Permit Form
Submittal # 2-Approved
Date: 10/20/2020 Cupertino Sanitary Permit # 20-127
APN: 342-57-010 Cupertino Building Permit # BLD-2020-1179
Applicant Name: Jeff Guinta
Address: 10789 Juniper Ct, Cupertino, CA 95014-6556
Scope of Work: New Detached ADU (732 SF); Cover Porch (36 SF); Exterior Water Heater
Closet (10SF)
Cupertino Sanitary District COVID-19 Procedure
The Cupertino Sanitary District office and permit counter will be closed to the
public but will continue to provide services. Permit review staff will work remotely
to review and process permits. For payment, please mail checks to the District
office. Payment via credit card can be made over the phone. Please contact
Frankie Martinez at (408) 477-7300 to process your credit card payment.
The Cupertino Sanitary District has reviewed the plans for the subject project:
Sanitary sewer is available and the existing building is connected to our sanitary sewer system,
see conditions/requirements listed below.
Additional Dwelling will be added to next fiscal year’s sewer service charges.
Conditions/Requirements for permit approval:
Completed Conditions/Requirements
Cupertino Sanitary District Lateral Plan Check Fee ($300) (O.C. 7102.3.1)
Show the following on the SITE PLAN on Sheet A0:
• Sanitary sewer lateral
o Sanitary sewer lateral is located approximately 22’ from the right
property line
Conditions/Requirements to be met during construction:
• Install new property line cleanout to District’s standards. See attached detail. Property line
cleanout must be within 5 feet of the property line. Cleanout shall be the same diameter as the
street portion of the service lateral. Gravity lateral is 4” diameter. (O.C. 4101)
• Cupertino Sanitary District Final (CCTV) Inspection and Approval of the new property line
cleanout, point of connection, and District lateral is required prior to clearance for City of
Cupertino Final Inspection. Owner must allow District at least 48 hours’ notice to schedule a
Page 2
Cupertino Sanitary Permit # : 20-127
Cupertino Building Department # : BLD-2020-1179
PERMITS HAVE EXPIRATION DATE OF 1 YEAR FROM DATE OF APPROVAL. IF REFILING FOR PERMIT APPLICATION AFTER YEAR IS UP, NEW PERMIT FEES
MUST BE PAID BY APPLICANT.
SUPPLYING SANITARY SEWERAGE SERVICES FOR: CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, LOS ALTOS AND
SURROUNDING UNINCORPORATED AREAS
District Inspector for a video inspection. District to provide Building Department with written
notification upon completion of inspection. (O.C. 7102)
Additional Comments:
• Storm water surface or roof drains and other general surface water runoff, shall not be discharged
to the sanitary sewer.
• The Cupertino Sanitary District recommends installing the required improvements near the
beginning of the project in case any unforeseen issues arise with the installations.
• The applicant may potentially be required to upgrade their sanitary sewer lower lateral if the
District finds the structural conditions of the pipe to be unsatisfactory.
Fees can be paid at the District office located at 20863 Stevens Creek Boulevard, Suite 100
in Cupertino, CA by cash or check (payable to “Cupertino Sanitary District”).
All conditions, requirements and recommendations are to be completed at the
(owner/developer)’s expense. If you have any questions or need additional information, please
call Esteban Delgadillo at 408-477-7323 or Cindy Diaz at cdiaz@markthomas.com.
Respectfully,
For: Benjamin T. Porter, P.E.
District Manager-Engineer
MARK THOMAS
U:\Permits & Fees\Permits - Developments\2020\20-127_BLD-2020-1179_10789 Juniper Ct\20-127_S2-Approved_BLD-2020-