation.2. Samples of all Topsoil, Coarse Sand, Compost and Planting Soil shall be submitted at the same time asthe particle size and physical analysis of that material.E. Soil testing for Imported and Existing Topsoil, existing site soil to be modified as Planting Soil and Planting SoilMixes.1. Topsoil, existing site soil and Planting Soil Mix testing: Submit soil test analysis report for each sample ofTopsoil, existing site soil and Planting Soil from an approved soil-testing laboratory and where indicated inPart 2 of the specification as follows:a. Submit Topsoil, Planting Soil, Compost, and Coarse Sand for testing at least 8 weeks before scheduledinstallation of Planting Soil Mixes. Submit Planting Soil Mix test no more than 2 weeks after the approvalof the Topsoil, Compost and Coarse Sand. Do not submit to the testing laboratory, Planting Soil Mixes,for testing until all Topsoil, Compost and Coarse Sand have been approved.b. If tests fail to meet the specifications, obtain other sources of material, retest and resubmit untilaccepted by the Owner's Representative.c. All soil testing will be at the expense of the Contractor.2. Submit all testing required by California Code of regulation Title 23 waters, Division 2 Department of Waterresources Chapter 2.7 Model Water Efficient Landscape Ordinance, 492.5 Soil Management Report.Note to specifier: Delete the above paragraph if the project is not in California.3. Provide a particle size analysis (% dry weight) and USDA soil texture analysis. Soil testing of Planting SoilMixes shall also include USDA gradation (percentage) of gravel, coarse sand, medium sand, and fine sandin addition to silt and clay.4. Provide the following other soil properties:a. pH and buffer pH.b. Percent organic content by oven dried weight.c. Nutrient levels by parts per million including: phosphorus, potassium, magnesium, manganese, iron,zinc and calcium. Nutrient test shall include the testing laboratory recommendations for supplementaladditions to the soil for optimum growth of the plantings specified.d. Soluble salt by electrical conductivity of a 1:2 soil water sample measured in Milliohm per cm.e. Cation Exchange Capacity (CEC).1.11 SOIL INSTALLATION MOCKUPNote to specifier: This section is designed to provide the construction team an opportunity to test means andmethods and to record expectations on the finished soil installation. The Owner's Representative mustunderstand enough about soil installation to make an assessment of the mockup and have sufficient observationfee budget to review the work. Mockups add to the cost of the project and this section should be evaluated for itscritical nature to the soil installation scope.A. Prior to installation or modification of Topsoil, site soil, Planting Soil, or Planting Soil Mixes, construct at the site,a mockup of each soil type using the means and methods and equipment proposed by the Contractor to complete thework. Installation of the mockup shall be in the presence of the Owner's Representative. The purpose of the mockup isto test the methods of installation and compaction of the soil and to serve as a benchmark for completed soilcompaction and serve to calibrate penetrometer readings to the known proctor density of the mockup. The mockup shallbe as follows:1. Following acceptance of the soil submittals, in areas that can be protected from disturbance and furthercompaction, install mockups of each soil type and soil modification, 20 foot X 20 foot X the full depth of thedeepest installation, using the requirements of these specifications. Compaction methods, including thetype of compaction equipment and number of passes required to achieve the required compaction, shall beevaluated and results measured.2. Compaction in the mockup soil shall be tested using the penetrometer. A minimum of four penetrometerreadings from each Planting Soil shall be taken at the specified depths of the soil profile. Record the soilmoisture at each penetrometer test site. In the event that the penetrometer readings exceed the specifieddensities, reconstruct the mockup, adjusting the soil density to achieve the desired results. Where themodification requires ripping, tilling or fracturing soils that are over compacted, start the procedure in a newlocation so that the process is working on soil that is similar to the density of the expected soil.3. Submit a report of the final methods of soil installation, the penetrometer and soil moisture readings to theOwner's Representative.4. The mockup area may remain as part of the installed work at the end of the project if protected from furthercompaction, contamination or other disturbance.5. Provide a protective 4 foot high fence on metal posts around each mockup to keep all work and equipmentfrom entering the surface of the mockup area.1.12 OBSERVATION OF THE WORKA. The Owner's Representative may observe the work at any time. They may remove samples of materials forconformity to specifications. Rejected materials shall be immediately removed from the site and replaced at theContractor's expense. The cost of testing materials not meeting specifications shall be paid by the Contractor.1. The Owner's Representative may utilize the Contractor's penetrometer and moisture meter at any time tocheck soil compaction and moisture.B. The Owner's Representative shall be informed of the progress of the work so the work may be observed at thefollowing key times in the construction process. The Owner's Representative shall be afforded sufficient time toschedule visit to the site. Failure of the Owner's Representative to make field observations shall not relieve theContractor from meeting all the requirements of this specification.1. SOIL MOCKUP REVIEW: At the time of construction of all soil mockups.2. EXISTING SOIL CONDITIONS REVIEW: Prior to the start of any soil modification that will utilize or modifythe existing soil.3. EXCAVATION REVIEW: Observe each area of excavation prior to the installation of any Planting Soil.4. DRAIN LINE INSTALLATION REVIEW: Upon completion of the installation of drain lines and prior to theinstallation of any Planting Soil5. COMPLETION of SOIL MODIFICATIONS REVIEW: Upon completion of all soil modification andinstallation of planting soil.6. COMPLETION OF FINE GRADING AND SURFACE SOIL MODIFICATIONS REVIEW: Upon completionof all surface soil modifications and fine grading but prior to the installation of shrubs, ground covers, orlawns.1.13 PRE-CONSTRUCTION CONFERENCEA. Schedule a pre-construction meeting with the Owner's Representative at least seven (7) days before beginningwork to review any questions the Contractor may have regarding the work, administrative procedures duringconstruction and project work schedule.1.14 QUALITY ASSURANCEA. Installer Qualifications: The installer shall be a firm having at least five (5) years of experience of a scopesimilar to that required for the work, including the preparation, mixing and installation of soil mixes to support planting.The installer of the work in Section: Planting, shall be the same firm installing the work in this section.1. The bidders list for work under this section shall be approved by the Owner's Representative.2. Installer Field Supervision: When any Planting Soil work is in progress, installer shall maintain, on site, anexperienced full - time supervisor who can communicate in English with the Owner's Representative.3. Installer's field supervisor shall have a minimum of five (5) years experience as a field supervisor installingsoil, shall be trained and proficient in the use of field surveying equipment to establish grades and cancommunicate in English with the Owner's Representative.4. The installer's crew shall be experienced in the installation of Planting Soil, plantings, and irrigation (whereapplicable) and interpretation of planting plans, soil installation plans, and irrigation plans (whereapplicable).5. Submit references of past projects and employee training certifications that support that the Contractorsmeet all of the above installer qualifications and applicable licensures.B. Soil testing laboratory qualifications: an independent laboratory, with the experience and capability to conductthe testing indicated and that specializes in USDA agricultural soil testing, Planting Soil Mixes, and the types of tests tobe performed. Geotechnical engineering testing labs shall not be used.C. All delivered and installed Planting Soil shall conform to the approved submittals sample color, texture andapproved test analysis.1. The Owner's Representative may request samples of the delivered or installed soil be tested for analysis toconfirm the Planting Soil conforms to the approved material.2. All testing shall be performed by the same soil lab that performed the original Planting Soil testing.3. Testing results shall be within 10% plus or minus of the values measured in the approved Planting SoilMixes.4. Any Planting Soil that fails to meet the above criteria, if requested by the Owner's Representative, shall beremoved and new soil installed.D. Soil compaction testing: following installation or modification of soil, test soil compaction with a penetrometer.1. Maintain at the site at all times a soil cone penetrometer with pressure dial and a soil moisture meter tocheck soil compaction and soil moisture.a. Penetrometer shall be AgraTronix Soil Compaction Meter distributed by Ben Meadows,www.benmeadows.com or approved equal.b. Moisture meter shall be “general digital soil moisture meter” distributed by Ben Meadows,www.benmeadows.com or approved equal.2. Prior to testing the soil with the penetrometer check the soil moisture and penetrometer readings in themockup soils. Penetrometer readings are impacted by soil moisture and excessively wet or dry soils willread significantly lower or higher than soils at optimum moisture.3. The penetrometer readings shall be within 20% plus or minus of the readings in the approved mockupwhen at similar moisture levels.1.15 SITE CONDITIONSA. It is the responsibility of the Contractor to be aware of all surface and subsurface conditions, and to notify theOwner's Representative, in writing, of any circumstances that would negatively impact the health of plantings. Do notproceed with work until unsatisfactory conditions have been corrected.1. Should subsurface drainage or soil conditions be encountered which would be detrimental to growth orsurvival of plant material, the Contractor shall notify the Owner's Representative in writing, stating theconditions and submit a proposal covering cost of corrections. If the Contractor fails to notify the Owner'sRepresentative of such conditions, they shall remain responsible for plant material under the warranteeclause of the specifications.2. This specification requires that all Planting Soil and Irrigation (if applicable) work be completed andaccepted prior to the installation of any plants.1.16 SOIL COMPACTION - GENERAL REQUIREMENTSA. Except where more stringent requirements are defined in this specification. The following parameters shalldefine the general description of the threshold points of soil compaction in existing, modified or installed soil and subsoil.B. The following are threshold levels of compaction as determined by each method.1. Acceptable Compaction: Good rooting anticipated, but increasing settlement expected as compaction isreduced and/or in soil with a high organic matter content.a. Bulk Density Method - Varies by soil type see Chart on page 32 in Up By Roots.b. Standard Proctor Method - 75-85%; soil below 75% is unstable and will settle excessively.c. Penetration Resistance Method - about 75-250 psi, below 75 psi soil becomes increasingly unstableand will settle excessively.2. Root limiting Compaction: Root growth is limited with fewer, shorter and slower growing roots.a. Bulk Density Method - Varies by soil type see Chart on page 32 in Up By Roots.b. Standard Proctor Method - above approximately 85%.c. Penetration Resistance Method - about 300 psi.3. Excessive Compaction: Roots not likely to grow but can penetrate soil when soil is above field capacity.a. Bulk Density Method - Varies by soil type see Chart on page 32 in Up By Roots.b. Standard Proctor Method - Above 90%.c. Penetration Resistance Method - Approximately above 400 psi1.17 DELIVERY, STORAGE, AND HANDLINGA. Weather: Do not mix, deliver, place or grade soils when frozen or with moisture above field capacity.B. Protect soil and soil stockpiles, including the stockpiles at the soil blender's yard, from wind, rain and washingthat can erode soil or separate fines and coarse material, and contamination by chemicals, dust and debris that may bedetrimental to plants or soil drainage. Cover stockpiles with plastic sheeting or fabric at the end of each workday.C. All manufactured packaged products and material shall be delivered to the site in unopened containers andstored in a dry enclosed space suitable for the material and meeting all environmental regulations. Biological additivesshall be protected from extreme cold and heat. All products shall be freshly manufactured and dated for the year inwhich the products are to be used.D. Deliver all chemical amendments in original, unopened containers with original labels intact and legible, whichstate the guaranteed chemical analysis. Store all chemicals in a weather protected enclosure.E. Bulk material: Coordinate delivery and storage with Owner's Representative and confine materials to neat pilesin areas acceptable to Owner's Representative.1.18 EXCAVATING AND GRADING AROUND UTILITIESA. Contractor shall carefully examine the civil, record, and survey drawings to become familiar with the existingunderground conditions before digging.B. Determine location of underground utilities and perform work in a manner that will avoid damage. Handexcavate as required. Maintain grade stakes set by others until parties concerned mutually agree upon removal.C. Notification of the local utility locator service, Insert PHONE NUMBER, is required for all planting areas. TheContractor is responsible for knowing the location and avoiding utilities that are not covered by the local utility locatorservice.Note to specifier: Insert the telephone number and correct name of the local utility locator service to theparagraph above if available.PART 2 PRODUCTSNote to specifier: Delete all products not applicable to this specific project. Local conditions for the harvestedmaterials will vary and these specifications may need to be revised to reflect local source requirements,availability, budgets and plants to be grown.2.1 IMPORTED TOPSOILA. Imported Topsoil definition: Fertile, friable soil containing less than 5% total volume of the combination ofsubsoil, refuse, roots larger than 1 inch diameter, heavy, sticky or stiff clay, stones larger than 2 inches in diameter,noxious seeds, sticks, brush, litter, or any substances deleterious to plant growth. The percent (%) of the above objectsshall be controlled by source selection not by screening the soil. Topsoil shall be suitable for the germination of seedsand the support of vegetative growth. Imported Topsoil shall not contain weed seeds in quantities that cause noticeableweed infestations in the final planting beds. Imported Topsoil shall meet the following physical and chemical criteria:Note to specifier: Make adjustments in the following to account for the fact that these idea soils may notbe available in your area.1. Soil texture: USDA loam, sandy clay loam or sandy loam with clay content between 15 and 25%. And acombined clay/silt content of no more than 55%.2. pH value shall be between 5.5 and 7.0.3. Percent organic matter (OM): 2.0-5.0%, by dry weight.4. Soluble salt level: Less than 2 mmho/cm.5. Soil chemistry suitable for growing the plants specified.B. Imported Topsoil shall be a harvested soil from fields or development sites. The organic content and particlesize distribution shall be the result of natural soil formation. Manufactured soils where Coarse Sand, Composted organicmaterial or chemical additives has been added to the soil to meet the requirements of this specification section shall notbe acceptable. Retained soil peds shall be the same color on the inside as is visible on the outside.Note to specifier: Make adjustments to the above to account for the fact that these idea soils may not beavailable in your area. Soil peds may not normally occur, especially where soils have a high sand content.C. Imported Topsoil for Planting Soil shall NOT have been screened and shall retain soil peds or clods larger than2 inches in diameter throughout the stockpile after harvesting.D. Stockpiled Existing Topsoil at the site meeting the above criteria may be acceptable.E. Provide a two gallon sample from each Imported Topsoil source with required soil testing results. The sampleshall be a mixture of the random samples taken around the source stockpile or field. The soil sample shall be deliveredwith soil peds intact that represent the size and quantity of expected peds in the final delivered soil.2.2 COMPOSTA. Compost: Blended and ground leaf, wood and other plant based material, composted for a minimum of 9months and at temperatures sufficient to break down all woody fibers, seeds and leaf structures, free of toxic material atlevels that are harmful to plants or humans. Source material shall be yard waste trimmings blended with other plant ormanure based material designed to produce Compost high in fungal material.1. Compost shall be commercially prepared Compost and meet US Compost Council STA/TMECC criteria oras modified in this section for “Compost as a Landscape Backfill Mix Component”.http://compostingcouncil.org/admin/wp-content/plugins/wp-pdfupload/pdf/191/LandscapeArch_Specs.pdf2. Compost shall comply with the following parameters:a. pH: 5.5 - 8.0.b. Soil salt (electrical conductivity): maximum 5 dS/m (mmhos/cm).c. Moisture content %, wet weight basis: 30 - 60.d. Particle size, dry weight basis: 98% pass through 3/4 inch screen or smear.e. Stability carbon dioxide evolution rate: mg CO2-C/ g OM/ day < 2.f. Solvita maturity test: > 6.g. Physical contaminants (inerts), %, dry weight basis: <1%.h. Chemical contaminants, mg/kg (ppm): meet or exceed US EPA Class A standard, 40CFR § 503.13,Tables 1 and 3 levels.i. Biological contaminants select pathogens fecal coliform bacteria, or salmonella, meet or exceed USEPA Class A standard, 40 CFR § 503.32(a) level requirements.B. Provide a two gallon sample with manufacturer's literature and material certification that the product meets therequirements.2.3 COARSE SANDA. Clean, washed, sand, free of toxic materials1. Coarse concrete sand, ASTM C-33 Fine Aggregate, with a Fines Modulus Index of 2.8 and 3.2.2. Coarse Sands shall be clean, sharp, natural Coarse Sands free of limestone, shale and slate particles.Manufactured Coarse Sand shall not be permitted.3. pH shall be lower than 7.0.4. Provide Coarse Sand with the following particle size distribution:Sieve Percent passing3/8 inch (9.5 mm)100No 4 (4.75 mm)95 - 100No 8 (2.36 mm)80 - 100No 16 (1.18 mm)50 - 85No 30 (.60 mm)25 - 60No 50 (.30 mm)10 - 30No 100 (.15 mm)2 - 10No 200 (0.75 mm2-5B. Provide a two gallon sample with manufacturer's literature and material certification that the product meets therequirements.2.5 LIMEA. ASTM C 602, agricultural limestone containing a minimum 80 percent calcium carbonate equivalent and asfollows:1. Class: Class T, with a minimum 99 percent passing through No. 8 (2.36-mm) sieve and a minimum 75percent passing through No. 60 (0.25-mm) sieve.2. Provide lime in form of dolomitic limestone.B. Provide manufacturer's literature and material certification that the product meets the requirements.2.6 EXISTING SOIL (ACCEPTABLE FOR PLANTING WITH MINIMUM MODIFICATIONS)Note to specifier: If existing soil is to be retained and reused, it is prudent to document the condition of thissoil prior to the start of construction. Documentation (called a soil report) should include standard agriculturalchemical soil testing, soil profile condition, as well as documenting soil penetration resistance to anticipatedrooting depth. Such testing is typically already needed in order to make the decision of reusing this resourceand the testing and observations can easily be inserted into this section of the specification.Undisturbed soil or soil with minor disturbance to soil profiles (e.g. farming) has at least two of the followingattributes:A. Site soils not excessively graded or not compacted at root limiting or above.B. Soils previously disturbed have a restored A horizon (min 2.5% organic matter dry weight) at least 6 inchesdeep and B and/or C horizons that drain and have acceptable compaction.C. Soils are currently supporting mature tree and or large shrub growth with high vitality.D. Sufficient soil volumes meeting the above criteria above rock or other limiting structures to support theproposed plants.In addition to the above, the soil organic matter, pH, and chemistry in the A horizon should be suitable for theproposed plants, or may need to be modified if required. In dry climates and sandy soils plants are oftenadapted to grow in soil with very low organic matter and high pH. Raising the organic matter too high orlowering the pH may negatively impact native or adapted plant performance.A. General definition of existing soil: Surface soil in the areas designated on the soils plan as existing soil, that isnot altered, compacted to root limiting density, graded or contaminated before or during the construction process andconsidered acceptable for planting and long term health of the plants specified either as it exists or with only minormodification.1. The Owner's Representative shall verify that the soil in the designated areas is suitable at the beginning ofplanting bed preparation work in that area. In the event that the work of this project construction hasdamaged the existing soil in areas designated for use as Planting Soil to the point where the soil is nolonger suitable to support the plants specified, the Owner's Representative may require modification of thedamaged soil up to and including removal and replacement with soil of equal quality to the soil that existedprior to construction. Examples of damage include further compaction, contamination, grading, creation ofhard pan or drainage problems, and loss of the O, and or A horizon.a. Do not begin work on additional modifications until changes to the contract price are approved byOwner's Representative.2. Soil testing results and soil observation notes that describe the pre - construction soil conditions in theexisting soil areas are included as an appendix to this specification:Note to specifier: Delete the above sentence if no soil test are included.B. Protect existing soil from compaction, contamination, and degradation during the construction process.C. Unless otherwise instructed, remove all existing plants, root thatch, and non-soil debris from the surface of thesoil using equipment that does not increase compaction of soil to root limiting levels.D. Modifications:1. When results of soil tests recommend chemical adjustments, till surface soil to six inches or greater afterchemical adjustments have been are applied.2. Remove existing turf thatch, ground cover plants and weeds.3. Provide pre-emergent weed control if indicated.Make chemical adjustment as recommended by the soil test.70AH 10-28-2021 70 of 82 NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020SpecificationsL-232.7 MODIFIED EXISTING SOIL (SOIL SUITABLE FOR PLANTING WITH INDICATED MODIFICATION)Note to specifier: SOILS PLANS: This specification assumes that there will be separate set of drawings in theconstruction documents titled Soils Plans. These plans and details will define the areas on the site wheredifferent type of soil modification practices will occur. The plan should be a simple diagram with each type of soilmodification keyed to a detail. Details of different modifications are included in the set of details that accompanythis set of specifications. Using this method allows a wide range of different modifications to be required such thatthe modifications can easily fix the existing soil conditions, the expectations for plant performance, the projectbudget and schedule.In the event that there is not a separate Soils Plan, this information can be added to the Planting Plan. On simplesites where one soil modification may be appropriate, the specification could be used without having a plan. If noSoils Plan is included, be sure to remove reference to a Soils Plan from these specifications and replace it withthe appropriate reference that defines the limits of soil modification.A. General definition: Surface soil in the areas designated on the soils plan as Modified Existing Soil has beenaltered and or graded before or during the construction process but is still considered acceptable for planting and longterm health of the plants specified with the proposed modifications. Modifications respond to the soil problems expectedor encountered. The Owner's Representative shall verify that the soil in the designated areas is suitable for modificationat the beginning of planting bed preparation work in that area.1. The Owner's Representative shall verify that the soil in the designated areas is suitable for the specifiedmodification at the beginning of planting bed preparation work in that area. In the event that the work of thisproject construction has damaged the existing soil in areas designated for modification to the point wherethe soil is no longer suitable to support the plants specified with the specified modification, the Owner'sRepresentative may require further modification of the damaged soil up to an including removal andreplacement with soil of equal quality to the soil that would have resulted from the modification. Damagemay include further compaction, contamination, grading, creation of hard pan or drainage problem, andloss of the O, and or A horizon.2. General requirements for all soil modifications:a. Take soil samples, test for chemical properties, and make appropriate adjustments.b. Unless otherwise instructed, remove all existing plants, root thatch, and non-soil debris from the surfaceof the soil using equipment that does not add to the compaction in the soil.c. All soil grading, tilling and loosening must be completed at times when the soil moisture is below fieldcapacity. Allow soil to drain for at least two days after any rain event more than 1 inch in 24 hours, orlong enough so that the soil does not make the hand muddy when squeezed.d. Provide pre-emergent weed control after the soil work is complete and plants planted but prior to addingmulch to the surface, if indicated by weed type and degree of threat.B. Modified existing soil - soil removed, stockpiled, and spread1. Description of condition to be modified: Existing soil that is suitable for reuse as Planting Soil but is in thewrong place of elevation, or cannot be adequately protected during construction. Soil is to be harvested,stockpiled and re-spread with or without further modifications as indicated.Note to specifier; If existing soils are to be harvested and reused, the areas where soil may be reusedand the depths of soil harvesting must be described on the drawings and the specifications. This requiresthat the specifier has site and soil knowledge sufficient to make these decisions. Additionally, one of thegreatest limitations on reuse of soil at many projects is finding a suitable place to store the soil duringconstruction. This coordination must be resolved during the design process with the project manager.2. Modifications:a. Excavate existing soil from the areas and to depths designated on the drawings. Stockpile in zonesnoted on the drawings or in areas proposed by the Contractor.1.) Prepare a soil stock pile plan for approval.b. Excavate soil using equipment and methods to preserve the clumps and peds in the soil. Generally thismeans using the largest piece of equipment that is practical for the project size and scope.c. Protect stock piles from erosion by compacting or tracking the soil surface, covering with breathablefabric or planting with annual grasses as appropriate for the season, location, and length of expectedtime of storage.d. Re-spread soil as required in Part 3 of this specification.C. Modified existing soil - compacted surface soil (Tilling Option)Note to specifier: If the soil problem is limited to surface compaction, one of two options should beconsidered: Tilling option or Radial Trenching option. Tilling prepares an entire root zone for trees andother plants but is relatively shallow. The radial trenching goes deeper. As the level of compactionincreases, these two methods become less effective. Select one of these options based on the projectrequirements and delete the other or use both options to treat the upper (Tilling) and lower (Trenching)portions of the soil profile..1. Description of condition to be modified: Surface soil compaction to a maximum of 6 inches deep from trafficor light grading. Original A horizon may be previously removed or graded but lower profile intact withacceptable compaction levels and limited grading. The soil organic matter, pH and chemistry in the Ahorizon may not be suitable for the proposed plants and may need to be modified as required.2. Modifications:Note to specifier: A spade tiller is a superior tiller than the standard roto tiller. A spade tiller leaves a soilwith larger peds and less glazing between the loose soil and the subsoil. However these tillers are limitedin availability and may be more costly than the conventional tiller. Check with local Contractors beforerequiring a spade tiller over roto tiller.a. Till top 6 inches or deeper of the soil surface, with a roto tiller, spade tiller, ripper or agricultural plow.Spread 2 - 3 inches of Compost on the surface of the tilled soil and make any chemical adjustment asrecommended by the soil test.1.) If spade tillers are to be required, add a paragraph to that effect here.b. Till or disk the Compost into the loosened soil. Smooth out grades with a drag rake or drag slip.D. Modified existing soil - compacted surface soil (Radial Trenching Option)1. Description of condition to be modified: Surface soil compaction to a maximum of 24 inches deep fromtraffic or light grading. Original A horizon may be previously removed or graded but lower profile below 24inches intact with acceptable compaction levels and limited grading. The soil organic matter, pH andchemistry in the A horizon may not be suitable for the proposed plants and may need to be modified asrequired.2. Modifications:a. Using a trenching machine, dig trenches to the extent and depth shown on the plans and details.b. Backfill the trench with the soil removed from the trench. Add additional site soil if needed to fill thetrench to be flush to the existing grade after the soil settlement.E. Modified existing soil - compacted subsoil1. Description of condition to be modified: Deep soil compaction the result of previous grading, filling anddynamic or static compaction forces. Original A horizon likely removed or buried. The soil organic matter,pH and chemistry in the A horizon is likely not suitable for the proposed plants and should be modified asrequired.Note to specifier: Select one of the following options as appropriate to the constraints at the site, and theproject budget. Do not give the contractor the option to select any of the below alternative as they are notequal treatments. Soil fracturing is the most effective and may be the most cost effective in small tomedium size spaces. Soil ripping is usually the cheapest option but only appropriate in large spaces,approximately ¼ acre or greater, accessible by large size grading machines, and where there are nounderground utilities or where limited utility locations can be avoided. Soil trenching is only suitable forspaces where only small sized equipment such as a walk-behind chain trencher can access the area. Ifdifferent treatments are appropriate for different locations on the same project be clear on the drawings theextent of each treatment.The Trenching modification below is for compacted soil that is NOT within the root zone of existing treesand is substantially different from the modification “Radial Trenching” described above. The practice ofradial trenching within the root zone of an existing tree is not described in this specification.2. Soil Ripping:a. Step one: After grading and removing all plants and debris from the surface, using a tracked dozer orsimilar large grading equipment, loosen the soil by dragging a ripping shank or chisel thru the soil todepths of 24 inches with ripping shanks spaced 18 inches or less apart in two directions. The number ofshanks per pull is dependent on the degree of soil compaction and the size of the dozer.b. Step 2: Spread 3 - 4 inches of Compost over the ripped area and till into the top 6 inches of the soilsurface.3. Soil Fracturing:a. Step one: After grading and removing all plants and debris from the surface, spread 2 - 3 inches ofCompost over the surface of the soil. Loosen the soil to depth of 18 - 24 inches, using a backhoe to diginto the soil through the Compost. Lift and then drop the loosened soil immediately back into the hole.The bucket then moves to the adjacent soil and repeats the process until the entire area indicated hasbeen loosened.b. Step 2: Spread 3-4 inches of Compost over the ripped area and till into the top 6 inches of the soilsurface.4. Trenching:a. Step one: After grading and removing all plants and debris from the surface using a chain trenchingmachine, dig 24 inch deep trenches, 24 inches apart across the entire area. Maintain an 18 - inchstandoff from the edges of all curbs, paving and structures. Backfill the trenches with Compost.b. Step 2: Spread 3 - 4 inches of Compost over the trenches area and till into the top 6 inches of the soilsurface. Compost tilling treatment shall extend to the edges of curbs, paving and structures.5. Following soil ripping or fracturing the average penetration resistance should be less than 250 psi to thedepth of the ripping or fracturing.6. Do not start planting into ripped or fractured soil until soil has been settled or leave grades sufficiently highto anticipate settlement of 10 - 15% of ripped soil depth.F. Modified existing soil - low organic matter1. Description of condition to be modified: Low soil organic matter and/or missing A horizon but soil is notcompacted except for some minor surface compaction. The soil organic matter, pH and/or chemistry arelikely not suitable for the proposed plants and should be modified as required.2. Modifications:a. Spread 3 - 4 inches of Compost over the surface of the soil and make chemical adjustment asrecommended by the soil test.b. Till Compost into the top 6 inches of the soil.G. Modified existing soil - soil within the root zone of existing established treesNote to specifier: Any of the above soil conditions may be present within the root zone areas of largeexisting trees to remain but these must be dealt with in a different manner in order to preserve the rootsystem of the tree. Options are limited. On the other hand, usually problems with soil within the root zoneof mature trees are limited to the surface 6 - 12 inches of soil. These are most often excess surface soilcompaction, chemical changes from applied material, added soil over an existing soil, severed roots, anddrainage problems caused by adjacent work that changed drainage patterns. Deep compaction and otherdeep soil disturbances would likely already have killed the tree or the tree has adapted to the condition.Modifications to consider:Surface compaction - There are several methods to remediate excess surface soil compaction within aroot zone. The preferred method is to use a pneumatic digging device such as an Air Knife or Air Spadethat can loosen soil without significant damage to roots. Compost is added to the soil as part of theloosening process. A specification section on this process is included. Other methods include verticalmulching, radial trenching, surface applications of Compost or mulch, Compost Tea injections into soil, andsoil-injected air combined with added material. Each of these has demonstrated limited success dependingon the level of compaction and many variables in the process. Due to the complexity of each of theseoptions they will not be included in the specification. Consult a local soils and / or arboricultural expert todevelop a specification.Chemical changes - Changes in soil chemistry due to applications intentional and inadvertent are toocomplex to determine and remediate to be part of this specification. Consult a local soils and / orarboricultural expert to develop a specification.Soil added over the root zone - Small amounts of soil added over the root zone may not be a problem forthe tree, and leaving it there or mixing with an air knife may be the best option. Often the greatest damageto the tree is caused not by the soil, even at relatively deep layers of soil, but the damage caused by theequipment that brought in the soil or is used to remove the soil. Setting requirements to remediate soiladded over the root zone are too complex to be part of this specification. Consult a local soils and / orarboricultural expert to develop a specification.Drainage problems - The different types of conditions that cause drainage problems and how toremediate them around existing trees are too complex to be part of this specification. Consult a local soilsand / or arboricultural expert to develop a specification.1. Description of condition to be modified: Surface compaction near or above root limited levels in the uppersoil horizon the result of traffic or other mechanical compaction.2. Modifications:a. Remove the tops of all plants to be removed from the root zone. Remove sod with a walk behind sodcutter. Do not grub out the roots of plats to be removed.b. Use a pneumatic air knife to loosen the top 9 - 12 inches of the soil. Surface roots may move andseparate from soil during this process but the bark on roots should not be broken1.) Pneumatic air knife shall be as manufactured by:Concept Engineering Group, Inc., Verona, PA (412) 826-8800 or Supersonic Air Knife, Inc., AllisonPark, PA (866) 328 5723c. Make chemical adjustment as recommended by the soil test and add 2 - 3 inches of Compost over thesoil.d. Using the pneumatic air knife, mix the Compost into the top 6 - 8 inches of the loosened soil.e. Work in sections such that the entire process - including irrigation - can be completed in one day. Applyapproximately one inch of water over the loosened soil at the completion of each day's work. Applymulch or turf as indicated on the drawings within one week of the completion of work.2.8 PLANTING SOIL MIXESNote to specifier: The subject of Planting Soil Mixes is quite complex and requires significant informationabout the goals of the planting. Mixes can include free draining high use turf planting soil mixes, bio-retentionmixes, specialty mixes for palm planting or slow draining mixes designed to reduce water use andmaintenance. The specifier will need to design the Planting Soil Mix that is best for each part of the project.The following specification is for a moderately slow draining Mix that would be good for trees and shrubs andcan serve as a template for other mixes. The key adjustment for most applications is to change the proportionTopsoil/Coarse Sand and Compost. Local suppliers may also have their own specification or Mix design.These can be inserted into this specification.Note that the topsoil and planting mix is not to be screened or mixed in a sol blending machine. Screeningand blending breaks down important topsoil peds and reduces drainage in the soil. Machine blended andscreened mixes typically will require more sandA. General definition: Mixes of Existing Soil or Imported Topsoil, Coarse Sand, and or Compost to make a newsoil that meets the project goals for the indicated planting area. These may be mixed off site or onsite, and will vary inMix components and proportions as indicated.B. Planting Mix - moderately slow draining soil for trees and shrub beds1. A Mix of Imported Topsoil, Coarse Sand and Compost. The approximate Mix ratio shall be:Mix component% by moist volumeImported Topsoil unscreened 45 - 50%Coarse sand40 - 45%Compost10%2. Final tested organic matter between 2.75 and 4% (by dry weight).3. Mix the Coarse Sand and Compost together first and then add to the Topsoil. Mix with a loader bucket toloosely incorporate the Topsoil into the Coarse Sand/Compost Mix. DO NOT OVER MIX! Do not mix with asoil blending machine. Do not screen the soil. Clumps of Soil, Compost and Coarse Sand will be permittedin the overall Mix.4. At the time of final grading, add fertilizer if required to the Planting Soil at rates recommended by thetesting results for the plants to be grown.5. Provide a two gallon sample with testing data that includes recommendations for chemical additives for thetypes of plants to be grown. Samples and testing data shall be submitted at the same time.2.9 PRE - EMERGENT HERBICIDESNote to specifier: Pre-emergent herbicides have known environmental impacts. The project team must evaluatethe risks and rewards of using chemical treatments to control weeds and consider specifying hand weed removal.A. Chemical herbicides are designed to prevent seeds of selective plants from germinating. Exact type ofherbicide shall be based on the specific plants to be controlled and the most effective date of application.B. Submit report of expected weed problems and the recommendation of the most effective control for approval byOwner's Representative. Provide manufacturer's literature and material certification that the product meets therequirements.Note to specifier: Insert additional products as needed for the specific project requirements.Note to specifier: If soil drainage rates or subsurface conditions indicate that additional drainage beyondmodification in needed subsurface drain lines may need to be added.There are many pipe options available from heavy duty Schedule 40 PVC pipes to lightweight ABS corrugatedflexible pipes. This specification will provide three pipe options. The specifier must select the appropriate pipefrom the below list that meets the budget and operational needs of the project and delete the other options. Itis advised not to use the corrugated pipe as it is too easily crushed and tends to silt up faster than the otheralternatives.Note that filter fabric socks and other filter cloth applications around the pipe or the pipe bedding material isnot include in this specification and is not recommended due to tendency of the filter cloth to clog.2.10 HEAVY DUTY PIPE DRAIN PIPEA. Drain pipe shall be 4 inch diameter, perforated, PVC, Schedule 40 pipe. Holes in the pipe shall only be on thebottom quadrant. All fittings, elbows, unions, T's and screw caps shall be the same material and from the samemanufacturer as the pipe. "T" and elbow joints shall be sanitary type connections. All joints shall be solvent welded.Submit manufacturers product literature for approval by the Owner's Representative.1. When pipe has perforations on all quadrants, drape a 12 inch wide 4 mil plastic sheet over the length of thepipe to force water to the bottom of the pipe.B. Clean out: Clean out risers shall be 4 inch diameter Schedule 40 PVC solid pipe compatible with the bottomfitting and clean out screw cap. Elbow fitting at the bottom of the clean out riser. When the cleanout is in the middle of apipe run the fitting shall be a sanitary T fitting. Screw cap FITTING shall be PVC Schedule 40.2.11 MEDIUM DUTY PIPE DRAIN PIPEA. Drain pipe shall be 4 inch diameter, perforated, PVC, double wall (smooth interior wall / corrugated exteriorwall) pipe. Holes in the pipe shall only be on the bottom quadrant. All fittings, elbows, unions, T's and screw caps shallbe the same material and from the same manufacturer as the pipe. "T" and elbow joints shall be sanitary typeconnections. All joints shall be gasketed bell and spigot. Example source A -2000 by Contech Construction Products orapproved equal. Submit manufacturers product literature for approval by the Owner's Representative.1. When pipe has perforations on all quadrants, drape a 12 inch wide 4 mil plastic sheet over the length of thepipe to force water to the bottom of the pipe.B. Clean out: Clean out risers shall be 4 inch diameter Schedule 40 PVC solid pipe compatible with the bottomfitting and clean out screw cap. Elbow fitting at the bottom of the clean out riser. When the cleanout is in the middle of apipe run the fitting shall be a sanitary T fitting. Screw cap FITTING shall be PVC Schedule 40.2.12 LIGHT DUTY PIPE DRAIN PIPEA. Drain pipe shall be 4 inch diameter, perforated, HDPE, single wall corrugated exterior pipe. ASTM F405. Allfittings, elbows, unions, T's and screw caps shall be the same material and from the same manufacturer as the pipe. Alljoints shall be gasketed bell and spigot. Example source ADS Single Wall Pipe by Advance Drainage Systems orapproved equal. Submit manufacturers product literature for approval by the Owner's Representative.1. When pipe has perforations on all quadrants, drape a 12 inch wide 4 mil plastic sheet over the length of thepipe to force water to the bottom of the pipe.B. Clean out: Clean out risers shall be 4 inch diameter Schedule 40 PVC solid pipe compatible with the bottomfitting and clean out screw cap. Elbow fitting at the bottom of the clean out riser. When the cleanout is in the middle of apipe run the fitting shall be a sanitary T fitting. Screw cap FITTING shall be PVC Schedule 40.PART 3 EXECUTION3.1 SITE EXAMINATIONA. Prior to installation of Planting Soil, examine site to confirm that existing conditions are satisfactory for the workof this section to proceed.1. Confirm that the subgrade is at the proper elevation and compacted as required. Subgrade elevations shallslope toward the under drain lines as shown on the drawings.2. Confirm that surface all areas to be filled with Planting Soil are free of construction debris, refuse,compressible or biodegradable materials, stones greater than 2 inches diameter, soil crusting films of silt orclay that reduces or stops drainage from the Planting Soil into the subsoil; and/or standing water. Removeunsuitable material from the site.3. Confirm that no adverse drainage conditions are present.4. Confirm that no conditions are present which are detrimental to plant growth.5. Confirm that utility work has been completed per the drawings.6. Confirm that irrigation work, which is shown to be installed below prepared soil levels, has been completed.B. If unsatisfactory conditions are encountered, notify the Owner's Representative immediately to determinecorrective action before proceeding.3.2 COORDINATION WITH PROJECT WORKA. The Contractor shall coordinate with all other work that may impact the completion of the work.B. Prior to the start of work, prepare a detailed schedule of the work for coordination with other trades.C. Coordinate the relocation of any irrigation lines, heads or the conduits of other utility lines that are in conflictwith tree locations. Root balls shall not be altered to fit around lines. Notify the Owner's Representative of any conflictsencountered.3.3 GRADE AND ELEVATION CONTROLA. Provide grade and elevation control during installation of Planting Soil. Utilize grade stakes, surveyingequipment, and other means and methods to assure that grades and contours conform to the grades indicated on theplans.3.4 SITE PREPARATIONA. Excavate to the proposed subgrade. Maintain all required angles of repose of the adjacent materials as shownon the drawings or as required by this specification. Do not over excavate compacted subgrades of adjacent pavementor structures. Maintain a supporting 1:1 side slope of compacted subgrade material along the edges of all paving andstructures where the bottom of the paving or structure is above the bottom elevation of the excavated planting area.B. Remove all construction debris and material including any construction materials from the subgrade.C. Confirm that the subgrade is at the proper elevation and compacted as required. Subgrade elevations shallslope approximately parallel to the finished grade and/or toward the subsurface drain lines as shown on the drawings.D. In areas where Planting Soil is to be spread, confirm subgrade has been scarified.E. Protect adjacent walls, walks and utilities from damage or staining by the soil. Use 1/2 inch plywood and orplastic sheeting as directed to cover existing concrete, metal and masonry work and other items as directed during theprogress of the work.1. At the end of each working day, clean up any soil or dirt spilled on any paved surface.2. Any damage to the paving or site features or work shall be repaired at the Contractor's expense.3.5 SOIL MOISTUREA. Volumetric soil moisture level, in both the Planting Soil and the root balls of all plants, prior to, during and afterplanting shall be above permanent wilt point and below field capacity for each type of soil texture within the followingranges.Soil texturePermanent wilting pointFieldcapacitySand, Loamy sand, Sandy loam5 - 8%12 -18%Loam, Sandy clay, Sandy clay loam14 - 25%27 -36%Clay loam, Silt loam11 - 22%31 -36%Silty clay, Silty clay loam22 - 27%38 -41%B. The Contractor shall confirm the soil moisture levels with a moisture meter (Digital Soil Moisture Meter,DSMM500 by General Specialty Tools and Instruments, or approved equivalent). If moisture is found to be too low, theplanting holes shall be filled with water and allowed to drain before starting any planting operations. If the moisture istoo high, suspend planting operations until the soil moisture drains to below field capacity.3.6 EXISTING SOIL MODIFICATIONA. Follow the requirements for modifying existing soil as indicated in Part 2 for the different types of soilmodifications. The extent of the areas of different soil modification types are indicated on the Soils Plan or as directedby the Owner's Representative.Note to specifier: Note above that it is critical for the contract documents to define the extent of all soilimprovement work on a Soil Plan and detail drawing that is part of the contract documents.3.7 DRAIN PIPE INSTALLATION1. Trench lines to depths and widths shown on plans.2. Place 2 - 3 inches Coarse Sand as bedding for pipes.3. Place pipe (holes facing down) to invert elevations shown on the plan.a. If pipe with holes on all sides is used drape a piece of 4 mil plastic 12 inches wide over top of pipe.b. Cover sides and top of pipe with Coarse Sand with min 4 inches of Coarse Sand cover above top ofpipe.c. Backfill trench with Planting Soil compacted to same level as Planting Soil requirements.4. Add cleanout pipe reaching the surface at the uphill end of each pipe run as shown on drawings.5. Connect pipes to manhole or daylight outfall as shown on the drawings.3.8 PLANTING SOIL and planting soil mix INSTALLATIONNote to specifier: These specifications are not intended to include Planting Soils over architectural structuresthat are waterproofed. If this condition exists, add special installation instructions in this paragraph.A. Prior to installing any Planting Soil from stockpiles or Planting Soil Mixes blended off site, the Owner'sRepresentative shall approve the condition of the subgrade and the previously installed subgrade preparation and theinstallation of subsurface drainage.B. All equipment utilized to install or grade Planting Soils shall be wide track or balloon tire machines rated with aground pressure of 4 psi or less. All grading and soil delivery equipment shall have buckets equipped with 6 inch longteeth to scarify any soil that becomes compacted.C. In areas of soil installation above existing subsoil, scarify the subgrade material prior to installing Planting Soil.1. Scarify the subsoil of the subgrade to a depth of 3 - 6 inches with the teeth of the back hoe or loaderbucket, tiller or other suitable device.2. Immediately install the Planting Soil. Protect the loosened area from traffic. DO NOT allow the loosenedsubgrade to become compacted.3. In the event that the loosened area becomes overly compacted, loosen the area again prior to installing thePlanting Soil.D. Install the Planting Soil in 12 - 18 inch lifts to the required depths. Apply compacting forces to each lift asrequired to attain the required compaction. Scarify the top of each lift prior to adding more Planting Soil by dragging theteeth of a loader bucket or backhoe across the soil surface to roughen the surface.E. Phase work such that equipment to deliver or grade soil does not have to operate over previously installedPlanting Soil. Work in rows of lifts the width of the extension of the bucket on the loader. Install all lifts in one row beforeproceeding to the next. Work out from the furthest part of each bed from the soil delivery point to the edge of the eachbed area.Note to specifier: The following 4 paragraphs are not normal to most soil installation specifications but aredeemed critical to the process. Be sure that the Owner's Representative is familiar with these requirementsduring construction observation.F. Where possible place large trees first and fill Planting Soil around the root ball.G. Installing soil with soil or mulch blowers or soil slingers shall not be permitted due to the over mixing and soilped breakdown cause by this type of equipment.H. Where travel over installed soil is unavoidable, limit paths of traffic to reduce the impact of compaction inPlanting Soil. Each time equipment passes over the installed soil it shall reverse out of the area along the same pathwith the teeth of the bucket dropped to scarify the soil. Comply with the paragraph “Compaction Reduction” (section 3.9)in the event that soil becomes over compacted.I. The depths and grades shown on the drawings are the final grades after settlement and shrinkage of thecompost material. The Contractor shall install the Planting Soil at a higher level to anticipate this reduction of PlantingSoil volume. A minimum settlement of approximately 10 - 15% of the soil depth is expected. All grade increases areassumed to be as measured prior to addition of surface Compost till layer, mulch, or sod.3.9 Compaction requirements for installed or modified Planting SoilA. Compact installed Planting Soil to the compaction rates indicated and using the methods approved for the soilmockup. Compact each soil lift as the soil is installed.B. Existing soil that is modified by tilling, ripping or fracturing shall have a density to the depth of the modification,after completion of the loosening, such that the penetrometer reads approximately 75 to 250 psi at soil moistureapproximately the mid-point between wilting point and field capacity. This will be approximately between 75 and 82% ofmaximum dry density standard proctor.C. Installed Planting Soil Mix and re-spread existing soil shall have a soil density through the required depth of theinstalled layers of soil, such that the penetrometer reads approximately 75 to 250 psi at soil moisture approximately themid-point between wilt point and field capacity. This will be approximately between 75 and 82% of maximum dry densitystandard proctor.D. Planting Soil compaction shall be tested at each lift using a penetrometer calibrated to the mockup soil and itsmoisture level. The same penetrometer and moisture meter used for the testing of the mockup shall be used to testinstalled soil throughout the work.E. Maintain moisture conditions within the Planting Soil during installation or modification to allow for satisfactorycompaction. Suspend operations if the Planting Soil becomes wet. Apply water if the soil is overly dry.F. Provide adequate equipment to achieve consistent and uniform compaction of the Planting Soils. Use thesmallest equipment that can reasonably perform the task of spreading and compaction. Use the same equipment andmethods of compaction used to construct the Planting Soil mockup.G. Do not pass motorized equipment over previously installed and compacted soil except as authorized below.1. Light weight equipment such as trenching machines or motorized wheel barrows is permitted to pass overfinished soil work.2. If work after the installation and compaction of soil compacts the soil to levels greater than the aboverequirements, follow the requirements of the paragraph "Over Compaction Reduction" below.3.10 OVER COMPACTION REDUCTIONA. Any soil that becomes compacted to a density greater than the specified density and/or the density in theapproved mockup shall be dug up and reinstalled. This requirement includes compaction caused by othersub-contractors after the Planting Soil is installed and approved.B. Surface roto tilling shall not be considered adequate to reduce over compaction at levels 6 inches or greaterbelow finished grade.3.11 INSTALLATION OF CHEMICAL ADDITIVESA. Following the installation of each soil and prior to fine grading and installation of the Compost till layer, applychemical additives as recommended by the soil test, and appropriate to the soil and specific plants to be installed.B. Types, application rates and methods of application shall be approved by the Owner's Representative prior toany applications.3.12 FINE GRADINGA. The Owner's Representative shall approve all rough grading prior to the installation of Compost, fine grading,planting, and mulching.B. Grade the finish surface of all planted areas to meet the grades shown on the drawings, allowing the finishedgrades to remain higher (10 - 15% of depth of soil modification) than the grades on the grading plan, as defined inparagraph Planting Soil Installation, to anticipate settlement over the first year.C. Utilize hand equipment, small garden tractors with rakes, or small garden tractors with buckets with teeth forfine grading to keep surface rough without further compaction. Do not use the flat bottom of a loader bucket to finegrade, as it will cause the finished grade to become overly smooth and or slightly compressed.D. Provide for positive drainage from all areas toward the existing inlets, drainage structures and or the edges ofplanting beds. Adjust grades as directed to reflect actual constructed field conditions of paving, wall and inlet elevations.Notify the Owner's Representative in the event that conditions make it impossible to achieve positive drainage.E. Provide smooth, rounded transitions between slopes of different gradients and direction. Modify the grade sothat the finish grade before adding mulch and after settlement is one or two inches below all paving surfaces or asdirected by the drawings.F. Fill all dips and remove any bumps in the overall plane of the slope. The tolerance for dips and bumps in shruband ground cover planting areas shall be a 2 inch deviation from the plane in 10 feet. The tolerance for dips and bumpsin lawn areas shall be a 1 inch deviation from the plane in 10 feet.3.13 INSTALLATION OF COMPOST TILL LAYERNote to specifier: The following paragraph is critical to building a proper A/O horizon in installed Planting SoilMixes. This added layer of Compost must be shown on the soil details in the drawings.A. After Planting Soil Mixes are installed in planting bed areas and just prior to the installation of shrub orgroundcover plantings, spread 3 - 4 inches of Compost over the beds and roto till into the top 4 - 6 inches of the PlantingSoil. This step will raise grades slightly above the grades required in paragraph “Fine Grading”. This specificationanticipates that the raise in grade due to this tilling will settle within a few months after installation as Compost breaksdown. Additional settlement as defined in paragraph “Planting Soil and Planting Soil Mix installation” must still beaccounted for in the setting of final grades.3.14 CLEAN - UPA. During installation, keep the site free of trash, pavements reasonably clean and work area in an orderlycondition at the end of each day. Remove trash and debris in containers from the site no less than once a week.1. Immediately clean up any spilled or tracked soil, fuel, oil, trash or debris deposited by the Contractor fromall surfaces within the project or on public right of ways and neighboring property.B. Once installation is complete, wash all soil from pavements and other structures. Ensure that mulch is confinedto planting beds and that all tags and flagging tape are removed from the site. The Owner's Representative seals are toremain on the trees and removed at the end of the warranty period.1. Make all repairs to grades, ruts, and damage to the work or other work at the site.2. Remove and dispose of all excess Planting Soil, subsoil, mulch, plants, packaging, and other materialbrought to the site by the Contractor.3.15 PLANTING SOIL AND MODIFIED EXISTING SOIL PROTECTIONA. The Contractor shall protect installed and/or modified Planting Soil from damage including contamination andover compaction due to other soil installation, planting operations, and operations by other Contractors or trespassers.Maintain protection during installation until acceptance. Utilize fencing and matting as required or directed to protect thefinished soil work. Treat, repair or replace damaged Planting Soil immediately.B. Loosen compacted Planting Soil and replace Planting Soil that has become contaminated as determined by theOwner's Representative. Planting Soil shall be loosened or replaced at no expense to the Owner.a. Till and restore grades to all soil that has been driven over or compacted during the installation ofplants.b. Where modified existing soil has become contaminated and needs to be replaced, provide imported soilthat is of similar composition, depth and density as the soil that was removed.3.16 PROTECTION DURING CONSTRUCTIONA. The Contractor shall protect planting and related work and other site work from damage due to plantingoperations, operations by other Contractors or trespassers.1. Maintain protection during installation until the date of plant acceptance (see specifications section -Planting). Treat, repair or replace damaged work immediately.2. Provide temporary erosion control as needed to stop soil erosion until the site is stabilized with mulch,plantings or turf.B. Damage done by the Contractor, or any of their sub-contractors to existing or installed plants, or any other partsof the work or existing features to remain, including large existing trees, soil, paving, utilities, lighting, irrigation, otherfinished work and surfaces including those on adjacent property, shall be cleaned, repaired or replaced by theContractor at no expense to the Owner. The Owner's Representative shall determine when such cleaning, replacementor repair is satisfactory. Damage to existing trees shall be assessed by a certified arborist.3.17 Substantial Completion AcceptanceA. Upon written notice from the Contractor, the Owners Representative shall review the work and make adetermination if the work is substantially complete.B. The date of substantial completion of the planting soil shall be the date when the Owner's Representativeaccepts that all work in Planting, Planting Soil, and Irrigation installation sections is complete.3.18 FINAL ACCEPTANCE / SOIL SETTLEMENTA. At the end of the plant warrantee and maintenance period, (see Specification section - Planting) the Owner'sRepresentative shall observe the soil installation work and establish that all provisions of the contract are complete andthe work is satisfactory.1. Restore any soil settlement and or erosion areas to the grades shown on the drawings. When restoring soilgrades remove plants and mulch and add soil before restoring the planting. Do not add soil over the rootballs of plants or on top of mulch.B. Failure to pass acceptance: If the work fails to pass final acceptance, any subsequent observations must berescheduled as per above. The cost to the Owner for additional observations will be charged to the Contractor at theprevailing hourly rate of the Owner's Representative.Appendix to 32 9100 Planting soilExisting Soil Test DataNote to specifier: If existing soil test data is available, add such testing reports in this location. Include a plan ofthe site designating the extent of the different soil types identified and the location of all soil test pits. If no testingwas completed, remove the appendix.END OF SECTION 32 910032 8400-24 IrrigationSECTION 32 8400IRRIGATIONPART 1 GENERAL1.1 SUMMARYNote to specifier: Remove any parts of this work description that does not apply.A. Irrigation system required for this work includes but is not limited to the furnishing of all labor, tools, materials,appliances, tests, permits, taxes, etc., necessary for the installation of a landscape irrigation system as herein specifiedand shown on the drawings, and the removal of all debris from the site.Note to specifier: Confirm if the installing Contractor or the general Contractor or the owner is paying forwater and electric use fees and hook up charges. Amend the above paragraph if the installing Contractor isrequired to pay any of these fees.1. Locate, purchase, deliver and install piping, conduit, sleeves, 120 volt and low voltage electrical and waterconnections, valves, backflow preventer devices, controllers, rain sensors, spray and bubbler heads, dripirrigation lines, and associated accessories for a fully operational automatic irrigation system.2. Trenching and water settling of backfill material.3. Testing and startup of the irrigation system.4. Prepare an as built record set of drawings.5. Training of the Owner's maintenance personnel in the operational requirements of the Irrigation system.6. Clean up and disposal of all excess and surplus material.7. Maintenance of the irrigation system during the proscribed maintenance period.B. The system shall efficiently and evenly irrigate all areas and be complete in every respect and shall be leftready for operation to the satisfaction of the Owner's Representative.C. Coordinate with other trades, as needed to complete work, including but not limited to Water Meter, Point ofConnection (POC), Backflow Preventer Device (BFPD) location, booster pump location and electrical hookups.1.2 CONTRACT DOCUMENTSA. Shall consist of specifications and its general conditions and the drawings. The intent of these documents is toinclude all labor, materials, and services necessary for the proper execution of the work. The documents are to beconsidered as one. Whatever is called for by any part shall be as binding as if called for in all parts.1.3 RELATED DOCUMENTS AND REFERENCESA. Related Documents:Note to specifier: Coordinate this list with the other related specification sections. Add or delete sections asappropriate.1. Drawings and general provisions of contract, including general and supplementary conditions and Division Ispecifications, apply to work of this section.2. Related Specification Sectionsa. Section - Plantingb. Section - Planting Soilc. Section - Lawnd. Sections - Mechanical/Plumbinge. Section - Tree and Plant Protectionf. Sections - ElectricalB. References:1. American Society of Testing Materials (ASTM): cited section numbers.2. National Sanitation Foundation (NSF): rating system.3. Irrigation Association: Turf & Landscape Irrigation Best Management Practices1.4 VERIFICATIONA. Irrigation piping and related equipment are drawn diagrammatically. Scaled dimensions are approximate only.Before proceeding with work, carefully check and verify dimensions and immediately notify the Owner's Representativeof discrepancies between the drawings or specifications and the actual conditions. Although sizes and locations ofplants and or irrigation equipment are drawn to scale wherever possible, it is not within the scope of the drawings toshow all necessary offsets, obstructions, or site conditions. The Contractor shall be responsible to install the work insuch a manner that it will be in conformance to site conditions, complete, and in good working order.B. Piping and equipment is to be located within the designated planting areas wherever possible unlessspecifically defined or dimensioned otherwise.1.5 PERMITS AND REGULATIONSA. The Contractor shall obtain and pay for all permits related to this section of the work unless previously excludedunder provision of the contract or general conditions. The Contractor shall comply with all laws and ordinances bearingon the operation or conduct of the work as drawn and specified. If the Contractor observes that a conflict exists betweenpermit requirements and the work outlined in the contract documents, the Contractor shall promptly notify the Owner'sRepresentative in writing including a description of any necessary changes and changes to the contract price resultingfrom changes in the work.B. Wherever references are made to standards or codes in accordance with which work is to be performed ortested, the edition or revision of the standards and codes current on the effective date of this contract shall apply, unlessotherwise expressly set forth.C. In case of conflict among any referenced standards or codes or between any referenced standards and codesand the specifications, the more restrictive standard shall apply or Owner's Representative shall determine which shallgovern.1.6 PROTECTION OF WORK, PROPERTY AND PERSONA. The Contractor shall adequately protect the work, adjacent property, and the public, and shall be responsiblefor any damages or injury due to the Contractor's actions.1.7 CHANGES IN THE WORKA. The Owner's Representative may order changes in the work, and the contract sum being adjusted accordingly.All such orders and adjustments plus claims by the Contractor for extra compensation must be made and approved inwriting before executing the work involved.B. All changes in the work, notifications and Contractor's request for information (RFI) shall conform to thecontract general condition requirements.1.8 CORRECTION OF WORKA. The Contractor shall re-execute any work that fails to conform to the requirements of the contract and shallremedy defects due to faulty materials or workmanship upon written notice from the Owner's Representative, at thesoonest as possible time that can be coordinated with other work, and seasonal weather demands, but not more than90 (ninety) days after notification.1.9 DEFINITIONSA. Owner's Representative: The person appointed by the Owner to represent their interest in the review andapproval of the work and to serve as the contracting authority with the Contractor. The Owner's Representative mayappoint other persons to review and approve any aspects of the work.B. Substantial Completion Acceptance: The date at the end of the Planting, Planting Soil, and Irrigation installationwhere the Owner's Representative accepts that all work in these sections is complete and the Warranty period hasbegun. This date may be different that the date of substantial completion for the other sections of the project.C. Final Acceptance: The date when the Owner's Representative accepts that the plants and work in this sectionmeet all the requirements of specification. It is intended that the materials and workmanship warranty for Planting,Planting Soil, and Irrigation work run concurrently.1.10 SUBMITTALSA. See the contract General Conditions for policy and procedures related to submittals.B. Product data1. Submit a minimum of (3) complete lists of all irrigation equipment to be used, manufacturer's brochures,maintenance manuals, warrantees and operating instructions, within 15 days after the notice to proceed.a. This submission may be done digitally and all documents shall be submitted in one PDF document.2. The submittals shall be packaged and presented in an organized manner, in the quantity described inDivision 1 of the specifications. Provide a table of contents of all submitted items.3. Clearly identify on each submitted sheet by underlining or highlighting (on each copy) the specific productbeing submitted for approval. Failure to clearly identify the specific product being submitted will result in arejection for the entire submittal. No substitutions of material or procedures shall be made concerningthese documents without the written consent of an accepted equivalent by the Owner's Representative.4. Equipment or materials installed or furnished without prior approval of the Owner's Representative, may berejected by the Owner's Representative and the Contractor shall be required to remove such materialsfrom the site at their own expense.5. Approval of substitution of material and/or products, other than those specified shall not relieve theContractor from complying with the requirements of the contract documents and specifications. TheContractor shall be responsible, at their own expense, for all changes that may result from the approvedsubstitutions, which affect the installation or operations other items of their own work and/or the work ofother Contractors.C. Samples: Samples of the equipment may be required at the request of the Owner's Representative if theequipment is other than that specified.D. Other Submittals: Submit for approval:1. Documentation of the installer's qualifications.2. As built record set of drawings.3. Testing data from all required pressure testing.4. Backflow prevention device certification: Certification from the manufacturer or their representative that theback flow prevention device has been installed correctly according to the manufactures requirements.5. Booster pump certification: Certification from the manufacturer or their representative that the boosterpump has been installed correctly according to the manufacturer's requirements.6. Irrigation controller certification: Certification from the manufacturer or an authorized distributor that theController has been installed correctly according to the manufactures requirements.1.11 OBSERVATION OF THE WORKA. The Owner's Representative may inspect the work at any time. They may remove samples of materials forconformity to specifications. Rejected materials shall be immediately removed from the site and replaced at theContractor's expense. The cost of testing materials not meeting specifications shall be paid by the Contractor.B. The Owner's Representative shall be informed of the progress of the work so the work may be observed at thefollowing key times in the construction process. The Owner's Representative shall be afforded sufficient time toschedule visit to the site. Failure of the Owner's Representative to make field observations shall not relieve theContractor from meeting all the requirements of this specification.1. Trenching, directional boring, and sleeving review.2. Hydrostatic pressure testing.3. Adjustment and coverage test.4. Pre - maintenance observation.5. Final acceptance / system malfunction corrections.1.12 PRE - CONSTRUCTION CONFERENCEA. Schedule a pre - construction meeting with the Owner's Representative at least seven (7) days beforebeginning work to review any questions the Contractor may have regarding the work, administrative procedures duringconstruction and project work schedule.1.13 QUALITY ASSURANCEA. It is the intention of this specification to accomplish the work of installing an automatic irrigation system, whichwill operate in an efficient and satisfactory manner. The irrigation system shall be installed and made operationalaccording to the workmanlike standards established for landscape installation and sprinkler irrigation operation as setforth by the most recent Best Management Practices (BMP) of the Irrigation Association.B. The specification can only indicate the intent of the work to be performed rather than a detailed description ofthe performance of the work. It shall be the responsibility of the Contractor to install said materials and equipment insuch a manner that they shall operate efficiently and evenly and support optimum plant growth and health.C. The Owner's Representative shall be the sole judge of the true intent of the drawings and specifications and ofthe quality of all materials furnished in performance of the contract.D. The Contractor shall keep one copy of all drawings and specifications on the work site, in good order. TheContractor shall make these documents available to the Owner's Representative when requested.E. In the event of any discrepancies between the drawings and the specification, the final decision as to whichshall be followed, shall be made by the Owner's Representative.F. In the event the installation is contradictory to the direction of the Owner's Representative, the installation shallbe rectified by the Contractor at no additional cost to the Owner. The Contractor shall immediately bring any suchdiscrepancies to the attention of the Owner's Representative.G. It shall be distinctly understood that no oral statement of any person shall be allowed in any manner to modifyany of the contract provisions. Changes shall be made only on written authorization of the Owner's Representative.H. Installer Qualifications: The installer shall be a firm having at least five (5) years of successful experience of ascope similar to that required for the work.a. Installer Field Supervision: The installer shall maintain on site an experienced full-time supervisor whocan communicate in English with the Owner's Representative.b. Submit the installer's qualifications for approval.1.14 IRRIGATION SYSTEM WARRANTY:A. The Contractor shall Warrantee all workmanship and materials for a period of X year (s) following theacceptance of the work.Note to specifier: Insert above the length of time for the system warrantee period. It is advised to make theirrigation system and the plants have the same length of warrantee.1. Any parts of the irrigation work that fails or is defective shall be replaced or reconstructed at no expense tothe Owner including but not limited to: restoring grades that have settled in trenches and excavationsrelated to the work. Reconstruction shall include any plantings, soil, mulch or other parts of the constructedlandscape that may be damaged during the repair or that results from soil settlement.B. The date of acceptance of the work and start of the Guarantee period shall be determined by the Owner'sRepresentative, upon the finding that the entire irrigation system is installed as designed and specified, and found to beoperating correctly, supplying water evenly to all planting and/or lawn areas.C. The system controller shall be warranted by the equipment manufacturer against equipment malfunction anddefects for a period of X years, following the acceptance of the work.Note to specifier: Insert the length of time that the selected controller is warrantied. Verify materialwarranty with the controller manufacturer. If a specific controller is not specified, delete the aboveparagraph.D. Neither the final acceptance nor any provision in the contract documents shall relieve the Contractor ofresponsibility for faulty materials or workmanship. The Contractor shall remedy any defects within a period of seven (7)days (s) from the date of notification of a defect.1.15 SITE CONDITIONSA. It is the responsibility of the Contractor to be aware of all surface and sub-surface conditions, and to notify theOwner's Representative, in writing, of any circumstances that would negatively impact the installation of the work. Donot proceed with work until unsatisfactory conditions have been corrected.1.16 DELIVERY, STORAGE, AND HANDLINGA. All materials and equipment shall be stored properly and protected as required by the Contractor. TheContractor shall be entirely responsible for damages or loss by weather or other cause to work under the contract.Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of the work.B. Deliver the products to the job site in their original unopened container with labels intact and legible at time ofuse.C. Store in accordance with the manufacturers' recommendations.1.17 PROTECTIONA. The Contractor shall continuously maintain adequate protection of all their work from damage, destruction, orloss, and shall protect the owner's property from damage arising in connection with this contract. Contractor shall makegood any such damage, destruction, loss or injury. Contractor shall adequately protect adjacent property as provided bylaw and the contract documents.B. The Contractor shall maintain sufficient safeguards, such as railings, temporary walks, lights, etc., against theoccurrence of accidents, injuries or damage to any person or property resulting from their work, and shall alone beresponsible for the same if such occurs.C. All existing paving, structures, equipment or plant material shall be protected at all times, including the irrigationsystem related to plants, from damage by workers and equipment. The Contractor shall follow all protectionrequirements including plant protection provision of the general contract documents. All damages shall be repaired orreplaced at the Contractor's expense. Repairs and or replacement shall be to the satisfaction of the Owner'sRepresentative, including the selection of a Contractor to undertake the repair or maintenance. Repairs shall be at nocost to the owner.1. For trees damaged to the point where they will not be expected to survive or which are severely disfiguredand that are too large to replace, the cost of damages shall be as determined by the Owner's arborist usingaccepted tree value evaluation methods.D. The Contractor shall refrain from trenching within the drip line of any existing tree to remain. The Owner'sRepresentative may require the Contractor to relocate proposed irrigation work, bore lines beneath roots or use airspade technology to dig trenches through and under the root system to avoid damage to existing tree root areas.1.18 EXCAVATING AROUND UTILITIESA. Contractor shall carefully examine the civil, record, and survey drawings to become familiar with the existingunderground conditions before digging.1. Do not begin any excavation until all underground utilities have been located and marked.Determine location of underground utilities and perform work in a manner that will avoid possible damage.Hand excavate, as required. Maintain stakes and or markings set by others until parties concerned mutuallyagree to their removal.Note to specifier: Insert the telephone number and correct name of the Local Utility Locator Service ifavailable to the paragraph below.B. Notification of Local Utility Locator Service, Insert PHONE NUMBER, is required for all excavation aroundutilities. The Contractor is responsible for knowing the location and avoiding utilities that are not covered by the LocalUtility Locator Service.Note to specifier: If the project is not in California remove the following paragraph.C. Section 4216/4217 of the government code requires a dig-alert identification number be issued before a “permitto excavate” will be valid. For your dig-alert identification number call underground service alert toll free 1-800-422-4133two working days before beginning construction.1.19 POINT OF CONNECTIONNote to specifier: Confirm exactly where the irrigation Contractor is to connect to the water and high voltageelectrical supply. Often the General Contractor and their plumber and electrician are to provide theconnections, including the electrical junction box or plug receptacle, back flow preventer, main shutoff valveand other items. Where non-potable water is used another Contractor may provide some of the requiredequipment and connections. This specification provides two options, which may also need furthermodification by the specifier. The specifier must confirm assumptions and pick one of the following options.Point of connection option 1 - Irrigation Contractor providedA. The point of connection of the irrigation system to its electrical power sources shall be provided by the irrigationinstaller. All connections shall be made by a licensed electrical Contractor per governing codes at the location shown onthe drawings.B. The point of connection of the irrigation system to its potable and or non-potable water sources, including themain shutoff valve and backflow preventer shall be provided by the irrigation installer. All connections shall be made bya licensed Contractor per governing codes, at the location shown on the drawings.Point of connection option 2 - General Contractor providedA. The point of connection of the irrigation system to its electrical power sources shall be provided by the GeneralContractor's licensed electrical Contractor per governing codes at the location shown on the drawings. The irrigationContractor will connect the power to provided junction box or grounded plug receptacle.B. The point of connection of the irrigation system to its potable and or non-potable water sources, including themain shutoff valve and backflow preventer shall be provided by the General Contractor's licensed plumbing Contractorper governing codes at the location shown on the drawings. The minimum size and water pressure of the pressurizedline will be as noted on the irrigation drawing.1.20 TEMPORARY UTILITIESA. All temporary piping, wiring, meters, panels and other related appurtenances required between source ofsupply and point of use shall be provided by the Contractor and coordinated with the Owner's Representative. Existingutilities may be used with the written permission of the owner.1.21 CUTTING, PATCHING, TRENCHING AND DIGGINGA. The Contractor shall do all cutting, fitting, trenching or patching of their work that may be required to make itsseveral parts come together as shown upon, or implied by, the drawings and specifications for the completed project.B. Digging and trenching operations shall be suspended when the soil moisture is above field capacity.1.22 USE OF PREMISESA. The Contractor shall confine their apparatus; the storage of materials, and the operations of their workers tolimits indicated by the law, ordinances, or permits and shall not unreasonably encumber the premises with theirmaterials.B. Contractor parking, and material and equipment storage shall in areas approved by the Owner'sRepresentative.1.23 AS BUILT RECORD SET OF DRAWINGSA. Immediately upon the installation of any buried pipe or equipment, the Contractor shall indicate on the progressrecord drawings the locations of said pipe or equipment. The progress record drawings shall be made available at anytime for review by the Owner's Representative.B. Before final acceptance of work, the Contractor shall provide an as built record set of drawings showing theirrigation system work as built. The drawings shall be transmitted to the Owner's Representative in paper format and asa pdf file of each document on compact disk or flash drive. The drawings shall include all information shown on theoriginal contract document and revised to reflect all changes in the work. The drawings shall include the followingadditional information1. All valves shall be numbered by station and corresponding numbers shall be shown on the as built recordset of drawings.2. All main line pipe or irrigation equipment including sleeves, valves, controllers, irrigation wire runs whichdeviate from the mainline location, backflow preventers, remote control valves, grounding rods, shut-offvalves, rain sensors, wire splice locations, and quick coupling valves shall be located by two (2) measureddimensions, to the nearest one-half foot. Dimensions shall be given from permanent objects such asbuildings, sidewalks, curbs, walls, structures and driveways. All changes in direction and depth of main linepipe shall be noted exactly as installed. Dimensions for pipes shall be shown at no greater than a 50 ft.maximum interval.3. As built record set of drawings shall be signed and dated by the Contractor attesting to and certifying theaccuracy of the as built record set of drawings. As built record set of drawings shall have "As Built RecordSet of Drawings”, company name, address, phone number and the name of the person who created thedrawing and the contact name (if different).C. The Owner shall make the original contract drawing files available to the Contractor.D. The Contractor shall GPS all points of connection, controllers, flow sensors, master valves, hydrometers,backflow prevention devices, remote control irrigation valves and moisture sensors prior to receiving a notice ofcompletion from the Owner's Representative.1.24 CONTROLLER CHARTS:A. Provide one controller chart for each automatic controller installed.1. On the inside surface of the cover of each automatic controller, prepare and mount a color-coded chartshowing the valves, main line, and systems serviced by that particular controller. All valves shall benumbered to match the operation schedule and the drawings. Only those areas controlled by that controllershall be shown. This chart shall be a plot plan, entire or partial, showing building, walks, roads and walls.The plan, reduced as necessary and legible in all details, shall be made to a size that will fit into thecontroller cover. This print shall be approved by the Owner's Representative and shall be protected inlaminated in a plastic cover and be secured to the inside back of the controller cabinet door.2. The controller chart shall be completed and approved prior to acceptance of the work.1.25 TESTINGA. Provide all required system testing with written reports as described in part 3.1.26 OPERATION AND MAINTENANCE MANUALS AND GUARANTEESA. Prepare and deliver to the Owner's Representative within ten calendar days prior to completion of construction,two(2) 3 - ring hard cover binders containing the following information:1. Index sheet stating Contractor's address and telephone number, list of equipment with name andaddresses of local manufacturers' representatives.2. Catalog and parts sheets on all material and equipment.3. Guarantee statement. The start of the guarantee period shall be the date the irrigation system is acceptedby the Owner.4. Complete operating and maintenance instruction for all major equipment.5. Irrigation product manufacturers warrantees.B. In addition to the above-mentioned maintenance manuals, provide the Owner's maintenance personnel withinstructions for maintaining major equipment and show evidence in writing to the Owner's Representative at theconclusion of the project that this has been rendered.PART 2 PRODUCTS2.1 MATERIALS GENERALA. All materials shall be of standard, approved and first grade quality and shall be new and in perfect conditionwhen installed and accepted.B. See the parts schedule on the drawings (or below) for specific components and manufacturers.1. Insert schedule of required parts with manufactures name(s) and contact information or add to the variousproduct specifications below.C. Approval of any items or substitutions indicates only that the product(s) apparently meet the requirements ofthe drawings and specifications on the basis of the information or samples submitted. The Contractor shall beresponsible for the performance of substituted items. If the substitution proves to be unsatisfactory or not compatiblewith other parts of the system, the Contractor shall replace said items with the originally specified items, including allnecessary work and modifications to replace the items, at no cost to the owner.Note to specifier: Some of the following product specifications have a clause that say that further productdescriptions are on the drawings. Confirm that this is the case. If this is the desired option for the specification,select Option 3 above. If this is not the case remove reference to the product being described on the drawings.Add additional specifications as needed to strengthen the product requirements as needed by the project goalsand tolerance for tightening industry product options.Delete all products in the following paragraphs not applicable to this specific project.2.2 RECLAIMED WATER SYSTEM DESIGNATIONA. Where irrigation systems use reclaimed water, all products including valve boxes, lateral and main line pipe,etc. where applicable and/or required by local code shall have the reclaimed water purple color designation.2.3 PIPING MATERIALA. Individual types of pipe and fittings supplied are to be of compatible manufacturer unless otherwise approved.Pipe sizes shown are nominal inside diameter unless otherwise noted.B. Plastic pipe:1. All pipe shall be free of blisters, internal striations, cracks, or any other defects or imperfections. The pipeshall be continuously and permanently marked with the following information: manufacturer's name ortrade mark, size, class and type of pipe pressure rating, quality control identifications, date of extrusion,and National Sanitation Foundation (NSF) rating.2. Pressure main line for piping upstream of remote control valves and quick coupling valves:a. Pipe smaller than 2 inch diameter shall be plastic pipe for use with solvent weld or threaded fittings.Shall be manufactured rigid virgin polyvinyl chloride (PVC) 1220, Type 1, Grade 2 conforming to ASTMD 1785, designated as Schedule 40.b. Pipe 2 - 3 inch diameter shall be manufactured rigid virgin polyvinyl chloride (PVC), Type 1, Grade 2conforming to ASTM D 1785, designated as bell gasket Class 315.c. Pipe larger than 3 inch diameter shall be manufactured rigid virgin polyvinyl chloride (PVC), Type 1,Grade 2 conforming to ASTM D 1785, designated as bell gasket Class 200 PVC.3. Non_pressure lateral line for piping downstream of remote control valves: plastic pipe for use with solventweld or threaded fittings. Shall be manufactured rigid virgin polyvinyl chloride PVC 1220 (type 1, grade 2)conforming to ASTM d 1785, designated as Class 200, 3/4 minimum size.C. Galvanized pipe shall be used for above ground connections to, backflow prevention device assemblies, hosebibs, and booster pumps and as shown on the plans and details.1. Pipe shall be hot dip galvanized continuous welded, seamless, Schedule 40 conforming to applicablecurrent ASTM standards.2.4 FITTINGS AND CONNECTIONS:A. Polyvinyl chloride pipe fittings and connections: Type II, Grade 1, Schedule 40, high impact molded fittings,manufactured from virgin compounds as specified for piping tapered socket or molded thread type, suitable for eithersolvent weld or screwed connections. Machine threaded fittings and plastic saddle and flange fittings are notacceptable. Furnish fittings permanently marked with following information: nominal pipe size, type and schedule ofmaterial, and National Sanitation Foundation (NSF) seal of approval. PVC fittings shall conform to ASTM D2464 andD2466.B. Brass pipe fittings, unions and connections: standard 125 pound class 85% red brass fittings and connections,IPS threaded.C. PVC Schedule 80 threaded risers and nipples: Type I, grade 1, Schedule 80, high impact molded,manufactured from virgin compounds as specified for piping and conforming to ASTM D-2464. Threaded ends shall bemolded threads only. Machined threads are not acceptable.D. Galvanized pipe fittings shall be galvanized malleable iron ground joint Schedule 40 conforming to applicablecurrent ASTM standards.2.5 SOLVENT CEMENTS AND THREAD LUBRICANTA. Solvent cements shall comply with ASTM D2564. Socket joints shall be made per recommended proceduresfor joining PVC plastic pipe and fittings with PVC solvent cement and primer by the pipe and fitting manufacturer andprocedures outlined in the appendix of ASTM D2564.B. Thread lubricant shall be Teflon ribbon-type, or approved equal, suitable for threaded installations as permanufacturer's recommendations.C.Pipe Joint Compound (Pipe dope) shall be used on all galvanized threaded connections. Pipe JointCompound is a white colored, non-separating thread sealant compound designed to seal threaded connections againstleakage due to internal pressure. It shall contain PTFE (Polytetrafluoroethylene) to permit a tighter assembly with lowertorque, secure permanent sealing of all threaded connections and allow for easy disassembly without stripping ordamaging threads.2.6 BACKFLOW PREVENTION DEVICESA. The backflow prevention device shall be certified to NSF/ANSI 372 shall be ASSE Listed 1013, rated to 180degree F, and supplied with full port ball valves.B. The main body and access covers shall be low lead bronze (ASTM B 584)C. The seat ring and all internal polymers shall be NSF Listed Noryl and the seat disc elastomers shall be silicone.D. Backflow Preventer shall be as indicated on the drawings.2.7 PRESSURE REGULATORA. Pressure regulator shall certified to NSF/ANSI 372, consisting of low lead bronze body bell housing, a separateaccess cap shall be threaded to the body and shall not require the use of ferrous screws.B. The main valve body shall be cast bronze (ASTM B 584).C. The access covers shall be bronze (ASTM B 584 or Brass ASTM B 16)D. The assembly shall be of the balanced piston design and shall reduce the pressure in both flow and no flowconditions.E. Pressure regulator shall be as indicated on the drawings.2.7.WYE STRAINERA.Strainer shall conform to MIL - S -16293, and be ANSI 3rd party certified to comply with the states leadplumbing law 0.25% maximum weighted average lead content.B.The main body shall be low lead bronze (ASTM B 584)C.The access covers shall be yellow brass or cast bronze (ASTM B 16 or ASTM B 584)D.Strainer screen shall be 300 series stainless steel available in 20, 40, 60, 80, or 100 mesh.E. Wye strainer shall be as indicated on the plans.2.8 BACKFLOW PREVENTER CAGEA. A heavy-duty steel mesh cage with rust proof finish. The caging shall be sized to allow space for the entirepiping assembly associated with the Backflow Preventer unit, and all associated equipment.B. The cage shall include the manufacturers' standard tamper proof locking mechanism.C. Provide a concrete base as detailed on the drawings.Backflow Preventer Cage type, manufacturer and color shall be as indicated on the plans.2.9 BOOSTER PUMPNote to specifier: Booster pumps are used when available static pressure is too low for the system to operate,demand is high requiring multiple stations to operate at once, future expansion of the system of the water windowis very small due to maintenance practices or site use (such as in the case of parks, sports fields, or schools). Itis the responsibility of the specifier to consider all such factors in determining whether or not a booster pump isrequired. IN many cases booster pumps are specified when they are not needed due to all of the variables notbeing taken into consideration.A. Booster pump shall be housed in a sturdy, locking, weather-resistant case, furnished for maximum exteriorprotection.B. Booster pump shall be as indicated on the drawings. .2.10 BALL VALVESA. Ball valves for 3/4 inch through 2 - 1/2 inch shall be of PVC, block, tru-union design with EDPDM seals ando-ring.B. Ball valves for 3 inch and larger shall be gate design and shall be iron body, brass or bronze mounted AWWAgate valves, and shall have a clear waterway equal to the full nominal diameter of the valve, and shall be rubber gasket,flanged or mechanical joint only, and shall be able to withstand a continuous working pressure of 150 PSI. Valve shallbe equipped with a square-operating nut.C. All ball valves located in a valve manifold shall be the same size as the main line (1-1/2 inch size minimum).Provide pipe - reducing adapters down stream of valves, as required. All ball valves in line shall be the same size as thepipe.D. Ball valves shall be as indicated on the drawings.2.11 CHECK VALVESA. Swing check valves 2 inch and smaller shall be 200 lbs., W.O.G., bronze construction with replaceablecomposition, neoprene or rubber disc and shall meet or exceed federal specification WW- V -5ld, class a, type iv.B. Anti - drain valves shall be of heavy-duty virgin PVC construction with female iron pipe thread inlet and outlet.Internal parts shall be stainless steel and neoprene. Anti - drain valves shall be field adjustable against draw out from 5to 40 feet of head.C. Check valves shall be as indicated on the drawings.2.12 REMOTE CONTROL VALVESA. Remote control valves shall be electrically operated, single seat, normally closed configuration, equipped withflow control adjustment and capability for manual operation.B. Valves shall be actuated by a normally closed low wattage solenoid using 24 volts, 50/60 cycle solenoid powerrequirement. Solenoid shall be epoxy encased. A union shall be installed on the discharge end.1. Battery operated controllers and controllers utilizing DC power shall be actuate by a normally closed lowwattage solenoid using 9 volts. A union shall be installed on the discharge end.C. Remote control valves shall be wired to controller in same numerical sequence as indicated on drawings.D. Remote control valves shall be as indicated on the drawings.2.13 SURGE ARRESTORA. Surge arrestor shall be a single copper piece with a one - inch (1") threaded lead free brass connection.B. Surge arrestor shall be designed to operate on all domestic and commercial lines with a minimum 150 PSIworking pressure.C. Surge arrestor shall be as indicated on the drawings.2.14 MASTER CONTROL VALVESNote to specifier: The master valve and flow sensor specifications must meet the requirements orrecommendations of the controller manufacturer. Additional specifications are required for this product.A. Master Control Valve shall be compatible with the irrigation controller.B. Master control valves shall be as indicated on the drawings.2.15 FLOW SENSORA. Flow sensor shall be compatible with the irrigation controller.B. Flow sensor shall be as indicated on the drawings.2.19 EMITTERSNote to specifier: The selection of irrigation heads is a complex decision and needs far stronger specificationsthan are listed here. Confirm the approach to selecting heads and revise the text.A. All emitters shall be pressure compensating.B. All emitters shall be as indicated on the drawings.C. Swing joints that are installed with the emitter shall be the same size as the emitter opening and as shown onthe drawings.2.20 AUTOMATIC CONTROLLERNote to specifier: Irrigation controllers vary upon the designer's preferences, users needs, and education of theowner/maintenance personal. The specifier shall develop these specifications based upon those factors.A. Controller shall be housed in a sturdy, locking, weather - resistant case, furnished for maximum exteriorprotection.B. Controller shall be equipped with evapo-transpiration (ET) sensor, which adjusts the controller programmingbased on local climatic conditions. The sensor shall also have a rain sensing shut-off switch, wind sensing shut offswitch, and freeze sensing shut-off of switch.1. If a moisture sensor is used in lieu of an evapo-transpiration sensor an additional sensor, which has arain-sensing shut - off switch, wind sensing shut-off switch, and freeze sensing shut-off switch shall beprovided.2. Automatic controller shall be as indicated on the drawings. 71AH 10-28-2021 71 of 82 NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020SpecificationsL-242.24 ELECTRICAL CONTROL WIRINGA. Low voltage1. The electrical control wire shall be direct burial type UF, no. 14 AWG, solid, single conductor, copper wireUL approved or larger, if required to operate system as designed.a. For 2 - Wire controllers all irrigation wire for the controller, flow sensor, master valve, hydrometer,remote control valves and moisture sensors shall be per the controller manufacturer's specifications andrecommendations.2. Color code wires to each valve. Common wire shall be white.3. If multiple controllers are being utilized, and wire paths of different controllers cross each other, bothcommon and control wires from each controller to be of different colors.4. Control wire splices: Splices are when required shall be placed in splice boxes.5. Wire connections shall be per the controller manufacturer's specifications and recommendations.B. High voltage1. Shall be of type as required by local codes and ordinances.2. Shall be of proper size to accommodate needs of equipment it is to serve.2.25 VALVE BOXES AND MATERIALSA. Valve boxes: valve boxes shall be constructed of ABS (acrylonitrile butadiene styrene) plastic, green in color,with rigid base and sides and shall be supplied with bolt lock cover secured with stainless steel bolts. Cover shall beidentified as shown on drawings. Provide box extensions as required.1. Surge Arrestors shall use a 14 inch x 19 inch x 24" rectangular box.2. Master valves, flow sensors, remote control irrigation valves, gate valves, and ball valves 3 inch or less insize shall use a 14 inch x 19 inch x 12 inch rectangular box.3. Quick coupler valves, wire splices, and grounding rods shall use a 10 inch circular box.4. Grounding rods shall be in a 8 inch circular box.2.26 CONCRETE THRUST BLOCKSA. Concrete thrust blocks shall be sized per the pipe manufactures requirement or as indicated on the drawings.2.27 VALVE IDENTIFICATION TAGSA. Valve Identification Tags shall be 2.25 inch x 2.65 inch polyurethane. Color: potable water; yellow /Non-potable water; purple. Tags shall be permanently attached to each remote control valve with tamper proof seals asindicated on the drawings.2.28 EQUIPMENT TO BE FURNISHED TO OWNERA. Two (2) sets of keys for each automatic controller.B. Two (2) 48 inch tee wrenches for operating the gate valves.C. Three (3) sets of special tools required for removing, disassembling and adjusting each type of sprinkler andvalve supplied on this project.D. Five (5) Extra sprinkler heads, nozzles, shrub adapters, nozzle filter screens, for each type used on the project.E. Two (2) quick coupler keys to match manufacturer type of quick coupler.F. Two (2) decoders of each type used on the project.G. One (1) moisture sensor of each type used on the project.2.29 INCIDENTAL MATERIALS AND EQUIPMENTA. Furnish all materials and equipment not specified above, but which are necessary for completion of the work asintended.2.30 MAIN LINE LOCATOR TAPEA. 3 - inch wide plastic detectable locator tape.2.31 MAIN LINE AND LATERAL LINE BEDDING SANDA. Sand shall consist of natural or manufactured granular material, free of organic material, mica, loam, clay orother substances not suitable for the intended purpose.B. Sand shall be masonry sand ASTM C 144 or coarse concrete sand, ASTM C 33.PART 3 EXECUTION3.1 GENERAL REQUIREMENTSA. Code requirements shall be those of state and municipal codes and regulations locally governing this work,providing that any requirements of the drawings and specifications, not conflicting therewith, but exceeding the coderequirements, shall govern unless written permission to the contrary is granted by the Owner's Representative.B. Extreme care shall be exercised at all times by the Contractor in excavating and working in the project area dueto existing utilities and irrigation systems to remain. Contractor shall be fully responsible for expenses incurred in therepair of damages caused by their operation.1. The Contractor is responsible for identifying and maintaining existing irrigation main lines that supply waterto areas on the site as noted on the drawings and outside of the proposed limit of work. The Contractorshall relocate or replace existing irrigation main line piping as required to provide a continuous supply ofwater to all areas of existing irrigation on site.a. Providing continuous water supply shall include hand watering and or the use of watering trucks toprovide adequate water.C. Plan locations of backflow preventers, valves, controllers, irrigation lines, sleeves, spray heads and otherequipment are diagrammatic and indicate the spacing and relative locations of all installations. Final site conditions andexisting and proposed plantings shall determine final locations and adjusted as necessary and as directed to meetexisting and proposed conditions and obtain complete water coverage. Minor changes in locations of the above fromlocations shown shall be made as necessary to avoid existing and proposed trees, piping, utilities, structures, etc. at theContractor's expense or when directed by the Owner's Representative.1. The Contractor shall be held responsible for relocation of any items without first obtaining the Owner'sRepresentative's approval. The Contractor shall remove and relocate such items at their expense if sodirected by the Owner's Representative.D. Prior to any work the Contractor shall stake out locations of all pipe, valves, equipment and irrigation heads andemitters using an approved staking method and maintain the staking of the approved layout in accordance with thedrawings and any required modifications. Verify all horizontal and vertical site dimensions prior to staking of heads. Donot exceed spacing shown on drawings for any given area. If such modified spacing demand additional or less materialthan shown on the drawings, notify the Owner's Representative before beginning any work in the adjacent area.E. Stub out main line at all end runs and as shown on drawings. Stub out wires for future connection whereindicated on plan and as directed.F. Point of connection shall be approximately as shown on drawings. Connect new underground piping and valvesand provide all flanges, adapters or other necessary fittings for connection.G. Permission to shut off any existing in - use water line must be obtained 48 hours in advance, in writing from theOwner. The Contractor shall receive instructions from the Owner's Representative as to the exact length of time of eachshut-off.H. No fittings shall be installed on pipe underneath pavement or walls.I. Prior to starting any work, Contractor shall obtain a reading of existing static water pressure (no flow condition)at the designated point of connection and immediately submit written verification of pressure with date and time ofrecording to Owner's Representative.3.2 TRENCHING, DIRECTIONAL BORING AND SLEEVINGA. Perform all trenching, directional boring, sleeving and excavations as required for the installation of the workincluded under this section, including shoring of earth banks to prevent cave - ins.B. The Contractor may directional bore lines where it is practical or where required on the plans.1. Extend the bore 1' past the edge of pavement unless noted differently on the plans2. Cap ends of each bore and locate ends at finished grade using metal stakes.3. All boring and sleeving shall have detectable locator tape placed at the ends of the pipe.C. Make trenches for mains, laterals and control wiring straight and true to grade and free of protruding stones,roots or other material that would prevent proper bedding of pipe or wire.D. Excavate trenches wide enough to allow a minimum of 4 - inch between parallel pipelines and 8 - inches fromlines of other trades. Maintain 3 - inch vertical clearance between irrigation lines. Minimum transverse angle is 45degrees. All pipes shall be able to be serviced or replaced without disturbing the other pipes.E. Trenches for pipelines shall be made of sufficient depth to provide the minimum cover from finished grade asfollows:1. Pressure main line: 18 inches below finish grade and 24 - 30 inches below paved areas in Schedule 40PVC sleeves.2. Reclaimed water constant pressure main lines shall cross at least twelve (12) inches below potable waterlines.a. If a constant pressure reclaimed water main line must be installed above a potable water line or lessthan twelve (12) inches below a potable water line, then reclaimed water line shall be installed within anapproved protective sleeve. The sleeve shall extend ten (10) feet from each side of the center of thepotable line, for a total of twenty (20) feet. The sleeve shall be color-coded (purple) for use withreclaimed water.3. Lateral lines: 12 inches below finish grade and 18 inches below paved areas in Schedule 40 PVC sleeves.4. Control wiring: to the side of pressure main line and 24 inches below paved areas in Schedule 40 PVCsleeves.F. On new on - site systems (post - meter), the required horizontal separation between potable water lines,reclaimed water constant pressure main lines and sewer lines shall be a minimum of four (4) feet apart as directed bythe project engineer and/ or regulatory agency. Measurements shall be between facing surfaces, not pipe centerlines.G. When trenching through areas of imported or modified soil, deposit imported or modified soils on one side oftrench and subsoil on opposite side.H. Backfill the trench per the requirements in paragraphs “Backfilling and Compacting” below.3.3 PIPE INSTALLATIONA. General Pipe Installation1. Exercise caution in handling, loading and storing, of plastic pipe and fittings to avoid damage.a. The pipe and fittings shall be stored under cover until using, and shall be transported in a vehicle with abed long enough to allow the length of pipe to lay flat so as not to be subjected to undue bending orconcentrated external load at any point.b. All pipe that has been dented or damaged shall be discarded unless such dent or damaged section iscut out and pipe rejoined with a coupling.2. Trench depth shall be as specified above from the finish grade to the top of the pipe.3. Install a detectable pipe locator tape 6 to 8 inches above all main line pipes.B. Polyvinyl Chloride Pipe (PVC) Installation1. Under no circumstance is pipe to rest on concrete, rock, wood blocks, construction debris or similar items.2. No water shall be permitted in the pipe until a period of at least 24 hours has elapsed for solvent weldsetting and curing.3. Install assemblies and pipe to conform to respective details and where shown diagrammatically ondrawings, using first class workmanship and best standard practices as approved. All fittings that arenecessary for proper connections such as swing joints, offsets, and reducing bushings that are not shownon details shall be installed as necessary and directed as part of the work.4. Dielectric bushings shall be used in any connections of dissimilar metals.5. Gasketed plastic pipe: pipe - to - pipe joints or pipe to fittings shall be made in accordance withmanufacturer's specifications.6. Solvent weld or threaded plastic pipe:a. Installation of all pipe and fittings shall be in strict accordance with manufacturer's specifications.b. Pipe shall be cut using approved PVC pipe cutters only. Sawed joints are disallowed. All field cuts shallbe beveled to remove burrs and excess before gluing.c. Welded joints shall be given a minimum of 15 minutes to set before moving or handling. Excess solventon the exterior of the joint shall be wiped clean immediately after assembly.d. Plastic to metal connections shall be made with plastic adapters and if necessary, short (not close)brass threaded_nipples. Connection shall be made with two (2) wraps of Teflon tape and handtightened plus one turn with a strap wrench.e. Snake pipe horizontally in trench to allow one (1) foot of expansion and contraction per 100 feet ofstraight run.f. Threaded pipe joints shall be made using Teflon tape. Solvent shall not be used with threaded joints.Pipe shall be protected from tool damage during assembly. All damaged pipe shall be removed andreplaced. Take up threaded joints with light wrench pressure.g. No close nipples or risers are allowed. Cross connections in piping is disallowed.h. Center load pipe at 10 feet on center intervals with small amount of backfill to prevent arching andslipping under pressure. Other than this preliminary backfill all pipe joints, fittings and connections are toremain uncovered until successful completion of hydrostatic testing and written approval of the testingreport.i. Concrete thrust blocks shall be constructed behind all pipe fittings 1-1/2 inch diameter and larger at allchanges of direction of 45 degrees or more.C. Galvanized Pipe Installation1. All joints shall be threaded with pipe joint compound used on all threads.2. Dielectric bushings shall be used in any connections of dissimilar metals.3.4 TRENCHING, DIRECTIONAL BORING, AND SLEEVING REVIEW:A. Upon completion and installation of all trenching, directional boring, and sleeving, all installed irrigation controlwiring, lines and fittings shall be visually observed by the Owner's Representative unless otherwise authorized. Do notcover any wires, lines or fittings until they have been tested and observed by the Owner's Representative.3.5 FLUSHINGA. Openings in piping system during installation are to be capped or plugged to prevent dirt and debris fromentering pipe and equipment. Remove plugs when necessary to flush or complete system.B. After completion and prior to the installation of any terminal fittings, the entire pipeline system shall bethoroughly flushed to remove dirt, debris or other material.3.6 HYDROSTATIC PRESSURE TESTINGA. After flushing, and the installation of valves the following tests shall be conducted in the sequence listed below.The Contractor shall furnish all equipment; materials and labor necessary to perform the tests and all tests shall beconducted in the presence of the Owner's Representative.B. Water pressure tests shall be performed on all pressure main lines before any couplings, fittings, valves andthe like are concealed.C. Immediately prior to testing, all irrigation lines shall be purged of all entrapped air or debris by adjusting controlvalves and installing temporary caps forcing water and debris to be discharged from a single outlet.D. Test all pressure main line at 150 PSI. For a minimum of four (4) hours with an allowable loss of 5 PSI.Pressure and gauges shall be read in PSI, and calibrated such that accurate determination of potential pressure losscan be ascertained.E. Re - test as required until the system meets the requirements. Any leaks, which occur during test period, will berepaired immediately following the test. All pipe shall be re - tested until final written acceptance.F. The Contractor is responsible for proving documentation stating the weather conditions, date, the start time andinitial water pressure readings, the finish time and final water pressure readings and the type of equipment used toperform the test. The documentation must be signed by a witness acceptable to the Owner, verifying all of the above -mentioned conditions.G. Submit a written report of the pressure testing results with the other above required information to the Owner'sRepresentative for approval3.9 BACKFILLING AND COMPACTINGA. Irrigation trenches shall be carefully backfilled with material approved for backfilling and free of rocks anddebris one (1) inch in diameter and larger. When back filling trenches in areas of imported or modified planting soil,replace any excavated subsoil at the bottom and the imported soil or modified planting soil at the top of the trench.B. Backfill shall be compacted with approved equipment to the following densities1. Backfill under pavement and within 2 feet of the edge of pavement: Compact to 95% or greater ofmaximum dry density standard proctor.2. Backfill of subsoil under imported planting mixes or modified existing planting soil: Between 85 and 90% ofmaximum dry density standard proctor.3. Backfill of imported planting mixes or modified existing planting soil: Compact to the requirements of theadjacent planting mix or planting soil as specified in section “Planting Soil”.C. Finish grade of all trenches shall conform to adjacent grades without dips or other irregularities. Dispose ofexcess soil or debris off site at Contractor's expense.D. Any settling of backfill material during the maintenance or warranty period shall be repaired at the Contractor'sexpense, including any replacement or repair of soil, lawn, and plant material or paving surface.3.10 RESURFACING PAVING OVER TRENCHESA. Restore all surfaces and repair existing underground installations damaged or cut as a result of the excavationto their original condition, satisfactory to the Owner's Representative.B. Trenches through paved areas shall be resurfaced with same materials quality and thickness as existingmaterial. Paving restoration shall be performed by the project paving Sub-contractor or an approved Contractor skilledin paving work.C. The cost of all paving restoration work shall be the responsibility of the irrigation Contractor unless thetrenching thru the paving was, by previous agreement, part of the general project related construction.3.11 INSTALLATION OF EQUIPMENTA. General:1. All equipment shall be installed to meet all installation requirements of the product manufacturer. In theevent that the manufactures requirements cannot be implemented due to particular condition at the site orwith other parts of the design, obtain the Owner's Representative's written authorization and approval forany modifications.2. Install all equipment at the approximately at the location(s) and as designated and detailed on thedrawings. Verify all locations with the Owner's Representative.3. Install all valves within a valve box of sufficient size to accommodate the installation and servicing of theequipment. Group valves together where practical and locate in shrub planting areas.4. All sprinkler irrigation systems that are using water from potable water systems shall require backflowprevention. All backflow prevention devices shall meet and be installed in accordance with requirementsset forth by local codes and the health departmentD. Remote control valves:2. Install one remote control valve per valve box.3. Remote control valve manifolds and quick coupler valves shall be separate allowing use of a quick couplerwith all remote control valves shut off.4. Install boxes no farther than 12 inches from edge of paving and perpendicular to edge of paving andparallel to each other. Allow 12 inches clearance between adjacent valve boxes.G. Emitters:1. All main lines and lateral lines, including swing joints, shall be flushed and pressure tested before installingsprinkler heads.2. Install emitters as shown in details at locations shown on the drawings.3. All emitters shall be set perpendicular to finish grade unless otherwise designated on the drawings ordetails.4. All emitters installed on slopes shall have a check valve installed between the riser and emitter.5. Soil around the emitter and swing joint shall be water settled to remove air pockets so that irrigation waterruns through the plant root ballH. Irrigation controllers:1. Remote control valves shall be connected to controller in numerical sequence as shown on the drawings.2. Controller shall be tested with complete electrical connections. The Contractor shall be responsible fortemporary power to the controller for operation and testing purposes.3. Connections to control wiring shall be made within the pedestal of the controller. All wire shall follow thepressure main insofar as possible.4. Electrical wiring shall be in a rigid gray PVC plastic conduit from controller to electrical outlet. The electricalContractor shall be responsible for installing all wiring to the controller, in order to complete this installation.A disconnect switch shall be included.K. Wiring:1. Low Voltagea. Control wiring between controller and electrical valves shall be installed in the same trench as the mainline where practical. The wire shall be bundled and secured to the lower quadrant of the trench at 10foot intervals with plastic electrical tape.a) 2 - wire controller wiring shall be installed in Sch 40 electrical conduit. Conduit shall be a minimum1-1/2 inch in size.b. When the control wiring cannot be installed in the same main line trench it shall be installed a minimumof 18 inches below finish grade and a bright colored plastic ribbon with suitable markings shall beinstalled in the trench 6 inches below grade directly over the wire.c. An expansion loop shall be provided every 500 feet in a box and inside each valve box. Expansion loopshall be formed by wrapping wire at least eight (8) times around a ¾ inch pipe and withdrawing pipe.d. Provide one control wire to service each valve in systeme. Provide 1 common wire(s) per controller.f. Run two (2) spare #14 - 1 wires from controller along entire main line to last electric remote controlvalve on each and every leg of main line. Label spare wires at controller and wire stub to be located in abox.g. All control wire splices not occurring at control valve shall be installed in a separate splice valve box.h. Wire markers (sealed, 1 inch to 3 inch square) are to identify control wires at valves and at terminalstrips of controller. At the terminal strip mark each wire clearly indicting valve circuit number.2. High Voltagea. All electrical work shall conform to local codes, ordinances and any authorities having jurisdiction. Allhigh voltage electrical work to be performed by licensed electrician.b. The Contractor shall provide 120 - volt power connection to the automatic controller unless notedotherwise on drawings.L. Valve boxes:1. Install one valve box for each type of valve installed as per the details.2. Gravel sump shall be installed after compaction of all trenches. Final portion of gravel shall be placedinside valve box after valve is backfilled and compacted.3. Permanently label valve number and or controller letter on top of valve box lid using a method approved bythe Owners Representative.M. Tracer wire:1. Tracer wire shall be installed with non - metallic plastic irrigation main lines where controller wires are notburied in the same trench as the main line.2. The tracer wire shall be placed on the bottom of the trench under the vertical projection of the pipe withspliced joints soldered and covered with insulation type tape.3. Tracer wire shall be of a color not used for valve wiring. Terminate wire in a valve box. Provide enoughlength of wire to make a loop and attach wire marker with the designation "tracer wire".N. Drip Installation:1. Clamp fittings with Oetiker clamps or approved equal when operating pressure exceeds specific drip tubingfitting requirements.2. When installing drip tubing, install soil staples as listed below:a. Sandy Soil - One staple every three (3') feet and two (2) staples on each change of direction (tee,elbow, or cross).b. Loam Soil - One staple every four (4') feet and two (2) staples on each change of direction (tee, elbow,or cross).c. Clay Soil - One staple every five (5') feet and two (2) staples on each change of direction (tee, elbow, orcross).3. Cap or plug all openings as soon as lines have been installed to prevent the intrusion of materials thatwould obstruct the pipe. Leave in place until removal is necessary for completion of installation.4. Thoroughly flush all water lines before installing valves and other hydrants.3.12 ADJUSTMENT AND COVERAGE TESTA. Adjustment:1. The Contractor shall flush and adjust all sprinkler heads, valves and all other equipment to ascertain thatthey function according to the manufacturer's data.2. Adjust all sprinkler heads not to overspray onto walks, roadways and buildings when under maximumoperating pressure and during times of normal prevailing winds.B. Coverage test:1. The Contractor shall perform the coverage test in the presence of the Owner's Representative after allsprinkler heads have been installed, flushed and adjusted. Each section is tested to demonstrate uniformand adequate coverage of the planting areas serviced.2. Any systems that require adjustments for full and even coverage shall be done by the Contractor prior tofinal acceptance at the direction of the Owner's Representative at no additional cost. Adjustments may alsoinclude realignment of pipes, addition of extra heads, and changes in nozzle type or size.3. The Contractor at no additional cost shall immediately correct all unauthorized changes or improperinstallation practices.4. The entire irrigation system shall be operating properly with written approval of the installation by theOwner's representative prior to beginning any planting operations.3.13 REPAIR OF PLANTING SOILA. Any areas of planting soil including imported or existing soils or modified planting soil which become compactedor disturbed or degraded as a result of the installation of the irrigation system shall be restored to the specified qualityand compaction prior to beginning planting operations at no additional expense to the Owner. Restoration methods anddepth of compaction remediation shall be approved by the Owner's Representative.3.14 CLEAN-UPA. During installation, keep the site free of trash, pavements reasonably clean and work area in an orderlycondition at the end of each day. Remove trash and debris in containers from the site no less than once a week.a. Immediately clean up any spilled or tracked soil, fuel, oil, trash or debris deposited by the Contractorfrom all surfaces within the project or on public right of ways and neighboring property.B. Once installation is complete, wash all soil from pavements and other structures.1. Make all repairs to grades ruts, and damage to the work or other work at the site.2. Remove and dispose of all excess soil, packaging, and other material brought to the site by the Contractor.3.15 PROTECTIONA. The Contractor shall protect installed irrigation work from damage due to operations by other Contractors ortrespassers.1. Maintain protection during installation until Acceptance. Treat, repair or replace damaged workimmediately. The Owner's Representative shall determine when such treatment, replacement or repair issatisfactory.3.16 PRE - MAINTENANCE OBSERVATION:A. Once the entire system shall be completely installed and operational and all planting is installed, the Owner'sRepresentative shall observe the system and prepare a written punch list indicating all items to be corrected and thebeginning date of the maintenance period.B. This is not final acceptance and does not relieve the Contractor from any of the responsibilities in the contractdocuments.3.17 GENERAL MAINTENANCE AND THE MAINTENANCE PERIODA. General maintenance shall begin immediately after installation of irrigation system. The general maintenanceand the maintenance period shall include the following:1. On a weekly basis the Contractor shall keep the irrigation system in good running order and makeobservations on the entire system for proper operation and coverage. Repair and cleaning shall be done tokeep the system in full operation.2. Records of all timing changes to control valves from initial installation to time of final acceptance shall bekept and turned over to the Owner's Representative at the time of final acceptance.3. During the last week of the maintenance period, provide equipment familiarization and instruction on thetotal operations of the system to the personnel who will assume responsibility for running the irrigationsystem.4. At the end of the maintenance period, turn over all operations logs, manuals, instructions, schedules, keysand any other equipment necessary for operation of the irrigation system to the Owner's Representativewho will assume responsibility for the operations and maintenance of the irrigation system.B. The maintenance period for the irrigation system shall coincide with the maintenance period for the Planting.(See specification section “Planting”3.18 SUBSTANTIAL COMPLETION ACCEPTANCEA. Upon written notice from the Contractor, the Owners Representative shall review the work and make adetermination if the work is substantially complete.B. The date of substantial completion of the irrigation shall be the date when the Owner's Representative acceptsthat all work in Planting, Planting Soil, and Irrigation installation sections is complete.3.19 FINAL ACCEPTANCE / SYSTEM MALFUNCTION CORRECTIONSA. At the end of the Plant Warrantee and Maintenance period, (See specification section “Planting”) the Owner'sRepresentative shall inspect the irrigation work and establish that all provisions of the irrigation system are completeand the system is working correctly.1. Restore any soil settlement over trenches and other parts of the irrigation system.2. Replace, repair or reset any malfunctioning parts of the irrigation system.B. The Contractor shall show all corrections made from punch list. Any items deemed not acceptable shall bereworked and the maintenance period will be extended.C. The Contractor shall show evidence that the Owner's Representative has received all charts, records,drawings, and extra equipment as required before final acceptance.D. Failure to pass review: If the work fails to pass final review, any subsequent observations must be rescheduledas per above. The cost to the Owner for additional observations will be charged to the Contractor at the prevailinghourly rate of the reviewer.END OF SECTION 32 84 00SECTION 32 93 00PLANTINGPART 1 GENERAL1.1 SUMMARYA. The scope of work includes all labor, materials, appliances, tools, equipment, facilities, transportation andservices necessary for, and incidental to performing all operations in connection with furnishing, delivery, and installationof plant (also known as "landscaping”) complete as shown on the drawings and as specified herein.B. The scope of work in this section includes, but is not limited to, the following:1. Locate, purchase, deliver and install all specified plants.2. Water all specified plants.3. Mulch, fertilize, stake, and prune all specified plants.4. Maintenance of all specified plants until the beginning of the warranty period.5. Plant warranty.6. Clean up and disposal of all excess and surplus material.7. Maintenance of all specified plants during the warranty period.1.2 CONTRACT DOCUMENTSA. Shall consist of specifications and general conditions and the construction drawings. The intent of thesedocuments is to include all labor, materials, and services necessary for the proper execution of the work. Thedocuments are to be considered as one. Whatever is called for by any parts shall be as binding as if called for in allparts.1.3 RELATED DOCUMENTS AND REFERENCESA. Related Documents:1. Drawings and general provisions of contract including general and supplementary conditions and Division Ispecifications apply to work of this section2. Related Specification Sectionsa. Section - Planting Soilb. Section - Irrigationc. Section - Tree Protection and Plant ProtectionB. References: The following specifications and standards of the organizations and documents listed in thisparagraph form a part of the specification to the extent required by the references thereto. In the event that therequirements of the following referenced standards and specification conflict with this specification section therequirements of this specification shall prevail. In the event that the requirements of any of the following referencedstandards and specifications conflict with each other the more stringent requirement shall prevail or as determined bythe Owners Representative.Note to specifier: Remove any references that do not apply in the project region.1. State of California, Department of Food and Agriculture, Regulations for Nursery Inspections, Rules andGrading.2. ANSI Z60.1 American Standard for Nursery Stock, most current edition.3. ANSI A 300 - Standard Practices for Tree, Shrub and other Woody Plant Maintenance, most current editionand parts.4. Florida Grades and Standards for Nursery Stock, current edition (Florida Department of Agriculture,Tallahassee FL).5. Interpretation of plant names and descriptions shall reference the following documents. Where the namesor plant descriptions disagree between the several documents, the most current document shall prevail.a. USDA - The Germplasm Resources Information Network (GRIN)http://www.ars-grin.gov/npgs/searchgrin.htmlb. Manual of Woody Landscape Plants; Michael Dirr; Stipes Publishing, Champaign, Illinois; Most CurrentEdition.c. The New Sunset Western Garden Book, Oxmoor House, most current edition.6. Pruning practices shall conform to recommendations “Structural Pruning: A Guide For The Green Industry”most current edition; published by Urban Tree Foundation, Visalia, California.7. Glossary of Arboricultural Terms, International Society of Arboriculture, Champaign IL, most current edition.1.4 VERIFICATIONA. All scaled dimensions on the drawings are approximate. Before proceeding with any work, the Contractor shallcarefully check and verify all dimensions and quantities, and shall immediately inform the Owner's Representative ofany discrepancies between the information on the drawings and the actual conditions, refraining from doing any work insaid areas until given approval to do so by the Owner's Representative.B. In the case of a discrepancy in the plant quantities between the plan drawings and the plant call outs, list orplant schedule, the number of plants or square footage of the planting bed actually drawn on the plan drawings shall bedeemed correct and prevail.1.5 PERMITS AND REGULATIONSA. The Contractor shall obtain and pay for all permits related to this section of the work unless previously excludedunder provision of the contract or general conditions. The Contractor shall comply with all laws and ordinances bearingon the operation or conduct of the work as drawn and specified. If the Contractor observes that a conflict exists betweenpermit requirements and the work outlined in the contract documents, the Contractor shall promptly notify the Owner'sRepresentative in writing including a description of any necessary changes and changes to the contract price resultingfrom changes in the work.B. Wherever references are made to standards or codes in accordance with which work is to be performed ortested, the edition or revision of the standards and codes current on the effective date of this contract shall apply, unlessotherwise expressly set forth.C. In case of conflict among any referenced standards or codes or between any referenced standards and codesand the specifications, the more restrictive standard shall apply or Owner's Representative shall determine which shallgovern.1.6 PROTECTION OF WORK, PROPERTY AND PERSONA. The Contractor shall adequately protect the work, adjacent property, and the public, and shall be responsiblefor any damages or injury due to his/her actions.1.7 CHANGES IN THE WORKA. The Owner's Representative may order changes in the work, and the contract sum should be adjustedaccordingly. All such orders and adjustments plus claims by the Contractor for extra compensation must be made andapproved in writing before executing the work involved.B. All changes in the work, notifications and contractor's request for information (RFI) shall conform to the contractgeneral condition requirements.1.8 CORRECTION OF WORKA. The Contractor, at their own cost, shall re-execute any work that fails to conform to the requirements of thecontract and shall remedy defects due to faulty materials or workmanship upon written notice from the Owner'sRepresentative, at the soonest as possible time that can be coordinated with other work and seasonal weatherdemands.1.9 DEFINITIONSAll terms in this specification shall be as defined in the “Glossary of Arboricultural Terms” or as modified below.A. Boxed trees: A container root ball package made of wood in the shape of a four-sided box.B. Container plant: Plants that are grown in and/or are currently in a container including boxed trees.C. Defective plant: Any plant that fails to meet the plant quality requirement of this specification.D. End of Warranty Final Acceptance: The date when the Owner's Representative accepts that the plants andwork in this section meet all the requirements of the warranty. It is intended that the materials and workmanshipwarranty for Planting, Planting Soil, and Irrigation work run concurrent with each other.E. Healthy: Plants that are growing in a condition that expresses leaf size, crown density, color; and with annualgrowth rates typical of the species and cultivar's horticultural description, adjusted for the planting site soil, drainage andweather conditions.F. Kinked root: A root within the root package that bends more than 90 degrees.G. Maintenance: Actions that preserve the health of plants after installation and as defined in this specification.H. Maintenance period: The time period, as defined in this specification, which the Contractor is to providemaintenance.I. Normal: the prevailing protocol of industry standard(s).J. Owner's Representative: The person appointed by the Owner to represent their interest in the review andapproval of the work and to serve as the contracting authority with the Contractor. The Owner's Representative mayappoint other persons to review and approve any aspects of the work.K. Reasonable and reasonably: When used in this specification relative to plant quality, it is intended to mean thatthe conditions cited will not affect the establishment or long term stability, health or growth of the plant. Thisspecification recognizes that it is not possible to produce plants free of all defects, but that some accepted industryprotocols and standards result in plants unacceptable to this project.When reasonable or reasonably is used in relation to other issues such as weeds, diseased, insects, it shallmean at levels low enough that no treatment would be required when applying recognized Integrated PlantManagement practices.This specification recognizes that some decisions cannot be totally based on measured findings and thatprofessional judgment is required. In cases of differing opinion, the Owner's Representative's expert shalldetermine when conditions are judged as reasonable.L. Root ball: The mass of roots including any soil or substrate that is shipped with the tree within the root ballpackage.M. Root ball package. The material that surrounds the root ball during shipping. The root package may include thematerial in which the plant was grown, or new packaging placed around the root ball for shipping.N. Root collar (root crown, root flare, trunk flare, flare): The region at the base of the trunk where the majority ofthe structural roots join the plant stem, usually at or near ground level.O. Shrub: Woody plants with mature height approximately less than 15 feet.P. Spade harvested and transplanted: Field grown trees that are mechanically harvested and immediatelytransplanted to the final growing site without being removed from the digging machine.Q. Stem: The trunk of the tree.R. Substantial Completion Acceptance: The date at the end of the Planting, Planting Soil, and Irrigation installationwhere the Owner's Representative accepts that all work in these sections is complete and the Warranty period hasbegun. This date may be different than the date of substantial completion for the other sections of the project.S. Stem girdling root: Any root more than ¼ inch diameter currently touching the trunk, or with the potential totouch the trunk, above the root collar approximately tangent to the trunk circumference or circling the trunk. Roots shallbe considered as Stem Girdling that have, or are likely to have in the future, root to trunk bark contact.T. Structural root: One of the largest roots emerging from the root collar.U. Tree: Single and multi-stemmed plants with mature height approximately greater than 15 feet.1.10 SUBMITTALSA. See contract general conditions for policy and procedure related to submittals.B. Submit all product submittals 8 weeks prior to installation of plantings.Note to specifier: Confirm submittal time above is appropriate for project schedule.C. Product data: Submit manufacturer product data and literature describing all products required by this sectionto the Owner's Representative for approval. Provide submittal eight weeks before the installation of plants.D. Plant growers' certificates: Submit plant growers' certificates for all plants indicating that each meets therequirements of the specification, including the requirements of tree quality, to the Owner's Representative for approval.Provide submittal eight weeks before the installation of plants.E. Samples: Submit samples of each product and material where required by the specification to the Owner'sRepresentative for approval. Label samples to indicate product, characteristics, and locations in the work. Samples willbe reviewed for appearance only. Compliance with all other requirements is the exclusive responsibility of theContractor.F. Plant sources: Submit sources of all plants as required by Article - “Selection of Plants” to the Owner'sRepresentative for approval.G. Close out submittals: Submit to the Owner's Representative for approval.1. Plant maintenance data and requirements1.11 OBSERVATION OF THE WORKA. The Owner's Representative may observe the work at any time. They may remove samples of materials forconformity to specifications. Rejected materials shall be immediately removed from the site and replaced at theContractor's expense. The cost of testing materials not meeting specifications shall be paid by the Contractor.B. The Owner's Representative shall be informed of the progress of the work so the work may be observed at thefollowing key times in the construction process. The Owner's Representative shall be afforded sufficient time toschedule visit to the site. Failure of the Owner's Representative to make field observations shall not relieve theContractor from meeting all the requirements of this specification.1. SITE CONDITIONS PRIOR TO THE START OF PLANTING: review the soil and drainage conditions.2. COMPLETION OF THE PLANT LAYOUT STAKING: Review of the plant layout.3. PLANT QUALITY: Review of plant quality at the time of delivery and prior to installation. Review treequality prior to unloading where possible, but in all cases prior to planting.4. COMPLETION OF THE PLANTING: Review the completed planting.1.12 PRE - CONSTRUCTION CONFERENCEA. Schedule a pre - construction meeting with the Owner's Representative at least seven (7) days beforebeginning work to review any questions the Contractor may have regarding the work, administrative procedures duringconstruction and project work schedule.Note to specifier: Confirm time frame above is appropriate for project schedule.1.13 QUALITY ASSURANCEA. Substantial Completion Acceptance - Acceptance of the work prior to the start of the warranty period:1. Once the Contractor completes the installation of all items in this section, the Owner's Representative willobserve all work for Substantial Completion Acceptance upon written request of the Contractor. Therequest shall be received at least ten calendar days before the anticipated date of the observation.2. Substantial Completion Acceptance by the Owner's Representative shall be for general conformance tospecified size, character and quality and not relieve the Contractor of responsibility for full conformance tothe contract documents, including correct species.3. Any plants that are deemed defective as defined under the provisions below shall not be accepted.B. The Owner's Representative will provide the Contractor with written acknowledgment of the date of SubstantialCompletion Acceptance and the beginning of the warranty period and plant maintenance period (if plant maintenance isincluded).C. Contractor's Quality Assurance Responsibilities: The Contractor is solely responsible for quality control of thework.D. Installer Qualifications: The installer shall be a firm having at least 5 years of successful experience of a scopesimilar to that required for the work, including the handling and planting of large specimen trees in urban areas. Thesame firm shall install planting soil (where applicable) and plant material.1. The bidders list for work under this section shall be approved by the Owner's Representative.2. Installer Field Supervision: When any planting work is in progress, installer shall maintain, on site, afull-time supervisor who can communicate in English with the Owner's Representative.3. Installer's field supervisor shall have a minimum of five years experience as a field supervisor installingplants and trees of the quality and scale of the proposed project, and can communicate in English with theOwner's Representative.4. The installer's crew shall have a minimum of 3 years experienced in the installation of Planting Soil,Plantings, and Irrigation (where applicable) and interpretation of soil plans, planting plans and irrigationplans.5. Submit references of past projects, employee training certifications that support that the Contractors meetsall of the above installer qualifications and applicable licensures.1.14 PLANT WARRANTY:A. The Contractor agrees to replace defective work and defective plants. The Owner's Representative shall makethe final determination if plants meet these specifications or that plants are defective.1. Plants warranty shall begin on the date of Substantial Completion Acceptance and continue for thefollowing periods, classed by plant type:Note to specifier: Modify below to state the number of years of the warranty.a. Trees - XX Year(s).b. Shrubs - XX Year(s).c. Ground cover and perennial flower plants - XX Year(s).d. Bulbs, annual flower and seasonal color plants - for the period of expected bloom or primary display.B. When the work is accepted in parts, the warranty periods shall extend from each of the partial SubstantialCompletion Acceptances to the terminal date of the last warranty period. Thus, all warranty periods for each class ofplant warranty, shall terminate at one time.C. All plants shall be warrantied to meet all the requirements for plant quality at installation in this specification.Defective plants shall be defined as plants not meeting these requirements. The Owner's representative shall make thefinal determination that plants are defective.D. Plants determined to be defective shall be removed immediately upon notification by the Owner'sRepresentative and replaced without cost to the Owner, as soon as weather conditions permit and within the specifiedplanting period.E. Any work required by this specification or the Owner's Representative during the progress of the work, tocorrect plant defects including the removal of roots or branches, or planting plants that have been bare rooted duringinstallation to observe for or correct root defects shall not be considered as grounds to void any conditions of thewarranty. In the event that the Contractor decides that such remediation work may compromise the future health of theplant, the plant or plants in question shall be rejected and replaced with plants that do not contain defects that requireremediation or correction.F. The Contractor is exempt from replacing plants, after Substantial Completion Acceptance and during thewarranty period, that are removed by others, lost or damaged due to occupancy of project, lost or damaged by a thirdparty, vandalism, or any natural disaster.G. Replacements shall closely match adjacent specimens of the same species. Replacements shall be subject toall requirements stated in this specification. Make all necessary repairs due to plant replacements. Such repairs shall bedone at no extra cost to the Owner.H. The warranty of all replacement plants shall extend for an additional one-year period from the date of theiracceptance after replacement. In the event that a replacement plant is not acceptable during or at the end of the saidextended warranty period, the Owner's Representative may elect one more replacement items or credit for each item.These tertiary replacement items are not protected under a warranty period.I. During and by the end of the warranty period, remove all tree wrap, ties, and guying unless agreed to by theOwner's Representative to remain in place. All trees that do not have sufficient caliper to remain upright, or thoserequiring additional anchorage in windy locations, shall be staked or remain staked, if required by the Owner'sRepresentative.E. End of Warranty Final Acceptance - Acceptance of plants at the end of the warranty period.1. At the end of the warranty period, the Owner's Representative shall observe all warranted work, uponwritten request of the Contractor. The request shall be received at least ten calendar days before theanticipated date for final observation.2. End of Warranty Final Acceptance will be given only when all the requirements of the work under thisspecification and in specification sections Planting Soil and Irrigation have been met.1.15 SELECTION AND OBSERVATION OF PLANTSA. The Owner's Representative may review all plants subject to approval of size, health, quality, character, etc.Review or approval of any plant during the process of selection, delivery, installation and establishment period shall notprevent that plant from later rejection in the event that the plant quality changes or previously existing defects becomeapparent that were not observed.B. Plant Selection: The Owner's Representative reserves the right to select and observe all plants at the nurseryprior to delivery and to reject plants that do not meet specifications as set forth in this specification. If a particular defector substandard element can be corrected at the nursery, as determined by the Owner's Representative, the agreedupon remedy may be applied by the nursery or the Contractor provided that the correction allows the plant to meet therequirements set forth in this specification. Any work to correct plant defects shall be at the contractor's expense.1. The Owner's Representative may make invasive observation of the plant's root system in the area of theroot collar and the top of the root ball in general in order to determine that the plant meets the qualityrequirements for depth of the root collar and presence of roots above the root collar. Such observations willnot harm the plant.2. Corrections are to be undertaken at the nursery prior to shipping.C. The Contractor shall bear all cost related to plant corrections.D. All plants that are rejected shall be immediately removed from the site and acceptable replacement plantsprovided at no cost to the Owner.E. Submit to the Owner's Representative, for approval, plant sources including the names and locations ofnurseries proposed as sources of acceptable plants, and a list of the plants they will provide. The plant list shall includethe botanical and common name and the size at the time of selection. Observe all nursery materials to determine thatthe materials meet the requirements of this section.F. Trees shall be purchased from the growing nursery. Re-wholesale plant suppliers shall not be used as sourcesunless the Contractor can certify that the required trees are not directly available from a growing nursery. WhenRe-wholesale suppliers are utilized, the Contractor shall submit the name and location of the growing nursery fromwhere the trees were obtained by the re - wholesale seller. The re - wholesale nursery shall be responsible for anyrequired plant quality certifications.G. The Contractor shall require the grower or re-wholesale supplier to permit the Owner's Representative toobserve the root system of all plants at the nursery or job site prior to planting including random removal of soil orsubstrate around the base of the plant. Observation may be as frequent and as extensive as needed to verify that theplants meet the requirements of the specifications and conform to requirements.H. Each tree shall have a numbered seal applied by the Contractor. The seal shall be placed on a lateral branchon the north side of the tree. The seal shall be a tamper proof plastic seal bearing the Contractors name and a uniqueseven - digit number embossed on the seal.1. Do not place seals on branches that are so large that there is not sufficient room for the branch growthover the period of the warranty.I. The Owner's Representative may choose to attach their seal to each plant, or a representative sample. Viewingand/or sealing of plants by the Owner's Representative at the nursery does not preclude the Owner's Representative'sright to reject material while on site. The Contractor is responsible for paying any up charge for the Owner'sRepresentative to attach their seal to specific plants.J. Where requested by the Owner's Representative, submit photographs of plants or representative samples ofplants. Photographs shall be legible and clearly depict the plant specimen. Each submitted image shall contain a heightreference, such as a measuring stick. The approval of plants by the Owner's Representative via photograph does notpreclude the Owner's Representative's right to reject material while on site.1.16 PLANT SUBSTITUTIONS FOR PLANTS NOT AVAILABLEA. Submit all requests for substitutions of plant species, or size to the Owner's Representative, for approval, priorto purchasing the proposed substitution. Request for substitution shall be accompanied with a list of nurseries contactedin the search for the required plant and a record of other attempts to locate the required material. Requests shall alsoinclude sources of plants found that may be of a smaller or larger size, or a different shape or habit than specified, orplants of the same genus and species but different cultivar origin, or which may otherwise not meet the requirements ofthe specifications, but which may be available for substitution.1.17 SITE CONDITIONSA. It is the responsibility of the Contractor to be aware of all surface and sub-surface conditions, and to notify theOwner's Representative, in writing, of any circumstances that would negatively impact the health of plantings. Do notproceed with work until unsatisfactory conditions have been corrected.1. Should subsurface drainage or soil conditions be encountered which would be detrimental to growth orsurvival of plant material, the Contractor shall notify the Owner's Representative in writing, stating theconditions and submit a proposal covering cost of corrections. If the Contractor fails to notify the Owner'sRepresentative of such conditions, he/she shall remain responsible for plant material under the warrantyclause of the specifications.B. It is the responsibility of the Contractor to be familiar with the local growing conditions, and if any specifiedplants will be in conflict with these conditions. Report any potential conflicts, in writing, to the Owner's Representative.C. This specification requires that all Planting Soil and Irrigation (if applicable) work be completed and acceptedprior to the installation of any plants.1. Planting operations shall not begin until such time that the irrigation system is completely operational forthe area(s) to be planted, and the irrigation system for that area has been preliminarily observed andapproved by the Owner's Representative.D. Actual planting shall be performed during those periods when weather and soil conditions are suitable inaccordance with locally accepted horticultural practices.1. Do not install plants into saturated or frozen soils. Do not install plants during inclement weather, such asrain or snow or during extremely hot, cold or windy conditions.1.18 PLANTING AROUND UTILITIESA. Contractor shall carefully examine the civil, record, and survey drawings to become familiar with the existingunderground conditions before digging.B. Determine location of underground utilities and perform work in a manner that will avoid possible damage.Hand excavate, as required. Maintain grade stakes set by others until parties concerned mutually agree upon removal.C. Notification of Local Utility Locator Service, Insert PHONE NUMBER, is required for all planting areas: TheContractor is responsible for knowing the location and avoiding utilities that are not covered by the Local Utility LocatorService.Note to specifier: Insert the telephone number and correct name of the Local Utility Locator Service ifavailable.PART 2 PRODUCTS2.1 PLANTS: GENERALA. Standards and measurement: Provide plants of quantity, size, genus, species, and variety or cultivars as shownand scheduled in contract documents.1. All plants including the root ball dimensions or container size to trunk caliper ratio shall conform to ANSIZ60.1 “American Standard for Nursery Stock” latest edition, unless modified by provisions in thisspecification. When there is a conflict between this specification and ANSI Z60.1, this specification sectionshall be considered correct.2. Plants larger than specified may be used if acceptable to the Owner's Representative. Use of such plantsshall not increase the contract price. If larger plants are accepted the root ball size shall be in accordancewith ANSI Z-60.1. Larger plants may not be acceptable if the resulting root ball cannot be fit into therequired planting space.3. If a range of size is given, no plant shall be less than the minimum size and not less than 50 percent of theplants shall be as large as the maximum size specified. The measurements specified are the minimum andmaximum size acceptable and are the measurements after pruning, where pruning is required.B. Proper Identification: All trees shall be true to name as ordered or shown on planting plans and shall be labeledindividually or in groups by genus, species, variety and cultivar.C. Compliance: All trees shall comply with federal and state laws and regulations requiring observation for plantdisease, pests, and weeds. Observation certificates required by law shall accompany each shipment of plants.1. Clearance from the local county agricultural commissioner, if required, shall be obtained before plantingtrees originating outside the county in which they are to be planted.Note to specifier: Confirm that the above sentence is applicable to the region of the project.D. Plant Quality:1. General: Provide healthy stock, grown in a nursery and reasonably free of die-back, disease, insects,eggs, bores, and larvae. At the time of planting all plants shall have a root system, stem, and branch formthat will not restrict normal growth, stability and health for the expected life of the plant2. Plant quality above the soil line:a. Plants shall be healthy with the color, shape, size and distribution of trunk, stems, branches, buds andleaves normal to the plant type specified. Tree quality above the soil line shall comply with the projectCrown Acceptance details (or Florida Grades and Standards, tree grade Florida Fancy or Florida #1)and the following:1.) Crown: The form and density of the crown shall be typical for a young specimen of the species orcultivar pruned to a central and dominant leader.a.) Crown specifications do not apply to plants that have been specifically trained in the nursery astopiary, espalier, multi-stem, clump, or unique selections such as contorted or weeping cultivars.2.) Leaves: The size, color, and appearance of leaves shall be typical for the time of year and stage ofgrowth of the species or cultivar. Trees shall not show signs of prolonged moisture stress or overwatering as indicated by wilted, shriveled, or dead leaves.3.) Branches: Shoot growth (length and diameter) throughout the crown should be appropriate for theage and size of the species or cultivar. Trees shall not have dead, diseased, broken, distorted, orotherwise injured branches.a.) Main branches shall be distributed along the central leader not clustered together. They shallform a balanced crown appropriate for the cultivar/species.b.) Branch diameter shall be no larger than two-thirds (one-half is preferred) the diameter of thecentral leader measured 1 inch above the branch union.c.) The attachment of the largest branches (scaffold branches) shall be free of included bark.4.) Trunk: The tree trunk shall be relatively straight, vertical, and free of wounds that penetrate to thewood (properly made pruning cuts, closed or not, are acceptable and are not considered wounds),sunburned areas, conks (fungal fruiting bodies), wood cracks, sap leakage, signs of boring insects,galls, cankers, girdling ties, or lesions (mechanical injury).5.) Temporary branches, unless otherwise specified, can be present along the lower trunk below thelowest main (scaffold) branch, particularly for trees less than 1 inch in caliper. These branchesshould be no greater than 3/8-inch diameter. Clear trunk should be no more than 40% of the totalheight of the tree.b. Trees shall have one central leader. If the leader was headed, a new leader (with a live terminal bud) atleast one-half the diameter of the pruning cut shall be present.1.) All trees are assumed to have one central leader trees unless a different form is specified in theplant list or drawings.c. All graft unions, where applicable, shall be completely closed without visible sign of graft rejection. Allgrafts shall be visible above the soil line.d. Trunk caliper and taper shall be sufficient so that the lower five feet of the trunk remains vertical withouta stake. Auxiliary stake may be used to maintain a straight leader in the upper half of the tree.3. Plant quality at or below the soil line:a. Plant roots shall be normal to the plant type specified. Root observations shall take place withoutimpacting tree health. Root quality at or below the soil line shall comply with the project RootAcceptance details and the following:1.) The roots shall be reasonably free of scrapes, broken or split wood.2.) The root system shall be reasonably free of injury from biotic (e.g., insects and pathogens)and abiotic (e.g., herbicide toxicity and salt injury) agents. Wounds resulting from root pruningused to produce a high quality root system are not considered injuries.3.) A minimum of three structural roots reasonably distributed around the trunk (not clustered onone side) shall be found in each plant. Root distribution shall be uniform throughout the rootball, and growth shall be appropriate for the species.a.) Plants with structural roots on only one side of the trunk (J roots) shall be rejected.4.) The root collar shall be within the upper 2 inches of the substrate/soil. Two structural rootsshall reach the side of the root ball near the top surface of the root ball. The grower may request amodification to this requirement for species with roots that rapidly descend, provided that the growerremoves all stem girdling roots above the structural roots across the top of the root ball.5.) The root system shall be reasonably free of stem girdling roots over the root collar or kinkedroots from nursery production practices.6.) At time of observations and delivery, the root ball shall be moist throughout. Roots shall not showsigns of excess soil moisture conditions as indicated by stunted, discolored, distorted, or dead roots.E. Submittals: Submit for approval the required plant quality certifications from the grower where plants are to bepurchased, for each plant type. The certification must state that each plant meets all the above plant qualityrequirements.1. The grower's certification of plant quality does not prohibit the Owner's Representative from observing anyplant or rejecting the plant if it is found to not meet the specification requirements.2.2 ROOT BALL PACKAGE OPTIONS: The following root ball packages are permitted. Specific root ball packagesshall be required where indicated on the plant list or in this specification. Any type of root ball packages that is notspecifically defined in this specification shall not be permitted.A. CONTAINER (INCLUDING ABOVE-GROUND FABRIC CONTAINERS AND BOXES) PLANTSNote to specifier: Remove the paragraph below if Container plants are not to be permitted.2. Container plants may be permitted only when indicated on the drawing, in this specification, or approved bythe Owner's Representative.3. Provide plants shall be established and well rooted in removable containers.4. Container class size shall conform to ANSI Z60.1 for container plants for each size and type of plant.2.5 PLANTING SOILA. Planting Soil as used in this specification means the soil at the planting site, or imported as modified anddefined in specification Section Planting Soil. If there is no Planting Soil specification, the term Planting Soil shall meanthe soil at the planting site within the planting hole.2.6 MULCHA. Mulch shall be "Walk on" grade, coarse, ground, from tree and woody brush sources. The size range shall be aminimum (less than 25% or less of volume) fine particles 3/8 inch or less in size, and a maximum size of individualpieces (largest 20% or less of volume) shall be approximately 1 to 1-1/2 inch in diameter and maximum lengthapproximately 4 to 8". Pieces larger than 8 inch long that are visible on the surface of the mulch after installation shallbe removed.1. It is understood that mulch quality will vary significantly from supplier to supplier and region to region. Theabove requirements may be modified to conform to the source material from locally reliable suppliers asapproved by the Owner's Representative.B. Submit supplier's product specification data sheet and a one gallon sample for approval.2.7 TREE STAKING AND GUYING MATERIALNote to specifier: Do not leave references to any of the staking and guying types you do not want to permit forthe project in the specification. Remove the paragraphs below of the types that will not be permitted. Addspecifications for other types of staking and guying.A. Tree guying to be flat woven polypropylene material, 3/4 inch wide, and 900 lb. break strength. Color to beGreen. Product to be ArborTie manufactured by Deep Root Partners, L.P. or approved equal.B. Stakes shall be lodge pole stakes free of knots and of diameters and lengths appropriate to the size of plant asrequired to adequately support the plant.C. Below ground anchorage systems to be constructed of 2 x 2 dimensional untreated wood securing (using 3inch long screws) horizontal portions to 4 feet long vertical stakes driven straight into the ground outside the root ball.D. Submit manufacturer's product data for approval.2.10 CHEMICAL OR BIOLOGICAL ADDITIVESNote to specifier: Insert additives, as desired for the specific project requirements.PART 3 EXECUTION3.1 SITE EXAMINATIONA. Examine the surface grades and soil conditions to confirm that the requirements of the Specification Section -Planting Soil - and the soil and drainage modifications indicated on the Planting Soil Plan and Details (if applicable)have been completed. Notify the Owner's Representative in writing of any unsatisfactory conditions.3.2 DELIVERY, STORAGE AND HANDLINGA. Protect materials from deterioration during delivery and storage. Adequately protect plants from drying out,exposure of roots to sun, wind or extremes of heat and cold temperatures. If planting is delayed more than 24 hoursafter delivery, set plants in a location protected from sun and wind. Provide adequate water to the root ball packageduring the shipping and storage period.1. All plant materials must be available for observation prior to planting.2. Using a soil moisture meter, periodically check the soil moisture in the root balls of all plants to assure thatthe plants are being adequately watered. Volumetric soil moisture shall be maintained above wilting pointand below field capacity for the root ball substrate or soil.B. Do not deliver more plants to the site than there is space with adequate storage conditions. Provide a suitableremote staging area for plants and other supplies.1. The Owner's Representative or Contractor shall approve the duration, method and location of storage ofplants.C. Provide protective covering over all plants during transporting.3.3 PLANTING SEASONA. Planting shall only be performed when weather and soil conditions are suitable for planting the materialsspecified in accordance with locally accepted practice. Install plants during the planting time as described below unlessotherwise approved in writing by the Owner's Representative. In the event that the Contractor request planting outsidethe dates of the planting season, approval of the request does not change the requirements of the warranty.Note to specifier: Insert required regional appropriate planting date limitations including limitations if any for fallplanting hazard plants.1. Deciduous trees and shrubs XXX to XXX and YYY to YYY2. Evergreen trees and shrubs XXX to XXX and YYY to YYY3.4 ADVERSE WEATHER CONDITIONSA. No planting shall take place during extremely hot, dry, windy or freezing weather.3.5 COORDINATION WITH PROJECT WORKA. The Contractor shall coordinate with all other work that may impact the completion of the work.B. Prior to the start of work, prepare a detailed schedule of the work for coordination with other trades.C. Coordinate the relocation of any irrigation lines, heads or the conduits of other utility lines that are in conflictwith tree locations. Root balls shall not be altered to fit around lines. Notify the Owner's Representative of any conflictsencountered.3.6 LAYOUT AND PLANTING SEQUENCEA. Relative positions of all plants and trees are subject to approval of the Owner's Representative.B. Notify the Owner's Representative, one (1) week prior to layout. Layout all individual tree and shrub locations.Place plants above surface at planting location or place a labeled stake at planting location. Layout bed lines with paintfor the Owner's Representative's approval. Secure the Owner's Representative's acceptance before digging and start ofplanting work.C. When applicable, plant trees before other plants are installed.D. It is understood that plants are not precise objects and that minor adjustments in the layout will be required asthe planting plan is constructed. These adjustments may not be apparent until some or all of the plants are installed.Make adjustments as required by the Owner's Representative including relocating previously installed plants.3.7 SOIL PROTECTION DURING PLANT DELIVERY AND INSTALLATIONA. Protect soil from compaction during the delivery of plants to the planting locations, digging of planting holes andinstalling plants.1. Where possible deliver and plant trees that require the use of heavy mechanized equipment prior to finalsoil preparation and tilling. Where possible, restrict the driving lanes to one area instead of driving over andcompacting a large area of soil.2. Till to a depth of 6 inches, all soil that has been driven over during the installation of plants.3.8 SOIL MOISTUREA. Volumetric soil moisture level, in both the planting soil and the root balls of all plants, prior to, during and afterplanting shall be above permanent wilting point and below field capacity for each type of soil texture within the followingranges.Soil typePermanent wilting pointField capacitySand, Loamy sand, Sandy loam 5 - 8% 12-18%Loam, Sandy clay, Sandy clay loam 14 - 25% 27-36%Clay loam, Silt loam11 - 22% 31 - 36%Silty clay, Silty clay loam22 - 27% 38 -41%1. Volumetric soil moisture shall be measured with a digital moisture meter. The meter shall be the Digital SoilMoisture Meter, DSMM500 by General Specialty Tools and Instruments, or approved equivalent.B. The Contractor shall confirm the soil moisture levels with a moisture meter. If the moisture is too high, suspendplanting operations until the soil moisture drains to below field capacity.3.9 INSTALLATION OF PLANTS: GENERALA. Installation plan shall be submitted a minimum of 14 days prior to the scheduled installation. Plan shoulddescribe the methods, activities, materials and schedule to achieve installation of plants.Note to specifier: Remove the above paragraph if no Installation Plan is required. Also remove the submittalrequirement in Part One - Submittals.B. Observe each plant after delivery and prior to installation for damage of other characteristics that may causerejection of the plant. Notify the Owner's Representative of any condition observed.C. No more plants shall be distributed about the planting bed area than can be planted and watered on the sameday.D. The root system of each plant, regardless of root ball package type, shall be observed by the Contractor, at thetime of planting to confirm that the roots meet the requirements for plant root quality in Part 2 Products: Plants General:Plant Quality. The Contractor shall undertake at the time of planting, all modifications to the root system required by theOwner's Representative to meet these quality standards.1. Modifications, at the time of planting, to meet the specifications for the depth of the root collar and removalof stem girdling roots and circling roots may make the plant unstable or stress the plant to the point that theOwner's Representative may choose to reject the plant rather than permitting the modification.2. Any modifications required by the Owner's Representative to make the root system conform to the plantquality standards outlined in Part 2 Products: Plants General: Quality, or other requirements related to thepermitted root ball package, shall not be considered as grounds to modify or void the plant warranty.3. The resulting root ball may need additional staking and water after planting. The Owner's Representativemay reject the plant if the root modification process makes the tree unstable or if the tree is not healthy atthe end of the warranty period. Such plants shall still be covered under the warranty4. The Contractor remains responsible to confirm that the grower has made all required root modificationsnoted during any nursery observations.E. Container and Boxed Root Ball Shaving: The outer surfaces of ALL plants in containers and boxes, includingthe top, sides and bottom of the root ball shall be shaved to remove all circling, descending, and matted roots. Shavingshall be performed using saws, knives, sharp shovels or other suitable equipment that is capable of making clean cutson the roots. Shaving shall remove a minimum of one inch of root mat or up to 2 inches as required to remove all rootsegments that are not growing reasonably radial to the trunk.F. Exposed Stem Tissue after Modification: The required root ball modifications may result in stem tissue that hasnot formed trunk bark being exposed above the soil line. If such condition occurs, wrap the exposed portion of the stemin a protective wrapping with a white filter fabric. Secure the fabric with biodegradable masking tape. DO NOT USEstring, twine, green nursery ties or any other material that may girdle the trunk if not removed.72AH 10-28-2021 72 of 82 NO. DESCRIPTION: DATE:SCALE:CLIENT PROJECT NO.TBDCLIENT:PROJECT INFO:ARCHITECT:REVIEWED BY:PROJECT NO:DRAWN BY:APPROVED BY:19036_WAFG01PHASE 218922 FORGE DRIVECUPERTINO, CA 950141512 W. Mineral King Ave.Visalia, Ca 93291559. 786. 9600 (c)559. 636. 3277 (f)www.iwoodarchitecture.comW O O DA R C H I T E C T U R E1"=10'GMTC- BACKGROUNDS 09/11/2019- DD PROGRESS 09/27/2019- DD ISSUED FOR REVIEW 10/18/2019- INITIAL CITY SUBMITTAL 12/16/20191 COMMENT RESPONSES 06/22/20202 DESIGN CHANGES 06/22/20203 DESIGN CHANGES 07/24/20204 DESIGN CHANGES 11/06/20205 RESUBMITTAL 12/11/20206 PLANNING APPLICATION 01/29/20217 DESIGN CHANGES 3/8/20208 RESUBMITTAL 3/8/2020SpecificationsL-25G. Excavation of the Planting Space: Using hand tools or tracked mini-excavator, excavate the planting hole intothe Planting Soil to the depth of the root ball measured after any root ball modification to correct root problems,and wide enough for working room around the root ball or to the size indicated on the drawing or as notedbelow.1. For trees and shrubs planted in soil areas that are NOT tilled or otherwise modified to a depth of at least 12inches over a distance of more than 10 feet radius from each tree, or 5 feet radius from each shrub, the soilaround the root ball shall be loosened as defined below or as indicated on the drawings.a. The area of loosening shall be a minimum of 3 times the diameter of the root ball at the surface slopingto 2 times the diameter of the root ball at the depth of the root ball.b. Loosening is defined as digging into the soil and turning the soil to reduce the compaction. The soildoes not have to be removed from the hole, just dug, lifted and turned. Lifting and turning may beaccomplished with a tracked mini excavator, or hand shovels.2. If an auger is used to dig the initial planting hole, the soil around the auger hole shall be loosened asdefined above for trees and shrubs planted in soil areas that are NOT tilled or otherwise modified.3. The measuring point for root ball depth shall be the average height of the outer edge of the root ball afterany required root ball modification.4. If motorized equipment is used to deliver plants to the planting area over exposed planting beds, or used toloosen the soil or dig the planting holes, all soil that has been driven over shall be tilled to a depth of 6inches.H. For trees to be planted in prepared Planting Soil that is deeper than the root ball depth, compact the soil underthe root ball using a mechanical tamper to assure a firm bedding for the root ball. If there is more than 12inches of planting soil under the root ball excavate and tamp the planting soil in lifts not to exceed 12 inches.I. Set top outer edge of the root ball at the average elevation of the proposed finish. Set the plant plumb andupright in the center of the planting hole. The tree graft, if applicable, shall be visible above the grade. Do notplace soil on top of the root ball.J. The Owner's Representative may request that plants orientation be rotated when planted based on the form ofthe plant.K. Backfill the space around the root ball with the same planting soil or existing soil that was excavated for theplanting space. See Specification Section Planting Soil, for requirements to modify the soil within the plantingbed.L. Brace root ball by tamping Planting Soil around the lower portion of the root ball. Place additional Planting Soilaround base and sides of ball in six - inch (6") lifts. Lightly tamp each lift using foot pressure or hand tools tosettle backfill, support the tree and eliminate voids. DO NOT over compact the backfill or use mechanical orpneumatic tamping equipment. Over compaction shall be defined as greater than 85% of maximum drydensity, standard proctor or greater than 250 psi as measured by a cone penetrometer when the volumetricsoil moisture is lower than field capacity.1. When the planting hole has been backfilled to three quarters of its depth, water shall be poured around theroot ball and allowed to soak into the soil to settle the soil. Do not flood the planting space. If the soil isabove field capacity, allow the soil to drain to below field capacity before finishing the planting. Air pocketsshall be eliminated and backfill continued until the planting soil is brought to grade level.M. Where indicated on the drawings, build a 4 inch high, level berm of Planting Soil around the outside of the rootball to retain water. Tamp the berm to reduce leaking and erosion of the saucer.N. Thoroughly water the Planting Soil and root ball immediately after planting.O. Remove all nursery plant identification tags and ribbons as per Owner's Representative instructions. TheOwner's Representative's seals are to remain on plants until the end of the warranty period.P. Remove corrugated cardboard trunk protection after planting.Follow additional requirements for the permitted root ball packages.3.10 Permitted Root ball packages and Special planting requirementsA. The following are permitted root ball packages and special planting requirements that shall be followed duringthe planting process in addition to the above General planting requirements.B. BALLED AND BURLAPPED PLANTSNote to specifier: Remove this paragraph if BALLED AND BURLAPPED PLANTS are not permitted.Removing some or all of the wire of a wire basket after the plant is positioned in the planting hole iscontroversial. Despite the scientific evidence showing that roots grow to engulf the wire, and lack ofdocumented cases of wire impacting tree health, some professionals insist that some or all wire be removed.Delete, accept, or modify sections B.1 and 2 below as you feel necessary.1. After the root ball has been backfilled, remove all twine and burlap from the top of the root ball. Cut theburlap away; do not fold down onto the Planting Soil.2. If the plant is shipped with a wire basket that does not meet the requirements of a “Low Rise” basket,remove the top 6 - 8 inches of the basket wires just before the final backfilling of the tree.3. Earth root balls shall be kept intact except for any modifications required by the Owner's Representative tomake root package comply with the requirement in Part 2 Products.C. SPADE HARVESTED AND TRANSPLANTED PLANTSNote to specifier: Remove this paragraph if Tree Spade Harvested and Transplanted Plants are not to bepermitted.1. After installing the tree, loosen the soil along the seam between the root ball and the surrounding soil out toa radius from the root ball edge equal to the diameter of the root ball to a depth of 8 - 10 inches by handdigging to disturb the soil interface.2. Fill any gaps below this level with loose soil.D. CONTAINER (INCLUDES BOXED AND ABOVE-GROUND FABRIC CONTAINERS) PLANTSNote to specifier: Remove this paragraph if CONTAINER PLANTS are not permitted. All of the items belowcan be included if the following details are included in the contract: 1) root ball shaving, 2) root observations,3) root correction. Remove sections below that will not be required.1. This specification assumes that most container plants have significant stem girdling and circling roots, andthat the root collar is too low in the root ball.2. Remove the container.3. Perform root ball shaving as defined in Installation of Plants: General above.4. Remove all roots and substrate above the root collar and the main structural roots according to rootcorrection details so root system conforms to root observations detail.5. Remove all substrate at the bottom of the root ball that does not contain roots.6. Using a hose, power washer or air excavation device, wash out the substrate from around the trunk andtop of the remaining root ball and find and remove all stem girdling roots within the root ball above the topof the structural roots.E. BARE ROOT PLANTSNote to specifier: Remove this paragraph if BARE ROOT PLANTS are not permitted.1. Dig the planting hole to the diameter of the spread of the roots to a depth in the center that maintains theroot collar at the elevation of the surrounding finished grade and slightly deeper along the edges of thehole.2. Spread all roots out radial to the trunk in the prepared hole making the hole wider where needed toaccommodate long roots. Root tips shall be directed away from the trunk. Prune any broken roots removingthe least amount of tissue possible.3. Maintain the trunk plumb while backfilling soil around the roots.4. Lightly tamp the soil around the roots to eliminate voids and reduce settlement.F. IN - GROUND FABRIC CONTAINERSNote to specifier: Remove this paragraph if FABRIC CONTAINERS are not permitted.1. Remove the fabric container from the root ball. Cut roots at the edge of the container as needed to extractthe fabric from the roots. Make clean cuts with sharp tools; do not tear roots away from the fabric.2. Observe the root system after the container is removed to confirm that the root system meets the qualitystandards.3.11 GROUND COVER, PERENNIAL AND ANNUAL PLANTSA. Assure that soil moisture is within the required levels prior to planting. Irrigation, if required, shall be applied atleast 12 hours prior to planting to avoid planting in muddy soils.B. Assure that soil grades in the beds are smooth and as shown on the plans.C. Plants shall be planted in even, triangularly spaced rows, at the intervals called out for on the drawings, unlessotherwise noted. The first row of Annual flower plants shall be 6 inches from the bed edge unless otherwisedirected.D. Dig planting holes sufficiently large enough to insert the root system without deforming the roots. Set the topof the root system at the grade of the soil.E. Schedule the planting to occur prior to application of the mulch. If the bed is already mulched, pull the mulchfrom around the hole and plant into the soil. Do not plant the root system in the mulch. Pull mulch back so it isnot on the root ball surface.F. Press soil to bring the root system in contact with the soil.G. Spread any excess soil around in the spaces between plants.H. Apply mulch to the bed being sure not to cover the tops of the plants with or the tops of the root ball withmulch.I. Water each planting area as soon as the planting is completed. Apply additional water to keep the soilmoisture at the required levels. Do not over water.3.12 PALM PLANTINGA. Palm trees shall be placed at grade making sure not to plant the tree any deeper in the ground than the palmtrees originally stood. B. The trees shall be placed with their vertical axis in a plumb position.C. All backfill shall be native soil except in cases where planting in rock. Water-settle the back fill.D. Do not cover root ball with mulch or topsoil.E. Provide a watering berm at each palm. Berms shall extend a minimum of 18 inches out from the trunk allaround and shall be a minimum of (6) inches high.F. Remove twine which ties fronds together after placing palm in planting hole and securing it in the uprightposition. 3.13 STAKING AND GUYINGNote to specifier: There are many staking systems available in the market. Special project requirements andregional or designer preferences may indicate different approach. Modify the following paragraphs to reflectproject requirements.If palms are include then add palm bracing detail.A. Do not stake or guy trees unless specifically required by the Contract Documents, or in the event that theContractor feels that staking is the only alternative way to keep particular trees plumb.1. The Owner's Representative shall have the authority to require that trees are staked or to reject staking asan alternative way to stabilize the tree.2. Trees that required heavily modified root balls to meet the root quality standards may become unstable.The Owner's Representative may choose to reject these trees rather than utilize staking to temporarilysupport the tree.B. Trees that are guyed shall have their guys and stakes removed after one full growing season or at other timesas required by the Owner's Representative.C. Tree guying shall utilize the tree staking and guying materials specified. Guying to be tied in such a manner asto create a minimum 12 - inch loop to prevent girdling. Refer to manufacturer's recommendations and theplanting detail for installation.1. Plants shall stand plumb after staking or guying.2. Stakes shall be driven to sufficient depth to hold the tree rigid.D. For trees planted in planting mix over waterproofed membrane, use dead men buried 24 inches to the top ofthe dead man, in the soil. Tie the guy to the dead man with a double wrap of line around the dead manfollowed by a double half hitch. When guys are removed, leave the dead men in place and cut the guy tape 12inches above the ground, leaving the tape end covered in mulch.3.14 TREE BARK PROTECTIONNote to specifier: This is a specialty application generally only used in location such as streetscapes where treetrunks may be subject to mechanical abuse. Remove this paragraph it this is not applicable.A. For all street trees in commercial areas where indicted on the drawings, apply a Tree Bark Protector to eachtree.3.15 STRAIGHTENING PLANTSA. Maintain all plants in a plumb position throughout the warranty period. Straighten all trees that move out ofplumb including those not staked. Plants to be straightened shall be excavated and the root ball moved to aplumb position, and then re-backfilled.B. Do not straighten plants by pulling the trunk with guys.3.16 INSTALLATION OF FERTILIZER AND OTHER CHEMICAL ADDITIVESA. Do not apply any soluble fertilizer to plantings during the first year after transplanting unless soil testdetermines that fertilizer or other chemical additives is required. Apply chemical additives only upon theapproval of the Owner's Representative.B. Controlled release fertilizers shall be applied according to the manufacturer's instructions and standardhorticultural practices.3.17 PRUNING OF TREES AND SHRUBSA. Prune plants as directed by the Owner's Representative. Pruning trees shall be limited to addressing structuraldefects as shown in details; follow recommendations in “Structural Pruning: A Guide For The Green Industry”published by Urban Tree Foundation, Visalia CA.B. All pruning shall be performed by a person experienced in structural tree pruning.C. Except for plants specified as multi-stemmed or as otherwise instructed by the Owner's Representative,preserve or create a central leader.D. Pruning of large trees shall be done using pole pruners or if needed, from a ladder or hydraulic lift to gainaccess to the top of the tree. Do not climb in newly planted trees. Small trees can be structurally pruned bylaying them over before planting. Pruning may also be performed at the nursery prior to shipping.E. Remove and replace excessively pruned or malformed stock resulting from improper pruning that occurred inthe nursery or after.F. Pruning shall be done with clean, sharp tools.G. No tree paint or sealants shall be used.3.18 MULCHING OF PLANTSA. Apply 4 inches of mulch before settlement, covering the entire planting bed area. Install no more than 1 inchof mulch over the top of the root balls of all plants. Taper to 2 inches when abutting pavement.B. For trees planted in lawn areas the mulch shall extend to a 5 foot radius around the tree or to the extentindicated on the plans.C. Lift all leaves, low hanging stems and other green portions of small plants out of the mulch if covered.3.19 PLANTING BED FINISHINGA. After planting, smooth out all grades between plants before mulching.B. Separate the edges of planting beds and lawn areas with a smooth, formed edge cut into the turf with the bedmulch level slightly lower, 1 and 2 inches, than the adjacent turf sod or as directed by the Owner'sRepresentative. Bed edge lines shall be a depicted on the drawings.3.20 WATERINGA. The Contractor shall be fully responsible to ensure that adequate water is provided to all plants from the pointof installation until the date of Substantial Completion Acceptance. The Contractor shall adjust the automaticirrigation system, if available, and apply additional or adjust for less water using hoses as required.B. Hand water root balls of all plants to assure that the root balls have moisture above wilt point and below fieldcapacity. Test the moisture content in each root ball and the soil outside the root ball to determine the watercontent.C. The Contractor shall install 25 gallon watering bag for each tree to be maintained and used for tree wateringduring the warranty period.re1. The watering bags shall remain the property of the Owner at the completion of the work.3.21 CLEAN - UPA. During installation, keep the site free of trash, pavements reasonably clean and work area in an orderlycondition at the end of each day. Remove trash and debris in containers from the site no less than once aweek.1. Immediately clean up any spilled or tracked soil, fuel, oil, trash or debris deposited by the Contractor fromall surfaces within the project or on public right of ways and neighboring property.B. Once installation is complete, wash all soil from pavements and other structures. Ensure that mulch isconfined to planting beds and that all tags and flagging tape are removed from the site. The Owner'sRepresentative's seals are to remain on the trees and removed at the end of the warranty period.C. Make all repairs to grades, ruts, and damage by the plant installer to the work or other work at the site.D. Remove and dispose of all excess planting soil, subsoil, mulch, plants, packaging, and other material broughtto the site by the Contractor.3.22 PROTECTION DURING CONSTRUCTIONA. The Contractor shall protect planting and related work and other site work from damage due to plantingoperations, operations by other Contractors or trespassers. Maintain protection during installation untilSubstantial Completion Acceptance. Treat, repair or replace damaged work immediately.B. Damage done by the Contractor, or any of their sub - contractors to existing or installed plants, or any otherparts of the work or existing features to remain, including roots, trunk or branches of large existing trees, soil,paving, utilities, lighting, irrigation, other finished work and surfaces including those on adjacent property, shallbe cleaned, repaired or replaced by the Contractor at no expense to the Owner. The Owner's Representativeshall determine when such cleaning, replacement or repair is satisfactory.3.23 PLANT MAINTENANCE PRIOR TO SUBSTANTIAL COMPLETION ACCEPTANCEA. During the project work period and prior to Substantial Completion Acceptance, the Contractor shall maintainall plants.B. Maintenance during the period prior to Substantial Completion Acceptance shall consist of pruning, watering,cultivating, weeding, mulching, removal of dead material, repairing and replacing of tree stakes, tightening andrepairing of guys, repairing and replacing of damaged tree wrap material, resetting plants to proper gradesand upright position, and furnishing and applying such sprays as are necessary to keep plantings reasonablyfree of damaging insects and disease, and in healthy condition. The threshold for applying insecticides andherbicide shall follow established Integrated Pest Management (IPM) procedures. Mulch areas shall be keptreasonably free of weeds, grass.3.24 SUBSTANTIAL COMPLETION ACCEPTANCEA. Upon written notice from the Contractor, the Owners Representative shall review the work and make adetermination if the work is substantially complete.1. Notification shall be at least 7 days prior to the date the contractor is requesting the review.B. The date of substantial completion of the planting shall be the date when the Owner's Representative acceptsthat all work in Planting, Planting Soil, and Irrigation installation sections is complete.C. The Plant Warranty period begins at date of written notification of substantial completion from the Owner'sRepresentative. The date of substantial completion may be different than the date of substantial completionfor the other sections of the project.Note to specifier: The following two sections are options for maintenance during the warranty period:Maintenance During the Warranty Period by Others” and “Maintenance During the Warranty Period by the PlantInstaller”. Confirm the approach that is appropriate to the project and delete the other option. These options mayalso need to be modified to meet the project requirements.Confirm that the lengths and timing of beginning and end of maintenance periods are suitable to the projectowner's requirements. If the owner does not want to purchase plant maintenance during warranty period, useoption one below. If plant maintenance is to be included the extent of the maintenance must be defined.The maintenance specification assumes that maintenance of lawn grass areas, if required, would be coveredunder a separate specification for lawn installation.3.25 MAINTENANCE DURING THE WARRANTY PERIOD by othersA. After Substantial Completion Acceptance, the Contractor shall make sufficient site visits to observe theOwner's maintenance and become aware of problems with the maintenance in time to request changes, untilthe date of End of Warranty Final Acceptance.1. Notify the Owner's Representative in writing if maintenance, including watering, is not sufficient to maintainplants in a healthy condition. Such notification must be made in a timely period so that the Owner'sRepresentative may take corrective action.a. Notification must define the maintenance needs and describe any corrective action required.2. In the event that the Contractor fails to visit the site and or notify, in writing, the Owner's Representative ofmaintenance needs, lack of maintenance shall not be used as grounds for voiding or modifying theprovisions of the warranty.3.26 MAINTENANCE DURING THE WARRANTY PERIOD by the plant installerA. During the warranty period, provide all maintenance for all plantings to keep the plants in a healthy state andthe planting areas clean and neat.B. General requirements:1. All work shall be undertaken by trained planting crews under the supervision of a foreman with a minimumof 5 years experience supervising commercial plant maintenance crews.2. All chemical and fertilizer applications shall be made by licensed applicators for the type of chemicals to beused. All work and chemical use shall comply with all applicable local, provincial and federal requirements.3. Assure that hoses and watering equipment and other maintenance equipment does not block paths or beplaced in a manner that may create tripping hazards. Use standard safety warning barriers and otherprocedures to maintain the site in a safe manner for visitors at all times.4. All workers shall wear required safety equipment and apparel appropriate for the tasks being undertaken.5. The Contractor shall not store maintenance equipment at the site at times when they are not in use unlessauthorized in writing by the Owner's Representative.6. Maintenance vehicles shall not park on the site including walks and lawn areas at any time without theOwner's Representative's written permission.7. Maintain a detailed log of all maintenance activities including types of tasks, date of task, types andquantities of materials and products used, watering times and amounts, and number of each crew.Periodically review the logs with the Owner's Representative, and submit a copy of the logs at the end ofeach year of the maintenance agreement.8. Meet with the Owner's Representative a minimum of three times a year to review the progress and discussany changes that are needed in the maintenance program. At the end of the warranty period attend a handover meeting to formally transfer the responsibilities of maintenance to the Owner's Representative.Provide all information on past maintenance activities and provide a list of critical tasks that will be neededover the next 12 months. Provide all maintenance logs and soil test data. Make the Contractor's supervisoravailable for a minimum of one year after the end of the warranty period to answer questions about pastmaintenance.C. Provide the following maintenance tasks:1. Watering; Provide all water required to keep soil within and around the root balls at optimum moisturecontent for plant growth.a. Maintain all watering systems and equipment and keep them operational.b. Monitor soil moisture to provide sufficient water. Check soil moisture and root ball moisture with a soilmoisture meter on a regular basis and record moisture readings. Do not over water.2. Soil nutrient levels: Take a minimum of 4 soil samples from around the site in the spring and fall and havethem tested by an accredited agricultural soil testing lab for chemical composition of plant requirednutrients, pH, salt and % organic matter. Test results shall include laboratory recommendations for nutrientapplications. Apply fertilizers at rates recommended by the soil test.a. Make any other soil test and/or plant tissue test that may be indicated by plant conditions that may notbe related to soil nutrient levels such as soil contaminated by other chemicals or lack of chemicaluptake by the plant.3. Plant pruning: Remove cross over branching, shorten or remove developing co dominant leaders, deadwood and winter-damaged branches. Unless directed by the Owner's Representative, do not shear plantsor make heading cuts.4. Restore plants: Reset any plants that have settled or are leaning as soon as the condition is noticed.5. Guying and staking: Maintain plant guys in a taught position. Remove tree guys and staking after the firstfull growing season unless directed by Owner's Representative.6. Weed control: Keep all beds free of weeds. Hand-remove all weeds and any plants that do not appear onthe planting plan. Chemical weed control is permitted only with the approval of the Owner's Representative.Schedule weeding as needed but not less 12 times per year.Note to specifier: Insert the frequency of weed control above based on the project budget and need tokeep the plantings weed free.7. Trash removal: Remove all trash and debris from all planting beds and maintain the beds in a neat and tidyappearance. The number of trash and debris removal visits shall be no less than 12 times per year andmay coincide with other maintenance visits.Note to specifier: Insert the frequency of trash removal based on the project budget and need to keepthe site trash free.8. Plant pest control: Maintain disease, insects and other pests at manageable levels. Manageable levelsshall be defined as damage to plants that may be noticeable to a professional but not to the averageperson. Use least invasive methods to control plant disease and insect outbreaks.a. The Owner's Representative must approve in advance the use of all chemical pesticide applications.9. Plant replacement: Replace all plants that are defective as defined in the warranty provisions, as soon asthe plant decline is obvious and in suitable weather and season for planting as outlined in above sections.Plants that become defective during the maintenance period shall be covered and replaced under thewarranty provisions.10.Mulch: Refresh mulch once a year to maintain complete coverage but do not over mulch. At no time shallthe overall mulch thickness be greater that 4 inches. Do not apply mulch within 6 inches of the trunks orstems of any plants. Replacement mulch shall meet the requirements of the original approved material.Mulch shall be no more than one inch on top of the root ball surface.Note to specifier: Insert the maximum depth of mulch based on the project budget and need to keepthe mulch in the beds. Often after bed foliage completely fills in, no or little additional mulch is needed.11.Bed edging: Check and maintain edges between mulch and lawn areas in smooth neat lines as originallyshown on the drawings.12.Leaf, fruit and other plant debris removal: Remove fall leaf, spent flowers, fruit and plant partaccumulations from beds and paved surfaces. Maintain all surface water drains free of debris. Debrisremoval shall be undertaken at each visit to weed or pick up trash in beds.13.Damage from site use: Repair of damage by site visitors and events, beyond normal wear, are not part ofthis maintenance. The Owner's Representative may request that the Contractor repair damage beds orplantings for an additional cost. All additional work shall be approved in advance by the Owner'sRepresentative.3.27 END OF WARRANTY FINAL ACCEPTANCE / MAINTENANCE OBSERVATIONA. At the end of the Warranty and Maintenance period the Owner's Representative shall observe the work andestablish that all provisions of the contract are complete and the work is satisfactory.1. If the work is satisfactory, the maintenance period will end on the date of the final observation.2. If the work is deemed unsatisfactory, the maintenance period will continue at no additional expense to theOwner until the work has been completed, observed, and approved by the Owner's Representative.B. FAILURE TO PASS OBSERVATION: If the work fails to pass final observation, any subsequent observationsmust be rescheduled as per above. The cost to the Owner for additional observations will be charged to theContractor at the prevailing hourly rate of the Owners Representative.END OF SECTION 32 93 0073AH 10-28-2021 73 of 82 2337 AMERICAN AVE, HAYWARD, CA 94545 1993 EAST BAYSHORE ROAD, REDWOOD CITY, CA 94063 OFFICE: (888) 969-8733 DIRECT: (925) 518-2028 SOAKLEY@ARBORWELL.COM June 23, 2021 City of Cupertino 10300 Torre Avenue Cupertino, California 95014 Re: Live Tree Removals at 18920 Forge Drive, Cupertino, CA To whom it may concern, This letter intends to address six (6) live trees located in the landscaping directly adjacent to the building on the 18920 Forge Drive property in Cupertino, California. Please see Exhibit 1.1 for the relative locations of the subject trees. The trees are live trees but will need to be removed and replaced. Metric for the trees are as follows: Number Species Trunk Diameter Condition 1 Coast Redwood 36” Good 2 Japanese Maple 4” Good 3 Southern Live Oak 5” Good 4 Modesto Ash 13” Poor 5 Southern Live Oak 5” Good 6 London Plane 4” Good Tree 1 is a large Coast Redwood that is growing too close to the building. According to Bagg Engineering, the tree’s root system is causing both irregular subsidence and lifting to the adjacent building, due to shrink/swell characteristics of the soil. Bagg would like its removal to mitigate further damage to the building. I support their recommendation for removal as the tree has outgrown its growing space and it is very likely that the damage to the building is caused by the tree’s root system, given that Redwoods have highly invasive root systems and are prone to causing structural damage to nearby buildings. In addition, concrete curb and paving, landscape, and growing space is planned to be removed and replaced/renovated within several feet from Trees 2-6. Trees 2, 3, & 5 require removal to repair the foundation of the building and as the the engineer recommends that no trees be planted or allowed to grow next to the building foundation due to the existing site’s shrink/swell soil characteristics. The trees are shallow rooted from being surface irrigated and the trees have developed extensive surface roots. I recommend these trees be removed and replaced as they have little chance for survival during the repairs. They will not be replaced as the landscape area is being removed. Trees 4 & 6 will need to be removed because the parking layout is proposed to be adjusted. There will be perpendicular parking stalls next to the building, shifting the drive aisle away from the building, which will require the removal of the trees. The planting area for 4 & 6 will be removed as they are located within the footprint of the proposed drive aisle and the trees are not recommended for retention based on their condition (Tree 4) and size (Tree 6). The trees are considered protected pursuant to Section 14.18.035 of the City of Cupertino’s Municipal Code and requires a permit from the City’s Planni ng Department prior to their removal. We ask for permission to remove the trees based on the following criteria: 74 AH 10-28-2021 74 of 82 2337 AMERICAN AVE, HAYWARD, CA 94545 1993 EAST BAYSHORE ROAD, REDWOOD CITY, CA 94063 OFFICE: (888) 969-8733 DIRECT: (925) 518-2028 SOAKLEY@ARBORWELL.COM & The replacement trees cannot reasonably be planted on the subject property, as the property is currently overplanted. The subject trees’ existing planting areas are being removed and the perimeter landscape area is already overplanted with redwood screening. Adding replacement trees to the perimeter would result in their removal within a few years as overcrowded growing conditions produce weakly structured trees prone to disease and breakage. To mitigate the removals, we are planning for the in-lieu fee option instead of replacement for the following reasons: Tree 1 – not enough space next to the building where trees are not recommended due to shrink/swell soil characteristics; Trees 2, 3, & 5 – the planting area is being removed and there is not enough space for growth at maturity elsewhere on the property to replace the trees; Tree 4 & 6 – the drive aisle is shifting and the planting area for these trees is being removed. There is not enough space for growth at maturity elsewhere on the property to replace the trees. The in-lieu fee for a mature specimen tree with trunk size equal to or less than thirty-six (36) inches, is based upon the purchase and installation cost of the replacement tree as determined by the Director of Community Development. The following replacement totals can be used to help facilitate this determination. Number Trunk Diameter Replacement 1 36” 2 24" box or 1 36" box 2 4” 1 - 24" box 3 5” 1 - 24" box 4 13” 2 24" box or 1 36" box 5 5” 1 - 24" box 6 4” 1 - 24" box Total 8 24” box OR 4 24” box and 2 36” box Please review this information and contact me with any questions or concerns regarding the information provided in this letter. Sincerely, Samuel Oakley ISA Board Certified Master Arborist, WE-9474B TRAQ ASCA Registered Consulting Arborist #556 75 AH 10-28-2021 75 of 82 2337 AMERICAN AVE, HAYWARD, CA 94545 1993 EAST BAYSHORE ROAD, REDWOOD CITY, CA 94063 OFFICE: (888) 969-8733 DIRECT: (925) 518-2028 SOAKLEY@ARBORWELL.COM Exhibit 1.1 – Site Map: The locations of the proposed removals. 1 2 3 4 5 6 76 AH 10-28-2021 76 of 82 2337 AMERICAN AVE, HAYWARD, CA 94545 1993 EAST BAYSHORE ROAD, REDWOOD CITY, CA 94063 OFFICE: (888) 969-8733 DIRECT: (925) 518-2028 SOAKLEY@ARBORWELL.COM Exhibit 1.2 - Supporting Image: An image of tree 1. 77 AH 10-28-2021 77 of 82 2337 AMERICAN AVE, HAYWARD, CA 94545 1993 EAST BAYSHORE ROAD, REDWOOD CITY, CA 94063 OFFICE: (888) 969-8733 DIRECT: (925) 518-2028 SOAKLEY@ARBORWELL.COM Exhibit 1.3 - Supporting Image: An image of tree 2. 78 AH 10-28-2021 78 of 82 2337 AMERICAN AVE, HAYWARD, CA 94545 1993 EAST BAYSHORE ROAD, REDWOOD CITY, CA 94063 OFFICE: (888) 969-8733 DIRECT: (925) 518-2028 SOAKLEY@ARBORWELL.COM Exhibit 1.4 - Supporting Image: An image of tree 3. 79 AH 10-28-2021 79 of 82 2337 AMERICAN AVE, HAYWARD, CA 94545 1993 EAST BAYSHORE ROAD, REDWOOD CITY, CA 94063 OFFICE: (888) 969-8733 DIRECT: (925) 518-2028 SOAKLEY@ARBORWELL.COM Exhibit 1.5 - Supporting Image: An image of tree 4. 80 AH 10-28-2021 80 of 82 2337 AMERICAN AVE, HAYWARD, CA 94545 1993 EAST BAYSHORE ROAD, REDWOOD CITY, CA 94063 OFFICE: (888) 969-8733 DIRECT: (925) 518-2028 SOAKLEY@ARBORWELL.COM Exhibit 1.6 - Supporting Image: An image of tree 5. 81 AH 10-28-2021 81 of 82 2337 AMERICAN AVE, HAYWARD, CA 94545 1993 EAST BAYSHORE ROAD, REDWOOD CITY, CA 94063 OFFICE: (888) 969-8733 DIRECT: (925) 518-2028 SOAKLEY@ARBORWELL.COM Exhibit 1.7 - Supporting Image: An image of tree 6. 82 AH 10-28-2021 82 of 82