Loading...
HomeMy WebLinkAboutAH 02-09-2023 Searchable PacketCITY OF CUPERTINO ADMINISTRATIVE HEARING AGENDA This will be a teleconference meeting with no physical location Thursday, February 9, 2023 5:00 PM TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION TO HELP STOP THE SPREAD OF COVID-19 In accordance with Government Code 54953(e), this will be a teleconference meeting without a physical location to help stop the spread of COVID-19. Members of the public wishing comment on an item on the agenda may do so in the following ways: 1) E-mail comments by 4:00 p.m. on Thursday, February 9 to the Committee at planning@cupertino.org. These e-mail comments will be received by the Committee members before the meeting and posted to the City’s website after the meeting. 2) E-mail comments during the times for public comment during the meeting to the Committee at planning@cupertino.org. The staff liaison will read the emails into the record, and display any attachments on the screen, for up to 3 minutes (subject to the Chair’s discretion to shorten time for public comments). Members of the public that wish to share a document must email planning@cupertino.org prior to speaking. 3) Teleconferencing Instructions Members of the public may observe the teleconference meeting or provide oral public comments as follows: Oral public comments will be accepted during the teleconference meeting. Comments may be made during “oral communications” for matters not on the agenda, and during the public comment period for each agenda item . To address the Committee, click on the link below to register in advance and access the meeting: Online Please click the link below to join the webinar : Page 1 Administrative Hearing Agenda February 9, 2023 https://cityofcupertino.zoom.us/webinar/register/WN_x_iCdFhpQ1G8qsI-BwAaFg Phone Dial: (669) 900 6833 and enter Webinar ID: 933 1400 8732 (Type *9 to raise hand to speak) Unregistered participants will be called on by the last four digits of their phone number . Or an H.323/SIP room system: H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) Meeting ID: 933 1400 8732 SIP: 93314008732@zoomcrc.com After registering, you will receive a confirmation email containing information about joining the webinar. Please read the following instructions carefully: 1. You can directly download the teleconference software or connect to the meeting in your internet browser. If you are using your browser, make sure you are using a current and up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain functionality may be disabled in older browsers, including Internet Explorer . 2. You will be asked to enter an email address and a name, followed by an email with instructions on how to connect to the meeting. Your email address will not be disclosed to the public. If you wish to make an oral public comment but do not wish to provide your name, you may enter “Cupertino Resident” or similar designation. 3. When the Chair calls for the item on which you wish to speak, click on “raise hand.” Speakers will be notified shortly before they are called to speak. 4. When called, please limit your remarks to the time allotted and the specific agenda topic . ROLL CALL APPROVAL OF MINUTES 1.Subject: Approve the September 9, 2022 Administrative Hearing Minutes Recommended Action: Approve the September 9, 2022 Administrative Hearing Minutes 1 - Draft minutes POSTPONEMENTS - None Page 2 Administrative Hearing Agenda February 9, 2023 ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the Committee on any matter within the jurisdiction of the Committee and not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Commission from making any decisions with respect to a matter not on the agenda. PUBLIC HEARINGS Effective January 1, 2023, Government Code Section 65103.5 (SB 1214) limits the distribution of copyrighted material associated with the review of development projects. Members of the public wishing to view plans for a project may make an appointment with the Planning Division to view them at City Hall by sending an email to planning@cupertino .org. Plans will also be made available digitally during the hearing to consider the proposal. 3.Subject: Architectural and Site Approval permit to consider a new 10,400 square foot ancillary amenity building and tree removal permit to transplant 68 trees, and the removal and replacement of 21 trees at Apple Park. (Application No(s).: ASA-2022-006, TR-2022-027; Applicant: Apple, Inc.; Location: 4 Apple Parkway; APN(s): 316-06-061) Recommended Action: Staff recommends that the Hearing Officer approve the: 1.Architectural and Site Approval, ASA-2022-006 in accordance with the Draft Resolution (Attachment 1); 2.Tree Removal Permit, TR-2022-027, in accordance with the Draft Resolution (Attachment 2). Staff Report 1 - Draft Resolution ASA-2022-006 2 - Draft Resolution TR-2022-027 3 - Project Plans (abridged due to limitations of state law pursuant to SB1214) 4 - Ninth Addendum to the Apple Campus 2 Project Final Environmental Impact Report (EIR), State Clearinghouse #2011082055 dated January 6 , 2023 OLD BUSINESS - None NEW BUSINESS - None STAFF AND COMMITTEE REPORTS - None FUTURE AGENDA SETTING - None ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request, in advance, by a person with a disability, meeting agendas and Page 3 Administrative Hearing Agenda February 9, 2023 writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue, Cupertino, California 95014, during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. Do not include any personal or private information in written communications to the City that you do not wish to make public, as written communications are considered public records and will be made publicly available on the City website. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment . Page 4 CITY OF CUPERTINO Agenda Item 22-11850 Agenda Date: 2/9/2023 Agenda #: 1. Subject: Approve the September 9, 2022 Administrative Hearing Minutes Approve the September 9, 2022 Administrative Hearing Minutes CITY OF CUPERTINO Printed on 2/6/2023Page 1 of 1 powered by Legistar™ City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE ADMINISTRATIVE HEARING REGULAR MEETING HELD SEPTEMBER 22, 2022 CALL TO ORDER Hearing officer Albert Salvador opened the meeting at 5:01 p.m. ROLL CALL Staff present: Albert Salvador, Assistant Community Development Director Gian Martire, Senior Planner Cyrah Caburian, Administrative Assistant Outside attendee(s): APPROVAL OF MINUTES 1. Subject: Approve the October 21, 2021 Administrative Hearing meeting minutes Recommended Action: Approve the October 21, 2021 Administrative Hearing meeting minutes Minutes of the October 21, 2021 minutes were approved as written. POSTPONEMENTS – None ORAL COMMUNICATIONS – None WRITTEN COMMUNICATIONS – None CONSENT CALENDAR – None PUBLIC HEARINGS 2. Subject: Development Permit and Architectural and Site Approval Permit for a 561 square foot addition to an existing commercial building located at 19900 Stevens Creek Boulevard. (Application No(s).: DP-2022-003; ASA-2022-005; Applicant: Kevin Tallman, Shane Co.; Location: 19900 Stevens Creek Blvd.; APN(s): 369-05-038) Recommended Action: That the Hearing Officer adopt the draft resolutions (Attachments 1 - 2) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Development Permit, and Architectural and Site Approval Permit. Staff member Martire provided a presentation and brief overview of proposed modifications. No signage exception approval is sought and project meets design standards. Hearing officer opened the public comment period and, seeing no hands raised, closed the public comment period. 2 Hearing officer asked questions regarding ADA-compliant parking spaces and future EV charging stations (which are not being included to be built at this time), and concurred with Staff’s findings. DECISION: The application was approved by the Hearing Officer with no changes to the recommended actions. OLD BUSINESS – None NEW BUSINESS – None STAFF UPDATES AND COMMISSION REPORTS – None FUTURE AGENDA – None ADJOURNMENT: The meeting was adjourned at 5:18 p.m. to the next regularly scheduled meeting. Respectfully submitted: /s/Cyrah Caburian___ Cyrah Caburian Administrative Assistant CITY OF CUPERTINO Agenda Item 23-11960 Agenda Date: 2/9/2023 Agenda #: 3. Subject:Architectural and Site Approval permit to consider a new 10,400 square foot ancillary amenity building and tree removal permit to transplant 68 trees,and the removal and replacement of 21 trees at Apple Park.(Application No(s).:ASA-2022-006,TR-2022-027;Applicant:Apple,Inc.; Location: 4 Apple Parkway; APN(s): 316-06-061) Staff recommends that the Hearing Officer approve the: 1.Architectural and Site Approval,ASA-2022-006 in accordance with the Draft Resolution (Attachment 1); 2.Tree Removal Permit, TR-2022-027, in accordance with the Draft Resolution (Attachment 2). CITY OF CUPERTINO Printed on 2/6/2023Page 1 of 1 powered by Legistar™ ADMINISTRATIVE HEARING STAFF REPORT Meeting Date: February 9, 2023 Subject Architectural and Site Approval permit to consider a new 10,400 square foot ancillary amenity building and tree removal permit to transplant 68 trees, and the removal and replacement of 21 trees at Apple Park. (Application No(s).: ASA-2022-006, TR-2022-027; Applicant: Apple, Inc.; Location: 4 Apple Parkway; APN(s): 316-06-061) Recommended Action Staff recommends that the Hearing Officer approve the: 1. Architectural and Site Approval, ASA-2022-006 in accordance with the Draft Resolution (Attachment 1) 2. Tree Removal Permit, TR-2022-027, in accordance with the Draft Resolution (Attachment 2) Discussion Project Data: General Plan Designation Industrial/Residential Zoning Designation P(MP) Consistency with General Plan Yes Consistency with Zoning Yes Environmental Assessment Addendum Apple Campus 2 Final EIR certified on Oct. 15, 2013 (Attachment 3) Total Approved Available Balance Proposed Phase I Development Allocation for Amenity Space 746,500 square feet 15,315 square feet 10,400 square feet OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org Background The applicant, Apple Inc., received approval from the City Council on October 15, 2013 to demolish the existing Hewlett Packard campus, and neighboring facilities and replace them with approximately 3.42 million square feet of office, research, and development buildings, as well as a 1,000-seat corporate auditorium, a fitness center, and associated site improvements including access tunnels, a surface parking lot, outdoor dining and recreational facilities and landscaping. As part of the approval, the Development Permit (CC Resolution No. 13-0841) and Development Agreement (Ordinance No. 13-21142) outline the process by which subsequent approvals for Phases I and II of the project should be processed. The process requires the City to approve these with Architectural and Site Approval permits approved at an administrative level if the overall development limits are not exceeded. Phase I, which comprises the main 150-acre Apple Park Campus, bounded by North Wolfe Road to the west, East Homestead Road to the north, North Tantau Avenue and the Calabazas Creek to the east, and Interstate 280 to the south, includes 746,500 allocated square feet for future amenity space. To date, only 731,185 square feet has been built out, leaving a difference of approximately 15,315 square feet of amenity yet to be constructed. Apple is seeking permits for a 10,400 square foot subterranean ancillary amenity building within the main Apple Park Campus, including site work which would necessitate transplanting 68 trees, and the removal and replacement of 21 trees. Analysis: Architectural and Site Approval 1 Online at: https://laserficherio- app.cupertino.org/WebLink/DocView.aspx?id=358146&dbid=0&repo=CityofCupertino 2 Online at: https://laserficherio- app.cupertino.org/WebLink/DocView.aspx?id=362352&dbid=0&repo=CityofCupertino Figure 1: Proposed site plan showing the location of the amenity building (Red Star). ASA-2022-006, TR-2022-027 Apple Park – Amenity Building February 9, 2023 Page 3 The proposed subterranean amenity building would include restrooms, flex spaces, mechanical, electrical, and data rooms. The building would be located on the southern half of the Apple Park site, just west of Steve Jobs Theater in an area that contains approximately 89 trees but is otherwise undeveloped. Refer to Figure 1 for the general location of the building in relation to the site. The building will be totally submerged below grade, under a mound that is approximately twenty-seven feet at its highest point. Two rectangular skylights (4-feet by 36-feet) and a circular skylight (5-feet in diameter) with a view into the lobby area underneath would be visible when at the top of the mound. A new jogging path is proposed across the mound as well. Landscaping will match the existing palette of the surrounding areas including natural grasses and vegetation, as well as the consistency of the hardscape and furniture. No trees are proposed within the area of the building footprint. Refer to Figure 2 for a rendering of the facility looking south from the main building at Apple Park. Two tunnel entrances will allow entry into the amenity building: one each on the western and eastern sides of the structure. Both entrances would have an operable glass façade and accommodate vehicle deliveries up to the point of entry. An existing pathway to the western tunnel entrance will be widened to 20-feet to accommodate fire access. A 1,190 square foot terrace will open from the main space on the northern end. The proposed building would be largely located below grade and would require the excavation of 14,000 cubic yards of soil. A total of 7,000 cubic yards would be used for fill, and therefore the remaining 7,000 cubic yards would be exported from the project site. Tree Removal Permit Eighty-nine (89) trees have been identified within the 2-acre project area. The development proposes to transplant 68 of the trees, and to remove and replace 21 trees. Each tree has been reviewed and a recommendation has been made to either side box, store and return to the site, or remove and replace with a like sized tree. Since the side Figure 2: Rendering of the amenity building (within red box) looking south. ASA-2022-006, TR-2022-027 Apple Park – Amenity Building February 9, 2023 Page 4 boxing and transportation process would be overly stressful for trees of low vitality, the arborist recommends that the project and the campus forest would be better served by removing of poor performing trees and replacing them with a new tree that exhibit high vitality. The side boxing and transportation process is proposed to be reserved for the trees that have high vitality. The City’s consultant arborist has conducted site visits, reviewed the preservation measures, and found the applicant’s proposal acceptable and consistent with current urban forestry standards. Conditions have been added to the draft Tree Removal Permit Resolution that require that any tree removed and any side boxed tree that dies, reflect the replacement standards mandated in CMC 14.18.160 Tree Replacement. Environmental Review An EIR was prepared and approved in accordance with the requirements of CEQA. The proposed plans have been evaluated by LSA Associates, Inc. in their memo dated January 6, 2023, and the analysis indicates that the architectural refinements that the applica nt is seeking would not require major revisions to the Final EIR certified on October 15, 2013, due to new or substantially increased significant environmental effects. Furthermore, there have been no substantial changes with respect to the circumstances under which these refinements would be undertaken that would require major revisions of the Final EIR due to new or substantially increased significant environmental effects, and there has been no discovery of new information of substantial importance that would trigger or require major revisions to the Final EIR due to new or substantially increased significant environmental effects. The certified Final EIR adequately identifies all environmental effects and adequate mitigation measures for the proposed modifications to the previously approved project. Therefore, no subsequent or supplemental EIR is required prior to approval of the Architectural and Site Approval as described above. Refer to Attachment 3, Ninth Addendum to the Apple Campus 2 Project Final Environmental Impact Report (EIR), State Clearinghouse #2011082055 dated January 6, 2023. Other Department/Agency Review The City’s Building Division, Environmental Programs Division, Public Works Department, Cupertino Sanitary District, and the Santa Clara County Fire Department have no objections to the project. Public Noticing A summary of noticing on the project is presented in the table below: ASA-2022-006, TR-2022-027 Apple Park – Amenity Building February 9, 2023 Page 5 Notice of Public Hearing, Site Notice & Legal Ad Agenda  Site Signage (14 days prior to the hearing)  Adjacent noticing to neighbors along the eastern property line for all phases of project (10 days prior to the hearing)  Posted on the City's official notice bulletin board (one week prior to the hearing)  Posted on the City of Cupertino’s Website Public Comments As of the publishing of this report, no comments have been received. Conclusion Staff recommends approval of the Architectural and Site Approva l permit and Tree Removal Permit, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all applicable findings for approval of the proposed project, consistent with chapters 19.168 and 14.18 of the Cupertino Municipal Code, may be made as follows: Architectural and Site Approval 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes to add a 10,400 square foot amenity building within the 170-acre Apple Park Campus. The structure will be subterranean and not likely to be visible from neighboring properties. All the proposed changes are minor improvements to the existing site and will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale as the structure will be subterranean. The landscape mound will interact seamlessly with the existing landscaping and only minimal portions of the structure will be visible to pedestrians onsite. No other height or scale modifications are proposed that will impact the existing massing. ASA-2022-006, TR-2022-027 Apple Park – Amenity Building February 9, 2023 Page 6 b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. The proposed structure will be subterranean and unlikely visible from neighboring properties. Existing mature trees are proposed to be retained, and the landscaping on the mound formed by the structure will blend seamlessly in the Apple Park Meadow. Outdoor lighting incorporates appropriate shielding and is designed to meet the dark-sky requirements of the Municipal Code. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. At this point, no signs are approved as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and will maintain the existing buffering and setbacks established adjacent to the existing residential neighborhoods. Tree Removal Permit 1. That the location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by owners of similarly zoned and situated property, and the applicant has demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the tree(s). The applicant’s arborist, as well as the City’s consultant arborist, has found that the area in which the structure will be located cannot maintain the trees as they are currently planted. ASA-2022-006, TR-2022-027 Apple Park – Amenity Building February 9, 2023 Page 7 Tree replacements, as well as side boxing healthy trees for replanting, have been conditioned into the project. Next Steps The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until February 9, 2025. The applicant may apply for a one-time two- year extension before the approval expires. Prepared by: Gian Paolo Martire, Senior Planner Reviewed and Approved for submission by: Piu Ghosh, Planning Manager ATTACHMENTS 1. Draft Resolution ASA-2022-006 2. Draft Resolution TR-2022-027 3. Project Plans (abridged due to limitations of state law pursuant to SB1214) 4. Ninth Addendum to the Apple Campus 2 Project Final Environmental Impact Report (EIR), State Clearinghouse #2011082055 dated January 6, 2023 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW A NEW 10,400 SQUARE FOOT ANCILLARY AMENITY BUILDING AT APPLE PARK LOCATED AT 4 APPLE PARKWAY SECTION I: PROJECT DESCRIPTION Application No.: ASA-2022-006 Applicant: Apple, Inc. Location: 4 Apple Parkway; APN: 316-06-061 SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing a new 10,400 square foot ancillary amenity building at Apple Park, as described in Section I. of this Resolution; and WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on October 15, 2013, the City Council adopted Resolution No. 13- 084, adopting an Environmental Impact Report (EIR)for the Apple Park Project; and WHEREAS, environmental analysis was conducted by LSA, Inc. pursuant to the requirements of CEQA, and an addendum to the EIR was prepared which found that no new or substantially increased significant environmental effects; and WHEREAS, the necessary public notices have been given as required by the Cupertino Municipal Code, and the Administrative Hearing Officer has held at least one public meeting with regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: Resolution No. ASA-2022-006 February 9, 2023 Page 2 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes to add a 10,400 square foot amenity building within the 170-acre Apple Park Campus. The structure will be subterranean and not likely to be visible from neighboring properties. All the proposed changes are minor improvements to the existing site and will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are no changes in building scale as the structure will be subterranean. The landscape mound will interact seamlessly with the existing landscaping and only minimal portions of the structure will be visible to pedestrians onsite. No other height or scale modifications are proposed that will impact the existing massing. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. The proposed structure will be subterranean and unlikely visible from neighboring properties. Existing mature trees are proposed to be retained, and the landscaping on the mound formed by the structure will blend seamlessly in the Apple Park Meadow. Outdoor lighting incorporates appropriate shielding and is designed to meet the dark-sky requirements of the Municipal Code. Resolution No. ASA-2022-006 February 9, 2023 Page 3 c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. At this point, no signs are approved as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and will maintain the existing buffering and setbacks established adjacent to the existing residential neighborhoods. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, The application for an Architectural and Site Approval, Application no. ASA-2022-006 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. ASA-2022-006 as set forth in the Minutes of the Administrative Hearing Meeting of February 9, 2023 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Foster + Partners titled “Apple Park Amenity Building” consisting of twenty-two (22) sheets labeled A-AB-0000 - A-AB- 0012, C-AB-0001 - C-AB-0005, L-AB-0000 - L-AB-0003, and LT-AB-0001, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. Resolution No. ASA-2022-006 February 9, 2023 Page 4 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. EA-2011-12 (CC Res No. 13-082) and TR-2022-027 shall be applicable to this approval. 4. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 5. EXTERIOR BUILDING MATERIALS/TREATMENTS a. The final building exterior plan shall closely resemble the details shown on the original approved plans. b. No fencing is approved within the front setback area. c. All final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. d. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 6. SIGNAGE Signage is not approved with this application. Signage shall conform to the City Sign Code. 7. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy. 8. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 9. DARK SKY COMPLIANCE AND/OR BIRD SAFE COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved lighting plans to comply with development standards of Cupertino Municipal Code Section 19.102.030 Bird-Safe Development Requirements and/or Section 19.102.040 Outdoor Lighting Resolution No. ASA-2022-006 February 9, 2023 Page 5 Requirements. In the event changes are proposed from the approved plans, said changes must be reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all do cumentation required to determine compliance with the Municipal Code. The final lighting plan (including a detailed photometric plan) shall be reviewed and approved by the Director of Community Development prior to building permit issuance. A report from a licensed lighting engineer may be required to confirm all exterior lighting throughout the site complies with the City’s Ordinance. 10. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any O rdinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counse l and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by Resolution No. ASA-2022-006 February 9, 2023 Page 6 proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 1. C.3 STORMWATER TREATMENT Project shall satisfy C.3 stormwater treatment requirements. Provide revised Stormwater Management Plan, including revised stormwater treatment/BMP plan, revised stormwater calculations and/or justifications (such as self-retaining or existing BMP’s have adequate capacities), engineer’s & 3rd party certifications. SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 1. FIRE SPRINKLERS REQUIRED Approved automatic sprinkler systems in new and existing buildings and structures shall be provided in the locations described in this Section or in Sections 903.2.1 through 903.2.18 whichever is the more restrictive. For the purposes of this section, firewalls used to separate building areas shall be constructed in accordance with the California Building Code and shall be without openings or penetrations. NOTE: The owner(s), occupant(s) and any contractor(s) or subcontractor(s) are responsible for consulting with the water purveyor of record in order to determine if any modification or upgrade of the existing water service is required. A State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to this department for review and approval prior to beginning their work. CFC Sec. 903.2 Resolution No. ASA-2022-006 February 9, 2023 Page 7 2. FIRE ALARM REQUIREMENTS Refer to CFC Sec. 907 and the currently adopted edition of NFPA 72. Submit shop drawings (3 sets) and a permit application to the SCCFD for approval before installing or altering any system. Call (408) 341-4420 for more information. 3. REQUIRED FIRE FLOW The minimum require fireflow for this project is 1000 Gallons Per Minute (GPM) at 20 psi residual pressure. This fireflow assumes installation of automatic fire sprinklers per CFC [903.3.1.3]. Fireflow data shall be provided during building permit phrase. 4. FIRE HYDRANT SYSTEMS REQUIRED Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, onsite fire hydrants and mains shall be provided where required by the fire code official. Exception: For Group R-3 and Group U occupancies equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3, the distance requirement shall be not more than 600 feet. [CFC, Section 507.5.1]. There shall be no combustible construction prior to hydrant installation. 5. BUILDINGS AND FACILITIES ACCESS Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or with the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. [CFC, Section 503.1.1]. 6. FIRE APPARATUS (ENGINE)ACCESS ROADWAY REQUIRED Provide an access roadway with a paved all-weather surface, a minimum unobstructed width of 20 feet, vertical clearance of 13 feet 6 inches, minimum circulating turning radius of 36 feet outside, and a maximum slope of 15%. Surface shall be capable of supporting 75K pounds. Installations shall conform to Fire Department Standard Details and Specifications sheet A-1. CFC Sec. 503. 7. TURNING RADIUS (CUL-DE-SACS) The minimum outside turning radius is 36 feet. Use of cul-de-sacs is not acceptable where it is determined by the Fire Department that Ladder Truck access is required, Resolution No. ASA-2022-006 February 9, 2023 Page 8 unless greater turning radius is provided. Cul-De-Sac Diameters shall be no less than 72 feet. CFC Sec. 503. 8. FIRE DEPARTMENT (ENGINE) ROADWAY TURNAROUND REQUIRED Dead-end fire apparatus access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. Provide an approved fire department engine driveway turnaround with a minimum radius of 36 feet outside and 23 feet inside. Maximum grade in any direction shall be 5%. Installations shall conform with Fire Department Standard Details and Specifications A-1. [CFC Section 503.2.5]. 9. FIRE DEPARTMENT CONNECTION The fire department connection (FDC) shall be installed at the street on the street address side of the building. It shall be located within 100 feet of a public fire hydrant and within ten (10) feet of the main PIV (unless otherwise approved by the Chief due to practical difficulties). FDC's shall be equipped with a minimum of two (2), two - and-one-half (2- 1/2”) inch national standard threaded inlet couplings. Orientation of the FDC shall be such that hose lines may be readily and conveniently attached to the inlets without interference. FDC's shall be painted safety yellow. [SCCFD, SP-2 Standard]. 10. WATER SUPPLY REQUIREMENTS Potable water supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Such requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner to an appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). 2019 CFC Sec. 903.3.5 and Health and Safety Code 13114.7. 11. ADDRESS IDENTIFICATION New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Where required by the fire code official, address numbers Resolution No. ASA-2022-006 February 9, 2023 Page 9 shall be provided in additional approved locations to facilitate emergency response. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address numbers shall be maintained. CFC Sec. 505.1. 12. CONSTRUCTION SITE FIRE SAFETY All construction sites must comply with applicable provisions of the CFC Chapter 33 and our Standard Detail and Specification S1-7. Provide appropriate notations on subsequent plan submittals, as appropriate to the project. CFC Chp. 33. 13. FIRE LANES REQUIRED The minimum clear width of fire department access roads shall be 20 feet. The minimum outside turning radius is 36 feet for required Cul-de-sacs access roadways. Fire apparatus access roads shall be designated and marked as a fire lane as set forth in Section 22500.1 of the California Vehicle Code. PASSED AND ADOPTED this 9th day of February 2023 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Gian Martire Luke Connolly Senior Planner Administrative Hearing Officer CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A TREE REMOVAL PERMIT TO ALLOW THE TRANSPLANTING OF 68 TREES, AND THE REMOVAL AND REPLACEMENT OF 21 TREES AT APPLE PARK LOCATED AT 4 APPLE PARKWAY SECTION I: PROJECT DESCRIPTION Application No.: TR-2022-027 Applicant: Apple, Inc. Location: 4 Apple Parkway; APN: 316-06-061 SECTION II: FINDINGS TREE REMOVAL PERMIT: WHEREAS, the City of Cupertino received an application for a Tree Removal permit as described in Section I of this Resolution; and WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on October 15, 2013, the City Council adopted Resolution No. 13- 084, adopting an Environmental Impact Report (EIR)for the Apple Park Project; and WHEREAS, environmental analysis was conducted by LSA, Inc. pursuant to the requirements of CEQA, and an addendum to the EIR was prepared which found that no new or substantially increased significant environmental effects; and WHEREAS, the necessary public notices have been given as required by the Cupertino Municipal Code, and the Administrative Hearing Officer has held at least o ne public meeting with regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 2. That the location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by Resolution No. TR-2022-027 February 9, 2023 Page 2 owners of similarly zoned and situated property, and the applicant has demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the tree(s). The applicant’s arborist, as well as the City’s consultant arborist, has found that the area in which the structure will be located cannot maintain the trees as they ar e currently planted. Tree replacements, as well as side boxing healthy trees for replanting, have been conditioned into the project. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff’s report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof: The application for a Tree Removal permit, Application no. TR-2022-027 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. TR-2022-027 as set forth in the Minutes of the Administrative Hearing Meeting of February 9, 2023 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS This approval for tree removals is based on the certified arborist report prepared by Tyson Carroll (ISA Board Certified Master Arborist, PLA #5803) with Wood Architecture, dated October 25, 2022 consisting of forty-nine (49) pages, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. ASA-2022-006 shall be applicable to this approval. Resolution No. TR-2022-027 February 9, 2023 Page 3 4. TREE REPLACEMENTS Prior to issuance of Building Permits, applicant must provide staff with the replacement plan consistent with CMC 14.18 Protected Trees. Any trees that have been boxed and stored offsite but have died prior to panting must also be replaced in accordance with CMC 14.18 Protected Trees. Prior to Final Occupancy, an ISA Board Certified Master Arborist shall confirm in writing that all replacement trees have been planted. 5. TREE AND LANDSCAPE MAINTENANCE The property owner shall be responsible for ensuring that the existing trees and newly planted trees are properly maintained including but not limited to ensuring that there is adequate soil drainage, that the soil is well-aerated, and irrigation systems are thoroughly tested to provide sufficient water to landscaped areas while reducing water waste. 6. INDEMNIFICATION As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City’s choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the “indemnified parties”) from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as “proceeding”) brought by a third party against one or more of the indemnified partie s or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys’ fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys’ fees and costs incurred in defense of the litigation. Such attorneys’ fees and costs shall include amounts paid to the City’s outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The ap plicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys’ fees, or costs awards, including attorneys’ fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against Resolution No. TR-2022-027 February 9, 2023 Page 4 the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 7. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. PASSED AND ADOPTED this 9th day of February 2023 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Gian Paolo Martire Luke Connolly Senior Planner Administrative Hearing Officer MAIN BUILDING PARKING STRUCTURE 191' - 4"370' - 1" STEVE JOBS THEATER BIKE PARKING BIKE PARKING 569' - 7"6 6 . 4 6° 1 A-AB-0005 1932 1st Ave., Suite 605 Seattle, WA 98101 Tel: 206.456.4554 niteolighting.com 84 W. Santa Clara Street, Ste 200 San Jose, California, 95113 Telephone 408.288.7833 Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelpia, PA 19106 Tel: 215.440.0030 / FAX 215.440.0041 www.theolinstudio.com LANDSCAPE ARCHITECTURE AND URBAN DESIGN www.arup.com Tel (415) 957 9445 Fax (415) 957 9096 San Francisco, CA 94105 USA 560 Mission Street, Suite 700 Arup North America Ltd. C N N Client Project Title Project No.Date Scale at Arch E1 Drawing Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Any discrepancies on these drawings shall be brought to the immediate attention of Foster + Partners. Any areas indicated on this sheet are approximate and indicative only. Riverside, 22 Hester Road London SW11 4AN www.fosterandpartners.com T +44(0)20 7738 0455 Rev. Date Reason For Issue Chk Revision © Foster + Partners 2022 1/32" = 1'-0" 00 Apple, Inc. Apple Park Amenity Building 07/18/22 A-AB-0004 AB Amenity Building Proposed Site Plan 1/32" = 1'-0"1 Proposed Site Plan 00 07/18/22 Planning Set RB CARLSBAD CLOVIS IRVINE LOS ANGELES PALM SPRINGS POINT RICHMOND RIVERSIDE ROSEVILLE SAN LUIS OBISPO 157 Park Place, Pt. Richmond, California 94801 510.236.6810 www.lsa.net MEMORANDUM DATE: January 6, 2023 TO: Gian Martire, Senior Planner, City of Cupertino FROM: Theresa Wallace, AICP, Principal Matthew Wiswell, AICP, Senior Planner SUBJECT: Ninth Addendum to the Apple Campus 2 Project Final Environmental Impact Report (EIR), State Clearinghouse #2011082055 This memorandum, prepared pursuant to the California Environmental Quality Act (CEQA), is a Ninth Addendum to the certified Apple Campus 2 Project Final EIR (Final EIR).1 For a description of the previous addendums, please see the Previous Addendums section below. The Ninth Addendum to the Final EIR evaluates proposed changes (minor modifications) in the overall building square footage and excavation and grading totals within the Apple Campus 2 (now called Apple Park) project. The proposed changes are described more fully below, in Minor Modifications to the Project. The proposed changes would include the construction of a new amenity building that was not previously considered in the Final EIR, as described more fully below. The Final EIR, which was certified on October 15, 2013, analyzed the environmental impacts of development of a new campus for Apple on a 176-acre site bordered generally by East Homestead Road on the north, North Tantau Avenue on the east, Interstate 280 (I-280) and The Hamptons apartments on the south, and North Wolfe Road on the west. The approved Apple Campus 2 project involves demolition of all existing structures within the project site and the construction of 3,420,000 square feet of office, research, and development uses; 245,000 square feet of auditorium, fitness center, and valet parking reception uses; 92,000 square feet of utility plants; and parking and ancillary buildings. Significant environmental impacts were identified in the following topical areas: Planning Policy; Land Use; Biological Resources; Cultural Resources; Geology, Soils, and Seismicity; Hydrology and Water Quality; Hazards and Hazardous Materials; Transportation and Circulation; Noise; Air Quality; and Public Services and Utilities. This Ninth Addendum has been prepared pursuant to CEQA Guidelines Section 15164, which states: “The lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary, but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred.” Section 15162 specifies that “no 1 LSA Associates, Inc., 2013. Apple Campus 2 Project Final Environmental Impact Report. September. 1/6/23 (P:\COC2201 Apple Amenity Bldg\Products\Final\Draft Apple Ninth Addendum_010523.docx) 2 subsequent EIR shall be prepared for that project unless the lead agency determines … one or more of the following”: 1. Substantial changes are proposed in the project which would require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2. Substantial changes occur with respect to the circumstances under which the project is under- taken which would require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete was adopted, shows any of the following: a. The project would have one or more significant effects not discussed in the previous EIR; b. Significant effects previously examined would be substantially more severe than shown in the previous EIR; c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. Pursuant to CEQA Guidelines Section 15164(e), the following describes the final designs and any minor modifications and briefly explains that no impacts would be associated with the proposed changes identified in the design applications for the ancillary buildings, and the reasons for the City’s conclusion that changes to the proposed project (and associated environmental effects) do not meet the conditions described in Sections 15162 and 15163 calling for preparation of a Subsequent EIR or a Supplement to an EIR. MINOR MODIFICATIONS TO THE PROJECT The following describes the proposed minor changes to the approved development program analyzed in the Final EIR. The proposed Apple Park Amenity Building Project would result in the construction of an approximately 10,000-square-foot amenity building that would include restrooms, flex spaces, mechanical, electrical, and data rooms. The proposed amenity building would be located on the southern half of the Apple Park site just west of Steve Jobs Theater in an area that contains approximately 70 trees but is otherwise undeveloped. The proposed building would be largely located below grade and would require the excavation of 14,000 cubic yards of soil. 1/6/23 (P:\COC2201 Apple Amenity Bldg\Products\Final\Draft Apple Ninth Addendum_010523.docx) 3 A total of 7,000 cubic yards would be used for fill, and therefore the remaining 7,000 cubic yards would be exported from the project site. The proposed project would also include the removal, storage, and replanting of 42 protected trees. Construction is expected to begin March 2023 and occur through Fall 2024 (18 months). The proposed building and associated improvements, including soil export, were not included in the overall development program analyzed in the Final EIR. COMPARISON TO THE CONDITIONS LISTED IN CEQA GUIDELINES SECTIONS 15162 AND 15163 The following discussion summarizes the reasons that a Subsequent EIR or Supplement to the EIR, pursuant to CEQA Guidelines Sections 15162 and 15163, is not required to evaluate the environmental effects of the currently-proposed minor modifications to the project evaluated in the Final EIR. Substantial Changes to the Project As discussed above, the modifications to the project evaluated in the Final EIR consist of the construction of a new amenity building that was not previously considered. The proposed amenity building would be an ancillary use to the existing buildings within Apple Park. Air Quality The Final EIR evaluated potential air quality impacts from all phases of construction (Phases 1-4) under Impacts AIR-1 (Construction of the proposed project would generate air pollutant emissions that could violate air quality standards), AIR-3 (Construction and operation of the proposed project would result in a significant cumulative net increase in criteria pollutant emissions), and AIR-4 (Without the construction practices identified in the Apple Campus Construction Equipment Summary, construction of the proposed project would expose sensitive receptors to substantial pollutant concentrations). The Final EIR evaluated the potential for approximately 1,690,000 cubic yards of excavation and 1,620,000 cubic yards of fill, including 150,000 cubic yards 2 of exported soils and 50,000 cubic yards of imported soils. The emissions associated with these grading totals are shown in Table B in the Air Quality Memorandum, which is included as an attachment. The Final EIR found that construction emissions of ozone precursors (ROG and nitrogen oxides [NOx]) would exceed the BAAQMD’s threshold for average daily construction emissions and identified mitigation measures to reduce construction-related air quality impacts. To address potential effects on air quality, LSA prepared a technical memorandum analyzing the air quality impacts of the proposed modifications, which is attached to this memorandum. The California Emissions Estimator Model version 2020.4.0 (CalEEMod) computer program was used to 2 The 150,000 cubic yards of exported soils was subsequently reduced to 90,000 cubic yards as a result of the Third Addendum (see the section titled ‘Previous Addendums’ below). However, to present the most conservative analysis, this addendum adds the minor modifications (i.e., the 7,000 additional cubic yards of export) to the Final EIR total of 150,000 cubic yards, for a total export of 157,000 cubic yards, which would result in higher emissions totals than if 97,000 cubic yards were used. Therefore, the analysis in this addendum likely overestimates the total emissions. 1/6/23 (P:\COC2201 Apple Amenity Bldg\Products\Final\Draft Apple Ninth Addendum_010523.docx) 4 calculate emissions from on-site construction equipment and emissions from worker and vehicle trips to the site. Construction of the proposed project would begin March 2023 and occur through Fall 2024 (18 months), which was included in CalEEMod. The proposed project would require the export of 7,000 cubic yards of soil, which was also included in CalEEMod. Consistent with Final EIR Mitigation Measure AIR-1, this analysis also assumes the use of Tier 2 construction equipment with level 3 diesel particulate filters, exposed areas would be watered twice per date, and traffic speeds on all unpaved roads would be reduced to 15 miles per hour or less. With implementation of 2013 EIR Mitigation Measures AIR-1 and AIR-4, the air quality analysis concluded that the minor modifications, which includes the export of 7,000 additional cubic yards of soil that was not evaluated in the Final EIR, would increase the total project emissions by 0.0 to 4.3 percent compared to the Final EIR (as shown in Table B in the Air Quality Memorandum, included as an attachment), but this increase would not be substantial and would not change the significance findings in the Final EIR. Transportation Since the time the Final EIR and previous Addenda were certified and adopted, the CEQA Guidelines were modified to require the use of vehicle miles traveled (VMT) instead of level of service (LOS) as a threshold for transportation-related impacts. The proposed amenity building would be an ancillary use to the existing buildings within Apple Park and would not generate any new vehicle trips or VMT. The amenity building could result in a reduction in VMT by providing services on-site that employees and/or visitors previously had to travel off-site to access. As noted above, the proposed amenity building would require additional haul truck trips to transport off-haul associated with construction of the building. As identified in the Final EIR, truck access to the site would be restricted during the peak commute times (7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 7:00 p.m.) to minimize potential impacts to the surrounding roadway network operations. As described above, the timeframe for project construction would be 18 months. As identified in the Final EIR, all truck access on Homestead Road would be restricted and trucks would access the project site via the I-280/Wolfe Road interchange. All truck travel would be consistent with the City’s Municipal Code (Section 11.32.010). Only construction workers would access the project site from the north from Wolfe Road and/or Homestead Road. Construction truck traffic would not exceed the peak truck activity evaluated in the Final EIR. Two new driveways that would connect to existing internal roadways would provide access to the proposed amenity building. No other changes to the existing roadway network would be required, and therefore the proposed amenity building would not result in any new impacts related to site access beyond those previously identified in the Final EIR. Therefore, no new impacts related to transportation would occur and no additional mitigation measures would be required. Biological Resources As noted above, construction of the proposed amenity building would require the removal, storage, and replanting of 42 protected trees. These trees provide nesting habitat for native bird species, including eggs and young birds in active nests. Grading and construction activities near nests during the nesting season could cause nest abandonment and/or loss of eggs or young during the breeding season and would represent a significant impact. The Final EIR identified Mitigation Measure BIO-1, 1/6/23 (P:\COC2201 Apple Amenity Bldg\Products\Final\Draft Apple Ninth Addendum_010523.docx) 5 which requires preconstruction surveys by a biologist for construction during the breeding season, to reduce this impact to a less-than-significant level. The Final EIR also identified Mitigation Measure BIO-3 to ensure that any protected trees that are removed would be replaced consistent with the requirements of the Chapter 14.18 of the City’s Protected Tree Ordinance. With implementation of Mitigation Measures BIO-1 and BIO-3, no new impacts related to biological resources would occur. Hazards and Hazardous Materials The Final EIR identified four different sites within the project site and 10 off-site locations that were listed on a regulatory database with a record of hazardous materials releases, as shown on Figure V.H-1 of the Final EIR. Hazardous materials are known to be present in soil, soil gas, and/or groundwater at the project site from past and current land uses. The Final EIR identified Mitigation Measure HAZ-2a, which requires all construction at the project site to be conducted under a project- specific Environmental Site Management Plan (ESMP), and Mitigation Measure HAZ-2b, which requires a vapor intrusion assessment for construction in areas with potential residual volatile organic compounds (VOCs). The amenity building site is not located in an area with a record of hazardous materials releases. Therefore, no new impacts related to hazards and hazardous materials would occur and no additional mitigation measures would be required. Summary The minor modifications to the project would not result in new significant environmental impacts beyond those identified in the Final EIR, would not substantially increase the severity of impacts identified in the Final EIR, and thus would not require major revisions to the Final EIR. Therefore, the proposed construction of the amenity building would be minor refinements and not substantial changes, and an Addendum is the appropriate document to address these minor modifications rather than a Subsequent EIR or a Supplement to the Final EIR. Substantial Changes in Circumstances Construction of the Apple Campus 2 Project has been substantially completed. Environmental conditions in and around the project site have not changed such that implementation of the proposed minor modifications to the project would result in new significant environmental effects or a substantial increase in the severity of environmental effects identified in the Final EIR, and thus major revisions to the Final EIR are not required due to substantial changes in circumstances. New Information No new information of substantial importance, which was not known and could not have been known when the Final EIR was certified, has been identified to show that the proposed minor design modifications to the project would be expected to result in: 1) new significant environmental effects not identified in the Final EIR; 2) substantially more severe environmental effects than shown in the Final EIR; 3) mitigation measures or alternatives previously determined to be infeasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project sponsor declines to adopt the mitigation measure or alternative; or 4) mitigation measures or alternatives that are considerably different from those identified in the Final EIR would substantially reduce one or more significant effects of the project, but the project sponsor declines to adopt the mitigation measure or alternative. In addition, the proposed minor design 1/6/23 (P:\COC2201 Apple Amenity Bldg\Products\Final\Draft Apple Ninth Addendum_010523.docx) 6 modifications to the project would require no new mitigation measures because no new or substantially more severe impacts are expected beyond those identified in the Final EIR. Existing regulations (including City of Cupertino General Plan policies and Zoning Ordinance regulations) and mitigation measures adopted and made conditions of project approval would continue to apply. Since certification of the Final EIR, the City has adopted Standard Environmental Protection requirements that all construction projects must meet (Chapter 17.04 of the Cupertino Municipal Code). Additionally, the City has subsequently adopted two Climate Action Plans (2015 and 2022). Both Chapter 17.04 of the Municipal Code and the currently applicable 2022 Climate Action Plan include policies that could require additional measures to be implemented by the proposed project to address potential environmental impacts. However, as discussed above, the proposed project would not result in any new or more significant environmental impacts and is within the scope of the analysis provided in the certified Final EIR. Therefore, because these policies would not be required to address any new environmental impacts, Chapter 17.04 of the Municipal Code and the Climate Action Plan would not be applicable. CONCLUSION The construction and operation of the proposed amenity building would not require major revisions to the Final EIR, as amended by the First through Eighth Addenda, due to new or substantially increased significant environmental effects. There have been no substantial changes with respect to the circumstances under which these minor modifications would be undertaken that would require major revisions of the Final EIR due to new or substantially increased significant environmental effects, and there has been no discovery of new information of substantial importance that would trigger or require major revisions to the Final EIR due to new or substantially increased significant environmental effects. Therefore, no subsequent or supplemental EIR is required prior to approval of the amenity building component of the Apple Campus 2 Project, as described in this Ninth Addendum. PREVIOUS ADDENDUMS The following is a list of previous Addendums to the Final EIR that have been adopted to date: 1. The First Addendum to the Final EIR was adopted by the City on April 9, 2014, in connection with the City’s approval of minor modifications to the dimensions, geometry and footprint of several site buildings, a reduction of parking spaces, and the addition of a Security Operations Center.3 2. The Second Addendum to the Final EIR was adopted by the City in September 2014 in connection with the City’s approval of minor modifications to the Corporate Auditorium, Corporate Fitness Center, and Central Plant Equipment Yard.4 3 LSA Associates, Inc., 2014. Addendum to the Apple Campus 2 Project Final Environmental Impact Report. April 4. 4 LSA Associates, Inc., 2014. Second Addendum to the Apple Campus 2 Project Final Environmental Impact Report. September 15. 1/6/23 (P:\COC2201 Apple Amenity Bldg\Products\Final\Draft Apple Ninth Addendum_010523.docx) 7 3. The Third Addendum to the Final EIR was adopted by the City in November 2014 in connection with the City’s approval of minor modifications to the Phase 2 North Tantau Avenue Sites C and D portion of the project and included revisions to the configuration of buildings, the placement of parking, and tree removal and landscaping.5 4. The Fourth Addendum to the Final EIR was adopted by the City in July 2015 in connection with the City’s approval of minor modifications to North Tantau Avenue Phase 1 Site A, including the replacement of valet reception and parking uses with a visitor center/store and parking, and increasing the number of parking spaces and moving most of the parking from a structured building to a garage below the visitor center.6 5. The Fifth Addendum to the Final EIR was adopted by the City in August 2015 and addressed modifications to Phase 2 office buildings, a parking structure and a satellite plant.7 6. The Sixth Addendum to the Final EIR was adopted by the City in April 2016 in connection with the City’s approval of additional proposed modifications to the Apple Campus 2 Phase 2 North Tantau Avenue Sites C and D portion of the project.8 7. The Seventh Addendum to the Final EIR was adopted by the City in April 2016 and evaluated final designs for ancillary buildings including a small maintenance shed, two security/reception buildings, and two outdoor food stations associated with the Apple Campus 2 project.9 8. The Eighth Addendum to the Final EIR was adopted by the City in July 2018 and evaluated revised land uses for Phase 2 Site B of the Apple Campus 2 project.10 Attachment: Air Quality Memorandum 5 LSA Associates, Inc., 2014. Third Addendum to the Apple Campus 2 Project Final Environmental Impact Report. November 4. 6 LSA Associates, Inc., 2015. Fourth Addendum to the Apple Campus 2 Project Final Environmental Impact Report. July 2. 7 Chao, Gary, Assistant Director of Community Development and Ghosh, Piu, Senior Planner, City of Cupertino. 2015. Staff Report: Director’s Minor Modification (DIR-2015-15) to allow modifications to a previously approved office building, parking structure and satellite plant as part of Phase 2 of an office, Research and Development Campus located at 10300 and 10435 N. Tantau Avenue. August 4. 8 LSA Associates, Inc., 2016. Sixth Addendum to the Apple Campus 2 Project Final Environmental Impact Report. March 16. As revised per Community Development Department Edits on April 7, 2016. 9 LSA Associates, 2016. Seventh Addendum to the Apple Campus 2 Project Final Environmental Impact Report. April 7. 10 LSA Associates, 2018. Eighth Addendum to the Apple Campus 2 Project Final Environmental Impact Report. July 20. 1/6/23 (P:\COC2201 Apple Amenity Bldg\Products\Final\Draft Apple Ninth Addendum_010523.docx) 8 ATTACHMENT AIR QUALITY MEMORANDUM CARLSBAD CLOVIS IRVINE LOS ANGELES PALM SPRINGS POINT RICHMOND RIVERSIDE ROSEVILLE SAN LUIS OBISPO 2565 Alluvial Avenue, Suite 172, Clovis, California 93611 559.490.1210 www.lsa.net MEMORANDUM DATE: November 11, 2022 TO: Gian Martire, Senior Planner, City of Cupertino FROM: Amy Fischer, Executive Vice President Cara Carlucci, Associate SUBJECT: Apple Park Amenity Building Project Construction Emissions Evaluation INTRODUCTION LSA has prepared this memorandum to evaluate the impacts associated with construction of the proposed Apple Park Amenity Building Project (project) in the City of Cupertino, California. This analysis was prepared using methods and assumptions recommended by the Bay Area Air Quality Management District (BAAQMD).1 This analysis evaluates whether construction of the proposed project would result in any new or more severe impacts than were identified in the 2013 Environmental Impact Report (2013 EIR) for the Apple Campus 2 Project and is prepared pursuant to State CEQA Guidelines Section 15164(a) which states: “the lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in PRC Section 21166 and Section 15162 calling for preparation of a subsequent EIR have occurred.” The 2013 EIR, which was certified on October 15, 2013, analyzed the environmental impacts of development of a new campus for Apple on a 176-acre site bordered generally by East Homestead Road on the north, North Tantau Avenue on the east, Interstate 280 (I-280) and The Hamptons apartments on the south, and North Wolfe Road on the west. The approved Apple Campus 2 project involves demolition of all existing structures within the project site and the construction of 3,420,000 square feet of office, research, and development uses; 245,000 square feet of auditorium, fitness center, and valet parking reception uses; 92,000 square feet of utility plants; and parking and ancillary buildings. The proposed Apple Park Amenity Building Project (proposed project) would result in the construction of an approximately 10,000-square-foot amenity building that would include restrooms, flex spaces, mechanical, electrical, and data rooms. The proposed amenity building would be located on the southern half of the Apple Park site just west of Steve Jobs Theater in an area that contains approximately 70 trees but is otherwise undeveloped. The proposed building would be largely located below grade and would require the excavation of 14,000 cubic yards of soil. 1 Bay Area Air Quality Management District (BAAQMD). 2017. California Environmental Quality Act, Air Quality Guidelines. May. 11/11/22 (P:\COC2201 Apple Amenity Bldg\Products\Apple Amenity Building AQ Memo.docx) 2 A total of 7,000 cubic yards would be used for fill, and therefore the remaining 7,000 cubic yards would be exported from the project site. The proposed project would also include the removal, storage, and replanting of 42 protected trees. Construction is expected to begin March 2023 and occur through Fall 2024 (18 months). The proposed building and associated improvements, including soil export, were not included in the overall development program analyzed in the 2013 EIR. ENVIRONMENTAL SETTING The City of Cupertino is within the jurisdiction of the BAAQMD, which regulates air quality in the Bay Area. Air quality conditions in the Bay Area have improved significantly since the BAAQMD was created in 1955. Ambient concentrations of air pollutants and the number of days during which the region exceeds air quality standards have fallen dramatically. Neither State nor national ambient air quality standards of the following chemicals have been violated in recent decades: nitrogen dioxide, sulfur dioxide, sulfates, lead, hydrogen sulfide, and vinyl chloride. Those exceedances of air quality standards that do occur primarily happen during meteorological conditions conducive to high pollution levels, such as cold, windless nights or hot, sunny summer afternoons. Both State and federal governments have established health-based Ambient Air Quality Standards for six criteria air pollutants: carbon monoxide (CO), ozone (O3), nitrogen dioxide (NO2), sulfur dioxide (SO2), lead (Pb), and suspended particulate matter. In addition, the State has set standards for sulfates, hydrogen sulfide, vinyl chloride and visibility-reducing particles. These standards are designed to protect the health and welfare of the populace with a reasonable margin of safety. Two criteria pollutants, O3 and NO2, are considered regional pollutants because they (or their precursors) affect air quality on a regional scale. Pollutants such as CO, SO2, and Pb are considered local pollutants that tend to accumulate in the air locally. The BAAQMD is under State nonattainment status for ozone and particulate matter standards. The BAAQMD is classified as nonattainment for the federal ozone 8-hour standard and nonattainment for the federal PM2.5 24-hour standard. As such, the primary pollutants of concern in the project area are O3, CO, and PM2.5. SUMMARY OF 2013 EIR FINDINGS The 2013 EIR evaluated potential air quality impacts from all phases of construction (Phases 1-4) under Impacts AIR-1 (Construction of the proposed project would generate air pollutant emissions that could violate air quality standards), AIR-3 (Construction and operation of the proposed project would result in a significant cumulative net increase in criteria pollutant emissions), and AIR-4 (Without the construction practices identified in the Apple Campus Construction Equipment Summary, construction of the proposed project would expose sensitive receptors to substantial pollutant concentrations). The 2013 EIR found that construction emissions of ozone precursors (ROG and nitrogen oxides [NOx]) would exceed the BAAQMD’s threshold for average daily construction emissions and identified the following mitigation measures to reduce construction-related air quality impacts. 11/11/22 (P:\COC2201 Apple Amenity Bldg\Products\Apple Amenity Building AQ Memo.docx) 3 Mitigation Measure AIR-1 Consistent with guidance from the BAAQMD, the following actions shall be required in relevant construction contracts and specifications for the project: • All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. • All haul trucks transporting soil, sand, or other loose material off site shall be covered. • All visible mud or dirt tracked-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. • All vehicle speeds on unpaved roads shall be limited to 15 miles per hour (mph). • All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. • Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. • Construction equipment idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 2 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. • All construction equipment shall be maintained and properly tuned in accordance with the manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. • The project applicant shall post a publicly visible sign with the telephone number and person to contact at the City of Cupertino regarding dust complaints. This person shall respond to complaints and take corrective action within 48 hours. The BAAQMD’s phone number shall also be visible to ensure compliance with applicable regulations. • All exposed surfaces shall be watered at a frequency adequate to maintain minimum soil moisture of 12 percent. Moisture content can be verified by lab samples or a moisture probe. 11/11/22 (P:\COC2201 Apple Amenity Bldg\Products\Apple Amenity Building AQ Memo.docx) 4 • All excavation, grading, and/or demolition activities shall be suspended when average wind speeds exceed 20 mph. • Vegetative ground cover (e.g., fast-germinating native grass seed) or other plants that offer dust mitigation measures shall be planted in disturbed areas as soon as possible and watered appropriately until vegetation is established. • The simultaneous occurrence of excavation, grading, and ground-disturbing construction activities on the same area at any one time shall be limited. To the extent feasible, activities shall be phased to reduce the amount of disturbed surfaces at any one time. • All trucks and equipment, including their tires, shall be washed off prior to leaving the site. • Sandbags or other erosion control measures shall be installed to prevent silt runoff to public roadways from sites with a slope greater than 1 percent. • Use low volatile organic compound (i.e., ROG) coatings beyond the local requirements (i.e., Regulation 8, Rule 3: Architectural Coatings). • To the maximum extent feasible, all construction equipment, diesel trucks, and generators shall be equipped with Best Available Control Technology for emission reductions of NOx and PM. • To the maximum extent feasible, all contractors shall use equipment that meets ARB’s most recent certification standard for off-road heavy duty diesel engines. • Excluding the following equipment, ensure that all diesel- powered off-road equipment used on-site meets U.S. EPA “Tier 2” exhaust emission standards, and that engines are equipped with California ARB “Level 3 Verified Diesel Emission Control Strategies” (which include diesel particulate filters) or are certified to meet the U.S. EPA “Tier 4 Interim” standard for particulate matter emissions. Equipment that will meet U.S. EPA “Tier 2” exhaust emission standards but will not be equipped with California “Level 3 Verified Diesel Emission Control Strategy” shall be limited to:  Scrapers 623G 11/11/22 (P:\COC2201 Apple Amenity Bldg\Products\Apple Amenity Building AQ Memo.docx) 5  Scrapers 633B  Four of the six proposed Scrapers 657G • Ensure that trucks used at the site to haul material and/or soil are model year 2007 or newer (or meet equivalent U.S. EPA emission standards). • Require all aerial and personnel lifts less than 50 horsepower to be fueled with natural gas or propane. Mitigation Measure AIR-4 The project sponsor shall implement Mitigation Measure AIR-1 and the following additional measure: • To the maximum extent feasible, material staging roads shall be set back from the curb by at least 65 feet. While Impacts AIR-1 and AIR-3 were determined to be significant and unavoidable with mitigation, Impact AIR-4 was determined to be less than significant with mitigation. IMPACT ANALYSIS This section identifies the potential construction air quality impacts associated with the proposed project. Methodology The California Emissions Estimator Model version 2020.4.0 (CalEEMod) computer program was used to calculate emissions from on-site construction equipment and emissions from worker and vehicle trips to the site. Construction of the proposed project would begin March 2023 and occur through Fall 2024 (18 months), which was included in CalEEMod. The proposed project would require the export of 7,000 cubic yards of soil, which was also included in CalEEMod. Consistent with 2013 EIR Mitigation Measure AIR-1, this analysis also assumes the use of Tier 2 construction equipment with level 3 diesel particulate filters, exposed areas would be watered twice per date, and traffic speeds on all unpaved roads would be reduced to 15 miles per hour or less. Proposed Project Construction Emissions During construction, short-term degradation of air quality may occur due to the release of particulate matter emissions (i.e., fugitive dust) generated by grading, building construction, paving, and other activities. Emissions from construction equipment are also anticipated and would include CO, nitrogen oxide (NOx), volatile organic compounds (VOC), directly emitted PM2.5 or PM10, and toxic air contaminants such as diesel exhaust particulate matter. Construction-related effects on air quality from the proposed project would be greatest during the site preparation phase due to the disturbance of soils. If not properly controlled, these activities would temporarily generate particulate emissions. Sources of fugitive dust would include disturbed soils at the construction site. Unless properly controlled, vehicles leaving the site would deposit dirt 11/11/22 (P:\COC2201 Apple Amenity Bldg\Products\Apple Amenity Building AQ Memo.docx) 6 and mud on local streets, which could be an additional source of airborne dust after it dries. PM10 emissions would vary from day to day, depending on the nature and magnitude of construction activity and local weather conditions. PM10 emissions would depend on soil moisture, silt content of soil, wind speed, and amount of operating equipment. Larger dust particles would settle near the source, whereas fine particles would be dispersed over greater distances from the construction site. Water or other soil stabilizers can be used to control dust, resulting in emission reductions of 50 percent or more. The BAAQMD has established standard measures for reducing fugitive dust emissions (PM10). With the implementation of these Basic Construction Mitigation Measures, as required by 2013 EIR Mitigation Measure AIR-1, fugitive dust emissions from construction activities would not result in adverse air quality impacts. In addition to dust-related PM10 emissions, heavy trucks and construction equipment powered by gasoline and diesel engines would generate CO, sulfur oxides (SOX), NOX, VOCs, and some soot particulate (PM2.5 and PM10) in exhaust emissions. If construction activities were to increase traffic congestion in the area, CO and other emissions from traffic would increase slightly while those vehicles idle in traffic. These emissions would be temporary in nature and limited to the immediate area surrounding the construction site. Construction emissions were estimated for the project using CalEEMod and are summarized in Table A, below. CalEEMod output sheets are attached. Table A: Project Construction Emissions (in Pounds Per Day) Project Construction ROG NOX Exhaust PM10 Fugitive Dust PM10 Total PM10 Exhaust PM2.5 Fugitive Dust PM2.5 Total PM2.5 Average Daily Emissions 0.5 7.7 <0.1 0.3 0.4 <0.1 0.1 0.2 BAAQMD Thresholds 54.0 54.0 82.0 BMP NA 54.0 BMP NA Exceeds Threshold? No No No No NA No No NA Source: Compiled by LSA (November 2022). BAAQMD = Bay Area Air Quality Management District BMP = best management practices NA = not applicable NOX = nitrogen oxides PM2.5 = particulate matter 2.5 microns or less in diameter PM10 = particulate matter 10 microns or less in diameter ROG = reactive organic gases Table B below identifies the original Apple Campus 2 Project emissions from Table V.L-5 of the 2013 EIR (identified in Table B as the 2013 Project) and adds the proposed project emissions to the total project emissions. As shown in Table B, the proposed project would increase the total project emissions by 0.0 percent to 4.3 percent. While the proposed project would increase the total project emissions, this increase would not be substantial and overall, the proposed project’s emissions would not change the 2013 EIR’s significance findings. In addition, the proposed project would be required to implement 2013 EIR Mitigation Measures AIR-1 and AIR-4. With implementation of 2013 EIR Mitigation Measures AIR-1 and AIR-4, the proposed project would not lead to new or more severe construction impacts beyond those identified in the 2013 EIR. 11/11/22 (P:\COC2201 Apple Amenity Bldg\Products\Apple Amenity Building AQ Memo.docx) 7 Table B: Project Construction Emissions (in Pounds Per Day) Project Construction ROG NOX Exhaust PM10 Fugitive Dust PM10 Total PM10 Exhaust PM2.5 Fugitive Dust PM2.5 Total PM2.5 2013 Project Average Daily Exhaust Emissions 6.1 181.2 1.8 55.3 57.1 1.8 21.1 22.9 2013 Project Average Daily Architectural Coating/ Paving Emissions 179.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total 2013 Project Emissions 186.0 181.2 1.8 55.3 57.1 1.8 21.1 22.9 Proposed Project Average Daily Emissions 0.5 7.7 <0.1 0.3 0.4 <0.1 0.1 0.2 Total Project Average Daily Emissions 186.5 188.9 1.8 55.6 57.5 1.8 21.2 23.1 Percent Change in Total Average Daily Emissions 0.3% 4.3% 0.0% 0.5% 0.7% 0.0% 0.5% 0.9% Source: Compiled by LSA (November 2022). BAAQMD = Bay Area Air Quality Management District BMP = best management practices NA = not applicable NOX = nitrogen oxides PM2.5 = particulate matter 2.5 microns or less in diameter PM10 = particulate matter 10 microns or less in diameter ROG = reactive organic gases CONCLUSION Based on the analysis presented above and pursuant to Section 15164 of the State CEQA Guidelines, no substantial changes in environmental circumstances have occurred for this topic, and no substantial revisions to the project have occurred, or new information known that could not have been known at the time the 2013 EIR was certified leading to new or more severe significant impacts. Therefore, there would be no new impacts related to construction-period air quality associated with the proposed project, and no new mitigation is not required.