Loading...
BLD-2020-1179 Bldg. - Final Review 6280 W. Las Positas Boulevard, Suite 220 | Pleasanton, California 94588 | Tel. (925) 264-9559 November 9, 2020 Albert Salvador Building Official City of Cupertino Building Division 10300 Torre Ave Cupertino, CA 95014 Email: JasmineA@cupertino.org; KimD@cupertino.org; HaleyM@cupertino.org Project: (N) Detached ADU with Covered Porch and Exterior Water Heater Closet Address: 10789 Juniper Court (Main) and 10791 Juniper Court (ADU) City Application #: BLD-2020-1179 ICCI Job #: CUPE20-126 Independent Code Consultants, Inc. has completed the final plan review on behalf of the City of Cupertino’s Building Division. The following electronic documents were received for review: 1. Plans: Sheets (revision 2) dated 10.26.20: 0, A0, A1, A2, E1 by Innovative Concepts Sheet dated 06.15.20: 1 (Boundary and Topographic Survey) by NNR Engineering Services Co. Sheets (revision 1) dated 09.15.20: C1.0, C1.1, C2.0 by GKM Engineering Sheet dated 09.15.20: C3.0 by GKM Engineering Sheet dated 09.10.20: A3 by Innovative Concepts Sheet (revision 2) dated 10.23.20: CG1 by Innovative Concepts Sheets (revision 2) dated 10.26.20: S1, S4 by Charles L. Williams, P.E. Sheets (revision 1) dated 09.11.20: S2, S3.1 by Charles L. Williams, P.E. Sheet dated 06.05.20: S3 by Charles L. Williams, P.E. Sheets undated: T24-1, T24-2 by FRI Energy Consultants 2. Structural Calculations: Otis ADU dated 07.20.20 by Charles L. Williams, P.E. 3. Geotechnical Report: Otis Accessory Dwelling Unit dated 07.2020 by Romig Engineers (N) Detached ADU with Covered Porch and Exterior Water Heater Closet 10789 Juniper Court (Main) and 10791 Juniper Court (ADU) Cupertino Application #: BLD-2020-1179 ICCI Job #: CUPE20-126 Plan Review Round: Final Page 2 | 2 4. Energy Report: Building Energy Analysis Report dated 07.29.20 by FRI Energy Consultants 5. Other: Response to (PC2) Plan Check dated 10.26.20 by Innovative Concepts Performance Platinum Hybrid Electric Water Heater product information dated 01.2018 by Rheem Response to (PC1) Plan Check dated 09.10.20 by Innovative Concepts City of Cupertino Statement of Special Inspections dated 09.10.20 and signed by the Project Engineer (also performing the special inspection) and the Owner Geotechnical Plan Review letter dated 07.30.20 by Romig Engineers The basis of the review is the following codes 2019 California Building Code (CBC), 2019 California Residential Code (CRC), 2019 California Mechanical Code (CMC), 2019 California Plumbing Code (CPC), 2019 California Electrical Code (CEC), 2019 California Energy Code (CEnC) (2019 Building Energy Efficiency Standards), 2019 California Green Building Standards Code (CGBSC), and the City of Cupertino Ordinances. Please note that our review has been completed and we have no comments. Enclosed for your use are the above noted documents that were reviewed, bearing Independent Code Consultants, Inc.’s plan review stamp. If you have any questions, please do not hesitate to contact us directly. Respectfully Submitted, INDΞPΞNDΞNT CODΞ CONSULTANTS, INC. Fee= 2 hours @ $125.00/hour = $500.00 (will bill at the end of the month)