Loading...
PresentationsPIRC Meeting April T. 2022 Presentations Item 2 Proposed Fiscal Year 2022- 23 Capital Improvement Programs Parks and Recreation Commission FY22-23 CIP Proposed Projects Report CUPERTINO 07 April 2022 1. Current CIP projects: background information 2. Proposed FY 2022 - 2023 CIP projects t ' n. e, ry, -•'�- #�� `r. �'�'•y'/�' - .rah. 'S' �-�. �►-••{,�`t •° - 1 �� u x• Jop - - - �k CIPProjects 40 active projects: 12 Parks & Rec, 16 Bike/Ped, 5 Streets & Grounds, and 7 Facilities 1. All -Inclusive Play Area (External Funding) 2. Annual Playground Replacement (Multi -year) 3. Blackberry Farm Golf Renovation / Alternative Use Study 4. Blackberry Farm Pool Improvements s. Citywide [Satellite] Community Garden 6. Full-sized Outdoor Basketball Court (External Funding) 7. Lawrence-Mitty Park - Master Plan 8. Memorial Park -Amphitheater Improvements 9. Memorial Park -Pond Repurposing 10. Memorial Park -Specific Plan Design 11. Park Amenity Improvements (Multi -year) 12. Tree Inventory - Stevens Creek Corridor 13. Bicycle Blvd Interim Improvements, Ph. 2 14. Bicycle Blvd Interim Improvements, Ph. 3 15. Civic Center Parking Analysis 16. Homestead/DeAnza - Construction 17. Homestead/De Anza - Design (External Funding) 18. 1-280 Trail - Central Segment (External Funding) 19. 1-280 Trail - East Segment (External Funding) 20. McClellan Rd Sep. Bike Corridor, Ph. 3 (External Funding) 21. Regnart Creek Trail Fencing 22. School Walk Audit Implementation (External Funding) 23. Stelling and Alves Crosswalk Installation 24. Stevens Creek Blvd & Bandley Dr. Signal Upgrades (Ext'I Fund) 25. Stevens Creek Blvd Class IV Bikeway Ph. 2 - Design 26. Stevens Creek Blvd Class IV Bikeway Ph. 2A - Construction 27. Stevens Creek Blvd Class IV Bikeway Ph. 2B - Construction (External Funding) 28. Traffic Calming 29. Pumpkin and Fiesta Storm Drain project, Phase 1 and 2 30. Regnart Road Improvements 31. Retaining Wall Repair - Cordova Road 32. Sidewalk Improvements - Orange and Byrne Avenues (External Funding) 33. Street Light Installation -Annual Infill (Multi -year) 34. ADA Improvements (Multi -year) 35. City Hall and Community Hall Improvements (Programming and Feasibility) 36. City Hall Annex (10455 Torre Avenue Improvements) 37. Citywide Building Condition Assessment Implementation 38. Electric Vehicle Parking Expansion (External Funding) 39. Library Expansion Project 40. QCC Multi -Site Sustainable Infrastructure Upgrade (External *Green = Parks & Rec *Blue = Bike Ped *Red = Streets & Grounds *Orange = Facilities CIP Projects 20 projects in Design phase, 6 projects in RFQ/RFP, 6 projects in Construction, and 8 projects are Ongoing or Feasibility Studies DESIGN: 1. All -Inclusive Play Area 2. Blackberry Farm Pool Improvements 3. Citywide [Satellite] Community Garden 4. Full-sized Outdoor Basketball Court s. Lawrence-Mitty Park - Master Plan 6. Memorial Park -Pond Repurposing 7. Bicycle Blvd Interim Improvements Ph. 3 8. Homestead/De Anza - Design 9. 1-280 Trail - Central Segment 10. 1-280 Trail - East Segment 11. McClellan Road Separated Bike Corridor, Ph. 3 12. Stevens Creek Blvd and Bandley Dr. Signal Upgrades 13. Stevens Creek Blvd Class IV Bikeway, Ph. 2 - Design 14. Stevens Creek Blvd Class IV Bikeway Ph. 2A - Construction 15. Stevens Creek Blvd Class IV Bikeway Ph. 2B - Construction 16. Pumpkin and Fiesta Storm Drain project, Ph. 1 and 2 17. Regnart Road Improvements 18. Retaining Wall Repair -Cordova Road 19. Sidewalk Improvements - Orange and Byrne Avenues 20. Citywide Building Condition Assessment Implementation RFQ/RFP: 1. Memorial Park -Amphitheater Improvements 2. Memorial Park -Specific Plan Design 3. Homestead/DeAnza - Construction 4. City Hall Annex (10455 Torre Ave Improvements) s. Electric Vehicle Parking Expansion 6. QCC Multi -Site Sustainable Infrastructure Upgrade CONSTRUCTION: 1. Park Amenity Improvements 2. Annual Playground Replacement 3. Bicycle Blvd Interim Improvements Ph. 2 4. Regnart Creek Trail Fencing s. Stelling and Alves Crosswalk Installation 6. Library Expansion Project ONGOING/FEASIBILITY: 1. Blackberry Farm Golf Renovation / Alternative Use Study 2. Tree Inventory - Stevens Creek Corridor 3. Civic Center Parking Analysis 4. School Walk Audit Implementation s. Traffic Calming 6. Street Light Installation - Annual Infill 7. ADA Improvements 8. City Hall & Comm. Hall Impr (Programming and Feasibility) *Green = Parks & Rec *Blue = Bike Ped *Red = Streets & Grounds *Orange = Facilities CIP Projects FY21-22 COMPLETED PROJECTS: 1. Lawrence-Mitty Park —Annexation" 2. Bicycle Wayfinding Signage 3. Bubb Road Separated Bikeway 4. Carmen Road Bridge Right -of -Way s. Mary Avenue Protected Bikeway 6. Regnart Creek Trail 7. Quinlan Preschool Shade Structure 8. City Lighting LED Transition Assessment 9. Stevens Creek Bank Repair Concept io. Street Light Replacement — Citywide (Labor) 9 completed projects, 6 deferred (on hold) projects DEFERRED PROJECTS: 1. Stevens Creek Corridor Park Chain Master Plan 2. Sports Center Community Needs Analysis 3. 1-280 Trail - West Segment 4. McClellan Road Separated Bike Corridor - Byrne Ave to Imperial Ave, Phase 4 s. Interim City Hall 6. City Bridge Maintenance Repairs *Green = Parks & Rec *Blue = Bike Fed *Red = Streets & Grounds *Orange = Facilities CIP Projects Funding ACTIVE PROJECTS $50,398,361 COMPLETED PROJECTS $5,653,645 DEFERRED PROJECTS $3,242,700 TOTAL FUNDING $59,294,706 TOTAL ACTIVE PROJECTS FUNDING $50,398,361 ACTIVE PARKS & REC PROJECTS $15,814,084 ACTIVE BIKE PED PROJECTS $11,810,535 ACTIVE STREETS & GROUNDS PROJECTS $8,561,834 ACTIVE FACILITIES PROJECTS $14,211,908 *Green = Parks & Rec *Blue = Bike Ped *Red = Streets & Grounds *Orange = Facilities _ ; a g�FA h � � � �~� ,..r. i; � 'f ++ , i` � .- _ f_. � �� . _ '�� FY 22-23 CIP Projects PROPOSED PROJECTS: 1. Blackberry Farms Pools Splash Pad 2. Jollyman All -Inclusive Play Area: Adult-Assistive Bathroom Facilities 3. Major Recreation Facilities: Use and Market Analysis 4. De Anza Boulevard Buffered Bike Lanes s. City Lighting LED improvements 6. City Hall and Parking Garage: Design and Construction 7. Stocklmeir, Byrne and Blesch: Inspection Reports and Analysis *Green = Parks & Rec *Blue = Bike Ped *Red = Streets & Grounds *Orange = Facilities Blackberry Farms Pools Splash Pad Proposed Budget: $500,000 Proposed Scope: Design and construct a splash pad to replace the slide feature at the Blackberry Farm Pools. Jollyman All-inclusive Play Area: Adult-Assistive Bathroom Facilities ..ate,: ; � i�•iil � i`� � -. r.i. �i Proposed Budget: $850,000 Proposed Scope: Design and construct a new adult-assistive bathroom facility adjacent to the All -Inclusive Play Area. Major Recreation Facilities: Use & Market Analysis i • r Proposed Budget: $350,000 Proposed Scope: Commission a report to study the possible locations for new major facilities: Aquatic, Fine Arts/ Performance and/or Recreation Facilities. Existing recreational and arts facilities will be reviewed, and a recommendation based on need, available locations, and financial investments required. The Market Analysis and Business Plan will be the first phase in the potential development of additional recreation facilities in the City. Future P&R/CIP Project Proposals FY23 - 24: 1. [Adjustments to] Park Amenities scope/funding TBD 2. BBF Golf Course [Study Outcome] project $3,200,000 3. QCC skylight renovation $350,000 FY24 - 25 and Beyond: 1. Blackberry Farm Bocce Ball Shade Structure $125,000 2. Linda Vista Park Picnic Area Shade Structure $125,000 3. Portal Park Picnic Area Shade Structure $125,000 a. [Add to] CW Community Gardens funding $725,000 5. [Add to] Playground Replacement funding $600,000 6. Major Facilities [Results] Programming & Design TBD 7. Memorial Park Design & Construction TBD s. Lawrence Mitty Design & Construction TBD *Green = Parks & Rec *Blue = Bike Ped *Red = Streets & Grounds *Orange = Facilities Thank You! CUPERTINO