Loading...
01 North Vallco Master Plan 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3308 FAX (40R) 777-:\:'\'\'\ CIIT OF CUPEIQ1NO Community Development Department Agenda No. ~ Agenda Date: April 11, 2006 Application Summary: Discussion on North Valko Master Plan BACKGROUND: The Planning Commission's Work Program includes a project to do proactive planning for the North Valko area, based on the assumption that there have been and will continue to be requests for conversion of industrial uses to residential uses. To that end, the Planning Commission sent a minute order to the City Council recommending that a master plan be prepared for the North Vallco area so that area-wide planning could occur prior to specific development approval. On April 4, at its second study session on conversion of industrial lands, the City Council endorsed preparation of a master plan, and indicated that they will hold a joint study session with the Planning Commission after the study is underway. DISCUSSION: The Planning Commission requested the opportunity to discuss this topic so that the beginning steps could be taken to implement the master plan. Staff requests that the Commission provide direction on a scope of work for the study. Staff expects that a consultant will be retained to help prepare the master plan, based on the scope of work developed with the Commission's input. SCOPE OF WORK The following elements are suggested for discussion in determining the scope of the master plan. » Objectives of Study » Area to be included in the master plan » General Plan Policy Framework: o Development Allocation o Density o Height o Parks o Connectivity o Conversion Criteria Printed on Recycled Paper H 2 » Circulation » Schools » Development Standards » Design Guidelines » Community Involvement in Planning Process BACKGROUND DATA The North Valko area as defined in the General Plan is shown in Exhibit A. The area to be studied needs to be determined. Exhibit A shows the officejindustrial parcels theoretically subject to conversion. The area east of Tantau is outlined in blue; west of Tantau in green, and "edge" properties are shown in red, because they are mostly likely to meet the conversion criteria. The remaining parcels are outlined in light blue. Since the General Plan prohibits residential uses on the Hewlett Packard campus (policy 2-35), that property is not included in the analysis regarding conversion to residential. The table below shows the officejindustrial square footage, acreage and potential residential units for the each of the three areas, if the available units were distributed evenly. Area Officejlnd Acres Units Maximum Maximum Square Feet Available Density Density per (total is less based on General than 170 Units Plan due to Available rounding) East of 871,413 46.3 85 Tantau West of 337,277 24.5 44 Tantau Edge 299,513 21.6 39 7.86* properties TOTAL 1,508,203 92.4 170 25 unitsj ac *Density is provided for only the edge properties because distributing units into the other areas would result in unrealistically low densities. Conversion of other areas would need to be done selectively. A master plan for North Valko could include the parcels outlined in light blue, if the objective of the study is to create a master plan for all new development, not just conversion of officej industrial to residential. For example, if additional office buildings were proposed by Hewlett Packard facing Pruneridge Drive, a master plan could address the desired relationship to the street. 1-;;)