HomeMy WebLinkAboutAH 09-22-2022 Searchable PacketCITY OF CUPERTINO
ADMINISTRATIVE HEARING
AGENDA
This will be a teleconference meeting with no physical location
Thursday, September 22, 2022
5:00 PM
TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION TO HELP STOP THE
SPREAD OF COVID-19
In accordance with Government Code 54953(e), this will be a teleconference meeting
without a physical location to help stop the spread of COVID-19.
Members of the public wishing comment on an item on the agenda may do so in the
following ways:
1) E-mail comments by 4:00 p.m. on Thursday, September 22 to the Committee at
planning@cupertino.org. These e-mail comments will be received by the Committee
members before the meeting and posted to the City’s website after the meeting.
2) E-mail comments during the times for public comment during the meeting to the
Committee at planning@cupertino.org. The staff liaison will read the emails into the record,
and display any attachments on the screen, for up to 3 minutes (subject to the Chair’s
discretion to shorten time for public comments). Members of the public that wish to share a
document must email planning@cupertino.org prior to speaking.
3) Teleconferencing Instructions
Members of the public may observe the teleconference meeting or provide oral public
comments as follows:
Oral public comments will be accepted during the teleconference meeting. Comments may
be made during “oral communications” for matters not on the agenda, and during the
public comment period for each agenda item.
To address the Committee, click on the link below to register in advance and access the
meeting:
Online
Please click the link below to join the webinar:
Page 1
AH 09-22-2022
1 of 42
Administrative Hearing Agenda September 22, 2022
https://cityofcupertino.zoom.us/webinar/register/WN_G4BqIU85Q36BWqF8dvnzTg
Phone
Dial: (669) 900 6833 and enter Webinar ID: 998 9559 9327 (Type *9 to raise hand to speak)
Unregistered participants will be called on by the last four digits of their phone number.
Or an H.323/SIP room system:
H.323:
162.255.37.11 (US West)
162.255.36.11 (US East)
Meeting ID: 998 9559 9327
SIP: 99895599327@zoomcrc.com
After registering, you will receive a confirmation email containing information about
joining the webinar.
Please read the following instructions carefully:
1. You can directly download the teleconference software or connect to the meeting in your
internet browser. If you are using your browser, make sure you are using a current and
up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain
functionality may be disabled in older browsers, including Internet Explorer.
2. You will be asked to enter an email address and a name, followed by an email with
instructions on how to connect to the meeting. Your email address will not be disclosed to
the public. If you wish to make an oral public comment but do not wish to provide your
name, you may enter “Cupertino Resident” or similar designation.
3. When the Chair calls for the item on which you wish to speak, click on “raise hand.”
Speakers will be notified shortly before they are called to speak.
4. When called, please limit your remarks to the time allotted and the specific agenda topic.
ROLL CALL
APPROVAL OF MINUTES
1.Subject: Approve the October 28, 2021 Administrative Hearing Minutes
Recommended Action: Approve the October 28, 2021 Administrative Hearing Minutes
1 - Draft Minutes
POSTPONEMENTS
Page 2
AH 09-22-2022
2 of 42
Administrative Hearing Agenda September 22, 2022
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the Committee on any matter
within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3)
minutes. In most cases, State law will prohibit the Commission from making any decisions with respect
to a matter not on the agenda.
PUBLIC HEARINGS
2.Subject: Development Permit and Architectural and Site Approval Permit for a 561
square foot addition to an existing commercial building located at 19900 Stevens Creek
Boulevard. (Application No(s).: DP-2022-003; ASA-2022-005; Applicant: Kevin Tallman,
Shane Co.; Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-038)
Recommended Action: That the Hearing Officer adopt the draft resolutions
(Attachments 1 - 2) to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Development Permit, and Architectural and Site Approval Permit
Staff Report
1 - Draft Resolution for DP-2022-003
2 - Draft Resolution for ASA-2022-005
3 - Plan Set
4 - Rendering Package
OLD BUSINESS
NEW BUSINESS
STAFF AND COMMITTEE REPORTS
FUTURE AGENDA SETTING
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this
meeting who is visually or hearing impaired or has any disability that needs special assistance should
call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for
assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and
writings distributed for the meeting that are public records will be made available in the appropriate
alternative format.
Any writings or documents provided to a majority of the members after publication of the agenda will
be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at
10300 Torre Avenue, Cupertino, California 95014, during normal business hours.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section
Page 3
AH 09-22-2022
3 of 42
Administrative Hearing Agenda September 22, 2022
2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff
concerning a matter on the agenda are included as supplemental material to the agendized item. These
written communications are accessible to the public through the City’s website and kept in packet
archives. Do not include any personal or private information in written communications to the City
that you do not wish to make public, as written communications are considered public records and will
be made publicly available on the City website.
Members of the public are entitled to address the members concerning any item that is described in the
notice or agenda for this meeting, before or during consideration of that item. If you wish to address the
members on any other item not on the agenda, you may do so during the public comment.
Page 4
AH 09-22-2022
4 of 42
CITY OF CUPERTINO
Agenda Item
22-11430 Agenda Date: 9/22/2022
Agenda #: 1.
Subject: Approve the October 28, 2021 Administrative Hearing Minutes
Approve the October 28, 2021 Administrative Hearing Minutes
CITY OF CUPERTINO Printed on 9/15/2022Page 1 of 1
powered by Legistar™
AH 09-22-2022
5 of 42
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE ADMINISTRATIVE HEARING REGULAR MEETING
HELD OCTOBER 21, 2021
CALL TO ORDER
Hearing officer Albert Salvador opened the meeting at 5:04 p.m.
ROLL CALL
Staff present: Albert Salvador, Assistant Community Development Director
Erick Serrano, Senior Planner
Outside attendee(s): Rebecca Tolentino
Brice Colton
APPROVAL OF MINUTES
1. Subject: Approve the July 22, 2021 Administrative Hearing meeting minutes
Recommended Action: Approve the July 22, 2021 Administrative Hearing meeting minutes
Minutes of the July 22, 2021 minutes were approved as written.
POSTPONEMENTS – None
ORAL COMMUNICATIONS – None
WRITTEN COMMUNICATIONS – None
CONSENT CALENDAR – None
PUBLIC HEARINGS
2. Subject: Architectural and Site Approval to consider exterior and landscape alterations to an existing
office building, and a Tree Removal Permit to allow for the removal of six (6) development trees.
(Application No(s).: ASA-2021-002, TR-2021-037; Applicant: Brice Colton (Habitec Architecture);
Location 18920-18922 Forge Dr.: (APN: 316-09-030)
Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachments 1 and 2) to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Architectural and Site Approval Permit (ASA-2021-002) and the Tree Removal
Permit (TR-2021-037).
Staff member Serrano provided a presentation and brief overview of proposed modifications. As
condition of approval, applicant will need to apply for updated permit if applicant wishes to use the
interior storage space as an additional functional office area.
Hearing officer opened the public comment period and, seeing no hands raised, closed the public
comment period.
AH 09-22-2022
6 of 42
2
Hearing officer asked questions regarding parking and access to the proposed outdoor patio space, and
concurred with Staff’s findings.
DECISION: The application was approved by the Hearing Officer with no changes to the recommended
actions.
OLD BUSINESS – None
NEW BUSINESS – None
STAFF UPDATES AND COMMISSION REPORTS – None
FUTURE AGENDA – None
ADJOURNMENT:
The meeting was adjourned at 5:24 p.m. to the next regularly scheduled meeting.
Respectfully submitted:
/s/Cyrah Caburian___
Cyrah Caburian
Administrative Assistant
AH 09-22-2022
7 of 42
CITY OF CUPERTINO
Agenda Item
22-11356 Agenda Date: 9/22/2022
Agenda #: 2.
Subject: Development Permit and Architectural and Site Approval Permit for a 561 square foot
addition to an existing commercial building located at 19900 Stevens Creek Boulevard. (Application
No(s).: DP-2022-003; ASA-2022-005; Applicant: Kevin Tallman, Shane Co.; Location: 19900 Stevens
Creek Blvd.; APN(s): 369-05-038)
That the Hearing Officer adopt the draft resolutions (Attachments 1 - 2) to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Development Permit, and Architectural and Site Approval Permit
CITY OF CUPERTINO Printed on 9/15/2022Page 1 of 1
powered by Legistar™
AH 09-22-2022
8 of 42
ADMINISTRATIVE HEARING STAFF REPORT
Meeting Date: September 22, 2020
Subject
Development Permit and Architectural and Site Approval for a 561 square foot addition
to an existing commercial building located at 19900 Stevens Creek Boulevard.
(Application No(s).: DP-2022-003; ASA-2022-005; Applicant: Kevin Tallman, Shane Co.;
Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-038)
Recommended Action
That the Hearing Officer adopt the draft resolutions (Attachments 1 – 2) to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Development Permit, and Architectural and Site Approval Permit
Discussion
Project Data:
General Plan Designation Office/Commercial/Residential
General Plan Special Area Central Stevens Creek Sub-area of the Heart of the City
Special Area
Zoning Designation P(CG, Res)
Lot Size 83,766 sq. ft. (no change)
Allowed Existing Proposed
Floor Area N/A 28,813 SF 29,374 SF
Building Height 45 feet 20’-1” 33’-3”
Setbacks Required Existing Proposed
Front 35 feet from
back of curb 50’-6” No change (flush
with existing)
Side (Greater of one-half
(1/2) times height of
building, or ten (10) feet)
10’-8” West side - 11’-1”
East side - 71’-10”
No change (flush
with existing)
Rear (Greater of one and
one-half (1.5) times height
of building or 20 feet)
30’-11” 117 feet No change
AH 09-22-2022
9 of 42
DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022
ASA-2022-005 Page 2
Project Consistency With:
General Plan Yes
Zoning Yes
Environmental
Assessment
Categorically Exempt per Section 15301 and 15332 (Class
1) of the California Environmental Quality Act (CEQA)
Background:
The property is located south
of Stevens Creek Blvd,
between S. Blaney and S.
Portal Avenues. The
property is located within the
Central Stevens Creek sub-
area of the Heart of the City
Special Area, which serves as
the main commercial
corridor in the City. The
property is currently
occupied by Keller Williams,
Shane Co. Jewelers, and
Dance Academy USA. The
site is surrounded by other
commercial and commercial office uses (Cort Furniture, Pacific Workplaces, Travigne
retail) to the north, single family residences to the south, a condominium complex to the
east, and commercial uses (Arya Restaurant, a bank and a gas station) to the west.
Application Summary
The applicant, Kevin Tallman of Shane Co., is requesting to add 561 square feet to the
existing commercial building and improve the tenant façade.
Analysis:
Development Permit
The applicant is proposing to add 561 square feet to the northeast corner at the front of
the building, expanding over existing landscape area by adding a tower element with a
skylight to accommodate a “Diamond Viewing Area” within the added space. The
addition will be flush with both the existing north and east elevations, maintaining the
current setbacks. See Figure 2 below for a partial site plan, and Figure 3 for the proposed
floor plan. The project site currently meets the Heart of the City’s common open space
standards. There is no reduction in the common open space area as part of this proposal.
Figure 1: Site aerial
STEVENS CREEK BLVD BLANEY AVENUE PORTAL AVENUE AH 09-22-2022
10 of 42
DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022
ASA-2022-005 Page 3
This 561 square feet addition will reduce the commercial development allocation within
the Heart of the City Special Area. Currently, it has 839,994 square feet available and with
the approval of this application, the available balance will be 839,433 square feet.
Architectural and Site Approval
The addition (see area highlighted red in Figures 2 & 3 above) is proposed to enhance the
façade by adding a tower element with a skylight above the new addition, as well as a
smaller tower entry feature to accentuate the main entrance to the tenant space.
The design team for Shane Co. propose to integrate the “Diamond Viewing Area”
addition and façade upgrade to complement the existing contemporary architectural
style. The materials chosen consists of natural stone, wood, and frosted glass, particularly
Figure 2: Partial Site Plan indicating the proposed expansion (circled in red).
Figure 3: Shane Co. floor plan with the proposed expansion (circled in red).
AH 09-22-2022
11 of 42
DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022
ASA-2022-005 Page 4
on the skylight on the top of the main tower. This added glass feature as a primary design
element would also allow customers to view their diamonds in natural light by bringing
them into the daylit room to view the diamond jewelry in a natural setting.
The proposed design adheres to the contemporary style by utilizing clean lines over
straight and harsh lines. The City’s architectural consultant, RRM Design Group, has
reviewed the design and ensured that the tower massing remain prominent, the windows
(particularly along the east façade) are aligned and proportionate, and that the materials
used are compatible with the existing building, while also being durable. This includes
using composite wood, and metal paneling. Please refer to Figures 4 & 5 to compare the
existing and proposed elevations.
The proposed addition is within the 1:1 slope line from the arterial curb as required by
the General Plan. No signs are being approved as part of this application.
Landscaping
In compliance with the City’s C3 requirements, Public Works has conditioned the
applicant to complete a C3 Impervious Surface Data Form to reflect the total new and/or
replaced impervious area. No trees are proposed to be removed with this application.
Parking
Based on the proposed tenant mix of 25% office uses (the maximum allowed in General
Commercial CG zones) and 75% other permitted commercial uses, as well as the added
square footage, the project must provide 114 parking spaces. The applicant proposes 114
Figure 4: Existing (top) and
proposed (bottom) north elevation.
Figure 5: Existing (top) and proposed (bottom) east
elevation.
AH 09-22-2022
12 of 42
DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022
ASA-2022-005 Page 5
vehicular spaces which is adequate. The project must provide 22 Class II bicycle parking
spaces.
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15301 – Existing Facilities and 15332 - In-
Fill Development Projects.
Other Department/Agency Review
The City’s Building Division, Environmental Programs Division, Public Works
Department, Cupertino Sanitary District, and the Santa Clara County Fire Department
have no objections to the project.
Public Noticing And Community Outreach
The following table is a summary of the noticing for this project:
Notice of Public Hearing Agenda
Site Signage (at least 10 days prior to
hearing)
102 notices mailed to property owners
within 300 feet of the project site (at least
10 days prior to the hearing)
Posted on the City's official notice
bulletin board (five days prior to
hearing)
Posted on the City of Cupertino’s Web
site (five days prior to hearing)
No comments have been received at the time of production of this staff report.
Permit Streamlining Act
This project is subject to the Permit Streamlining Act (Government Code Section 65920 –
65964). The City has complied with the deadlines found in the Permit Streamlining Act.
Plans Received: May 9, 2022; Deemed Incomplete: June 9, 2022
Revisions Received: August 9, 2022; Deemed Complete: August 25, 2022
Since this project is Categorically Exempt, the City has 60 days (until October 25, 2022) to
make a decision on the project.
Conclusion
Staff recommends approval of the Development Permit, and Architectural and Site
Approval permit, since the plans and conditions of approval address all concerns related
to the proposed project. Additionally, all applicable findings for approval of the proposed
project, consistent with chapters 19.156, and 19.168 of the Cupertino Municipal Code,
may be made as follows:
AH 09-22-2022
13 of 42
DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022
ASA-2022-005 Page 6
Development Permit
1. The proposed development, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety, general welfare, or convenience;
The current building is a one-story commercial building that is located within the Heart of
the City Special Area that promotes retail and active uses. The zoning district allows the 45
feet tall buildings, while the existing building measures approximately 20 feet. The proposal
will add a tower element that will increase the height of the building to approximately 33 feet.
The project will add 561 square feet, filling in the northeast corner of the existing building.
There are no floor area limitations on development in the Heart of the City Special Area. There
will be minimal change to the massing and no change to the setbacks. Therefore, the proposal
will not be detrimental or injurious to property or improvements in the vicinity.
2. The proposed development will be located and conducted in a manner in accord
with the Cupertino Comprehensive General Plan and the purpose of this title and
complies with the California Environmental Quality Act (CEQA).
The proposed development is in conformance with the Cupertino General Plan and the
proposal has met the development standards specified in the Heart of the City Specific Plan
and the City Municipal Code such as heights, setbacks and landscaping requirements.
Furthermore, the use of the building is proposed to be consistent with the goals of the General
Plan to maintain a commercial core along Stevens Creek Blvd. The project is categorically
exempt from CEQA under Section 15301 since it is an addition to an existing structure of
less than 10,000 sq. ft. Furthermore, since the building is already a developed site and merely
proposes to fill in a corner of the existing building, the project is also categorically exempt
from CEQA under Section 15332 - In-Fill Development Projects.
Architectural and Site Approval
3. The proposed development, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety, general welfare, or convenience;
The applicant proposes to enhance portions of the north and east elevations while adding 561
square feet to fill in the northeast corner of the existing building. The upgrades include a tower
element and enhanced main entrance completed in a contemporary style, and with mate rials
that are considered quality and durable. All the proposed changes are minor improvements to
the existing building and site and will not be detrimental or injurious to property or
improvements in the vicinity.
4. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any
specific plan, zoning ordinances, applicable planned development permit, conditional
AH 09-22-2022
14 of 42
DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022
ASA-2022-005 Page 7
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following specific
criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
There are no changes in building scale except the minor addition of the tower element where
the 561 square foot addition is proposed. The architectural feature will add 13’-6” feet at
the northeast corner of the building, which will be within the 45 foot height limit and under
the required 1:1 slope line of the General Plan. No other height or scale modifications are
proposed that will impact the existing massing.
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments and
provide shielding to prevent spill-over light to adjoining property owners.
Through this proposal the applicant has incorporated existing materials with attractive
contemporary stone, metal, and composite wood elements that are suited and compatible
with the character of the area. Existing mature trees are proposed to be retained. Outdoor
lighting incorporates appropriate shielding and is designed to meet the dark-sky
requirements of the Municipal Code.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
There is currently a ground sign located within the front setback area and no modifications
are proposed. At this point, no signs are approved as part of this project.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
AH 09-22-2022
15 of 42
DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022
ASA-2022-005 Page 8
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
This application is not a new project and will maintain the existing buffering and setbacks
established adjacent to the existing residential neighborhoods.
Next Steps
The permit will be effective 14 calendar days from the date of the hea ring. The decision
of the Administrative Hearing Officer is final, unless appealed within 14 calendar days
from the date of the hearing. The applicant team may apply for building and/or other
permits with the City at the end of the appeal period.
This approval is valid until September 22, 2024. The applicant may apply for a one-time
two-year extension before the approval expires.
Prepared by: Gian Paolo Martire, Senior Planner
Reviewed and Approved for submission by: Piu Ghosh, Planning Manager
ATTACHMENTS
1. Draft Resolution for DP-2022-003
2. Draft Resolution for ASA-2022-005
3. Plan Set
4. Rendering Package
AH 09-22-2022
16 of 42
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO.
OF THE ADMINISTRATIVE HEARING OFFICER
OF THE CITY OF CUPERTINO APPROVING A DEVELOPMENT
PERMIT TO ALLOW A 561 SQUARE FEET ADDITION TO AN EXISTING
BUILDING FOR COMMERCIAL USES LOCATED
AT 19900 STEVENS CREEK BLVD.
SECTION I: PROJECT DESCRIPTION
Application No.: DP-2022-003
Applicant: Kevin Tallman
Location: 19900 Stevens Creek Blvd. (APN 369-05-038)
SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT:
WHEREAS, the City of Cupertino received an application for a Development Permit to
consider allowing a 561 square feet addition to an existing retail building for commercial
uses, as described in Section I. of this Resolution; and
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting in regard to the application; and
WHEREAS, pursuant to the provisions of the California Environmental Quality Act of
1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State
CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.)
(hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed
Project and has determined that the Project is exempt from environmental review
pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for
the reasons set forth in the staff report dated September 22, 2022 and incorporated herein;
and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
AH 09-22-2022
17 of 42
Resolution No. DP-2022-003 September 22, 2022
Page 2
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
1. The proposed development, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety, general welfare, or convenience;
The current building is a one-story commercial building that is located within the Heart of
the City Special Area that promotes retail and active uses. The zoning district allows the 45
feet tall buildings, while the existing building measures approximately 20 feet. The proposal
will add a tower element that will increase the height of the building to approximately 33
feet. The project will add 561 square feet, filling in the northeast corner of the existing
building. There are no floor area limitations on development in the Heart of the City Special
Area. There will be minimal change to the massing and no change to the setbacks. Therefore,
the proposal will not be detrimental or injurious to property or improvements in the
vicinity.
2. The proposed development will be located and conducted in a manner in accord
with the Cupertino Comprehensive General Plan and the purpose of this title and
complies with the California Environmental Quality Act (CEQA).
The proposed development is in conformance with the Cupertino General Plan and the
proposal has met the development standards specified in the Heart of the City Specific Plan
and the City Municipal Code such as heights, setbacks and landscaping requirements.
Furthermore, the use of the building is proposed to be consistent with the goals of the
General Plan to maintain a commercial core along Stevens Creek Blvd. The project is
categorically exempt from CEQA under Section 15301 since it is an addition to an existing
structure of less than 10,000 sq. ft. Furthermore, since the building is already a developed
site and merely proposes to fill in a corner of the existing building, the project is also
categorically exempt from CEQA under Section 15332 - In-Fill Development Projects.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimo ny, staff’s report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 2 thereof,:
The application for a Development Permit, Application no. DP-2022-003 is hereby
approved and that the subconclusions upon which the findings and conditions specified
in this resolution are based and contained in the Public Hearing recor d concerning
Application no. DP-2022-003 as set forth in the Minutes of the Administrative Hearing
Meeting of September 22, 2022 and are incorporated by reference as though fully set forth
herein.
AH 09-22-2022
18 of 42
Resolution No. DP-2022-003 September 22, 2022
Page 3
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by Stacey Hall titled “Shane Co. Exterior
Improvements” consisting of five (5) sheets labeled G0.0, G0.1, and A-1 – A-3, except
as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
first page of the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. ASA-2019-006 and TR-2019-032 shall
be applicable to this approval.
5. DEVELOPMENT ALLOCATION
The applicant shall receive an allocation of 561 square feet of the retail commercial
allocations from the Heart of the City Special Area.
6. BELOW MARKET RATE PROGRAM
The applicant shall participate in the City’s Below Market Rate (BMR) Housing
Program by paying the Below Market Rate linkage fee for Commercial use concurrent
with issuance of building permits at the rate in effect at that time. The current fee is
$13.52 per net new square feet (~561 sq.ft.) for commercial use.
7. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
AH 09-22-2022
19 of 42
Resolution No. DP-2022-003 September 22, 2022
Page 4
8. BUILDING AND FIRE CODE
The applicant shall apply for and obtain building permits to allow the construction of
the approved project. The applicant shall provide information and plans to allow the
Building Official and the Fire Marshall or their designee that the proposed plans
comply with Building and Fire Codes in effect at the time of application for a building
permit.
9. CONSTRUCTION MANAGEMENT PLAN
A construction management plan shall be prepared by the applicant and approved by
staff prior to issuance of building permits. Staging of construction equipment shall
not occur within 40 feet of any residential property.
10. SCREENING
All mechanical and other equipment on the building or on the site shall be screened
so they are not visible from public street areas or adjoining developments. Screening
materials/colors shall match building features and materials. The height of the
screening shall be taller than the height of the mechanical equipment that it is
designed to screen. The location of equipment and necessary screening shall be
reviewed and approved by the Director of Community Development prior to issuance
of building permits.
11. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a. All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b. Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c. Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m.
and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed
on holidays as defined in Chapter 10.48 of the Municipal Code. Night time
construction is allowed if compliant with nighttime standards of Section 10.48 of
the Cupertino Municipal Code.
e. Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
AH 09-22-2022
20 of 42
Resolution No. DP-2022-003 September 22, 2022
Page 5
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f. The applicant shall be responsible for educating all contractors and subcontractors
of said construction restrictions.
The applicant shall comply with the above grading and construction hours and noise
limit requirements unless otherwise indicated.
12. BAAQMD BASIC CONTROL MEASURES (DUST CONTROL)
Project shall comply with the Bay Area Quality Management District’s Basic
Construction Mitigation Measures as follows:
a. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas,
and unpaved access roads) shall be watered two times per day.
b. All haul trucks transporting soil, sand, or other loose material off -site shall be
covered.
c. All visible mud or dirt tracked-out onto adjacent public roads shall be removed
using wet power vacuum street sweepers at least once per day. The use of dry
power sweeping is prohibited.
d. All vehicle speeds on unpaved roads shall be limited to 15 mph.
e. All roadways, driveways, and sidewalks to be paved shall be completed as soon
as possible. Building pads shall be laid as soon as possible after grading unles s
seeding or soil binders are used.
f. Idling times shall be minimized either by shutting equipment off when not in use
or reducing the maximum idling time to 5 minutes (as required by the California
airborne toxics control measure Title 13, Section 2485 of C alifornia Code of
Regulations [CCR]). Clear signage shall be provided for construction workers at
all access points.
g. All construction equipment shall be maintained and properly tuned in accordance
with manufacturer’s specifications. All equipment shall be checked by a certified
mechanic and determined to be running in proper condition prior to operation.
h. A publicly visible sign shall be posted with the telephone number and person to
contact at the City of Cupertino regarding dust complaints. This person sha ll
respond and take corrective action within 48 hours. The BAAQMD phone number
shall also be visible to ensure compliance with applicable regulations.
Applicant shall indicate compliance with BAAQMD’s basic control measures on
all demolition, construction and grading permits and construction management
plan(s).
13. NOISE AND VIBRATION NOTICE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall send notices of the
AH 09-22-2022
21 of 42
Resolution No. DP-2022-003 September 22, 2022
Page 6
planned activity by first class mail to off-site businesses and residents within 500 feet
of the project site. The City will provide a template notice and mailing addresses for
the Applicant’s use. The notice must be approved by City staff prior to sending. The
project applicant shall provide the City with evidence of mailing of the notice, upon
request.
Please note that, if pile driving, the requirements for noticing and monitoring outlined
in City Code Section 17.04.050 G (3) shall apply.
14. NOISE AND VIBRATION SIGNAGE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least four feet by six feet shall be posted on construction fencing at the
entrance(s) to the job site, clearly visible to the public, and include the following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
c. Telephone numbers of the City’s and contractor’s authorized representatives that
are assigned to respond in the event of a noise or vibration complaint; and
d. Contact information for City’s and contractor’s authorized representatives that are
assigned to respond in the event of a complaint related to fugitive dust, pursuant
to the requirements for compliance with BAAQMD’s CEQA Air Quality
Guidelines.
If the authorized contractor’s representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
15. NOISE DURING CONSTRUCTION
Prior to issuance of any demolition, grading or building permit, include on plans a
note that, during project construction, the project applicant shall incorporate the
following measures to reduce noise during construction and demolition activity:
a. The project applicant and contractors shall prepare and submit a Construction
Noise Control Plan to the City’s Planning Department for review and approval
prior to issuance of the first permit. The Construction Noise Plan shall demonstrate
compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48
(Community Noise Control) of Cupertino Municipal Code. The details of the
Construction Noise Control Plan shall be included in the applicable construction
documents and implemented by the on-site Construction Manager. Noise
reduction measures selected and implemented shall be based on the type of
construction equipment used on the site, distance of construction activities from
sensitive receptor(s), site terrain, and other features on and surrounding the site
AH 09-22-2022
22 of 42
Resolution No. DP-2022-003 September 22, 2022
Page 7
(e.g., trees, built environment) and may include, but not be limited to, temporary
construction noise attenuation walls, high quality mufflers. During the entire
active construction period, the Construction Noise Control Plan shall demonstrate
that compliance with the specified noise control requirements for construction
equipment and tools will reduce construction noise in compliance with the City’s
daytime and nighttime decibel limits.
b. Select haul routes that avoid the greatest amount of sensitive use areas and submit
to the City of Cupertino Public Works Department for approval prior to the start
of the construction phase.
c. Signs will be posted at the job site entrance(s), within the on-site construction
zones, and along queueing lanes (if any) to reinforce the prohibition of
unnecessary engine idling. All other equipment will be turned off if not in use for
more than 5 minutes.
d. During the entire active construction period and to the extent feasible, the use of
noise producing signals, including horns, whistles, alarms, and bells will be for
safety warning purposes only. The construction manager will use smart back -up
alarms, which automatically adjust the alarm level based on the background noise
level or switch off back-up alarms and replace with human spotters in compliance
with all safety requirements and law.
16. FUGITIVE DUST CONTROL
Prior to issuance of the any demolition, grading, or building permit, include on all
permit plans, the full text of each of the Bay Area Air Quality Management District’s
Basic Control Measures from the latest version of BAAQMD’s CEQA Air Quality
Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive
dust (i.e., particulate matter PM2.5 and PM10) during demolition, ground disturbing
activities and/or construction.
17. DARK SKY COMPLIANCE
Prior to issuance of Building Permits, the applicant/property owner shall submit final
plans in compliance with the approved lighting plans to comply with development
standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting
Requirements. In the event changes are proposed from the approved plans, said
changes must be reviewed and approved by the Director of Community Development
or their designee. The applicant shall provide all documentation required to
determine compliance with the Municipal Code.
18. INDEMNIFICATION AND LIMITATION OF LIABILITY
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless
AH 09-22-2022
23 of 42
Resolution No. DP-2022-003 September 22, 2022
Page 8
the City, its City Council, and its officers, employees, and agents (collectively, the
“indemnified parties”) from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
“proceeding”) brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant related to any Ordinance,
Resolution, or action approving the project, the related entitlements, environmental
review documents, finding or determinations, or any other permit or approval
authorized for the project. The indemnification shall include but not be limited to
damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’
fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or
bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and
costs shall include amounts paid to the City’s outside counsel and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City. The applicant shall
likewise agree to indemnify, defend, and hold harmless the indemnified parties from
and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees
awarded under Code of Civil Procedure section 1021.5, assessed or awarded against
the indemnified parties. The Applicant shall cooperate with the City to enter a
Reimbursement Agreement to govern any such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
19. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
AH 09-22-2022
24 of 42
Resolution No. DP-2022-003 September 22, 2022
Page 9
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT.
20. C3 IMPERVIOUS DATA FORM
Complete a C.3. Impervious Surface Data Form to reflect the total new and/or
replace impervious area.
21. GRADING & DRAINAGE
Show proposed drainage patterns using arrows, flow lines and/or slope percentage.
No concentrated flow is permitted across the right-of-way and no drainage is
permitted to flow to neighboring properties. Direct on-site drainage through
landscaped swales and allow drainage towards the public street.
SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE
DEPT.
22. REQUIRED FIRE FLOW
The fire flow for this project is 4750 GPM at 20 psi residual pressure. Since
an automatic fire sprinkler system is installed, the fire flow will be reduced by 75%,
establishing a required adjusted fire flow of 1,188 GPM at 20 psi residual pressure.
Note: The minimum required number and spacing of the hydrants shall be in
accordance with CFC Table C102.1. Letter received. Hydrant is capable of meeting
required fire flow.
23. FIRE SPRINKLER MODIFICATION REQUIRED
Provide submittal to SCCFD for installation of each of the systems listed below, per
CFC Chapter 1 and 9. Submit shop drawings (3 sets) and a permit application to the
SCCFD for approval before altering the system.
24. FIRE ALARM MODIFICATION REQUIRED
Any modifications to the existing fire alarm system re quires drawings and a permit
application be submitted to SCCFD for approval before any install or alteration
occurs.
PASSED AND ADOPTED this 22nd day of September 2022 at a noticed Public Meeting
of the Administrative Hearing Officer of the City of Cupertino, State of California, held
by the Director of Community Development, or his or her designee, pursuant to
Cupertino Municipal Code Section 19.12.120.
ATTEST: APPROVED:
_________ ________
AH 09-22-2022
25 of 42
Resolution No. DP-2022-003 September 22, 2022
Page 10
Gian Paolo Martire Albert Salvador
Senior Planner Administrative Hearing Officer
AH 09-22-2022
26 of 42
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO.
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO APPROVING AN ARCHITECTURAL AND SITE
APPROVAL PERMIT TO ALLOW FAÇADE IMPROVEMENTS
TO AN EXISTING COMMERICAL BUILDING
LOCATED AT 19900 STEVENS CREEK BLVD.
SECTION I: PROJECT DESCRIPTION
Application No.: ASA-2022-005
Applicant: Kevin Tallman
Location: 19900 Stevens Creek Blvd. (APN 369-05-038)
SECTION II: FINDINGS
WHEREAS, the City of Cupertino received an application for an Architectural and Site
Approval to consider allowing modifications to the exterior building materials and
landscaping for an existing retail building, as described in Section I. of this Resolution;
and
WHEREAS, the necessary public notices have been given as required by the Cupertino
Municipal Code, and the Administrative Hearing Officer has held at least one public
meeting with regard to the application; and
WHEREAS, pursuant to the provisions of the California Environmental Quality Act of
1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State
CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.)
(hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed
Project and has determined that the Project is exempt from environmental review
pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for
the reasons set forth in the staff report dated September 22, 2022 and incorporated herein;
and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
AH 09-22-2022
27 of 42
Resolution No. ASA-2022-005 September 22, 2022
Page 2
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
1. The proposal, at the proposed location, will not be detrimental or injurious to property
or improvements in the vicinity, and will not be detrimental to the public health,
safety, general welfare, or convenience;
The applicant proposes to enhance portions of the north and east elevations while adding
561 square feet to fill in the northeast corner of the existing building. The upgrades include
a tower element and enhanced main entrance completed in a contemporary style, and with
materials that are considered quality and durable. All the proposed changes are minor
improvements to the existing building and site and will not be detrimental or injurious to
property or improvements in the vicinity.
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any
specific plan, zoning ordinances, applicable planned development permit, conditional
use permits, variances, subdivision maps or other entitlements to use which regulate
the subject property including, but not limited to, adherence to the following specific
criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
There are no changes in building scale except the minor addition of the tower element where
the 561 square foot addition is proposed. The architectural feature will add 13’-6” feet at
the northeast corner of the building, which will be within the 45 foot height limit and under
the required 1:1 slope line of the General Plan. No other height or scale modifications are
proposed that will impact the existing massing.
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments and
provide shielding to prevent spill-over light to adjoining property owners.
AH 09-22-2022
28 of 42
Resolution No. ASA-2022-005 September 22, 2022
Page 3
Through this proposal the applicant has incorporated existing materials with attractive
contemporary stone, metal, and composite wood elements that are suited and compatible
with the character of the area. Existing mature trees are proposed to be retained. Outdoor
lighting incorporates appropriate shielding and is designed to meet the dark-sky
requirements of the Municipal Code.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
There is currently a ground sign located within the front setback area and no modifications
are proposed. At this point, no signs are approved as part of this project.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
This application is not a new project and will maintain the existing buffering and setbacks
established adjacent to the existing residential neighborhoods.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 3 thereof,
The application for an Architectural and Site Approval, Application no. ASA-2022-005 is
hereby approved and that the subconclusions upon which the findings and conditions
specified in this resolution are based and contained in the Public Meeting record
concerning Application no. ASA-2022-005 as set forth in the Minutes of the
Administrative Hearing Meeting of September 22, 2022 and are incorporated by reference
as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by Stacey Hall titled “Shane Co. Exterior
Improvements” consisting of five (5) sheets labeled G0.0, G0.1, and A-1 – A-3, except
as may be amended by conditions in this resolution.
AH 09-22-2022
29 of 42
Resolution No. ASA-2022-005 September 22, 2022
Page 4
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or
construction records. Any misrepresentation of any property data may invalidate
this approval and may require additional review.
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. DP-2022-003 shall be applicable
to this approval.
4. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on
the first page of the building plans.
5. EXTERIOR BUILDING MATERIALS/TREATMENTS
a. The final building exterior plan shall closely resemble the details shown on the
original approved plans.
b. No fencing is approved within the front setback area.
c. All final building exterior treatment plan (including but not limited to details
on exterior color, materials, architectural treatments, doors, windows, lighting
fixtures, and/or embellishments) shall be reviewed and approved by the
Director of Community Development prior to issuance of building permits to
ensure quality and consistency.
d. Any exterior changes determined to be substantial by the Director of
Community Development shall either require a modification to this permit or
a new permit based on the extent of the change.
6. WINDOW DETAILS
All storefront windows shall be kept open and transparent to the greatest extent
possible. The final storefront design and window display shall be reviewed and
approved by the Director of Community Development prior to issuance of
building permits for tenant improvements. No changes shall be made to the
transparency of the windows without the express approval of the Director of
Community Development.
7. BICYCLE PARKING
In accordance with CMC Chapter 19.124 Parking, applicant is to provide 22 Class
II bicycle parking spaces.
AH 09-22-2022
30 of 42
Resolution No. ASA-2022-005 September 22, 2022
Page 5
8. SIGNAGE
Signage is not approved with this application. Signage shall conform to the City
Sign Code.
9. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum
extent feasible subject to the Building Official. The applicant shall provide
evidence that materials were recycled prior to occupancy.
10. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies
with regard to the proposed project for additional conditions and requirements.
Any misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
11. INDEMNIFICATION AND LIMITATION OF LIABILITY
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless
the City, its City Council, and its officers, employees, and agents (collectively, the
“indemnified parties”) from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
“proceeding”) brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant related to any Ordinance,
Resolution, or action approving the project, the related entitlements, environmental
review documents, finding or determinations, or any other permit or approval
authorized for the project. The indemnification shall include but not be limited to
damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’
fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or
bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and
costs shall include amounts paid to the City’s outside counsel and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City. The applicant shall
likewise agree to indemnify, defend, and hold harmless the indemnified parties from
and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees
awarded under Code of Civil Procedure section 1021.5, assessed or awarded against
AH 09-22-2022
31 of 42
Resolution No. ASA-2022-005 September 22, 2022
Page 6
the indemnified parties. The Applicant shall cooperate with the City to enter a
Reimbursement Agreement to govern any such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
12. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions.
PASSED AND ADOPTED this 22nd day of September 2022 at a noticed Public Meeting
of the Administrative Hearing Officer of the City of Cupertino, State of California, held
by the Director of Community Development, or his or her designee, pursuant to
Cupertino Municipal Code Section 19.12.120.
ATTEST: APPROVED:
Gian Martire Albert Salvador
Senior Planner Administrative Hearing Officer
AH 09-22-2022
32 of 42
SHANE CO.
CUPERTINO
DESIGN REVIEW
DRAWINGS
4.20.2022
19900 STEVENS
CREEK BLVD. -
CUPERTINO, CA
PROJECT TEAM
SHANE, CO.
CONTACT: KEVIN TALLMAN
PH: 720.874.2791
EMAIL: KEVIN.TALLMAN@WSMCORP.COM
OWNER / APPLICANT
STACEY HALL
5732 CAMAS CT.
POLLOCK PINES, CA 95726
PH: 510.220.1193
EMAIL: SBOWEN505@YAHOO.COM
ARCHITECT
VICINITY MAPPROJECT INFORMATION
BUILDING INFORMATION DEFERRED / SEPARATE PERMITS
SITE INFORMATION
2019 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R.
2019 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.
2019 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.
2019 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R.
2019 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R.
2019 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.
2019 CALIFORNIA FIRE CODE, PART 9, TITLE 24 C.C.R.
2019 CALIFORNIA GREEN BUILDING STANDARDS CODE (CAL GREEN), PART
11, TITLE 24 C.C.R.
APPLICABLE CODES
SCOPE OF WORK
THE SCOPE OF WORK INCLUDED HEREIN INCLUDES TENANT EXTERIOR
IMPROVEMENTS. IMPROVEMENTS INCLUDE A NEW, 560 SF ADDITION AND
TOWER ELEMENT, A NEW MAIN ENTRY TOWER ELEMENT AND NEW EXTERIOR
FINISHES ON THE NORTH-EAST CORNER OF THE EXISTING STRUCTURE
LOCATED AT 19900 STEVENS CREEK BLVD.
CONSTRUCTION TYPE:VB
NUMBER OF STORIES:1-STORY
OVERALL BUILDING AREA: 28,813 SF
ADDITION AREA:561 SF
OCCUPANCY TYPES:M / B / S-1 (ACCESSORY_
FIRE SPRINKLER: YES (IN ACCORDANCE WITH 903.3.1.1)
FIRE ALARM:YES
TOTAL BUILDING OCCUPANTS: 258
ASSESSOR'S PARCEL:369-05-044
ZONING CODE USE:P (CG, RES)
LOT AREA:83,766 SF
PROJECT LOCATION
.GENERAL.
G0.0 COVER SHEET
G0.1 SYMBOLS AND ABBREVIATIONS
.ARCHITECTURAL.
A-1 SITE PLAN
A-2 FLOOR PLAN - PROPOSED
A-3 EXTERIOR ELEVATIONS
BENJAMIN TALPOSREVISIONS:
C-31704
8/8/2022 1:09:52 PME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022
SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGCOVER SHEETG0.0STACEY HALL
19900 STEVENS CREEK BLVD., CUPERTINO, CASHEET INDEX
3 8/8/2022 PLANNING RESPONSE
3
AH 09-22-2022
33 of 42
GENERAL SYMBOLS
SHEET ON WHICH DRAWN
REVISION NUMBER
WALL TYPE
SPECIALTY DOOR
DOOR NUMBER
ROOM NUMBER
COLUMN LINE
LEGEND/KEY NOTE
BUILDING ELEVATION
INTERIOR ELEVATION
DETAIL REFERENCE
WALL SECTION
CROSS REFERENCE
DETAIL NUMBER
(CONTINUOUS BLOCKING)
BATT INSULATION
RIGID INSULATION
CARPET (LARGE SCALE)
TILE (LARGE SCALE)
ACOUSTICAL TILE (LARGE SCALE)
PROTECTION BOARD
CONCRETE MASONRY UNIT
METAL STUDS
STEEL (LARGE SCALE)
(LARGE SCALE)
GYPSUM WALL BOARD
PLYWOOD (LARGE SCALE)
BRICK VENEER
SHINGLES
STONE
GLASS
(TRIM/FINISH)
WOOD
(NON-CONTINUOS BLOCKING)
WOOD
GRAVEL/BALLAST
WOOD
GYM FLOOR
STEEL
PRECAST CONCRETE
CONCRETE
SAND
EARTH
CASEWORK
ELEVATION
SIMILAR OR TYPICAL REFERENCE
SIMILAR OR TYPICAL REFERENCE
NO
DESCRIPTION
101
???
?SIM
BUILDING SECTION
?
?
ROOM NAME
???
?
???
SIM
?
???
SIM
?
???
SIM ?
???
SIM
XX/ A11.X
??EastWINDOW / STOREFRONT
NUMBER???
1i
1. SCOPE DOCUMENTS: THESE DRAWINGS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF
ARCHITECTURAL DESIGN CONCEPT, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTRUAL ELEMENTS
AND THE TYPE OF STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS. ON THE BASIS OF THE GENERAL SCOPE
INDICATED OR DEXRIBED, THE CONTRACTOR SHALL FURNISH ALL ITESM REQUIRED FOR THE PROPER EXECUTION
AND COMPLETION OF THE WORK. DECISIONS OF THE ARCHITECT AS TO THE ITEMS OF WORK INCLUDED WITHIN THE
SCOPE OF THESE DOCUMENTS SHALL BE FINAL AND BINDING ON THE CONTRACTOR AND THE OWNER.
2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE STARTING THE WORK. SHOULD
THE CONTRACTOR BECOME AWARE OF A DISCREPENCY, OR ITEM OF NON-CONFORMANCE, IN THE DRAWINGS OR
SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY BOTH THE ARCHITECT AND THE OWNER AT ONCE FOR
INSTRUCTION. IF CONTRACTOR PROCEEDS WITH THE WORK AFFECTED WITHOUT INSTRUCTION OR APPROVAL
FROM THE ARCHITECT AND OWNER, THE CONTRACTOR SHALL PROCEED AT THEIR OWN RISK AND SHALL MAKE
GOOD ANY RESULTING DAMAGE OR DEFECT TO THE SATISFACTION OF THE ARCHITECT. SHOULD A CONFLICT
OCCUR ON OR BETWEEN THE DRAWINGS AND SPECIFICATIONS, THE CONTRACTOR IS DEEMED TO HAVE ESTIMATED
THE MOST EXPENSIVE MATERIAL AND/OR CONSTRUCTION METHOD INVOLVED, UNLESS A WRITTEN DECISION FROM
THE ARCHITECT HAS BEEN OBTAINED WHICH DESCRIBES AND ALTERNATE METHOD AND/OR MATERIAL. CONTRACTO
SHALL ALSO NOTIFY THE ARCHITECT OF ANY SUCH DISCREPENCY IMMEDIATELY.
3. ALL CONSTRUCTION AND MATERIALS SHALL BE AS SPECIFICED AND AS REQUIRED BY THE CURRENT EDITION OF THE
CALIFORNIA BUILDING CODE, CALIFORNIA ELECTRICAL CODE, CALIFORNIA MECHANICAL CODE, CALIFORNIA
PLUMBING CODE, LOCAL CODES AND AUTHORITIES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT OF THE BUILDING ON THE SITE.
5. ALL MATERIAL SOTRES ON THE SITE SHALLBE PROPERLY STACKED AND PROTECTED TO PREVENT DAMAGE AND
DETERIORATION UNTIL USE. FAILURE TO PROTECT MATERIALS MAY BE CASUE FOR REJECTION OF THE WORK.
6. THE CONTRACTOR SHALL CONFINE HIS OPERATIONS ON TEH SITE TO AREAS PERMITTED BY THE OWNER AND IS
DEEMED NECESSARY TO COMPLETE THE WORK. THE JOB SITE SHALL BE MAINTAINED IN A CLEAN, ORDERLY
CONDITION FREE OF DEBRIS AND LITTER, AND SHALL NOT BE UNREASONABLY ENCUMBERED WITH ANY MATERIALS
OR EQUIPMENT. EACH SUBCONTRACTO IMMEDATIATELY UPON COMPLETION OF EACH PHASE OF HIS WORK SHALL
REMOVE ALL TRASH AND DEBRIS AS A RESULT OF HIS OPERATIONS.
7. THE CONTRACTOR SHALL DO ALL CUTTING, FITTING OR PATCHING OF HIS WORK THAT MAY BE REQUIRED TO MAKE
SEVERAL PARTS FIT TOGETHER PROPERLY AND SHALL NOT ENDANGER ANY OTHER WORK BY CUTTING,
EXCAVATING OR OTHERWISE ALTERING THE TOTAL WORK OR ANY PART OF IT. ALL PATCHING, REPAIRING AND
REPLACING OF MATERIALS AND SURFACES, CUT OR DAMAGED IN EXECUTION OF THE WORK, SHALL BE DONE WITH
APPLICABLE MATERIALS SO THAT SURFACES REPLACED WILL, UPON COMPLETION, MATCH SURROUNDING SIMILAR
SURFACES.
8. NO PORTION OF THE WORK REQUIRING A SHOP DRAWING OR SAMPLE SUBMISSION, AS OUTLINED BY THE
SPECIFICATIONS, SHALL BE COMMENCED UNTIL THE SUBMISSION HAS BEEN APPROVED BY THE ARCHITECT. ALL
SUCH PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH THE APPROVED SHOP DRAWINGS AND SAMPLES.
CONTRACTOR TO REVIEW AND APPROVED THAT ALL SAMPLES, SHOP DRAWINGS, DIAGRAMS, ETC. ARE IN
CONFORMANCE WITH THE CONTRACT DOCUMENTS PRIOR TO SENDING TO THE ARCHITECT FOR REVIEW.
9. PROVIDE ALL NECESSARY BLOCKING, BACKING AND FRAMING FOR LIGHT FIXTURES, ELECTRICAL UNITS, A.C.
EQUIPMENT AND ALL OTHER ITEMS AS REQUIRED.
10. WHERE LARGER SUTDS OR FURRINGS ARE REQUIRED TO COVER DUCTS, PIPING AND CONDUITS, THE LARGER STUD
SIZE OR FURRING SHALL EXTEND TO THE FULL SURFACE OF THE WALL WIDTH AND LENGTH WHERE THE FURRING
OCCURS.
11. DETAILS MARKED AS "TYPICAL" SHALL APPLY IN ALL INSTANCES U.N.O.
12. CONTRACTOR TO VERIFY HOURS OF CONSTRUCTION WITH J.H.A. AND OWNER PRIOR TO WORK COMMENCING.
1. GENERAL: CONSTRUCTION SHALL COMPLY WITH THE AIR LEAKAGE REQUIREMENTS OF THE CALIFORNIA
ADMINISTRATIVE CODE, TITLE 24, PART 6, DIVISION T20, CHAPTER 2, SUBCHAPTER 4, ARTICLE 2, SECTION
T20-1495-1495 FOR WINDOWS, DOORS, CAULKING AND SEALING.
2. CAUKLING AND SEALING: OPEN EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, BETWEEN WALL AND
FOUNDATION, BETWEEN WALL AND ROOF, BETWEEN WALL PANELS, AT PENETRATIONS OF UTILITY SERVICES
THROUGH WALLS, FLOORS AND ROOF, AND ALL OTHER OPENINGS IN THE EXTERIOR ENVELOPE SHALL BE SEALED,
CAULKED, GASKETED OR WEATHERSTRIPPED TO LIMIT AIR LEAKAGE.
3. WINDOWS: FIXED WINDOWS CONSTRUCTION AND/OR ERECTED ON SITE SHALL BE SEALED TO LIMIT AIR
INFILTRATION.
4. DOORS: ALL EXTERIOR DOORS SHALL BE SO DESIGNED TO LIMIT AIR LEAKAGE AROUND THEIR PERIMETER WHEN IN
A CLOSED POSITION.
5. ALL DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE AT THE HEAD AND SILL.
6. DOORS MOUNTED ON EITHER THE INSIDE OR OUTISDE OF AN EXTERIOR WALL SHALL HAVE A MINIMUM ONE-HALF
INCH LAP AT EACH JAMB.
7. DOORS REQUIRING VERTICAL TRACK OR GUIDES SHALL USE A CONTINUOUS MOUNTING ANGLE, SEALED IN
ACCORDANCE WITH SECTION T-20-1495 (E), AT EACH JAMB.
8. DORRS MOUNTED BETWEEN THE JAMBS SHALL HAVE A CONTINUOUS SEAL OR BAFFLE AT EACH JAMB.
9. MEETING RAILS OF SECTIONLAL DOORS AND MEETING STILES OF RAILS OF BI-PARTING DOORS SHALL BE PROVIDED
WITH A SEAL, ASTRAGAL, OR BAFFLE.
10. SWINGING AND REVOLVING DOORS SHALL BE WEATHERSTRIPPED AT THE HEAD, SILL AND JAMB.
11. DOUBLE DOORS SHALL BE PROVIDED WITH A WEATHERTIGHT ASTRGAL OR CLOSURE AT THE CENTER CRACK.
GENERAL NOTES:
ENERGY NOTES:
B to B BACK TO BACK
BBO BOILER BLOW OFF
BC BALANCING COCK
BCMU BURNISHED CONCRETE MASONRY UNIT
BD BOARD
BD BACK DRAFT DAMPER
BET BETWEEN
BFP BACKFLOW PREVENTOR
BFR BELOW FLOOR
BF BOILER FEED
BFV BUTTERFLY VALVE
BHP BREAK HORSE POWER
BKR BREAKER
BL BUILDING LINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BLKHD BULKHEAD
BM BEAM
BM BENCH MARK
BOD BOTTOM OF DUCT
BOF BOTTOM OF FOOTING
BOTT BOTTOM
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BT BATH TUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BUR BUILT UP ROOFING
BV BALL VALVE
C CONDENSER WATER
C CONDUIT
CA COMBUSTION AIR
CAB CABINET
CANT CANTILEVER
CAP CAPACITY
CAS CASING
CBD CHALKBOARD
CD CONDENSATE DRAIN
CCTV CLOSED CIRCUIT TELEVISION
CE COVER ELEVATION
CEM CEMENT
CENT CENTRIFUGAL
CER CERAMIC
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CH CHANNEL
CI CAST IRON
CI CURB INLET
CIP CAST IN PLACE
CIP CAST IRON PIPE
CIRC CIRCULATING
CJ CONTROL JOINT
CJA CONTROL JOINT ABOVE
CKT CIRCUIT
CKT BK CIRCUIT BREAKER
CL CENTERLINE
CL CIRCUIT LINE
CLG CEILING
CLOS CLOSET
CLR CLEAR
CM CEILING MOUNTED
CMP CORRUGATED METAL PIPE
CMUCONCRETE MASONRY UNIT
CO CLEAN OUT
CO CONDUIT ONLY
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION
COMM COMMUNICATIONS
COMP COMPOSITE
COMP COMPRESSOR UNIT
COMPR COMPRESSIBLE
CONC CONCRETE
CONF CONFERENCE
CONFIG CONFIGURATION
CONN CONNECT
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR OR CONTRACT
CONV CONVECTOR
CORR CORRIDOR
CP CONDENSER PUMP
CP COVER PLATE
CPS CYCLES PER SECOND
CPT CARPET
CR CONDENSER WATER RETURN
CR CORROSION RESISTANT
CS COUNTERSINK
CS COMBINATION SEWER
CS CONDENSER WATER SUPPLY
CSK COUNTERSUNK
CSMU CALCIUM SILICATE MASONRY UNIT
CSP COMBINATION STANDPIPE
CSTJ CONSTRUCTION JOINT
CSWK CASEWORK
CT COOLING TOWER
CT CERAMIC TILE
CT CURRENT TRANSFORMER
CTR CENTER
CU COPPER
CU CONDENSING UNIT
CU CUBIC
CU COMBINATION UNIT
CUH CABINET UNIT HEATER
CW COLD WATER
CV CONDOM VENDOR
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
CY CUBIC YARD
CYL CYLINDER
D DRAIN
D DEPTH
D DATA
DB DRY BULB
DB DECIBEL
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DC DIRECT CURRENT
DC DUST COLLECTOR
DCJ DUMMY CONTROL JOINT
d PENNY (AS NAIL 10D)
DDC DIRECT DIGITAL CONTROL
DE DEIONIZED WATER
DEG DEGREE
DEPR DEPRESS(ION)(ED)
DEPT DEPARTMENT
DET DETENTION
DF DRINKING FOUNTAIN
DFR DIESEL FUEL RETURN
DFS DIESEL FUEL SUPPLY
DFV DIESEL FUEL VENT
DG DOOR GRILLE
DH DUCT HEATER
DI DISTILLED WATER
DI DUCTILE IRON
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISC SW DISCONNECT SWITCH
DISC DISCONNECT
DISCH DISCHARGE
DISTR DISTRIBUTION
DL DEAD LOAD
DM DAMPER MOTOR
DMPR DAMPER
DN DOWN
DN DOWNSPOUT NOZZLE
DO OR " DITTO
DPFG DAMPROOFING
DPS DIFFERENTIAL PRESSURE SWITCH
DR DOOR
DR DRAIN
DS DOWNSPOUT
DS DISTILLED WATER
DSP DRY STANDPIPE
DTL DETAIL
DTR DUCT THRU ROOF
DW DISHWASHER
DWG DRAWING
DWL DOWEL
DWR DRAWER
DXS DOUBLE EXTRA STRONG
E EAST
EA EACH
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EB EXPANSION BOLT
EC ELECTRICAL CONTRACTOR
EDH ELECTRIC DUCT HEATER
EE EACH END
EER ENERGY EFFICIENCY RATIO
EEW EMERGENCY EYEWASH
EEWS EMERGENCY EYEWASH/SHOWER
EF EACH FACE
EF EXHAUST FAN
EFF EFFICIENCY
EH ELECTRICAL HEATER
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAS ELASTOMERIC
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EMD ESTIMATED MAXIMUM DEMAND
EMT ELECTRICAL METALLIC TUBING
EMV EMERGENCY MIXING VALVE
ENCL ENCLOSURE
ENTR ENTRANCE
EOMD END OF MAIN DRIP
EP ELECTRO-PNEUMATIC
EP EXPLOSION PROOF
EPO EMERGENCY POWER OFF
ERF EPOXY RESIN FLOORING
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ES EMERGENCY SHOWER
ES EXTRA STRONG
ESP EXTERNAL STATIC PRESSURE
EST ESTIMATE
ET EXPANSION TANK
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EXC EXCAVATE
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXP EXPOSED
EXPL EXPLOSION
EXT EXTERIOR
F FAHRENHEIT
F FIRELINE
F FURNACE
FA FIRE ALARM
FA FRESH AIR
FAB FABRICATED
FB FACE BRICK
FC FOOT CANDLE
FCMU FLUTED CONCRETE MASONRY UNIT
FCO FLOOR CLEAN OUT
FCU FAN COIL UNIT
FD FIRE DAMPER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FFE FINISH FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FIX FIXTURE
FL FLOOR
FLASH FLASHING
FLEX FLEXIBLE
FLUOR FLUORESCENT
FLG FLOORING
FLM FULL LENGTH MIRROR
FM FACTORY MUTUAL
FM FIRE MAIN
FME FLOW MEASURING EQUIPMENT
FO FACE OF
FO FINISH OPENING
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOF FUEL OIL FILL
FOM FACE OF MASONRY
FOR FUEL OIL RETURN
FOS FACE OF STUD
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FOW FACE OF WALL
FP FIREPROOFING
FPD FIRE PUMP DISCHARGE
FPM FEET PER MINUTE
FR FIRE RESISTIVE
FR FRAME
FRP FIBERGLASS REINFORCED PANEL
FS FLOOR SINK
FS FLOW SWITCH
FSD FIRE/SMOKE DAMPER
FSS FOLDING SHOWER SEAT
FT FEET (FOOT)
FT FIN TUBE
FT FLOW TRANSMITTER
FTG FOOTING
FUT FUTURE
FVC FIRE VALVE CABINET
FWC FABRIC WALL COVERING
G GRILLE
G NATURAL GAS
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GCO GRADE CLEAN OUT
GCMU GLAZED CONCRETE MASONRY UNIT
GD GARBAGE DISPOSAL
GEN GENERAL
GEN GENERATOR
GFA GROSS FLOOR AREA
GFI GROUND FAULT INTERRUPTER
GFRC GLASS FIBER REINFORCED CONCRETE
GHR GLYCOL-WATER HEATING RETURN
GHS GLYCOL-WATER HEATING SUPPLY
GI GALVANIZED IRON
GL GLUE LAMINATED
GL GLASS
GMU GLASS MASONRY UNIT
GND GROUND
GOVT GOVERNMENT
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GUARD RAIL
GR GRADE
GR GRILLE
GRC GLAVANIZED RIGID CONDUIT
GRC GLASS REINFORCED CONCRETE
GRGP GLASS REINFORCED GYPSUM PLASTER
GRS GALVANIZED RIGID STEEL
GS GASOLINE
GV GATE VALVE
GW GREASE WASTE
GWB GYPSUM WALL BOARD
GYP GYPSUM
H HEIGHT
H 1E HOOK ONE END
HB HOSE BIB
HC HANDICAP
HC HOLLOW CORE
HCB HANDICAP BENCH
HCR HOT / CHILLED WATER RETURN
HCS HOT / CHILLED WATER SUPPLY
HD HAND DRYER OR HAIR DRYER
HDBD HARDBOARD
HDR HEADER
HDWD HARDWOOD
HDWR HARDWARE
HEV HOSE END VALVE
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HOA HAND OFF AUTOMATIC
HORIZ HORIZONTAL
HP HEAT PUMP
HP HIGH PRESSURE
HP HORSEPOWER
HPR HIGH PRESSURE STEAM RETURN
HPS HIGH PRESSURE SODIUM
HPS HIGH PRESSURE STEAM SUPPLY
HR HANDRAIL
HR HOUR
HS HEADSTUD
HSS HOLLOW STRUCTURAL SECTION
HSTR HIGH STRENGTH
HT HEIGHT
HTG HEATING
HTR HEATER
HTWR HIGH TEMP HOT WATER RETURN
HTWS HIGH TEMP HOT WATER SUPPLY
HUM HUMIDIFIER
HV HEATING VENTILATING UNIT
HVAC HEATING VENTILATING AND AIR CONDITIONING
HW DOMESTIC HOT WATER
HWC DOMESTIC HOT WATER RECIRCULATING
HWR LOW TEMP HOT WATER RETURN
HWS LOW TEMP HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
JAN JANITOR
JB JUNCTION BOX
JCT JUNCTION
JST JOIST
JFB JOINT FILLER BOARD
JT JOINT
KCJ KEYED CONSTRUCTION JOINT
KCP KEENE'S CEMENT PLASTER
KD KNOCKDOWN
KH KITCHEN HOOD
KHE KITCHEN HOOD EXHAUST FAN
KHS KITCHEN HOOD SUPPLY FAN
KIT KITCHEN
KO KNOCKOUT
KS KITCHEN SINK
KV KILOVOLT
KVA KILOVOLT AMPERES
KVAR KILOVOLT AMPERES REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
L ANGLE
L LAVATORY
LA LABORATORY COMPRESSED AIR
LAB LABORATORY
LAM LAMINATE(D)
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LB POUND
LBR LUMBER
LBS POUNDS
LDG LOADING
LF LINEAR FOOT (FEET)
LG LENGTH (LONG)
LIN LINEAR
LINO LINOLEUM
LKR LOCKER
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LONG LONGITUDINAL
LOX LIQUID OXYGEN
LPG LIQUEFIED PETROLEUM GAS
LPR LOW PRESSURE STEAM RETURN
LPS LOW PRESSURE STEAM SUPPLY
LR LIVING ROOM
LS LAWN SPRINKLER
LSC LIFE SAFETY CODE
LT LIGHT
LTD LINED TRANSFER DUCT
LTG LIGHTING
LV LOUVER
LV LABORATORY VACUUM
LW LONG WAY
LWT LEAVING WATER TEMPERATURE
M THOUSAND
MA MIXED AIR
MA MEDICAL COMPRESSED AIR
MAC MACHINE
MAG MAGNETIC
MAINT MAINTENANCE
MAN MANUAL
MAS MASONRY
MATL MATERIAL
MAU MAKEUP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MACHINE BOLT
MB MOP BASIN
MBD MARKER BOARD
MBH THOUSAND BTU PER HOUR
MBTUH THOUSAND BTU PER HOUR
MC MECHANICAL CONTRACTOR
MC MEDICINE CABINET
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKERJ
MCM THOUSAND CIRCULAR MILLS
MD MANUAL VOLUME DAMPER
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MEMB MEMBRANE
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MFRG MANUFACTURING
MG MOTOR GENERATOR
MH MANHOLE
MH METAL HALIDE
MH MOP HOLDER
MIN MINIMUM
MISC MISCELLANEOUS
ML MOTORIZED LOUVER
MLDG MOLDING
MLO MAIN LUGS ONLY
MLWK MILLWORK
MO MASONRY OPENING
MPG MEDIUM PRESSURE GAS
MPR MEDIUM PRESSURE STEAM RETURN
MPS MEDIUM PRESSURE STEAM SUPPLY
MR MIRROR
MR/S MIRROR WITH SHELF
MS MAGNETIC STARTER
MTD MOUNTED
MTG MOUNTING
MTL METAL
MTWR MEDIUM TEMP HOT WATER RETURN
MTWS MEDIUM TEMP HOT WATER SUPPLY
MUL MULLION
MV MERCURY VAPOR
MV MEDICAL VACUUM
MW MARKER WALL
N NITROGEN
N NORTH
N2O NITROUS OXIDE
N/A NOT APPLICABLE
P PAINT
P POLE
P/T PRESSURE/TEMPERATURE TEST PORT
P PUMP
PA PUBLIC ADDRESS
PAN B PANIC BOLT
PAR PARALLEL
PB PARTICLE BOARD
PB PULL BOX
PB PUSH BUTTON
PBS PUSH BUTTON STATION
PC PRECAST
PC PUMPED CONDENSATE
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCT PORCELAIN CERAMIC TILE
PD PRESSURE DROP
PD PUMP DISCHARGE
PDI PLUMBING & DRAINAGE INSTITUTE
PENT PENTHOUSE
PERF PERFORATED
PERP PERPENDICULAR
PF POWER FACTOR
PG PRESSURE GAGE
PH PHASE
PI POINT OF INTERSECTION
PI PRESSURE INDICATOR
PIC PORTABLE INSTRUMENT CONNECTION
PIV POST INDICATOR VALVE
PL PLACE(S)
PL PLATE
PLAM;PL PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLYWD PLYWOOD
PNEU PNEUMATIC
PNL PANEL
POC POINT OF CONNECTION
PORC PORCELAIN
PPM PARTS PER MILLION
PR PAIR
PREFAB PREFABRICATED
PROJ PROJECTION
PRV PRESSURE REDUCING VALVE
PS PIPE SUPPORT
PS PROJECTION SCREEN
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSV PRESSURE SAFETY VALVE
PT PLASTER TRAP
PT POINT
PT POTENTIAL TRANSFORMER
PTD PAPER TOWEL DISPENSER
PTD/R COMBINATION TOWEL DISPENSER/RECEPTACLE
PTN PARTITION
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
PWL SOUND POWER LEVEL
PWR POWER
QT QUARRY TILE
QTR RNDQUARTER ROUND
R RISER
RA RETURN AIR
RAD RADIATOR
RAD or R RADIUS
RB RUBBER BASE
RC REMOVE CONTROL
RCP REFLECTED CEILING PLAN
RCP REINFORCED CONCRETE PIPE
RCU RECIPROCATING CHILLER JOINT
RD ROOF DRAIN
RD REFRIGERANT DISCHARGE
RECP RECEPTACLE
REF REFERENCE
REFL REFLECTED
REFR REFRIGERANT
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCEMENT
REM REMOVABLE
REQ(D) REQUIRE(D)
RESIL RESILIENT
RET RETAINING (WALL)
REV REVISIONS
RF RETURN FAN
RF RUBBER FLOOR
RFM RECESSED FLOOR MAT
RH RELATIVE HUMIDITY
RH RELIEF HOOD
RHC REHEAT COIL
RH ROBE HOOK
RHG REFRIGERANT HOT GAS
RI&C ROUGH IN AND CONNECT
RIJS RISE IN JOIST SPACE
RL REFRIGERANT LIQUID
RM ROOM
RND ROUND
RO ROUGH OPENING
S SINK
S SANITARY SEWER
S SOAP DISH
S SOUTH
S SPRINKLER LINE
SA SHOCK ABSORBER
SA SUPPLY AIR
SAN SANITARY WASTE
SC SECURITY
SC SOLID CORE
SC SHOWER CURTAIN
SC SPECIAL COATING
SCD SEAT COVER DISPENSER
SCH SHOWER CURTAIN HOOKS
SCHED SCHEDULE
SCR SHOWER CURTAIN ROD
SCT STRUCTURAL CLAY TILE
SCUT SCUTTLE
SCW SOFT COLD WATER
SD SOAP DISPENSER
SD SMOKE DAMPER
SD SMOKE DETECTOR
SD STORM DRAIN
SE STEAM EXHAUST VENT
SEC SECONDARY
SECT SECTION
SECY SECRETARY
SENS SENSIBLE
SF SQUARE FOOT
SF SUPPLY FAN
SFCMU SPLIT-FACED CONCRETE MASONRY UNIT
SFU STRUCTURAL FACING UNIT
SGL SINGLE
SH SHOWER
SHEATH SHEATHING
SHM SECURITY HOLLOW METAL
SHT SHEET
SHW SOFT HOT WATER
SIM SIMILAR
SL SHORT LEG
SLNT SEALANT
SM SHEET METAL
SM SPRINKLER MAIN
SND SANITARY NAPKIN DISPOSAL
SNV SANITARY NAPKIN VENDOR
SP STATIC PRESSURE (H2O)
SP STAND PIPE
SP STATIC PRESSURE
SPEC SPECIFICATIONS
SPK SPRINKLER
SPL SOUND PRESSURE LEVEL
SPL SPECIAL
SPL BLK SPLASH BLOCK
SQ SQUARE
SS STAINLESS STEEL
SSA STORM SHELTER AREA
SS SERVICE SINK
SS SOLID SURFACE
ST STAIR
ST STORM SEWER
STAG'D STAGGERED
STC SOUND TRANSMISSION CLASS
STD STANDARD
STE SINGLE TAPERED END
STGR STRINGER
STL STEEL
STOR STORAGE
STR STRUCTURAL - STRUCTURE
SUB SUBSTATION
SUBFL SUBFLOOR
SURF SURFACE
SUSP SUSPENDED
SV SHEET VINYL
SV SOLENOID VALVE
SW SHORT WAY
SW SWITCH
SWBD SWITCH BOARD
SWP STEAM WORKING PORESSURE
SYM SYMMETRICAL
T TEMPERED
T THERMOSTAT
T & B TOP & BOTTOM
T& G TONGUE & GROOVE
T TREAD
TA TRANSFER AIR
TAB TEST AND BALANCE
TAN TANGENT
TB TERMINAL BOX
TB TOWEL BAR
TBD TACK BOARD
TC TEMPERATURE CONTROL
TC TIME CLOCK
TD TRANSFER DUCT
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEL TELEPHONE
TEMP TEMPERED - TEMPORARY
TEMP TEMPERATURE
TERR TERRAZZO
TEXT TEXTURED
TGL TOGGLE
TH THRESHOLD
TH TOWEL HOOK
THK THICK(NESS)
TMR TILT MIRROR UNIT
TMV THERMOSTATIC MIXING VALVE
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOIL TOILET
TOP TOP OF PAVING
TOS TOP OF STEEL
TOW TOP OF WALL
TPV TRAP PRIMER
TR TRIP
TRANS TRANSVERSE
TRD TREAD
TS TEMPERATURE SENSOR
TSP TOTAL STATIC PRESSURE
TT TEMPERATURE TRANSMITTER
TT TERRAZZO TILE
TTD TOILET TISSUE DISPENSER
TV TELEVISION
TW TACK WALL
TYP TYPICAL
U URINAL
UC UNIT COOLER
UG UNDERGROUND
V VENT
V VOLT
V VACUUM
VA VALVE
VAC VACUUM
VAV VARIABLE AIR VOLUME
VB VAPOR BARRIER
VB VINYL BASE
VBF VENT BELOW FLOOR
VCB VENTED COVE BASE
VCP VITRIFIED CLAY PIPE
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER - MANUAL
VEL VELOCITY
VENT VENTILATION
VENT VENTILATOR
VERT VERTICAL
VEST VESTIBULE
VF VINYL FLOOR
VFD VARIABLE FREQUENCY DRIVE
VM VOLTMETER
VOL VOLUME
VP VENEER PLASTER
VP VACUUM PUMP
VSMC VARIABLE SPEED MOTOR CONTROLLER
VT VINYL TILE
VTR VENT THROUGH ROOF
VWC VINYL WALLCOVERING
W WATER SERVICE
W WIDE; WIDTH
W WASTE (PLUG)
W WATT
W WEST
W WIDE FLANGE
W/ WITH
W/O WITHOUT
WB WET BULB
WC WALL COVERING
WC WATER COLUMN
WC WATER CLOSET
WCC WATER COOLED CONDENSER
WCL WATER CLOSET/LAVATORY COMBINATION
WCO WALL CLEAN OUT
WD WOOD
WDW WINDOW
WF WASH FOUNTAIN
WH WALL HYDRANT
WFMD WATER FLOW MEASURING DEVICE
WH WATER HEATER
WHM WATT HOUR METER
WI WROUGHT IRON
WLR WATER LOOP RETURN
WLS WATER LOOP SUPPLY
WMG WATER MOTOR GONG
WNSCT WAINSCOT
WP WEATHERPROOF
WPB WHIRLPOOL BATH
WPF WATERPROOF
WPFG WATERPROOFING
WR WATER RESISTANT
WR WASTE RECEPTACLE
WSP WET STAND PIPE
WT WEIGHT
WW WARM WHITE
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
XMTR TRANSMITTER
YD YARD
YH YARD HYDRANT
Z IMPEDANCE
ZCV ZONE CONTROL VALVE
ZVB ZONE VALVE BOX
& AND
@ AT
i.e. THAT IS
# NUMBER
CG CLEAR FLOAT GLASS
CIG CLEAR INSULATING GLASS
CTG CLEAR TEMPERED FLOAT GLASS
CTIG CLEAR TEMPERED INSULATING GLASS
LG LAMINATED GLASS
PG PATTERN GLASS
PIG PATTERN INSULATING GLASS
SG SPANDREL GLASS
TG TINTED FLOAT GLASS
TIG TINTED INSULATING GLASS
TTG TINTED TEMPERED FLOAT GLASS
TTIG TINTED TEMPERED INSULATING GLASS
WG POLISHED WIRE GLASS
THE FOLLOWING ABBREVIATIONS
ARE USED WITH GLAZING:
IAQ INDOOR AIR QUALITY
IAW IN ACCORDANCE WITH
IBC INTERNATIONAL BUILDING CODE
IC INTERCOM
ID INSIDE DIAMETER
IE INVERT ELEVATION
IES ILLUMINATING ENGINEERING SOCIETY
IF INSIDE FACE
IG ISOLATED GROUND
IH INTAKE HOOD
IJ ISOLATION JOINT
IJS IN JOIST SPACE
IMC INTERMEDIATE METAL CONDUIT
IN INCH
INC INCLUDE (ING)
INSUL INSULATION
INT INTERIOR
IP IRON PIPE
IW INDIRECT WASTE
O&M OPERATION AND MAINTENANCE
O to O OUT TO OUT
OA OVERALL
OA OUTSIDE AIR
OBSC OBSCURE
OC ON CENTER
OD OUTSIDE DIAMETER
OD OVERFLOW DRAIN
OF OUTSIDE FACE
OVFL OVERFLOW
OFC OWNER FURNISHED CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED OWNER INSTALLED
OHP OVERHEAD POWER
OHT OVERHEAD TELEPHONE
OPG OPENING
OPP OPPOSITE
OSD OVERFLOW STORM DRAIN
OS&Y OUTSIDE SCREW AND YOKE
OTCS OPEN TO CEILING SPACE
OVHD OVERHEAD
OX OXYGEN
A/C AIR CONDITIONING(ER)
A AMP AMPERE
A COMPRESSED AIR
AAP AREA ALARM PANEL
AAV AUTOMATIC AIR VENT
AB ANCHOR BOLT
ABS ACRYLONITRILE-BUTADIENE-STYRENE
AC ACOUSTICAL CEILING
AC ALTERNATING CURRENT
ACC AIR COOLED CONDENSER
ACCU AIR COOLED CONDENSING UNIT
ACM ALUMINUM COMPOSITE MATERIAL
ACST ACOUSTIC
AD ACCESS DOOR
AD AREA DRAIN
ADDN ADDITION OR ADDITIONAL
ADJ ADJUSTABLE
ADJT ADJACENT
ADMIN ADMINISTRATION
AF AIR FILTER
AFF ABOVE FINISH FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AI AREA INLET
ALT ALTERNATE
ALUM ALUMINUM
AMB AMBIENT
ANCH ANCHOR
AP ACCESS PANEL
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR ACID RESISTING
ARCH ARCHITECTURAL
ASB ASBESTOS
ASPH ASPHALT
AUTO AUTOMATIC
AV ACID VENT
AV AIR VENT
AV AVERAGE
AW ACID WASTE
AWG AMERICAN WIRE GAUGE
AWP ACOUSTICAL WALL PANEL
ABBREVIATIONS
NC NOISE CRITERIA
NC NORMALLY CLOSED
NC NURSE CALL
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSN.
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NO NUMBER
NO NITROUS OXIDE
NOM NOMINAL
NS NEUTRAL SENSOR
NTS NOT TO SCALE
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE BACKFLOW PREVENTER
RS REFRIGERANT SUCTION
RWL RAIN WATER LEADERS SENSOR
UGE UNDERGROUND ELECTRICAL
UGT UNDERGROUND TELEPHONE
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
UNEX UNEXCAVATED
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UR URINAL
URD UNDERGROUND RESIDENTIAL DISTRIBUTION
US UTILITY SHELF
UTIL UTILITY
UV UNIT VENTILATOR
BENJAMIN TALPOSREVISIONS:
C-31704
4/20/2022 1:37:22 PME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022
SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGSYMBOLS AND ABBREVIATIONSG0.1STACEY HALL
19900 STEVENS CREEK BLVD., CUPERTINO, CAAH 09-22-2022
34 of 42
CAPABLE
EV
CAPABLE
EV
CAPABLE
EV
CAPABLE
EV
CAPABLE
EV
CAPABLE
EV
S 0°13'00" E 372.28'
N 0°13'00" W 372.28'S 89°36'00" W 224.96'N 89°36'00" E 224.96'PROPERTY LINEPROPERTY LINE
PROPERTY LINEPROPERTY LINE
PARKING
NO
PARKINGNONO PARKINGVANVANException #8 of Prelim Title
G
ADJACENT TENANT SPACES T E V E N S C R E E K B L V D.SHANE CO SUITE
S1
-S2
S2
S3S3
S3S3
S3S3
S3S3S3S3
S3S3
S3S3
S3S3
S3S3 S3S3
S3S3
S3S3
S4S5
S6
S6
S6
S7
S7 S7 S7
S7
S7S7
S7S7S7S7S7S7
S30
S7
S7
S7
S7
S8
S8
S9
S10
S11S12
S13
S14
S15
S16 S16
S16 S16
S16
S17 S18
S20
S21 S22
S23
S24
S24
S24
S24
S24
S25
S26S26
S26S26
S31
S33S33
ADDITIONAL SQ. FT.
= 560 SF CLR.4' - 2" MIN.S19
S34
SET BACK (NEW ADDITION HEIGHT = 25'-2")
50' - 6"
5"
A-1
2
S35S35
S35 S35 S35 S35 S35 S35 S35 S35 S35 S35 S35
S35
S35
L1
L1
L1 L1
L4
L2
L3
L3L3L3 L3 L3 L3 L3 L3 L3
L3
L3
L3
L3
(E) ROOF LINE (VARIEIS)
113' - 6"
FIRST FLOOR (F.F.)
100' - 0"
(E) HIGH PARAPET LEVEL
120' - 1"
(E) LOW PARAPET LEVEL
116' - 1"
(N) ENTRY TOWER LEVEL
123' - 0"
DISTANCE FROM PRIMARY (N) BUILDING BULK TO (E) ARTERIAL/BLVD CURB
50' - 6 1/2"
45.00°1:1 SLOPE(N) CORNER TOWER
127' - 0"
MARK DESCRIPTION TYPE
L1 4" OUTDOOR CYLINDER -FC OUTDOOR LIGHTING ZFCC410 (DOWN LT ONLY)WALL MTD
L2 4" RECESSED SOFFIT -LITHONIA LIGHTING LBR4 RECESSED
L3 6" BOLLARD -LIGHTWAVE 2 STRAIGHT BOLLARD ULW-10874 GROUND
L4 18" WALL SCONCE -WDGE3 LED (FIXTURE TO MATCH (E) L.L. PROVIDED FIXTURES)WALL MTD
NOTES
BENJAMIN TALPOSREVISIONS:
C-31704
8/8/2022 1:06:38 PME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022
SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGSITE PLANA-1STACEY HALL
19900 STEVENS CREEK BLVD., CUPERTINO, CASCALE:1/16" = 1'-0"
SITE PLAN - PROPOSED PLANNING
NORTH
NOTE:
SITE PLAN BY OTHERS. SHOWN FOR REFERENCE ONLY.
LOT AREA 83,766 SF
BUILDING AREA
EXISTING BUILDING AREA: 28,813 SF
NEW BUILDING AREA: 29,374 SF (560 SF ADDITION)
LOT COVERAGE: 35.1%
REQUIRED PARKING
SHANE CO:15,279 / 250 = 61.11 STALLS
KELLER WILLIAMS:7,088 / 285 = 24.87 STALLS
DANCE STUDIO:OPTION 1
7,006 / 250 = 28.02 STALLS
OPTION 2
6 CLASSROOMS W/ AN AVERAGE 12 STUDENTS: 72
72 / 4 = 18 STALLS
6 TEACHERS = 6 STALLS
3 STAFF = 3 STALLS
TOTAL = 27 STALLS
*OPTION 1 IS MOST RESTRICTIVE
TOTAL PARKING REQUIRED:114 SPACES
TOTAL PARKING PROVIDED: 114 SPACES
KEYNOTES - SITE
Key
Value Keynote Text
S1 (E) PUBLIC UTILITY SUB STATION TO REMAIN.
S2 (E) ACCESSIBLE PARKING STALLS AND
SIGNAGE TO REMAIN.
S3 (E) PARKING STALL TO REMAIN, TYP.
S4 (E) MONUMENT SIGN TO REMAIN.
S5 (E) ACCESSIBLE SITE ENTRY SIGNAGE TO
REMAIN.
S6 (E) PAVING/WALKABLE SURFACE TO
REMAIN, TYP.
S7 (E) LANDSCAPE PLANTING AREA TO REMAIN.
S8 (E) SHORT-TERM BIKE RACK TO REMAIN.
S9 (E) PARKING LOT LIGHTING TO REMAIN,
TYPE.
S10 (E) DRIVEWAY TO REMAIN.
S11 (E) TRANSFORMER TO REMAIN.
S12 (E) TRUNCATED INDICATOR DOMES, TYP.
S13 (E) TRASH ENCLOSURE TO REMAIN.
S14 (E) FIRE DEPARTMENT VEHICLE TURNING
RADIUS - PREVIOUSLY APPROVED, TYP.
S15 (E) GAS METER AND FIRE SPRINKLER
SERVICE TO REMAIN.
S16 (E) "FUTURE" ELECTRIC VEHICLE PARKING
STALL.
S17 (E) MAIL/PARCEL BOX TO REMAIN.
S18 (E) WHEELSTOP TO REMAIN, TYP.
S19 ACCESSIBLE PATH OF TRAVEL.
S20 (E) ACCESSIBLE CURB RAMP TO REMAIN.
S21 (E) LONG-TERM BIKE STORAGE ROOM TO
REMAIN. NOT PART OF SHANE CO LEASABLE
AREA.
S22 (E) MAIN BUILDING ELECTRICAL ROOM AND
MAIN DISTRIBUTION PANEL TO REMAIN. NOT
PART OF SHANE CO LEASABLE AREA.
S23 (E) ADJACENT STRUCTURES TO REMAIN,
TYP.
S24 (E) BUILDING ENTRANCE TO REMAIN.
S25 (E) TRIO-TRASH RECEPTACLES TO REMAIN.
S26 (E) PARKING AREA TO REMAIN, TYP.
S30 PREPARE (E) LANDSCAPE AREA FOR NEW
ADDITION.
S31 (N) PLANTER AND INTEGRAL BENCH -
REQUIRED AS A SECURITY ELEMENT TO
PROTECT FRONT ENTRY FROM VEHICLE
ENTRY.
S33 (N) SUITE ENTRANCE AND ENTRANCE
TOWER ELEMENT. ENTRANCE TOWER IS
NON-CONDITIONED SPACE AND NOT
CONSIDERED AS PART OF THE OVERALL
OCCUPIABLE BUILDING AREA.
S34 (E) DEMISING WALL TO REMAIN.
S35 (N) DECORATIVE SITE BOLLARD W/
INTEGRAL LIGHTING COMPONENT
(LIGHTWAVE 2 STRAIGHT BOLLARD,
ULW-10874, W/ SECURITY CORE IN FRONT OF
ALL FENESTRATION AREAS), TYP.
SITE STATISTICS / PARKING ANALYSIS
NOTE:
WITH THE EXCEPTION OF WORK REQUIRED
TO PREPARE THE EXISTING SITE FOR THE
NEW ADDITION AND ENTRY TOWER
PROPOSED HEREIN AS PART OF THE SCOPE
WORK, ALL SITE ELEMENTS ARE EXISTING
TO REMAIN AND NOT INCLUDED AS PART OF
THE SCOPE OF THIS PERMIT.
SITE WORK IS CURRENTLY UNDER
CONSTRUCTION BY THE BUILDING OWNER
AND UNDER PERMIT # BLD-2020-0387.
1 2/24/2021 PLANNING RESPONSE
3 8/8/2022 PLANNING RESPONSE
SCALE: 1/16" = 1'-0"A-1
2 ELEVATION - EAST (BUILDING BULK SETBACK DIAGRAM)
1
3
LIGHTING SCHEDULE
3
AH 09-22-2022
35 of 42
CAPABLE
EV
CAPABLE
EVPARKINGNONO PARKINGVANVANWALL LEGEND
EXISTING WALLS TO REMAIN
NEW WALLS
EXISTING WALLS TO BE DEMOLISHED
DIM F.O. STUD DIMENSION
DIM F.O. FINISH
**SEE G.02 FOR WALL TYPES
(E) SHEAR WALL
GENERAL NOTES
A. GENERAL NOTES APPLY TO ALL SHEETS.
B. DIMENSIONS ARE ACTUAL AND ARE TO FACE OF STUDS,
FACE OF CONCRETE WALLS, FACE OF CMU WALLS, FACE
OF FRAMES OR CENTERLINE OF COLUMNS, UNLESS
NOTED OTHERWISE - SEE WALL TYPE LEGEND.
C. FLOOR SPOT ELEVATIONS ARE SHOWN THUS XXX’-X”
D. SEE STRUCTURAL FOR CONCRETE RETAINING WALL
THICKNESS.
E. SEE SHEET G0.2 FOR TYPICAL WALL TYPES.
F. INTERIOR STUD WALLS SHALL EXTEND TO UNDERSIDE OF
FLOOR OR ROOF DECK ABOVE UNLESS NOTED
OTHERWISE. SEE TYPICAL WALL TYPES ON SHEET G0.2.
G. PROVISIONS SHALL BE MADE AT FULL HEIGHT
NONBEARING WALLS FOR 1-INCH VERTICAL MOVEMENT
OF BUILDING STRUCTURE WITHOUT TRANSFER OF
COMPRESSIVE LOADS TO WALL. FILL IRREGULARITIES
BETWEEN TOP OF WALL AND DECK ABOVE WITH FIRE
SAFING INSULATION OR FIRE STOPPING MATERIALS AS
REQUIRED TO MEET FIRE RATING OF RESPECTIVE WALLS.
H. GYPSUM BOARD AND PLASTER SURFACES SHALL BE
ISOLATED WITH CONTROL JOINTS WERE INDICATED ON
DRAWINGS AND/OR AS DESCRIBED IN THE
SPECIFICATIONS.
I. CONTROL JOINTS (CJ) AND CONTROL JOINTS ABOVE (CJA)
SHALL BE LOCATED AS INDICATED ON BUILDING
ELEVATIONS.
J. THE OWNER SHALL FURNISH AND INSTALL THE
FOLLOWING: KITCHENETTE EQUIPMENT INCLUDING:
DISHWASHER, REFRIGERATOR, MICROWAVE.
K. INCLUDE OWNER-FURNISHED AND INSTALLED ITEMS AND
OWNER FURNISHED AND CONTRACTOR INSTALLED ITEMS
IN THE CONSTRUCTION SCHEDULE, AND COORDINATE
WITH OWNER TO ACCOMMODATE THESE ITEMS.
L. COORDINATE MECHANICAL CHASE SIZES WITH
MECHANICAL CONTRACTOR.
M. COORDINATE WITH MECHANICAL AND ELECTRICAL
CONTRACTORS SIZE AND LOCATION OF EQUIPMENT PADS
INDICATED ON FLOOR PLANS.
N. SEE CIVIL DRAWINGS FOR FINISH FLOOR ELEVATIONS.
O. EXTEND FURRING CHANNELS AND GYPSUM BOARD UP
MINIMUM 4 INCHES ABOVE FINISHED CEILING.
P. SCRIBE GYPSUM BOARD OF WALL AND PARTITIONS TO
IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY
AROUND PENETRATIONS.
Q. PROVIDE SEISMIC BRACING FOR SUSPENDED CEILINGS
OR AS INDICATED ON DRAWINGS.
R. PROVIDE INTERIOR GYP. BD. CONTROL JOINT EVERY 30'-0"
MAX. .
A
A
A1
A1
B
B
B1
B1
C
C
D
D
E
E
F
F
G
G
H
H
I
I
J
J
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
BREAK ROOM
DIRTY SHOP
WORKSHOP
VAULT STRORAGE
TRAINING
ROOM
FAMILY
TOILET
TOILET
CSA
ELECTRICAL /
IT
OFFICE
CLEAN AND
CHECK
SM OFFICE
TOILET
TOILET
STORAGE
SEATING
DIAMOND
ROOM
SHOWROOM
CUST.
WELLNESS
ADJACENT TENANT SPACE
LOBBYHOSPITALITY
NOOK
STORAGE
QUEUE
VEST.
7.1 7.1
A-3 2
A-3
4
A-3
3
A-3 1
SHANE CO. TENANT SPACE
TENANT IMPROVEMENT WORK
UNDER SEPARATE PERMIT
(N) DIAMOND
VIEWING AREA
36' - 0"7"4 1/2"
213' - 8"
21' - 8"24' - 0"24' - 0"24' - 0"24' - 0"24' - 0"24' - 0"12' - 0"12' - 0"12' - 0"12' - 0"77' - 2"4' - 10"12' - 4"12' - 0"12' - 0"12' - 0"12' - 0"9' - 2"2' - 10"9 3/8"17' - 2"NEW BUILDING
ADDITION AREA
AND TOWER
NEW BUILDING
ENTRANCE
AND TOWER
STORAGE
SHANE CO GRAPHICS WALL -
GRAPHICS TO BE CHANGED
OUT AT EACH WINDOW (4
TOTAL)EVERY QUARTER
7.2 7.2
560 SF
3' - 3"6' - 0"5' - 6"6' - 0"5' - 0"6' - 0"4' - 5"3' - 7"15' - 3"
2' - 11"9' - 6"2' - 11"
A
A
A1
A1
B
B
B1
B1
C
C
D
D
E
E
11 11
12 12
13 13
14 14
7.2 7.21/4" / 12"1/2" / 12"R1
R1
R1
R2
R3
R4
R5R5 R5R5
R6
R712' - 6"19' - 4"
EQ14' - 1"EQ
EQ7' - 9"EQ1/4" / 12"
1/4" / 12"
R2
R8
NOTES
BENJAMIN TALPOSREVISIONS:
C-31704
8/9/2022 9:57:12 AME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022
SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGFLOOR PLAN -PROPOSEDA-2STACEY HALL
19900 STEVENS CREEK BLVD., CUPERTINO, CANORTH
SCALE:3/32" = 1'-0"
FLOOR PLAN - PROPOSED_PLANNING
3 8/8/2022 PLANNING RESPONSE
NOTE:
THE INTERIOR TENANT IMPROVEMENT PROJECT HAS BEEN SUBMITTED AS A
SEPARATE PROJECT UNDER PERMIT # BLD-2021-0181
SCALE:3/32" = 1'-0"
ROOF PLAN - DRAINAGE
NORTH
3
KEYNOTES - ROOF
Key
Value Keynote Text
R1 (N) TPO ROOF ASSEMBLY.
R2 (N) THROUGH-WALL ROOF DRAIN OPENING TO DRAIN TO (E)
LOWER ROOF ASSEMBLY.
R3 (N) SKYLIGHT.
R4 (N) PARAPET CAP. SEE EXTERIOR ELEVATIONS FOR COLOR.
R5 (E) TPO ROOF ASSEMBLY TO REMAIN. NO CHANGE TO
EXISTING ROOF DRAINAGE PATTERN.
R6 (E) ROOF DRAIN TO BE RELOCATED.
R7 (N) ROOF AND OVERFLOW DRAIN. ROUTE NEW DRAIN LINES
THROUGH (N) ENTRY TOWER TO (E) LOCATIONS. PROVIDE
NEW THROUGH-WALL OVERFLOW OPENING AND (N) GUTTER
AS REQUIRED.
R8 (N) STANDING SEAM METAL ROOF.
AH 09-22-2022
36 of 42
EXTERIOR MATERIAL FINISHES (M#)
DESIGNATION MATERIAL TYPE MANUFACTURER COLOR COMMENTS
M1 NOT USED ---
M2 METAL CLADDING AEP SPAN - FLEX SERIES COOL SLATE GREY MATCH EXISTING
M3 METAL CLADDING ALUCOBOND - ACENT
FLAT STOCK GRAPHIC MICA
M4 CERAMIC WALL TILE
CREATIVE MATERIALS
CORP - MOSA SOLID, V
(SMOOTH)
5102 VIVID WHITE
16"x24"
CONTROL/EXPANSION JOINTS EVERY 8'
TO 10' IN EA. DIRECTION W/ MIN. 1/2" JOINT
WIDTH
M5 FIBER CEMENT SIDING
ASPYRE COLLECTION -
ARTISAN V-GROOVE
SIDING (HARDIE BOARD
PRODUCT)
PRIMED PAINT MATERIAL: BENJAMIN MOORE CHELSEA
GREY HC-168
M7 METAL ACCENT TRIM ALUCOBOND - ACENT
FLAT STOCK PRIMED PAINT MATERIAL: BENJAMIN MOORE DINNER
PARTY AF-300
M8 LOUVERS -
COMPOSITE WOOD TBD WESTERN CEDAR
M9 CANVAS SUNBRELLA SLATE GREY 4684 BY OTHERS
M11 ALUMINUM
STOREFRONT KAWNEER (OR EQUIV.)
FRAME: CLEAR
ANODIZED
GLASS:
TRANSLUCENT
INSULATED
GLASS TO BE FROSTED FOR SECURITY AND
BIRD SAFETY PURPOSES
M12 COMPOSITE WOOD
PLANKS TBD WESTERN RED
M13 ALUMINUM
STOREFRONT KAWNEER (OR EQUIV.)
FRAME:
GRAPHITE
GLASS: CLEAR
INSULATED
(E) ROOF LINE (VARIEIS)
113' - 6"
FIRST FLOOR (F.F.)
100' - 0"
(E) HIGH PARAPET LEVEL
120' - 1"
E1 E2 E7 E8E8E8
E12E12E9E9
E8E13
E16
E18E18E18
E4E20
E1
(E) ROOF LINE (VARIEIS)
113' - 6"
FIRST FLOOR (F.F.)
100' - 0"
(E) HIGH PARAPET LEVEL
120' - 1"
(N) ENTRY TOWER LEVEL
123' - 0"
EQ 8' - 4"EQ
16' - 10"
NE2
NE5
M11
M3
3' - 6"NE10
16' - 0"
M4
NE15
(N) CORNER TOWER
127' - 0"
NE4
34 SF
3' - 7"9' - 9"
NE11
NE1M2
NE11
NE18
NE16
6' - 3"(E) ROOF LINE (VARIEIS)
113' - 6"
FIRST FLOOR (F.F.)
100' - 0"
FIRST FLOOR (F.F.)
100' - 0"
(E) HIGH PARAPET LEVEL
120' - 1"
(E) LOW PARAPET LEVEL
116' - 1"
E1
E1
E1
E1
E14
E3E5E8E11E10
E9 E12
E8
E9E12
E8
E7 E8E14E9E12
E8E12 E6 V.I.F.9' - 8"V.I.F.
9' - 6"
E18 E18 E18 E18 E18
E4 E4 E4 E4 BEYOND
METAL PANEL
E17
E18 E18 E18E19
E20 E20 E20
(E) ROOF LINE (VARIEIS)
113' - 6"
FIRST FLOOR (F.F.)
100' - 0"
FIRST FLOOR (F.F.)
100' - 0"
(E) HIGH PARAPET LEVEL
120' - 1"
(E) LOW PARAPET LEVEL
116' - 1"
(N) ENTRY TOWER LEVEL
123' - 0"
36' - 2"
3' - 3"6' - 0"5' - 6"6' - 0"5' - 0"6' - 0"4' - 5"
NE2
NE10NE10NE10
49' - 6"
NE6
8' - 6"2' - 11"9' - 6"2' - 11"9' - 1"2' - 11"9' - 0"
NE9 NE9 NE9NE108' - 0"MATCH (E)11' - 0"MATCH (E) OPENING
9' - 10"1' - 0"10' - 3"NE7 NE7NE7
NE8 NE5
M11M11M11
M5
M9M9M9
M4
M8M8M8
M7
NE11NE11
M11
NE10
24' - 3"
16' - 2"
M3
M3
M13
NE1
(N) CORNER TOWER
127' - 0"
NE17
NE11
M4
M12
NE16
NE11
NE18
EQ 7' - 0"EQ
20' - 9"6' - 3"NE17
BENJAMIN TALPOSREVISIONS:
C-31704
8/8/2022 1:06:42 PME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022
SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGEXTERIOR ELEVATIONSA-3STACEY HALL
19900 STEVENS CREEK BLVD., CUPERTINO, CASCALE:1/8" = 1'-0"A-3
1 ELEVATION - NORTH DEMO
SCALE: 1/8" = 1'-0"A-3
2 ELEVATION - NORTH PROPOSED
SCALE: 1/8" = 1'-0"A-3
3 ELEVATION - EAST DEMO
SCALE: 1/8" = 1'-0"A-3
4 ELEVATION - EAST PROPOSED
KEYNOTES - EXTERIOR EXISTING/DEMO
Key
Value Keynote Text
E1 (E) METAL CLADDING TO BE REMOVED.
E2 (E) SIGNAGE TO BE REMOVED AND SAVED FOR RELOCATION.
E3 (E) STOREFRONT ASSEMBLY TO BE REMOVED.
E4 (E) STUCCO AND WALL INFILL TO BE REMOVED AS REQUIRED
FOR NEW OPENINGS.
E5 (E) CANOPY TO BE REMOVED.
E6 (E) EXTERIOR FINISH AND WALL INFILL TO BE REMOVED FOR
NEW ENTRY.
E7 (E) WOOD PLANKING TO REMAIN.
E8 (E) METAL CLADDED ACCENT ELEMENT TO REMAIN.
E9 (E) STOREFRONT WINDOW TO REMAIN.
E10 (E) DOWNSPOUT TO REMAIN.
E11 (E) DOOR/FRAME TO REMAIN.
E12 (E) CANOPY TO REMAIN.
E13 (E) BRICK FINISH AND EXTERIOR WALL TO REMAIN, TYP.
E14 (E) EXTERIOR WALL TO REMAIN, TYP.
E16 (E) STUCCO AND WALL INFILL TO REMAIN.
E17 (E) ROOF DRAIN DOWNSPOUT TO BE REROUTED AS
NECESSARY.
E18 (E) BRICK FINISH ONLY TO BE REMOVED.
E19 (E) BRICK ARCHWAY TO BE REMOVED.
E20 (E) BRICK ARCHWAY TO REMAIN. GC TO PROTECT AND
PRESERVE DURING CONSTRUCTION.
KEYNOTES - EXTERIOR NEW
Key
Value Keynote Text
NE1 (N) METAL CLADDING PANEL TO MATCH (E).
NE2 (N) TOWER ELEMENT.
NE4 (E) APPROVED BACK-LIT ILLUMINATED SIGNAGE TO BE
REINSTALLED.
NE5 (N) PLANTER AND INTEGRAL BENCH - REQUIRED AS A
SECURITY ELEMENT TO PROTECT FRONT ENTRY FROM
VEHICLE ENTRY.
NE6 (N) EXTERIOR METAL STUD WALL.
NE7 (N) AWNING.
NE8 (N) PRE-MANUFACTURED CANOPY AND ANCHOR ROD
SUPPORTS.
NE9 (N) LOUVERS.
NE10 (N) STOREFRONT WINDOW/DOOR ASSEMBLY.
NE11 (N) LIGHT FIXTURE, TYP.
NE15 TILE CONTROL/EXPANSION JOINT. SPACING PER
MANUFACTURER.
NE16 (N) SKYLIGHT W/ TRANSLUCENT GLASS (FROSTED).
NE17 (N) POTENTIAL BACK-LIT ILLUMINATED SIGNAGE. OWNER TO
APPLY FOR SEPARATE SIGNAGE VARIANCE.
NE18 (N) SITE SECURITY BOLLARD WITH LED LIGHT, TYP.
3 8/8/2022 PLANNING RESPONSE
NOTES:
• ALL PARAPET COPING SHALL BE PAINTED TO MATCH ADJACENT WALL MATERIAL.
NOTES:
• ALL EXISTING EXTERIOR DESIGN ELEMENTS NOT IDENTIFIED
AS NEW (N) WERE PREVIOUSLY APPROVED UNDER THE
BUILDING OWNER'S SUBMITTAL FOR PLANNING APPROVAL.
REFERENCE PLANNING APPROVALS ARE AS SUCH:
DIR-2020-015 AND DP-2019-001.
3
3
3
AH 09-22-2022
37 of 42
07.20.2022
CUPERTINO FACADE
REVISED DESIGN
THIS DOCUMENT CONTAINS INFORMATION THAT IS PRIVILEGED AND CONFIDENTIAL. ANY UNAUTHORIZED
DISCLOSURE, REPRODUCTION, DISTRIBUTION OR USE OF THIS INFORMATION WITHOUT EXPRESS WRITTEN
AUTHORIZATION IS STRICTLY PROHIBITED.
AH 09-22-2022
38 of 42
CHAPTER ONE
VISUALIZATION
CUPERTINO FACADE - REVISED DESIGN l 07.20.2022
AH 09-22-2022
39 of 42
3 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 07.20.2022 07.20.2022
CHAPTER ONE - VISUALIZATION
*THE IMAGES SHOWN IN WINDOWS WILL CHANGE FROM TIME TO TIME.
THE SIZE OF THE IMAGES WILL CONSISTENTLY BE AS SHOWN.
STREET VIEWREVISED DESIGN
JAMES HARDIE
- ARTISAN
V-GROOVE
FIBER CEMENT
SIDING,
PAINTED
BLACK ANODIZED
ALUMINUM STOREFRONT
7
1
2
3
4
5
6
SOLARBAN 60
LOW - E GLASS
CLEAR
8
SOLARBAN 60
LOW - E GLASS
WHITE TRANSLUCENT
9
39
7 2
2
9 9
AH 09-22-2022
40 of 42
4 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 07.20.2022 07.20.2022
ENTRY VIEWREVISED DESIGN
CHAPTER ONE - VISUALIZATION
3
2 2
111
1 SIM.
3
4
JAMES HARDIE
- ARTISAN
V-GROOVE
FIBER CEMENT
SIDING,
PAINTED
5 5
5
BLACK ANODIZED
ALUMINUM STOREFRONT
7
1
2
3
4
5
6
7
7
SOLARBAN 60
LOW - E GLASS
CLEAR
8
SOLARBAN 60
LOW - E GLASS
WHITE TRANSLUCENT
9
99
8
99
6
AH 09-22-2022
41 of 42
5 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 07.20.2022 07.20.2022
AH 09-22-2022
42 of 42