Loading...
04. Director's Report CITY OF CUPERTINO 10300 TORRE A VENUE, CUPERTINO, CALIFORNIA 95014 DEPARTMENT OF COMMUNITY DEVELOPMENT 'C. Subject: Report of the Community Development DirectOI(-~>~~. Planning Commission Agenda Date: Tuesday, Tanuarv 24, 2006 The City Council met on Tuesdav, Tanuarv 17, 2006, and discussed the following items of interest to the Planning Commission: (see attached reports) 1. Consider Application Nos. U-2005-20, ASA-2005-18 (EA-2005-16); Peter Ko (Whole Foods\. 20955 Stevens Creek Blvd: The City Council approved the applications with the following conditions: o A $250,000.00 bond is required to study and implement additional traffic mitigations. o Provide pedestrian access along the north side of the store into the Stevens Creek Office Center. 2. Consider Application Nos. U-2005-19, ASA-2005-17, TR-2005-08 (EA-2005-15); Mike Rohde IVallco Fashion Park parking garage\. 10123 N. Wolfe Road, APN 316-20-064: The City Council approved the applications with the following conditions: o The height of the parking structure shall not exceed 32 feet measured from the effective grade of the adjacent family homes. o The elevator on the southeast corners shall not exceed 49 feet in height. o The screening recommended by the Planning Commission will be included except that the upper level wall may be 4 feet in height. o Staff will review the architectural and landscaping plans rather than the Planning Commission. 3. Consider Application Nos. U-2005-16, ASA-2005-11, TM-2005-06, Z-2005-05, GPA-2005-04, TR-2005-04, DA-2005-01 (EA-2005-10); Mike Rohde, (Valleo Fashion Park condominium development), 10123 N. Wolfe Road, APN 316-20- 064: This item will be heard at the special City Council meeting on January 30, 2006, 7:30 p.m. bl1l-1 Report of the Community Development Director Tuesday, January 24, 2006 Page 2 4. Consider a Petition for Reconsideration of the City Council's decision to uphold an appeal of Application No. U-2005-04, Gate of Heaven Cemetery located at 22555 Cristo Rev Dr.. APN 342-63-002, regarding the Planning Commission's approval of a use permit for statuarv, Veterans' markers and landscape features at an existing cemetery. The City Council denied the petition of reconsideration. Miscellaneous: 2006 Planners Institute and Mini Expo Attached are the registration forms for the 2006 Planners Institute and Mini Expo at the Monterey Conference Center, Monterey, California. The conference is Wednesday, March 22 - Friday, March 24, 2006. The cost for a City Official is $490.00. This cost will be paid by the Planning Commission budget for conferences. If you are interested in attending, please fill out the 2 forms and give them Kiersa Witt by the February 14, 2006 Planning Commission meeting. Enclosures: Staff Reports 2006 Planner Institute and Mini Expo forms (2) Newspaper Articles G: \Planning \ SteveP\Virector's Report \2006 \pdOl- 24-06.doc D-a.., 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3308 fAX {40B) 75'7-3333 tlWOF CUPEIQ1NO Community Development Department SUMMARY AGENDA NO._ AGENDA DATE January 17,2006 SUMMARY: Application: U-2005-20, ASA-2005-18, EA-2005-16 Applicant: Peter Ko (for Sandhill Properties/Whole Foods Market) Owner: Paul & Barbara Weiss Location: 20955 Stevens Creek Boulevard, APN 316-31-018, -020 USE PERMIT to demolish structures associated with a former car dealership and construct a new 68,214 square foot one-story market with mezzanine level. ARCHITECTURAL & SITE APPROVAL for a new 68,214 square foot one-story market with mezzanine level. RECOMMENDATIONS: On 5-0 votes, the Planning Commission recommended the following actions: 1. the granting of a mitigated negative declaration, file no. EA-2005-16; 2. approving the Use Permit, file no. U-2005-20, based on the resolution no. 6349; and 3. approving the Architectural & Site Approval, file no. ASA-2005-18, based on resolution no. 6350. BACKGROUND: The Planning Commission heard this item on December 20, 2005. Staff presented information pertaining to parking, traffic, site and architectural design in its staff report (Exhibit A-I). DISCUSSION: Public Comments. Various members of the public and the Chamber of Commerce were very supportive of the project (Exhibit B-1). Alves Drive neighbors, who would be most impacted by the project, had a detailed list of 1)--3 Printed on Recycled Pap9f File Nos. U-2005-20, ASA-2005-18 & EA-2005-16 Page 2 Janrurry 17, 2006 concerns, which is categories: 1) included in Exhibit B-1. Those concerns fell into two Compliance with existing city regulations, governing noise, operating hours, lighting and refuse management. 2) Parking Lot Design-designing Stelling Road driveways for entrance only with the goal of directing all outbound traffic onto Stevens Creek Boulevard. Staff Comments. There is one significant size tree on the property - a 36" diameter Bay Laurel, which is located in the planned footprint of the proposed Whole Foods Market. The tree is not one of the protected species and its removal would be mitigated by the planting of dozens of proposed trees in the parking lot, along the street and along the building perimeter. With respect to neighbor concerns, existing ordinances regulating commercial noise, operating hours, lighting and refuse management will be followed. Staff pointed out that the noisest area will be near the entrance to the loading dock, which is over 260 feet away from the nearest residence and there are intervening church buildings. There are also building design features that will limit noise: 1) the loading dock will be enclosed and roofed, and 2) most rooftop equipment will be concentrated on the south side of the building roof away from residences. Whole Foods is not proposing late night or early morning hours that require special permission from the City. Building and parking lot lighting is being designed to not avoid glare on adjacent properties. Staff believes that the residents' suggestion to make the Stelling Road driveways "entrance only," would not resolve the real issue of potential cut-through traffic on Alves Drive. Some late traffic/circulation comments were submitted by the Public Works Department and introduced to the Commission on December 20th (Exhibit C-l). The memorandums recommended additional conditions of approval, including: 1) Having all truck transporters abide by an approved truck route plan; 2) Having the Public Works Department continue to evaluate the on-site circulation plan during the building permit review to ensure that truck turning movements can be negotiated; 3) Conducting traffic engineering studies to evaluate the feasibility of extending the left turn pockets on westbound Stevens Creek Boulevard and/ or southbound Stelling Road; and 4) Removing on-street parking on the north side of Stevens Creek Boulevard adjoining the project site. D-+ 2 File Nos. U-2005-20, ASA-2005-18 & EA-2005-16 Page 3 January 17,2006 After the Commission hearing, the Community Development and Public Works Department Directors had further traffic discussions and developed additional concerns that were not expressed in the traffic consultant's study. The concern is to provide for left turns from the project site onto Stelling Road to avoid an excessive number of U-turn movements on the same road. Staff is recommending an added condition of approval to the Planning Commission resolutions that would: Require a traffic engineering study to evaluate the feasibility of allowing controlled left turns from the project site onto Stelling Road and provide funding for such traffic improvements iffeasible. The study should include the possible use of the abutting church property in its evaluation. Commission Comments. Overall, the commissioners were pleased with the project design and felt the site was far enough away from the closest residents to not have a noise impact. Their main concerns were with traffic and circulation. The Commission modified staff's recommended conditions of approval by expanding the cut-through traffic study to include the Garden Gate neighborhood, not just Alves Drive, examining the combined impact of Whole Foods and church traffic on Sunday, and prohibiting project construction traffic on Alves Drive. Enclosures: Planning Commission Resolution Nos. 6349,6350 Exhibit A-I: Planning Commission Staff Report dated 12/20/05 Exhibit B-1: Written public comments Exibit C-l: Public Works Dept. Memos (2) Negative Declaration Plan Set Prepared by: Colin Jung, Senior Planner Submitted by: Approved by: ¡:?..,(L D /~~ ([~~li_/(tJ Steve Piasecki Director of Community Development Q})! David W: Knapp City Manager g:plarming/ pdreport/ cc/U·2005-20 co.doc b-S 3 City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3308 Fax: (408) 777-3333 t¡ ÖF CUPEIQ1NO Community Development Department Summary Agenda Item No. _ Agenda Date: January 17, 2006 Application: U-2005-19, ASA-2005-17, TR-2005-08 (EA-2005-15) Applicant: Mike Rohde (Valko Shopping Center) Property Location: 10123 N. Wolfe Road, APN 316-20-064 RECOMMENDATION The Planning Commission recommends approval of the following: 1. Mitigated Negative Declaration 2. Use Permit for a portion of a proposed three-level, four-story parking garage that exceeds the permitted 32-foot height limit (portions of the garage a approximately 41 feet and elevator tower at 49 feet) 3. Architectural and site approval for a portion of a three-story, four level parking garage that exceeds the permitted height of 32 feet 4. Tree removal and replanting to construct a parking garage Project Data: General Plan Designation: Zoning Designation: Site Area: Commercial/ Residential P (Regional Shopping) 60,310 sq. ft. (1.4 acres) footprint of parking garage 63 acres (total shopping center) Maximum Building Height: Eight stories allowed Height above 32 feet requires a use permit Actual Building Height: 36 to 41 feet Required Parking: 5,564 spaces for proposed shopping center Provided Parking: 5,702 spaces for proposed shopping center 746 spaces for subject parking garage D-(o Applications: U-2005-19, ASA-2005-17, TR-2005-08 (EA-2005-15) Vallco Parking Garage Page 2 Environmental Assessment: Mitigated Negative Declaration BACKGROUND: The parking garage is proposed to be located in the northwest area of Vallco Fashion Park, directly north of Macy's. The current use isa surface parking lot. Single-family residential uses are located to the west, and a residential condominium project is proposed for the parking area to the north. The location of the proposed parking garage is vested in the Vallco Development Agreement. The City Council recently extended the expiration date of the Development Agreement until 2009. They also specified that a three-story / four-level parking garage is permitted in this location, with a maximum height of 32 feet. Portions of the proposed garage exceed 32 feet, which consist of the fourth level and the elevator tower. The portions of the garage that exceed 32 feet are the subject of this use permit/ architectural and site approval application. The Planning Commission held a public hearing on this item on January 10, 2006. DISCUSSION: Please refer to the enclosed Planning Commission report for a detailed description of the project. This report focuses on the issues raised at the Planning Commission's public hearing. Planning Commission: > Provide separate lighting control for roof level lighting; applicant states it would be possible to control roof lighting separately. > Provide secure and clear access from the cinema to the parking garage after Macy's is closed (movie-goers can access the cinema through Macy's when it is open). Adequate signage, security and internal access, if possible, should be provided. > There is the possibility of overflow parking into adjacent properties if Vallco is successful. There should be a long-term plan to deal with a potential parking shortage. > Relocation of sewer lines underneath the garage will be required. > Issues related to the highest portion of the fourth level: it provides 20 parking spaces; there is a problem with a dead-end aisle with no turn-around area. > Look at planting additional ash trees and providing greater tree protection after construction. D-1- Applications: U-2005-19, ASA-2005-17, TR-2005-08 (EA-2005-15) Vallco Parking Garage Page 3 Applicant: }> There should not be a problem with overflow parking because adequate parking is provided; they will provide more than required by the Development Agreement. }> The 20-space fourth-level is needed for structural reasons, as well as for the parking spaces it provides. They might need to remove three spaces to provide a turn-around. }> The barriers on Perimeter Road that are required after 9 P.M. might need to be relocated to provide better circulation. }> Entrance locations were chosen for safety and visibility reasons. }> They will investigate the possibility of exiting the cinema through the mall during late hours. }> Getting agreement on the garage design from the major tenants, particuj¡irly Federated, dictates the garage design. They do not want an underground level, and they want visibility of their entrance from inside the garage. Public: There were eight speakers, who provided the following comments: }> Garage should be lowered to reduce impacts to the neighbors. Verify why it can't be lowered. }> Chamber of Commerce supports the parking garage because it increases the viability of commerce in Cupertino. }> Existing garage is visible from adjacent residences. Keep height at 32 feet. }> Information was not forthcoming from Vallco when neighbors met with them. }> The ash trees drop their leaves in the winter and allow greater visibility from the residential area. }> Garage entrance should be on Wolfe, not on the west elevation. Staff: }> Fourth-level parking with 20 spaces could be eliminated, and just the structural elements could be retained if they are needed. This would remove the barriers and green screen, and would reduce the height and visual impacts on the neighbors. Planning Commission Recommendation: The Planning Commission modified the model resolution to eliminate parking on the ramp extension on the fourth level, which eliminates 20 parking spaces and the need for barriers and lighting in that area. Additional modifications were to increase the tree protection measures and require further evaluation of the deciduous ash trees. D-ô Applications: U-2005-19, ASA-2005-17, TR-2005-08 (EA-2005-15) Vallco Parking Garage Page 4 ENCLOSURES Planning Commission Resolution 6352 for U-2005-19 Planning Commission Resolution 6353 for ASA-2004-14 Planning Commission Resolution 6354 for TR-2005-08 Planning Commission and Staff Report and enclosures dated January 10, 2006 Mitigated Negative Declaration Plan Set Parking Distribution Prepared by: Ciddy Wordell, City Planner Submitted by: Approvèd by: 65~~ ~ef10 /Ua- Steve Piasecki Director, Community Development S)~( David W. Knapp City Manager G:\Planning\PDREPORT\ CC\ U-2005-19.doc D,9 City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3308 Fax: (408) 777-3333 élTYOF CUPEIQ1NO Community Development Department Summary Agenda Item No._ Agenda Date: January 17, 2006 SUBJECT Request for a Petition for Reconsideration of the City Council's decision approving a use permit for statuary, Veterans' markers and landscape features a the existing Gate of Heaven Cemetery located at 22555 Cristo Rey Drive. The petitioners are Oak Valley Community Awareness and Keith Hocker. Note: The Petitioners' request for reconsideration relates to the upright markers. RECOMMENDATION The City Council can take either of the following actions: 1) Grant the request for reconsideration by making required findings outlined . by the City Attorney (reconsideration could either be heard at this or a future meeting) Or 2) Deny the request reconsideration by making required findings outlined by the City Attorney. Environmental Assessment: Categorically Exempt BACKGROUND: The Gate of Heaven Cemetery applied to the City of Cupertino for a use permit for changes to the cemetery because they were operating under a Santa Clara County use permit. The cemetery was annexed into the City of Cupertino in 1986, and had been operating under a Santa Clara County use permit approved in 1962. Condition 5 of the use permit required flat horizontal markers, with statuary and shrines to be approved by the Planning Commission through Architectural and Site approval. The Gate of Heaven Cemetery requested upright markers, resulting in the need to apply for a use permit through the City since the request is in conflict with the original use permit. The use permit included other changes to the cemetery, as well: veterans' markers and D-IO U-2005-04 Page 2 Gate of Heaven Cemetery Reconsideration January 17, 2006 niche features; a new niche feature; life-size statue of the Pieta; bishop's plaza and statuary; and 36 existing upright markers. The Planning Commission held two public hearings on the request. There was significant public interest in the application, and the Planning Commission requested that the applicant meet with interested residents and groups to work through their concerns. As a result, there was mutual agreement on the cemetery proposal at the second public hearing, except for the request for upright markers. The cemetery modified the upright marker request, which reduced the number of markers requested and created a terraced design with the intent to reduce the visual impact of the markers. However, the neighborhood group and the Midpeninsula Regional Open Space District were still opposed to the upright markers. The Planning Commission approved the cemetery use permit on August 23, 2005, except for the upright markers. They also required that a detailed landscape plan be approved by the Planning Commission. The Gate of Heaven Cemetery appealed the decision to the City Council because of the denial of the upright markers and the requirement for Planning Commission approval of the landscape plan. on November 15, 2005, the City Council held a public hearing on the appeal and granted the appeal, allowing upright markers and staff review of the landscaping plan. The approved plan and conditions of approval are enclosed (Exhibit q. DISCUSSION: Applicants' Appeal: Specific grounds for reconsideration are provided in the Cupertino Municipal Code. The appellants' reasons for the reconsideration request are outlined in the appeal letters attached to the staff report (Exhibit D). The grounds for reconsideration are discussed in the attached matrix, Exhibit B, as prepared by the City Attorney. The City Attorney recommends that the City Council deny the request for reconsideration, for the reasons stated in Exhibit B. A resolution for denial is enclosed (Exhibit A). ENCLOSURES Exhibit A: City Council Resolution Exhibit B: City Council Findings in Response to Petition for Reconsideration Exhibit C: City Council Staff Report (w / attachments), November 15, 2005 Exhibit D: Petition of Reconsideration Exhibit E: City Council Meeting Minutes, November 15, 2005 Exhibit F: Letter from Gate of Heaven Cemetery attorney, January 9, 2006 Exhibit G: Declarationof Councilmember Patrick Kwok Prepared by: Ciddy Wordell, City Planner b-I \ ER Volume 58. Number 52· January 18. 2006· Cupertino. CA· Est. 1947 ·WWW..cupertinocourier.com VOLUME 58. NUMBER52 CUPERTINO, CAI..JFORNIA JANAURY 18.2006 _________________.HH._________ Commission OKs Vallco mixed-use project By HUGH BIGGAR A proposal by Valleo Fashion Park officials. which would allow for 139 condominiums on the west side of N. Wolfe Road and require rezoning of the 5- acre site to planned residential, has gotten a thumbs up from CupertiDo's planning commis- sion. At its Jan. 10 meeting, the commission also supported a three-story parking garage, which is considered a key part of the' residential and commer- cial project. The development, which would involve Vallco's owners, Landmark Properties., and the Perkowitz and Ruth architectural firm, will go to the city council for final approval "The structure helps us secure the department stores, movie theaters and other build- ings," said Mike Rohde, manag- er of Vall co. Due to concerns of nearby residents, designs of the park- ing garage and other compo- nents of the project were tai- lored to be more neighbor- hood-friendly. In response to those concerns, the proposed .. VaBc:o, page 10 Valko: Final number of units is reduced Continued from page 7 project is to have two-story condomini- ums. limited vehicle and pedestrian access to nearby neighborhoods and landscaping to screen views of the Valleo buildings. The number of resi- dences was also reduced from a pro~ posed 156. "Relationships are very important to the neighborhOod," said Steve Piasecki, Cupertino's director of community development. "Building height, setback [from the street] and traffic patterns are ways to make [the project] compatible." With these suggestions in mind, the planning commission unanimously rec~ ommended the project to tb,e city coun~ cil for approval. Angela Chen, a com- missioner for five years, did not vote since she unexpectedly resigned her position Jan. 1 to devote more time to her personal life. . The redevelopment of Valleo, which has seen business decline in the last decade, is seen as key to jump-starting Cupertino's sales tax revenue. To he:1p ensure that will happen, I Commissioner Marty Miller also rec- ommended the city council hire a con- sultant to assess Vallco's future fiscal health. At the moment, city officials speculate the mall could generate about $4 million per year in revenue. "We don't want to see an under-per- forming man." Piasecki said. -~ b-I~ LupertÏno RIER Volume 58. Number 51 . January n. 2006 . Cupertino. CA . Est.· 1947 . www.cupertinocoutier.com .. Rendering courtesy of the City of Cupertino With the complet(on afthe 16-screen AMC theaters. Valleo Fashion Park entrance will have a new . face. Movie goers will ride the escalator up to the theaters, which are currently under construction on tM rodf df the mall. . Vall co theaters are on fast track I I i Vallco: Timeline critical for AMC contract ' By HUGH BIGGAR Cupertino's city council approved an unusual request for accelerated construction on a new 16- screen movie theater at Vallee Fashion Park. According to city officials, the accelerated con- struction is key to securing the future of major Valko tenants. DPR Construction had sought permission for 24-hour construction on the project for five months-an unusual request due to its length; safety issues and noise from steel con- struction. After much debate, the coun- cil voted 4-0. with Councilman Orrin Mahoney absent, for the project so long as a long list of conditions was met. As a part of approving the project, the city council also agreed to a different schedule than the one proposed by DPR. The new schedule allows for construction Monday through Saturday, with steel construc- tion to take place only after the mall is closed (from 10 p.m. to 6 a.m.). The project is to begin Jan. 17 and conclude May 31. Other conditions include maintaining noise levels at the current level of roughly 60 decibels, hiring a noise consul- tant to monitor ambient noise. establishing a hot1ine to regis- ter noise complaints. providing monthly reports to residents living within 1,000 feet of Vallco and having Vallco offi- cials deposit $50,000 with the city to pay for any penalties. According to Carol Atwood, project managers would have a short period to fix problems that occur before penalties of $5,000 would be assessed. DPR plans to tear out the center out of the mall -and install escalators leading to the theaters, which would be on what is now the roof. Equipment for the project is to be placed on Wolfe Road. Atwood said the fast-paced schedule is necessary due to' ... VaDÅ“, page 11 : Continued from page 7 commitments between Vallco and the AMC Theater chain. Vallco has com- .mitted to completing the 16-screen the- ater at the top of the mall by November, just before the start of the holiday shop- ping season. . "There are many economic threads," Atwood said of the timeline. AMC can pull out of the deal, for instance, Ü the theater complex is not built by November. H that happens, other anchor stores planned for the mall could then rescind on their commitments. All of this is part of a larger plan to revitalize Vallco and the city's sales tax I base. Sales taxes in Cupertino, which I provide a third of the city's general fund, have declined in recent years. In ·1 2005, some sales taxes have increased in the high-tech sector, but the retail sec- tor continues to struggle. I The movie theater comp~ex is seen as ! a key to changing that trend. "The theaters will generate about $2,000 in sales tax per screen from con." cessions," Atwood said. "But the the- aters will bring in about 1.5 million cus- tomers and they will produce sales tax at the shops and bookstores. The hope is to bring Valleo to the level of Oak Ridge Mall [in San Jose] and generates about $4.2 million in saJes taxes," ~ ~ b-I,,\-