Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AH 02-23-2023 Searchable Packet
CITY OF CUPERTINO ADMINISTRATIVE HEARING AGENDA This will be a teleconference meeting with no physical location Thursday, February 23, 2023 5:00 PM TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION TO HELP STOP THE SPREAD OF COVID-19 In accordance with Government Code 54953(e), this will be a teleconference meeting without a physical location to help stop the spread of COVID-19. Members of the public wishing comment on an item on the agenda may do so in the following ways: 1) E-mail comments by 4:00 p.m. on Thursday, February 23 to the Committee at planning@cupertino.org. These e-mail comments will be received by the Committee members before the meeting and posted to the City’s website after the meeting. 2) E-mail comments during the times for public comment during the meeting to the Committee at planning@cupertino.org. The staff liaison will read the emails into the record, and display any attachments on the screen, for up to 3 minutes (subject to the Chair’s discretion to shorten time for public comments). Members of the public that wish to share a document must email planning@cupertino.org prior to speaking. 3) Teleconferencing Instructions Members of the public may observe the teleconference meeting or provide oral public comments as follows: Oral public comments will be accepted during the teleconference meeting. Comments may be made during “oral communications” for matters not on the agenda, and during the public comment period for each agenda item. To address the Committee, click on the link below to register in advance and access the meeting: Online Please click the link below to join the webinar: Page 1 AH 02-23-2023 1 of 272 Administrative Hearing Agenda February 23, 2023 https://cityofcupertino.zoom.us/webinar/register/WN_wmgvIW1AS-u1Yfmg86CZ5A Phone Dial: (669) 900 6833 and enter Webinar ID: 938 5227 5380 (Type *9 to raise hand to speak) Unregistered participants will be called on by the last four digits of their phone number. Or an H.323/SIP room system: H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) Meeting ID: 938 5227 5380 SIP: 93852275380@zoomcrc.com After registering, you will receive a confirmation email containing information about joining the webinar. Please read the following instructions carefully: 1. You can directly download the teleconference software or connect to the meeting in your internet browser. If you are using your browser, make sure you are using a current and up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain functionality may be disabled in older browsers, including Internet Explorer. 2. You will be asked to enter an email address and a name, followed by an email with instructions on how to connect to the meeting. Your email address will not be disclosed to the public. If you wish to make an oral public comment but do not wish to provide your name, you may enter “Cupertino Resident” or similar designation. 3. When the Chair calls for the item on which you wish to speak, click on “raise hand.” Speakers will be notified shortly before they are called to speak. 4. When called, please limit your remarks to the time allotted and the specific agenda topic. APPROVAL OF MINUTES 1.Subject: Approve the February 9 Administrative Hearing meeting minutes Recommended Action: Approve the February 9 Administrative Hearing meeting minutes 1 - Draft minutes POSTPONEMENTS ORAL COMMUNICATIONS Page 2 AH 02-23-2023 2 of 272 Administrative Hearing Agenda February 23, 2023 This portion of the meeting is reserved for persons wishing to address the Committee on any matter within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Commission from making any decisions with respect to a matter not on the agenda. PUBLIC HEARINGS Effective January 1, 2023, Government Code Section 65103.5 (SB 1214) limits the distribution of copyrighted material associated with the review of development projects. Members of the public wishing to view plans for a project may make an appointment with the Planning Division to view them at City Hall by sending an email to planning@cupertino.org. Plans will also be made available digitally during the hearing to consider the proposal. 2.Subject: Subdivision of one 18,000-square-foot lot into two lots of roughly equal size, and permits to allow the construction of two, two-story single-family residences. (Application No.(s): TM-2021-001, R-2021-014, & R-2021-015; Applicant: Aditi Mukherjee; Location: 7752 Orion Lane; APN(s): 362-18-008) Recommended Action That the Hearing Officer adopt the draft resolutions (Attachment 1 & 2) to: 1. Find the actions exempt from the California Environmental Quality Act (“CEQA”); and 2. Approve the Tentative Parcel Map (TM-2021-001); and 3. Approve the Two-Story Permits (R-2021-014 and R-2021-015) Staff Report 1 - Draft Resolution TM-2021-001 2 - Draft Resolution R-2021-014 and R-2021-015 3 - Project Plan Set 4 - Phase I Environment Site Assessment 5 - Soil Sampling Report OLD BUSINESS - None NEW BUSINESS - None STAFF AND COMMITTEE REPORTS - None FUTURE AGENDA SETTING - None ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate Page 3 AH 02-23-2023 3 of 272 Administrative Hearing Agenda February 23, 2023 alternative format. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue, Cupertino, California 95014, during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. Do not include any personal or private information in written communications to the City that you do not wish to make public, as written communications are considered public records and will be made publicly available on the City website. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 4 AH 02-23-2023 4 of 272 CITY OF CUPERTINO Agenda Item 23-12066 Agenda Date: 2/23/2023 Agenda #: 1. Subject: Approve the February 9 Administrative Hearing meeting minutes Approve the February 9 Administrative Hearing meeting minutes CITY OF CUPERTINO Printed on 2/16/2023Page 1 of 1 powered by Legistar™ AH 02-23-2023 5 of 272 City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3308 MINUTES OF THE ADMINISTRATIVE HEARING REGULAR MEETING HELD FEBRUARY 9, 2023 CALL TO ORDER Hearing officer Luke Connolly opened the meeting at 5:01 p.m. ROLL CALL Staff present: Luke Connolly, Acting Community Development Director Gian Martire, Senior Planner Piu Ghosh, Planning Manager Cyrah Caburian, Administrative Assistant Outside attendee(s): Gary Chao, Apple Vanessa Chow, Apple Erick Serrano, Development Services Manager, Apple APPROVAL OF MINUTES 1. Subject: Approve the September 9, 2022 Administrative Hearing meeting minutes Recommended Action: Approve the September 9, 2022 Administrative Hearing meeting minutes Minutes of the September 9, 2022 minutes were approved as written. POSTPONEMENTS – None ORAL COMMUNICATIONS Jennifer Griffin expressed concerns on limitations sharing SB1214 copyrighted plans. WRITTEN COMMUNICATIONS – None CONSENT CALENDAR – None PUBLIC HEARINGS 2. Subject: Architectural and Site Approval permit to consider a new 10,400 square foot ancillary amenity building and tree removal permit to transplant 68 trees, and the removal and replacement of 21 trees at Apple Park. (Application No(s).: ASA-2022-006, TR-2022-027; Applicant: Apple, Inc.; Location: 4 Apple Parkway; APN(s): 316-06-061) Recommended Action: Staff recommends that the Hearing Officer approve the: 1. Architectural and Site Approval, ASA-2022-006 in accordance with the Draft Resolution (Attachment 1) 2. Tree Removal Permit, TR-2022-027, in accordance with the Draft Resolution (Attachment 2). Staff member Martire provided a presentation and brief overview of proposed development and tree removal and replacements. The applicant’s proposal is acceptable and was found to be consistent with AH 02-23-2023 6 of 272 2 current urban forestry standards. As condition of approval, any tree removed and any side boxed tree that dies must meet replacement standards mandated under CMC 14.18.160 “Tree Replacement”. An EIR was prepared and approved in accordance of CEQA standards and no significant findings were made nor require revisions from the final Certified EIR certified on October 15, 2013. Under said EIR and existing Development Agreement the applicant is obliged to utilize specific Bird Safe fenestration, of which current structures are already in compliance. Emailed written communication was received for this item and forwarded to Hearing officer and Senior Planner Martire. Member of the public, Jennifer Griffin, supported project and asked about the amount of time during construction project that would be allocated toward dirt hauling and skylights; Chao responded dirt hauling would take about four months and Senior Planner Martire responded three skylights would be installed. Hearing officer concurred with Staff’s findings. DECISION: The application was approved by the Hearing Officer with condition #9 Dark Sky Compliance and/or Bird Safety to be removed from Architectural and Site Approval resolution (ASA-2022-006). OLD BUSINESS – None NEW BUSINESS – None STAFF UPDATES AND COMMISSION REPORTS – None FUTURE AGENDA – None ADJOURNMENT: The meeting was adjourned at 5:26 p.m. to the next regularly scheduled meeting. Respectfully submitted: /s/Cyrah Caburian___ Cyrah Caburian Administrative Assistant AH 02-23-2023 7 of 272 CITY OF CUPERTINO Agenda Item 22-11846 Agenda Date: 2/23/2023 Agenda #: 2. Subject: Subdivision of one 18,000-square-foot lot into two lots of roughly equal size, and permits to allow the construction of two,two-story single-family residences.(Application No.(s): TM-2021-001, R-2021-014, & R-2021-015; Applicant: Aditi Mukherjee; Location: 7752 Orion Lane; APN(s): 362-18- 008) Recommended Action That the Hearing Officer adopt the draft resolutions (Attachment 1 & 2) to: 1. Find the actions exempt from the California Environmental Quality Act (“CEQA”); and 2. Approve the Tentative Parcel Map (TM-2021-001); and 3. Approve the Two-Story Permits (R-2021-014 and R-2021-015) CITY OF CUPERTINO Printed on 2/16/2023Page 1 of 1 powered by Legistar™ AH 02-23-2023 8 of 272 ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: February 23, 2023 Subject Subdivision of one 18,000-square-foot lot into two lots of roughly equal size, and permits to allow the construction of two, two-story single-family residences.1 (Application No.(s): TM-2021-001, R-2021-014, & R-2021-015; Applicant: Aditi Mukherjee; Location: 7752 Orion Lane; APN(s): 362-18-008) Recommended Action That the Hearing Officer adopt the draft resolutions (Attachment 1 & 2) to: 1. Find the actions exempt from the California Environmental Quality Act (“CEQA”); and 2. Approve the Tentative Parcel Map (TM-2021-001); and 3. Approve the Two-Story Permits (R-2021-014 and R-2021-015) Discussion Background: The applicant, Aditi Mukherjee, representing property owner, Sue Jane Han (Cherryland, LLC), is seeking to subdivide one single- family residential lot into two single-family residential lots, develop each lot with a two-story residence, associated landscaping, and street improvements (Attachment 3). The property is located on the north side of Orion Lane at the 1 Project includes an additional 749 sq. ft. as an ADU with each proposed home. This additional sq. ft. cannot be absorbed into the space of the primary home. Due to the ministerial nature of ADU permit processing as required by state law, the particulars of the ADUs are not discussed in this staff report. Figure 1: Project Location AH 02-23-2023 9 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 2 intersection of Orion Lane and Hunterston Place. The neighboring uses are single-family residences, with single family residences to the north, east, south, and west of the property with R1-6 zoning and a church with BQ (Quasi Public uses) zoning, approximately 175 feet to the west. The site has a gross area of 18,000 square feet, which, after required frontage improvements and dedications to complete the street and sidewalk on the north side of Orion Lane, will have a net area of 15,000 square feet. The project site currently contains an existing single-family residence with attached garage. Vegetation present on the site consists of numerous trees and shrubs of varying conditions, including, but not limited to, one Protected Tree, a 30” Deodar Cedar. The Cedar was originally proposed for removal (TR-2021-018), however this tree removal permit was withdrawn following redesign recommendations from the City’s consulting arborist. The protected Deodar Cedar will remain on site , and be subject to the City’s standards for tree protection during construction. Project Data: General Plan Designation Residential Low Density (1-5 DU/ac) General Plan Planning Area South Monta Vista Neighborhood Zoning Designation R1-6 Max. Allowed Existing Proposed Density 5 du/ac 2.44 du/ac 4.88 du/ac Lot Size 18,000 sq. ft. (0.41 acres) Net lot Area (after dedications) 15,000 sq. ft. (0.34 acres) Required Lot A Lot B Net Square Feet Min. 6,000 sq. ft. 7,500 sq. ft. 7,500 sq. ft. Lot Width Min. 60 ft. 75 ft. 75 ft. Development Standards Allowed Lot A Lot B Floor Area Ratio (F.A.R.) 45% of net lot area (3,375 sq. ft.) 3,373 sq. ft. (44.97%) 3,374 sq. ft (44.98%) Lot Coverage 50% of net lot area (3,750 sq. ft.) 3,095 sq. ft. (41.3%) 3,050 sq. ft. (40.7%) 1st Floor Setbacks Required Lot A Lot B Front 20’ Minimum 20’ 20’ Rear 20’ Minimum 20’ 20’ Side Combined 15’& No side less than 5’ Combined 16’-7” West: 6’ East: 10’-7” Combined 15’ West: 5’ East: 10’ 2nd Floor Setbacks Required Lot A Lot B Front 25’ Minimum 28’ 28’ AH 02-23-2023 10 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 3 Rear 25’ Minimum 30’-4” 30’-4” Side Combined 25’ & No side < 10’ Combined 30’ West: 15’ East: 15’ Combined 30’ West: 15’ East: 15’ Total Building Height Principal Building 28’ maximum 25’-9” 26’-6” ADU Development Standards Floor Area 800 sq ft maximum 749 sq. ft. 749 sq. ft. Stories One Maximum One One Front Setback 20’Minimum >20’ >20’ Side Setbacks 4’ Minimum 7’-0” 5’-2” Rear Setback 4’ Minimum >30’ >30’ Project Consistency with: General Plan: Yes Zoning: Yes Environmental Review: Categorically Exempt per Section 15332, Class 32 of CEQA Analysis: Conformance with General Plan & Zoning The General Plan Land Use Designation for the site is Low Density Residential, which allows a density of 1-5 dwelling units per acre. With a proposed density of 4.88 dwelling units per acre, the proposal is consistent with the General Plan Land Use designation for the site. Additionally, Staff has evaluated the project’s consistency with the General Plan and has concluded that the proposed project supports several of the City’s other General Plan goals including: Chapter 3: Land Use and Community Design Policy LU-3.3: Building Design - Ensure that building layouts and design are compatible with the surrounding environment and enhance the streetscape and pedestrian activity. Strategy LU-3.3.1: Attractive Design - Emphasize attractive building and site design by paying careful attention to building scale, mass, placement, architecture, materials, landscaping, screening of equipment, loading areas, signage and other design considerations. Strategy LU-3.3.5: Building Location - Encourage building location and entries closer to the street while meeting appropriate landscaping and setback requirements. AH 02-23-2023 11 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 4 Strategy LU-3.3.6: Architecture and Articulation - Promote high-quality architecture, appropriate building articulation and use of special materials and architectural detailing to enhance visual interest. Policy LU-27.2: Relationship to the Street - Ensure that new development in and adjacent to neighborhoods improve the walkability of neighborhoods by providing inviting entries, stoops and porches along the street frontage, compatible building design and reducing visual impacts of garages. Strategy LU-27.7.1 - Lot Size. Ensure that subdivision and lot line adjustment requests respect the neighborhood lot size patterns. Consider revisions to lot size requirements if the neighborhood lot pattern is different from the zoning requirements. Policy LU-27.4: Connections - Support pedestrian and bicycling improvements that improve access with neighborhoods to parks, schools and local retail, and between neighborhoods. Support traffic calming measures rather than blocking the street to reduce traffic impacts on neighborhoods. The site is zoned R1-6, which requires a minimum lot size of 6,000 sq. ft. and minimum lot width of 60 feet. The project proposal is to create two new lots with 7,500 sq. ft. lot size and lot width of 75 feet. This proposal is consistent with the site development regulations for this zoning district pursuant to Chapter 19.28 Single Family Residential Ordinance of the Cupertino Municipal Code. Development Allocation Since there is only one residence on the property, the proposed subdivision will need an allocation of one unit from the Citywide residential development allocation. This will leave a balance of 127 units in this allocation pool. Subdivision Design & Street Improvements The proposed subdivision will create two rectangular lots, each with access from Orion Lane. The project is required to dedicate 20 feet along Orion Lane as right-of-way to accommodate required off-site improvements consisting of a monolithic sidewalk, curb, gutter, street trees, and pavement work. As previously mentioned, the proposed lots meet the subdivision standards established in the R1 zoning ordinance. Since the predominant development pattern in the neighborhood is that of single family homes, the proposed subdivision respects the existing lot pattern by creating two lots which are generally consistent in size and configuration to existing surrounding residential parcels. Two Story Permits The project proposes to develop the two subdivided lots with two two-story single-family residences each. The zoning for the site allows each new lot to be developed with a single AH 02-23-2023 12 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 5 family home (and any accessory structures, other than a streamlined Accessory Dwelling Unit allowed under state law) with a maximum development of 3,375 square feet. As shown in the table above, the two residences will each be approximately 3,375 square feet. The proposed homes comply with building development standards including the maximum floor area ratio (45%) and lot coverage (50%) requirements pursuant to Cupertino Municipal Code Chapter 19.28. The two single-family residences comply with the first and second floor setbacks. Site Planning and Architectural Design The project would include demolishing all existing buildings and removal of several on- site unprotected trees to allow for the development of two residences on two new residential lots. The development provides vehicular and pedestrian access along Orion Lane. Each single-family home includes a garage, a private rear yard for the homes, and on-site and off-site parking spaces as required by the City’s parking ordinance. The houses all have prominent front porches that face Orion Lane and are consistent with the orientation of existing front porches along Orion Lane. As shown on Sheet L12, the project proposes decorative landscaping in the front yards of the homes, privacy planting in the viewsheds to mitigate privacy impacts to adjacent neighbors from the new second story windows, and a front yard tree as required pursuant to Cupertino Municipal Code Section 19.28.120 and Chapter 14.15. By integrating projecting and recessed wall planes, wall height variation, and roofline variation, the applicant has worked to reduce the massing of the custom detached single- family homes. As shown on Sheets A6.1 through A7.22, the applicant has introduced different projections and a variation of materials along the building frontage that help to reduce the massing of the structure. Second story walls are articulated with an assortment of window sizes and trims and a variation in materials to reduce the apparent mass of the second story. The custom homes display a conscious mix of vertical or horizontal aligned windows, doors and architectural elements that provide a symmetry along the building facade. The proposed design is substantially consistent with Section 19.28.110 Single Family Residential Design Guidelines and Principles of the Cupertino Municipal Code. As required through Municipal Code Section 19.28.120, the potential privacy impacts resulting from the second stories have been mitigated with the inclusion of privacy planting 2 Complete plan sets emailed under separate cover due to limitations of state law pursuant to SB1214. AH 02-23-2023 13 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 6 Housing Accountability Act The Housing Accountability Act (“HAA”), California Government Code Section 65589.5(j), requires that when a proposed housing development complies with the applicable, objective general plan and zoning standards, but a local agency proposes to deny the project or approve it only if the density is reduced, the agency must base its decision on written findings supported by substantial evidence that: 1. The development would have a specific adverse impact on public health or safety unless disapproved, or approved at a lower density; and 2. There is no feasible method to satisfactorily mitigate or avoid the specific adverse impact, other than the disapproval, or approval at a lower density. Subdivision (j) of the HAA also requires the local agency to identify and provide written documentation of the reasons why a proposed housing development is inconsistent, not in compliance, or not in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other provision within 30 days of the date that the application for the housing development project is determined to be complete if the housing development project contains 150 or fewer housing units. The proposed project has been determined to comply with applicable, objective general plan and zoning standards, including maximum height, density, minimum setbacks, and number of parking spaces. Thus, subdivision (j) of the Housing Accountability Act applies. Staff is not aware of any basis to make the findings listed above. Environmental Review A Phase I Environment Site Assessment (“ESA”) was prepared for the project by PIERS Environmental Services in August of 2020 (Attachment 4). The report revealed no evidence of Recognized Environmental Conditions or Controlled Recognized Environmental Conditions, in connection with the subject Property or adjacent properties. However, a Historical Recognized Environmental Condition was identified, the potential for residual agricultural chemicals from use of the Prop erty as an orchard. As such, a recommendation for surficial soil sampling and analysis for herbicides and pesticides was included. This soil sampling was conducted by Environmental Resource Group in December of 2020 (Attachment 5). The soil sampling results, in conjunction with the information provided in the Phase 1 ESA, did not indicate reason to suspect that surface soils or deeper soils have been significantly impacted by historical site operations. The reports also indicate that the site contains a former underground storage tank used for gasoline, with no unauthorized release (i.e. soil contamination). According to Fire Department records (Attachment 6), the tank was closed in place in 1987 by filling it with concrete. The applicant has proposed to retain the tank on site following review by their structural engineer and confirmation that the proposed footings will not disturb the tank. AH 02-23-2023 14 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 7 Should the tank be removed, a condition of approval has been added to ensure that removal of the tank will be completed under oversight by the Santa Clara County Department of Environmental Health prior to building permit issuance. As no potentially significant impacts were identified, the project is considered Categorically Exempt per Section 15332, Class 32 of CEQA which exempts infill development within urbanized areas if it meets the following criteria: (a) The project is consistent with the applicable General Plan designation, General Plan policies, and zoning designation and regulations. (b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. (c) The project site has no value as habitat for endangered, rare or threatened species. (d) Approval of the project would not result in any significa nt effects relating to traffic, noise, air quality, or water quality. (e) The site can be adequately served by all required utilities and public services. The project is also subject to the applicable standards of City Municipal Code Title 17, including, but not limited to standards for fugitive dust control, use of low-VOC paint, standards for protection of nesting birds, and noise control and noticing. Other Department/Agency Review The City’s Public Works Department, Building Division, Environmental Programs Division, County Fire Department, and Cupertino Sanitary have reviewed the project and have no objections. Their conditions have been incorporated as conditions of approval in the draft resolutions. In compliance with the Subdivision Map Act requirements, notices have been sent to the two school districts that will serve the new parcels. However, no comments have been received on the project as of the date of production of this staff report. The applicant will be required to pay the appropriate school impact fees upon development of the lots with homes. Public Noticing The following table is a brief summary of the noticing for this project: Notice of Public Hearing Agenda Site Signage (at least 10 days prior to hearing) 58 notices mailed to property owners adjacent to the project site (at least 10 days prior to the hearing) Posted on the City's official notice bulletin board (five days prior to hearing) Posted on the City of Cupertino’s Web site (three days prior to hearing) AH 02-23-2023 15 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 8 Findings All of the findings for approval of the proposed project, consistent with Chapter 18.20 of the Cupertino Municipal Code, may be made as follows: a. That the proposed subdivision map is consistent with the City of Cupertino General Plan. The subject property is consistent with the General Plan since the property is permitted to have up to three dwelling units based on its land use designation of Low Density (1-5 DU/Ac.). The lot acreage will be consistent with the underlying single family residential standards proposed with a minimum lot square footage of 6,000 square feet. Adjacent land uses include similar developments. The proposed subdivision is compatible with the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. b. That the design and improvements of the proposed subdivision are consistent with the General Plan. The off-site improvements proposed with the project are similar to the existing improvements adjacent to the subject site. These are consistent with the City’s General Plan policies related to pedestrian safety etc. by separating sidewalks from the street, minimizing curb-cuts and requiring an urban canopy within the public right-of-way. c. That the site is physically suitable for the type of development contemplated under the approved subdivision. The proposed subdivision is compatible with the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. There are no topographical anomalies that differentiate this property from adjacent properties. The site is located on the valley floor and the proposed three lot subdivision is typical of properties in the neighborhood. d. That the site is physically suitable for the intensity of development contemplated under the approved subdivision. The subject property is physically suitable in size and shape in conformance to development standards and is appropriately configured to accommodate single-family dwelling units that can comply with development standards in Chapter 19.28. e. That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and avoidable injure fish and wildlife or their habitat. The proposed subdivision design and improvements are not likely to cause serious public health problems nor substantially injure fish and wildlife or their habitat because the property is a developed site and located in an urbanized area where residential land use is allowed. AH 02-23-2023 16 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 9 f. That the design of the subdivision or the type of improvements associated therewith are not likely to cause serious public health problems. The proposed development is consistent with the existing adjacent residential development, and the on-site and off-site improvements improve neighborhood walkability through new detached sidewalk construction with size-appropriate driveway cuts and street and private trees planting. g. That the design of the subdivision and its associated improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision. No easement or right-of-way exists currently that would be impeded or conflict with the proposed subdivision. All findings for approval of the proposed project, consistent with Chapter 19.28 of the Cupertino Municipal Code, may be made as follows: a. The project is consistent with the Cupertino General Plan, any applicable specific plans, zoning ordinance, and the purposes of the R-1 Ordinance; and The proposed project is consistent with the General Plan as the project is within the Low Density land use area. There are no applicable specific plans that affect the project. The project has been found to be consistent with the requirements of Cupertino Municipal Code Chapter 19.28 Single Family (R-1) Residential. b. The granting of the permit will not result in a condition that is detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, or welfare; and The granting of the permit will not result in a condition that is detrimental or injurious to property improvements in the vicinity, and will not be detrimental to the public health, safety or welfare as the project is located within the R1-6 (Single Family Residential) zoning district, and will be compatible with the surrounding uses of the neighborhood. The project meets the building development regulations of the R-1 Ordinance and complies with the privacy protection measures to ensure that visual impacts to adjacent neighbors are mitigated. c. The project is harmonious in scale and design with the general neighborhood; and The proposed project is located in a residential area consisting of single -family homes. The subject neighborhood contains a mix of single-story and two-story homes, making the proposed project compatible with the neighborhood. The proposed six two-story residences are comparable in size to the existing residences in the surrounding area and complies with the R- 1 Ordinance regulations for floor area ratio. Additionally, the project complies with all other development regulations for R1-6 zoned properties regarding mass and bulk, including, but AH 02-23-2023 17 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 10 not limited to, first floor building envelope, minimum setback regulations, and building height limitations. d. Adverse visual impacts on adjoining properties have been reasonably mitigated. Any potential adverse visual impacts on adjoining properties have been reasonably mitigated through adherence to the setback requirements and privacy protection measures of the R-1 Ordinance. The R-1 Ordinance allows property owners the ability to construct second-story windows and balconies as long as privacy protection trees and/or shrubs are planted as required by the ordinance. The project complies with the privacy screening requirements of the R-1 Ordinance by providing privacy screening plantings for the second-story balcony and second-story windows with a sill height below 5 feet along the property lines for each lot that proposes these window sizes. Per the R-1 Ordinance, the objective of privacy protection plantings is to provide substantial screening within three years of planting. Privacy protection plantings are considered Protected Trees under the City’s Municipal Code (Chapter 14.18) and are recorded as such with a covenant against the property to inform current and future property owners about their protected status. Protected trees are not permitted to be removed without obtaining a tree removal permit and providing replacement plantings. Conclusion Staff recommends approval of the Tentative Map and associated Two-Story Permits because the project is consistent with the General Plan, subdivisions, and zoning ordinances, in accordance with Chapters 18.20 and 19.28 of the Cupertino Municipal Code. Next Steps If approved, the permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for permits and approval of a Final Map with the City at the end of the appeal period. This approval is valid until February 23, 2024. The applicant team may apply for a one- time one-year extension before the approval expires. Prepared by: Emi Sugiyama, Associate Planner Reviewed and Approved for submission by: Gian Martire, Senior Planner ATTACHMENTS 1. Draft Resolution for TM-2021-001 2. Draft Resolution for R-2021-014 and R-2021-015 AH 02-23-2023 18 of 272 TM-2021-001, R-2021-014, 7752 Orion Lane February 23, 2023 R-2021-015 Page 11 3. Project Plan Set 4. Phase I Environment Site Assessment 5. Soil Sampling Report AH 02-23-2023 19 of 272 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. ________ A RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A TENTATIVE MAP TO ALLOW THE SUBDIVISION OF ONE PARCEL INTO TWO INDIVIDUAL PARCELS LOCATED AT 7752 ORION LANE (APN: 362 18 008) SECTION I: PROJECT DESCRIPTION Application No.: TM-2021-001 Applicant: Aditi Mukherjee Location: 7752 Orion Lane; APN# 362 18 008 SECTION II: FINDINGS FOR A TENTATIVE MAP: WHEREAS, the City of Cupertino received an application for a Tentative Map (Application No. TM-2021-001) as described in Section I of this resolution to subdivide one 18,000-square-foot lot into two lots of equal size; and WHEREAS, the project is determined to be categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15332 of the CEQA Guidelines; and WHEREAS, on February 23, 2023, the Administrative Hearing Officer held a duly noticed public hearing to receive staff’s presentation and public testimony, and to consider the information contained in all staff reports, other pertinent documents, and all written and oral statements received prior to and at the public hearing; and WHEREAS, the applicant has met the burden of proof required to support the application for a Tentative Map; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. That the proposed subdivision map is consistent with the City of Cupertino General Plan. The subject property is consistent with the General Plan since the property is permitted to have up to two dwelling units based on its land use designation of Low Density (1-5 DU/Ac.). The AH 02-23-2023 20 of 272 lot acreage will be consistent with the underlying single family residential standards proposed with a minimum lot square footage of 6,000 square feet. Adjacent land uses include similar developments. The proposed subdivision is compatible with the adjoining land uses and n o physical constraints are present that would conflict with anticipated land use development. 2. That the design and improvements of the proposed subdivision are consistent with the General Plan. The off-site improvements proposed with the project are similar to the existing improvements adjacent to the subject site. These are consistent with the City’s General Plan policies related to pedestrian safety etc. by separating sidewalks from the street, minimizing curb-cuts and requiring an urban canopy within the public right-of-way. 3. That the site is physically suitable for the type development contemplated under the approved subdivision. The proposed subdivision is compatible with the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. There are no topographical anomalies that differentiate this property from adjacent properties. The site is located on the valley floor and the proposed two lot subdivision is typical of properties in the neighborhood. 4. That the site is physically suitable for the intensity of development contemplated under the approved subdivision. The subject property is physically suitable in size and shape in conformance to development standards and is appropriately configured to accommodate single-family dwelling units that can comply with development standards in Chapter 19.28. 5. That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and avoidably injure fish and wildlife or their habitat. The proposed subdivision design and improvements are not likely to cause serious public health problems nor substantially injure fish and wildlife or their habitat because the property is a developed site and located in an urbanized area where residential land use is allowed. 6. That the design of the subdivision or the type of improvements asso ciated therewith are not likely to cause serious public health problems. The proposed development is consistent with the existing adjacent residential development, and the on-site and off-site improvements improve neighborhood walkability through new detached sidewalk construction with size-appropriate driveway cuts and street and private tree plantings. AH 02-23-2023 21 of 272 7. That the design of the subdivision and its associated improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision. No easement or right-of-way exists currently that would be impeded or conflict with the proposed subdivision. NOW, THEREFORE, BE IT RESOLVED that after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, and those contained in all other Resolutions approved for this Project, the Administrative Hearing Officer does hereby: 1. Exercises its independent judgment and determines that the Project is exempt from CEQA pursuant to CEQA Guidelines section 15332. Section 15332 exemption applies projects characterized as in-fill development meeting the following criteria: a. The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. b. The proposed development occurs within the city limits on a project site of no more than five acres substantially surrounded by urban uses. c. The project site has no value as habitat for endangered, rare or threatened species. d. Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. e. The site can be adequately served by all required utilities and public services. Therefore, the proposed project is consistent with the criteria stated above (Section 15332) and will not have a significant effect on the environment. 2. Approve the application for a Tentative Map, Application No. TM-2021-001, and 3. Find that the subconclusions upon which the findings and conditions specified in this Resolution are based are contained in the Public Hearing record concerning Application no. TM-2021-001 as set forth in the Minutes of the Administrative Hearing Officer of February 23, 2023 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS The approval is based on a plan set entitled “Tentative Parcel Map for 2-lot Subdivision 7752 Orion Lane,” prepared by RW Engineering, Inc., on July 18, 2022 consisting of three (3) sheets titled “Sheet 1 through Sheet 3” and the plan set entitled AH 02-23-2023 22 of 272 “New Two Story Residence w/ Attached ADU for Suejane Han,” prepared by Aditi Mukherjee and Gregory Lewis Landscape Architect and dated October 11, 2022 and August 22, 2022, respectively, consisting of twenty-four (24) sheets titled “A1.1, A1, A3.1 to A3.2A, A4.1 to A4.2A, A6.1, A6.2, A7.1, A7.2, A8.1, A8.2, and L0 through L6” except as may be amended by conditions in this resolution. In the event there are conflicts between the floor plan, cross sections and elevation drawings, the elevation drawings take precedence. 2. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 3. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of property data may invalidate this approval and may require additional review. 4. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 5. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. R-2021-014 and R-2021-015 shall be applicable to this approval. 6. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. 7. PROTECTED TREES No removal of protected trees is approved as part of this Tentative Map approval. Any specimen trees proposed for removal will require approval of a separate Tree Removal Permit application and replacement under Chapter 14.18 of the Cupertino Municipal Code. 8. DEVELOPMENT ALLOCATION AH 02-23-2023 23 of 272 The project is granted a development allocation of one unit from the Citywide allocation. 9. BELOW MARKET RATE HOUSING PROGRAM The applicant shall participate in the City’s Below Market Rate (BMR) Housing Program by paying the housing mitigation fees as per the Housing Mitigation Manual. These fees will be assessed at the time of Building Permit issuance for the net new residential unit and any associated accessory dwelling units. 10. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 11. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 12. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a. Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b. All haul trucks transporting soil, sand, or other loose material off -site shall be covered. c. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. AH 02-23-2023 24 of 272 e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations. The applicant shall incorporate the City’s construction best management practices into the building permit plan set prior to any grading, excavation, foundation or building permit issuance. 13. NOISE AND VIBRATION NOTICE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall send notices of the planned activity by first class mail to off-site businesses and residents within 500 feet of the project site. The City will provide a template notice and mailing addresses for the Applicant’s use. The notice must be approved by City staff prior to sending. The project applicant shall provide the City with evidence of mailing of the notice, upon request. Please note that, if pile driving, the requirements for noticing and monitoring outlined in City Code Section 17.04.050 G (3) shall apply. 14. NOISE AND VIBRATION SIGNAGE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall ensure that a sign measuring at least four feet by six feet shall be posted on construction fencing at the entrance(s) to the job site, clearly visible to the public, and include the following: a. Permitted construction days and hours; b. A description of proposed construction activities; c. Telephone numbers of the City’s and contractor’s authorized representatives that are assigned to respond in the event of a noise or vibration complaint; and AH 02-23-2023 25 of 272 d. Contact information for City’s and contractor’s authorized representatives that are assigned to respond in the event of a complaint related to fugitive dust, pursuant to the requirements for compliance with BAAQMD’s CEQA Air Quality Guidelines. If the authorized contractor’s representative receives a complaint, they shall investigate, take appropriate corrective action, and report the complaint a nd the action taken to the City within three business days of receiving the complaint. 15. NOISE DURING CONSTRUCTION Prior to issuance of any demolition, grading or building permit, include on plans a note that, during project construction, the project applica nt shall incorporate the following measures to reduce noise during construction and demolition activity: a. The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City’s Planning Department for review and appro val prior to issuance of the first permit. The Construction Noise Plan shall demonstrate compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The details of the Construction Noise Control Plan shall be included in the applicable construction documents and implemented by the on-site Construction Manager. Noise reduction measures selected and implemented shall be based on the type of construction equipment used on the site, dista nce of construction activities from sensitive receptor(s), site terrain, and other features on and surrounding the site (e.g., trees, built environment) and may include, but not be limited to, temporary construction noise attenuation walls, high quality mufflers. During the entire active construction period, the Construction Noise Control Plan shall demonstrate that compliance with the specified noise control requirements for construction equipment and tools will reduce construction noise in compliance with the City’s daytime and nighttime decibel limits. b. Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. c. Signs will be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. d. During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells will be for AH 02-23-2023 26 of 272 safety warning purposes only. The construction manager will use smart back -up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and law. 16. FUGITIVE DUST CONTROL Prior to issuance of the any demolition, grading, or building permit, include on all permit plans, the full text of each of the Bay Area Air Quality Management District’s Basic Control Measures from the latest version of BAAQMD’s CEQA Air Quality Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive dust (i.e., particulate matter PM2.5 and PM10) during demo lition, ground disturbing activities and/or construction. 17. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 18. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES AH 02-23-2023 27 of 272 Prior to the issuance of any demolition, grading or building permit involving soil disturbance, the project applicant shall provide written verification, including the materials provided to contractors and construction crews, to the City confirming that contractors and construction crews have been notified of basic archaeological site indicators, the potential for discovery of archaeological resources, laws pertaining to these resources, and procedures for protecting these resources as follows: a. Basic archaeological site indicators that may include, but are not limited to, darker than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of stone, bone, or shellfish; evidence of living surfaces (e.g., floors); and burials, either human or animal. b. The potential for undiscovered archaeological resources or tribal cultural resources on site. c. The laws protecting these resources and associated penalties, including, but not limited to, the Native American Graves Protection and Repatriation Act of 1990, Public Resources Code Section 5097, and California Health and Safety Code Section 7050 and Section 7052. d. The protection procedures to follow should construction crews discover cultural resources during project-related earthwork, include the following: i. All soil disturbing work within 25 feet of the find shall cease. ii. The project applicant shall retain a qualified archaeologist to provide and implement a plan for survey, subsurface investigation, as needed, to define the deposit, and assessment of the remainder of the site within the project area to determine whether the resource is significant and would be affected by the project. iii. Any potential archaeological or tribal cultural resources found during construction activities shall be recorded on appropriate California Department of Parks and Recreation forms by a qualified archaeologist. If the resource is a tribal cultural resource, the consulting archaeologist shall consult with the appropriate tribe, as determined by the Native American Heritage Commission, to evaluate the significance of the resource and to recommend appropriate and feasible avoidance, testing, preservation or mitigation measures, in light of factors such as the significance of the find, proposed AH 02-23-2023 28 of 272 project design, costs, and other considerations. The archeologist shall perform this evaluation in consultation with the tribe. 19. HUMAN REMAINS AND NATIVE AMERICAN BURIALS Prior to issuance of the any demolition, grading and building permits that involve soil disturbance, include on plans a note that, during project construction, the project applicant shall comply with California Health and Safety Code Section 7050.5 and California Public Resources Code Section 5097.98. a. In the event of discovering human remains during construction activities, there shall be no further excavation or disturbance of the site within a 100-foot radius of the remains, or any nearby area reasonably suspected to overlie adjacent remains. b. The Santa Clara County Coroner shall be notified immediately and shall make a determination as to whether the remains are Native American. c. If the Santa Clara County Coroner determines that the remains are not subject to his authority, he shall notify the Native American Heritage Commission (NAHC) within 24 hours. d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of the deceased Native American. e. The Most Likely Descendant has 48 hours following access to the project site to make recommendations or preferences regarding the disposition of the remains. If the Most Likely Descendant does not make recommendations within 48 hours after being allowed access to the project site, the owner shall, with appropriate dignity, reinter the remains in an area of the property secure from further disturbance and provide documentation about this determination and the location of the remains to the NAHC and the City of Cupertino. Alternatively, if the owner does not accept the Most Likely Descendant’s recommendations, the owner or the descendent may request mediation by the NAHC. Construction shall halt until the mediation has concluded. 20. PALEONTOLOGICAL RESOURCES Prior to issuance of the any demolition, grading or building permit, include on plans a note that, during project construction, the project applicant shall implement the following measures: a. If paleontological resources are encountered during ground disturbing and/or other construction activities, all construction shall be temporarily hal ted or redirected to allow a qualified paleontologist, which shall be retained by the AH 02-23-2023 29 of 272 project applicant, to assess the find for significance and the Applicant shall notify the City. b. If paleontological resources are found to be significant, the paleontological monitor shall determine appropriate actions, in coordination with a qualified paleontologist, City staff, and property owner. Appropriate actions may include, but are not limited to, a mitigation plan formulated pursuant to guidelines developed by the Society of Vertebrate Paleontology and implemented to appropriately protect the significance of the resource by preservation, documentation, and/or removal, prior to recommencing activities. Measures may include, but are not limited to, salvage of unearth ed fossil remains and/or traces (e.g., tracks, trails, burrows); screen washing to recover small specimens; preparation of salvaged fossils to a point of being ready for curation (e.g., removal of enclosing matrix, stabilization and repair of specimens, an d construction of reinforced support cradles); and identification, cataloging, curation, and provision for repository storage of prepared fossil specimens. 21. NESTING BIRDS Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code. a. Construction and tree removal/pruning activities shall be scheduled to avoid the nesting season to the extent feasible. If feasible, tree removal and/or pruning shall be completed before the start of the nesting season to help preclude nesting. The nesting season for most birds and raptors in the San Francisco Bay area extends from February 1 through August 31. Preconstruction surveys (described below) are not required for tree removal or construction activities outside the nesting period. If construction activities and any required tree removal occur during the nesting season (February 1 and August 31), a qualified ornithologist shall be required to conduct surveys prior to tree removal or construction activities. Preconstruction surveys shall be conducted no more than 14 days prior to the start of tree removal, pruning or construction. Preconstruction surveys shall be repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. During this survey, the ornithologist shall inspect all trees and other possible nesting habitats in and immediately adjacent to the construction areas for nests. b. If the survey does not identify any nesting birds that would be affected by construction activities, no further mitigation is required. If an active nest containing viable eggs or young birds is found sufficiently close to work areas to be disturbed by these activities, their locat ions shall be documented and protective AH 02-23-2023 30 of 272 measures implemented under the direction of the qualified ornithologist until the nests no longer contain eggs or young birds. c. Protective measures shall include establishment of clearly delineated exclusion zones (i.e. demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by the qualified ornithologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to ide ntify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified biologist, if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. The protection measures and buffers shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. d. A final report on nesting birds and raptors, including survey methodology, survey date(s), map of identified active nests (if any), and protection measures (if required), shall be submitted to the Planning Manager, through the building permit review process, and be completed to the satisfaction of the Community Development Director prior to the start of grading. 22. UNDERGROUNG STORAGE TANK REMOVAL Should the existing underground storage tank be removed, prior to application for a demolition permit, the applicant shall obtain any required permits, testing, and certifications from the Department of Environmental Health for the closure and removal of underground storage tanks. Remediation, as required, shall be performed prior to submittal of any construction permits for the associated residences. Compliance with this condition shall be verified by the City of Cupertino Community Development Department and the Santa Clara County Environmental Health Department, prior to the issuance of the first grading and/or building permit. 23. HAZARDS AND HAZARDOUS MATERIALS ASBESTOS AND/OR LEAD ASSESSOR CONSULTATION Prior to issuance of a demolition permit for on-site structures, the project applicant shall consult with certified Asbestos and/or Lead Risk Assessors to complete and submit for review to the Building Department an asbestos and lead survey. If asbestos containing materials or lead-containing materials are not discovered during the survey, further mitigation related to asbestos-containing materials or lead containing materials shall not be required. If asbestos containing materials and/or lead - AH 02-23-2023 31 of 272 containing materials are discovered by the survey, the project applicant shall prepare a work plan to demonstrate how the on-site asbestos-containing materials and/or lead-containing materials shall be removed in accordance with current California Occupational Health and Safety (Cal-OSHA) Administration regulations and disposed of in accordance with all CalEPA regulations, prior to the demolition and/or removal of the on-site structures. The plan shall include the requirement that work shall be conducted by a Cal-OSHA registered asbestos and lead abatement contractor in accordance with Title 8 CCR 1529 and Title 8 CCR 1532.1 regarding asbestos and lead training, engineering controls, and certifications. The applicant shall submit the work plan to the City of Cupertino for review and approval. The City has the right to defer the work plan to the Santa Clara County Department of Environmental Health for additional review. Materials containing more than one (1) percent asbestos that is friable are also subject to BAAQMD regulations. Removal of materials containing more than one (1) percent friable asbestos shall be completed in accor dance with BAAQMD Section 11-2-303. 24. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against AH 02-23-2023 32 of 272 the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the A pplicant for business interruption, punitive, speculative, or consequential damages. 25. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT Public Works Project Conditions of Approval. Except for otherwise noted, the following conditions must be completed and/or submitted prior to Parcel Map recordation. 26. STREET IMPROVEMENTS & DEDICATION 20’ of Roadway dedication in fee title and frontage improvements along the project will be required to the satisfaction of the Director of Public Works. Street improvements, grading and drainage plans must be completed and approved prior to parcel map approval. Street improvements may include, but not be limited to, installation of curb & gutter, sidewalk, driveways, AC pavement, storm main, underground joint trench, sewer laterals. All improvements must be completed and accepted by the City prior to Building Final Occupancy or Street Improvement Encroachment Permit acceptance whichever comes first. 27. ACCEPTANCE OF PROPERTY RIGHTS The Public Works Director, or his/her designee, shall have the authority to accept all offers of dedications, easements, quitclaims and other property rights and interests on behalf of the City. 28. GRADING Grading shall be as approved and required by the Director of Public Works in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications AH 02-23-2023 33 of 272 and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. Address comments provided during Planning application stage (comment letter dated 11- 23-21). 29. DRAINAGE Drainage shall be provided to the satisfaction of the Director of Public. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. If not all site drainage can be directed towards the street, drywells, retention systems or other approved systems and improvements will be required as necessary to collect the increase in storm water runoff between the pre- and post-development impervious area. 30. C.3 REQUIREMENTS C.3 regulated improvements are required if Project is creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the Director of Public Works. 31. SUBDIVISION IMPROVEMENT AGREEMENT The project developer shall enter into a subdivision improvement agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement and fees shall be executed and paid prior to parcel map approval. Fees: a. Checking & Inspection Fees: Per current fee schedule ($4,898) b. Grading Permit: Per current fee schedule ($3,647) c. Parcel Map Fee: Per current fee schedule ($7,421) d. Storm Drainage Fee: Per current fee schedule ($1,858) e. Transportation Impact Fee: Per current fee schedule: ($6,797 for new unit) f. Park Fees: Per current fee schedule: ($60,000 for new unit) g. Street Tree Fee: Per current fee schedule: ($438 per tree) Bonds: a. Faithful Performance Bond: 100% of Off-site and On-site Improvements b. Labor & Material Bond: 100% of Off-site and On-site Improvement c. On-site Grading Bond: 100% of site improvements. AH 02-23-2023 34 of 272 The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 32. PARCEL MAP Prior to approval of the Building permit, a parcel map shall be recorded. And, existing house must be demolished prior to recordation of the parcel map as building(s) cannot straddle between parcel lines. 33. TRANSPORTATION IMPACT FEES The Project is subject to the payment of Transportation Impact Fees under City’s Transportation Impact Fee Program (Chapter 14.02 of the Cupertino Municipal Code). 34. PARKS The residential units are subject to the payment of parkland fees in -lieu of parkland dedication per Chapter 13.08 and Chapter 18.24 of the Cupertino Municipal Code. 35. SURVEYS A Boundary Survey and a horizontal control plan will be required for all new construction to ensure the proposed building will be set based on the boundary survey and setback requirements. 36. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 37. TRANSFORMERS & CABINETS Electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and AH 02-23-2023 35 of 272 landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 38. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 39. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 40. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 41. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 42. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 43. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100’ of a Fire Hydrant). 44. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. AH 02-23-2023 36 of 272 45. SAN JOSE WATER SERVICE COMPANY CLEARANCE Provide San Jose Water Company approval for water connection, service capability and location and layout of water lines and backflow preventers prior to parcel map approval. 46. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall “quit claim” to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 47. SANITARY DISTRICT A letter of clearance or sign off of street improvement plans for the project shall be obtained from the Cupertino Sanitary District prior parcel map approval. 48. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and San Jose Water Company, and/or equivalent agencies) will be required prior final map approval. SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 49. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall or their designee that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. SECTION VI: CONDITIONS ADMINISTERED BY THE ENVIRONMENTAL SERVICES DIVISION 50. ENVIRONMENTAL DIVISION STANDARDS Prior to issuance of the first demolition, grading and building permit, the applicant shall include the complete the City of Cupertino Climate Action Plan – Development Project Consistency Checklist, as subsequently revised, supplemented, or replaced, for review and approval by the City Environment and Sustainability Department to demonstrate how the project is consistent with the Cupertino Climate Action Plan. AH 02-23-2023 37 of 272 SECTION VII: CONDITIONS ADMINISTERED BY CUPERTINO SANITARY 51. CONNECTION PERMIT FEES Sewer Development Fees & Treatment Plant Capacity Fees will be required for the proposed work during the Building Permit Phase. The District is currently in the process of drafting up a District Wide Inflow and Infiltration Reduction program. Additional fees for this projects Inflow & Infiltration reduction may be required during the Building Phase. 52. LATERAL & SEWER LINE CLEANOUT At time of Building Permits, the Property Owner shall disconnect and temporarily cap their connection to the District-owned sanitary sewer lateral at the property line, per the District’s standards. The Property Owner shall provide video inspection of the existing District-owned sanitary sewer lateral. If the conditions of the existing lateral is not adequate, the owner shall be required to abandon and install a new sanitary sewer lateral, per District’s standards. New lateral connection, inspection, administration, & engineering fees will be required for the new lateral during the Building Permit Phase. Prior to application for Building Permits, the applicant shall a dd a new cleanout symbol on the proposed and existing sewer laterals on Sheet 3 of the civil sheets. 53. REGISTERED CONTRACTOR The contractor performing the work disconnecting and connecting to the District’s sewer mains shall be registered with the District. CITY ENGINEER'S CERTIFICATE OF ACCEPTANCE OF ENGINEERING/SURVEYING CONDITIONS (Section 66474.18 California Government Code) I hereby certify that the engineering and surveying conditions specified in Section IV. of this Resolution conform to generally accepted engineering practices. ___________________________ Chad Mosley, Assistant Director of Public Works City Engineer CA License 66077 AH 02-23-2023 38 of 272 PASSED AND ADOPTED this 23rd day of February, 2023 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: _________ _ __________ Emi Sugiyama Luke Connolly Associate Planner Administrative Hearing Officer AH 02-23-2023 39 of 272 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. ________ A RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A TWO TWO-STORY PERMITS TO ALLOW TWO NEW TWO-STORY HOMES WITH ATTACHED ADUS LOCATED AT 7752 ORION LANE (APN: 362 18 008) SECTION I: PROJECT DESCRIPTION Application No.: R-2021-014 and R-2021-015 Applicant: Aditi Mukherjee Location: 7752 Orion Lane; APN# 362 18 008 SECTION II: FINDINGS FOR A TWO-STORY PERMIT: WHEREAS, the City of Cupertino received applications for two Two Story Permits to allow the construction of a two new two story homes of 3,373 and 3,374 square feet, respectively with an attached accessory dwelling unit of 749 square feet each; and WHEREAS, the project is determined to be categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15332 of CEQA Guidelines; and WHEREAS, on February 23, 2023, the Administrative Hearing Officer held a duly noticed public hearing to receive staff’s presentation and public testimony, and to consider the information contained in all staff reports, other pertinent documents, and all written and oral statements received prior to and at the public hearing; and WHEREAS, the applicant has met the burden of proof required to support the applications for two Two-Story Permits and WHEREAS, the Administrative Hearing Officer finds as follows with regard to these applications: 1. The project is consistent with the Cupertino General Plan, any applicable specific plans, zoning ordinance, and the purposes of the R-1 Ordinance; and The proposed project is consistent with the General Plan as the project is within the Low Density land use area. There are no applicable specific plans that affect the project. The AH 02-23-2023 40 of 272 project has been found to be consistent with the requirements of Cupertino Municipal Code Chapter 19.28 Single Family (R-1) Residential. 2. The granting of the permit will not result in a condition that is detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, or welfare; and The granting of the permit will not result in a condition that is detrimental or injurious to property improvements in the vicinity, and will not be detrimental to the public health, safety or welfare as the project is located within the R1-6 (Single Family Residential) zoning district, and will be compatible with the surrounding uses of the neighborhood. The project meets the building development regulations of the R-1 Ordinance and complies with the privacy protection measures to ensure that visual impacts to adjacent neighbors are mitigated. 3. The project is harmonious in scale and design with the general neighborhood; and The proposed project is located in a residential area consisting of single-family homes. The subject neighborhood contains a mix of single-story and two-story homes, making the proposed project compatible with the neighborhood. The proposed six two-story residences are comparable in size to the existing residences in the surrounding area and complies with the R-1 Ordinance regulations for floor area ratio. Additionally, the project complies with all other development regulations for R1-6 zoned properties regarding mass and bulk, including, but not limited to, first floor building envelope, minimum setback regulations, and building height limitations. 4. Adverse visual impacts on adjoining properties have been reasonably mitigated. Any potential adverse visual impacts on adjoining properties have been reasonably mitigated through adherence to the setback requirements and privacy protection measures of the R-1 Ordinance. The R-1 Ordinance allows property owners the ability to construct second-story windows and balconies as long as privacy protection trees and/or shrubs are planted as required by the ordinance. The project complies with the privacy screening requirements of the R -1 Ordinance by providing privacy screening plantings for the second-story balcony and second-story windows with a sill height below 5 feet along the property lines for each lot that proposes these window sizes. Per the R-1 Ordinance, the objective of privacy protection plantings is to provide substantial screening within three years of planting. Privacy protection plantings are considered Protected Trees under the City’s Municipal Code (Chapter 14.18) and are recorded as such with a covenant against the property to inform current and future property owners about their protected status. Protected trees are not AH 02-23-2023 41 of 272 permitted to be removed without obtaining a tree removal permit and providing replacement plantings. NOW, THEREFORE, BE IT RESOLVED that after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, and those contained in all other Resolutions approved for this Project, the Administrative Hearing Officer does hereby: 1. Exercises its independent judgment and determines that the Project is exempt from CEQA pursuant to CEQA Guidelines section 15332. Section 15332 exemption applies projects characterized as in-fill development meeting the following criteria: a. The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. b. The proposed development occurs within the city limits on a project site of no more than five acres substantially surrounded by urban uses. c. The project site has no value as habitat for endangered, rare or threatened species. d. Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. e. The site can be adequately served by all required utilities and public services. Therefore, the proposed project is consistent with the criteria stated above (Section 15332) and will not have a significant effect on the environment. 2. Approve the applications for two Two-Story Permits, Application Nos. R-2021-014 and R-2021-015, and 3. Find that the subconclusions upon which the findings and conditions specified in this Resolution are based are contained in the Public Hearing record concerning Application nos. R-2021-014 and R-2021-015 as set forth in the Minutes of the Administrative Hearing Officer of February 23, 2023 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS The approval is based on a plan set entitled “Tentative Parcel Map for 2-lot Subdivision 7752 Orion Lane,” prepared by RW Engineering, Inc., on July 18, 2022 consisting of three (3) sheets titled “Sheet 1 through Sheet 3” and the plan set entitled “New Two Story Residence w/ Attached ADU for Suejane Han,” prepared by Aditi Mukherjee and Gregory Lewis Landscape Architect and dated October AH 02-23-2023 42 of 272 11, 2022 and August 22, 2022, respectively, consisting of twenty-four (24) sheets titled “A1.1, A1, A3.1 to A3.2A, A4.1 to A4.2A, A6.1, A6.2, A7.1, A7.2, A8.1, A8.2, and L0 through L6” except as may be amended by conditions in this resolution. In the event there are conflicts between the floor plan, cross sections and elevation drawings, the elevation drawings take precedence. 2. UNITS APPROVED A total of two single family homes with two attached Accessory Dwelling Units are approved. A covenant shall be recorded prior to final occupancy to ensure that there shall be no internal connection between the accessory dwelling unit and the principal dwelling unit throughout the lifetime of the home, nor shall the accessory dwelling unit ever be allowed to converted to be part of the principal dwelling unit. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 4. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of property data may invalidate this approval and may require additional review. 5. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 6. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. TM-2021-001. 7. PRIVACY PLANTING The final privacy planting plan shall be reviewed and approved by the Planning Division prior to issuance of building permits. The variety, size, and planting distance shall be consistent with the City’s requirements. 8. PROTECTED TREES No removal of protected trees is approved as part of this Two-Story Permit approval. Any specimen trees proposed for removal will require approval of a AH 02-23-2023 43 of 272 separate Tree Removal Permit application and replacement under Chapter 14.18 of the Cupertino Municipal Code. 9. PRIVACY PROTECTION COVENANT The property owner shall record a covenant on this property to inform future property owners of the privacy protection measures and tree protection requirements consistent with the R-1 Ordinance, for all windows with views into neighboring yards and a sill height that is 5 feet or less from the second story finished floor. The precise language will be subject to approval by the Director of Community Development. Proof of recordation must be submitted to the Community Development Department prior to final occupancy of the residence. 10. FRONT YARD TREE The applicant shall indicate on site and landscape plans the location of a front yard tree to be located within the front yard setback area in order to screen the massing of the second story. The front yard tree shall be a minimum 24-inch box and 6 feet planted height and otherwise be consistent with the City’s requirements. 11. FRONT YARD TREE COVENANT The property owner shall record a covenant on this property with the Santa Clara County Recorder’s Office that requires the retention and maintenance of the required front yard tree. The precise language will be subject to approval by the Director of Community Development. Proof of recordation must be submitted to the Community Development Department prior to final occupancy of the residence. 12. LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance, for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 13. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, AH 02-23-2023 44 of 272 windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 14. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a. Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations. The applicant shall incorporate the City’s construction best management practices into the building permit plan set prior to any grading, excavation, foundation or building permit issuance. AH 02-23-2023 45 of 272 15. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 16. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 17. DARK SKY ORDINANCE COMPLIANCE The applicant shall comply with Dark Sky Ordinance regulations, as applicable, prior to issuance of the building permit. 18. NESTING BIRDS Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code. AH 02-23-2023 46 of 272 a. Construction and tree removal/pruning activities shall be scheduled to avoid the nesting season to the extent feasible. If feasible, tree removal and/or pruning shall be completed before the start of the nesting season to help preclude nesting. The nesting season for most birds and raptors in the San Francisco Bay area extends from February 1 through August 31. Preconstruction surveys (described below) are not required for tree removal or construction activities outside the nesting period. If construction activities and any required tree removal occur during the nesting season (February 1 and August 31), a qualified ornithologist shall be required to conduct surveys prior to tree removal or construction activities. Preconstruction surveys shall be conducted no more than 14 days prior to the start of tree removal, pruning or construction. Preconstruction surveys shall be repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. During this survey, the ornithologist sha ll inspect all trees and other possible nesting habitats in and immediately adjacent to the construction areas for nests. b. If the survey does not identify any nesting birds that would be affected by construction activities, no further mitigation is required. If an active nest containing viable eggs or young birds is found sufficiently close to work areas to be disturbed by these activities, their locations shall be documented and protective measures implemented under the direction of the qualified ornithologist until the nests no longer contain eggs or young birds. c. Protective measures shall include establishment of clearly delineated exclusion zones (i.e. demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by the qualified ornithologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified biologist, if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. The protection measures and buffers shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. d. A final report on nesting birds and raptors, including survey methodology, survey date(s), map of identified active nests (if any), and protection measures (if required), shall be submitted to the Planning Manager, through the building permit review process, and be completed to the satisfaction of the Community Development Director prior to the start of grading. AH 02-23-2023 47 of 272 19. HAZARDS AND HAZARDOUS MATERIALS ASBESTOS AND/OR LEAD ASSESSOR CONSULTATION Prior to issuance of a demolition permit for on-site structures, the project applicant shall consult with certified Asbestos and/or Lead Risk Assessors to complete and submit for review to the Building Department an asbestos and lead survey. If asbestos containing materials or lead-containing materials are not discovered during the survey, further mitigation related to asbestos-containing materials or lead containing materials shall not be required. If asbestos containing materials and/or lead - containing materials are discovered by the survey, the project applicant shall prepare a work plan to demonstrate how the on-site asbestos-containing materials and/or lead-containing materials shall be removed in accordance with current California Occupational Health and Safety (Cal-OSHA) Administration regulations and disposed of in accordance with all CalEPA regulations, prior to the demolition and/or removal of the on-site structures. The plan shall include the requirement that work shall be conducted by a Cal-OSHA registered asbestos and lead abatement contractor in accordance with Title 8 CCR 1529 and Title 8 CCR 1532.1 regarding asbestos and lead training, engineering controls, and certifications. The applicant shall submit the work plan to the City of Cupertino for review and approval. The City has the right to defer the work plan to the Santa Clara County Department of Environmental Health for additional review. Materials containing more than one (1) percent asbestos that is friable are also subject to BAAQMD regulations. Removal of materials containing more than one (1) percent friable asbestos shall be completed in accordance with BAAQMD Section 11-2-303. 20. NOISE AND VIBRATION NOTICE AND SIGNAGE REQUIREMENTS a. At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant shall send notices of the planned activity by first class mail as follows: i. For projects on sites that are more than 0.5 acres or four or more residential units the notices shall be sent to off-site businesses and residents within 500 feet of the project site; ii. For projects on sites between 0.25 to 0.5 acres, or two or three residential units (not including Accessory Dwelling Units) notices shall be sent to off- site businesses and residents within 250 feet of the project site; or iii. For projects on sites less than 0.25 acres or one residential unit, the notices shall be sent to off-site businesses and residents within 100 feet of the project site. AH 02-23-2023 48 of 272 The notification shall include a brief description of the project, the activities that would occur, the hours when activity would occur, and the construction period’s overall duration. The notification should include the telephone numbers of the contractor’s authorized representatives that are assigned to respond in the event of a noise or vibration complaint. The project applicant shall provide the City with evidence of mailing of the notice, upon request. b. At least 10 days prior to the start of construction activities, a sign shall be posted at the entrance(s) to the job site, clearly visible to the public, which includes permitted construction days and hours, as well as the telephone numbers of the City’s and contractor’s authorized representatives that are assigned to respond in the event of a noise or vibration complaint. If the authorized contractor’s representative receives a complaint, they shall investigate, take appropriate corrective action, and report the action to the City within three business days of receiving the complaint. 21. NOISE MANAGEMENT DURING CONSTRUCTION Projects shall implement the following measures to reduce noise during construction and demolition activity: a. The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City’s Planning Department for review and approval prior to issuance of the first permit during the Building Permit stage. The Construction Noise Plan shall demonstrate compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The details of the Construction Noise Control Plan shall be included in the applicable construction documents and implemented by the on-site Construction Manager. Noise reduction measures selected and implemented shall be based on the type of construction equipment used on the site, distance of construction activities from sensitive receptor(s), site terrain, and other features on and surrounding the site (e.g., trees, built environment) and may include, but not be limited to, temporary construction noise attenuation walls, high quality mufflers. During the entire active construction period, the Construction Noise Control Plan shall demonstrate that compliance with the specified noise control requirements for construction equipment and tools will reduce construction noise in compliance with the City’s daytime and nighttime decibel limits. AH 02-23-2023 49 of 272 b. Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. c. Signs will be posted at the job site entrance(s), within the on -site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells will be for safety warning purposes only. The construction manager will use smart back -up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and law. 22. VOLATILE ORGANIC COMPOUND EMISSIONS FROM PAINT Prior to issuance of the first building permit, the Applicant shall include a note on all plans where paint specifications or other design specifications are listed, that the project design will incorporate only low-VOC paint (i.e., 50 grams per liter [g/L] or less) for interior and exterior wall architectural coatings. 23. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES Prior to the issuance of any demolition, grading or building permit involving soil disturbance, the project applicant shall provide written verification, including the materials provided to contractors and construction crews, to the City confirming that contractors and construction crews have been notified of basic archaeological site indicators, the potential for discovery of archaeological resources, laws pertaining to these resources, and procedures for protecting these resources as follows: a. Basic archaeological site indicators that may include, but are not limited to, darker than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of stone, bone, or shellfish; evidence of living surfaces (e.g., floors); and burials, either human or animal. b. The potential for undiscovered archaeological resources or tribal cultural resources on site. AH 02-23-2023 50 of 272 c. The laws protecting these resources and associated penalties, including, but not limited to, the Native American Graves Protection and Repatriation Act of 1990, Public Resources Code Section 5097, and California Health and Safety Code Section 7050 and Section 7052. d. The protection procedures to follow should construction crews discover cultural resources during project-related earthwork, include the following: i. All soil disturbing work within 25 feet of the find shall cease. ii. The project applicant shall retain a qualified archaeologist to provide and implement a plan for survey, subsurface investigation, as needed, to define the deposit, and assessment of the remainder of the site within the project area to determine whether the resource is significant and would be affected by the project. iii. Any potential archaeological or tribal cultural resources found during construction activities shall be recorded on appropriate California Department of Parks and Recreation forms by a qualified archaeologist. If the resource is a tribal cultural resource, the consulting archaeologist shall consult with the appropriate tribe, as determined by the Native American Heritage Commission, to evaluate the significance of the resource and to recommen d appropriate and feasible avoidance, testing, preservation or mitigation measures, in light of factors such as the significance of the find, proposed project design, costs, and other considerations. The archeologist shall perform this evaluation in consultation with the tribe. 24. HUMAN REMAINS AND NATIVE AMERICAN BURIALS Prior to issuance of the any demolition, grading and building permits that involve soil disturbance, include on plans a note that, during project construction, the project applicant shall comply with California Health and Safety Code Section 7050.5 and California Public Resources Code Section 5097.98. a. In the event of discovering human remains during construction activities, there shall be no further excavation or disturbance of the site wit hin a 100-foot radius of the remains, or any nearby area reasonably suspected to overlie adjacent remains. b. The Santa Clara County Coroner shall be notified immediately and shall make a determination as to whether the remains are Native American. AH 02-23-2023 51 of 272 c. If the Santa Clara County Coroner determines that the remains are not subject to his authority, he shall notify the Native American Heritage Commission (NAHC) within 24 hours. d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of the deceased Native American. e. The Most Likely Descendant has 48 hours following access to the project site to make recommendations or preferences regarding the disposition of the remains. If the Most Likely Descendant does not make recommendations within 48 hours after being allowed access to the project site, the owner shall, with appropriate dignity, reinter the remains in an area of the property secure from further disturbance and provide documentation about this determination and the location of the remains to the NAHC and the City of Cupertino. Alternatively, if the owner does not accept the Most Likely Descendant’s recommendations, the owner or the descendent may request mediation by the NAHC. Construction shall halt until the mediation has concluded. 25. PALEONTOLOGICAL RESOURCES Prior to issuance of the any demolition, grading or building permit, include on plans a note that, during project construction, the project applicant shall implement the following measures: a. If paleontological resources are encountered during gr ound disturbing and/or other construction activities, all construction shall be temporarily halted or redirected to allow a qualified paleontologist, which shall be retained by the project applicant, to assess the find for significance and the Applicant shall notify the City. b. If paleontological resources are found to be significant, the paleontological monitor shall determine appropriate actions, in coordination with a qualified paleontologist, City staff, and property owner. Appropriate actions may include, but are not limited to, a mitigation plan formulated pursuant to guidelines developed by the Society of Vertebrate Paleontology and implemented to appropriately protect the significance of the resource by preservation, documentation, and/or removal, prior to recommencing activities. Measures may include, but are not limited to, salvage of unearthed fossil remains and/or traces (e.g., tracks, trails, burrows); screen washing to recover small specimens; preparation of salvaged fossils to a point of being r eady for curation (e.g., removal of enclosing matrix, stabilization and repair of specimens, and AH 02-23-2023 52 of 272 construction of reinforced support cradles); and identification, cataloging, curation, and provision for repository storage of prepared fossil specimens. 26. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 27. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS AH 02-23-2023 53 of 272 The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT Public Works Project Conditions of Approval. Except for otherwise noted, the following conditions must be completed and/or submitted prior to Parcel Map recordation. 28. STREET IMPROVEMENTS & DEDICATION 20’ of Roadway dedication in fee title and frontage improvements along the project will be required to the satisfaction of the Director of Public Works. Stree t improvements, grading and drainage plans must be completed and approved prior to parcel map approval. Street improvements may include, but not be limited to, installation of curb & gutter, sidewalk, driveways, AC pavement, storm main, underground joint trench, sewer laterals. All improvements must be completed and accepted by the City prior to Building Final Occupancy or Street Improvement Encroachment Permit acceptance whichever comes first. 29. ACCEPTANCE OF PROPERTY RIGHTS The Public Works Director, or his/her designee, shall have the authority to accept all offers of dedications, easements, quitclaims and other property rights and interests on behalf of the City. 30. GRADING Grading shall be as approved and required by the Director of Public Works in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. Address comments provided during Planning application stage (comment letter dated 11- 23-21). 31. DRAINAGE Drainage shall be provided to the satisfaction of the Director of Public. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. If not all site drainage can be directed towards the street, drywells, retention systems or AH 02-23-2023 54 of 272 other approved systems and improvements will be required as necessary to collect the increase in storm water runoff between the pre- and post-development impervious area. 32. C.3 REQUIREMENTS C.3 regulated improvements are required if Project is creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the Director of Public Works. 33. SUBDIVISION IMPROVEMENT AGREEMENT The project developer shall enter into a subdivision improvement agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement and fees shall be executed and paid prior to parcel map approval. Fees: a. Checking & Inspection Fees: Per current fee schedule ($4,898) b. Grading Permit: Per current fee schedule ($3,647) c. Parcel Map Fee: Per current fee schedule ($7,421) d. Storm Drainage Fee: Per current fee schedule ($1,858) e. Transportation Impact Fee: Per current fee schedule: ($6,797 for new unit) f. Park Fees: Per current fee schedule: ($60,000 for new unit) g. Street Tree Fee: Per current fee schedule: ($438 per tree) Bonds: a. Faithful Performance Bond: 100% of Off-site and On-site Improvements b. Labor & Material Bond: 100% of Off-site and On-site Improvement c. On-site Grading Bond: 100% of site improvements. The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modif ied at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 34. PARCEL MAP AH 02-23-2023 55 of 272 Prior to approval of the Building permit, a parcel map shall be recorded. And, existing house must be demolished prior to recordation of the parcel map as building(s) cannot straddle between parcel lines. 35. TRANSPORTATION IMPACT FEES The Project is subject to the payment of Transportation Impact Fees under City’s Transportation Impact Fee Program (Chapter 14.02 of the Cupertino Municipal Code). 36. PARKS The residential units are subject to the payment of parkland fees in -lieu of parkland dedication per Chapter 13.08 and Chapter 18.24 of the Cupertino Municipal Code. 37. SURVEYS A Boundary Survey and a horizontal control plan will be required for all new construction to ensure the proposed building will be set based on the boundary survey and setback requirements. 38. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 39. TRANSFORMERS & CABINETS Electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 40. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. AH 02-23-2023 56 of 272 41. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 42. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 43. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 44. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 45. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100’ of a Fire Hydrant). 46. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 47. SAN JOSE WATER SERVICE COMPANY CLEARANCE Provide San Jose Water Company approval for water connection, service capability and location and layout of water lines and backflow preventers prior to parcel map approval. 48. DEDICATION OF UNDERGROUND WATER RIGHTS AH 02-23-2023 57 of 272 Developer shall “quit claim” to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 49. SANITARY DISTRICT A letter of clearance or sign off of street improvement plans for the project shall be obtained from the Cupertino Sanitary District prior parcel map approval. 50. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and San Jose Water Company, and/or equivalent agencies) will be required prior final map approval. SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 51. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall or their designee that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. SECTION VI: CONDITIONS ADMINISTERED BY THE ENVIRONMENTAL SERVICES DIVISION 52. ENVIRONMENTAL DIVISION STANDARDS Prior to issuance of the first demolition, grading and building permit, the applicant shall include the complete the City of Cupertino Climate Action Plan – Development Project Consistency Checklist, as subsequently revised, supplemented, or replaced, for review and approval by the City Environment and Sustainability Department to demonstrate how the project is consistent with the Cupertino Climate Action Plan. SECTION VII: CONDITIONS ADMINISTERED BY CUPERTINO SANITARY 53. CONNECTION PERMIT FEES Sewer Development Fees & Treatment Plant Capacity Fees will be required for the proposed work during the Building Permit Phase. The District is currently in the process of drafting up a District Wide Inflow and Infiltration Reduction program. AH 02-23-2023 58 of 272 Additional fees for this projects Inflow & Infiltration reduction may be required during the Building Phase. 54. LATERAL & SEWER LINE CLEANOUT At time of Building Permits, the Property Owner shall disconnect and temporarily cap their connection to the District-owned sanitary sewer lateral at the property line, per the District’s standards. The Property Owner shall provide video inspection of the existing District-owned sanitary sewer lateral. If the conditions of the existing lateral is not adequate, the owner shall be required to abandon and install a new sanitary sewer lateral, per District’s standards. New lateral connection, inspection, administration, & engineering fees will be required for the new lateral during the Building Permit Phase. Prior to application for Building Permits, the applicant shall a dd a new cleanout symbol on the proposed and existing sewer laterals on Sheet 3 of the civil sheets. 55. REGISTERED CONTRACTOR The contractor performing the work disconnecting and connecting to the District’s sewer mains shall be registered with the District. PASSED AND ADOPTED this 23rd day of February, 2023 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: _________ _ __________ Emi Sugiyama Luke Connolly Associate Planner Administrative Hearing Officer AH 02-23-2023 59 of 272 FF 329.50FF 328.50STREETSCAPE CONDITIONS revisionsbydrawncheckeddatescalejob no.sheetof sheets1/8" = 1'-0"A1.1AMDARSTATEOFCALI FORN IA L I C E NSEDARCHITECTADITI MUKHERJEEPROPOSED STREETSCAPE NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA(WEST)(EAST)2. 16 . 21 EXISTING STREETSCAPE8.12.21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22SANITARY DISTRICT CONDITIONSPUBLIC WORKS DEPARTMENT CONDITIONS10.11.22AH 02-23-2023 60 of 272 x xxx N ORION LANE N89°59'02"E 150'BBQX X X X X X X X X X X X X X XXXX zzzzzOHOHOHOHOHOHOHOHOHOHOHOHOHOHOHXXXXXXXXXXXzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzXXXXXXX X X XXXXXXXXXXXXXXXXXXXXX X X XXXXX XXXXSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD N89°59'02"E 150'N0°0'33"W 120'N89°59'02"E 120'TREE 6" TREE 5" TREE 2"/9" BRICK WALL WOOD WALL SHED SHED SHED TREE 6"/24" TREE 6" TREE 7" TREE 7" TREE 7" TREE 7" TREE 27" TREE 5"/10" TREE 30" EDGE OF PAVEMENT EDGE OF PAVEMENT SHED 15' ACCESS AND UTILITY EASEMENT NEW TWO CAR GARAGE NEW TWO STORY EAST RESIDENCE PARCEL B NEW TWO CAR GARAGE NEW TWO STORY WEST RESIDENCE PARCEL A NEW DRIVEWAY NEW DRIVEWAY NEW ADU NEW ADU COVERED PORCH COVERED PORCHREQUIRED 1ST STORY SETBACK20'- 0"REQUIRED 2ND STORY SETBACK25'- 0"REQUIRED 2ND STORY SETBACK25'- 0"REQUIRED 1ST STORY SETBACK20'- 0"PROPOSED FIRST FLOOR SIDE SETBACK 10'- 7" PROPOSED FIRST FLOOR SIDE SETBACK 10'-0" PROPOSED FIRST FLOOR SIDE SETBACK 6'- 0" REQD. & PROPOSED FIRST FLOOR SIDE SETBACK 5'- 0"REQUIRED & PROPOSED 1ST STORY SETBACK20'- 0"REQUIRED 2ND STORY SETBACK25'- 0"COVERED PORCH COVERED PORCH REQUIRED 2ND STORY SETBACK25'- 0"REQUIRED 1ST STORY SETBACK20'- 0"TO BE REMOVED TO BE REMOVED ADU SETBACK 7'-0" ADU SETBACK 5'- 2" NEW DRIVEWAY APRON REMOVE AVOCADO TREE REMOVE TREE REMOVE OLIVE TREE REMOVE TREE REMOVE TREE REMOVE TREE REMOVE TREE REMOVE TREEREMOVE TREE REMOVE TREE TO BE REMOVED TO BE REMOVED 75'-0" 75'-0" 75'-0"75'-0" 400 AMP ELECTRIC METER 400 AMP ELECTRIC METER NEW GAS METER FOR ADU TO BE REMOVED NEW SIDEWALK PROPOSED SECOND FLOOR SIDE SETBACK 15'- 0" PROPOSED SECOND FLOOR SIDE SETBACK 15'- 0" PROPOSED SECOND FLOOR SIDE SETBACK 15'- 0" PROPOSED SECOND FLOOR SIDE SETBACK 15'- 0" NEW GAS METER FOR ADU REQUIRED 2ND STORY SETBACK30'- 4"NEW 6 FT TALLWOOD FENCEADU ENTRANCE ADU ENTRANCEEXISTING 6 FT TALLWOOD FENCETO REMAINEXISTING 6 FT TALLWOOD FENCETO REMAINEXISTING 6 FT TALL WOOD FENCE TO REMAIN 10 x 20 PARKING 10 x 20 PARKING 10 x 20 PARKING 10 x 20 PARKINGXXXXXXSHED 30'TREE 7"/16" REMOVE TREE NEW DRIVEWAY APRON REMOVE CITRUS TREE REMOVE CITRUS TREE REMOVE CITRUS TREE REMOVE CITRUS TREE GRAVEL WALKWAY 3 FT MAX. PROTRUSION UPTO THE EAVE AT THE FRONT PORCH IN THE REQD. FRONTYARD SETBACK 3 FT MAX. PROTRUSION UPTO THE EAVE AT THE FRONT PORCH IN THE REQD. FRONTYARD SETBACK NEW PARKSTRIP NEW PARKSTRIP PRELIMINARYSITE PLANrevisions by drawn checked date scale job no. sheet of sheets 1/8" = 1'-0" A1PRELIMINARY SITE PLAN AMSTAT E OF CA L I F O R NIALICEN S E D A RC H I T ECT ARCHITECT LIC. C 31611 1448 S. STELLING ROADCUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM408 455 3793 NORTH ADITI MUKHERJEEVICINITY MAP 1/8" = 1'-0" 2.16.21 LEGEND A1 SITE PLAN, AREA SUMMARY A1.1 EXTERIOR ELEVATIONS STREETSCAPE/ CONDITIONS A2 NOT USED A3.1 FIRST FLOOR PLAN PARCEL A A3.1A FIRST FLOOR AREA CALCULATIONS PARCEL A A4.1 SECOND FLOOR PLAN PARCEL A A4.1A SECOND FLOOR AREA CALCULATIONS PARCEL A A6.1 EXTERIOR ELEVATION PARCEL A A7.1 EXTERIOR ELEVATION PARCEL A A8.1 BUILDING SECTION PARCEL A A3.2 FIRST FLOOR PLAN PARCEL B A3.2A FIRST FLOOR AREA CALCULATIONS PARCEL B A4.2 SECOND FLOOR PLAN PARCEL B A4.2A SECOND FLOOR AREA CALCULATIONS PARCEL B A6.2 EXTERIOR ELEVATION PARCEL B A7.2 EXTERIOR ELEVATION PARCEL B A8.2 BUILDING SECTION PARCEL B L0.E LANDSCAPE DOCUMENTATION - PARCEL A L0.W LANDSCAPE DOCUMENTATION - PARCEL B L1 HYDROZONE & LANDSCAPE PLAN L2 IRRIGATION PLAN L3 DETAILS L4 LANDSCAPE SPECIFICATION 1 TITLE SHEET 2 PRELIMINARY SITE PLAN 3 PRELIMINARY GRADING AND DRAINAGE PLAN SU-1 LOT SURVEY SHEET INDEX NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA NORTH SCOPE OF WORK: TWO NEW TWO STORY HOMES PARCEL A 2932.3 SF WITH ATTACHED TWO CAR GARAGE 441 SF NEW ADU 748.7 SF. NEW LANDSCAPE AREA - WEST LOT 3303 SF PROJECT SUMMARY PROJECT ADDRESS 7752 ORION LANE APN 362-18-008 ZONING DISTRICT R1- 6 LAND USE LOW RES 1-5 DU/ AC FLOOD ZONE NO AREA CALCULATION GROSS LOT AREA 18000 S.F. NET LOT AREA 15000 S.F. ( 7500 SF EACH LOT) EXISTING FLOOR AREA 2285 SF - 12.7 % EXISTING LOT COVERAGE 2607 SF - 14.5% FLOOR AREA SUMMARY NEW FIRST FLOOR 1939.1 S.F 1943.2 S.F. ATTIC ABOVE 5 FT. 0.0 S.F. 0.0 S.F. FIRST FLOOR ROOF O/ 16 FT. 0.0 S.F. 0.0 S.F. NEW SECOND FLOOR 993.19 S.F. 989.9 S.F. TOTAL LIVING AREA 2932.28 S.F. 2933.1S.F. NEW 2 CAR GARAGE 441.0 S.F. 441.0 S.F. TOTAL PROPOSED FLOOR AREA 3373.28 S.F. 3374.13 S.F. ALLOWABLE FLOOR AREA 3375 S.F. 3375.0 S.F. NEW ADU 748.75 S.F. 749.41S.F. LOT COVERAGE SUMMARY NEW FIRST FLOOR 1939.1 S.F. 1943.2 S.F. NEW FRONT PORCH 66.0 S.F. 131.0 S.F. NEW REAR PORCH 218.0 S.F. 218.0 S.F. BAY WINDOW 20.2 S.F. 20.2 S.F. POP OUT WINDOW AT KITCHEN 4.7 S.F. 4.7.S.F. SECOND FLOOR OVERHANG 0 S.F. 0.0 S.F. NEW GARAGE 441 S.F. 441.0 S.F. TOTAL EAVE PROJECTION 406.4 S.F. 411.0 S.F. TOTAL PROPOSED COVERAGE 3095.4 S.F. ( 41.4 % ) 3050.9 S.F.(40.6%) NEW ADU 748.75 S.F. 749.41 S.F. BAY WINDOW AT ADU 31.0 S.F. 0.0 S.F. TOTAL LOT COVERAGE AT ADU 779.75 S.F. 749.41 S.F. PARCEL A PARCEL B SCOPE OF WORK: TWO NEW TWO STORY HOMES PARCEL B 2933.1 SF WITH ATTACHED TWO CAR GARAGE 441 SF NEW ADU 749.4 SF. NEW LANDSCAPE AREA - EAST LOT 3247 SF 8.12.21 LOT AREA 7500 S.F. 7500 S.F. 2ND FLR TO 1ST FLR RATIO 41.7% 41.5% 3.21.22 SITE OVERALL FLOOR AREA OVERALL LOT COVERAGE 4122.03 S.F. (54.9%) 4123.53 S.F.(54.9%) 3875.15 S.F. (51.6%) 3800.31S.F.( 50.6%) 4.25.22 10.11.22 AH 02-23-2023 61 of 272 N89°59'02"E 120'FIRST FLOOR PLANPARCEL Arevisions by drawn checked date scale job no. sheet of sheets 1/4" = 1'-0" A3.1STA T E OF CA L I F O R NIALICEN S E D A RC H I T ECTAM D A RDAR STA T E OF C A L I F O R NIALICEN S E D A RC H I T ECTADITI MUKHERJEE2.16.21 FIRST FLOOR PLAN PARCEL A NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA8.12.21 ARCHITECT LIC. C 31611 1448 S. STELLING ROADCUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM408 455 37933.21.22 10.11.22 AH 02-23-2023 62 of 272 N89°59'02"E 120'FIRST FLOORAREA CALCULATIONSPARCEL Arevisions by drawn checked date scale job no. sheet of sheets 1/4" = 1'-0" A3.1A AM D A RDAR STA T E OF C A L I F O R NIALICEN S E D A RC H I T ECTADITI MUKHERJEE2.16.21 FIRST FLOOR AREA CALCULATIONS - PARCEL A NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA AREA CALCULATIONS - PARCEL A ARCHITECT LIC. C 31611 1448 S. STELLING ROADCUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM408 455 37933.21.22 10.11.22 AH 02-23-2023 63 of 272 N N0°0'33"W 120'FIRST FLOOR PLANPARCEL Brevisions by drawn checked date scale job no. sheet of sheets 1/4" = 1'-0" A3.2 AM D A RDAR STA T E OF C A L I F O R NIALICEN S E D A RC H I T ECTADITI MUKHERJEE2.16.21 FIRST FLOOR PLAN - PARCEL B NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA8.12.21 ARCHITECT LIC. C 31611 1448 S. STELLING ROADCUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM408 455 37933.21.22 AH 02-23-2023 64 of 272 NN0°0'33"W 120'FIRST FLOOR AREA CALCULATION PARCEL B revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A3.2AAMDARDARSTATEOFCALI FORN IA L I C E NSEDARCHITECTADITI MUKHERJEE 2.16.21FIRST FLOOR AREA CALCULATION - PARCEL B NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA 8.12.21 AREA CALCULATION - PARCEL B ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22AH 02-23-2023 65 of 272 N89°59'02"E 120' SECOND FLOOR PLAN PARCEL A revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A4.1AMDARSTATEOFCALIFORN IA L I C E NSEDARCHITECTADITI MUKHERJEESECOND FLOOR PLAN PARCEL A1/4" = 1'-0" NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA2.16.212.16.21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22AH 02-23-2023 66 of 272 N89°59'02"E 120'JKLMNPRQSECOND FLOOR AREA CALCULATION PARCEL A revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A4.1AAMDARSTATEOFCALI FORN IA L I C E NSEDARCHITECTADITI MUKHERJEESECOND FLOOR AREA CALCULATION PARCEL A1/4" = 1'-0" NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA2.16.21AREA CALCULATION PARCEL A ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22AH 02-23-2023 67 of 272 N0°0'33"W 120'75'-0"SECOND FLOOR PLAN PARCEL B revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A4.2AMDARSTATEOFCALI FORN IA L I C E NSEDARCHITECTADITI MUKHERJEESECOND FLOOR PLAN - PARCEL B1/4" = 1'-0" NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA2.16.218.12.21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22AH 02-23-2023 68 of 272 N0°0'33"W 120'75'-0"JKMNPQLRSECOND FLOOR AREA CALCULATION PARCEL B revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A4.2AAMDARSTATEOFCALI FORN IA L I C E NSEDARCHITECTADITI MUKHERJEESECOND FLOOR AREA CALCULATION - PARCEL B1/4" = 1'-0" NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA2.16.218.12.21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22AH 02-23-2023 69 of 272 FF 329.50NG 327.98NG 327.08AVG. GRADE 327.30MAIN HOUSEAT ADUNG 327.08FF 340.55FF 329.50FF 340.55FF 329.50NG 327.98NG 326.70NG 325.82NG 327.31HEATPUMPFF 340.55FF 329.50FF 340.55EXTERIOR ELEVATIONS PARCEL A revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A6.1AMDARSTATEOFCALI FORN IA L I C E NSEDARCHITECTADITI MUKHERJEELEFT SIDE ELEVATION (WEST) PARCEL AFRONT ELEVATION (SOUTH) PARCEL A NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA2. 16 . 21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.224.25.22AH 02-23-2023 70 of 272 NG 326.92AVG. GRADE 326.00NG 325.00FF 328.0NG 325.92FF 327.0 AT ADUP.H. AT ADU P.H. AT ENTRY PORCH FF 339.05FF 328.0FF 339.05FF 328.0NG 326.92NG 326.64NG 326.33NG 324.71NG 326.32FF 339.05FF 328.0FF 339.05EXTERIOR ELEVATIONS PARCEL B revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A6.2AMDARSTATEOFCALIFORN IA L I C E NSEDARCHITECTADITI MUKHERJEELEFT SIDE ELEVATION (WEST) PARCEL BFRONT ELEVATION (SOUTH) PARCEL B NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA2. 16 . 21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22AH 02-23-2023 71 of 272 FF 329.50NG 327.08NG 326.62NG 325.40FF 340.55FF 329.50FF 340.55FF 329.50NG 326.70NG 326.62NG 327.40P.H. AT ADU FF 340.55FF 329.50FF 340.55revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A7.1REAR ELEVATION ( NORTH) PARCEL AAMRIGHT SIDE ELEVATION ( EAST) PARCEL AEXTERIOR ELEVATIONS PARCEL A ADITI MUKHERJEE DARSTATEOFCALIFORN IA L I C E NSEDARCHITECT NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA2. 16 . 21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.224.25.22AH 02-23-2023 72 of 272 FF 328.00NG 325.00NG 324.55FF 327.0 AT ADUFF 328.00NG 324.71NG 326.32FF 339.05FF 339.05FF 328.00FF 328.00NG 324.55FF 327.00NG 326.64NG 324.55NG 326.64AT ADUAT MAIN HOUSEP.H. AT ADU FF 339.05FF 339.05revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A7.2REAR ELEVATION ( NORTH) PARCEL BAMRIGHT SIDE ELEVATION ( EAST) PARCEL BEXTERIOR ELEVATIONS PARCEL B ADITI MUKHERJEE DARSTATEOFCALIFORN IA L I C E NSEDARCHITECT NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA2. 16 . 21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22AH 02-23-2023 73 of 272 FF 329.50NG 326.70NG 325.82NG 327.31SSSSSSSS327.34 NGFF 329.50MAIN HOUSENG 327.08 NGFF 329.50ADUBUILDING SECTIONS PARCEL A revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A8.1SECTION BB PARCEL AAMSECTION AA PARCEL AADITI MUKHERJEE DARSTATEOFCALI FORN IA L I C E NSEDARCHITECT NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA1.11.21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22AH 02-23-2023 74 of 272 FF 328.00FF 328.0NG 326.33NG 324.71NG 326.32SSSSSSSS327.00 NGFF 327.00 AT ADUFF 328.00NG 325.00BUILDING SECTIONS PARCEL B revisionsbydrawncheckeddatescalejob no.sheetof sheets1/4" = 1'-0"A8.2SECTION BB PARCEL BAMSECTION AA PARCEL BADITI MUKHERJEE DARSTATEOFCALI FORN IA L I C E NSEDARCHITECT NEW TWO STORY RESIDENCES W/ ATTACHED ADU FOR SUEJANE HAN 7752 ORION LANE CUPERTINO, CALIFORNIA2.16.21 ARCHITECT LIC. C 31611 1448 S. STELLING ROAD CUPERTINO, CALIFORNIA ADITI@AMARCHITECTSCA.COM 408 455 3793 3.21.22AH 02-23-2023 75 of 272 BASIS OF BEARINGS:ORION LANELEGENDTENTATIVE PARCEL MAPFOR 2-LOT SUBDIVISION7752 ORION LANECUPERTINO, CAGENERAL NOTES:INDEX OF DRAWINGSTITLESHEETTITLE SHEET 1PRELIMINARY SITE PLAN2PRELIMINARY GRADING 3& DRAINAGE & UTILITYPLANDATE:SHEET NO.SCALE:DRAWN BY:DESIGNED BY:RW ENGINEERING, INC. DATE BYREVISIONNO.OF SHEETSRW 1TITLE SHEET 7752 ORION LANE CUPERTINO, CA 95014 NSANTA CLARA COUNTYAPN: 362-18-008 VICINITY MAPHUNTERSTON PLACE AH 02-23-2023 76 of 272 ORION LANEDATE:SHEET NO.SCALE:DRAWN BY:DESIGNED BY:RW ENGINEERING, INC. REVISIONNO.OF SHEETSRW 2PRELIMINARY SITE PLAN 7752 ORION LANE CUPERTINO, CA 95014 NSANTA CLARA COUNTYAPN: 362-18-008 HUNTERSTON PLACE TWO STORYRESIDENCECOVEREDPORCHTWO CARGARAGE20' WIDE DRIVEWAYNEW ADUNEW ADUCOVEREDPORCHCOVEREDPORCHCOVEREDPORCHTWO CARGARAGETWO STORYRESIDENCEORION LANETYPICAL HALF STREET SECTION20' WIDE DRIVEWAYAH 02-23-2023 77 of 272 EARTHWORK TABLESITE BENCHMARK:ORION LANEDATE:SHEET NO.SCALE:DRAWN BY:DESIGNED BY:RW ENGINEERING, INC. REVISIONNO.OF SHEETSRW 3PRELIMINARY GRADING & DRAINAGE AND UTILITY PLAN 7752 ORION LANE CUPERTINO, CA 95014 NSANTA CLARA COUNTYAPN: 362-18-008 TWO STORYRESIDENCECOVEREDPORCHTWO CARGARAGEDRIVEWAYNEW ADUNEW ADUCOVEREDPORCHCOVEREDPORCHCOVEREDPORCHTWO CARGARAGETWO STORYRESIDENCEHUNTERSTON PLACE GRADING NOTES:LEGENDABBREVIATIONDRIVEWAYTYPICAL GRADING AROUND FOUNDATIONSANITARY SEWER NOTES:AH 02-23-2023 78 of 272 BASIS OF BEARINGS:SITE BENCHMARK:NOTES:ABBREVIATIONLEGENDSITE DATA:NORION LANEHUNTERSTON PLACE 7752 ORION LANE CUPERTINO, CA 95014 TOPOGRAPHIC & BOUNDARY SURVEY SANTA CLARA COUNTYDATE:SHEET NO.SCALE:DRAWN BY:DESIGNED BY:RW ENGINEERING, INC. DATE BYREVISIONNO.OF SHEETSRW APN: 362-18-008SU-1AH 02-23-2023 79 of 272 FENCEADUENTRANCEof#2176GREGORY LEWIS LANDSCAPE ARCHITECT 736 Park Way Santa Cruz, CA 95065 (831) 425-4747 lewislandscape@sbcglobal.net"I have complied with the criteria of the Water Efficient Landscape Ordinance and applied them forthe efficient use of water in the landscape design plan"Gregory Lewis - Landscape Architect Lic. #2176 8/22/221 Driveway - Natural color broom finish Conc. or pavers - pattern andcolor to be determined later by owner2 Front walkway - Natural color broom finish Conc. pads with gravelbetween them in 3.5" spaces. Gravel to be gray .75" to 1.5" dia.3 Side yard walks - Natural color concrete or pavers to be determined by owner4 Rear patios - poured in place natural color concrete or pavers tobe determined by owner5 Front Porch - poured in place natural color concrete6 Pervious gravel walk in front yard setback with 2x4 headers andweed cloth. Gravel to be selected by owner.7 Existing fencing to be kept when in good condition and repaired orreplaced when necessary8 New 6 foot high fence solid wood with 3 foot wide gate9 New 6 foot high fence solid wood10 2" deep gravel on top of 2" deep compacted base rock on top ofweed cloth with 2x4 RWD header boards - gravel to be selected byowner11 Tree Protection Fence12 Landscape screening projection lines from 2nd story windows13 Lawn sprinklers min. 2 feet from impervious paving14 Minimum 2 foot wide landscape swale for drainage. Provide 2.5feet or more when possible15 Landscape screening projection lines from 2nd story windowsWe have landscape screening waivers from the neighbors alonghere so screen shrubs are not requiredSEE SHEET L0 FOR PLANTING NOTESIF YOU USE WEED FABRIC PUT THE DRIP IRRIGATION TUBING ON TOP OF IT(NOT UNDER IT)AH 02-23-2023 80 of 272 FENCEADUENTRANCEof#2176GREGORY LEWIS LANDSCAPE ARCHITECT 736 Park Way Santa Cruz, CA 95065 (831) 425-4747 lewislandscape@sbcglobal.net"I have complied with the criteria of the Water Efficient Landscape Ordinance and applied them forthe efficient use of water in the irrigation design plan"Gregory Lewis - Landscape Architect Lic. #2176 8/22/22AH 02-23-2023 81 of 272 #2176GREGORY LEWIS LANDSCAPE ARCHITECT 736 Park Way Santa Cruz, CA 95065 (831) 359-0960 lewislandscape@sbcglobal.net AFAH 02-23-2023 82 of 272 #2176GREGORY LEWIS LANDSCAPE ARCHITECT 736 Park Way Santa Cruz, CA 95065 (831) 359-0960 lewislandscape@sbcglobal.net AH 02-23-2023 83 of 272 FENCEADUENTRANCEof#2176GREGORY LEWIS LANDSCAPE ARCHITECT 736 Park Way Santa Cruz, CA 95065 (831) 425-4747 lewislandscape@sbcglobal.net AH 02-23-2023 84 of 272 FENCEADUENTRANCEof#2176GREGORY LEWIS LANDSCAPE ARCHITECT 736 Park Way Santa Cruz, CA 95065 (831) 425-4747 lewislandscape@sbcglobal.net AH 02-23-2023 85 of 272 of#2176GREGORY LEWIS LANDSCAPE ARCHITECT 736 Park Way Santa Cruz, CA 95065 (831) 359-0960 lewislandscape@sbcglobal.net DocuSign Envelope ID: 0051503C-9E0E-4483-9C4E-5BC8B810DDF73/10/20223/10/2022AH 02-23-2023 86 of 272 of#2176GREGORY LEWIS LANDSCAPE ARCHITECT 736 Park Way Santa Cruz, CA 95065 (831) 359-0960 lewislandscape@sbcglobal.net DocuSign Envelope ID: 1C6699BA-4A06-4CBD-9489-470508A418D33/10/20223/10/2022AH 02-23-2023 87 of 272 PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT FOR: 7752 ORION LANE CUPERTINO, CALIFORNIA Prepared For: Ms. Suejane Han 20846 Dunbar Drive Cupertino, CA 95014 Prepared By: PIERS Environmental Services 1038 Redwood Highway, Suite 100A Mill Valley, CA 94941 AUGUST 2020 PIERS PROJECT NO. 20154 AH 02-23-2023 88 of 272 August 17, 2020 Ms. Suejane Han 20846 Dunbar Drive Cupertino, CA 95014 RE: PHASE I ENVIRONMENTAL SITE ASSESSMENT 7752 ORION LANE, CUPERTINO, CA Dear Ms. Han: PIERS Environmental Services is pleased to provide you with the attached Phase I Environmental Site Assessment (Phase I ESA) for the above referenced subject site (hereafter referred to as the “Property”). This Phase I ESA conforms to the scope and limitations of the ASTM Practice E1527-13 Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process. The work performed for this project included a professional site reconnaissance; interviews with owners, operators and occupants; and detailed research of regulatory agency files, aerial photographs, historical maps, and a review of the regulatory environmental database listings for the Property and surrounding area. Should you have any questions or concerns regarding this report please do not hesitate in contacting either of us. Respectfully, PIERS Environmental Services Author: Donal Manning Environmental Professional Chief Executive Officer Reviewed by: Norma K. Pannell Senior Project Manager REPA #100002 TEL: 415-388-7900 piers@pierses.com FAX: 415-388-7909 WWW.PIERSES.COM AH 02-23-2023 89 of 272 TABLE OF CONTENTS EXECUTIVE SUMMARY ..................................................................................................................................................... 1 FINDINGS AND OPINIONS .............................................................................................................................................. 2 CONCLUSIONS AND RECOMMENDATIONS ................................................................................................................... 2 INTRODUCTION ................................................................................................................................................................. 3 PROPERTY ..................................................................................................................................................................... 3 PURPOSE ........................................................................................................................................................................ 3 SCOPE OF WORK ........................................................................................................................................................... 4 NON-SCOPE SERVICES .................................................................................................................................................. 5 RECOMMENDATIONS .................................................................................................................................................... 5 ADDITIONAL SERVICES ................................................................................................................................................ 5 Limiting Conditions and Exceptions ........................................................................................................................... 5 Matters Known to Client ............................................................................................................................................ 7 LIMITATION OF LIABILITY ........................................................................................................................................... 7 USER RELIANCE AND ASSIGNMENT ........................................................................................................................... 8 Deviations ................................................................................................................................................................... 8 Significant Assumptions ............................................................................................................................................. 8 Special Terms and Conditions .................................................................................................................................... 8 USER PROVIDED INFORMATION ...................................................................................................................................... 9 USER QUESTIONNAIRE ................................................................................................................................................. 9 OWNER, PROPERTY MANAGER AND OCCUPANT INFORMATION .............................................................................. 9 PREVIOUS ENVIRONMENTAL REPORTS....................................................................................................................... 9 PROPERTY DESCRIPTION ............................................................................................................................................... 10 LOCATION AND LEGAL DESCRIPTION ....................................................................................................................... 10 SITE AND VICINITY GENERAL CHARACTERISTICS ................................................................................................... 10 GENERAL SITE SETTING............................................................................................................................................. 11 EXTERIOR OBSERVATIONS ........................................................................................................................................ 11 INTERIOR OBSERVATIONS.......................................................................................................................................... 11 DESCRIPTION OF STRUCTURES AND PROPERTY IMPROVEMENTS .......................................................................... 11 Structures ................................................................................................................................................................. 11 Roads ........................................................................................................................................................................ 11 Mechanical Systems ................................................................................................................................................. 11 Solid Waste and Sewage Disposal ............................................................................................................................ 12 Surface Water Drainage, Pits, Ponds and Lagoons .................................................................................................. 12 Heating and Cooling Systems ................................................................................................................................... 12 AH 02-23-2023 90 of 272 Source Of Potable Water ......................................................................................................................................... 12 Hazardous Materials Storage, Use, Disposal............................................................................................................ 12 Wells ......................................................................................................................................................................... 12 Floor Drains, Sumps and Clarifiers ........................................................................................................................... 12 Storage Tanks ........................................................................................................................................................... 12 Stained Soil or Pavement ......................................................................................................................................... 12 USES AND CONDITIONS OF THE PROPERTY AND ADJOINING PROPERTIES ............................................................. 13 Current Use of the Property ..................................................................................................................................... 13 Current Uses of Adjoining Properties ...................................................................................................................... 13 RECORDS REVIEW .......................................................................................................................................................... 14 PHYSICAL SETTING SOURCES ..................................................................................................................................... 14 Topographic Map Review ........................................................................................................................................ 14 Hydrogeological Review ........................................................................................................................................... 14 STANDARD AND ADDITIONAL ENVIRONMENTAL RECORDS SOURCES .................................................................... 14 Local Fire Department Records Review ................................................................................................................... 14 Local Building Department Records Review ............................................................................................................ 15 Local Health Department Records Review ............................................................................................................... 15 Additional File Reviews ............................................................................................................................................ 15 Regulatory Agencies Databases Review................................................................................................................... 16 Summary of Databases Reviewed ............................................................................................................................ 16 SUBJECT PROPERTY .................................................................................................................................................. 16 SURROUNDING SITES ............................................................................................................................................... 16 NPL - NATIONAL PRIORITIES LIST/TRIBAL NPL ......................................................................................................... 16 Corract ...................................................................................................................................................................... 16 TSD ........................................................................................................................................................................... 16 DEFENSE ................................................................................................................................................................... 16 BROWN..................................................................................................................................................................... 17 CSL ............................................................................................................................................................................ 17 DEED ......................................................................................................................................................................... 17 SUPERFUND .............................................................................................................................................................. 17 U.S. INSTITUTIONAL AND ENGINEERING CONTROL REGISTRIES/TRIBAL ................................................................. 17 LUST/ TRIBAL LUST ................................................................................................................................................... 17 SWLF/ TRIBAL SWLF ................................................................................................................................................. 18 WELLS ....................................................................................................................................................................... 18 HAZMAT ................................................................................................................................................................... 18 AH 02-23-2023 91 of 272 ERNS ......................................................................................................................................................................... 18 RCRIS GENERATORS ................................................................................................................................................. 18 UST/TRIBAL UST ....................................................................................................................................................... 18 AST/TRIBAL AST ........................................................................................................................................................ 18 AIR EMISSIONS ......................................................................................................................................................... 18 HAZNET .................................................................................................................................................................... 19 Sanborn Fire Insurance Maps Review ...................................................................................................................... 19 Local City Directory Review ...................................................................................................................................... 19 Historical Aerial Photograph Review........................................................................................................................ 20 INTERVIEWS .................................................................................................................................................................... 21 PAST AND PRESENT OWNERS AND OCCUPANTS ....................................................................................................... 21 STATE AND LOCAL GOVERNMENT OFFICIALS .......................................................................................................... 21 VAPOR ENCROACHMENT SCREENING ........................................................................................................................... 22 FINDINGS, OPINIONS AND CONCLUSIONS ...................................................................................................................... 23 Findings .................................................................................................................................................................... 23 Opinions ................................................................................................................................................................... 23 Conclusions .............................................................................................................................................................. 23 ADDITIONAL INVESTIGATIONS .................................................................................................................................. 23 DATA GAPS .................................................................................................................................................................. 24 DELETIONS .................................................................................................................................................................. 24 ENVIRONMENTAL PROFESSIONAL’S STATEMENT ........................................................................................................ 25 REFERENCES ............................................................................................................................................................... 26 AH 02-23-2023 92 of 272 FIGURES Figure 1 - Property Vicinity Map Figure 2 - Property Site Plan APPENDICES Appendix A - Property Photographs Appendix B - Regulatory Records Documentation Appendix C - PIERS Identified Hazardous Materials Sites Radius Report Appendix D - Historical Research Documentation Appendix E - Interview Documentation Appendix F - Qualifications of Environmental Professional(s) AH 02-23-2023 93 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 1 EXECUTIVE SUMMARY The Property is located on the northern side of Orion Lane, west of the intersection with South Stelling Road in a residential area. The Property at 7752 Orion Lane consists of a 0.41-acre parcel, developed with a 2,285-square-foot residence, in the City of Cupertino, Santa Clara County, California. The parcel is identified as Assessor’s Parcel Number (APN) 008 of Assessor’s Map Book 362, Page 18 (362-18-008). According to the Property profile, the building was constructed in 1956. On September 16, 2019, PIERS conducted a visual reconnaissance of the Property. PIERS inspected all areas of the Property during the site reconnaissance. None of the sites in the near vicinity are listed on the regulatory agency databases as having had any spills or releases. The area slopes gently towards the east to northeast. Property is occupied by a 2,285-square-foot residential structure of wood frame and stucco construction on concrete slab and perimeter foundation with red clay roof tiles. The exterior surface is occupied by a driveway and parking area, contained landscaping and orchard trees. A large storage shed is located on the western side of the residence. A smaller storage shed is located in the northwest corner and another storage shed is located in the northeast corner. A concrete patio area is located at the northern exterior portion of the residence. No hazardous materials or other chemicals were observed at the Property, and there was no evidence of any improper storage, usage, or disposal of hazardous materials or other chemicals. No evidence of water supply, irrigation, oil, injection, or dry wells was observed on the Property. No sumps or clarifiers were observed. No storage tanks were observed at the Property. Historical review of Fire Department files indicated a 500-gallon gasoline underground storage tank (UST) was closed in place by filling with concrete in 1986. The UST is located on the western portion of the Property to the south of the storage shed. No staining was observed on the exterior paved surfaces or soil areas at the Property. Historical research was conducted using aerial photographs of the Property and vicinity. On the 1948 aerial photograph the Property and vicinity are occupied by orchards. No features of obvious environmental concern were identified at the Property or vicinity on any of the aerial photographs reviewed. According to Santa Clara County Fire Department records, the Property contained a 550-gallon underground storage tank used to store gasoline. The tank was installed in 1979 on the western portion of the Property just south of the tool shed. In July 1986, a permit was issued to close the tank in place by way of filling with concrete slurry. The tank was closed in place on August 20, 1987, and Blaine Tech conducted soil sampling around the tank; no gasoline, benzene, toluene or xylenes were detected. Closure was verified by inspection on October 9, 1987. AH 02-23-2023 94 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 2 City directory listings were not reviewed as the Property has always been used for residential purposes. No sites with volatile organic compound (VOC) contamination were identified within the critical distances cited in the VES guidance document. Therefore, it is unlikely that a VEC exists on or near the subject Property. FINDINGS AND OPINIONS This assessment has revealed no evidence of Recognized Environmental Conditions (RECs) or Controlled Recognized Environmental Conditions (CRECs) associated with the subject Property. This assessment has revealed evidence of a Historical Recognized Environmental Condition (HREC) associated with the subject Property due to the present of a 550-gallon underground storage tank used to store gasoline that was closed in place by being filled with concrete in 1987. An environmental issue is defined as an environmental concern which does not qualify as a REC, but which may warrant further discussion. The Property was used as an orchard from by at least 1948. Orchard trees are still present on the Property in 1960. This implies the use of agricultural chemicals. However, former use of agricultural chemicals is considered de minimis under ASTM E1527-13. Fertilizers and pesticides tend to biodegrade over time and the last likely use of agricultural chemicals was prior to the development of the Property in 1956, nearly 64 years ago. Additionally, subsurface migration of agricultural chemicals tends to be low, and surface soils were likely removed during development of the Property. Therefore, the Property’s former use as an orchard is not likely to pose significant environmental risk to human health or the environment. CONCLUSIONS AND RECOMMENDATIONS This Phase I ESA has revealed no evidence of Recognized Environmental Conditions or Controlled Recognized Environmental Conditions, in connection with the subject Property or adjacent properties. A Historical Recognized Environmental Condition was identified. One environmental issue was identified, the potential for residual agricultural chemicals from use of the Property as an orchard. As the Property is to be redeveloped, surficial soil sampling and analysis for herbicides and pesticides is recommended. AH 02-23-2023 95 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 3 INTRODUCTION PROPERTY PIERS Environmental Services (PIERS) has completed this Phase I Environmental Site Assessment (ESA) for the 7752 Orion Lane, in Cupertino, Santa Clara County, California (cited hereafter as the Property). PIERS was retained by Ms. Suejane Han (cited hereafter as the Client) to conduct this Phase I Environmental Site Assessment for the subject Property for the purpose of compliance with the “All Appropriate Inquiries” Final Rule (40 CFR Part 312) under CERCLA (42 USC 9601). This report follows the guidelines as stated in ASTM Standard Designation E1527-13: Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process. This Standard complies with “All Appropriate Inquiries” (AAI) 40 CFR Part 312. Any exceptions to, or deletions from, this practice are described in the Deviations Section of this report. PURPOSE The purpose is to conduct a Phase I Environmental Site Assessment (Phase I ESA) on this parcel of commercial real estate at the 7752 Orion Lane, Cupertino, California with respect to the range of contaminants within the scope of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) (42 USC 9601) and petroleum products. This practice (ASTM E1527-13) is intended to permit a user, (i.e. Property owner, buyer, seller, or the Client) to satisfy one of the requirements to qualify for the innocent landowner, contiguous property owner or bona fide prospective purchaser limitation on CERCLA liability (hereinafter, the “landowner liability protections,” or “LLPs”) as defined under 42 USC 9601(35)(B). The goal of the Phase I ESA is to identify recognized environmental conditions (RECs); historical RECs (HREC); or Controlled RECs (CREC). RECs are defined as the presence or likely presence of any hazardous substances or petroleum products, in, on or at a property due to release to the environment; under conditions indicative of a release to the environment or under conditions that pose a material threat of a future release. De minimis conditions are not recognized environmental conditions. HRECS are defined as the historical presence or likely presence at a property of any hazardous substances or petroleum products which were remediated or had undergone risk-based cleanup to meet unrestricted land use criteria. CRECs are defined as past releases of hazardous substances or petroleum products at a property that were addressed with risk-based closures, but contaminants are allowed to remain in place subject to the implementation of required activity and use limitations (AULs), for example, institutional controls or engineering controls. De minimis conditions are defined as a condition that generally does not present a threat to human health or the environment and that generally would not be the subject of an enforcement action if brought to the attention of appropriate governmental agencies. AH 02-23-2023 96 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 4 The identification of potential or existing RECs, HRECs, and/or CRECs affecting the Property is to determine if it: Constitutes or results in a potential or material violation of any applicable environmental laws; Imposes any material constraints of the operations of the Property or requires a material change in the use thereof (i.e. institutional controls/deed restrictions); Requires remedial actions or other responses with respect to hazardous substances or petroleum products affecting the Property under any applicable environmental law; May affect the value of the Property; and May require specific actions to be performed with regard to such conditions and circumstances. The Client may use the information contained in this Phase I ESA report for the purposes of: Evaluating the Client’s legal and financial liabilities for transactions related to purchase, sale, loans, seller financing, or foreclosure of the Property; Evaluating the Property’s overall development potential, associated market value and the impact of applicable laws that restrict financial or other types of assistance for Property development; and/or Determining if specific actions are required prior to the purchase, sale, loan, financing or foreclosure of the Property. SCOPE OF WORK The Scope of Services for the performance of this Phase I ESA included the following tasks: On-site visual reconnaissance of the Property to evaluate on-site activities in respect to hazardous materials use, storage and disposal activities. On-site visual survey of the current uses of the immediately adjacent sites, and surrounding area. Review of selected historic documentation for the Property to determine what activities have occurred at the subject site since the Property’s first developed use. Review of reasonably ascertainable regulatory agency files concerning hazardous material use, storage and disposal at the Property and at adjacent and surrounding sites. Acquisition and detailed professional review of a current environmental sites radius report (PIERS Identified Hazardous Materials Sites Radius Report [IHMSRR]). Preparation of this report in general accordance with the document entitled Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process (The American Society for Testing and Materials [ASTM], Designation E 1527-13) and “All Appropriate Inquiries” Final Rule, 40 Code of Federal Regulations (CFR) Part 312. Interviews with available Property contacts, regulatory officials and personnel associated with the subject and adjoining properties. AH 02-23-2023 97 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 5 NON-SCOPE SERVICES The objective of this Phase I Environmental Site Assessment is to help users (i.e. the Client) qualify for one of the CERCLA Landowner Liability Protections (LLPs) under the “All Appropriate Inquiries” Final Rule (40 CFR Part 312) using the practice of ASTM E1527-13. As such, other environmental concerns of clients may be considered out of scope. Out of scope services may include analysis of Business Environmental Risk (BER); surveys for asbestos-containing building material (ACBM), Naturally Occurring Asbestos (NOA), radon gas, lead-based paint (LBP), and lead in drinking water (LIW); presence of wetlands; federal, state or local regulatory compliance including health and safety; presence of listed species under the Endangered Species Act (ESA); evaluation of indoor air quality; and/or evaluation for the presence of mold. This Section lists any non-scope services requested by the Client or recommended by PIERS. No Non-Scope Services were requested by the Client. RECOMMENDATIONS PIERS has no recommendations for non-scope services. ADDITIONAL SERVICES No additional services were requested by the Client or recommended by PIERS. LIMITING CONDITIONS AND EXCEPTIONS The findings, conclusions, recommendations and opinions are constrained by the limitations of the methodologies inherent in the ASTM Standard Practice E1527- 13. This Phase I Environmental Site Assessment does not guarantee the condition of the Property. PIERS Environmental Services (PIERS) cannot and does not warrant or guarantee that information obtained from other sources, e.g. interviews and historical records, concerning the Property is accurate and reliable. PIERS is not responsible for conditions or consequences arising from facts and information that were withheld or concealed, or not fully disclosed at the time this evaluation was performed. Conclusions and recommendations made in the report for the Property are preliminary in nature and are based wholly upon the data obtained and available information reviewed during the assessment. The site assessment is prepared to assist in decisions regarding this Property, and its possible subsurface environmental hazards. PIERS is not responsible for errors or omissions in agency files or databases or non-disclosure by Property owners or representatives. AH 02-23-2023 98 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 6 To achieve the study objectives for this project PIERS was required to base conclusions and recommendations on the best information available during the period the investigation was conducted. PIERS professional services are performed using the degree of care and skill ordinarily exercised by environmental consultants practicing in this or similar fields. The findings are mainly based upon examination of historic records, maps, aerial photographs, and governmental agencies lists. It should be noted that governmental agencies often do not list all sites with environmental contamination; the lists and data used could be inaccurate and/or incomplete. Recommendations are based on the historic land use of the subject Property, as well as features noted during the site inspection. The absence of potential gross contamination sources, historic or present, does not necessarily imply that the subject Property is free of any contamination. This project did not include sampling of materials (for example: soil, water, air, mold, building materials). This Phase I ESA does not include the mention of, recovery, sampling, or reporting of the nature or extent of Asbestos Containing Materials or any mold issues. PIERS does not warrant or guarantee that no significant events, releases or conditions could have arisen during the periods with data gaps (if they exist). This Phase I ESA does not include information or advice relating to any environmental issues, laws or environmentally related business decisions that have not been stated in the above outline. No warranties, therefore, are expressed or implied. PIERS has no liability towards consequential damages. In some cases, an environmental compliance audit may be necessary for a Property. The information and opinions rendered in the report are exclusively for use by the Client. PIERS will not distribute or publish this report without the Client’s consent except as required by law or court order. PIERS has no responsibilities or liability whatsoever to persons or entities other than the Client if they so choose to use this report. This Phase I ESA does not address requirements of any state or local laws or of any federal laws other than the AAI provisions of the LLPs. Not does this report address all of the safety concerns, if any, of the subject Property. AH 02-23-2023 99 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 7 MATTERS KNOWN TO CLIENT The Client, Property representative or site owner should have provided PIERS with any and all information known to the Client, or suspected by the Client, which pertains to: (a) the existence or possible existence at, on, under or in the vicinity of the Property, of any hazardous materials, pollutants; (b) any conditions at, on, under or in the vicinity of the site, which might represent a potential safety hazard or danger to human health or the environment; (c) any permit, manifest, title record, lien or other record of compliance or non-compliance with any federal, state or local laws, or court or administrative order or decrees which could affect the recommendations or conclusions reached by PIERS in the performance of its Services. There may be additional reports relating to the Property (whether prepared by PIERS or other parties), and reliance upon any PIERS report without reference to any such other reports is done at Client’s sole risk. All information regarding operations, plans, specifications, conditions or test data which is provided to PIERS by the Client, Property owners or third parties (including without limitation, any point of contact at the site), is deemed by PIERS to be correct and complete without any independent verification by PIERS. PIERS assumes no responsibility for the accuracy of such information and shall not be liable if reliance on such information results in incorrect conclusions or results. LIMITATION OF LIABILITY PIERS total liability to the Client for any and all injuries, claims, losses, expenses or damages whatsoever directly or indirectly arising out of or in any way related to this report from any cause or causes, including but not limited to PIERS negligence, errors, omissions, strict liability, or breach of contract shall NOT EXCEED THE TOTAL AMOUNT OF THE CONTRACT FOR THIS PROJECT. PIERS SHALL NOT BE LIABLE FOR LATENT OR HIDDEN CONDITIONS, CONDITIONS NOT ACTUALLY OBSERVED BY PIERS, THE POTENTIAL CONSEQUENCES OF OBSERVABLE CONDITIONS, CONDITIONS OF WHICH CLIENT HAD KNOWLEDGE OF AT THE TIME OF THE SERVICES, OR ANY UNAUTHORIZED ASSIGNMENT OF OR RELIANCE UPON THE REPORTS. NONWITHSTANDING THE PRIOR SENTENCE, IN NO EVENT SHALL PIERS BE LIABLE TO CLIENT FOR ANY EXEMPLARY, PUNITIVE, DIRECT OR INDIRECT, INCIDENTAL, SPECIAL, OR CONSEQUENTIAL (INCLUDING LOST PROFITS) DAMAGES ARISING FROM OR IN ANY WAY CONNECTED WITH ITS PERFORMANCE OR FAILURE TO PERFORM UNDER THE AGREEMENT, EVEN IF THE AFFECTED PARTY HAS KNOWLEDGE OF THE POSSIBILITY OF SUCH DAMAGES. AH 02-23-2023 100 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 8 USER RELIANCE AND ASSIGNMENT This Phase I Environmental Site Assessment has been prepared for the exclusive use of the Client. The Client may rely on the contents of this report. No other person or entity may rely on the report without the advance written consent of PIERS, and no other third-party beneficiaries are intended. In the absence of a written agreement with PIERS granting such rights, no third parties shall have rights of recourse or recovery whatsoever under any course of action against PIERS, its officers, employees, vendors, successors or assigns. Any such unauthorized user shall be responsible to protect indemnify and hold PIERS, the Client and the respective officers, employees, vendors, successors and assigns harmless from any and all claims, damages, losses, liabilities, expenses, and costs attributable to such use. Unauthorized use of the report shall constitute acceptance of and commitment to these responsibilities, which shall be irrevocable and shall apply regardless of the cause of action or legal theory pled or asserted. DEVIATIONS No deviations from the recommended scope of ASTM E1527-13 were observed as part of this Phase I, except for the following: The user did not provide PIERS with any land title or environmental lien records. PIERS view during the site reconnaissance was partially obstructed by stored materials. Interviews with owners previous to the current owner were not reasonably ascertainable and constitute a data gap. Based on information obtained from other historical sources, this data gap is not expected to alter the findings of this Phase I ESA. SIGNIFICANT ASSUMPTIONS PIERS assumes all the information provided to us was true and accurate. SPECIAL TERMS AND CONDITIONS The Client for this project requested no special terms, conditions or extraneous services. Therefore, PIERS implemented no special terms, conditions or extraneous services for this project. Business Environmental Risk concerns have not been addressed for this project. Controlled substances information has not been included, as it is outside the scope of ASTM E1527-13 unless specifically requested by the Client. AH 02-23-2023 101 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 9 USER PROVIDED INFORMATION The “All Appropriate Inquiries” Final Rule (40 CFR Part 312) requires tasks to be performed by or on behalf of a party seeking to qualify for an LLP to CERCLA liability. The environmental professional (EP) shall request that the user (“Client”) provide the results of a review of: Recorded land title records Title and Judicial Records for Environmental Liens and Activity and Use Limitation (AULs) Specialized Knowledge or Experience of the User Fair Market Value: In a transaction involving the purchase of a parcel, the User should inform the EP if the purchase price is lower than the fair market value due to contamination. The User is not required to disclose the purchase price to the EP. Commonly Known or Reasonably Ascertainable Information about the Property to identify conditions indicative of releases or threatened releases of hazardous substances or petroleum products. For this Phase I ESA the Client did not provide PIERS with any information regarding liens, activity and use limitations, specialized knowledge, or value reductions for environmental issues on the Property. USER QUESTIONNAIRE On August 14, 2020, PIERS submitted ASTM Site Reconnaissance and Interview Forms to the owner of the Property. A completed interview form had not been obtained as of the date of this report. A copy of the interview form, with observations recorded by PIERS’ Project Manager is attached to this report. PIERS recommends that a completed interview form be obtained from the Property owner. OWNER, PROPERTY MANAGER AND OCCUPANT INFORMATION Cherryland LLC is listed as the owner of the Property. PREVIOUS ENVIRONMENTAL REPORTS No previous environmental reports were provided to PIERS. AH 02-23-2023 102 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 10 PROPERTY DESCRIPTION LOCATION AND LEGAL DESCRIPTION The Property at 7752 Orion Lane consists of a 0.41-acre parcel, developed with a 2,285- square-foot residence, in the City of Cupertino, Santa Clara County, California. A Property Site Plan and a Property Parcel Map are attached to this report as Figures 1 and 2, respectively. Site photographs are presented in Appendix A. The Property is legally described as Assessor’s Parcel Number (APN) 008 of Assessor’s Map Book 362, Page 18 (362-18-008) as shown on Figure 2. SITE AND VICINITY GENERAL CHARACTERISTICS The Property is located in an area comprised of residential use. None of the adjacent properties are considered to be of significant environmental concern to the Property. AH 02-23-2023 103 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 11 SITE RECONNAISSANCE On August 5, 2020, PIERS conducted a visual reconnaissance of the Property. PIERS inspected all areas of the Property during the site reconnaissance. Property photographs (Appendix A), site plans, and notes were taken during the reconnaissance. GENERAL SITE SETTING The Property is located on the northern side of Orion Lane, west of the intersection with South Stelling Road in a residential area. None of the sites in the near vicinity are listed on the regulatory agency databases as having had any spills or releases. The Property is served by the normal municipal utilities. EXTERIOR OBSERVATIONS The Property exterior surface is occupied by lawns, contained landscaping and orchard trees. The area slopes gently towards the east to northeast. A large storage shed is located on the western side of the residence. A smaller storage shed is located in the northwest corner and another storage shed is located in the northeast corner. A concrete patio area is located at the northern exterior portion of the residence. INTERIOR OBSERVATIONS Due to current Covid-19 environmental regulations, PIERS did not enter the residence. PIERS observed that the interior of the storage shed contained personal storage belongings, tools and equipment. DESCRIPTION OF STRUCTURES AND PROPERTY IMPROVEMENTS STRUCTURES The Property is occupied by a 2,285-square-foot residential structure of wood frame and stucco construction on concrete slab and perimeter foundation with red clay roof tiles. ROADS No roads are located on the Property. The Property is accessed from the adjoining streets. MECHANICAL SYSTEMS No mechanical systems were observed at the Property. AH 02-23-2023 104 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 12 SOLID WASTE AND SEWAGE DISPOSAL The area is served by a municipal garbage service and a sanitary sewer system. SURFACE WATER DRAINAGE, PITS, PONDS AND LAGOONS Surface water drains into on-site storm water drains located along the Property boundary and into the public right of way. Sewage is disposed of via city sewer lines. No wetlands, surface impoundments, natural catch basins, settling ponds or lagoons are located on the Property. HEATING AND COOLING SYSTEMS No heating or cooling systems were observed. SOURCE OF POTABLE WATER Water is provided by a municipal water service. HAZARDOUS MATERIALS STORAGE, USE, DISPOSAL No hazardous materials or other chemicals were observed at the Property, and there was no evidence of any improper storage, usage, or disposal of hazardous materials or other chemicals. WELLS No evidence of water supply, irrigation, oil, injection, or dry wells was observed on the Property. FLOOR DRAINS, SUMPS AND CLARIFIERS No sumps or clarifiers were observed. No unusual stains or odors were observed at the Property. STORAGE TANKS No storage tanks were observed at the Property. No evidence of any fill pipes was observed. According to Fire Department files a former underground storage tank used for gasoline was closed in place by being filled with concrete. The tank is located just south of the storage shed on the western portion of the Property. STAINED SOIL OR PAVEMENT No staining was observed on the exterior paved surfaces or soil areas at the Property. AH 02-23-2023 105 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 13 USES AND CONDITIONS OF THE PROPERTY AND ADJOINING PROPERTIES CURRENT USE OF THE PROPERTY The Property is used for residential purposes. CURRENT USES OF ADJOINING PROPERTIES The area surrounding the Property is comprised of residential parcels. The parcels immediately surrounding and in the vicinity of the Property are as follows: The Property is bound to the north by a residence that fronts onto Catalano Court. The Property is bound to the south by Orion Lane, across which are residential parcels and a T-intersection with Hunterston Place. The Property is bound to the east and west by residences that front onto Orion Lane. No items of obvious environmental concern were observed on the vicinity reconnaissance. AH 02-23-2023 106 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 14 RECORDS REVIEW PHYSICAL SETTING SOURCES TOPOGRAPHIC MAP REVIEW The Property is located at an elevation of approximately 325 feet above mean sea level (U. S. Geological Survey 7.5 Minute Topographic Quadrangle, “Cupertino”). The Property is located within an area that slopes towards the northeast. Regionally the area also slopes towards the northeast. HYDROGEOLOGICAL REVIEW The direction of groundwater flow in the vicinity of the Property is inferred to be to the northeast, consistent with the regional topography. The Santa Clara Formation in the foothills is considered to be a non-water bearing zone (transmits only small quantities of groundwater). Based on information obtained online from the USDA Natural Resources Conservation Service Web Soil Survey database, the Property is mapped as Literr-Urban Land – Merbeth Complex, with a lesser component (approximately one-third) of Urban Land – Flaskan Complex. Both units consist of loam, clay loam, sandy clay loam, gravelly clay loam and sandy loam. The soils are well drained with a high runoff potential. A Case Closure Summary Report, dated March 1, 1999, at a nearby Leaking Underground Storage Tank (LUST) case at 1188 Saratoga-Sunnyvale Road, measured depths to groundwater at between 74 feet and 121 feet below ground surface (bgs) with a flow direction to the northeast. STANDARD AND ADDITIONAL ENVIRONMENTAL RECORDS SOURCES Regulatory records documentation is attached to this report as Appendix B. LOCAL FIRE DEPARTMENT RECORDS REVIEW Santa Clara County Central Fire Protection District (SCCCFPD) Review Date – August 13, 2020 The Santa Clara County Central Fire Protection District is the CUPA for the Property area, but had no files for the Property. On August 13, 2020, PIERS was informed by the SCCCFPD that there were files for the Property and the files were reviewed at SCCFD offices. The Property contained a 550-gallon underground storage tank used to store gasoline. The tank was installed in 1979 on the western portion of the Property in front of the tool shed. In July 1986 a permit was issued to close the tank in place by way of filling AH 02-23-2023 107 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 15 with concrete slurry. The tank was closed in place on August 20, 1987 and Blaine Tech conducted soil sampling around the tank; no gasoline, benzene, toluene or xylenes were detected. Closure was verified by inspection October 9, 1987. LOCAL BUILDING DEPARTMENT RECORDS REVIEW Cupertino Building Department (CBD) Review Date –August 7, 2020 On August 7, 2020, PIERS reviewed the file for the Property using the online city of Cupertino Digital Archive database. No files were found for the Property. LOCAL HEALTH DEPARTMENT RECORDS REVIEW Santa Clara County Department of Environmental Health (SCCDEH) Inquiry Date – August 3, 2020 On August 3, 2020, PIERS submitted a public records request to Santa Clara County. On August 12, PIERS was informed there were no files for the Property. ADDITIONAL FILE REVIEWS GeoTracker Database – Regional Water Quality Control Board (RWQCB) The Property is not listed on this database. There are no open cases in close proximity to the Property. EnviroStor Database – Department of Toxic Substances Control (DTSC) The DTSC maintains a database of spills or leaks cases on the EnviroStor database. The Property is not listed on this database. There are no open cases in close proximity to the Property. AH 02-23-2023 108 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 16 REGULATORY AGENCIES DATABASES REVIEW Attached to this report as Appendix C is a PIERS Identified Hazardous Materials Sites Radius Report (IHMSRR) for the subject Property. The report identifies sites of environmental concern within a one-mile radius of the subject Property. The databases searched to compile the enclosed report are gathered from numerous federal, state and local governing environmental entities. All of the databases required to be searched by ASTM E1527-13 – Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process – Section 8.2.1 Standard Federal, State, and Tribal Environmental Record Sources have been included in this report, and searched to the required distances from the subject Property. The following is an analysis of the attached report. SUMMARY OF DATABASES REVIEWED: SUBJECT PROPERTY The Property is not listed on any of the regulatory agency databases including in this radius report. SURROUNDING SITES NPL - NATIONAL PRIORITIES LIST/TRIBAL NPL No sites within a one-mile radius from the Property were listed on the National Priority List (NPL) database. No sites were listed on the Proposed NPL database, Delisted NPL database or on a Tribal NPL database. CORRACT Two sites (one site listed twice) within a one-mile radius from the Property were listed on the CORRACT database. The site is located approximately 3,638 feet to the northwest of the Property. As the inferred groundwater flow direction is to the northeast, this site is considered to be in the cross-gradient or down-gradient directions, and as such does not appear to be of significant environmental concern to the Property. TSD Thirteen sites within a one-mile radius from the Property were listed on the TSD database. The sites are located between 1,170 feet east and 5,230 feet south from the Property, either cross-gradient or down-gradient, and as such, do not appear to be of environmental concern to the Property. DEFENSE No sites within a one-mile radius from the Property were listed on the DEFENSE sites database. AH 02-23-2023 109 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 17 BROWN No sites within a one-mile radius from the Property were listed on the BROWN sites database. CSL Eighteen sites (several sites are listed twice) within a one-mile radius from the Property was listed on the CSL database. The sites are located between approximately 2,107 feet to the west and 4,278 feet northeast from the Property, cross-gradient or down-gradient, and therefore do not appear to be of significant environmental concern to the Property. DEED No sites within a one-mile radius from the Property were listed on the DEED database. SUPERFUND One site within a one-mile radius from the Property was listed on the SUPERFUND database. The site is located approximately 3,638 feet northwest, cross-gradient from the Property, is listed as No Further Remedial Action Planned (NFRAP), and does not appear to be of environmental concern to the Property. U.S. INSTITUTIONAL AND ENGINEERING CONTROL REGISTRIES/TRIBAL Neither the Property nor any adjacent parcel is listed on the federal institutional control/engineering control registries database. Neither the Property nor any adjacent parcel is listed on a tribal institutional control/engineering control registries database. There were no sites listed on this database within a one-half mile radius from the Property. LUST/ TRIBAL LUST Five sites (one site listed twice) within a one-half mile radius from the Property were listed on the LUST database. Some sites are closed cases. In fuel leak cases, research conducted in the State of California by Lawrence Livermore National Laboratory (LLNL) indicates that attenuation and degradation of the product in groundwater play major roles in reducing the hydrocarbon contamination to non-detectable levels within several hundred feet of the contaminant source. Moreover, this research indicates that in over 90% of the hydrocarbon contamination cases, with the possible exception of MTBE or other fuel oxygenates, groundwater contaminant plumes do not extend more than 250 feet from the source. Solvent/toxic contamination plumes may extend farther from the source. AH 02-23-2023 110 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 18 Based on the discussion above, fuel leak LUST sites that are within one-eighth mile in the up-gradient direction, and up-gradient solvent or toxic leak sites are considered to have potential risk to the subsurface soils and/or groundwater of the Property. There are no LUST sites within one-eighth mile of the Property. SWLF/ TRIBAL SWLF No sites within a one-half mile radius from the Property were listed on the SWLF database. No sites were listed on a Tribal SWLF database. WELLS One site within a one-quarter mile radius from the Property was listed on the WELLS database. The site is the lake Alpine Improvement Association located approximately 1,071 feet southeast, cross-gradient, and as such, does not appear to be of environmental concern to the Property. HAZMAT No sites within a one-quarter mile radius from the Property were listed on the HAZMAT database. ERNS No sites within one-eighth mile of the Property were listed on the ERNS database. RCRIS GENERATORS Three sites (one site is listed twice) within one-eighth mile of the Property were listed on the GENERATORS database. The sites are located approximately 405 feet north and 412 feet northeast, cross-gradient to down-gradient, and as such, do not appear to be of environmental concern to the Property. UST/TRIBAL UST No sites within one-eighth mile of the Property were listed on the UST database. No sites were listed on the Tribal UST database. AST/TRIBAL AST No sites within one-eighth mile of the Property were listed on the AST database. No sites were listed on the Tribal AST database. AIR EMISSIONS No sites within one-eighth mile of the Property were listed on the Air Emissions database. AH 02-23-2023 111 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 19 HAZNET Seven sites within a one-quarter mile radius from the Property were listed on the HAZNET database (two sites are listed twice). These sites are located between approximately 259 feet northwest and 412 feet northeast. Neither the Property nor any adjacent parcels are listed on the HAZNET database. All of the sites are located over 259 feet away. These sites would only be of potential environmental concern where they are located up-gradient and are listed on other agency databases as having had unauthorized releases or spills, in which case they are discussed under the agency-listed heading. HISTORICAL USE INFORMATION As described under ASTM E1527-13 – Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process – Section 8.3 Historical Use Information, Historical Use Information is the objective of consulting historical records sources to develop a history of the previous uses of the Property and surrounding area in order to identify the likelihood of past uses having led to recognized environmental conditions in connection with the Property. All obvious uses of the Property shall be identified from the present back to the Property’s first developed use or back to 1940 whichever is earlier. Sources of such information are typically: interviews, aerial photographs, Sanborn Fire Insurance (Sanborn) Maps, city directories, and local fire, building and health department files. Other historical sources include internet sites, community organizations, local libraries and historical societies, and current owner/occupants of neighboring properties. Historical research documentation is attached to this report as Appendix D. SANBORN FIRE INSURANCE MAPS REVIEW No Sanborn Fire Insurance Map coverage was found for the Property, which is typical of areas away from older urban centers. LOCAL CITY DIRECTORY REVIEW City Directories have been published for major cities and towns across the United States since the 18th century. Originally, these Directories, published in the 20th century, also included a street index. For each street address, the Directory lists the name of the resident or business operating from this address during a given year. City Directories are a valuable source of historical information with regard to site tenancy and use. Directories for rural areas were not often published. PIERS did not review historical city directory listings for the Property as the Property has been used for residential purposes since development. PIERS did not identify potential environmental concerns in association with the historical use of the subject Property, or the vicinity, during the city directory review. The listings in the surrounding area were predominantly residential. AH 02-23-2023 112 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 20 HISTORICAL AERIAL PHOTOGRAPH REVIEW On August 6, 2020, aerial photographs from the NETR online database were reviewed for evidence of hazardous materials and features that may have impacted the Property. Aerial photographs from 1948, 1953, 1956, 1960, 1980, 1987, 1991, 1993, 1998, 2002, 2005, 2009, 2012 and 2014 were reviewed. The following is a summary of this review: On the 1948 aerial photograph, the Property and vicinity are occupied by orchards. On the 1953 aerial photograph, the Property and vicinity are mostly still occupied by orchards. The adjacent parcel to the west is now developed with a residence and there are some residential structures in the vicinity. The roads Orion Lane and S Stelling Rd. have been constructed. By 1956, the Property appears to have been cleared and developed or in development as a residence. Much of the vicinity is still covered in orchard trees. There are also more residential structures evident in the vicinity. On the 1960 aerial photograph, there is a residence on the parcel. Orchard trees are still present on the Property and in the vicinity. The parcels to the east and west are not residential. There is residential development to the south. Orchards are evident in the vicinity. On the 1968 aerial photograph, the Property is unchanged. There is more residential development to the south. There are still remnants of orchards in the vicinity. By 1980 the Property is unchanged. In the vicinity, the area is gradually developed with more residences. On the 1982, 1987 and 1991 aerial photographs, the area is largely residential. From 2002 to 2016, the Property appears developed with the current residential structure. The adjacent parcels and the vicinity are residential. No features of obvious environmental concern were identified at the Property or vicinity on any of the aerial photographs reviewed. The prior use of the Property for agriculture is of potential environmental concern as it implies the use of agricultural chemicals such as pesticides and fertilizers. However, former use of agricultural chemicals is considered de minimis under ASTM E1527-13. Fertilizers and pesticides tend to biodegrade over time and the last likely use of agricultural chemicals was prior to the development of the Property in 1956, nearly 64 years ago. Additionally, subsurface migration of agricultural chemicals tends to be low, and surface soils were likely removed during development of the Property. Therefore, the Property’s former use as an orchard is not likely to pose significant environmental risk to human health or the environment. AH 02-23-2023 113 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 21 INTERVIEWS ASTM E1527-13 requires the Environmental Professional (EP) or the User to interview current and or previous owners, operators or occupants of the Property likely to have material information about the Property. This task is completed when the aforementioned parties have been identified by the User and the parties comply with the interview request. PAST AND PRESENT OWNERS AND OCCUPANTS PIERS Project Manager completed the following interviews of past and present owners, operators and occupants, report user, key site manager and others. On August 14, 2020, PIERS submitted ASTM Site Reconnaissance and Interview Forms to the owner of the Property. A completed interview form had not been obtained as of the date of this report. A copy of the interview form, with observations recorded by PIERS’ Project Manager is attached to this report. PIERS recommends that a completed interview form be obtained from the Property owner. STATE AND LOCAL GOVERNMENT OFFICIALS PIERS Project Manager did not complete interviews of state and local government officials. The Property is not listed as a spills or releases site. AH 02-23-2023 114 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 22 VAPOR ENCROACHMENT SCREENING The Vapor Encroachment Screening (VES) Standard (ASTM E2600-10) may include a two- tiered screening process. Initially, the Tier 1 VES focuses on known or suspected contaminated properties located within the area of concern (AOC). According to ASTM E2600-10: “the AOC is one third of a mile around the TP [Target Property], unless the use of a shorter distance (such as for petroleum hydrocarbon constituents of concern [COCs]) is appropriate. The AOC is measured from the TP to a contaminated property with known or suspect COC contamination of soil or groundwater or both.” “If there are known or suspect property sources of contamination within the AOC, the environmental professional should evaluate whether COC may be present at the TP. “For a contaminated property identified in Tier 1 located cross-gradient from the TP, the AOC will be the area within the critical distance plus one half of a reasonable estimation of the contaminated plume width (at the point nearest the closest TP boundary) that might be associated with the nearby known or suspect contaminated property (that is, the contaminated property where the groundwater contamination originated).” ASTM E2600-10 states that if a VEC cannot be ruled out in the Tier 1 screen, the user can undertake more refined screening, as provided in Tier 2. “Tier 2 applies numeric screening criteria to existing or newly collected soil, soil gas, and/or groundwater testing results to evaluate whether or not a VEC can be ruled out. Tier 2 has two data collection components: one non-invasive and one invasive. The objective of the non-invasive Tier 2 process is to identify through documentation, information regarding plume lengths and contaminants, remediation status, etc. The non- invasive Tier 2 VES uses a plume test and critical distance determination to evaluate whether vapors from the contaminated property might migrate to and encroach upon the Target Property. The critical distance between the Target Property and a contaminated plume is defined by E2600-10 as 30 feet (9 meters) for dissolved petroleum hydrocarbons, and 100 feet (30.5 meters) for separate-phase product petroleum hydrocarbons and non-petroleum chemicals of concern (“COCs”) such as volatile organic compounds (VOCs). Contaminated groundwater plumes within these distances may constitute a VEC to the Target Property. The User should be aware that: The presence of a VEC does not necessarily constitute a REC. The EP is to determine if the VEC represents a REC for the Target Property. The VES process does not evaluate the potential for vapor intrusion (VI) of subsurface vapors into existing buildings. Evaluation of VI conditions requires field sampling, and is not included in ASTM E1527-13. EVALUATION No sites with VOC contamination were identified within the critical distances cited in the VES guidance document. Therefore, it is unlikely that a VEC exists on or near the subject Property. AH 02-23-2023 115 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 23 FINDINGS, OPINIONS AND CONCLUSIONS PIERS has performed this Phase I Environmental Site Assessment in conformance with the scope and limitations of ASTM Practice E1527-13 for the font portions of7752 Orion Lane in Cupertino, CA, i.e., the Property. Any exceptions to, or deletions from, this practice are described in the Deviations Section of this report. FINDINGS This assessment has revealed no evidence of Recognized Environmental Conditions (RECs) or Controlled Recognized Environmental Conditions (CRECs) associated with the subject Property. This assessment has revealed evidence of Historical Recognized Environmental Conditions (HRECs) associated with the subject Property due to the underground gasoline storage tank that was closed in place in 1987. OPINIONS An environmental issue is defined as an environmental concern which does not qualify as a REC, but which may warrant further discussion. The Property was used as an orchard prior to 1956. Orchard trees are still present on the Property in 1960. This implies the use of agricultural chemicals. However, former use of agricultural chemicals is considered de minimis under ASTM E1527-13. Fertilizers and pesticides tend to biodegrade over time and the last likely use of agricultural chemicals was prior to the development of the Property in 1956, nearly 64 years ago. Additionally, subsurface migration of agricultural chemicals tends to be low, and surface soils were likely removed during development of the Property. Therefore, the Property’s former use as an orchard is not likely to pose significant environmental risk to human health or the environment. CONCLUSIONS One environmental issue was identified, the potential for residual agricultural chemicals from use of the Property as an orchard. As the Property is to be redeveloped, surficial soil sampling and analysis for herbicides and pesticides is recommended. ADDITIONAL INVESTIGATIONS Additional investigations were not performed for this Phase I ESA. AH 02-23-2023 116 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 24 DATA GAPS A data gap is defined as a lack of or inability to obtain information required by this practice (ASTM E1527-13) despite good faith efforts by the environmental professional to gather such information. Data gaps may result from incompleteness in any of the activities required by this practice, including, but not limited to site reconnaissance (for example, an inability to conduct the site visit), and interviews. ASTM Standard E 1527-13 requires the ESA report to note any data failure from historical research sources, if any; to give reasons why such sources were excluded; and discuss if data failure significantly affects the ability of the Environmental Professional to identify RECS. For this ESA, historical sources were able to document land use from 1948 to present. No significant data gaps were identified for this Phase I ESA. DELETIONS Deviations from the recommended scope of ASTM E1527-13 are summarized earlier in this report, but are not considered significant data gaps. AH 02-23-2023 117 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 25 ENVIRONMENTAL PROFESSIONAL’S STATEMENT “I, Donal Manning, declare that, to the best of my professional knowledge and belief, I meet the definition of Environmental Professional as defined in 312.10 of 40 CFR 312”, and “I have the specific qualifications based on education, training, and experience to assess a property of the nature, history, and setting of the subject property. I have developed and performed All Appropriate Inquiries (AAI) in conformance with the standards and practices set forth in 40CFR Part 312.” The Environmental Professional(s) Qualifications are set forth in Appendix F of this report. Should you have any questions or concerns regarding this report please do not hesitate in contacting either of us. Respectfully, PIERS Environmental Services Author: Donal Manning Environmental Professional Chief Executive Officer Reviewed by: Norma K. Pannell Senior Project Manager REPA #100002 AH 02-23-2023 118 of 272 Phase I ESA Report August 2020 7752 Orion Lane, Cupertino, CA Page 26 REFERENCES American Society for Testing and Materials (ASTM) E1527-13, Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process ASTM E2091, Guide for Use of Activity and Use Limitations, Including Institutional and Engineering Controls ASTM E2600, Guide for Vapor Encroachment Screening on Property Involved in Real Estate Transactions “All Appropriate Inquiries” Final Rule, 40 Code of Federal Regulations (CFR) Part 312, Chapter 1 EPA, Subchapter J-Superfund, Emergency Planning, and Community Right-To- Know Programs, 40 C.F.R. Parts 300-399 Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (“CERCLA” or “Superfund”), as amended by Superfund Amendments and Reauthorization Act of 1986 (“SARA”) and Small Business Liability Relief and Brownfields Revitalization Act of 2002 (“Brownfields Amendments”), 42 U.S.C. §§9601 et seq. National Oil and Hazardous Substances Pollution Contingency Plan, 40 C.F.R. Part 300. Resource Conservation and Recovery Act (also referred to as the Solid Waste Disposal Act), as amended (“RCRA”), 42 U.S.C §6901 et seq. AH 02-23-2023 119 of 272 FIGURES AH 02-23-2023 120 of 272 FIGURE 1 PROPERTY VICINITY MAP 7752 ORION LANE CUPERTINO, CA 95014 WEDNESDAY 29TH OF JULY, 2020 REPORT A MAP ERROR500 M MAP DATA ©2020 GOOGLE TERMS OF USE AH 02-23-2023 121 of 272 FIGURE 2 PROPERTY SITE PLAN 7752 ORION LANE AUGUST 2020 CUPERTINO, CALIFORNIA NOT TO SCALE PIERS ENVIRONMENTAL SERVICES 1038 REDWOOD HIGHWAY, SUITE 100A, MILL VALLEY, CA 94941 PHONE: 415-388-7900 FAX: 415-388-7909 WWW.PIERSES.COM AH 02-23-2023 122 of 272 APPENDIX A PROPERTY PHOTOGRAPHS AH 02-23-2023 123 of 272 PROPERTY PHOTOGRAPHS 7752 ORION LANE, CUPERTINO, CA PHOTO #1. VIEW OF 7752 ORION LANE. PHOTO #2. VIEW OF ADJACENT RESIDENCE TO THE WEST. AH 02-23-2023 124 of 272 PROPERTY PHOTOGRAPHS FRONT PORTION OF 7752 ORION LANE, CUPERTINO, CA PHOTO #3. VIEW ACROSS ORION LANE TO SOUTH. PHOTO #4. VIEW OF FRONT AREA OF PROPERTY. AH 02-23-2023 125 of 272 PROPERTY PHOTOGRAPHS FRONT PORTION OF 7752 ORION LANE, CUPERTINO, CA PHOTO #5. VIEW OF STORAGE SHED AND AREA OF FORMER UST. PHOTO #6. VIEW OF EASTERN PORTION OF PARCEL. AH 02-23-2023 126 of 272 PROPERTY PHOTOGRAPHS FRONT PORTION OF 7752 ORION LANE, CUPERTINO, CA PHOTO #7. VIEW OF RESIDENCE TO THE EAST. PHOTO #8. VIEW STORAGE SHED AND BRICK WORK AREA IN BACKYARD. AH 02-23-2023 127 of 272 PROPERTY PHOTOGRAPHS FRONT PORTION OF 7752 ORION LANE, CUPERTINO, CA PHOTO #9. VIEW OF NORTHERN PORTION OF PARCEL. PHOTO #10. VIEW OF NORTHWEST PORTION AND RESIDENCE TO THE NORTH. AH 02-23-2023 128 of 272 APPENDIX B REGULATORY RECORDS DOCUMENTATION AH 02-23-2023 129 of 272 AH 02-23-2023 130 of 272 AH 02-23-2023 131 of 272 AH 02-23-2023 132 of 272 AH 02-23-2023 133 of 272 AH 02-23-2023 134 of 272 AH 02-23-2023 135 of 272 AH 02-23-2023 136 of 272 AH 02-23-2023 137 of 272 AH 02-23-2023 138 of 272 AH 02-23-2023 139 of 272 AH 02-23-2023 140 of 272 AH 02-23-2023 141 of 272 AH 02-23-2023 142 of 272 AH 02-23-2023 143 of 272 AH 02-23-2023 144 of 272 AH 02-23-2023 145 of 272 AH 02-23-2023 146 of 272 AH 02-23-2023 147 of 272 AH 02-23-2023 148 of 272 AH 02-23-2023 149 of 272 APPENDIX C PIERS IDENTIFIED HAZARDOUS MATERIALS SITES RADIUS REPORT AH 02-23-2023 150 of 272 Tel: Fax: 4153887900 4153887909 piers@pierses.com www.pierses.com 1 23 4 5 6 Report a map error50 m Map data ©2020 Google Terms of Use I ˻ ǽ ˻ H þ