Loading...
HomeMy WebLinkAboutAH 09-22-2022 Searchable PacketCITY OF CUPERTINO ADMINISTRATIVE HEARING AGENDA This will be a teleconference meeting with no physical location Thursday, September 22, 2022 5:00 PM TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION TO HELP STOP THE SPREAD OF COVID-19 In accordance with Government Code 54953(e), this will be a teleconference meeting without a physical location to help stop the spread of COVID-19. Members of the public wishing comment on an item on the agenda may do so in the following ways: 1) E-mail comments by 4:00 p.m. on Thursday, September 22 to the Committee at planning@cupertino.org. These e-mail comments will be received by the Committee members before the meeting and posted to the City’s website after the meeting. 2) E-mail comments during the times for public comment during the meeting to the Committee at planning@cupertino.org. The staff liaison will read the emails into the record, and display any attachments on the screen, for up to 3 minutes (subject to the Chair’s discretion to shorten time for public comments). Members of the public that wish to share a document must email planning@cupertino.org prior to speaking. 3) Teleconferencing Instructions Members of the public may observe the teleconference meeting or provide oral public comments as follows: Oral public comments will be accepted during the teleconference meeting. Comments may be made during “oral communications” for matters not on the agenda, and during the public comment period for each agenda item. To address the Committee, click on the link below to register in advance and access the meeting: Online Please click the link below to join the webinar: Page 1 AH 09-22-2022 1 of 42 Administrative Hearing Agenda September 22, 2022 https://cityofcupertino.zoom.us/webinar/register/WN_G4BqIU85Q36BWqF8dvnzTg Phone Dial: (669) 900 6833 and enter Webinar ID: 998 9559 9327 (Type *9 to raise hand to speak) Unregistered participants will be called on by the last four digits of their phone number. Or an H.323/SIP room system: H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) Meeting ID: 998 9559 9327 SIP: 99895599327@zoomcrc.com After registering, you will receive a confirmation email containing information about joining the webinar. Please read the following instructions carefully: 1. You can directly download the teleconference software or connect to the meeting in your internet browser. If you are using your browser, make sure you are using a current and up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain functionality may be disabled in older browsers, including Internet Explorer. 2. You will be asked to enter an email address and a name, followed by an email with instructions on how to connect to the meeting. Your email address will not be disclosed to the public. If you wish to make an oral public comment but do not wish to provide your name, you may enter “Cupertino Resident” or similar designation. 3. When the Chair calls for the item on which you wish to speak, click on “raise hand.” Speakers will be notified shortly before they are called to speak. 4. When called, please limit your remarks to the time allotted and the specific agenda topic. ROLL CALL APPROVAL OF MINUTES 1.Subject: Approve the October 28, 2021 Administrative Hearing Minutes Recommended Action: Approve the October 28, 2021 Administrative Hearing Minutes 1 - Draft Minutes POSTPONEMENTS Page 2 AH 09-22-2022 2 of 42 Administrative Hearing Agenda September 22, 2022 ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the Committee on any matter within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Commission from making any decisions with respect to a matter not on the agenda. PUBLIC HEARINGS 2.Subject: Development Permit and Architectural and Site Approval Permit for a 561 square foot addition to an existing commercial building located at 19900 Stevens Creek Boulevard. (Application No(s).: DP-2022-003; ASA-2022-005; Applicant: Kevin Tallman, Shane Co.; Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-038) Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachments 1 - 2) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Development Permit, and Architectural and Site Approval Permit Staff Report 1 - Draft Resolution for DP-2022-003 2 - Draft Resolution for ASA-2022-005 3 - Plan Set 4 - Rendering Package OLD BUSINESS NEW BUSINESS STAFF AND COMMITTEE REPORTS FUTURE AGENDA SETTING ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue, Cupertino, California 95014, during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section Page 3 AH 09-22-2022 3 of 42 Administrative Hearing Agenda September 22, 2022 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. Do not include any personal or private information in written communications to the City that you do not wish to make public, as written communications are considered public records and will be made publicly available on the City website. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 4 AH 09-22-2022 4 of 42 CITY OF CUPERTINO Agenda Item 22-11430 Agenda Date: 9/22/2022 Agenda #: 1. Subject: Approve the October 28, 2021 Administrative Hearing Minutes Approve the October 28, 2021 Administrative Hearing Minutes CITY OF CUPERTINO Printed on 9/15/2022Page 1 of 1 powered by Legistar™ AH 09-22-2022 5 of 42 City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE ADMINISTRATIVE HEARING REGULAR MEETING HELD OCTOBER 21, 2021 CALL TO ORDER Hearing officer Albert Salvador opened the meeting at 5:04 p.m. ROLL CALL Staff present: Albert Salvador, Assistant Community Development Director Erick Serrano, Senior Planner Outside attendee(s): Rebecca Tolentino Brice Colton APPROVAL OF MINUTES 1. Subject: Approve the July 22, 2021 Administrative Hearing meeting minutes Recommended Action: Approve the July 22, 2021 Administrative Hearing meeting minutes Minutes of the July 22, 2021 minutes were approved as written. POSTPONEMENTS – None ORAL COMMUNICATIONS – None WRITTEN COMMUNICATIONS – None CONSENT CALENDAR – None PUBLIC HEARINGS 2. Subject: Architectural and Site Approval to consider exterior and landscape alterations to an existing office building, and a Tree Removal Permit to allow for the removal of six (6) development trees. (Application No(s).: ASA-2021-002, TR-2021-037; Applicant: Brice Colton (Habitec Architecture); Location 18920-18922 Forge Dr.: (APN: 316-09-030) Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachments 1 and 2) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit (ASA-2021-002) and the Tree Removal Permit (TR-2021-037). Staff member Serrano provided a presentation and brief overview of proposed modifications. As condition of approval, applicant will need to apply for updated permit if applicant wishes to use the interior storage space as an additional functional office area. Hearing officer opened the public comment period and, seeing no hands raised, closed the public comment period. AH 09-22-2022 6 of 42 2 Hearing officer asked questions regarding parking and access to the proposed outdoor patio space, and concurred with Staff’s findings. DECISION: The application was approved by the Hearing Officer with no changes to the recommended actions. OLD BUSINESS – None NEW BUSINESS – None STAFF UPDATES AND COMMISSION REPORTS – None FUTURE AGENDA – None ADJOURNMENT: The meeting was adjourned at 5:24 p.m. to the next regularly scheduled meeting. Respectfully submitted: /s/Cyrah Caburian___ Cyrah Caburian Administrative Assistant AH 09-22-2022 7 of 42 CITY OF CUPERTINO Agenda Item 22-11356 Agenda Date: 9/22/2022 Agenda #: 2. Subject: Development Permit and Architectural and Site Approval Permit for a 561 square foot addition to an existing commercial building located at 19900 Stevens Creek Boulevard. (Application No(s).: DP-2022-003; ASA-2022-005; Applicant: Kevin Tallman, Shane Co.; Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-038) That the Hearing Officer adopt the draft resolutions (Attachments 1 - 2) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Development Permit, and Architectural and Site Approval Permit CITY OF CUPERTINO Printed on 9/15/2022Page 1 of 1 powered by Legistar™ AH 09-22-2022 8 of 42 ADMINISTRATIVE HEARING STAFF REPORT Meeting Date: September 22, 2020 Subject Development Permit and Architectural and Site Approval for a 561 square foot addition to an existing commercial building located at 19900 Stevens Creek Boulevard. (Application No(s).: DP-2022-003; ASA-2022-005; Applicant: Kevin Tallman, Shane Co.; Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-038) Recommended Action That the Hearing Officer adopt the draft resolutions (Attachments 1 – 2) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Development Permit, and Architectural and Site Approval Permit Discussion Project Data: General Plan Designation Office/Commercial/Residential General Plan Special Area Central Stevens Creek Sub-area of the Heart of the City Special Area Zoning Designation P(CG, Res) Lot Size 83,766 sq. ft. (no change) Allowed Existing Proposed Floor Area N/A 28,813 SF 29,374 SF Building Height 45 feet 20’-1” 33’-3” Setbacks Required Existing Proposed Front 35 feet from back of curb 50’-6” No change (flush with existing) Side (Greater of one-half (1/2) times height of building, or ten (10) feet) 10’-8” West side - 11’-1” East side - 71’-10” No change (flush with existing) Rear (Greater of one and one-half (1.5) times height of building or 20 feet) 30’-11” 117 feet No change AH 09-22-2022 9 of 42 DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022 ASA-2022-005 Page 2 Project Consistency With: General Plan Yes Zoning Yes Environmental Assessment Categorically Exempt per Section 15301 and 15332 (Class 1) of the California Environmental Quality Act (CEQA) Background: The property is located south of Stevens Creek Blvd, between S. Blaney and S. Portal Avenues. The property is located within the Central Stevens Creek sub- area of the Heart of the City Special Area, which serves as the main commercial corridor in the City. The property is currently occupied by Keller Williams, Shane Co. Jewelers, and Dance Academy USA. The site is surrounded by other commercial and commercial office uses (Cort Furniture, Pacific Workplaces, Travigne retail) to the north, single family residences to the south, a condominium complex to the east, and commercial uses (Arya Restaurant, a bank and a gas station) to the west. Application Summary The applicant, Kevin Tallman of Shane Co., is requesting to add 561 square feet to the existing commercial building and improve the tenant façade. Analysis: Development Permit The applicant is proposing to add 561 square feet to the northeast corner at the front of the building, expanding over existing landscape area by adding a tower element with a skylight to accommodate a “Diamond Viewing Area” within the added space. The addition will be flush with both the existing north and east elevations, maintaining the current setbacks. See Figure 2 below for a partial site plan, and Figure 3 for the proposed floor plan. The project site currently meets the Heart of the City’s common open space standards. There is no reduction in the common open space area as part of this proposal. Figure 1: Site aerial STEVENS CREEK BLVD BLANEY AVENUE PORTAL AVENUE AH 09-22-2022 10 of 42 DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022 ASA-2022-005 Page 3 This 561 square feet addition will reduce the commercial development allocation within the Heart of the City Special Area. Currently, it has 839,994 square feet available and with the approval of this application, the available balance will be 839,433 square feet. Architectural and Site Approval The addition (see area highlighted red in Figures 2 & 3 above) is proposed to enhance the façade by adding a tower element with a skylight above the new addition, as well as a smaller tower entry feature to accentuate the main entrance to the tenant space. The design team for Shane Co. propose to integrate the “Diamond Viewing Area” addition and façade upgrade to complement the existing contemporary architectural style. The materials chosen consists of natural stone, wood, and frosted glass, particularly Figure 2: Partial Site Plan indicating the proposed expansion (circled in red). Figure 3: Shane Co. floor plan with the proposed expansion (circled in red). AH 09-22-2022 11 of 42 DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022 ASA-2022-005 Page 4 on the skylight on the top of the main tower. This added glass feature as a primary design element would also allow customers to view their diamonds in natural light by bringing them into the daylit room to view the diamond jewelry in a natural setting. The proposed design adheres to the contemporary style by utilizing clean lines over straight and harsh lines. The City’s architectural consultant, RRM Design Group, has reviewed the design and ensured that the tower massing remain prominent, the windows (particularly along the east façade) are aligned and proportionate, and that the materials used are compatible with the existing building, while also being durable. This includes using composite wood, and metal paneling. Please refer to Figures 4 & 5 to compare the existing and proposed elevations. The proposed addition is within the 1:1 slope line from the arterial curb as required by the General Plan. No signs are being approved as part of this application. Landscaping In compliance with the City’s C3 requirements, Public Works has conditioned the applicant to complete a C3 Impervious Surface Data Form to reflect the total new and/or replaced impervious area. No trees are proposed to be removed with this application. Parking Based on the proposed tenant mix of 25% office uses (the maximum allowed in General Commercial CG zones) and 75% other permitted commercial uses, as well as the added square footage, the project must provide 114 parking spaces. The applicant proposes 114 Figure 4: Existing (top) and proposed (bottom) north elevation. Figure 5: Existing (top) and proposed (bottom) east elevation. AH 09-22-2022 12 of 42 DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022 ASA-2022-005 Page 5 vehicular spaces which is adequate. The project must provide 22 Class II bicycle parking spaces. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301 – Existing Facilities and 15332 - In- Fill Development Projects. Other Department/Agency Review The City’s Building Division, Environmental Programs Division, Public Works Department, Cupertino Sanitary District, and the Santa Clara County Fire Department have no objections to the project. Public Noticing And Community Outreach The following table is a summary of the noticing for this project: Notice of Public Hearing Agenda  Site Signage (at least 10 days prior to hearing)  102 notices mailed to property owners within 300 feet of the project site (at least 10 days prior to the hearing)  Posted on the City's official notice bulletin board (five days prior to hearing)  Posted on the City of Cupertino’s Web site (five days prior to hearing) No comments have been received at the time of production of this staff report. Permit Streamlining Act This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Plans Received: May 9, 2022; Deemed Incomplete: June 9, 2022 Revisions Received: August 9, 2022; Deemed Complete: August 25, 2022 Since this project is Categorically Exempt, the City has 60 days (until October 25, 2022) to make a decision on the project. Conclusion Staff recommends approval of the Development Permit, and Architectural and Site Approval permit, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all applicable findings for approval of the proposed project, consistent with chapters 19.156, and 19.168 of the Cupertino Municipal Code, may be made as follows: AH 09-22-2022 13 of 42 DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022 ASA-2022-005 Page 6 Development Permit 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The current building is a one-story commercial building that is located within the Heart of the City Special Area that promotes retail and active uses. The zoning district allows the 45 feet tall buildings, while the existing building measures approximately 20 feet. The proposal will add a tower element that will increase the height of the building to approximately 33 feet. The project will add 561 square feet, filling in the northeast corner of the existing building. There are no floor area limitations on development in the Heart of the City Special Area. There will be minimal change to the massing and no change to the setbacks. Therefore, the proposal will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposed development will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed development is in conformance with the Cupertino General Plan and the proposal has met the development standards specified in the Heart of the City Specific Plan and the City Municipal Code such as heights, setbacks and landscaping requirements. Furthermore, the use of the building is proposed to be consistent with the goals of the General Plan to maintain a commercial core along Stevens Creek Blvd. The project is categorically exempt from CEQA under Section 15301 since it is an addition to an existing structure of less than 10,000 sq. ft. Furthermore, since the building is already a developed site and merely proposes to fill in a corner of the existing building, the project is also categorically exempt from CEQA under Section 15332 - In-Fill Development Projects. Architectural and Site Approval 3. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes to enhance portions of the north and east elevations while adding 561 square feet to fill in the northeast corner of the existing building. The upgrades include a tower element and enhanced main entrance completed in a contemporary style, and with mate rials that are considered quality and durable. All the proposed changes are minor improvements to the existing building and site and will not be detrimental or injurious to property or improvements in the vicinity. 4. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional AH 09-22-2022 14 of 42 DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022 ASA-2022-005 Page 7 use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale except the minor addition of the tower element where the 561 square foot addition is proposed. The architectural feature will add 13’-6” feet at the northeast corner of the building, which will be within the 45 foot height limit and under the required 1:1 slope line of the General Plan. No other height or scale modifications are proposed that will impact the existing massing. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. Through this proposal the applicant has incorporated existing materials with attractive contemporary stone, metal, and composite wood elements that are suited and compatible with the character of the area. Existing mature trees are proposed to be retained. Outdoor lighting incorporates appropriate shielding and is designed to meet the dark-sky requirements of the Municipal Code. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. There is currently a ground sign located within the front setback area and no modifications are proposed. At this point, no signs are approved as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and AH 09-22-2022 15 of 42 DP-2022-003; 19900 Stevens Creek Blvd. September 22, 2022 ASA-2022-005 Page 8 visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and will maintain the existing buffering and setbacks established adjacent to the existing residential neighborhoods. Next Steps The permit will be effective 14 calendar days from the date of the hea ring. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until September 22, 2024. The applicant may apply for a one-time two-year extension before the approval expires. Prepared by: Gian Paolo Martire, Senior Planner Reviewed and Approved for submission by: Piu Ghosh, Planning Manager ATTACHMENTS 1. Draft Resolution for DP-2022-003 2. Draft Resolution for ASA-2022-005 3. Plan Set 4. Rendering Package AH 09-22-2022 16 of 42 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A DEVELOPMENT PERMIT TO ALLOW A 561 SQUARE FEET ADDITION TO AN EXISTING BUILDING FOR COMMERCIAL USES LOCATED AT 19900 STEVENS CREEK BLVD. SECTION I: PROJECT DESCRIPTION Application No.: DP-2022-003 Applicant: Kevin Tallman Location: 19900 Stevens Creek Blvd. (APN 369-05-038) SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT: WHEREAS, the City of Cupertino received an application for a Development Permit to consider allowing a 561 square feet addition to an existing retail building for commercial uses, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for the reasons set forth in the staff report dated September 22, 2022 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and AH 09-22-2022 17 of 42 Resolution No. DP-2022-003 September 22, 2022 Page 2 WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The current building is a one-story commercial building that is located within the Heart of the City Special Area that promotes retail and active uses. The zoning district allows the 45 feet tall buildings, while the existing building measures approximately 20 feet. The proposal will add a tower element that will increase the height of the building to approximately 33 feet. The project will add 561 square feet, filling in the northeast corner of the existing building. There are no floor area limitations on development in the Heart of the City Special Area. There will be minimal change to the massing and no change to the setbacks. Therefore, the proposal will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposed development will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed development is in conformance with the Cupertino General Plan and the proposal has met the development standards specified in the Heart of the City Specific Plan and the City Municipal Code such as heights, setbacks and landscaping requirements. Furthermore, the use of the building is proposed to be consistent with the goals of the General Plan to maintain a commercial core along Stevens Creek Blvd. The project is categorically exempt from CEQA under Section 15301 since it is an addition to an existing structure of less than 10,000 sq. ft. Furthermore, since the building is already a developed site and merely proposes to fill in a corner of the existing building, the project is also categorically exempt from CEQA under Section 15332 - In-Fill Development Projects. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimo ny, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof,: The application for a Development Permit, Application no. DP-2022-003 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing recor d concerning Application no. DP-2022-003 as set forth in the Minutes of the Administrative Hearing Meeting of September 22, 2022 and are incorporated by reference as though fully set forth herein. AH 09-22-2022 18 of 42 Resolution No. DP-2022-003 September 22, 2022 Page 3 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Stacey Hall titled “Shane Co. Exterior Improvements” consisting of five (5) sheets labeled G0.0, G0.1, and A-1 – A-3, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. ASA-2019-006 and TR-2019-032 shall be applicable to this approval. 5. DEVELOPMENT ALLOCATION The applicant shall receive an allocation of 561 square feet of the retail commercial allocations from the Heart of the City Special Area. 6. BELOW MARKET RATE PROGRAM The applicant shall participate in the City’s Below Market Rate (BMR) Housing Program by paying the Below Market Rate linkage fee for Commercial use concurrent with issuance of building permits at the rate in effect at that time. The current fee is $13.52 per net new square feet (~561 sq.ft.) for commercial use. 7. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. AH 09-22-2022 19 of 42 Resolution No. DP-2022-003 September 22, 2022 Page 4 8. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall or their designee that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. 9. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. Staging of construction equipment shall not occur within 40 feet of any residential property. 10. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 11. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an AH 09-22-2022 20 of 42 Resolution No. DP-2022-003 September 22, 2022 Page 5 applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 12. BAAQMD BASIC CONTROL MEASURES (DUST CONTROL) Project shall comply with the Bay Area Quality Management District’s Basic Construction Mitigation Measures as follows: a. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. b. All haul trucks transporting soil, sand, or other loose material off -site shall be covered. c. All visible mud or dirt tracked-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unles s seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of C alifornia Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. A publicly visible sign shall be posted with the telephone number and person to contact at the City of Cupertino regarding dust complaints. This person sha ll respond and take corrective action within 48 hours. The BAAQMD phone number shall also be visible to ensure compliance with applicable regulations. Applicant shall indicate compliance with BAAQMD’s basic control measures on all demolition, construction and grading permits and construction management plan(s). 13. NOISE AND VIBRATION NOTICE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall send notices of the AH 09-22-2022 21 of 42 Resolution No. DP-2022-003 September 22, 2022 Page 6 planned activity by first class mail to off-site businesses and residents within 500 feet of the project site. The City will provide a template notice and mailing addresses for the Applicant’s use. The notice must be approved by City staff prior to sending. The project applicant shall provide the City with evidence of mailing of the notice, upon request. Please note that, if pile driving, the requirements for noticing and monitoring outlined in City Code Section 17.04.050 G (3) shall apply. 14. NOISE AND VIBRATION SIGNAGE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall ensure that a sign measuring at least four feet by six feet shall be posted on construction fencing at the entrance(s) to the job site, clearly visible to the public, and include the following: a. Permitted construction days and hours; b. A description of proposed construction activities; c. Telephone numbers of the City’s and contractor’s authorized representatives that are assigned to respond in the event of a noise or vibration complaint; and d. Contact information for City’s and contractor’s authorized representatives that are assigned to respond in the event of a complaint related to fugitive dust, pursuant to the requirements for compliance with BAAQMD’s CEQA Air Quality Guidelines. If the authorized contractor’s representative receives a complaint, they shall investigate, take appropriate corrective action, and report the complaint and the action taken to the City within three business days of receiving the complaint. 15. NOISE DURING CONSTRUCTION Prior to issuance of any demolition, grading or building permit, include on plans a note that, during project construction, the project applicant shall incorporate the following measures to reduce noise during construction and demolition activity: a. The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City’s Planning Department for review and approval prior to issuance of the first permit. The Construction Noise Plan shall demonstrate compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The details of the Construction Noise Control Plan shall be included in the applicable construction documents and implemented by the on-site Construction Manager. Noise reduction measures selected and implemented shall be based on the type of construction equipment used on the site, distance of construction activities from sensitive receptor(s), site terrain, and other features on and surrounding the site AH 09-22-2022 22 of 42 Resolution No. DP-2022-003 September 22, 2022 Page 7 (e.g., trees, built environment) and may include, but not be limited to, temporary construction noise attenuation walls, high quality mufflers. During the entire active construction period, the Construction Noise Control Plan shall demonstrate that compliance with the specified noise control requirements for construction equipment and tools will reduce construction noise in compliance with the City’s daytime and nighttime decibel limits. b. Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. c. Signs will be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. d. During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells will be for safety warning purposes only. The construction manager will use smart back -up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and law. 16. FUGITIVE DUST CONTROL Prior to issuance of the any demolition, grading, or building permit, include on all permit plans, the full text of each of the Bay Area Air Quality Management District’s Basic Control Measures from the latest version of BAAQMD’s CEQA Air Quality Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive dust (i.e., particulate matter PM2.5 and PM10) during demolition, ground disturbing activities and/or construction. 17. DARK SKY COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved lighting plans to comply with development standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting Requirements. In the event changes are proposed from the approved plans, said changes must be reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all documentation required to determine compliance with the Municipal Code. 18. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless AH 09-22-2022 23 of 42 Resolution No. DP-2022-003 September 22, 2022 Page 8 the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 19. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. AH 09-22-2022 24 of 42 Resolution No. DP-2022-003 September 22, 2022 Page 9 SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT. 20. C3 IMPERVIOUS DATA FORM Complete a C.3. Impervious Surface Data Form to reflect the total new and/or replace impervious area. 21. GRADING & DRAINAGE Show proposed drainage patterns using arrows, flow lines and/or slope percentage. No concentrated flow is permitted across the right-of-way and no drainage is permitted to flow to neighboring properties. Direct on-site drainage through landscaped swales and allow drainage towards the public street. SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPT. 22. REQUIRED FIRE FLOW The fire flow for this project is 4750 GPM at 20 psi residual pressure. Since an automatic fire sprinkler system is installed, the fire flow will be reduced by 75%, establishing a required adjusted fire flow of 1,188 GPM at 20 psi residual pressure. Note: The minimum required number and spacing of the hydrants shall be in accordance with CFC Table C102.1. Letter received. Hydrant is capable of meeting required fire flow. 23. FIRE SPRINKLER MODIFICATION REQUIRED Provide submittal to SCCFD for installation of each of the systems listed below, per CFC Chapter 1 and 9. Submit shop drawings (3 sets) and a permit application to the SCCFD for approval before altering the system. 24. FIRE ALARM MODIFICATION REQUIRED Any modifications to the existing fire alarm system re quires drawings and a permit application be submitted to SCCFD for approval before any install or alteration occurs. PASSED AND ADOPTED this 22nd day of September 2022 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: _________ ________ AH 09-22-2022 25 of 42 Resolution No. DP-2022-003 September 22, 2022 Page 10 Gian Paolo Martire Albert Salvador Senior Planner Administrative Hearing Officer AH 09-22-2022 26 of 42 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW FAÇADE IMPROVEMENTS TO AN EXISTING COMMERICAL BUILDING LOCATED AT 19900 STEVENS CREEK BLVD. SECTION I: PROJECT DESCRIPTION Application No.: ASA-2022-005 Applicant: Kevin Tallman Location: 19900 Stevens Creek Blvd. (APN 369-05-038) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing modifications to the exterior building materials and landscaping for an existing retail building, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Cupertino Municipal Code, and the Administrative Hearing Officer has held at least one public meeting with regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) (“CEQA”), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Project and has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for the reasons set forth in the staff report dated September 22, 2022 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and AH 09-22-2022 27 of 42 Resolution No. ASA-2022-005 September 22, 2022 Page 2 WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes to enhance portions of the north and east elevations while adding 561 square feet to fill in the northeast corner of the existing building. The upgrades include a tower element and enhanced main entrance completed in a contemporary style, and with materials that are considered quality and durable. All the proposed changes are minor improvements to the existing building and site and will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale except the minor addition of the tower element where the 561 square foot addition is proposed. The architectural feature will add 13’-6” feet at the northeast corner of the building, which will be within the 45 foot height limit and under the required 1:1 slope line of the General Plan. No other height or scale modifications are proposed that will impact the existing massing. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. AH 09-22-2022 28 of 42 Resolution No. ASA-2022-005 September 22, 2022 Page 3 Through this proposal the applicant has incorporated existing materials with attractive contemporary stone, metal, and composite wood elements that are suited and compatible with the character of the area. Existing mature trees are proposed to be retained. Outdoor lighting incorporates appropriate shielding and is designed to meet the dark-sky requirements of the Municipal Code. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. There is currently a ground sign located within the front setback area and no modifications are proposed. At this point, no signs are approved as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and will maintain the existing buffering and setbacks established adjacent to the existing residential neighborhoods. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, The application for an Architectural and Site Approval, Application no. ASA-2022-005 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. ASA-2022-005 as set forth in the Minutes of the Administrative Hearing Meeting of September 22, 2022 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Stacey Hall titled “Shane Co. Exterior Improvements” consisting of five (5) sheets labeled G0.0, G0.1, and A-1 – A-3, except as may be amended by conditions in this resolution. AH 09-22-2022 29 of 42 Resolution No. ASA-2022-005 September 22, 2022 Page 4 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. DP-2022-003 shall be applicable to this approval. 4. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 5. EXTERIOR BUILDING MATERIALS/TREATMENTS a. The final building exterior plan shall closely resemble the details shown on the original approved plans. b. No fencing is approved within the front setback area. c. All final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. d. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 6. WINDOW DETAILS All storefront windows shall be kept open and transparent to the greatest extent possible. The final storefront design and window display shall be reviewed and approved by the Director of Community Development prior to issuance of building permits for tenant improvements. No changes shall be made to the transparency of the windows without the express approval of the Director of Community Development. 7. BICYCLE PARKING In accordance with CMC Chapter 19.124 Parking, applicant is to provide 22 Class II bicycle parking spaces. AH 09-22-2022 30 of 42 Resolution No. ASA-2022-005 September 22, 2022 Page 5 8. SIGNAGE Signage is not approved with this application. Signage shall conform to the City Sign Code. 9. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy. 10. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 11. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against AH 09-22-2022 31 of 42 Resolution No. ASA-2022-005 September 22, 2022 Page 6 the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 12. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. PASSED AND ADOPTED this 22nd day of September 2022 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Gian Martire Albert Salvador Senior Planner Administrative Hearing Officer AH 09-22-2022 32 of 42 SHANE CO. CUPERTINO DESIGN REVIEW DRAWINGS 4.20.2022 19900 STEVENS CREEK BLVD. - CUPERTINO, CA PROJECT TEAM SHANE, CO. CONTACT: KEVIN TALLMAN PH: 720.874.2791 EMAIL: KEVIN.TALLMAN@WSMCORP.COM OWNER / APPLICANT STACEY HALL 5732 CAMAS CT. POLLOCK PINES, CA 95726 PH: 510.220.1193 EMAIL: SBOWEN505@YAHOO.COM ARCHITECT VICINITY MAPPROJECT INFORMATION BUILDING INFORMATION DEFERRED / SEPARATE PERMITS SITE INFORMATION 2019 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R. 2019 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R. 2019 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R. 2019 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R. 2019 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R. 2019 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R. 2019 CALIFORNIA FIRE CODE, PART 9, TITLE 24 C.C.R. 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE (CAL GREEN), PART 11, TITLE 24 C.C.R. APPLICABLE CODES SCOPE OF WORK THE SCOPE OF WORK INCLUDED HEREIN INCLUDES TENANT EXTERIOR IMPROVEMENTS. IMPROVEMENTS INCLUDE A NEW, 560 SF ADDITION AND TOWER ELEMENT, A NEW MAIN ENTRY TOWER ELEMENT AND NEW EXTERIOR FINISHES ON THE NORTH-EAST CORNER OF THE EXISTING STRUCTURE LOCATED AT 19900 STEVENS CREEK BLVD. CONSTRUCTION TYPE:VB NUMBER OF STORIES:1-STORY OVERALL BUILDING AREA: 28,813 SF ADDITION AREA:561 SF OCCUPANCY TYPES:M / B / S-1 (ACCESSORY_ FIRE SPRINKLER: YES (IN ACCORDANCE WITH 903.3.1.1) FIRE ALARM:YES TOTAL BUILDING OCCUPANTS: 258 ASSESSOR'S PARCEL:369-05-044 ZONING CODE USE:P (CG, RES) LOT AREA:83,766 SF PROJECT LOCATION .GENERAL. G0.0 COVER SHEET G0.1 SYMBOLS AND ABBREVIATIONS .ARCHITECTURAL. A-1 SITE PLAN A-2 FLOOR PLAN - PROPOSED A-3 EXTERIOR ELEVATIONS BENJAMIN TALPOSREVISIONS: C-31704 8/8/2022 1:09:52 PME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022 SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGCOVER SHEETG0.0STACEY HALL 19900 STEVENS CREEK BLVD., CUPERTINO, CASHEET INDEX 3 8/8/2022 PLANNING RESPONSE 3 AH 09-22-2022 33 of 42 GENERAL SYMBOLS SHEET ON WHICH DRAWN REVISION NUMBER WALL TYPE SPECIALTY DOOR DOOR NUMBER ROOM NUMBER COLUMN LINE LEGEND/KEY NOTE BUILDING ELEVATION INTERIOR ELEVATION DETAIL REFERENCE WALL SECTION CROSS REFERENCE DETAIL NUMBER (CONTINUOUS BLOCKING) BATT INSULATION RIGID INSULATION CARPET (LARGE SCALE) TILE (LARGE SCALE) ACOUSTICAL TILE (LARGE SCALE) PROTECTION BOARD CONCRETE MASONRY UNIT METAL STUDS STEEL (LARGE SCALE) (LARGE SCALE) GYPSUM WALL BOARD PLYWOOD (LARGE SCALE) BRICK VENEER SHINGLES STONE GLASS (TRIM/FINISH) WOOD (NON-CONTINUOS BLOCKING) WOOD GRAVEL/BALLAST WOOD GYM FLOOR STEEL PRECAST CONCRETE CONCRETE SAND EARTH CASEWORK ELEVATION SIMILAR OR TYPICAL REFERENCE SIMILAR OR TYPICAL REFERENCE NO DESCRIPTION 101 ??? ?SIM BUILDING SECTION ? ? ROOM NAME ??? ? ??? SIM ? ??? SIM ? ??? SIM ? ??? SIM XX/ A11.X ??EastWINDOW / STOREFRONT NUMBER??? 1i 1. SCOPE DOCUMENTS: THESE DRAWINGS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPT, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTRUAL ELEMENTS AND THE TYPE OF STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS. ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DEXRIBED, THE CONTRACTOR SHALL FURNISH ALL ITESM REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK. DECISIONS OF THE ARCHITECT AS TO THE ITEMS OF WORK INCLUDED WITHIN THE SCOPE OF THESE DOCUMENTS SHALL BE FINAL AND BINDING ON THE CONTRACTOR AND THE OWNER. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE STARTING THE WORK. SHOULD THE CONTRACTOR BECOME AWARE OF A DISCREPENCY, OR ITEM OF NON-CONFORMANCE, IN THE DRAWINGS OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY BOTH THE ARCHITECT AND THE OWNER AT ONCE FOR INSTRUCTION. IF CONTRACTOR PROCEEDS WITH THE WORK AFFECTED WITHOUT INSTRUCTION OR APPROVAL FROM THE ARCHITECT AND OWNER, THE CONTRACTOR SHALL PROCEED AT THEIR OWN RISK AND SHALL MAKE GOOD ANY RESULTING DAMAGE OR DEFECT TO THE SATISFACTION OF THE ARCHITECT. SHOULD A CONFLICT OCCUR ON OR BETWEEN THE DRAWINGS AND SPECIFICATIONS, THE CONTRACTOR IS DEEMED TO HAVE ESTIMATED THE MOST EXPENSIVE MATERIAL AND/OR CONSTRUCTION METHOD INVOLVED, UNLESS A WRITTEN DECISION FROM THE ARCHITECT HAS BEEN OBTAINED WHICH DESCRIBES AND ALTERNATE METHOD AND/OR MATERIAL. CONTRACTO SHALL ALSO NOTIFY THE ARCHITECT OF ANY SUCH DISCREPENCY IMMEDIATELY. 3. ALL CONSTRUCTION AND MATERIALS SHALL BE AS SPECIFICED AND AS REQUIRED BY THE CURRENT EDITION OF THE CALIFORNIA BUILDING CODE, CALIFORNIA ELECTRICAL CODE, CALIFORNIA MECHANICAL CODE, CALIFORNIA PLUMBING CODE, LOCAL CODES AND AUTHORITIES. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT OF THE BUILDING ON THE SITE. 5. ALL MATERIAL SOTRES ON THE SITE SHALLBE PROPERLY STACKED AND PROTECTED TO PREVENT DAMAGE AND DETERIORATION UNTIL USE. FAILURE TO PROTECT MATERIALS MAY BE CASUE FOR REJECTION OF THE WORK. 6. THE CONTRACTOR SHALL CONFINE HIS OPERATIONS ON TEH SITE TO AREAS PERMITTED BY THE OWNER AND IS DEEMED NECESSARY TO COMPLETE THE WORK. THE JOB SITE SHALL BE MAINTAINED IN A CLEAN, ORDERLY CONDITION FREE OF DEBRIS AND LITTER, AND SHALL NOT BE UNREASONABLY ENCUMBERED WITH ANY MATERIALS OR EQUIPMENT. EACH SUBCONTRACTO IMMEDATIATELY UPON COMPLETION OF EACH PHASE OF HIS WORK SHALL REMOVE ALL TRASH AND DEBRIS AS A RESULT OF HIS OPERATIONS. 7. THE CONTRACTOR SHALL DO ALL CUTTING, FITTING OR PATCHING OF HIS WORK THAT MAY BE REQUIRED TO MAKE SEVERAL PARTS FIT TOGETHER PROPERLY AND SHALL NOT ENDANGER ANY OTHER WORK BY CUTTING, EXCAVATING OR OTHERWISE ALTERING THE TOTAL WORK OR ANY PART OF IT. ALL PATCHING, REPAIRING AND REPLACING OF MATERIALS AND SURFACES, CUT OR DAMAGED IN EXECUTION OF THE WORK, SHALL BE DONE WITH APPLICABLE MATERIALS SO THAT SURFACES REPLACED WILL, UPON COMPLETION, MATCH SURROUNDING SIMILAR SURFACES. 8. NO PORTION OF THE WORK REQUIRING A SHOP DRAWING OR SAMPLE SUBMISSION, AS OUTLINED BY THE SPECIFICATIONS, SHALL BE COMMENCED UNTIL THE SUBMISSION HAS BEEN APPROVED BY THE ARCHITECT. ALL SUCH PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH THE APPROVED SHOP DRAWINGS AND SAMPLES. CONTRACTOR TO REVIEW AND APPROVED THAT ALL SAMPLES, SHOP DRAWINGS, DIAGRAMS, ETC. ARE IN CONFORMANCE WITH THE CONTRACT DOCUMENTS PRIOR TO SENDING TO THE ARCHITECT FOR REVIEW. 9. PROVIDE ALL NECESSARY BLOCKING, BACKING AND FRAMING FOR LIGHT FIXTURES, ELECTRICAL UNITS, A.C. EQUIPMENT AND ALL OTHER ITEMS AS REQUIRED. 10. WHERE LARGER SUTDS OR FURRINGS ARE REQUIRED TO COVER DUCTS, PIPING AND CONDUITS, THE LARGER STUD SIZE OR FURRING SHALL EXTEND TO THE FULL SURFACE OF THE WALL WIDTH AND LENGTH WHERE THE FURRING OCCURS. 11. DETAILS MARKED AS "TYPICAL" SHALL APPLY IN ALL INSTANCES U.N.O. 12. CONTRACTOR TO VERIFY HOURS OF CONSTRUCTION WITH J.H.A. AND OWNER PRIOR TO WORK COMMENCING. 1. GENERAL: CONSTRUCTION SHALL COMPLY WITH THE AIR LEAKAGE REQUIREMENTS OF THE CALIFORNIA ADMINISTRATIVE CODE, TITLE 24, PART 6, DIVISION T20, CHAPTER 2, SUBCHAPTER 4, ARTICLE 2, SECTION T20-1495-1495 FOR WINDOWS, DOORS, CAULKING AND SEALING. 2. CAUKLING AND SEALING: OPEN EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, BETWEEN WALL AND FOUNDATION, BETWEEN WALL AND ROOF, BETWEEN WALL PANELS, AT PENETRATIONS OF UTILITY SERVICES THROUGH WALLS, FLOORS AND ROOF, AND ALL OTHER OPENINGS IN THE EXTERIOR ENVELOPE SHALL BE SEALED, CAULKED, GASKETED OR WEATHERSTRIPPED TO LIMIT AIR LEAKAGE. 3. WINDOWS: FIXED WINDOWS CONSTRUCTION AND/OR ERECTED ON SITE SHALL BE SEALED TO LIMIT AIR INFILTRATION. 4. DOORS: ALL EXTERIOR DOORS SHALL BE SO DESIGNED TO LIMIT AIR LEAKAGE AROUND THEIR PERIMETER WHEN IN A CLOSED POSITION. 5. ALL DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE AT THE HEAD AND SILL. 6. DOORS MOUNTED ON EITHER THE INSIDE OR OUTISDE OF AN EXTERIOR WALL SHALL HAVE A MINIMUM ONE-HALF INCH LAP AT EACH JAMB. 7. DOORS REQUIRING VERTICAL TRACK OR GUIDES SHALL USE A CONTINUOUS MOUNTING ANGLE, SEALED IN ACCORDANCE WITH SECTION T-20-1495 (E), AT EACH JAMB. 8. DORRS MOUNTED BETWEEN THE JAMBS SHALL HAVE A CONTINUOUS SEAL OR BAFFLE AT EACH JAMB. 9. MEETING RAILS OF SECTIONLAL DOORS AND MEETING STILES OF RAILS OF BI-PARTING DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE. 10. SWINGING AND REVOLVING DOORS SHALL BE WEATHERSTRIPPED AT THE HEAD, SILL AND JAMB. 11. DOUBLE DOORS SHALL BE PROVIDED WITH A WEATHERTIGHT ASTRGAL OR CLOSURE AT THE CENTER CRACK. GENERAL NOTES: ENERGY NOTES: B to B BACK TO BACK BBO BOILER BLOW OFF BC BALANCING COCK BCMU BURNISHED CONCRETE MASONRY UNIT BD BOARD BD BACK DRAFT DAMPER BET BETWEEN BFP BACKFLOW PREVENTOR BFR BELOW FLOOR BF BOILER FEED BFV BUTTERFLY VALVE BHP BREAK HORSE POWER BKR BREAKER BL BUILDING LINE BLDG BUILDING BLK BLOCK BLKG BLOCKING BLKHD BULKHEAD BM BEAM BM BENCH MARK BOD BOTTOM OF DUCT BOF BOTTOM OF FOOTING BOTT BOTTOM BRDG BRIDGING BRG BEARING BRKT BRACKET BSMT BASEMENT BT BATH TUB BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNIT PER HOUR BUR BUILT UP ROOFING BV BALL VALVE C CONDENSER WATER C CONDUIT CA COMBUSTION AIR CAB CABINET CANT CANTILEVER CAP CAPACITY CAS CASING CBD CHALKBOARD CD CONDENSATE DRAIN CCTV CLOSED CIRCUIT TELEVISION CE COVER ELEVATION CEM CEMENT CENT CENTRIFUGAL CER CERAMIC CF CUBIC FEET CFH CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CG CORNER GUARD CH CHANNEL CI CAST IRON CI CURB INLET CIP CAST IN PLACE CIP CAST IRON PIPE CIRC CIRCULATING CJ CONTROL JOINT CJA CONTROL JOINT ABOVE CKT CIRCUIT CKT BK CIRCUIT BREAKER CL CENTERLINE CL CIRCUIT LINE CLG CEILING CLOS CLOSET CLR CLEAR CM CEILING MOUNTED CMP CORRUGATED METAL PIPE CMUCONCRETE MASONRY UNIT CO CLEAN OUT CO CONDUIT ONLY CO2 CARBON DIOXIDE COL COLUMN COM COMMON COMB COMBINATION COMM COMMUNICATIONS COMP COMPOSITE COMP COMPRESSOR UNIT COMPR COMPRESSIBLE CONC CONCRETE CONF CONFERENCE CONFIG CONFIGURATION CONN CONNECT CONN CONNECTION CONST CONSTRUCTION CONT CONTINUOUS CONTR CONTRACTOR OR CONTRACT CONV CONVECTOR CORR CORRIDOR CP CONDENSER PUMP CP COVER PLATE CPS CYCLES PER SECOND CPT CARPET CR CONDENSER WATER RETURN CR CORROSION RESISTANT CS COUNTERSINK CS COMBINATION SEWER CS CONDENSER WATER SUPPLY CSK COUNTERSUNK CSMU CALCIUM SILICATE MASONRY UNIT CSP COMBINATION STANDPIPE CSTJ CONSTRUCTION JOINT CSWK CASEWORK CT COOLING TOWER CT CERAMIC TILE CT CURRENT TRANSFORMER CTR CENTER CU COPPER CU CONDENSING UNIT CU CUBIC CU COMBINATION UNIT CUH CABINET UNIT HEATER CW COLD WATER CV CONDOM VENDOR CWR CHILLED WATER RETURN CWS CHILLED WATER SUPPLY CY CUBIC YARD CYL CYLINDER D DRAIN D DEPTH D DATA DB DRY BULB DB DECIBEL DBA DEFORMED BAR ANCHOR DBL DOUBLE DC DIRECT CURRENT DC DUST COLLECTOR DCJ DUMMY CONTROL JOINT d PENNY (AS NAIL 10D) DDC DIRECT DIGITAL CONTROL DE DEIONIZED WATER DEG DEGREE DEPR DEPRESS(ION)(ED) DEPT DEPARTMENT DET DETENTION DF DRINKING FOUNTAIN DFR DIESEL FUEL RETURN DFS DIESEL FUEL SUPPLY DFV DIESEL FUEL VENT DG DOOR GRILLE DH DUCT HEATER DI DISTILLED WATER DI DUCTILE IRON DIA DIAMETER DIAG DIAGONAL DIFF DIFFUSER DIM DIMENSION DISC SW DISCONNECT SWITCH DISC DISCONNECT DISCH DISCHARGE DISTR DISTRIBUTION DL DEAD LOAD DM DAMPER MOTOR DMPR DAMPER DN DOWN DN DOWNSPOUT NOZZLE DO OR " DITTO DPFG DAMPROOFING DPS DIFFERENTIAL PRESSURE SWITCH DR DOOR DR DRAIN DS DOWNSPOUT DS DISTILLED WATER DSP DRY STANDPIPE DTL DETAIL DTR DUCT THRU ROOF DW DISHWASHER DWG DRAWING DWL DOWEL DWR DRAWER DXS DOUBLE EXTRA STRONG E EAST EA EACH EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EB EXPANSION BOLT EC ELECTRICAL CONTRACTOR EDH ELECTRIC DUCT HEATER EE EACH END EER ENERGY EFFICIENCY RATIO EEW EMERGENCY EYEWASH EEWS EMERGENCY EYEWASH/SHOWER EF EACH FACE EF EXHAUST FAN EFF EFFICIENCY EH ELECTRICAL HEATER EIFS EXTERIOR INSULATION AND FINISH SYSTEM EJ EXPANSION JOINT EL ELEVATION ELAS ELASTOMERIC ELEC ELECTRIC(AL) ELEV ELEVATOR EMER EMERGENCY EMD ESTIMATED MAXIMUM DEMAND EMT ELECTRICAL METALLIC TUBING EMV EMERGENCY MIXING VALVE ENCL ENCLOSURE ENTR ENTRANCE EOMD END OF MAIN DRIP EP ELECTRO-PNEUMATIC EP EXPLOSION PROOF EPO EMERGENCY POWER OFF ERF EPOXY RESIN FLOORING EQ EQUAL EQUIP EQUIPMENT ER EXHAUST REGISTER ES EMERGENCY SHOWER ES EXTRA STRONG ESP EXTERNAL STATIC PRESSURE EST ESTIMATE ET EXPANSION TANK EW EACH WAY EWC ELECTRIC WATER COOLER EWH ELECTRIC WATER HEATER EWT ENTERING WATER TEMPERATURE EXC EXCAVATE EXH EXHAUST EXIST EXISTING EXP EXPANSION EXP EXPOSED EXPL EXPLOSION EXT EXTERIOR F FAHRENHEIT F FIRELINE F FURNACE FA FIRE ALARM FA FRESH AIR FAB FABRICATED FB FACE BRICK FC FOOT CANDLE FCMU FLUTED CONCRETE MASONRY UNIT FCO FLOOR CLEAN OUT FCU FAN COIL UNIT FD FIRE DAMPER FD FLOOR DRAIN FDC FIRE DEPARTMENT CONNECTION FDN FOUNDATION FDR FEEDER FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FF FINISH FLOOR FFE FINISH FLOOR ELEVATION FH FIRE HYDRANT FHC FIRE HOSE CABINET FIG FIGURE FIN FINISH FIX FIXTURE FL FLOOR FLASH FLASHING FLEX FLEXIBLE FLUOR FLUORESCENT FLG FLOORING FLM FULL LENGTH MIRROR FM FACTORY MUTUAL FM FIRE MAIN FME FLOW MEASURING EQUIPMENT FO FACE OF FO FINISH OPENING FOC FACE OF CONCRETE FOF FACE OF FINISH FOF FUEL OIL FILL FOM FACE OF MASONRY FOR FUEL OIL RETURN FOS FACE OF STUD FOS FUEL OIL SUPPLY FOV FUEL OIL VENT FOW FACE OF WALL FP FIREPROOFING FPD FIRE PUMP DISCHARGE FPM FEET PER MINUTE FR FIRE RESISTIVE FR FRAME FRP FIBERGLASS REINFORCED PANEL FS FLOOR SINK FS FLOW SWITCH FSD FIRE/SMOKE DAMPER FSS FOLDING SHOWER SEAT FT FEET (FOOT) FT FIN TUBE FT FLOW TRANSMITTER FTG FOOTING FUT FUTURE FVC FIRE VALVE CABINET FWC FABRIC WALL COVERING G GRILLE G NATURAL GAS GA GAUGE GAL GALLON GALV GALVANIZED GB GRAB BAR GC GENERAL CONTRACTOR GCO GRADE CLEAN OUT GCMU GLAZED CONCRETE MASONRY UNIT GD GARBAGE DISPOSAL GEN GENERAL GEN GENERATOR GFA GROSS FLOOR AREA GFI GROUND FAULT INTERRUPTER GFRC GLASS FIBER REINFORCED CONCRETE GHR GLYCOL-WATER HEATING RETURN GHS GLYCOL-WATER HEATING SUPPLY GI GALVANIZED IRON GL GLUE LAMINATED GL GLASS GMU GLASS MASONRY UNIT GND GROUND GOVT GOVERNMENT GPH GALLONS PER HOUR GPM GALLONS PER MINUTE GR GUARD RAIL GR GRADE GR GRILLE GRC GLAVANIZED RIGID CONDUIT GRC GLASS REINFORCED CONCRETE GRGP GLASS REINFORCED GYPSUM PLASTER GRS GALVANIZED RIGID STEEL GS GASOLINE GV GATE VALVE GW GREASE WASTE GWB GYPSUM WALL BOARD GYP GYPSUM H HEIGHT H 1E HOOK ONE END HB HOSE BIB HC HANDICAP HC HOLLOW CORE HCB HANDICAP BENCH HCR HOT / CHILLED WATER RETURN HCS HOT / CHILLED WATER SUPPLY HD HAND DRYER OR HAIR DRYER HDBD HARDBOARD HDR HEADER HDWD HARDWOOD HDWR HARDWARE HEV HOSE END VALVE HID HIGH INTENSITY DISCHARGE HM HOLLOW METAL HOA HAND OFF AUTOMATIC HORIZ HORIZONTAL HP HEAT PUMP HP HIGH PRESSURE HP HORSEPOWER HPR HIGH PRESSURE STEAM RETURN HPS HIGH PRESSURE SODIUM HPS HIGH PRESSURE STEAM SUPPLY HR HANDRAIL HR HOUR HS HEADSTUD HSS HOLLOW STRUCTURAL SECTION HSTR HIGH STRENGTH HT HEIGHT HTG HEATING HTR HEATER HTWR HIGH TEMP HOT WATER RETURN HTWS HIGH TEMP HOT WATER SUPPLY HUM HUMIDIFIER HV HEATING VENTILATING UNIT HVAC HEATING VENTILATING AND AIR CONDITIONING HW DOMESTIC HOT WATER HWC DOMESTIC HOT WATER RECIRCULATING HWR LOW TEMP HOT WATER RETURN HWS LOW TEMP HOT WATER SUPPLY HX HEAT EXCHANGER HZ HERTZ JAN JANITOR JB JUNCTION BOX JCT JUNCTION JST JOIST JFB JOINT FILLER BOARD JT JOINT KCJ KEYED CONSTRUCTION JOINT KCP KEENE'S CEMENT PLASTER KD KNOCKDOWN KH KITCHEN HOOD KHE KITCHEN HOOD EXHAUST FAN KHS KITCHEN HOOD SUPPLY FAN KIT KITCHEN KO KNOCKOUT KS KITCHEN SINK KV KILOVOLT KVA KILOVOLT AMPERES KVAR KILOVOLT AMPERES REACTIVE KW KILOWATT KWH KILOWATT HOUR L ANGLE L LAVATORY LA LABORATORY COMPRESSED AIR LAB LABORATORY LAM LAMINATE(D) LAT LEAVING AIR TEMPERATURE LAV LAVATORY LB POUND LBR LUMBER LBS POUNDS LDG LOADING LF LINEAR FOOT (FEET) LG LENGTH (LONG) LIN LINEAR LINO LINOLEUM LKR LOCKER LL LIVE LOAD LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LOC LOCATION LONG LONGITUDINAL LOX LIQUID OXYGEN LPG LIQUEFIED PETROLEUM GAS LPR LOW PRESSURE STEAM RETURN LPS LOW PRESSURE STEAM SUPPLY LR LIVING ROOM LS LAWN SPRINKLER LSC LIFE SAFETY CODE LT LIGHT LTD LINED TRANSFER DUCT LTG LIGHTING LV LOUVER LV LABORATORY VACUUM LW LONG WAY LWT LEAVING WATER TEMPERATURE M THOUSAND MA MIXED AIR MA MEDICAL COMPRESSED AIR MAC MACHINE MAG MAGNETIC MAINT MAINTENANCE MAN MANUAL MAS MASONRY MATL MATERIAL MAU MAKEUP AIR UNIT MAV MANUAL AIR VENT MAX MAXIMUM MB MACHINE BOLT MB MOP BASIN MBD MARKER BOARD MBH THOUSAND BTU PER HOUR MBTUH THOUSAND BTU PER HOUR MC MECHANICAL CONTRACTOR MC MEDICINE CABINET MCA MINIMUM CIRCUIT AMPS MCB MAIN CIRCUIT BREAKERJ MCM THOUSAND CIRCULAR MILLS MD MANUAL VOLUME DAMPER MDO MEDIUM DENSITY OVERLAY MECH MECHANICAL MEMB MEMBRANE MET METAL MEZZ MEZZANINE MFR MANUFACTURER MFRG MANUFACTURING MG MOTOR GENERATOR MH MANHOLE MH METAL HALIDE MH MOP HOLDER MIN MINIMUM MISC MISCELLANEOUS ML MOTORIZED LOUVER MLDG MOLDING MLO MAIN LUGS ONLY MLWK MILLWORK MO MASONRY OPENING MPG MEDIUM PRESSURE GAS MPR MEDIUM PRESSURE STEAM RETURN MPS MEDIUM PRESSURE STEAM SUPPLY MR MIRROR MR/S MIRROR WITH SHELF MS MAGNETIC STARTER MTD MOUNTED MTG MOUNTING MTL METAL MTWR MEDIUM TEMP HOT WATER RETURN MTWS MEDIUM TEMP HOT WATER SUPPLY MUL MULLION MV MERCURY VAPOR MV MEDICAL VACUUM MW MARKER WALL N NITROGEN N NORTH N2O NITROUS OXIDE N/A NOT APPLICABLE P PAINT P POLE P/T PRESSURE/TEMPERATURE TEST PORT P PUMP PA PUBLIC ADDRESS PAN B PANIC BOLT PAR PARALLEL PB PARTICLE BOARD PB PULL BOX PB PUSH BUTTON PBS PUSH BUTTON STATION PC PRECAST PC PUMPED CONDENSATE PCD PAPER CUP DISPENSER PCF POUNDS PER CUBIC FOOT PCT PORCELAIN CERAMIC TILE PD PRESSURE DROP PD PUMP DISCHARGE PDI PLUMBING & DRAINAGE INSTITUTE PENT PENTHOUSE PERF PERFORATED PERP PERPENDICULAR PF POWER FACTOR PG PRESSURE GAGE PH PHASE PI POINT OF INTERSECTION PI PRESSURE INDICATOR PIC PORTABLE INSTRUMENT CONNECTION PIV POST INDICATOR VALVE PL PLACE(S) PL PLATE PLAM;PL PLASTIC LAMINATE PLAS PLASTER PLBG PLUMBING PLYWD PLYWOOD PNEU PNEUMATIC PNL PANEL POC POINT OF CONNECTION PORC PORCELAIN PPM PARTS PER MILLION PR PAIR PREFAB PREFABRICATED PROJ PROJECTION PRV PRESSURE REDUCING VALVE PS PIPE SUPPORT PS PROJECTION SCREEN PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PSV PRESSURE SAFETY VALVE PT PLASTER TRAP PT POINT PT POTENTIAL TRANSFORMER PTD PAPER TOWEL DISPENSER PTD/R COMBINATION TOWEL DISPENSER/RECEPTACLE PTN PARTITION PVC POLYVINYL CHLORIDE PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENCY PWL SOUND POWER LEVEL PWR POWER QT QUARRY TILE QTR RNDQUARTER ROUND R RISER RA RETURN AIR RAD RADIATOR RAD or R RADIUS RB RUBBER BASE RC REMOVE CONTROL RCP REFLECTED CEILING PLAN RCP REINFORCED CONCRETE PIPE RCU RECIPROCATING CHILLER JOINT RD ROOF DRAIN RD REFRIGERANT DISCHARGE RECP RECEPTACLE REF REFERENCE REFL REFLECTED REFR REFRIGERANT REFR REFRIGERATOR REG REGISTER REINF REINFORCEMENT REM REMOVABLE REQ(D) REQUIRE(D) RESIL RESILIENT RET RETAINING (WALL) REV REVISIONS RF RETURN FAN RF RUBBER FLOOR RFM RECESSED FLOOR MAT RH RELATIVE HUMIDITY RH RELIEF HOOD RHC REHEAT COIL RH ROBE HOOK RHG REFRIGERANT HOT GAS RI&C ROUGH IN AND CONNECT RIJS RISE IN JOIST SPACE RL REFRIGERANT LIQUID RM ROOM RND ROUND RO ROUGH OPENING S SINK S SANITARY SEWER S SOAP DISH S SOUTH S SPRINKLER LINE SA SHOCK ABSORBER SA SUPPLY AIR SAN SANITARY WASTE SC SECURITY SC SOLID CORE SC SHOWER CURTAIN SC SPECIAL COATING SCD SEAT COVER DISPENSER SCH SHOWER CURTAIN HOOKS SCHED SCHEDULE SCR SHOWER CURTAIN ROD SCT STRUCTURAL CLAY TILE SCUT SCUTTLE SCW SOFT COLD WATER SD SOAP DISPENSER SD SMOKE DAMPER SD SMOKE DETECTOR SD STORM DRAIN SE STEAM EXHAUST VENT SEC SECONDARY SECT SECTION SECY SECRETARY SENS SENSIBLE SF SQUARE FOOT SF SUPPLY FAN SFCMU SPLIT-FACED CONCRETE MASONRY UNIT SFU STRUCTURAL FACING UNIT SGL SINGLE SH SHOWER SHEATH SHEATHING SHM SECURITY HOLLOW METAL SHT SHEET SHW SOFT HOT WATER SIM SIMILAR SL SHORT LEG SLNT SEALANT SM SHEET METAL SM SPRINKLER MAIN SND SANITARY NAPKIN DISPOSAL SNV SANITARY NAPKIN VENDOR SP STATIC PRESSURE (H2O) SP STAND PIPE SP STATIC PRESSURE SPEC SPECIFICATIONS SPK SPRINKLER SPL SOUND PRESSURE LEVEL SPL SPECIAL SPL BLK SPLASH BLOCK SQ SQUARE SS STAINLESS STEEL SSA STORM SHELTER AREA SS SERVICE SINK SS SOLID SURFACE ST STAIR ST STORM SEWER STAG'D STAGGERED STC SOUND TRANSMISSION CLASS STD STANDARD STE SINGLE TAPERED END STGR STRINGER STL STEEL STOR STORAGE STR STRUCTURAL - STRUCTURE SUB SUBSTATION SUBFL SUBFLOOR SURF SURFACE SUSP SUSPENDED SV SHEET VINYL SV SOLENOID VALVE SW SHORT WAY SW SWITCH SWBD SWITCH BOARD SWP STEAM WORKING PORESSURE SYM SYMMETRICAL T TEMPERED T THERMOSTAT T & B TOP & BOTTOM T& G TONGUE & GROOVE T TREAD TA TRANSFER AIR TAB TEST AND BALANCE TAN TANGENT TB TERMINAL BOX TB TOWEL BAR TBD TACK BOARD TC TEMPERATURE CONTROL TC TIME CLOCK TD TRANSFER DUCT TD TRENCH DRAIN TDH TOTAL DYNAMIC HEAD TEL TELEPHONE TEMP TEMPERED - TEMPORARY TEMP TEMPERATURE TERR TERRAZZO TEXT TEXTURED TGL TOGGLE TH THRESHOLD TH TOWEL HOOK THK THICK(NESS) TMR TILT MIRROR UNIT TMV THERMOSTATIC MIXING VALVE TOB TOP OF BEAM TOC TOP OF CONCRETE TOF TOP OF FOOTING TOIL TOILET TOP TOP OF PAVING TOS TOP OF STEEL TOW TOP OF WALL TPV TRAP PRIMER TR TRIP TRANS TRANSVERSE TRD TREAD TS TEMPERATURE SENSOR TSP TOTAL STATIC PRESSURE TT TEMPERATURE TRANSMITTER TT TERRAZZO TILE TTD TOILET TISSUE DISPENSER TV TELEVISION TW TACK WALL TYP TYPICAL U URINAL UC UNIT COOLER UG UNDERGROUND V VENT V VOLT V VACUUM VA VALVE VAC VACUUM VAV VARIABLE AIR VOLUME VB VAPOR BARRIER VB VINYL BASE VBF VENT BELOW FLOOR VCB VENTED COVE BASE VCP VITRIFIED CLAY PIPE VCT VINYL COMPOSITION TILE VD VOLUME DAMPER - MANUAL VEL VELOCITY VENT VENTILATION VENT VENTILATOR VERT VERTICAL VEST VESTIBULE VF VINYL FLOOR VFD VARIABLE FREQUENCY DRIVE VM VOLTMETER VOL VOLUME VP VENEER PLASTER VP VACUUM PUMP VSMC VARIABLE SPEED MOTOR CONTROLLER VT VINYL TILE VTR VENT THROUGH ROOF VWC VINYL WALLCOVERING W WATER SERVICE W WIDE; WIDTH W WASTE (PLUG) W WATT W WEST W WIDE FLANGE W/ WITH W/O WITHOUT WB WET BULB WC WALL COVERING WC WATER COLUMN WC WATER CLOSET WCC WATER COOLED CONDENSER WCL WATER CLOSET/LAVATORY COMBINATION WCO WALL CLEAN OUT WD WOOD WDW WINDOW WF WASH FOUNTAIN WH WALL HYDRANT WFMD WATER FLOW MEASURING DEVICE WH WATER HEATER WHM WATT HOUR METER WI WROUGHT IRON WLR WATER LOOP RETURN WLS WATER LOOP SUPPLY WMG WATER MOTOR GONG WNSCT WAINSCOT WP WEATHERPROOF WPB WHIRLPOOL BATH WPF WATERPROOF WPFG WATERPROOFING WR WATER RESISTANT WR WASTE RECEPTACLE WSP WET STAND PIPE WT WEIGHT WW WARM WHITE WWF WELDED WIRE FABRIC XFMR TRANSFORMER XMTR TRANSMITTER YD YARD YH YARD HYDRANT Z IMPEDANCE ZCV ZONE CONTROL VALVE ZVB ZONE VALVE BOX & AND @ AT i.e. THAT IS # NUMBER CG CLEAR FLOAT GLASS CIG CLEAR INSULATING GLASS CTG CLEAR TEMPERED FLOAT GLASS CTIG CLEAR TEMPERED INSULATING GLASS LG LAMINATED GLASS PG PATTERN GLASS PIG PATTERN INSULATING GLASS SG SPANDREL GLASS TG TINTED FLOAT GLASS TIG TINTED INSULATING GLASS TTG TINTED TEMPERED FLOAT GLASS TTIG TINTED TEMPERED INSULATING GLASS WG POLISHED WIRE GLASS THE FOLLOWING ABBREVIATIONS ARE USED WITH GLAZING: IAQ INDOOR AIR QUALITY IAW IN ACCORDANCE WITH IBC INTERNATIONAL BUILDING CODE IC INTERCOM ID INSIDE DIAMETER IE INVERT ELEVATION IES ILLUMINATING ENGINEERING SOCIETY IF INSIDE FACE IG ISOLATED GROUND IH INTAKE HOOD IJ ISOLATION JOINT IJS IN JOIST SPACE IMC INTERMEDIATE METAL CONDUIT IN INCH INC INCLUDE (ING) INSUL INSULATION INT INTERIOR IP IRON PIPE IW INDIRECT WASTE O&M OPERATION AND MAINTENANCE O to O OUT TO OUT OA OVERALL OA OUTSIDE AIR OBSC OBSCURE OC ON CENTER OD OUTSIDE DIAMETER OD OVERFLOW DRAIN OF OUTSIDE FACE OVFL OVERFLOW OFC OWNER FURNISHED CONTRACTOR INSTALLED OFF OFFICE OFOI OWNER FURNISHED OWNER INSTALLED OHP OVERHEAD POWER OHT OVERHEAD TELEPHONE OPG OPENING OPP OPPOSITE OSD OVERFLOW STORM DRAIN OS&Y OUTSIDE SCREW AND YOKE OTCS OPEN TO CEILING SPACE OVHD OVERHEAD OX OXYGEN A/C AIR CONDITIONING(ER) A AMP AMPERE A COMPRESSED AIR AAP AREA ALARM PANEL AAV AUTOMATIC AIR VENT AB ANCHOR BOLT ABS ACRYLONITRILE-BUTADIENE-STYRENE AC ACOUSTICAL CEILING AC ALTERNATING CURRENT ACC AIR COOLED CONDENSER ACCU AIR COOLED CONDENSING UNIT ACM ALUMINUM COMPOSITE MATERIAL ACST ACOUSTIC AD ACCESS DOOR AD AREA DRAIN ADDN ADDITION OR ADDITIONAL ADJ ADJUSTABLE ADJT ADJACENT ADMIN ADMINISTRATION AF AIR FILTER AFF ABOVE FINISH FLOOR AHJ AUTHORITY HAVING JURISDICTION AHU AIR HANDLING UNIT AI AREA INLET ALT ALTERNATE ALUM ALUMINUM AMB AMBIENT ANCH ANCHOR AP ACCESS PANEL APC ACOUSTICAL PANEL CEILING APPROX APPROXIMATE AR ACID RESISTING ARCH ARCHITECTURAL ASB ASBESTOS ASPH ASPHALT AUTO AUTOMATIC AV ACID VENT AV AIR VENT AV AVERAGE AW ACID WASTE AWG AMERICAN WIRE GAUGE AWP ACOUSTICAL WALL PANEL ABBREVIATIONS NC NOISE CRITERIA NC NORMALLY CLOSED NC NURSE CALL NEC NATIONAL ELECTRIC CODE NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSN. NEUT NEUTRAL NIC NOT IN CONTRACT NO NORMALLY OPEN NO NUMBER NO NITROUS OXIDE NOM NOMINAL NS NEUTRAL SENSOR NTS NOT TO SCALE RPM REVOLUTIONS PER MINUTE RPZ REDUCED PRESSURE BACKFLOW PREVENTER RS REFRIGERANT SUCTION RWL RAIN WATER LEADERS SENSOR UGE UNDERGROUND ELECTRICAL UGT UNDERGROUND TELEPHONE UH UNIT HEATER UL UNDERWRITERS LABORATORIES UNEX UNEXCAVATED UNFIN UNFINISHED UNO UNLESS NOTED OTHERWISE UR URINAL URD UNDERGROUND RESIDENTIAL DISTRIBUTION US UTILITY SHELF UTIL UTILITY UV UNIT VENTILATOR BENJAMIN TALPOSREVISIONS: C-31704 4/20/2022 1:37:22 PME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022 SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGSYMBOLS AND ABBREVIATIONSG0.1STACEY HALL 19900 STEVENS CREEK BLVD., CUPERTINO, CAAH 09-22-2022 34 of 42 CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV S 0°13'00" E 372.28' N 0°13'00" W 372.28'S 89°36'00" W 224.96'N 89°36'00" E 224.96'PROPERTY LINEPROPERTY LINE PROPERTY LINEPROPERTY LINE PARKING NO PARKINGNONO PARKINGVANVANException #8 of Prelim Title G ADJACENT TENANT SPACES T E V E N S C R E E K B L V D.SHANE CO SUITE S1 -S2 S2 S3S3 S3S3 S3S3 S3S3S3S3 S3S3 S3S3 S3S3 S3S3 S3S3 S3S3 S3S3 S4S5 S6 S6 S6 S7 S7 S7 S7 S7 S7S7 S7S7S7S7S7S7 S30 S7 S7 S7 S7 S8 S8 S9 S10 S11S12 S13 S14 S15 S16 S16 S16 S16 S16 S17 S18 S20 S21 S22 S23 S24 S24 S24 S24 S24 S25 S26S26 S26S26 S31 S33S33 ADDITIONAL SQ. FT. = 560 SF CLR.4' - 2" MIN.S19 S34 SET BACK (NEW ADDITION HEIGHT = 25'-2") 50' - 6" 5" A-1 2 S35S35 S35 S35 S35 S35 S35 S35 S35 S35 S35 S35 S35 S35 S35 L1 L1 L1 L1 L4 L2 L3 L3L3L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 (E) ROOF LINE (VARIEIS) 113' - 6" FIRST FLOOR (F.F.) 100' - 0" (E) HIGH PARAPET LEVEL 120' - 1" (E) LOW PARAPET LEVEL 116' - 1" (N) ENTRY TOWER LEVEL 123' - 0" DISTANCE FROM PRIMARY (N) BUILDING BULK TO (E) ARTERIAL/BLVD CURB 50' - 6 1/2" 45.00°1:1 SLOPE(N) CORNER TOWER 127' - 0" MARK DESCRIPTION TYPE L1 4" OUTDOOR CYLINDER -FC OUTDOOR LIGHTING ZFCC410 (DOWN LT ONLY)WALL MTD L2 4" RECESSED SOFFIT -LITHONIA LIGHTING LBR4 RECESSED L3 6" BOLLARD -LIGHTWAVE 2 STRAIGHT BOLLARD ULW-10874 GROUND L4 18" WALL SCONCE -WDGE3 LED (FIXTURE TO MATCH (E) L.L. PROVIDED FIXTURES)WALL MTD NOTES BENJAMIN TALPOSREVISIONS: C-31704 8/8/2022 1:06:38 PME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022 SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGSITE PLANA-1STACEY HALL 19900 STEVENS CREEK BLVD., CUPERTINO, CASCALE:1/16" = 1'-0" SITE PLAN - PROPOSED PLANNING NORTH NOTE: SITE PLAN BY OTHERS. SHOWN FOR REFERENCE ONLY. LOT AREA 83,766 SF BUILDING AREA EXISTING BUILDING AREA: 28,813 SF NEW BUILDING AREA: 29,374 SF (560 SF ADDITION) LOT COVERAGE: 35.1% REQUIRED PARKING SHANE CO:15,279 / 250 = 61.11 STALLS KELLER WILLIAMS:7,088 / 285 = 24.87 STALLS DANCE STUDIO:OPTION 1 7,006 / 250 = 28.02 STALLS OPTION 2 6 CLASSROOMS W/ AN AVERAGE 12 STUDENTS: 72 72 / 4 = 18 STALLS 6 TEACHERS = 6 STALLS 3 STAFF = 3 STALLS TOTAL = 27 STALLS *OPTION 1 IS MOST RESTRICTIVE TOTAL PARKING REQUIRED:114 SPACES TOTAL PARKING PROVIDED: 114 SPACES KEYNOTES - SITE Key Value Keynote Text S1 (E) PUBLIC UTILITY SUB STATION TO REMAIN. S2 (E) ACCESSIBLE PARKING STALLS AND SIGNAGE TO REMAIN. S3 (E) PARKING STALL TO REMAIN, TYP. S4 (E) MONUMENT SIGN TO REMAIN. S5 (E) ACCESSIBLE SITE ENTRY SIGNAGE TO REMAIN. S6 (E) PAVING/WALKABLE SURFACE TO REMAIN, TYP. S7 (E) LANDSCAPE PLANTING AREA TO REMAIN. S8 (E) SHORT-TERM BIKE RACK TO REMAIN. S9 (E) PARKING LOT LIGHTING TO REMAIN, TYPE. S10 (E) DRIVEWAY TO REMAIN. S11 (E) TRANSFORMER TO REMAIN. S12 (E) TRUNCATED INDICATOR DOMES, TYP. S13 (E) TRASH ENCLOSURE TO REMAIN. S14 (E) FIRE DEPARTMENT VEHICLE TURNING RADIUS - PREVIOUSLY APPROVED, TYP. S15 (E) GAS METER AND FIRE SPRINKLER SERVICE TO REMAIN. S16 (E) "FUTURE" ELECTRIC VEHICLE PARKING STALL. S17 (E) MAIL/PARCEL BOX TO REMAIN. S18 (E) WHEELSTOP TO REMAIN, TYP. S19 ACCESSIBLE PATH OF TRAVEL. S20 (E) ACCESSIBLE CURB RAMP TO REMAIN. S21 (E) LONG-TERM BIKE STORAGE ROOM TO REMAIN. NOT PART OF SHANE CO LEASABLE AREA. S22 (E) MAIN BUILDING ELECTRICAL ROOM AND MAIN DISTRIBUTION PANEL TO REMAIN. NOT PART OF SHANE CO LEASABLE AREA. S23 (E) ADJACENT STRUCTURES TO REMAIN, TYP. S24 (E) BUILDING ENTRANCE TO REMAIN. S25 (E) TRIO-TRASH RECEPTACLES TO REMAIN. S26 (E) PARKING AREA TO REMAIN, TYP. S30 PREPARE (E) LANDSCAPE AREA FOR NEW ADDITION. S31 (N) PLANTER AND INTEGRAL BENCH - REQUIRED AS A SECURITY ELEMENT TO PROTECT FRONT ENTRY FROM VEHICLE ENTRY. S33 (N) SUITE ENTRANCE AND ENTRANCE TOWER ELEMENT. ENTRANCE TOWER IS NON-CONDITIONED SPACE AND NOT CONSIDERED AS PART OF THE OVERALL OCCUPIABLE BUILDING AREA. S34 (E) DEMISING WALL TO REMAIN. S35 (N) DECORATIVE SITE BOLLARD W/ INTEGRAL LIGHTING COMPONENT (LIGHTWAVE 2 STRAIGHT BOLLARD, ULW-10874, W/ SECURITY CORE IN FRONT OF ALL FENESTRATION AREAS), TYP. SITE STATISTICS / PARKING ANALYSIS NOTE: WITH THE EXCEPTION OF WORK REQUIRED TO PREPARE THE EXISTING SITE FOR THE NEW ADDITION AND ENTRY TOWER PROPOSED HEREIN AS PART OF THE SCOPE WORK, ALL SITE ELEMENTS ARE EXISTING TO REMAIN AND NOT INCLUDED AS PART OF THE SCOPE OF THIS PERMIT. SITE WORK IS CURRENTLY UNDER CONSTRUCTION BY THE BUILDING OWNER AND UNDER PERMIT # BLD-2020-0387. 1 2/24/2021 PLANNING RESPONSE 3 8/8/2022 PLANNING RESPONSE SCALE: 1/16" = 1'-0"A-1 2 ELEVATION - EAST (BUILDING BULK SETBACK DIAGRAM) 1 3 LIGHTING SCHEDULE 3 AH 09-22-2022 35 of 42 CAPABLE EV CAPABLE EVPARKINGNONO PARKINGVANVANWALL LEGEND EXISTING WALLS TO REMAIN NEW WALLS EXISTING WALLS TO BE DEMOLISHED DIM F.O. STUD DIMENSION DIM F.O. FINISH **SEE G.02 FOR WALL TYPES (E) SHEAR WALL GENERAL NOTES A. GENERAL NOTES APPLY TO ALL SHEETS. B. DIMENSIONS ARE ACTUAL AND ARE TO FACE OF STUDS, FACE OF CONCRETE WALLS, FACE OF CMU WALLS, FACE OF FRAMES OR CENTERLINE OF COLUMNS, UNLESS NOTED OTHERWISE - SEE WALL TYPE LEGEND. C. FLOOR SPOT ELEVATIONS ARE SHOWN THUS XXX’-X” D. SEE STRUCTURAL FOR CONCRETE RETAINING WALL THICKNESS. E. SEE SHEET G0.2 FOR TYPICAL WALL TYPES. F. INTERIOR STUD WALLS SHALL EXTEND TO UNDERSIDE OF FLOOR OR ROOF DECK ABOVE UNLESS NOTED OTHERWISE. SEE TYPICAL WALL TYPES ON SHEET G0.2. G. PROVISIONS SHALL BE MADE AT FULL HEIGHT NONBEARING WALLS FOR 1-INCH VERTICAL MOVEMENT OF BUILDING STRUCTURE WITHOUT TRANSFER OF COMPRESSIVE LOADS TO WALL. FILL IRREGULARITIES BETWEEN TOP OF WALL AND DECK ABOVE WITH FIRE SAFING INSULATION OR FIRE STOPPING MATERIALS AS REQUIRED TO MEET FIRE RATING OF RESPECTIVE WALLS. H. GYPSUM BOARD AND PLASTER SURFACES SHALL BE ISOLATED WITH CONTROL JOINTS WERE INDICATED ON DRAWINGS AND/OR AS DESCRIBED IN THE SPECIFICATIONS. I. CONTROL JOINTS (CJ) AND CONTROL JOINTS ABOVE (CJA) SHALL BE LOCATED AS INDICATED ON BUILDING ELEVATIONS. J. THE OWNER SHALL FURNISH AND INSTALL THE FOLLOWING: KITCHENETTE EQUIPMENT INCLUDING: DISHWASHER, REFRIGERATOR, MICROWAVE. K. INCLUDE OWNER-FURNISHED AND INSTALLED ITEMS AND OWNER FURNISHED AND CONTRACTOR INSTALLED ITEMS IN THE CONSTRUCTION SCHEDULE, AND COORDINATE WITH OWNER TO ACCOMMODATE THESE ITEMS. L. COORDINATE MECHANICAL CHASE SIZES WITH MECHANICAL CONTRACTOR. M. COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTORS SIZE AND LOCATION OF EQUIPMENT PADS INDICATED ON FLOOR PLANS. N. SEE CIVIL DRAWINGS FOR FINISH FLOOR ELEVATIONS. O. EXTEND FURRING CHANNELS AND GYPSUM BOARD UP MINIMUM 4 INCHES ABOVE FINISHED CEILING. P. SCRIBE GYPSUM BOARD OF WALL AND PARTITIONS TO IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY AROUND PENETRATIONS. Q. PROVIDE SEISMIC BRACING FOR SUSPENDED CEILINGS OR AS INDICATED ON DRAWINGS. R. PROVIDE INTERIOR GYP. BD. CONTROL JOINT EVERY 30'-0" MAX. . A A A1 A1 B B B1 B1 C C D D E E F F G G H H I I J J 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 BREAK ROOM DIRTY SHOP WORKSHOP VAULT STRORAGE TRAINING ROOM FAMILY TOILET TOILET CSA ELECTRICAL / IT OFFICE CLEAN AND CHECK SM OFFICE TOILET TOILET STORAGE SEATING DIAMOND ROOM SHOWROOM CUST. WELLNESS ADJACENT TENANT SPACE LOBBYHOSPITALITY NOOK STORAGE QUEUE VEST. 7.1 7.1 A-3 2 A-3 4 A-3 3 A-3 1 SHANE CO. TENANT SPACE TENANT IMPROVEMENT WORK UNDER SEPARATE PERMIT (N) DIAMOND VIEWING AREA 36' - 0"7"4 1/2" 213' - 8" 21' - 8"24' - 0"24' - 0"24' - 0"24' - 0"24' - 0"24' - 0"12' - 0"12' - 0"12' - 0"12' - 0"77' - 2"4' - 10"12' - 4"12' - 0"12' - 0"12' - 0"12' - 0"9' - 2"2' - 10"9 3/8"17' - 2"NEW BUILDING ADDITION AREA AND TOWER NEW BUILDING ENTRANCE AND TOWER STORAGE SHANE CO GRAPHICS WALL - GRAPHICS TO BE CHANGED OUT AT EACH WINDOW (4 TOTAL)EVERY QUARTER 7.2 7.2 560 SF 3' - 3"6' - 0"5' - 6"6' - 0"5' - 0"6' - 0"4' - 5"3' - 7"15' - 3" 2' - 11"9' - 6"2' - 11" A A A1 A1 B B B1 B1 C C D D E E 11 11 12 12 13 13 14 14 7.2 7.21/4" / 12"1/2" / 12"R1 R1 R1 R2 R3 R4 R5R5 R5R5 R6 R712' - 6"19' - 4" EQ14' - 1"EQ EQ7' - 9"EQ1/4" / 12" 1/4" / 12" R2 R8 NOTES BENJAMIN TALPOSREVISIONS: C-31704 8/9/2022 9:57:12 AME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022 SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGFLOOR PLAN -PROPOSEDA-2STACEY HALL 19900 STEVENS CREEK BLVD., CUPERTINO, CANORTH SCALE:3/32" = 1'-0" FLOOR PLAN - PROPOSED_PLANNING 3 8/8/2022 PLANNING RESPONSE NOTE: THE INTERIOR TENANT IMPROVEMENT PROJECT HAS BEEN SUBMITTED AS A SEPARATE PROJECT UNDER PERMIT # BLD-2021-0181 SCALE:3/32" = 1'-0" ROOF PLAN - DRAINAGE NORTH 3 KEYNOTES - ROOF Key Value Keynote Text R1 (N) TPO ROOF ASSEMBLY. R2 (N) THROUGH-WALL ROOF DRAIN OPENING TO DRAIN TO (E) LOWER ROOF ASSEMBLY. R3 (N) SKYLIGHT. R4 (N) PARAPET CAP. SEE EXTERIOR ELEVATIONS FOR COLOR. R5 (E) TPO ROOF ASSEMBLY TO REMAIN. NO CHANGE TO EXISTING ROOF DRAINAGE PATTERN. R6 (E) ROOF DRAIN TO BE RELOCATED. R7 (N) ROOF AND OVERFLOW DRAIN. ROUTE NEW DRAIN LINES THROUGH (N) ENTRY TOWER TO (E) LOCATIONS. PROVIDE NEW THROUGH-WALL OVERFLOW OPENING AND (N) GUTTER AS REQUIRED. R8 (N) STANDING SEAM METAL ROOF. AH 09-22-2022 36 of 42 EXTERIOR MATERIAL FINISHES (M#) DESIGNATION MATERIAL TYPE MANUFACTURER COLOR COMMENTS M1 NOT USED --- M2 METAL CLADDING AEP SPAN - FLEX SERIES COOL SLATE GREY MATCH EXISTING M3 METAL CLADDING ALUCOBOND - ACENT FLAT STOCK GRAPHIC MICA M4 CERAMIC WALL TILE CREATIVE MATERIALS CORP - MOSA SOLID, V (SMOOTH) 5102 VIVID WHITE 16"x24" CONTROL/EXPANSION JOINTS EVERY 8' TO 10' IN EA. DIRECTION W/ MIN. 1/2" JOINT WIDTH M5 FIBER CEMENT SIDING ASPYRE COLLECTION - ARTISAN V-GROOVE SIDING (HARDIE BOARD PRODUCT) PRIMED PAINT MATERIAL: BENJAMIN MOORE CHELSEA GREY HC-168 M7 METAL ACCENT TRIM ALUCOBOND - ACENT FLAT STOCK PRIMED PAINT MATERIAL: BENJAMIN MOORE DINNER PARTY AF-300 M8 LOUVERS - COMPOSITE WOOD TBD WESTERN CEDAR M9 CANVAS SUNBRELLA SLATE GREY 4684 BY OTHERS M11 ALUMINUM STOREFRONT KAWNEER (OR EQUIV.) FRAME: CLEAR ANODIZED GLASS: TRANSLUCENT INSULATED GLASS TO BE FROSTED FOR SECURITY AND BIRD SAFETY PURPOSES M12 COMPOSITE WOOD PLANKS TBD WESTERN RED M13 ALUMINUM STOREFRONT KAWNEER (OR EQUIV.) FRAME: GRAPHITE GLASS: CLEAR INSULATED (E) ROOF LINE (VARIEIS) 113' - 6" FIRST FLOOR (F.F.) 100' - 0" (E) HIGH PARAPET LEVEL 120' - 1" E1 E2 E7 E8E8E8 E12E12E9E9 E8E13 E16 E18E18E18 E4E20 E1 (E) ROOF LINE (VARIEIS) 113' - 6" FIRST FLOOR (F.F.) 100' - 0" (E) HIGH PARAPET LEVEL 120' - 1" (N) ENTRY TOWER LEVEL 123' - 0" EQ 8' - 4"EQ 16' - 10" NE2 NE5 M11 M3 3' - 6"NE10 16' - 0" M4 NE15 (N) CORNER TOWER 127' - 0" NE4 34 SF 3' - 7"9' - 9" NE11 NE1M2 NE11 NE18 NE16 6' - 3"(E) ROOF LINE (VARIEIS) 113' - 6" FIRST FLOOR (F.F.) 100' - 0" FIRST FLOOR (F.F.) 100' - 0" (E) HIGH PARAPET LEVEL 120' - 1" (E) LOW PARAPET LEVEL 116' - 1" E1 E1 E1 E1 E14 E3E5E8E11E10 E9 E12 E8 E9E12 E8 E7 E8E14E9E12 E8E12 E6 V.I.F.9' - 8"V.I.F. 9' - 6" E18 E18 E18 E18 E18 E4 E4 E4 E4 BEYOND METAL PANEL E17 E18 E18 E18E19 E20 E20 E20 (E) ROOF LINE (VARIEIS) 113' - 6" FIRST FLOOR (F.F.) 100' - 0" FIRST FLOOR (F.F.) 100' - 0" (E) HIGH PARAPET LEVEL 120' - 1" (E) LOW PARAPET LEVEL 116' - 1" (N) ENTRY TOWER LEVEL 123' - 0" 36' - 2" 3' - 3"6' - 0"5' - 6"6' - 0"5' - 0"6' - 0"4' - 5" NE2 NE10NE10NE10 49' - 6" NE6 8' - 6"2' - 11"9' - 6"2' - 11"9' - 1"2' - 11"9' - 0" NE9 NE9 NE9NE108' - 0"MATCH (E)11' - 0"MATCH (E) OPENING 9' - 10"1' - 0"10' - 3"NE7 NE7NE7 NE8 NE5 M11M11M11 M5 M9M9M9 M4 M8M8M8 M7 NE11NE11 M11 NE10 24' - 3" 16' - 2" M3 M3 M13 NE1 (N) CORNER TOWER 127' - 0" NE17 NE11 M4 M12 NE16 NE11 NE18 EQ 7' - 0"EQ 20' - 9"6' - 3"NE17 BENJAMIN TALPOSREVISIONS: C-31704 8/8/2022 1:06:42 PME:\Shane Co_Cupertino\EXTERIOR\OPTION 1_WITH DVA TOWER\SHANE CO_CUPERTINO_OPTION 1A.rvt4/20/2022 SHANE CO. EXTERIOR IMPROVEMENTSDESIGNREVIEW -PLANNINGEXTERIOR ELEVATIONSA-3STACEY HALL 19900 STEVENS CREEK BLVD., CUPERTINO, CASCALE:1/8" = 1'-0"A-3 1 ELEVATION - NORTH DEMO SCALE: 1/8" = 1'-0"A-3 2 ELEVATION - NORTH PROPOSED SCALE: 1/8" = 1'-0"A-3 3 ELEVATION - EAST DEMO SCALE: 1/8" = 1'-0"A-3 4 ELEVATION - EAST PROPOSED KEYNOTES - EXTERIOR EXISTING/DEMO Key Value Keynote Text E1 (E) METAL CLADDING TO BE REMOVED. E2 (E) SIGNAGE TO BE REMOVED AND SAVED FOR RELOCATION. E3 (E) STOREFRONT ASSEMBLY TO BE REMOVED. E4 (E) STUCCO AND WALL INFILL TO BE REMOVED AS REQUIRED FOR NEW OPENINGS. E5 (E) CANOPY TO BE REMOVED. E6 (E) EXTERIOR FINISH AND WALL INFILL TO BE REMOVED FOR NEW ENTRY. E7 (E) WOOD PLANKING TO REMAIN. E8 (E) METAL CLADDED ACCENT ELEMENT TO REMAIN. E9 (E) STOREFRONT WINDOW TO REMAIN. E10 (E) DOWNSPOUT TO REMAIN. E11 (E) DOOR/FRAME TO REMAIN. E12 (E) CANOPY TO REMAIN. E13 (E) BRICK FINISH AND EXTERIOR WALL TO REMAIN, TYP. E14 (E) EXTERIOR WALL TO REMAIN, TYP. E16 (E) STUCCO AND WALL INFILL TO REMAIN. E17 (E) ROOF DRAIN DOWNSPOUT TO BE REROUTED AS NECESSARY. E18 (E) BRICK FINISH ONLY TO BE REMOVED. E19 (E) BRICK ARCHWAY TO BE REMOVED. E20 (E) BRICK ARCHWAY TO REMAIN. GC TO PROTECT AND PRESERVE DURING CONSTRUCTION. KEYNOTES - EXTERIOR NEW Key Value Keynote Text NE1 (N) METAL CLADDING PANEL TO MATCH (E). NE2 (N) TOWER ELEMENT. NE4 (E) APPROVED BACK-LIT ILLUMINATED SIGNAGE TO BE REINSTALLED. NE5 (N) PLANTER AND INTEGRAL BENCH - REQUIRED AS A SECURITY ELEMENT TO PROTECT FRONT ENTRY FROM VEHICLE ENTRY. NE6 (N) EXTERIOR METAL STUD WALL. NE7 (N) AWNING. NE8 (N) PRE-MANUFACTURED CANOPY AND ANCHOR ROD SUPPORTS. NE9 (N) LOUVERS. NE10 (N) STOREFRONT WINDOW/DOOR ASSEMBLY. NE11 (N) LIGHT FIXTURE, TYP. NE15 TILE CONTROL/EXPANSION JOINT. SPACING PER MANUFACTURER. NE16 (N) SKYLIGHT W/ TRANSLUCENT GLASS (FROSTED). NE17 (N) POTENTIAL BACK-LIT ILLUMINATED SIGNAGE. OWNER TO APPLY FOR SEPARATE SIGNAGE VARIANCE. NE18 (N) SITE SECURITY BOLLARD WITH LED LIGHT, TYP. 3 8/8/2022 PLANNING RESPONSE NOTES: • ALL PARAPET COPING SHALL BE PAINTED TO MATCH ADJACENT WALL MATERIAL. NOTES: • ALL EXISTING EXTERIOR DESIGN ELEMENTS NOT IDENTIFIED AS NEW (N) WERE PREVIOUSLY APPROVED UNDER THE BUILDING OWNER'S SUBMITTAL FOR PLANNING APPROVAL. REFERENCE PLANNING APPROVALS ARE AS SUCH: DIR-2020-015 AND DP-2019-001. 3 3 3 AH 09-22-2022 37 of 42 07.20.2022 CUPERTINO FACADE REVISED DESIGN THIS DOCUMENT CONTAINS INFORMATION THAT IS PRIVILEGED AND CONFIDENTIAL. ANY UNAUTHORIZED DISCLOSURE, REPRODUCTION, DISTRIBUTION OR USE OF THIS INFORMATION WITHOUT EXPRESS WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED. AH 09-22-2022 38 of 42 CHAPTER ONE VISUALIZATION CUPERTINO FACADE - REVISED DESIGN l 07.20.2022 AH 09-22-2022 39 of 42 3 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 07.20.2022 07.20.2022 CHAPTER ONE - VISUALIZATION *THE IMAGES SHOWN IN WINDOWS WILL CHANGE FROM TIME TO TIME. THE SIZE OF THE IMAGES WILL CONSISTENTLY BE AS SHOWN. STREET VIEWREVISED DESIGN JAMES HARDIE - ARTISAN V-GROOVE FIBER CEMENT SIDING, PAINTED BLACK ANODIZED ALUMINUM STOREFRONT 7 1 2 3 4 5 6 SOLARBAN 60 LOW - E GLASS CLEAR 8 SOLARBAN 60 LOW - E GLASS WHITE TRANSLUCENT 9 39 7 2 2 9 9 AH 09-22-2022 40 of 42 4 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 07.20.2022 07.20.2022 ENTRY VIEWREVISED DESIGN CHAPTER ONE - VISUALIZATION 3 2 2 111 1 SIM. 3 4 JAMES HARDIE - ARTISAN V-GROOVE FIBER CEMENT SIDING, PAINTED 5 5 5 BLACK ANODIZED ALUMINUM STOREFRONT 7 1 2 3 4 5 6 7 7 SOLARBAN 60 LOW - E GLASS CLEAR 8 SOLARBAN 60 LOW - E GLASS WHITE TRANSLUCENT 9 99 8 99 6 AH 09-22-2022 41 of 42 5 CUPERTINO FACADE - REVISED DESIGN CUPERTINO FACADE - REVISED DESIGN ll 07.20.2022 07.20.2022 AH 09-22-2022 42 of 42